OBRA:”CONSTRUCCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA I.

E 31410 EL BUEN SAMARITANO-COMUHUILLCA”

PROJECT INFORMATION

Project the Ingener : Marlene Yuz Velinda Mellisho Salas


Job No
Company Designer Remarks

Software CSICOL (Version: 8.2 (Rev. 2))


File Name C:\Program Files\Computers and Structures\CSiCol
\Column1

Working Units Metric (m, Ton, Ton-m, kg/cm^2)


Design Code ACI-318-02

Column:columna T Basic Design Parameters

Caption = columna T
Default Concrete Strength, Fc = 210 kg/cm^2
Default Concrete Modulus, Ec = 210000 kg/cm^2
Maximum Concrete Strain = 0.003 in/in

Rebar Set = ASTM


Default Rebar Yeild Strength, Fy = 4200 kg/cm^2
Default Rebar Modulus, Es = 2000000 kg/cm^2
Default Cover to Rebars = 4.00 cm
Maximum Steel Strain = Infinity

Transverse Rebar Type = Ties

Total Shapes in Section =1


Consider Slenderness = No

Section Diagram

Cross-section Shapes

Shape Width Height Conc Fcu S/S Curve Rebars


cm c m kg/cm'2
General Polygon 45.00 50.00 210.00 ACI-Whitney Rectangular 2-#4+5-#5

Rebar Properties

Sr.No Designation Area Cord-X Cord-Y Fy S/S Curve

C:\Program Files\Computers and Structures\CSiCol\Column 1. CDB Page 1


OBRA:”CONSTRUCCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA I.E 31410 EL BUEN SAMARITANO-COMUHUILLCA”

cm'2 cm cm kg/cm'2
1 #5 2.0 2.59 5.36 4200 Elasto-Plastic
2 #5 2.0 22.24 5.36 4200 Elasto-Plastic
3 #5 2.0 41.38 5.36 4200 Elasto-Plastic
4 #5 2.0 2.59 44.64 4200 Elasto-Plastic
5 #5 2.0 22.50 44.64 4200 Elasto-Plastic
6 #4 1.3 2.59 23.42 4200 Elasto-Plastic
7 #4 1.3 22.24 23.42 4200 Elasto-Plastic

+2-#4+5-#5
Total Area = 12.5 cm'2
Steel Ratio = 0.72 %
Basic Section Properties:

Total Width = 45.00 cm


Total Height = 50.00 cm
Center, Xo = 18.929 cm
Center, Yo = 21.429 cm

X-bar (Right) = 26.071 cm


X-bar (Left) = 18.929 cm
Y-bar (Top) = 28.571 cm
Y-bar (Bot) = 21.429 cm

Transformed Properties:
Base Materail = fc' = 210
kg/cm^2
Area, A = 1,750.0 cm^2
Inertia, Ixx = 3.42E+05 cm^4
Inertia, Iyy = 2.63E+05 cm^4
Inertia, Ixy = -1.00E+05 cm^4
Radius, rx = 13.985 cm
Radius, ry = 12.249 cm

Additional Section Properties:

Transformed Properties:
Base Materail = fc' = 210
kg/cm^2
Modulus, S3(Top) = 1 .20E+04 cm^3
Modulus, S3(Bot) = 1 .60E+04 cm^3
Modulus, S2(Left) = 1 .39E+04 cm^3
Modulus, S2(Right) = 1.01 E+04 cm^3

Plastic Modulus, Z3 = 2.03E+04 cm^3


Plastic Modulus, Z2 = 1 .77E+04 cm^3
Torsional, J = 3.05E+05 cm^4
Shear Area, A3 = 1,389.1 cm^2
Shear Area, A2 = 1,425.8 cm^2

Principal Angle = 34.182 Deg


Inertia, I33' = 4.10E+05 cm^4
Inertia, I22' = 1.94E+05 cm^4

Framing Along-X

Total C/C Length, Lc = 3.500 m


Unsupported Length, Lu = 3.000 m
Framing Type =4
Framing Case =0
K Factor, Braced = 1.00
Kl/r, Braced = 21.45
K Factor, Unbraced = 1.00
Kl/r, Unbraced = 21.45

