REPORT May 2, 2018

BY: Commissioner Wade Fleming, Chairperson, Local Road Improvement Program Subcommittee
IN RE: LOCAL ROAD IMPROVEMENT PROGRAM SUBCOMMITTEE – APPROVAL OF 2018 PILOT
LOCAL ROAD IMPROVEMENT PROGRAM PROJECT APPLICATIONS – ROUND TWO
To the Oakland County Board of Commissioners and the Finance Committee
Chairperson, Ladies and Gentlemen:
The Local Road Improvement Program Subcommittee, having met on April 26, 2018, recommends that the
following applications for the 2018 Pilot Local Road Improvement Projects be approved:

COMMUNITY DATE OF COUNTY PROJECT DESCRIPTION PROJECT


APPLICATION CONTRIBUTION BUDGET
CITY OF AUBURN April 13, 2018 $46,934 Rehabilitation of Giddings Road $1,444,000
HILLS
CITY OF April 19, 2018 $24,110 Improve road surface of Griffin Ave., just $50,000
BERKLEY north of 12 Mile
VILLAGE OF April 12, 2018 $16,801 Reconstruct/Resurface 14 Mile Rd. from $300,672
BEVERLY HILLS Lahser Rd., west to west Village limits
CITY OF April 13, 2018 $19,646 Improvements to 14 Mile Road, Washington $1,593,448.48
CLAWSON Ave. to Bellevue Ave., Main St. and
Broadacre Ave. to Gardner Ave., which
includes repair of drainage, water and sewer
structures. There will also be one pedestrian
crossing location added.
CITY OF April 17, 2018 $18,325 Improve local and major roads within the City $1,904,791
FARMINGTON of Farmington and improve pedestrian
crossings

CITY OF HAZEL April 11, 2018 $30,209 Remove and replace asphalt on East $65,290
PARK Woodward Heights Boulevard from Battelle
Avenue to Hazelwood Avenue
VILLAGE OF April 17, 2018 $12,106 Remove and replace concrete curb and $53,000
HOLLY roadway on Battle Alley and Alley Street.
Improvements to the storm system.
CITY OF March 28, 2018 $14,035 Resurfacing of Sunnybrook from Rackham to $41,000
LATHRUP Rainbow
VILLAGE
VILLAGE OF April 16, 2018 $13,163 Supplement existing plans to repair various $28,163+
MILFORD asphalt and concrete roads throughout the
Village.
CITY OF NOVI April 13, 2018 $244,897 (accrued Realignment of Flint Street between Grand $1,521,000
over 3 years) River Avenue and Novi Road

CITY OF OAK April 12, 2018 $96,863 (accrued Closing of the intersection at W. Nine Mile $193,779
PARK over 3 years) Rd. and Sherman St. to construct an
engaging public space.
CITY OF April 16, 2018 $8,865 2018 hot mix asphalt resurfacing project on $648,178.98
PLEASANT Ridge Rd., Indiana Rd. and Bermuda Rd.
RIDGE
CITY OF April 19, 2018 $22,681 Hot mix asphalt resurfacing on Bloomer $100,000
ROCHESTER Road, including the replacement of asphalt
curb.
CITY OF WALLED April 21, 2018 $13,556 Remove/replace asphalt on Quiniff Dr. and $32,928
LAKE Chestnut Ridge and replace 1 manhole, 72 ft.
of 15 in. concrete pipe & repave Arvida St.
CITY OF WIXOM April 19, 2018 $29,566 Joint and crack pavement sealing, legend $71,566
placements, pavement repair and pavement
replacement for a number of industrial roads
in Wixom.
LOCAL ROAD IMPROVEMENT SUBCOMMITTEE VOTE:
Motion carried unanimously on a roll call vote.
COMMUNITY DATE OF COUNTY PROJECT DESCRIPTION PROJECT
APPLICATION CONTRIBUTION BUDGET
VILLAGE OF April 18, 2018 $7,509 Construct pathway to run along east side of $25,600
WOLVERINE Benstein Road and connect Clara Miller Park (estimated)
LAKE to Glengary Road
TOTAL FY 2018 COUNTY $619,266
CONTRIBUTION – ROUND TWO

MULTI-YEAR COMMUNITIES

COMMUNITY DATE OF PROJECT BUDGET YEARS ACCRUED


APPLICATION
VILLAGE OF OXFORD April 19, 2018 $56,754 2017, 2018
CITY OF SOUTHFIELD April 18, 2018 $1,200,000 2018, 2019

Chairperson, on behalf of the Local Road Improvement Program Subcommittee, I submit the foregoing
report.

__________________________________
Commissioner Wade Fleming, District #16
Chairperson, LRIP Subcommittee