Project:

ETAP Page: 1
12.6.0H
Location: Date: 11-28-2017
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: unit6 Config.: Normal

SHORT-CIRCUIT REPORT

3-phase fault at bus: Bus Bunrakuken

Prefault voltage = 20.000 = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base ( 20.000 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

Bus Bunrakuken Total 0.00 0.375 -11.145 29.7 11.151 0.00 0.375 -11.145 29.7 11.151

Bus load 1 Bus Bunrakuken 0.00 0.000 0.000 999.9 0.000 0.00 0.000 0.000 999.9 0.000

Bus load 2 Bus Bunrakuken 0.00 0.000 0.000 999.9 0.000 0.00 0.000 0.000 999.9 0.000

Bus3 Bus Bunrakuken 99.52 0.156 -6.893 44.3 6.895 99.52 0.156 -6.893 44.3 6.895

Bus1 Coupler 36.87 0.110 -2.126 19.4 2.129 36.87 0.110 -2.126 19.4 2.129

Bus2 Coupler 36.87 0.110 -2.126 19.4 2.129 36.87 0.110 -2.126 19.4 2.129

U1 Bus3 100.00 0.021 -0.919 44.3 0.919 100.00 0.021 -0.919 44.3 0.919

Gen1 Bus1 100.00 0.159 -3.081 19.4 3.085 100.00 0.159 -3.081 19.4 3.085

Gen2 Bus2 100.00 0.159 -3.081 19.4 3.085 100.00 0.159 -3.081 19.4 3.085

* Coupler Bus Bunrakuken 0.00 0.220 -4.252 19.4 4.257 0.00 0.220 -4.252 19.4 4.257

NACD Ratio = 0.62

# Indicates a fault current contribution from a three-winding transformer


* Indicates a fault current through a tie circuit breaker
If faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these PDs will not be reported.
Project:
ETAP Page: 2
12.6.0H
Location: Date: 11-28-2017
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: unit6 Config.: Normal

3-phase fault at bus: Bus load 1

Prefault voltage = 20.000 = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base ( 20.000 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

Bus load 1 Total 0.00 2.457 -2.977 1.2 3.860 0.00 2.457 -2.977 1.2 3.860

Bus Bunrakuken Bus load 1 75.59 2.457 -2.977 1.2 3.860 75.59 2.457 -2.977 1.2 3.860

Bus load 2 Bus Bunrakuken 75.59 0.000 0.000 999.9 0.000 75.59 0.000 0.000 999.9 0.000

Bus3 Bus Bunrakuken 99.86 1.499 -1.857 1.2 2.387 99.86 1.499 -1.857 1.2 2.387

Bus1 Coupler 83.74 0.479 -0.560 1.2 0.737 83.74 0.479 -0.560 1.2 0.737

Bus2 Coupler 83.74 0.479 -0.560 1.2 0.737 83.74 0.479 -0.560 1.2 0.737

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer


* Indicates a fault current through a tie circuit breaker
If faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these PDs will not be reported.
Project:
ETAP Page: 3
12.6.0H
Location: Date: 11-28-2017
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: unit6 Config.: Normal

3-phase fault at bus: Bus load 2

Prefault voltage = 20.000 = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base ( 20.000 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

Bus load 2 Total 0.00 2.696 -3.616 1.3 4.510 0.00 2.696 -3.616 1.3 4.510

Bus Bunrakuken Bus load 2 70.65 2.696 -3.616 1.3 4.510 70.65 2.696 -3.616 1.3 4.510

Bus load 1 Bus Bunrakuken 70.65 0.000 0.000 999.9 0.000 70.65 0.000 0.000 999.9 0.000

Bus3 Bus Bunrakuken 99.83 1.642 -2.254 1.4 2.789 99.83 1.642 -2.254 1.4 2.789

Bus1 Coupler 80.34 0.527 -0.681 1.3 0.861 80.34 0.527 -0.681 1.3 0.861

Bus2 Coupler 80.34 0.527 -0.681 1.3 0.861 80.34 0.527 -0.681 1.3 0.861

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer


* Indicates a fault current through a tie circuit breaker
If faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these PDs will not be reported.
Project:
ETAP Page: 4
12.6.0H
Location: Date: 11-28-2017
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: unit6 Config.: Normal

3-phase fault at bus: Coupler

Prefault voltage = 20.000 = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base ( 20.000 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

Coupler Total 0.00 0.375 -11.145 29.7 11.151 0.00 0.375 -11.145 29.7 11.151

Bus1 Coupler 36.87 0.110 -2.126 19.4 2.129 36.87 0.110 -2.126 19.4 2.129

Bus2 Coupler 36.87 0.110 -2.126 19.4 2.129 36.87 0.110 -2.126 19.4 2.129

Bus load 1 Bus Bunrakuken 0.00 0.000 0.000 999.9 0.000 0.00 0.000 0.000 999.9 0.000

Bus load 2 Bus Bunrakuken 0.00 0.000 0.000 999.9 0.000 0.00 0.000 0.000 999.9 0.000

Bus3 Bus Bunrakuken 99.52 0.156 -6.893 44.3 6.895 99.52 0.156 -6.893 44.3 6.895

Gen1 Bus1 100.00 0.159 -3.081 19.4 3.085 100.00 0.159 -3.081 19.4 3.085

Gen2 Bus2 100.00 0.159 -3.081 19.4 3.085 100.00 0.159 -3.081 19.4 3.085

U1 Bus3 100.00 0.021 -0.919 44.3 0.919 100.00 0.021 -0.919 44.3 0.919

* Bus Bunrakuken Coupler 0.00 0.156 -6.893 44.3 6.895 0.00 0.156 -6.893 44.3 6.895

NACD Ratio = 0.62

# Indicates a fault current contribution from a three-winding transformer


* Indicates a fault current through a tie circuit breaker