Framing Along-Y

Total C/C Length, Lc = 3.500 m


Unsupported Length, Lu = 3.000 m
Framing Type =4
Framing Case =0

C:\Program Files\Computers and Structures\CSiCol\Column 1. CDB Page 2


OBRA:”CONSTRUCCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA I.E 31410 EL BUEN SAMARITANO-COMUHUILLCA”

K Factor, Braced = 1.00


Kl/r, Braced = 24.49
K Factor, Unbraced = 1.00
Kl/r, Unbraced = 24.49

Final Design Loads

Sr.No Combination Load Pu Mux-Bot Muy-Bot Mux-Top Muy-Top


ton ton-m ton-m ton-m ton-m
1 1.8CV 1.91 0.00 0.08 0.00 0.08
2 1.5CM 10.706 0.08 0.00 0.08 0.00
3 1.5CM+1.8CV 12.615 0.08 0.00 0.08 0.00
Result Summary

Sr.No Combination Pu (ton) Cap. Ratio-Bot Cap. Ratio- Remarks


Top
1 1 .8CV 1.91 0.011 0 . 0 1 1 Capacity OK
2 1.5CM 10.706 0.056 0 . 0 5 6 Capacity OK
3 1.5CM+1.8CV 12.615 0.066 0 . 0 6 6 Capacity OK
Moment Magnification Calculations

1.8CV- Along X

Bracing Condition = Non-Sway

Non-Sway Part of Loading:


Design Load, Pu = 0.000 ton
Sustained Load, Pud = 0.000 ton
End Moment, M1 = 0.00 ton-m
End Moment, M2 = 0.00 ton-m
Minimum Moment, Mmin = 0.00 ton-m
Design Moment, Mc = 0.00 ton-m

Creep Factor, Bd = 0.00


Section Stiffness, EI For Pcr = 0.00E+00 kg-cm^2
Euler Buckling Load, Pcr = 0.000 ton
Moment Factor, Cm = 0.000
Non-Sway Moment Magnifier = 1.00
Magnified Moment, Mc = 0.00 ton-m

1.8CV- Along Y

Bracing Condition = Non-Sway

Non-Sway Part of Loading:


Design Load, Pu = 0.000 ton
Sustained Load, Pud = 0.000 ton
End Moment, M1 = 0.00 ton-m
End Moment, M2 = 0.00 ton-m
Minimum Moment, Mmin = 0.00 ton-m
Design Moment, Mc = 0.00 ton-m

Creep Factor, Bd = 0.00


Section Stiffness, EI For Pcr = 0.00E+00 kg-cm^2
Euler Buckling Load, Pcr = 0.000 ton
Moment Factor, Cm = 0.000
Non-Sway Moment Magnifier = 1.00
Magnified Moment, Mc = 0.08 ton-m

1.5CM- Along X

Bracing Condition = Non-Sway

Non-Sway Part of Loading:


Design Load, Pu = 0.000 ton
Sustained Load, Pud = 0.000 ton
End Moment, M1 = 0.00 ton-m
End Moment, M2 = 0.00 ton-m

C:\Program Files\Computers and Structures\CSiCol\Column 1. CDB Page 3


OBRA:”CONSTRUCCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA I.E 31410 EL BUEN SAMARITANO-COMUHUILLCA”

Minimum Moment, Mmin = 0.00 ton-m


Design Moment, Mc = 0.00 ton-m

Creep Factor, Bd = 0.00


Section Stiffness, EI For Pcr = 0.00E+00 kg-cm^2
Euler Buckling Load, Pcr = 0.000 ton
Moment Factor, Cm = 0.000
Non-Sway Moment Magnifier = 1.00

Magnified Moment, Mc = 0.08 ton-m

1.5CM- Along Y

Bracing Condition = Non-Sway

Non-Sway Part of Loading:


