Вы находитесь на странице: 1из 28

Unit P-02-02

MYS Service Fitout


for
WPS RESOURCES SDN BHD
DESIGN SPECIFICATION
Project Title Reference Scale Date
MYSB020202 MYS SERVICE FITOUT ARCH+MECH+ NONE 2016-12-26
REV B B ELEC

FOR TENDER: 26 December 2016 WPS 1


DOCUMENT INDEX
Architectural Mechanical Electrical Appendix
Analysis Air Conditioning Power
Site Plan 3 AC sample layout 19 Sample Power Circuit Layout 23 Project Documentation
Existing Photos 4 Sample Switchboard schedule 24 Deliverables 28
Ventilation
Layouts Ventilation sample layout 20 Lighting
Floor Plan 5 Sample Lighting Layout 25
Plumbing
Visuals Plumbing and Drainage 21 Security
View 1 6 Security System Concept 26
Views 2 to 5 7 Gas
Gas 22
Physics
Wall Construction 8
Openings, Fixtures, Fittings 9
AV enabling works 10

Finishes
Fixed Cabinetry 11
Fixed Cabinetry 12
Kitchen & Clean Furniture 13
Kitchen & Clean Equipment 14
Kitchen & Clean Sanitary Fixtures 15
Products & Materials 16
Interior Colour Schedule - 1 17
Interior Colour Schedule - 2 18

PURPOSE OF THIS DOCUMENT OTHER REFERENCED DOCUMENTS


This document forms part of the Employers Requirements and outlines the purpose, Documents referenced throughout this design specification are listed below. This list is not
scope, design and other technical criteria for the fit out of the R e t a i l / S e r v i c e exhaustive. The Contractor shall confirm all Building Management requirements and all Existing
Space. Conditions.
• Contract
• Building Management Guidelines
TERMINOLOGY IN THIS DOCUMENT • Building Management provided Existing Conditions
• “Owner” referred to in this document means “Employer” as referred to in the contract • Building Management provided Owner’s Manual
• “Owners Representative “ referred to in this document means “Engineer” as referred • Contractor Supplied Furniture. Loose furniture is excluded from this design
to in the contract. specification. For loose furniture items to be included as part of the contract, refer to
separate document – “ C o n t r a c t o r S u p p l i e d F u r n i t u r e ” .
EXCLUSIONS FROM SCOPE OF WORKS
• Office equipment: copier, printers, computers
• Audio Video (AV) wirings
• Data Network installation by separate contractor

FOR TENDER: 26 December 2016 WPS 2


M Y S S E R V I C E F I T O U T

PROJECT DATA
• Location: Office Unit P-02-02, Level Podium, Block A
• Site Address: Tropicana Avenue, No.12, Persiaran
Tropicana, Pju 3, 47410 Petaling Jeya, Selangor

GENERAL SITE DESCRIPTION


Tropicana Avenue is a mixed development comprising:
• one block of 18 storeys office building; and
• one block of 40 storeys apartments; over
• 4 storeys retail premises and 4 storeys podium car park

SCOPE OF WORK
Scope of work outlined in this document includes
Retail/Service unit fit out work and services to Unit P-02-02
of the Tropicana Avenue complex.
The spaces are to be fitted out with the following facilities:
• Reception for Pusat Asuhan Keluarga (Family Insight
Centre)
• Office
• Meeting Room (providing for 35 people)
• Flexible Workspace (providing for 6 people)
• Store Room
• Cleaners
• Kitchen (providing for 40 people)

Refer to “Exclusions from Scope of Work” on page 2 of this


document for works excluded from this project.

Owner supplied items are scheduled throughout this


document. The Contractor shall coordinate with the
Owner’s Representative for the handover of these items.
The Contractor is responsible for installation, connection
and commissioning of owner supplied items.

OTHER PREMISES
Other premises connected to the operation of WPS
Resources SDN BHD but not forming part of the fitout work
described in this document:
• Office Unit A-08-01, Level 2 Block A, Tropicana Avenue
• 15x 1-Bedroom Apartment, Block B, Tropicana Avenue

Architectural
ANALYSIS Layouts Visuals Physics Finishes Appendix
SITE PLAN
FOR TENDER: 26 December 2016 WPS 3
M Y S S E R V I C E F I T O U T

Fire Stair
LOOKING TOWARD FRONT OF UNIT LOOKING TOWARD BACK OF UNIT

Lift Lobby LOOKING TOWARD BACK OF UNIT OUTSIDE BACK OF UNIT. AC HANGER OUTSIDE BACK OF UNIT

GARDEN AT THE FRONT OF UNIT

Fire Stair

Level 2 Podium Block A Floor Plan Key Plan


Architectural
ANALYSIS Layouts Visuals Physics Finishes Appendix
EXISTING PHOTOS
FOR TENDER: 26 December 2016 WPS 4
M Y S S E R V I C E F I T O U T

AREA m2

GIA 152 m2

USAGE Qty

Workspace 8

S-07 Meeting 1
S-04
S-03
ROOM NO. ROOM NAME m2

S-01 Office 8
S-02 S-02 Insight Family 19
S-06
S-03 Meeting 31

S-04 Corridor 13

S-05 S-08 S-05 Workspace 23

S-06 Cleaner 5

S-07 Store 9

S-01 S-08 Kitchen 28

USAGE AREA m²

Major ren. - m²

Minor ren. 152 m²

Maintenance - m²

FLOOR PLAN

Note: All loose furniture and office equipment shown for illustrative purpose only. For loose furniture items to be included as
part of this contract, refer to separate document – “ C o n t r a c t o r S u p p l i e d F u r n i t u r e ”
Architectural Key Plan
Analysis LAYOUTS Visuals Physics Finishes Appendix
FLOOR PLAN
FOR TENDER: 26 December 2016 WPS 5
M Y S S E R V I C E F I T O U T

S-03 S-04 S-07


S-02

S-05
S-06 S-08

S-01

View 1 Overall View

Note: All loose furniture and office equipment shown for illustrative purpose only. For loose furniture items to be included as
part of this contract, refer to separate document – “ C o n t r a c t o r S u p p l i e d F u r n i t u r e ”
Architectural Key Plan
Analysis Layout VISUALS Physics Finishes Appendix
VIEW 1
FOR TENDER: 26 December 2016 WPS 6
M Y S S E R V I C E F I T O U T

New reception desk


New shopfront
glazing New AV cabinet

New reception desk

View 2 View 3

TV bracket supplied
by owner, installed
by Contractor
Loose Furniture by
Wall art by owner owner

