“We have achieved above ‘102,730’ safe man hours without lost time injury”
The Internal roads and parking in, Dibba Al Hisn Harbour project has achieved approx.
102,730 cumulative man-hours worked up to 30th April ’ 2018. The project has accomplished
Zero LTI (Lost time Injury) free man-hours worked since last LTI on date 10 th Nov ‘2017.
1 no, First aid cases occurred during the month of April’ 2018.
Total 45 no’s of Construction Vehicles (Wheel loader, Backhoe loader, Excavator, Skid loader,
Motor grinder, Water tanker, Trucks, etc.) were inspected during the month of April ’2018.
Total 1 no’s of Safety trainings conducted at site and achieved 88 man attended during the
Total 600 man achieved from Tool box talks such as Incident alerts, Hazard & Fire safety to site
Total 2 no’s housekeeping Inspection conducted at site all during the Month of April’18.
10 Nos, Work Permit has been issued for excavation work during the Month of April’18.
Issued mandatory, PPE to the workers and ensure its proper use at site and, PPE stock list has
2 Reducing personal damage Achieve 102,730 safe man-hours The project has achieved
Class 2 and Class 3 incident worked since last LTI (lost time 31250 safe man-hours on the
systematically. injury) on 10 Th NOV 2017. Month of April 2018
PD Class-2:- Damage which PD (personal damage) - 0
temporarily alters a person’s PD -3 -1
future e.g. broken arm or
muscle strain etc.
PD Class-3:- Damage which
inconveniences a person e.g.
first aid treatment for a cut
hand, dust in eyes etc.
Near miss / Dangerous
Occurrence
3 Increase a level of safety and Conducted Tool Box Talk before Tool Box Talk conducted
health awareness among starting of work. before starting of work by
employees. Site Inspection with Checklist. HSE Team.
Total 1 nos. of training programs HSE meeting held on dated
Conduct at the site. 18th April ’17.
Total man-month for training
achieved 88Nos.
Conducted monthly HSE Committee
meeting at site for review of HSE
compliances and performance
4 Driver license & other Driver license & other documents Certificate of all required
documents should be available in construction construction vehicle has been
vehicle. update as on date.
TRAINING
In-House Health, Safety & Environmental Training:
Total 1 nos. Safety training conducted at site
Over 88 Worker participated in this training have successfully attended the above training
programmed.
The site training is a step towards our awareness programmes conducted on monthly basis on HSE
aspects among all workman and supervisory staff to create awareness among project staff for safe,
secure and healthy environment at worksite.
Every day tool box talks conducted at site, before starting of work at each working location.
Over 100 Persons including Engineers and Forman participated.
Environment:
Ensured water system (water tankers) at construction site for dust pollution control.
Environmental Monitoring along the Project road and plant site has been conducted on 5th April
2018.
Rehabilitation of Borrow area and Quarry sites to be initiated after completion of project.
SL ISSUED AVAILABL
NO ITEMS CONDITION THIS QTY.ISSUED E STORE REMARK
MONTH For Project S
ACCIDENT REPORT
SAFE CONDITION
LIFTING TOOLS
ELECTRICALS HAZARDS
Penalized/Warning 0 nos.
Definition of Breaches – Number of breaches of statutory health, safety & environmental requirements. This includes
Fines, Improvement Notice, Prohibition Notice, Penalty Notice or Prosecutions, or Non Compliance with Legal and Other
Requirements
5. Details of employee :
(1) No. of staff : 19 Person.
(2) No. of workers : 88Person.
(3) No of indirect staff : 18 Person.
(4) Total person : 125Person.
2 Chains NA NA NA NA NA
3 ROPE NA NA NA NA NA
4 Lifting tackles NA NA NA NA NA
9. Cause of Accident
(Separate sheet may be attached)
i) Remedial measure taken : NIL
(Separate sheet may be attached)
And belief.
Signature Signature