Design Load, Pu = 0.000 ton
Sustained Load, Pud = 0.000 ton
End Moment, M1 = 0.00 ton-m
End Moment, M2 = 0.00 ton-m
Minimum Moment, Mmin = 0.00 ton-m
Design Moment, Mc = 0.00 ton-m

Creep Factor, Bd = 0.00


Section Stiffness, EI For Pcr = 0.00E+00 kg-cm^2
Euler Buckling Load, Pcr = 0.000 ton
Moment Factor, Cm = 0.000
Non-Sway Moment Magnifier = 1.00
Magnified Moment, Mc = 0.00 ton-m

1.5CM+1.8CV- Along X

Bracing Condition = Non-Sway

Non-Sway Part of Loading:


Design Load, Pu = 0.000 ton
Sustained Load, Pud = 0.000 ton
End Moment, M1 = 0.00 ton-m
End Moment, M2 = 0.00 ton-m
Minimum Moment, Mmin = 0.00 ton-m
Design Moment, Mc = 0.00 ton-m

Creep Factor, Bd = 0.00


Section Stiffness, EI For Pcr = 0.00E+00 kg-cm^2
Euler Buckling Load, Pcr = 0.000 ton
Moment Factor, Cm = 0.000
Non-Sway Moment Magnifier = 1.00
Magnified Moment, Mc = 0.08 ton-m

1.5CM+1.8CV- Along Y

Bracing Condition = Non-Sway

Non-Sway Part of Loading:


Design Load, Pu = 0.000 ton
Sustained Load, Pud = 0.000 ton
End Moment, M1 = 0.00 ton-m
End Moment, M2 = 0.00 ton-m
Minimum Moment, Mmin = 0.00 ton-m
Design Moment, Mc = 0.00 ton-m
Creep Factor, Bd = 0.00
Section Stiffness, EI For Pcr = 0.00E+00 kg-cm^2
Euler Buckling Load, Pcr = 0.000 ton
Moment Factor, Cm = 0.000
Non-Sway Moment Magnifier = 1.00
Magnified Moment, Mc = 0.00 ton-m

Column:Column L

Basic Design Parameters

C:\Program Files\Computers and Structures\CSiCol\Column 1. CDB Page 4


OBRA:”CONSTRUCCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA I.E 31410 EL BUEN SAMARITANO-COMUHUILLCA”

Caption = Column L
Default Concrete Strength, Fc = 210 kg/cm^2
Default Concrete Modulus, Ec = 210000 kg/cm^2
Maximum Concrete Strain = 0.003 in/in

Rebar Set = ASTM


Default Rebar Yeild Strength, Fy = 4200 kg/cm^2
Default Rebar Modulus, Es = 2000000 kg/cm^2
Default Cover to Rebars = 4.00 cm
Maximum Steel Strain = Infinity

Transverse Rebar Type = Ties

Total Shapes in Section =1


Consider Slenderness = No

Section Diagram

Cross-section Shapes

Shape Width Height Conc Fcu S/S Curve Rebars


cm cm kg/cm^2
General Polygon 55.00 50.00 21 0.00 ACI-Whitney Rectangular 10-#5

Rebar Properties

Sr.No Designation Area Cord-X Cord-Y Fy S/S Curve


cm^2 cm cm kg/cm^2
1 #5 2.0 3.28 45.93 4200 Elasto-Plastic
2 #5 2.0 18.24 45.93 4200 Elasto-Plastic
3 #5 2.0 36.50 45.93 4200 Elasto-Plastic
4 #5 2.0 52.25 45.93 4200 Elasto-Plastic
5 #5 2.0 52.25 28.87 4200 Elasto-Plastic
6 #5 2.0 3.28 28.01 4200 Elasto-Plastic
7 #5 2.0 18.50 3.06 4200 Elasto-Plastic
8 #5 2.0 36.50 3.06 4200 Elasto-Plastic
9 #5 2.0 18.50 27.72 4200 Elasto-Plastic
10 #5 2.0 37.03 27.44 4200 Elasto-Plastic

