PROJECT DATA
• Location: Office Unit P-02-02, Level Podium, Block A
• Site Address: Tropicana Avenue, No.12, Persiaran
Tropicana, Pju 3, 47410 Petaling Jeya, Selangor
SCOPE OF WORK
Scope of work outlined in this document includes
Retail/Service unit fit out work and services to Unit P-02-02
of the Tropicana Avenue complex.
The spaces are to be fitted out with the following facilities:
• Reception for Pusat Asuhan Keluarga (Family Insight
Centre)
• Office
• Meeting Room (providing for 35 people)
• Flexible Workspace (providing for 6 people)
• Store Room
• Cleaners
• Kitchen (providing for 40 people)
OTHER PREMISES
Other premises connected to the operation of WPS
Resources SDN BHD but not forming part of the fitout work
described in this document:
• Office Unit A-08-01, Level 2 Block A, Tropicana Avenue
• 15x 1-Bedroom Apartment, Block B, Tropicana Avenue
Architectural
ANALYSIS Layouts Visuals Physics Finishes Appendix
SITE PLAN
FOR TENDER: 26 December 2016 WPS 3
M Y S S E R V I C E F I T O U T
Fire Stair
LOOKING TOWARD FRONT OF UNIT LOOKING TOWARD BACK OF UNIT
Lift Lobby LOOKING TOWARD BACK OF UNIT OUTSIDE BACK OF UNIT. AC HANGER OUTSIDE BACK OF UNIT
Fire Stair
AREA m2
GIA 152 m2
USAGE Qty
Workspace 8
S-07 Meeting 1
S-04
S-03
ROOM NO. ROOM NAME m2
S-01 Office 8
S-02 S-02 Insight Family 19
S-06
S-03 Meeting 31
S-04 Corridor 13
S-06 Cleaner 5
S-07 Store 9
USAGE AREA m²
Major ren. - m²
Maintenance - m²
FLOOR PLAN
Note: All loose furniture and office equipment shown for illustrative purpose only. For loose furniture items to be included as
part of this contract, refer to separate document – “ C o n t r a c t o r S u p p l i e d F u r n i t u r e ”
Architectural Key Plan
Analysis LAYOUTS Visuals Physics Finishes Appendix
FLOOR PLAN
FOR TENDER: 26 December 2016 WPS 5
M Y S S E R V I C E F I T O U T
S-05
S-06 S-08
S-01
Note: All loose furniture and office equipment shown for illustrative purpose only. For loose furniture items to be included as
part of this contract, refer to separate document – “ C o n t r a c t o r S u p p l i e d F u r n i t u r e ”
Architectural Key Plan
Analysis Layout VISUALS Physics Finishes Appendix
VIEW 1
FOR TENDER: 26 December 2016 WPS 6
M Y S S E R V I C E F I T O U T
View 2 View 3
TV bracket supplied
by owner, installed
by Contractor
Loose Furniture by
Wall art by owner owner
View 4 View 5
3 4
5
2
Note: All loose furniture and office equipment shown for illustrative purpose only. For loose furniture items to be included as
part of this contract, refer to separate document – “ C o n t r a c t o r S u p p l i e d F u r n i t u r e ”
Architectural Key Plan
Analysis Layout VISUALS Physics Finishes Appendix
VIEW 2 to 5
FOR TENDER: 26 December 2016 WPS 7
M Y S S E R V I C E F I T O U T
Existing zone
Egress Path
Fire Extinguisher
(supplied by owner,
installed by contractor)
OPTION:
FOLD BACK OFFICE WALL
Parameters: Include in the tender an option
S-01 for this wall to be a bi-fold partition . If
glazed include blinds for privacy.
Height: Floor to underside of ceiling
Acoustic rating: 41 dB reduction
Example Construction method:
FLOOR PLAN
Note: All loose furniture and office equipment shown for illustrative purpose only. For loose furniture items to be included as
part of this contract, refer to separate document – “ C o n t r a c t o r S u p p l i e d F u r n i t u r e ”
Architectural Key Plan
Analysis Layouts Visuals PHYSICS Finishes Appendix
WALL CONSTRUCTION
FOR TENDER: 26 December 2016 WPS 8
M Y S S E R V I C E F I T O U T
NEW / UPGRADE KEY
New door
Blinds to window
25mm horixontal slats
venetial blinds (refer colour
S-01 schedule)
TV 1 TV 3
SHOPFRONT ABBREVIATIONS
SHOPFRONT REQUIREMENTS
Contractor shall provide structural support at FP Fixed Powdercoated aluminium panel
the top of the shopfront as well as
intermediate vertical support in order to FG Fixed glazing panel
comply with the following minimum structural
requirements: FR Powdercoated Alumnium glazing frame
• Basic wind pressure = 1000 Pa
• Wind pressures: S Silicon Butt Joint, Glazing Edges to be Arrissed
P - Permissible stress = 2000 Pa
- Serviceability = 1700 Pa Privacy Film
G
- Ultimate = 2500 Pa Horizontal Bands of varying thickness (inidcative
• Toughened laminated glass. P
only, graphic design to be approved by owner
Retain roller shutter security doors. Centre of before installation.