View 4 View 5

3 4
5
2

Note: All loose furniture and office equipment shown for illustrative purpose only. For loose furniture items to be included as
part of this contract, refer to separate document – “ C o n t r a c t o r S u p p l i e d F u r n i t u r e ”
Architectural Key Plan
Analysis Layout VISUALS Physics Finishes Appendix
VIEW 2 to 5
FOR TENDER: 26 December 2016 WPS 7
M Y S S E R V I C E F I T O U T

FIRE ZONE KEY

Existing zone

Egress Path

Fire Extinguisher
(supplied by owner,
installed by contractor)

REMOVABLE OFFICE WALL

S-07 Parameters: This wall shall be constructed


S-04 to be easily removable in future and
S-03 therefore floor and ceiling tiles shall run
continuous above and below wall
Height: Floor to underside of ceiling
Acoustic rating: 41 dB reduction
S-02 Example Construction method:
S-06

• 1 layer 13mm plasterboard, paint finish


• 76mm steel stud @450 ctrs
S-05 S-08 • 1 layer 13mm plasterboard, paint finish

OPTION:
FOLD BACK OFFICE WALL
Parameters: Include in the tender an option
S-01 for this wall to be a bi-fold partition . If
glazed include blinds for privacy.
Height: Floor to underside of ceiling
Acoustic rating: 41 dB reduction
Example Construction method:

FLOOR PLAN

WET AREA WALL FURRING AT WALL STANDARD OFFICE WALL


Parameters: This wall shall be water proof Parameters: Fur wall to conceal conduit for Parameters: This wall shall provide a • 70mm thick x 1200 wide panels
and rodent proof and will consist of either office space and AV wiring to conferencing higher acoustic rating than the removable offset stacking (Bi-parting)
stud framing on concrete hob or a solid TVs. wall
masonry wall. Height: Floor to 200mm above ceiling level Height: Floor to 200mm above ceiling level
Height: Floor to 200mm above ceiling level Example Construction method: Acoustic rating: 45 dB reduction
Example Construction method: Example Construction method:

Wet area wall


• Wet
Steel furring
area wall clip fixed @450 ctrs
• 1 layer of Fibre Cement board • 1 layer 13mm plasterboard, paint finish • 2 layers 13mm plasterboard, paint finish
• 76mm steel stud @450 ctrs • 76mm steel stud @450 ctrs
• 1 layer of Fibre Cement board • 1 layer 13mm plasterboard, paint finish

Note: All loose furniture and office equipment shown for illustrative purpose only. For loose furniture items to be included as
part of this contract, refer to separate document – “ C o n t r a c t o r S u p p l i e d F u r n i t u r e ”
Architectural Key Plan
Analysis Layouts Visuals PHYSICS Finishes Appendix
WALL CONSTRUCTION
FOR TENDER: 26 December 2016 WPS 8
M Y S S E R V I C E F I T O U T
NEW / UPGRADE KEY

New door, new electronic


Refer to pages 13-15 of this access with door release
on reception desk
document for details of Kitchen
& Cleaners Fixtures and Existing door, install new
Fittings electronic access

New door

New door, with vision panel

Shopfront (See elevation


below)
S-07
S-04 New power and data
S-03 trunking (by separate
contractor)
AFL 2100
TV 2

TV and wall bracket


(supplied by owner, TV
installed by contractor)
S-02
S-06 Illuminated website sign
supplied by owner, JW
installed by contractor
AFL 2100

Centre of TV/sign above


JW

FFL AFL xxx


S-05 S-08 Existing roller shutter guide

Blinds to window
25mm horixontal slats
venetial blinds (refer colour
S-01 schedule)

TV 1 TV 3

AFL 1800 AFL 1500

FLOOR PLAN New handwash basin

SHOPFRONT ABBREVIATIONS
SHOPFRONT REQUIREMENTS
Contractor shall provide structural support at FP Fixed Powdercoated aluminium panel
the top of the shopfront as well as
intermediate vertical support in order to FG Fixed glazing panel
comply with the following minimum structural
requirements: FR Powdercoated Alumnium glazing frame
• Basic wind pressure = 1000 Pa
• Wind pressures: S Silicon Butt Joint, Glazing Edges to be Arrissed
P - Permissible stress = 2000 Pa
- Serviceability = 1700 Pa Privacy Film
G
- Ultimate = 2500 Pa Horizontal Bands of varying thickness (inidcative
• Toughened laminated glass. P
only, graphic design to be approved by owner
Retain roller shutter security doors. Centre of before installation.
column/vertical support must align with centre
of existing roller shutter guide. Nominal 40mm clear glazing gap between privacy
G
film
SAMPLE SHOPFRONT ELEVATION

Architectural Key Plan


Analysis Layouts Visuals PHYSICS Finishes Appendix
OPENINGS, FIXTURES AND FITTINGS
FOR TENDER: 26 December 2016 WPS 9
M Y S S E R V I C E F I T O U T
AUDIO VIDEO (AV) CABINET
Provide conduit and cut-out openings in walls. NEW / UPGRADE KEY
Unless otherwise noted, the owner will do all their own Audio Video wiring and installation.
SDI plate – future install by
owner. Contractor to SDI
Refer to page 11 of this provide opening and clearly
document for detail of AV label conduit end.
Volume Control for Meeting room located
adjacent to AV cabinet rather than TV AFL 1000 cabinet and associated outlet HDMI plate, conduit and
locations wiring – supply and install HDMI
VOL by contractor.

Volume Control plate –


future install by owner.
Contractor to provide
opening and clearly label VOL
conduit end.

Conduits in wall and ceiling


VOL AFL 1000 – Contractor to install and
clearly label each end of
conduit. Owner to wire in
future.
SDI AFL 2100
Conduits and wiring in wall
– Contractor to supply and
install
HDMI AFL 2100
Height of openings/plates
above finished floor level.
AFL Inside Coordinate with TV AFL xxx
HDMI
cabinet mounting height

NOTES:

1. Contractor to provide full length conduit from SDI


outlet and volume control plate to meeting room
AV cabinet. Provide cut-out opening in wall for
future installation of SDI outlet and volume
control plate
2. Conduit to be UPVC type. Conduit to be clearly
SDI SDI VOL identified by labelling in ceiling space. Conduit
size and bending radius to suit type, size and
AFL 1600 AFL 1300 AFL 1000 number of cabling. Provide accessories including
conduit support and fixings and intersection
boxes for ease of future cable installation.
FLOOR PLAN

