DAILY REPORT ENGINEERING

Project name : Bontang New Power Facilities / Transmission 20 and 70 kV


Location : Bontang. Kalimantan Timur
Owner : PT. Indominco Mandiri
Consultant :-
Contractor : MIA Consortium (Multicom-Areva)

Date :

PROGRES TARGET
NO ACTIVITY TODAY CUM FINISH CONSTRAINT NOTE
% % Date

A SURVEY AND SITE VISIT

B DESIGN AND CALCULATION

C DRAWING

D REPORT ENGINEERING

Prepared by : Acknowledge by : Approved by :

(Signature, Name, Date ) (Signature, Name, Date ) (Signature, Name, Date )


SCOPE WORKS
Project engineering

NO SCOPE SPESIFICATION
SURVEY DESIGN DRAWING CLARIFICATION MTQ/BTQ SHOP DRAWING
DESCRIPTION
SHEET CONTROL
SCOPE OF WORKS ENGINEERING

Project :………………………………………
Owner :………………………………………
Location :………………………………………

NO DESCRIPTION SPECIFICATION

SURVEY

DESIGN

DRAWING

QUANTITY
SURVEYOR

SHOP DRAWING

AS-BUILT DRAWING
DATE VOLUME CONFIRM
Project Name :
Project No. :
Owner :
Study :
Revision :
Project name :
Location : Bontang. Kalimantan Timur
Owner : PT. Indominco Mandiri
Consultant :-
Contractor : PT. Multicom Intermitra

Departement : Engineering
Date :

NO DESCRIPTION
SPESIFICATION UNIT QTY REMARK