column/vertical support must align with centre
of existing roller shutter guide. Nominal 40mm clear glazing gap between privacy
G
film
SAMPLE SHOPFRONT ELEVATION
NOTES:
Note: All loose furniture and office equipment shown for illustrative purpose only. For loose furniture items to be included as
part of this contract, refer to separate document – “ C o n t r a c t o r S u p p l i e d F u r n i t u r e ”
Architectural Key Plan
Analysis Layouts Visuals PHYSICS Finishes Appendix
AV ENABLING WORKS
FOR TENDER: 26 December 2016 WPS 10
M Y S S E R V I C E F I T O U T
AUDIO VIDEO (AV) CABINET Please Note: 4. Ceiling speakers and ceiling mounted camera on telescopic pole
The details on this page identify the owners cabinetry requirements 1. Power Outlets are required in the exact locations shown on this will be wired back to AV cabinet and installed by owner in future
for the AV cabinet to be located at the back of the meeting room. Diagram. and are not included in this contract.
Specific existing AV equipment supplied by the owner shall be re- 2. Data Network installation by separate contractor, coordinate
used. This drawing is a requirement rather than a sample. power outlet location with data outlet location and/or trunking
The cabinet can be constructed from solid surface material, laminate installation
and/or 2 pack polyurethane paint body and must match the colour 3. All SDI and volume control cabling to be reticulated back to
scheme presented in this document. Ensure the construction of the meeting room AV cabinet Brush Cable entry. SDI and volume
AV cabinet can support the weight of all equipment and load imposed control cable reticulation, outlets and volume control plates
by the user. supplied and installed by owner in future. ITEMS HOUSED IN THE AV CABINET
Keyboard drawer on
FMA 05 slide out runners Supply and install by contractor
450mm deep nominal
SAMPLE COUNTER
SUPPLY: CONTRACTOR
FKB 04 BUILT-IN SS LEDGE TO CONCEAL DRAINAGE
INSTALL/COMMISSION: CONTRACTOR
FKB 06 MOVEABLE SS MIXER BENCH 500W x700D x550H mm SUPPLY & INSTALL: OWNER
FKB 07 MOVEABLE SS WORK TABLE 1730W x760D x900H mm SUPPLY & INSTALL: OWNER
KITCHEN TROLLEYS
KITCHEN SHELVING
SUPPLY: OWNER
FKS 01 SS DISHWASHER SHELF 1055W x 920D x 440H mm
INSTALL/COMMISSION: CONTRACTOR
KITCHEN MISCELLANEOUS
SUPPLY: CONTRACTOR
FKM 03 CORNER GUARD
INSTALL/COMMISSION: CONTRACTOR
CLEANERS SHELVING
CLEANERS MISCELLANEOUS
MOP RACK 800W X 250H X 2MM THICK PLATE FIXED SUPPLY: CONTRACTOR
FCM 01
Architectural TO WALL WITH 7MM SS HOOKS INSTALL/COMMISSION: CONTRACTOR
KITCHEN DISHWASHING
REFRIGERATOR
EKG-03 SUPPLY & INSTALL: OWNER
STORE
KITCHEN PREPARATION
ROBOT
EKP-02 FOOD PROCESSOR R502 SUPPLY & INSTALL: OWNER
COUPE
CLEANERS
SUPPLY: OWNER
EKW-01 Washing Machine Electrolux W555H
INSTALL/COMMISSION: CONTRACTOR
SUPPLY: OWNER
EKW-02 Dryer Electrolux T5130
INSTALL/COMMISSION: CONTRACTOR
Architectural
Analysis Layouts Visuals Physics FINISHES Appendix
KITCHEN & CLEAN
FOR TENDER: 26 December 2016 WPS 14
M Y S S E R V I C E F I T O U T
SANITARY FIXTURES
The details on this page identify the owners spatial requirements for the kitchen and cleaners BRAND AND MODEL
TAG ITEM NAME ACTION
room. Specific existing kitchen and cleaners s a n i t a r y f i t t i n g s supplied by the owner RANGE NUMBER
must be re-used. Owners supply and install items are shown for reference, ensure design and
KITCHEN AND CLEANERS
construction allows enough space and services for these each of these items.