+10-#5
Total Area = 19.9 cm^2
Steel Ratio = 1.00 %
Basic Section Properties:

Total Width = 55.00 cm


Total Height = 50.00 cm
Center, Xo = -0.329 cm
Center, Yo = -3.335 cm

C:\Program Files\Computers and Structures\CSiCol\Column 1. CDB Page 5


OBRA:”CONSTRUCCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA I.E 31410 EL BUEN SAMARITANO-COMUHUILLCA”

X-bar (Right) = 27.329 cm


X-bar (Left) = 27.671 cm
Y-bar (Top) = 20.335 cm
Y-bar (Bot) = 29.665 cm

Transformed Properties:
Base Materail = fc' = 210
kg/cm^2
Area, A = 1,987.5 cm^2
Inertia, Ixx = 3.72E+05 cm^4
Inertia, Iyy = 3.70E+05 cm^4
Inertia, Ixy = 1.25E+03 cm^4

Radius, rx= 13.683 cm


Radius, ry= 13.642 cm

Additional Section Properties:

Transformed Properties:
Base Materail = fc' = 210
kg/cm^2
Modulus, S3(Top) = 1 .83E+04 cm^3
Modulus, S3(Bot) = 1 .25E+04 cm^3
Modulus, S2(Left) = 1 .34E+04 cm^3
Modulus, S2(Right) = 1 .35E+04 cm^3

Plastic Modulus, Z3 = 2.44E+04 cm^3


Plastic Modulus, Z2 = 2.33E+04 cm^3
Torsional, J = 3.87E+05 cm^4
Shear Area, A3 = 1,571.7 cm^2
Shear Area, A2 = 1,827.4 cm^2

Principal Angle = -24.137 Deg


Inertia, I33' = 3.73E+05 cm^4
Inertia, I22' = 3.69E+05 cm^4

Framing Along-X

Total C/C Length, Lc = 3.500 m


Unsupported Length, Lu = 3.000 m
Framing Type =4
Framing Case =0
K Factor, Braced = 1.00
Kl/r, Braced = 21.92

K Factor, Unbraced = 1.00


Kl/r, Unbraced = 21.92

Framing Along-Y

Total C/C Length, Lc = 3.500 m


Unsupported Length, Lu = 3.000 m
Framing Type =4
Framing Case =0
K Factor, Braced = 1.00
Kl/r, Braced = 21.99
K Factor, Unbraced = 1.00
Kl/r, Unbraced = 21.99

Final Design Loads

Sr.No Combination Load Pu Mux-Bot Muy-Bot Mux-Top Muy-Top


ton ton-m ton-m ton-m ton-m
1 1.8CV 3.753 0.007 0.025 0.007 0.025
2 1.5CM 16.08 0.025 0.007 0.025 0.007
3 1.5CM+1.8CV 19.833 0.025 0.007 0.025 0.007
Result Summary

Sr.No Combination Pu (ton) Cap. Ratio-Bot Cap. Ratio- Remarks

C:\Program Files\Computers and Structures\CSiCol\Column 1. CDB Page 6


OBRA:”CONSTRUCCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA I.E 31410 EL BUEN SAMARITANO-COMUHUILLCA”

Top
1 1.8CV 3.753 0.016 0 . 0 1 6 Capacity OK
2 1.5CM 16.08 0.071 0 . 0 7 1 Capacity OK
3 1.5CM+1.8CV 19.833 0.087 0 . 0 8 7 Capacity OK

Moment Magnification Calculations

1.8CV- Along X

Bracing Condition = Non-Sway

Non-Sway Part of Loading:


Design Load, Pu = 0.000 ton
Sustained Load, Pud = 0.000 ton
End Moment, M1 = 0.00 ton-m
End Moment, M2 = 0.00 ton-m
Minimum Moment, Mmin = 0.00 ton-m
Design Moment, Mc = 0.00 ton-m