SAMPLE TV BRACKET AND OUTLET CONFIGURATION

Note: All loose furniture and office equipment shown for illustrative purpose only. For loose furniture items to be included as
part of this contract, refer to separate document – “ C o n t r a c t o r S u p p l i e d F u r n i t u r e ”
Architectural Key Plan
Analysis Layouts Visuals PHYSICS Finishes Appendix
AV ENABLING WORKS
FOR TENDER: 26 December 2016 WPS 10
M Y S S E R V I C E F I T O U T
AUDIO VIDEO (AV) CABINET Please Note: 4. Ceiling speakers and ceiling mounted camera on telescopic pole
The details on this page identify the owners cabinetry requirements 1. Power Outlets are required in the exact locations shown on this will be wired back to AV cabinet and installed by owner in future
for the AV cabinet to be located at the back of the meeting room. Diagram. and are not included in this contract.
Specific existing AV equipment supplied by the owner shall be re- 2. Data Network installation by separate contractor, coordinate
used. This drawing is a requirement rather than a sample. power outlet location with data outlet location and/or trunking
The cabinet can be constructed from solid surface material, laminate installation
and/or 2 pack polyurethane paint body and must match the colour 3. All SDI and volume control cabling to be reticulated back to
scheme presented in this document. Ensure the construction of the meeting room AV cabinet Brush Cable entry. SDI and volume
AV cabinet can support the weight of all equipment and load imposed control cable reticulation, outlets and volume control plates
by the user. supplied and installed by owner in future. ITEMS HOUSED IN THE AV CABINET

TAG ITEM ACTION

EMA 01 Amplifier Supply and install by owner

EMA 02 Delay unit Supply and install by owner

EMA 03 Switcher Supply and install by owner

EMA 04 Monitor Supply and install by owner

EMA 05 Mixer Supply and install by owner

EMA 06 Wireless Microphone Supply and install by owner

EMA 07 Audio to SDI Supply and install by owner

EMA 08 Camera Control Supply and install by owner

EMA 09 CPU Supply and install by owner

EMA 12 SDI to HDMI Supply and install by owner

EMA 14 Telephone Supply and install by owner

EMA 14 Switcher Controller Supply and install by owner

FMA 02 Brush Cable Entry Supply and install by contractor

Monitor Bracket, Full


FMA 03 Supply and install by contractor
motion

FMA 04 Cable tidy Supply and install by contractor

Keyboard drawer on
FMA 05 slide out runners Supply and install by contractor
450mm deep nominal

FMA 06 CPU holder Supply and install by owner

Architectural Key Plan


Analysis Layouts Visuals Physics FINISHES Appendix
FIXED CABINETRY
FOR TENDER: 26 December 2016 WPS 11
M Y S S E R V I C E F I T O U T

RECEPTION DESK REQUIREMENTS INSIGHT FAMILY COUNTER REQUIREMENTS


Reception desk with front counter and mobile under bench drawer unit. Fixed wall hung cabinet 2100W x 450H x 500D with counter top
1400W x 1100H 1000D. Solid surface material, laminate and/or 2 pack 1000mm from finished floor level. Solid surface material, laminate
polyurethane paint body. Reception desk to house Computer, keyboard, and/or 2 pack polyurethane paint body with concealed cupboards/flaps.
mouse and CPU supplied by owner. Contractor to supply and install Cabinet is to house owners existing DVD player inside and coffee
door release buttons, cable tidy and power from cable trunking. machine on top.
Trunking and data outlets installed by separate Network Data contractor

SAMPLE COUNTER

SAMPLE RECEPTION DESK

Architectural Key Plan


Analysis Layouts Visuals Physics FINISHES Appendix
FIXED CABINETRY
FOR TENDER: 26 December 2016 WPS 12
M Y S S E R V I C E F I T O U T
FURNITURE TAG ITEM NAME ACTION
The details on this page identify the owners spatial requirements for the kitchen and cleaners
room. Specific existing kitchen and cleaners f u r n i t u r e supplied by the owner must be re- KITCHEN BENCHES
used. Owners supply and install items are shown for reference, ensure design and construction
MOVEABLE SS SINK 1230W x920D x900H mm, 2 BOWL. SUPPLY: OWNER
allows enough space for these items. FKB 01
INCLUDES TAPWARE INSTALL/COMMISSION: CONTRACTOR

MOVEABLE SS WORK BENCH 670W x1270D x 900H


FKB 02 SUPPLY & INSTALL: OWNER
mm.

MOVEABLE SS SINK 2000W x850D x900H mm, 2 BOWL. SUPPLY: OWNER


FKB 03
INLCUDES TAPWARE (CONNECT) INSTALL/COMMISSION: CONTRACTOR

SUPPLY: CONTRACTOR
FKB 04 BUILT-IN SS LEDGE TO CONCEAL DRAINAGE
INSTALL/COMMISSION: CONTRACTOR

MOVEABLE SS PREPARATION BENCH 1400W x700D SUPPLY: OWNER


FKB 05
x900H mm, LEFT BOWL. INSTALL/COMMISSION: CONTRACTOR

FKB 06 MOVEABLE SS MIXER BENCH 500W x700D x550H mm SUPPLY & INSTALL: OWNER

FKB 07 MOVEABLE SS WORK TABLE 1730W x760D x900H mm SUPPLY & INSTALL: OWNER

KITCHEN TROLLEYS

MOBILE SS TROLLEY 867W x842D x50H mm ON SUPPLY: CONTRACTOR


CLEANERS FKT 01
CASTOR WHEELs. TOP TO HAVE 15mm LIP INSTALL/COMMISSION: CONTRACTOR
TILE MOBILE SS TROLLEY 1000W x650D x825H mm WITH SS
FKT 02 SUPPLY & INSTALL: OWNER
5 m² SHELF 470 mm ABOVE FLOOR.

MOBILE SS CUTLERY/CROCKERY TROLLEY 1300W


FKT 03 SUPPLY & INSTALL: OWNER
x760D x830H mm.

KITCHEN SHELVING

SUPPLY: OWNER
FKS 01 SS DISHWASHER SHELF 1055W x 920D x 440H mm
INSTALL/COMMISSION: CONTRACTOR

1.6 mm THICK SS WALL MOUNTED SHELF 1000W x SUPPLY: CONTRACTOR


FKS 02
400D, 1500mm FROM FFL INSTALL/COMMISSION: CONTRACTOR

1.6 mm THICK SS WALL MOUNTED MICROWAVE SHELF SUPPLY: CONTRACTOR


FKS 03
1000W x 450D, 1550mm FROM FFL INSTALL/COMMISSION: CONTRACTOR

1.6 mm THICK SS WALL MOUNTED SHELF 800W x 400D,


SUPPLY: CONTRACTOR
FKS 04 1800mm FROM FFL
INSTALL/COMMISSION: CONTRACTOR

KITCHEN MISCELLANEOUS

UTENSIL RACK 500W X 200H X 2MM THICK PLATE SUPPLY: CONTRACTOR


FKM 02
FIXED TO WALL WITH 7MM SS HOOKS INSTALL/COMMISSION: CONTRACTOR

SUPPLY: CONTRACTOR
FKM 03 CORNER GUARD
INSTALL/COMMISSION: CONTRACTOR

CLEANERS SHELVING

MOVEABLE SS CLEANERS BENCH 810W x405D x900H SUPPLY: OWNER


FCB 01
mm, LEFT BOWL. INSTALL/COMMISSION: CONTRACTOR

1.6 mm THICK SS WALL MOUNTED CLEANERS SHELF, SUPPLY: CONTRACTOR


FCS 01
900W x 350D x 1500 FROM FFL INSTALL/COMMISSION: CONTRACTOR

CLEANERS MISCELLANEOUS

MOVEABLE SS SINK 810W x 405D x 890H, INLCUDES SUPPLY: OWNER


FCB 01
TAPWARE. INSTALL/COMMISSION: CONTRACTOR

MOP RACK 800W X 250H X 2MM THICK PLATE FIXED SUPPLY: CONTRACTOR
FCM 01
Architectural TO WALL WITH 7MM SS HOOKS INSTALL/COMMISSION: CONTRACTOR

