BILL OF QUANTITIES                   

GOUDRAND 
DEVELOPMENT                   
  
All Quantities in this Schedule are provisional & are subject to re‐measurements on site. 
Areas shaded in grey are not applicable to Landscape Contractor. 
  
ITEM  DESCRIPTION  UNIT AREA  QTY RATE  TOTAL 
1   PRELIMINARY AND GENERAL                
  
Contractor’s Establishment on site                                                
Incl Protection of Works, OSHSA Act Adherence and Public 
Liability                                                                                                
1.1  Based on 7.5% of project value.                                                              
  
TOTAL PRELIMINARY AND GENERAL    
  
2   EARTHWORKS                
  
2.1  Site Clearance                

Landscape Contractor to remove and cart away off site all 
vegetation and domestic Waste etc.  under supervision and 
instruction of the Landscape Architect. Landscape Architect 
to point out items to be removed at the tender site 
meeting.  It Remains the responsibility of the Landscape 
Contractor to acquaint him/herself on Site with the scope 
   of this item.  Includes areas to be landscaped with lawn.  m2  1675         
  
2.2  Earth Mounds                

Landscape Contractor to re‐use existing building rubble and 
debris like bricks, Broken tiles and lumps of concrete to 
form core of earth mounds.  All excavated soil To be re‐
   used for shaping and covering earth mounds.  m2  665         
  
2.3  Lawn                

Excavate in‐situ material to depth of 100mm (re‐use 
excavated material on earth Mounds – as included in item 
2.2).  scarify and prepare soil as specified.  Rotovate Scope 
   of the works on site.  m2  905         

2.4  Play area                
Excavate insitu material to a depth of 100mm (re‐use 
excavated material on earth Mounds – as included in item 
   2.2)  m2  105         

2.5  Trees.                  

Excavate 0.125m² (500x500x500mm) of soil per tree (re‐
sure excavated Material on earth mounds – as included in 
item 2.2).  Contractor to acquaint himself With soil 
conditions and the scope of the works on site.  Scarify 
bottom of Excavation, before backfilling.  All tree holes are 
   to be inspected by the Client prior to filling with topsoil.  Item  15         
  
 
 
2.6  Fine grading and shaping                
Fine grading and shaping as specified to all landscaping 
   areas.  m2  1675         
  
2.7  Compost (Supplied by JCP)                

Supply and spread compost as specified.  Compost to tree 
holes, shrub and Groundcover areas and lawn areas.  
Provide 1kg sample and details of supplier With quotation 
   for Landscape Architect’s approval.                
  
2.7.1  Trees : 0.05m² per tree hole  m2  0.5         
2.7.2  Lawn : 75mm layer  m2  68         
  
2.8  Topsoil                
Import topsoil as specified.  Topsoil to tree holes, shrub and 
Groundcover areas and lawn areas.  Provide 1kg sample 
and details of supplier With quotation for Landscape 
   Architect’s approval.                
  
2.8.1  Trees litre. 0.125m² per tree hole  m2  2         
2.8.2  Lawn : 100mm layer  m2  157         

2.9  Fertiliser (Supplied by JCP)                
2.9.1  Trees                
2.9.1a  0.1kg Super phosphate per hole  kg  2         
1 x Tablets (7 grams) per tree of “Agri‐Form” to 
2.9.1b  manufacturer’s specification or "Similar Approved"  ea  15         
2.9.1c  0.1kg bone meal or bone phosphate per hole  kg  2         
  
2.9.2  Lawn                
2.9.2a  0,2kg Super phosphate per  m²  kg  181         
2.9.2b  0,2kg 2:3:2 (22) + Zn per m²  kg  181         
2.9.2c  0,2kg / m² of Gypsum  kg  181         
  
TOTAL EARTHWORKS    
  
3   CONSTRUCTION 
ITEM  DESCRIPTION  UNIT AREA  QTY RATE  TOTAL 
  
3.1  Brick Mowing Edge                
Supply and install brick retaining edge on concrete footing 
   around Play Area  l/m  37         
  
3.2  Play Equipment                
Install play equipment in concrete footings ‐ equipment 
   supplied by JCP                
1. Roundabout Item 1
   2. See‐Saw  Item  1         
   3. Jungle Gyn  Item  1         
   4. Slide  Item  1         
  
3.3  Paved area Surfacing                
15mm Rubberworx play surface including 75mm ready mix 
   concrete base to 25Mpa  m2  101         
  
TOTAL CONSTRUCTION    
  
4  PLANTING 
PLANTS/m
ITEM  DESCRIPTION  SIZE  2  QTY RATE  TOTAL 
4.1  Lawn                
Provide, temporary store, and plant sods directly on 
prepared soil with reference to the sods, fertilizers, 
maintenance (including watering of sods directly after 
   planting)                
  
4.1.1  Specie: Kikuyu                
  
TOTAL PLANTING    
  
5  SUMMARY 

   PRELIMINAIRIES AND GENERAL    
   EARTHOWRKS    
   CONSTRUCTION    
   PLANTING    
   SUB‐TOTAL    
CONTINGENCIES
   10% OF ABOVE    
   SUB‐TOTAL    
   VALUE ADDED TAX (VAT) AT 14%    
   TOTAL    
 