Creep Factor, Bd = 0.00


Section Stiffness, EI For Pcr = 0.00E+00 kg-cm^2
Euler Buckling Load, Pcr = 0.000 ton
Moment Factor, Cm = 0.000
Non-Sway Moment Magnifier = 1.00
Magnified Moment, Mc = 0.01 ton-m

1.8CV- Along Y

Bracing Condition = Non-Sway

Non-Sway Part of Loading:


Design Load, Pu = 0.000 ton
Sustained Load, Pud = 0.000 ton
End Moment, M1 = 0.00 ton-m
End Moment, M2 = 0.00 ton-m
Minimum Moment, Mmin = 0.00 ton-m
Design Moment, Mc = 0.00 ton-m

Creep Factor, Bd = 0.00


Section Stiffness, EI For Pcr = 0.00E+00 kg-cm^2
Euler Buckling Load, Pcr = 0.000 ton
Moment Factor, Cm = 0.000
Non-Sway Moment Magnifier = 1.00
Magnified Moment, Mc = 0.03 ton-m

1.5CM- Along X

Bracing Condition = Non-Sway

Non-Sway Part of Loading:


Design Load, Pu = 0.000 ton
Sustained Load, Pud = 0.000 ton
End Moment, M1 = 0.00 ton-m
End Moment, M2 = 0.00 ton-m
Minimum Moment, Mmin = 0.00 ton-m
Design Moment, Mc = 0.00 ton-m

Creep Factor, Bd = 0.00


Section Stiffness, EI For Pcr = 0.00E+00 kg-cm^2
Euler Buckling Load, Pcr = 0.000 ton
Moment Factor, Cm = 0.000
Non-Sway Moment Magnifier = 1.00
Magnified Moment, Mc = 0.03 ton-m

1.5CM- Along Y

Bracing Condition = Non-Sway

Non-Sway Part of Loading:


Design Load, Pu = 0.000 ton
Sustained Load, Pud = 0.000 ton
End Moment, M1 = 0.00 ton-m

C:\Program Files\Computers and Structures\CSiCol\Column 1. CDB Page 7


OBRA:”CONSTRUCCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA I.E 31410 EL BUEN SAMARITANO-COMUHUILLCA”

End Moment, M2 = 0.00 ton-m


Minimum Moment, Mmin = 0.00 ton-m
Design Moment, Mc = 0.00 ton-m

Creep Factor, Bd = 0.00


Section Stiffness, EI For Pcr = 0.00E+00 kg-cm^2
Euler Buckling Load, Pcr = 0.000 ton
Moment Factor, Cm = 0.000
Non-Sway Moment Magnifier = 1.00
Magnified Moment, Mc = 0.01 ton-m

1.5CM+1.8CV- Along X

Bracing Condition = Non-Sway

Non-Sway Part of Loading:


Design Load, Pu = 0.000 ton
Sustained Load, Pud = 0.000 ton
End Moment, M1 = 0.00 ton-m
End Moment, M2 = 0.00 ton-m
Minimum Moment, Mmin = 0.00 ton-m
Design Moment, Mc = 0.00 ton-m

Creep Factor, Bd = 0.00


Section Stiffness, EI For Pcr = 0.00E+00 kg-cm^2
Euler Buckling Load, Pcr = 0.000 ton
Moment Factor, Cm = 0.000
Non-Sway Moment Magnifier = 1.00
Magnified Moment, Mc = 0.03 ton-m

1.5CM+1.8CV- Along Y

Bracing Condition = Non-Sway

Non-Sway Part of Loading:


Design Load, Pu = 0.000 ton
Sustained Load, Pud = 0.000 ton
End Moment, M1 = 0.00 ton-m
End Moment, M2 = 0.00 ton-m
Minimum Moment, Mmin = 0.00 ton-m
Design Moment, Mc = 0.00 ton-m
Creep Factor, Bd = 0.00
Section Stiffness, EI For Pcr = 0.00E+00 kg-cm^2
Euler Buckling Load, Pcr = 0.000 ton
Moment Factor, Cm = 0.000
Non-Sway Moment Magnifier = 1.00
Magnified Moment, Mc = 0.01 ton-m