Analysis Layouts Visuals Physics FINISHES Appendix


KITCHEN & CLEAN
FOR TENDER: 26 December 2016 WPS 13
M Y S S E R V I C E F I T O U T
EQUIPMENT
The details on this page identify the owners spatial requirements for the kitchen and cleaners BRAND AND MODEL
TAG ITEM NAME ACTION
room. Specific existing kitchen and cleaners e q u i p m e n t supplied by the owner must be RANGE NUMBER
re-used. Owners supply and install items are shown for reference, ensure design and construction
KITCHEN COOKING
allows enough space and services for these each of these items.
ELECTROLUX SUPPLY: OWNER
EKC-01 BOILING TOP PNC391002
E9GCGH4C00 INSTALL/COMMISSION: CONTRACTOR

ELECTROLUX SUPPLY: OWNER


EKC-02 COMBI OVEN PNC267203
AOS102ETA1 INSTALL/COMMISSION: CONTRACTOR

HOT CUPBOARD ELECTROLUX SUPPLY: OWNER


EKC-03 PNC922238
(UNDER OVEN) 1HCBE6101 INSTALL/COMMISSION: CONTRACTOR

EXHAUST HOOD ELECTROLUX SUPPLY: CONTRACTOR


EKC-04 NA
(BOILING TOP) INSTALL/COMMISSION: CONTRACTOR

EXHAUST HOOD ELECTROLUX SUPPLY: OWNER


EKC-05 PNC640794
(OVEN) KLWV10GE2M INSTALL/COMMISSION: CONTRACTOR

KITCHEN DISHWASHING

Electrolux SUPPLY: OWNER


EKD-01 Dishwasher PNC504254
EHT8IELG INSTALL/COMMISSION: CONTRACTOR

CLEANERS KITCHEN GENERAL

TILE EKG-01 FREEZER SUPPLY & INSTALL: OWNER


5 m²
4 DOOR
EKG-02 SUPPLY & INSTALL: OWNER
REFRIGERATOR

REFRIGERATOR
EKG-03 SUPPLY & INSTALL: OWNER
STORE

EKG-04 MICROWAVE SUPPLY & INSTALL: OWNER

EKG-05 BAIN MARIE SUPPLY & INSTALL: OWNER

KITCHEN PREPARATION

EKP-01 MIXER HOBART L20 SUPPLY & INSTALL: OWNER

ROBOT
EKP-02 FOOD PROCESSOR R502 SUPPLY & INSTALL: OWNER
COUPE

EKP-03 COFFEE MAKER BUNN VP-17 SUPPLY & INSTALL: OWNER

HOT WATER SUPPLY: OWNER


EKP-04 IMBACO AG-30
DISPENSER INSTALL/COMMISSION: CONTRACTOR

EKP-05 VACUUM SEALER QUIWARE VM-128 SUPPLY & INSTALL: OWNER

EKP-06 GRINDER PANASONIC MX-AC400 SUPPLY & INSTALL: OWNER

EKP-07 TOASTER HATCO TOAST MAX SUPPLY & INSTALL: OWNER

CLEANERS

SUPPLY: OWNER
EKW-01 Washing Machine Electrolux W555H
INSTALL/COMMISSION: CONTRACTOR

SUPPLY: OWNER
EKW-02 Dryer Electrolux T5130
INSTALL/COMMISSION: CONTRACTOR

Architectural
Analysis Layouts Visuals Physics FINISHES Appendix
KITCHEN & CLEAN
FOR TENDER: 26 December 2016 WPS 14
M Y S S E R V I C E F I T O U T
SANITARY FIXTURES
The details on this page identify the owners spatial requirements for the kitchen and cleaners BRAND AND MODEL
TAG ITEM NAME ACTION
room. Specific existing kitchen and cleaners s a n i t a r y f i t t i n g s supplied by the owner RANGE NUMBER
must be re-used. Owners supply and install items are shown for reference, ensure design and
KITCHEN AND CLEANERS
construction allows enough space and services for these each of these items.
JOHNSON WINDSOR SUPPLY: OWNER
172 BASIN
SUISSE 410 INSTALL/COMMISSION: CONTRACTOR

SENSOR SUPPLY: CONTRACTOR


623
OPERATED TAP INSTALL/COMMISSION: CONTRACTOR

WASHING SUPPLY: OWNER


662
MACHINE SET INSTALL/COMMISSION: CONTRACTOR

SUPPLY: CONTRACTOR
667 WALL SINK SET
INSTALL/COMMISSION: CONTRACTOR

HEAVY-DUTY SUPPLY: OWNER


682
TAP SET INSTALL/COMMISSION: CONTRACTOR

LIQUID SOAP SUPPLY: CONTRACTOR


731
DISPENSER INSTALL/COMMISSION: CONTRACTOR

PAPER TOWEL KIMBERLY SUPPLY: OWNER


750
DISPENSER CLARK INSTALL/COMMISSION: CONTRACTOR

CLEANERS
TILE
5 m²

Architectural
Analysis Layouts Visuals Physics FINISHES Appendix
KITCHEN & CLEAN
FOR TENDER: 26 December 2016 WPS 15
M Y S S E R V I C E F I T O U T
PRODUCTS AND MATERIALS
The details on this page identify the expected products and finishes for the spaces. Selections
shall be met to a reasonable degree.
Provide access panels to all equipment requiring regular maintenance.
ITEM KEY

Suggested minimum ceiling


access panel locations. Metal
faced access panels.
Coordinate number and location
of panels with services on site.
Services requiring access include
but are not limited to condendate
cleanout, mechanical filters, and
ductwork.

