Construction Tips
p
Doug Stohr – Lean Six Sigma Black Belt -- MINCO
1/14/2010 1
Presentation Topics
SIPOC Breakdown
Construction and Tips
Ranking Options
SIPOC uses and Purpose
p
SIPOC outputs -
SIPOC Examples / Details
1/14/2010 2
SIPOC – Definition
High Level Flow Chart which identifies:
Key Suppliers to Inputs of a process
Key Inputs to a process
The Process - transformation of the inputs – the
action steps
Outputs of the transformation of inputs
(CTQ CTR,CTD,CTC
(CTQ, CTR CTD CTC – requirements)
Customers the process Outputs serve
1/14/2010 3
SIPOC Details
SIPOC Construction
SIPOC Evaluation
SIPOC Loops
Know the S and C
Critical Steps
Share the knowledge
1/14/2010 4
SIPOC Construction
C t ti
Use a knowledgeable process team
(Critical) often cross functional
Start
St t with
ith Process
P – identify
id tif allll steps
t
List what is measured at process steps
Complete Outputs and if measured - list
Complete Inputs next – current state
1/14/2010 5
SIPOC Construction
C t ti
Complete Suppliers next
Complete Customers – check as a
supplier also and for any inputs
The SIPOC will help define a projects
scope
The SIPOC supports the Measure Stage –
when measurements are listed
The SIPOC diagram helps fence a
project’s
project s scope by defining IPO – creates
a visual guide for the project team
1/14/2010 6
SIPOC Construction
Tips
List all Suppliers -- is the
Customer a supplier (Loop)
Often Customers provide
critical information and or
materials
Inputs must link to a Supplier
Rank inputs for criticality to
process
1/14/2010 7
SIPOC Construction
Tips
If the
th Customer
C t is
i a supplier
li
with inputs --- list these.
The process itself --
transforms inputs – do not
over detail -- high level
process steps only
1/14/2010 8
SIPOC S – PCA / SMT Process –
Project Goal - Improve process FPY from 97% to
99.5%
S I P O
Suppliers Inputs Process Outputs
Provider
Stencil supplier
Paste Supplier
PCB Mfg
Stock Room
Component Kit
Eng.
Doc. Control
Eng.
Eng.
Plt Compressor
Conexus Power Co.
SIPOC – SI – PCA / SMT Process
S I P O
Suppliers Inputs Process Outputs
p requirements
Input q and
Provider measures
Stencil supplier Solder Stencil
Paste Supplier Solder Paste
PCB Mf
Mfg Bl k PCB
Blank
Stock Room Component Kit
Component Kit SMT Feeder setup
Eng. SMT Program
Doc. Control BOM
Plt Compressor Shop Air 4. Solder Screen print First PCB Passes Full Functional ET
Conexus Power Co. Elect 5. Verify first image registration of paste
6. Solder Paste Screen print PCBs Top side Meets Agency Callouts
7. Select correct SMT pick and place program
8. Load SMT line with component carriage feeders Meets ROHS if required
9
9. V
Verify
if pick
i k placement
l t tto P
Print
i t & BOM
Meets IPC Ionic
cleanness level - < 10 u
10. Populate first board and inspect gms/ cm
11. Select correct reflow program
12. Reflow one board and inspect
13. Select correct AOI program
14 Inspect first PCA with AOI
14.
15. Release and run line
End:
Completely populated and reflowed PCA Inspected and
confirmed by AOI .
Moves to:
Next operation or to packaging and shipping and then
shipped
pp to end customer.
SIPOC – COMPLETE – PCA / SMT Process
S I P O C
Suppliers Inputs Process Outputs Customers
Input requirements and Output requirements and
Provider measures Start: measures Receiver
Stencil supplier Solder Stencil Work Order Configured and sent to Mfg. Resources IPC 610 Class 2 Solder Electrical Test
Paste Supplier Solder Paste Stock Room issues kit to SMT joints Inspection
Mechanical
PCB Mfg Blank PCB Assembly
Correct components per
Stock Room Component Kit Customer print Wash
Component Kit SMT Feeder setup Post solder
Correct Polarity of Packaging &
Eng. SMT Program Components Shipping
Customer to Doc. OEM - Contract
Control BOM High-Level Process Description: Cust.
1. Setup and load component carriage feeders
Reflow Profile &
Eng. Program 2.Select correct solder paste and stencil Passes Board level ET
Eng. AOI Program 3.Select correct solder printer program
Passes Full Functional
Plt Compressor Shop Air 4. Solder Screen print First PCB ET
Conexus Power Co. Elect 5. Verify first image registration of paste
Customer Specifications 6. Solder Paste Screen print PCBs Top side Meets Agency Regs
7. Select correct SMT pick and place program
8. Load SMT line with component carriage feeders Meets ROHS if required
9. Verify pick placement to Print & BOM
Meets IPC Ionic
cleanness level - < 10 u
10. Populate first board and inspect gms/ cm
11. Select correct reflow program
12. Reflow one board and inspect
13. Select correct AOI program
14. Inspect first PCA with AOI
15. Release and run line
End:
S I P O C
Suppliers
S li IInputs
t Process
P Outputs
O t t Customers
C t
Input requirements and Output requirements and
Provider measures Start: Final Inspection Process measures Receiver
End
Inspection complete and results recorded and product
status marked and moved according to pass / fail status
SIPOC Analysis Tips
Use the SIPOC to identify Suppliers that may
impact project success
Stop and look at bad or problematic Suppliers
for action – may require action before project
started
Projects are directed at improving an output
Project
j scope
p fits inside the SIPOC
The Input Process Outputs define scope
1/14/2010 18
SIPOC Analysis Tips
Use VOC (Voice of the Customer)
Customer’s should agree with outputs
Have Customers review outputs
SIPOC helps find key customers of the Project -
by listing them
Rank SIPOC inputs and outputs to help
determine project focus – shows weak or risk
areas
Ranking helps a project with impact
1/14/2010 19
SIPOC – Critical Project Guidance Tool
– Benefits
Provides easy to see process
boundaries
Critical p
project
j scope
p tool
Easy to use
Fences project boundaries
Directs project effort
1/14/2010 20
SIPOC – Critical Project Guidance Tool
– Benefits
Stops a project from failing at
start by helping with a bad
supplier or input
Provides risk points – for
y
analysis
Supports VOC
Identifies C & M elements –
Constraints and measures
1/14/2010 21
SIPOC – Critical Project Guidance Tool
– Benefits
Provides CTQ,
CTR,CTD,CTC identifiers
Provides keyy customers
Provides key outputs and
measures
Acts as part of the project
road map
1/14/2010 22
Any
y Quest
Questions
o s
??????
THANK YOU
Best Regards
g Stohr
Doug
MINCO Lean Six Sigma Black Belt