Column:Columnrectangular

Basic Design Parameters

Caption =
Columnrectang ular
Default Concrete Strength, Fc = 210 kg/cm^2
Default Concrete Modulus, Ec = 210000 kg/cm^2
Maximum Concrete Strain = 0.003 in/in

Rebar Set= ASTM


Default Rebar Yeild Strength, Fy = 4200 kg/cm^2
Default Rebar Modulus, Es = 2000000 kg/cm^2
Default Cover to Rebars = 4.00 cm
Maximum Steel Strain = Infinity

Transverse Rebar Type = Ties

Total Shapes in Section =1


Consider Slenderness = No

C:\Program Files\Computers and Structures\CSiCol\Column 1. CDB Page 8


OBRA:”CONSTRUCCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA I.E 31410 EL BUEN SAMARITANO-COMUHUILLCA”

Section Diagram

Cross-section Shapes

Shape Width Height Conc Fcu S/S Curve Rebars


cm cm kg/cm^2
Rectangular 25.00 30.00 210.00 ACI-Whitney
Rectangular 6-#4
Shape
Rebar Properties

Sr.No Designation Area Cord-X Cord-Y Fy S/S Curve


cm^2 cm cm kg/cm^2
1 #4 1.3 4.64 4.64 4200 Elasto-Plastic
2 #4 1.3 4.64 25.36 4200 Elasto-Plastic
3 #4 1.3 20.36 25.36 4200 Elasto-Plastic
4 #4 1.3 20.36 4.64 4200 Elasto-Plastic
5 #4 1.3 4.64 15.00 4200 Elasto-Plastic
6 #4 1.3 20.04 14.91 4200 Elasto-Plastic

+6-#4
Total Area = 7.7 cm^2
Steel Ratio = 1.03 %
Basic Section Properties:

Total Width = 25.00 cm


Total Height = 30.00 cm
Center, Xo = 0.00 cm
Center, Yo = 0.00 cm

X-bar (Right) = 12.50 cm


X-bar (Left) = 12.50 cm
Y-bar (Top) = 15.00 cm
Y-bar (Bot) = 15.00 cm

Transformed Properties:
Base Materail = fc' = 210
kg/cm^2
Area, A = 750.00 cm^2
Inertia, Ixx = 5.63E+04 cm^4
Inertia, Iyy = 3.91E+04 cm^4
Inertia, Ixy = 0.00E+00 cm^4

Radius, rx= 8.66 cm


Radius, ry= 7.217 cm

Additional Section Properties:

Transformed Properties:
Base Materail = fc' = 210
kg/cm^2

C:\Program Files\Computers and Structures\CSiCol\Column 1. CDB Page 9


OBRA:”CONSTRUCCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA I.E 31410 EL BUEN SAMARITANO-COMUHUILLCA”

Modulus, S3(Top) = 3,750.0 cm^3


Modulus, S3(Bot) = 3,750.0 cm^3
Modulus, S2(Left) = 3,125.0 cm^3
Modulus, S2(Right) = 3,125.0 cm^3

Plastic Modulus, Z3 = 5,966.5 cm^3


Plastic Modulus, Z2 = 4,804.4 cm^3
Torsional, J = 80,251.7 cm^4
Shear Area, A3 = 631.57 cm^2
Shear Area, A2 = 624.47 cm^2

Principal Angle = 0.00E+00 Deg


Inertia, I33' = 5.63E+04 cm^4
Inertia, I22' = 3.91E+04 cm^4

Framing Along-X

Total C/C Length, Lc = 3.500 m


Unsupported Length, Lu = 3.000 m
Framing Type =4
Framing Case =0
K Factor, Braced = 1.00
Kl/r, Braced = 34.64
K Factor, Unbraced = 1.00

Kl/r, Unbraced = 34.64

Framing Along-Y

Total C/C Length, Lc = 3.500 m


Unsupported Length, Lu = 3.000 m
Framing Type =4
Framing Case =0
K Factor, Braced = 1.00
Kl/r, Braced = 41.57
K Factor, Unbraced = 1.00
Kl/r, Unbraced = 41.57

