Вы находитесь на странице: 1из 4

RAJAMANDALA HYDROELECTRIC POWER PLANT 1X47MW

ANCHOR BOLT INSPECTION REPORT


Description : Date :

Location : Switchyard Area Drawing Ref. : HH-E-EC-SY-D2-2248

Check Item and Result

A. Visual check (Location and Material Verification)

B. Quantity check

C. Vertical and horizontal leveling check

D Check the distance between anchor bolt (before concrete pouring)

E Check the distance between anchor bolt (after concrete pouring)

No. Description A B C D E Remar

Prepared Inspected
by Sign/date by Sign/dat
X47MW

E-EC-SY-D2-22480

Remarks
Sign/date