JOHNSON WINDSOR SUPPLY: OWNER
172 BASIN
SUISSE 410 INSTALL/COMMISSION: CONTRACTOR
SUPPLY: CONTRACTOR
667 WALL SINK SET
INSTALL/COMMISSION: CONTRACTOR
CLEANERS
TILE
5 m²
Architectural
Analysis Layouts Visuals Physics FINISHES Appendix
KITCHEN & CLEAN
FOR TENDER: 26 December 2016 WPS 15
M Y S S E R V I C E F I T O U T
PRODUCTS AND MATERIALS
The details on this page identify the expected products and finishes for the spaces. Selections
shall be met to a reasonable degree.
Provide access panels to all equipment requiring regular maintenance.
ITEM KEY
NOTES
ROOM
NAME
WALL
Unglazed vitrified solid body tile, slip resistant rating R11, reccomended
T2
maximum tile size 150mm square laid in stack bond pattern
Insight Family T1 S1 W1 C3 Bullkhead (roller shutter) to match ceiling S1 Tile - 600 x 100 mm high (matching T1)
Office T1 S1 W1 C3 Bullkhead (roller shutter) to match ceiling S2 Coved Tile - 150 x 10 x 35 mm radius (matching T2)
Store T2 S2 W1 C1 C2 Acoustic Ceiling Tile - 2800mm minimum above Finished Floor Level
Kitchen T2 S2 W2 C1
Full height: Dishwasher and cooking walls Plasterboard - 2800mm minimum above Finished Foor Level – Water based
1500mm high: All other locations C3
low gloss
Sceptrum White
SC01NN, 300 x http://www.feruni.com/black-white
TILE- Kitchen Wall
600mm, Polished
Finish
Nippon Paint: http://professional.nipponpaint.com.my/colours/colours_
BRILLIANT WHITE fandeck
1001 or
WALL PAINT
Pantone 11-0601 TCX https://www.pantone.com/color-finder/11-0601-TCX
Bright White
Nippon Paint:
http://professional.nipponpaint.com.my/colours/colours_
BRILLIANT WHITE
fandeck
1001 or
CEILING PAINT
Pantone 11-0601 TCX
https://www.pantone.com/color-finder/11-0601-TCX
Bright White
Architectural
Analysis Layouts Visuals Physics FINISHES Appendix
INTERIOR COLOURS
FOR TENDER: 26 December 2016 WPS 17
M Y S S E R V I C E F I T O U T
INTERIOR COLOUR SCHEDULE - OPTION 2
Colour selections on this page shall be met to a reasonable degree. GENERAL COLOUR SCHEME
Provide samples for review.
ITEM COLOUR SWATCH COLOUR NAME LINKS
Fossil
http://www.birrusmatting.com.au/ultramat.html
ENTRANCE MAT
Limestone: Waitomo
LM03N, 300 x 300mm, http://www.feruni.com/limestone
TILE- Kitchen Floor
Natural Surface Finish
Nippon Paint:
http://professional.nipponpaint.com.my/colours/colours_fa
RESERVED WHITE
ndeck
NP OW 1081 P or
WALL PAINT
Pantone 11-4300 TPX
https://www.pantone.com/color-finder/11-4300-TPX
Marshmallow
Nippon Paint:
http://professional.nipponpaint.com.my/colours/colours_fa
BRILLIANT WHITE
ndeck
1001 or
CEILING PAINT
Pantone 11-0601 TCX
https://www.pantone.com/color-finder/11-0601-TCX
Bright White
Retail 3D
Nippon Paint: http://professional.nipponpaint.com.my/colours/colours_fa
Concrete Kerb ndeck
DOOR COLOUR NP N 1833 D or
Pantone 7756 U https://www.pantone.com/color-finder/7756-U
http://www.beststone.com.my/reconstituted-
Best Stone, Quartz
ITEM COLOUR SWATCH COLOUR NAME LINKS stone/reconstituted-stone-2
Q5
JOINERY BENCH TOP
http://www.beststone.com.my/reconstituted- http://www.beststone.com.my/quartz/quartz-5
Best Stone, Quartz
Solid surface material stone/reconstituted-stone-2
Q5 PolyTec
(ST1) http://www.beststone.com.my/quartz/quartz-5
European Walnut http://www.polytec.com.my/colours.php
JOINERY CABINETS
Retail 3D PolyTec
Timber Grain Laminate European Walnut http://www.polytec.com.my/colours.php
(LAM 1) Nippon Paint:
http://professional.nipponpaint.com.my/colours/colours_fa
Millenium Gray
ndeck
PolyTec RECEPTION JOINERY NP N 2036 T
Plain Laminate Summit White http://www.polytec.com.my/colours.php 2PAC or Pantone 18-0615