Final Design Loads

Sr.No Combination Load Pu Mux-Bot Muy-Bot Mux-Top Muy-Top


ton ton-m ton-m ton-m ton-m
1 1.5CV 1.193 0.007 0.025 0.007 0.025
2 1.8CM 5.655 0.025 0.007 0.025 0.007
3 1.8CM+1.5CV 6.848 0.025 0.007 0.025 0.007
Result Summary

Sr.No Combination Pu (ton) Cap. Ratio-Bot Cap. Ratio- Remarks


Top
1 1.5CV 1.193 0.014 0 . 0 1 4 Capacity OK
2 1.8CM 5.655 0.065 0 . 0 6 5 Capacity OK
3 1 .8CM+1 .5CV 6.848 0.079 0 . 0 7 9 Capacity OK
Moment Magnification Calculations

1.5CV- Along X

Bracing Condition = Non-Sway

Non-Sway Part of Loading:


Design Load, Pu = 0.000 ton
Sustained Load, Pud = 0.000 ton
End Moment, M1 = 0.00 ton-m
End Moment, M2 = 0.00 ton-m
Minimum Moment, Mmin = 0.00 ton-m
Design Moment, Mc = 0.00 ton-m

Creep Factor, Bd = 0.00


Section Stiffness, EI For Pcr = 0.00E+00 kg-cm^2

C:\Program Files\Computers and Structures\CSiCol\Column 1. CDB Page 10


OBRA:”CONSTRUCCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA I.E 31410 EL BUEN SAMARITANO-COMUHUILLCA”

Euler Buckling Load, Pcr = 0.000 ton


Moment Factor, Cm = 0.000
Non-Sway Moment Magnifier = 1.00
Magnified Moment, Mc = 0.01 ton-m

1.5CV- Along Y

Bracing Condition = Non-Sway

Non-Sway Part of Loading:


Design Load, Pu = 0.000 ton
Sustained Load, Pud = 0.000 ton
End Moment, M1 = 0.00 ton-m
End Moment, M2 = 0.00 ton-m
Minimum Moment, Mmin = 0.00 ton-m
Design Moment, Mc = 0.00 ton-m

Creep Factor, Bd = 0.00

Section Stiffness, EI For Pcr = 0.00E+00 kg-cm^2


Euler Buckling Load, Pcr = 0.000 ton
Moment Factor, Cm = 0.000
Non-Sway Moment Magnifier = 1.00
Magnified Moment, Mc = 0.03 ton-m

1.8CM- Along X

Bracing Condition = Non-Sway

Non-Sway Part of Loading:


Design Load, Pu = 0.000 ton
Sustained Load, Pud = 0.000 ton
End Moment, M1 = 0.00 ton-m
End Moment, M2 = 0.00 ton-m
Minimum Moment, Mmin = 0.00 ton-m
Design Moment, Mc = 0.00 ton-m

Creep Factor, Bd = 0.00


Section Stiffness, EI For Pcr = 0.00E+00 kg-cm^2
Euler Buckling Load, Pcr = 0.000 ton
Moment Factor, Cm = 0.000
Non-Sway Moment Magnifier = 1.00
Magnified Moment, Mc = 0.03 ton-m

1.8CM- Along Y

Bracing Condition = Non-Sway

Non-Sway Part of Loading:


Design Load, Pu = 0.000 ton
Sustained Load, Pud = 0.000 ton
End Moment, M1 = 0.00 ton-m
End Moment, M2 = 0.00 ton-m
Minimum Moment, Mmin = 0.00 ton-m
Design Moment, Mc = 0.00 ton-m

Creep Factor, Bd = 0.00


Section Stiffness, EI For Pcr = 0.00E+00 kg-cm^2
Euler Buckling Load, Pcr = 0.000 ton
Moment Factor, Cm = 0.000
Non-Sway Moment Magnifier = 1.00
Magnified Moment, Mc = 0.01 ton-m

