Вы находитесь на странице: 1из 2

No.

Member Material UoW (kg/m) L (m)


A. Right Side (arm)
1 H. Long CS Pipe Ø2" t=2.9mm 4.11 2.890
2 H. Di. Long CS Pipe Ø1.5" t=2.9mm 3.26 2.929
3 V. Bar 1 CS Pipe Ø1.5" t=2.9mm 3.26 0.437
4 V. Bar 2 CS Pipe Ø1.5" t=2.9mm 3.26 0.294
5 V. Bar 3 CS Pipe Ø1.5" t=2.9mm 3.26 0.190
6 V. Bar 4 CS Pipe Ø1.5" t=2.9mm 3.26 0.085
7 Dia. Bar 1 SHS 30x30x2 11.30 0.835
8 Dia. Bar 2 SHS 30x30x2 11.30 0.618
9 Dia. Bar 3 SHS 30x30x2 11.30 0.557
10 Post SHS 100x100x4.5 83.37 0.815
Total
B. Foundation
1 F1 Concrete 1000x750x300 2400 0.225
Total

0.125m 1.276m

M2 = 67.50 kg/m
Weight (kg) A (m2) TB. X (m) M3 Moment
Stautus
(A) (B) (A) x (B) kg.m
11.88 0.17 1.42 0.25
9.55 0.14 1.41 0.20
1.42 0.02 0.01 0.00
0.96 0.01 0.85 0.01
0.62 0.01 1.45 0.01
0.28 0.00 2.05 0.01 60.52
9.44 0.03 0.43 0.01
OK
6.99 0.02 1.14 0.02
6.30 0.02 1.75 0.03
67.95 0.08 0.00 0.00 1.27607
47.43 0.42 0.541
(A) (B) (A) x (B)
540 0.225 0.125 0.03
67.5
540.00 0.225 0.03

0.125

1.276m
M1 = 60.52 kg/m

Вам также может понравиться