https://www.pantone.com/color-finder/18-0615-TPX
(LAM 2) TPX Stone grey
Gloss Finish
PolyTec Natural Anodised
SHOPFRONT
Laminate Kickback Cinder http://www.polytec.com.my/colours.php Aluminium
ALUMINIUM
(LAM 4)
Acaia Fabrics http://acaciafabrics.com/products-
Nippon Paint: WAITING CHAIR InsideOut Collection page2.php?selection=1&brsearch=yes&bid=21&catid=12
Millenium Gray http://professional.nipponpaint.com.my/colours/col UPHOLSTERY Range; Resort &cid=122&sid=315
NP N 2036 T ours_fandeck (Patterned Fabric Option) Col: Paprika 101
2 pack Polyurethane
or Pantone 18-0615
(2PAC1) WAITING CHAIR Acaia Fabrics http://acaciafabrics.com/products-
TPX Stone grey https://www.pantone.com/color-finder/18-0615-
Gloss Finish TPX UPHOLSTERY Immense Collection, page2.php?selection=1&brsearch=yes&bid=17&catid=12
(Plain Fabric Option) Col: Amber 57 &cid=420&sid=1150
Architectural
Analysis Layouts Visuals Physics FINISHES Appendix
INTERIOR COLOURS
FOR TENDER: 26 December 2016 WPS 18
M Y S S E R V I C E F I T O U T
AIR CONDITIONING EQUIPMENT - SAMPLE LAYOUT & SCHEDULE
Provide Mechanical Equipment to meet the HVAC parameters shown on this page.
NOTES:
AC25C
v 3. Use ceiling-mounted cassette units connected by
SF1 copper refrigerant piping to outdoor multi-split
condensing unit.
SF2 4. Multi-split condensing unit shall have adequate
capacity for simultaneous loads . do not size for
sum of connected unit capacity.
v
DSC01 condensate pipe and drain.
v
DSC01 adjust the temperature set points in the zones.
v
AC50A AC50A adjust set points automatically during unoccupied
hours. Provide controls for occupants to extend
operation after regular hours of occupancy.
v
AC35A EF1 DSC01
7. Makeup air supply fan (SF-1) interlocked to run
when cooktop range hood is on
DSC01 DX super multi split air-conditioner Daikin 5MKS100ESG 10.0 kW Nom Outdoor unit. Qty 3
AC35A Ceiling-Mounted Cassette Type Daikin FFQ35BV1B Nom 3.5 kW Indoor unit. Qty 1
AC50A Ceiling-Mounted Cassette Type Daikin FFQ50BV1B Nom 5.0 kW Indoor unit. Qty 3
AC60B Duct-connected Type Daikin FDKS60CVMB Nom 6.0 kW Indoor unit. Qty 1
AC25C Wall-Mounted Type Daikin FTKS35DVM Nom 3.5 kW Indoor unit. Qty 1
EF1 Axial Supply/Exhaust Air Fan Kruger TDS 400/9AA/7?? Fan diameter 400mm Air flow requirements: 180L/s @ 120Pa ESP - Power: 0.37kW - Voltage: 3Phase 50Hz 415V
SF1 Axial Supply/Exhaust Air Fan Kruger TDS 400/9AA/7?? Fan diameter 400mm Air flow requirements: 450L/s @ 120Pa ESP - Power: 0.37kW - Voltage: 3Phase 50Hz 415V
SF2 Axial Supply/Exhaust Air Fan Kruger TDS 400/9AA/7?? Fan diameter 400mm Air flow requirements: 190L/s @ 120Pa ESP - Power: 0.37kW - Voltage: 3Phase 50Hz 415V
Mechanical
AIR CONDITIONING Ventilation Plumbing Gas
FOR TENDER: 26 December 2016 WPS 19
M Y S S E R V I C E F I T O U T
VENTILATION
Provide Mechanical Equipment, ducts, filters, and grilles to meet the ventilation parameters shown
on this page ITEM KEY
NOTES:
v
60 L/s
1. Separate Outside Air (OA) Intake and Exhaust
450 L/s EF1 (EXH) Outlet Louvers by minimum of 3 meters.
10 L/s
2. Air flow units are in litres per second (L/s).
Mechanical
Air Conditioning VENTILATION Plumbing Gas
FOR TENDER: 26 December 2016 WPS 20
M Y S S E R V I C E F I T O U T
PLUMBING AND DRAINAGE
Provide Domestic Hot and Cold Water supply and Sanitary Drainage as outlined in the
requirements on this page
ITEM KEY
Sample Sanitary
drainage run
Sample Condensate
run
v8 Mechanical Equipment
1
11 7
2
GENERAL NOTES
4
1. Domestic Hot Water (DHW) pipe should be
insulated with Aeroflex Elastomeric or similar
material.