1.8CM+1.5CV- Along X

Bracing Condition = Non-Sway

Non-Sway Part of Loading:


Design Load, Pu = 0.000 ton
Sustained Load, Pud = 0.000 ton
End Moment, M1 = 0.00 ton-m

C:\Program Files\Computers and Structures\CSiCol\Column 1. CDB Page 11


OBRA:”CONSTRUCCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA I.E 31410 EL BUEN SAMARITANO-COMUHUILLCA”

End Moment, M2 = 0.00 ton-m


Minimum Moment, Mmin = 0.00 ton-m
Design Moment, Mc = 0.00 ton-m

Creep Factor, Bd = 0.00


Section Stiffness, EI For Pcr = 0.00E+00 kg-cm^2
Euler Buckling Load, Pcr = 0.000 ton
Moment Factor, Cm = 0.000
Non-Sway Moment Magnifier = 1.00
Magnified Moment, Mc = 0.03 ton-m

1.8CM+1.5CV- Along Y

Bracing Condition = Non-Sway

Non-Sway Part of Loading:


Design Load, Pu = 0.000 ton
Sustained Load, Pud = 0.000 ton
End Moment, M1 = 0.00 ton-m
End Moment, M2 = 0.00 ton-m
Minimum Moment, Mmin = 0.00 ton-m
Design Moment, Mc = 0.00 ton-m

Creep Factor, Bd = 0.00


Section Stiffness, EI For Pcr = 0.00E+00 kg-cm^2
Euler Buckling Load, Pcr = 0.000 ton
Moment Factor, Cm = 0.000
Non-Sway Moment Magnifier = 1.00
Magnified Moment, Mc = 0.01 ton-m

Moment Interaction Surface

Moment-Curvature Curve (Angle = 0)

C:\Program Files\Computers and Structures\CSiCol\Column 1. CDB Page 12


OBRA:”CONSTRUCCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA I.E 31410 EL BUEN SAMARITANO-COMUHUILLCA”

Neutral Axis Location: Loading-3 (Bot)

Elastic Stresses: Loading-3 (Bot)

Cracked Stresses: Loading-3 (Bot)

C:\Program Files\Computers and Structures\CSiCol\Column 1. CDB Page 13


OBRA:”CONSTRUCCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA I.E 31410 EL BUEN SAMARITANO-COMUHUILLCA”

Rebar Stresses: Loading-3 (Bot)

Moment Interaction Surface

Moment-Moment Interaction

C:\Program Files\Computers and Structures\CSiCol\Column 1. CDB Page 14


OBRA:”CONSTRUCCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA I.E 31410 EL BUEN SAMARITANO-COMUHUILLCA”

Moment-Curvature Curve (Angle = 0)

Moment-Curvature Curve (Angle = 0)

Elastic Stresses: Loading-3 (Bot)

C:\Program Files\Computers and Structures\CSiCol\Column 1. CDB Page 15


OBRA:”CONSTRUCCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA I.E 31410 EL BUEN SAMARITANO-COMUHUILLCA”

Cracked Stresses: Loading-3 (Bot)

Cracked Stresses: Loading-3 (Bot)

Moment Interaction Surface

C:\Program Files\Computers and Structures\CSiCol\Column 1. CDB Page 16


OBRA:”CONSTRUCCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA I.E 31410 EL BUEN SAMARITANO-COMUHUILLCA”

Moment-Curvature Curve (Angle = 0)

Neutral Axis Location: Loading-3 (Bot)

Elastic Stresses: Loading-3 (Bot)

C:\Program Files\Computers and Structures\CSiCol\Column 1. CDB Page 17


OBRA:”CONSTRUCCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA I.E 31410 EL BUEN SAMARITANO-COMUHUILLCA”

Cracked Stresses: Loading-3 (Bot)

Cracked Stresses: Loading-3 (Bot)

C:\Program Files\Computers and Structures\CSiCol\Column 1. CDB Page 18

Вам также может понравиться