GEOTHERMAL ENERGY
Outline
1. Introduction
2. Geothermal Potential
Lahendong 5 20
Sibayak 10
Ulubelu 3
Lumutbalai 1
Salak 4 1
Additional 200 MWe power plant to the total installed capacity (1032 MWe)
8 Exploration wells and 20 exploitation wells with a total depth of about 57.5
km
3. Electricity Usage
Total energy mix in Indonesia
GEOTHERMAL
GAS
41.0% COAL
OIL BASED
HYDRO
9.0%
Total fossil fuel plants is still dominant (88%); Renewable power plants ~12%
The total installed capacity from geothermal power plants is about 1032 MWe
The largest geothermal installation is located in Salak Field (375 MWE ~36%
of the total installed geothermal capacity); operate by Chevron Geothermal
Salak
PLN 2007
4. Geothermal Operator
SIBAYAK Exploration stage 1476 MW
(PERTAMINA) SARULA Development stage 612,5 MW
10 MW (MEDCO)
220 MW Producing stage 1032 MW
Joint Operation Contract
BUKIT GEDANG - HULU LAIS
PGEs OWN
Kamojang PGE 30 110 60 200 2 Expt drilling for secure
steam supply
Salak CGS 180 195 375 4 Expl drilling for next dev
1 Expt drilling for secure
steam supply
Bedugul BEL
Dieng GDE 60 60
Patuha GDE
Working Draft - Last Modified 9/21/2007 9:33:36 AM Printed 9/21/2007 7:35:22 AM
4. Opportunities & Challenges
4. Opportunities & Challenges
P ihak L ain* B idding
C ompanies DJ MB P Minis try G overnor B upati
(S K Menteri ) T eam
Preliminary
Data Data
survey (PS)
WKP
administrn
Pre-qualification
Terminate No
Final
price A price B Assessment &
Evaluation
If Price A > Price B
Right to match with *
Winner Winner
Working Draft - Last Modified 9/21/2007 9:33:36 AM Printed 9/21/2007 7:35:22 AM
Thanks
4. Opportunities & Challenges
Total 680 MW
3. Electricity Usage
100%
30%
0%
2000 2001 2002 2003 2004 2005 2006 2007
Coal Gas Geothermal Hydro Oil
PLN 2007
4. Geothermal Operator
Field Operator 1983 1988 1994 1997 2000 2001 2002 2006 2007 2008 Total MWe
Own Operation 252
Kamojang PGE 30 110 60
Lahendong PGE 20 20