Вы находитесь на странице: 1из 1

NOTES

1. All dimensions are in millimeters unless otherwise stated.


2. This drawing must not be scaled; only figured dimensions

450 should be used.

200 4550 200 200 4550 200 3. This drawing must be read in conjuction with separate
Architectural drawings.
4. Cover to main reinforcement to be as follows:
(a) Foundation = 50mm. (b) Columns = 40mm.

200

200
01
(c) Beams = 30mm. (d) Slabs = 25mm

4T8-200-03-T2
200

200
5. "Y" Denotes square twisted high yield bars to BS 4461.

600
6. Reinforcement in walls and columns must be inspected before
being enclosed in the formwork.
7. All reinforcement and formwork must be approved by the

01
structural Engineer.
8. All masonary works must be reinforced with hoop iron after

3000

3000
36T10-200-09-B2
4T8-200-01-T2 every alternate course.
600
3000

3000
600 9. Mass/Blinding concrete ~ 1:3:6.
10. Reinforced Concrete (R.C.) ~ 1:1.5:3. {fcu=25N/mm2}

01 01 11.Water Cement Ratio ~ 0.5


12.The Contractor/Builder to check and confirm all dimensions
6T10-200-11-B1 22T10-200-10-B1 and levels with Architects drawings before commencing any
02 02
work. Any discrepancy to be reported to the Engineer before

8T8-200-06-T2
18T10-200-07-T1

03
commencing work.

200

200
13. Holding-Down/Anchor Bolts to be cast to 5mm Accuracy and
200

200
should be Re-cast if this Tolerance is Exceeded.

03 Biggest bar.

1950
15. Place TOP BARS on ALL BEAMS even where not indicated
8T8-200-05-T2
7T8-200-02-T2 on drawing. Where lengths of TOP 'T1' BARS are not given
1950

10T10-200-08-T1
use minimum of 600mm .

2950
16. Concreting of steps to be done in layers

600
17. Engineer(s) to Ensure Foundation is Placed on Well

2950
03 03 Compacted Soil, Murram, Hardcore or Hard Rock.
18. All Steel Works to be Wire-Brush Cleaned Prior Application.
19. All Bolts Grade 4.6.
20. All Fillet welds to be >= 6mm Unless Otherwise Stated.

200 1000

7T8-200-04-T2

600
1200

REVISIONS
02

200
Date Description:
200

450

450
02

450
200 1000 1150 200 2200 200
1200 1150 200 2200 200
RING BEAM AND SLAB {150mm Thick} CONSULTANT:
FOUNDATION LAYOUT LAYOUT & DETAILS WESNICK PROJECTS LIMITED,
P.O. BOX, 18258-20100,
NAKURU.
Mob. +254-723-78 38 48

CLIENT:
FRIENDS APARTMENT LIMITED,
P.O. BOX, 2119-20100,
NAKURU.

200
200
200

BRC MESH A98


BRC MESH A98 DPC
DPC BRC MESH A98 1000g polythene sheet
1000g polythene sheet DPC laid on quarry dust 2T12 PROJECT:
laid on quarry dust G.L.
150

1000g polythene sheet


laid on quarry dust
150

PROPOSED GENERATOR ROOM AND GATE HOUSE ON


150

TO BE DETEMINED ON SITE

PLOT BLOCK No. 10/125, OFF MAASAI AVENUE,


TO BE DETEMINED ON SITE

450
T8@200
TO BE DETEMINED ON SITE

NAKURU COUNTY.
3T10-02-B2
3T10-02-B2
3T10-200-04-T2
2T12
T10-200-03-B1/T1
200
200

Blinding
TITLE:
200

Blinding

600 Blinding

600
600
TYPICAL 450 X 200 BEAM A
T10-200-01-B1 STRUCTURAL WORKING DRAWINGS.
T10-200-01-B1
3T10-200-02-B2
FOUNDATION, ROOF BEAM AND SLAB {150mm Thick}
SECTION 03-03 (1:30) SECTION 02-02 (1:30) LAYOUT & DETAILS
SECTION 01-01 (1:30)
Designed by: Wambugu Scale ~ 1:30

Drawn by: Mwangi Date MAY 2018

Drawing No. ~ WPL/04-05-18

Sheet 01 of 01