LEGEND PRODUCT INFORMATION


SKIRTING

T1 Unglazed vitrified solid body tile, 600 x 600 mm


CEILING
FLOOR

NOTES
ROOM
NAME

WALL

Unglazed vitrified solid body tile, slip resistant rating R11, reccomended
T2
maximum tile size 150mm square laid in stack bond pattern

Insight Family T1 S1 W1 C3 Bullkhead (roller shutter) to match ceiling S1 Tile - 600 x 100 mm high (matching T1)

Office T1 S1 W1 C3 Bullkhead (roller shutter) to match ceiling S2 Coved Tile - 150 x 10 x 35 mm radius (matching T2)

Meeting T1 S1 W1 C2 W1 Paint - Water based Low Gloss


Corridor T1 S1 W1 C2
W2 Tile - 600 x 300 x 9 mm, laid stack bond
Workspace T1 S1 W1 C2
Moisture Resistant Plasterboard - 2800mm minimum above Finished Floor
C1
Cleaner T2 S2 W1, W2 C1 1200mm high to cleaners sink wall Level - Paint - Water based semi gloss

Store T2 S2 W1 C1 C2 Acoustic Ceiling Tile - 2800mm minimum above Finished Floor Level

Kitchen T2 S2 W2 C1
Full height: Dishwasher and cooking walls Plasterboard - 2800mm minimum above Finished Foor Level – Water based
1500mm high: All other locations C3
low gloss

Architectural Key Plan


Analysis Layouts Visuals Physics FINISHES Appendix
PRODUCTS & MATERIALS
FOR TENDER: 26 December 2016 WPS 16
M Y S S E R V I C E F I T O U T
INTERIOR COLOUR SCHEDULE – OPTION 1
Colour selections on this page shall be met to a reasonable degree. GENERAL COLOUR SCHEME
Provide samples for review.
ITEM COLOUR SWATCH COLOUR NAME LINKS
Storm
http://www.birrusmatting.com.au/ultramat.html
ENTRANCE MAT

Fused: Grigio FD02N,


300 x 600mm, Natural http://www.feruni.com/fused
TILE- General Floor
Surface Finish

Fused: Nero FD03ST,


300 x 600mm,
http://www.feruni.com/fused
TILE- Kitchen Floor Structured Surface
Finish

Sceptrum White
SC01NN, 300 x http://www.feruni.com/black-white
TILE- Kitchen Wall
600mm, Polished
Finish
Nippon Paint: http://professional.nipponpaint.com.my/colours/colours_
BRILLIANT WHITE fandeck
1001 or
WALL PAINT
Pantone 11-0601 TCX https://www.pantone.com/color-finder/11-0601-TCX
Bright White

Nippon Paint:
http://professional.nipponpaint.com.my/colours/colours_
BRILLIANT WHITE
fandeck
1001 or
CEILING PAINT
Pantone 11-0601 TCX
https://www.pantone.com/color-finder/11-0601-TCX
Bright White

Nippon Paint: http://professional.nipponpaint.com.my/colours/colours_


Vulcan Blue fandeck
DOOR COLOUR 3233D or Pantone
P 114-16 U https://www.pantone.com/color-finder/P-114-16-U

CABINETRY COLOUR SCHEME T-081 Perforated


http://www.tachitica.com/window-blinds-
malaysia/venetian-blinds-23/venetian-blinds-colour-part-
VENETIAN BLINDS White
1_472
ITEM COLOUR SWATCH COLOUR NAME LINKS
http://www.beststone.com.my/reconstituted-
Best Stone,
Best Stone, http://www.beststone.com.my/reconstituted- stone/reconstituted-stone-2
reconstituted stone
Retail
Solid surface Floor Plan
material reconstituted stone stone/reconstituted-stone-2 JOINERY BENCH TOP
RS02
(ST1) RS02 http://www.beststone.com.my/quartz/quartz-5
http://www.beststone.com.my/quartz/quartz-5
PolyTec PolyTec
Timber Grain Laminate Natural oak Natural oak http://www.polytec.com.my/colours.php
http://www.polytec.com.my/colours.php JOINERY CABINETS
(LAM 1)

PolyTec Nippon Paint: http://professional.nipponpaint.com.my/colours/colours_


Plain Laminate Summit White http://www.polytec.com.my/colours.php Misty Rain fandeck
RECEPTION JOINERY
(LAM 2) NP BGG 1615 P
2PAC
or Pantone 5513 CP https://www.pantone.com/color-finder/5513-CP
PolyTec Gloss Finish
Laminate Kickback Hearth http://www.polytec.com.my/colours.php Natural Anodised
SHOPFRONT
(LAM 4) Aluminium
ALUMINIUM
Acaia Fabrics http://acaciafabrics.com/products-
Nippon Paint: WAITING CHAIR InsideOut Collection page2.php?selection=1&brsearch=yes&bid=21&catid=1
http://professional.nipponpaint.com.my/colours/c
Misty Rain UPHOLSTERY Range; Inner 2&cid=122&sid=316
2 pack Polyurethane olours_fandeck
NP BGG 1615 P (Patterned Fabric Option) Col: Navy 065
colour
or Pantone 5513 CP Acaia Fabrics
(2PAC1) https://www.pantone.com/color-finder/5513-CP WAITING CHAIR http://acaciafabrics.com/products-
Gloss Finish Immense Collection,
UPHOLSTERY page2.php?selection=1&brsearch=yes&bid=17&catid=1
Col: Baltic 52
(Plain Fabric Option) 2&cid=420&sid=1150

Architectural
Analysis Layouts Visuals Physics FINISHES Appendix
INTERIOR COLOURS
FOR TENDER: 26 December 2016 WPS 17
M Y S S E R V I C E F I T O U T
INTERIOR COLOUR SCHEDULE - OPTION 2
Colour selections on this page shall be met to a reasonable degree. GENERAL COLOUR SCHEME
Provide samples for review.
ITEM COLOUR SWATCH COLOUR NAME LINKS
Fossil
http://www.birrusmatting.com.au/ultramat.html
ENTRANCE MAT

Details Wood; Details


White 743640 200 x http://www.feruni.com/detailwoodofcerim
TILE- General Floor
1200mm

Limestone: Waitomo
LM03N, 300 x 300mm, http://www.feruni.com/limestone
TILE- Kitchen Floor
Natural Surface Finish

Calcite Ivory YS51NN,


300 x 600mm, http://www.feruni.com/black-white
TILE- Kitchen Wall
Polished Finish

Nippon Paint:
http://professional.nipponpaint.com.my/colours/colours_fa
RESERVED WHITE
ndeck
NP OW 1081 P or
WALL PAINT
Pantone 11-4300 TPX
https://www.pantone.com/color-finder/11-4300-TPX
Marshmallow

