Академический Документы
Профессиональный Документы
Культура Документы
C1 : Buildings
Main Area - P (Admin & CCR Area)
Sub-Areas - PA - Admin & Control Bldgs
- PB - Storage Warehousing
- PZ - General
C3 : Tank Farm QD HE
Main Area - M - Gas Oil
Sub Areas - MA - Base Oil Tanks North
- MB - Base Oil Tanks South MB HC
- MC - Future Heavy Base Oils MC HB
- MZ - General
Main Area - Q - Kero, Naptha & Slops
Sub-Areas - QA - Base Oil & Kerosene HD
- QB - Gas Oil, CDW & LDF
- QC - Naptha + Sour & Hot Slops
- QD - Hot Slops & HTF DA JE
FA JC
- QZ - General AA
FB UE
Sub-Area - HA - Slug Catcher AD
- HB - Cond Stab Common & Ph 1+
- HC - Cond Stab Ph 2
- HD- E-W Pipierack
- HE - Future Cond Stab & Misc. FE FC JF
FG AC DC JA
- HZ - General
Main Area - J - Processing Ph 1
Sub-Areas - JA - AGR & DMR
- JB - NGL Fractionat'n & Extract'n FD
- JC - Chilled Water CJ
- JD - N-S Piperack
- JE - Ethane Treating UA
- JF - Future CO2 Removal LC
FF UC
- JZ - General
Main Area - K - Processing Ph 2
LA
Sub-Areas - KA - AGR & DMR UD
- KB - NGL, LPG & Ethane CB CC CF CP
- KC - Chilled Water CA
- KD - E-W Piperack CD UB
- KZ - General
LD
Main Area - L (SRU & SCOT) CE LB
Sub-Areas - LA - SRU & SCOT - Ph 1
- LB - SRU & SCOT - Ph 2
- LC - Common Storage Area GA CK
- LD - Substation
- LZ - General
EA NA
BA KA
GB NE
GG
C6 : GTL Facilities C6 : GTL Power Generation C6 : GTL General Utilities C8 : Effluent Teatment Units (ETP)
Main Area - A - GTL Facilities Ph 1 Main Area - C (Power Generation) Main Area - U - General Utilities Main Area - N - Effluent Treatment
Sub Areas - AA - 2nd Stage HPS Sub-Areas - CA - Steam Turbine Gen. Sub-Areas - UA - CW Ph 1 Sub-Areas - NA - AOC, COC etc.
- AB - 1st Stage HPS - CB - Steam gen & IA - UB - CW Ph 2 (South) - NB - Biotreater, etc. Ph 1
- AC - SGP - CC - Power Gen Buildings - UC -Water Treatment - NC - Biotreater, etc. Ph 2
- AD - N-S Piperack - CD - Gast Turbine Gen - UD - Flare - ND - Effl Water, RO, etc.
- AZ - General - CE - BFW
Main Area - B - GTL Facilities Ph 2 - CF - Cond Recovery
- UE - Site Waste Disposal & Future
- UZ - General
- NE - FAR
- NF - Future CO2 Removal
RT LOCATION
Sub Areas - BA - 2nd Stage HPS - CJ - E-W Piperack Ph 1 (North) Main Area - Z - General & Infrastructure - NZ - General
-BB - 1st Stage HPS - CK - E-W Piperack Ph 2 (South) Sub-Areas - ZC - Main Cable Routes CWBD BUILDING
-BC - SGP - CP - N-S Interconn. Piperack -
- BD - N-S Piperack - CZ - General INSIDE NEAR
- BZ - General
0P-7132A