300

2-Ø8
1 2 3 4 1 2 3 4 5 50
6-Ø8
300
2500 2500 2500 833

300
A
50

300
B 4-D13
I I Top Section
F1 F1 F1 F2
Anchor (flat bar Sitemix 1:1,5:2,5 Top Section 4-D13
3000

3000
6x100mm)

Anchor (flat bar Sitemix 1:1,5:2,5


6x100mm)
C
F1 F1 F1 F2
2-Ø8

250
3000

3000
Slab 150mm thc. with M8-150

250
D 6-D10 F2
1100

750
F1 F1 F1 F2 5-Ø8

1867
E
F1 4-D13
1200

1050

300
F
350 5300
6-D10

70
Existing building (Manager
House) 6-D10
Concrete
plastic PE

300
Elevation -930mm Elevation 000 mm
Plan- Foundation of Veranda Plan- Foundation of Veranda Detail- Foundation Veranda

70
Scale 1 : 125 Scale 1 : 125 Scale 1 : 16
6-D10

Wood panel
40x200mm
1000
6
Existing building (Manager 100

Veranda building House) 22

50
Sitemix 1:1,5:2,5
2037

100
22
Wood beam
1190
100x120 mm 6-D10

1000
Wood beam

556
100x120 mm 2 - Ø22 holes
both sides
2810

70

406
250

Wood
column

70
750

200x200 mm
1340

6-D10
Bottom Section
45°

Section 1-1 View 212

Scale 1 : 100
300

833 to pedestrian slab


2500 2500 2500 Detail- Footing Detail- Flat bar anchor
Enlarge - Foundation Scale 1 : 20 Scale 1 : 10
Scale 1 : 30

...........................................

...........................................
BUMI SUKSESINDO
CONSTRUCTION CAMP FACILITY
...........................................
MANAGER HOUSE - VERANDA
...........................................
DETAIL FOUNDATION
PT. BUMI SUKSESINDO
A3 1 : 75 BSI - CCF - DWG - CS - 095 0