Nippon Paint:
http://professional.nipponpaint.com.my/colours/colours_fa
BRILLIANT WHITE
ndeck
1001 or
CEILING PAINT
Pantone 11-0601 TCX
https://www.pantone.com/color-finder/11-0601-TCX
Bright White
Retail 3D
Nippon Paint: http://professional.nipponpaint.com.my/colours/colours_fa
Concrete Kerb ndeck
DOOR COLOUR NP N 1833 D or
Pantone 7756 U https://www.pantone.com/color-finder/7756-U

T-051 Taupe http://www.tachitica.com/window-blinds-


malaysia/venetian-blinds-23/venetian-blinds-colour-part-
CABINETRY COLOUR SCHEME VENETIAN BLINDS
1_472

http://www.beststone.com.my/reconstituted-
Best Stone, Quartz
ITEM COLOUR SWATCH COLOUR NAME LINKS stone/reconstituted-stone-2
Q5
JOINERY BENCH TOP
http://www.beststone.com.my/reconstituted- http://www.beststone.com.my/quartz/quartz-5
Best Stone, Quartz
Solid surface material stone/reconstituted-stone-2
Q5 PolyTec
(ST1) http://www.beststone.com.my/quartz/quartz-5
European Walnut http://www.polytec.com.my/colours.php
JOINERY CABINETS
Retail 3D PolyTec
Timber Grain Laminate European Walnut http://www.polytec.com.my/colours.php
(LAM 1) Nippon Paint:
http://professional.nipponpaint.com.my/colours/colours_fa
Millenium Gray
ndeck
PolyTec RECEPTION JOINERY NP N 2036 T
Plain Laminate Summit White http://www.polytec.com.my/colours.php 2PAC or Pantone 18-0615
https://www.pantone.com/color-finder/18-0615-TPX
(LAM 2) TPX Stone grey
Gloss Finish
PolyTec Natural Anodised
SHOPFRONT
Laminate Kickback Cinder http://www.polytec.com.my/colours.php Aluminium
ALUMINIUM
(LAM 4)
Acaia Fabrics http://acaciafabrics.com/products-
Nippon Paint: WAITING CHAIR InsideOut Collection page2.php?selection=1&brsearch=yes&bid=21&catid=12
Millenium Gray http://professional.nipponpaint.com.my/colours/col UPHOLSTERY Range; Resort &cid=122&sid=315
NP N 2036 T ours_fandeck (Patterned Fabric Option) Col: Paprika 101
2 pack Polyurethane
or Pantone 18-0615
(2PAC1) WAITING CHAIR Acaia Fabrics http://acaciafabrics.com/products-
TPX Stone grey https://www.pantone.com/color-finder/18-0615-
Gloss Finish TPX UPHOLSTERY Immense Collection, page2.php?selection=1&brsearch=yes&bid=17&catid=12
(Plain Fabric Option) Col: Amber 57 &cid=420&sid=1150

Architectural
Analysis Layouts Visuals Physics FINISHES Appendix
INTERIOR COLOURS
FOR TENDER: 26 December 2016 WPS 18
M Y S S E R V I C E F I T O U T
AIR CONDITIONING EQUIPMENT - SAMPLE LAYOUT & SCHEDULE
Provide Mechanical Equipment to meet the HVAC parameters shown on this page.

NOTES:

1. Verify Air Conditioning loads and unit sizes by


performing load calculations. Submit
documentation of load calculation method and
results.

AC50A 2. Use R410a refrigerant.

AC25C
v 3. Use ceiling-mounted cassette units connected by
SF1 copper refrigerant piping to outdoor multi-split
condensing unit.
SF2 4. Multi-split condensing unit shall have adequate
capacity for simultaneous loads . do not size for
sum of connected unit capacity.

5. Pipe condensate from evaporator units to


v
AC60B plumbing drain. Include air gap between

v
DSC01 condensate pipe and drain.

6. Provide one controller/thermostat for each indoor


unit. Provide controls to allow the occupant to

v
DSC01 adjust the temperature set points in the zones.

v
AC50A AC50A adjust set points automatically during unoccupied
hours. Provide controls for occupants to extend
operation after regular hours of occupancy.

v
AC35A EF1 DSC01
7. Makeup air supply fan (SF-1) interlocked to run
when cooktop range hood is on

8. Outdoor units to be fixed to wall hidden visually by


existing grille.

TAG DESCRIPTION MAKE MODEL SIZE ADDITIONAL INFORMATION

DSC01 DX super multi split air-conditioner Daikin 5MKS100ESG 10.0 kW Nom Outdoor unit. Qty 3

AC35A Ceiling-Mounted Cassette Type Daikin FFQ35BV1B Nom 3.5 kW Indoor unit. Qty 1

AC50A Ceiling-Mounted Cassette Type Daikin FFQ50BV1B Nom 5.0 kW Indoor unit. Qty 3

AC60B Duct-connected Type Daikin FDKS60CVMB Nom 6.0 kW Indoor unit. Qty 1

AC25C Wall-Mounted Type Daikin FTKS35DVM Nom 3.5 kW Indoor unit. Qty 1

EF1 Axial Supply/Exhaust Air Fan Kruger TDS 400/9AA/7?? Fan diameter 400mm Air flow requirements: 180L/s @ 120Pa ESP - Power: 0.37kW - Voltage: 3Phase 50Hz 415V

SF1 Axial Supply/Exhaust Air Fan Kruger TDS 400/9AA/7?? Fan diameter 400mm Air flow requirements: 450L/s @ 120Pa ESP - Power: 0.37kW - Voltage: 3Phase 50Hz 415V

SF2 Axial Supply/Exhaust Air Fan Kruger TDS 400/9AA/7?? Fan diameter 400mm Air flow requirements: 190L/s @ 120Pa ESP - Power: 0.37kW - Voltage: 3Phase 50Hz 415V

Mechanical
AIR CONDITIONING Ventilation Plumbing Gas
FOR TENDER: 26 December 2016 WPS 19
M Y S S E R V I C E F I T O U T
VENTILATION
Provide Mechanical Equipment, ducts, filters, and grilles to meet the ventilation parameters shown
on this page ITEM KEY

Supply air grille

Air Conditioning Unit

Return air grille

20 L/s Existing exhaust duct


20 L/s (connects with rest of
SF1 building)

Existing Outside Air supply


SF2 duct

60 L/s Exhaust Air Fan


20 L/s
v
60 L/s Dryer
70 L/s Supply Air Fan
40 L/s

NOTES:

v
60 L/s
1. Separate Outside Air (OA) Intake and Exhaust
450 L/s EF1 (EXH) Outlet Louvers by minimum of 3 meters.
10 L/s
2. Air flow units are in litres per second (L/s).

3. Directly supply outside air to Air Conditioning Units


40 L/s 40 L/s
4. Prevent short-circuiting of fresh air supply into
exhaust grilles.
Oven Cooktop
Hood Hood 5. Install volume dampers on each duct branch
250 L/s 550 L/s serving exhaust grille or outside air diffuser.