v
13
8 2. Condensate pipe shall be insulated with
5 synthetic rubber or Aeroflex Elastomeric or
9 similar
v
for ease of installation and maintenance, this
space may reduce locally at flanges, valves and
` other fitments.
GT
4. Do not run water piping in ceiling above cable
tray except when crossing
12
GT 5. Fit a vacuum breaker or suitable backflow
prevention device to all domestic water services
where there is the possibility of back siphoning,
including but is not limited to the cleaners sink.
Mechanical
Air Conditioning Ventilation PLUMBING Gas
FOR TENDER: 26 December 2016 WPS 21
M Y S S E R V I C E F I T O U T
GAS REQUIREMENTS
Connect cooktop to existing LPG Gas supply as shown in schematic below. Connect Solenoid Valve to Gas detector and interlock with
fire panel to isolate Gas supply when fire panel is activated.
ITEM KEY
Solenoid Valve
Gas Regulator
Isolation valve
GAS SCHEMATIC
SIGNAGE REQUIREMENTS
Mechanical
Air Conditioning Ventilation Plumbing GAS
FOR TENDER: 26 December 2016 WPS 22
M Y S S E R V I C E F I T O U T
POWER CIRCUIT LAYOUT
Power outlets to meet the following minimum parameters: ITEM KEY
• 2 x double power outlets per workstation
• For enclosed office, locate power outlets on opposing walls Refer to pages 13-15 for details
of Kitchen & Cleaners Fixtures. New Single Power
• Provide power outlets in ceiling space for Mechanical equipment.
Provide power outlets for all
equipment. Outlets shall be
hose proof type IP65 rating in New Double Power
these areas.
4
Existing Distribution Board
location 1
x6
CONFIRM
CONFIRM
CONFIRM
Electrical
POWER Lighting
FOR TENDER: 26 December 2016 WPS 24
M Y S S E R V I C E F I T O U T
LIGHTING LAYOUT
Provide light fittings to meet the Lux levels outlined on this page. ITEM KEY
100 lux
250 lux
400 lux
NOTES:
1. Emergency lights to be installed as
required by local code but a minimum of 1
in each room without natural light.
ITEM KEY
Alarm Keypad
Motion Detector
Siren
NOTES:
APPENDIX
AS-BUILT DOCUMENTATION: PDF and digital CAD format, either AutoCAD (.dwg) or Revit (.rvt) DOOR AND HARDWARE SCHEDULE
TESTS ON COMPLETION: Record in Electronic format. To include results of Pre-commissioning, FINISHES SCHEDULE
Commisioning and Trial operation.
SANITARY SCHEDULE
DRAWING LIST SCALE SHEET SIZE FURNITURE. FIXTURES, FITTINGS AND EQUIIPMENT SCHEDULE
ROOM LAYOUT AND INTERIOR ELEVATIONS – KITCHEN, CLEANERS PLUMBING & FIRE SUPPRESSION
1:50 A1
INSIGHT FAMILY, MEETING. TRADE SPECIFICATION
EXTERIOR SHOPFRONT ELEVATION 1:50 A1 PLUMBING EQUIPMENT AND MATERIALS SCHEDULES
ELECTRICAL
“TESTS ON COMPLETION“
COVER SHEET WITH NOTES, SYMBOL LEGEND, ASSUMPTIONS, ELECTRICAL TESTS
SCALE TO SUIT A1
EXCLUSIONS, REFERENCES TO STANDARDS AND REGULATIONS ETC
CONTINUITY TEST OF THE EARTHING SYSTEM
SYSTEM WIDE ELECTRICAL SCHEMATIC WITH CABLE SIZES AND
- A1 INSULATION RESISTANCE
LENGTHS
ALARM SYSTEM LAYOUT AND SCHEMATIC 1:100 A1 MECHANICAL/PLUMBING SYSTEMS REQUIRING TESTS
MECHANICAL PLAN, FLOW DIAGRAM AND INSTALLATION DETAILS 1:100 A1 PLUMBING SYSTEM