6. Ensure adequate clearances and access for


regular maintenance of equipment above
suspended ceiling.

7. Use rigid ductwork except as needed for duct


connections to equipment and grilles registers and
diffusers.

8. Use flexible ductwork only as required, avoiding


hard bends. do not run flex duct for more than 2
meters in length. do not run flex duct through
partitions.

9. Provide controls to operate fans during occupied


hours and to shut off during unoccupied hours.

10. Kitchen Exhaust fan controls to be interlocked with


Fire Panel to isolate fan when fire panel activated
in fire mode

Mechanical
Air Conditioning VENTILATION Plumbing Gas
FOR TENDER: 26 December 2016 WPS 20
M Y S S E R V I C E F I T O U T
PLUMBING AND DRAINAGE
Provide Domestic Hot and Cold Water supply and Sanitary Drainage as outlined in the
requirements on this page

ITEM KEY

All SS sink drainage


must include a Grease GT
Inceptor

Sample Sanitary
drainage run

Sample Condensate
run

v8 Mechanical Equipment
1

11 7
2
GENERAL NOTES
4
1. Domestic Hot Water (DHW) pipe should be
insulated with Aeroflex Elastomeric or similar
material.
v
13
8 2. Condensate pipe shall be insulated with
5 synthetic rubber or Aeroflex Elastomeric or
9 similar

10 3 3. Maintain 100mm clear space around each


service, equipment, fixed sink unit etc. to allow

v
for ease of installation and maintenance, this
space may reduce locally at flanges, valves and

` other fitments.

GT
4. Do not run water piping in ceiling above cable
tray except when crossing
12
GT 5. Fit a vacuum breaker or suitable backflow
prevention device to all domestic water services
where there is the possibility of back siphoning,
including but is not limited to the cleaners sink.

KEYNOTES 6. Non-return Valve to be Eurostop VALSTOP


Art H.151.S.05 for DN20 (3/4”) or Art
H.151.S.06 for DN25 (1”) or similar
1. Connect to existing water meter.
8. Sanitary pipe shall be installed under the sink with a grade 1/40.
7. Install isolation valves so that isolating the water
2. Vertical piping to be concealed in wall between store and kitchen and then horizontally surface supply in one area does not cut off the water
9. Condensate clean out should be easily accessed from ceiling panel under the pipe.
mounted under bench and sink level. supply to another area. Isolation valve for each
10. Install Air Admittance Valve (AAV) before the last connection of sanitary piping. area and equipment where necessary to be
3. Main DCW and DHW should be located under the sink and fixed to the wall (typical) easily accessible.
11. Install electric hot water heater with 180L storage capacity. Mount water heater on steel frame
4. Install in-wall thermostatic mixing valve for basin: Broen Stabitherm 12 140 009 or local
approximately 400 mm high to allow for drainage. Install drain pan with enough height for
equivalent with integral non-return valves and strainers, set to maximum temperature of 45
drainage fall.
degrees Celsius.
12. All basin, cleaners sink, kitchen sink, and dishwasher waste must pass through a grease
5. Connect condensate from Air Conditioner (AC) and drainage from washing machine to
inceptor before entering the existing sanitary waste pipe (which exits through slab of unit).
cleaners sink with a water seal trap.
Conceal all drainage connections with a new half wall, SS bench top and side access panel.
6. Connect condensate from Air Conditioner to the sanitary pipe with a water seal trap.
13. Install tundish at each AC condensate connection
7. Clean Out should be installed to the all end of main sanitary pipe.

Mechanical
Air Conditioning Ventilation PLUMBING Gas
FOR TENDER: 26 December 2016 WPS 21
M Y S S E R V I C E F I T O U T
GAS REQUIREMENTS
Connect cooktop to existing LPG Gas supply as shown in schematic below. Connect Solenoid Valve to Gas detector and interlock with
fire panel to isolate Gas supply when fire panel is activated.

ITEM KEY

Solenoid Valve

Gas Regulator

Isolation valve

Existing Gas Meter

GAS SCHEMATIC

SIGNAGE REQUIREMENTS

Mechanical
Air Conditioning Ventilation Plumbing GAS
FOR TENDER: 26 December 2016 WPS 22
M Y S S E R V I C E F I T O U T
POWER CIRCUIT LAYOUT
Power outlets to meet the following minimum parameters: ITEM KEY
• 2 x double power outlets per workstation
• For enclosed office, locate power outlets on opposing walls Refer to pages 13-15 for details
of Kitchen & Cleaners Fixtures. New Single Power
• Provide power outlets in ceiling space for Mechanical equipment.
Provide power outlets for all
equipment. Outlets shall be
hose proof type IP65 rating in New Double Power
these areas.
4
Existing Distribution Board
location 1
x6

2 Install 15 Amp power outlet


2
for Baine Marie.

Install 15 Amp power outlet


1 for Data Rack. Coordinate
with data network installer 3
(separate contract) for
QTY: 3 location of power outlet.

3 Install 6 double power


6 outlets on AV joinery 4
cabinet, refer to
finishes/fixed cabinetry
5 Install one power outlet in
ceiling space for ceiling
5
mounted camera installed
by owner

Install one double power


outlet inside Family insight
AV cabinet, one directly
above cabinet top (for 6
coffee machine) and the
third power outlet at
1900mm for TV power

1600 H 1500 H QTY: 2


(for TV) (for TV)
NOTES:

1. Data outlets to be provided by separate contractor. Coordinate power outlet


location with network and data outlet design and installation
2. All power outlets not on skirting trunking shall be 300mm above FFL unless
otherwise noted.
3. All power circuits are to be supplied by 2.5mm2 Two Core plus Earth (2C+E)
PVC or XLPE cable as a minimum
4. All outlets shall be marked to indicate what circuit they are associated with.
5. All Cable circuits shall be run in conduits. Ensure all cable runs are as straight
as possible and fixed securely using conduit saddles.

Electrical Key Plan


POWER Lighting
FOR TENDER: 26 December 2016 WPS 23
M Y S S E R V I C E F I T O U T
SWITCHBOARD LAYOUT
The following table outlines a sample
switchboard circuit schedule.
SAMPLE SWTCHBOARD LAYOUT
1. Use Existing switchboard and circuit
breakers where practicable

2. Only Residual Current Devices (RCDs)


with a 30mA sensitivity are to be used for
power and lighting circuits.

3. All Power outlets in the kitchen to be hose


proof type IP65 rating.

4. Confirm exact Mechanical AC details and


Power requirements.

CONFIRM

CONFIRM

CONFIRM

Electrical
POWER Lighting
FOR TENDER: 26 December 2016 WPS 24
M Y S S E R V I C E F I T O U T
LIGHTING LAYOUT
Provide light fittings to meet the Lux levels outlined on this page. ITEM KEY

Supply and install tiltable


spot light for wall display
(display supplied by owner)

100 lux

250 lux

400 lux

Illuminated Exit sign

NOTES:
1. Emergency lights to be installed as
required by local code but a minimum of 1
in each room without natural light.

2. Existing Illuminated Exit sign above entry


door to remain if in working order.
Otherwise a new one is to be installed in
the same location

Electrical Key Plan


Power LIGHTING
FOR TENDER: 26 December 2016 WPS 25
M Y S S E R V I C E F I T O U T
SECURITY LAYOUT
Provide security system to meet the following requirements.

ITEM KEY

Drop existing PA speaker (attached to Main Building


Fire Alarm Panel) and associated emergency light to Security Alarm Panel
ceiling level.

Alarm Keypad

Motion Detector

Siren

NOTES:

1. The Alarm Panel installed shall support at


least 4 zones and come complete with
backup battery, 2 x keypad, motion
detectors and siren. It shall also have the
ability to be monitored remotely and to
contact a nominated person via telephone,
SMS or email upon intruder detection.

2. The existing Public Address speaker


connected to the building’s Fire Alarm Panel
is to be relocated from its exiting position to
the suspended ceiling.

Electrical Key Plan


Power Lighting SECURITY
FOR TENDER: 26 December 2016 WPS 26
M Y S S E R V I C E F I T O U T

APPENDIX

FOR TENDER: 26 December 2016 WPS 27


M Y S S E R V I C E F I T O U T
PROJECT DOCUMENTATION DELIVERABLES
DOCUMENT LIST
The following documents shall form the minimum output for review, construction and as-built purposes,
further documents can be added if needed. ARCHITECTURAL

REVIEW DOCUMENTATION: PDF format. TRADE SPECIFICATION

AS-BUILT DOCUMENTATION: PDF and digital CAD format, either AutoCAD (.dwg) or Revit (.rvt) DOOR AND HARDWARE SCHEDULE
TESTS ON COMPLETION: Record in Electronic format. To include results of Pre-commissioning, FINISHES SCHEDULE
Commisioning and Trial operation.
SANITARY SCHEDULE
DRAWING LIST SCALE SHEET SIZE FURNITURE. FIXTURES, FITTINGS AND EQUIIPMENT SCHEDULE

ARCHITECTURAL COLOUR BOARD (SAMPLE OF FINISHES)

COVER SHEET WITH NOTES, SYMBOL LEGEND, ASSUMPTIONS, ELECTRICAL


SCALE TO SUIT A1
EXCLUSIONS, REFERENCES TO STANDARDS AND REGULATIONS ETC TRADE SPECIFICATION
SITE PLAN SCALE TO SUIT A1 ELECTRICAL EQUIPMENT AND MATERIALS SCHEDULES

WORKSITE PLAN (HOARDING, ACCESS, STORAGE, STAGING, IF TEST ON COMPLETION PLAN


SCALE TO SUIT A1
APPLICABLE)
MECHANICAL
FLOOR PLAN 1:100 A1
TRADE SPECIFICATION
REFLECTED CEILING PLAN 1:100 A1 MECHANICAL EQUIPMENT AND MATERIALS SCHEDULES

CONSTRUCTION DETAILS SCALE TO SUIT A1 TEST ON COMPLETION PLAN

ROOM LAYOUT AND INTERIOR ELEVATIONS – KITCHEN, CLEANERS PLUMBING & FIRE SUPPRESSION
1:50 A1
INSIGHT FAMILY, MEETING. TRADE SPECIFICATION
EXTERIOR SHOPFRONT ELEVATION 1:50 A1 PLUMBING EQUIPMENT AND MATERIALS SCHEDULES

CABINETRY AND FURNITURE/FIXTURES DETAILS SCALE TO SUIT A1 TEST ON COMPLETION PLAN

ELECTRICAL
“TESTS ON COMPLETION“
COVER SHEET WITH NOTES, SYMBOL LEGEND, ASSUMPTIONS, ELECTRICAL TESTS
SCALE TO SUIT A1
EXCLUSIONS, REFERENCES TO STANDARDS AND REGULATIONS ETC
CONTINUITY TEST OF THE EARTHING SYSTEM
SYSTEM WIDE ELECTRICAL SCHEMATIC WITH CABLE SIZES AND
- A1 INSULATION RESISTANCE
LENGTHS

ELECTRICAL SWITCHBOARD SECTION AND CIRCUIT SCHEDULE - A1 POLARITY

CORRECT CIRCUIT CONNECTIONS


GENERAL POWER LAYOUT WITH CIRCUIT LABELS, POWER
1:100 A1
WIREWAYS EARTH FAULT LOOP IMPEDANCE

LIGHTING LAYOUT 1:100 A1 OPERATION OF RESIDUAL CURRENT DEVICES.

ALARM SYSTEM LAYOUT AND SCHEMATIC 1:100 A1 MECHANICAL/PLUMBING SYSTEMS REQUIRING TESTS

DOMESTIC COLD WATER SYSTEM


MECHANICAL
WATER TREATMENT
COVER SHEET WITH NOTES, SYMBOL LEGEND, ASSUMPTIONS,
SCALE TO SUIT A1 DOMESTIC HOT WATER SYSTEM
EXCLUSIONS, REFERENCES TO STANDARDS AND REGULATIONS ETC

MECHANICAL PLAN, FLOW DIAGRAM AND INSTALLATION DETAILS 1:100 A1 PLUMBING SYSTEM

SANITARY DRAINAGE SYSTEM


KITCHEN DETAIL PLAN, SECTIONS AND HOOD FABRICATION DETAILS SCALE TO SUIT A1
WASTE WATER TREATMENT
PLUMBING & FIRE SUPPRESSION
LAUNDRY EQUIPMENT
COVER SHEET WITH NOTES, SYMBOL LEGEND, ASSUMPTIONS,
SCALE TO SUIT A1 FOOD SERVICE EQUIPMENT
EXCLUSIONS, REFERENCES TO STANDARDS AND REGULATIONS ETC
LPG SYSTEM
FIRE SUPPRESSION LAYOUT AND DETAILS 1:100 A1
VENTILATION
PLUMBING DRAINAGE AND VENTING PLANS, SCALE TO SUIT A1
AIR CONDITIONING EQUIPMENT
PLUMBING AND DRAINAGE FLOW DIAGRAMS AND DETAILS SCALE TO SUIT A1
FIRE SYSTEM

Appendix A Project Documentation Deliverables SECURITY SYSTEM

FOR TENDER: 26 December 2016 WPS 28