LAPORAN JAM KERJA

Nama Karyawan Muhammad awaluddin Project : XL U900 & XL LTE Huawei


Jabatan : Engineer Periode : 16 Agustus 2017 - 15 September 2017

No. Hari Tanggal Aktivitas

1 Rabu 16-Aug-17 Install site U900 Tandun


2 kamis 17-Aug-17 install site Tandun & Integrasi site Rambah Samo(Done)
3 Jumat 18-Aug-17 Perapihan dan Integrasi site Tandun (Done)
4 Sabtu 19-Aug-17 T-Shoot sector 3 site Tandun (done)
5 minggu 20-Aug-17 OFF DAY
6 senin 21-Aug-17 Mos dan Install site LTE Delik
7 selasa 22-Aug-17 Integrasi site LTE Delik
8 Rabu 23-Aug-17 Mos, Install dan Integrasi site LTE Pangkalan Baru Barat (Done)
9 kamis 24-Aug-17 Perapihan dan Labelling site LTE Pangkalan Baru Barat
10 Jumat 25-Aug-17 SMQC site LTE Pangkalan Baru Barat
11 Sabtu 26-Aug-17 Mos dan Install U900 mulia Subur
12 minggu 27-Aug-17 lanjut Install U900 Mulia Subur
13 senin 28-Aug-17 perapian and smqc site minas timur
14 selasa 29-Aug-17 Training E-Survey at huawei office
15 Rabu 30-Aug-17 Training E-Survey at huawei office
16 kamis 31-Aug-17 revisi smqc pangkalan baru barat
17 Jumat 1-Sep-17 Libur hari raya idul adha
18 Sabtu 2-Sep-17 off day
19 minggu 3-Sep-17 off day
20 senin 4-Sep-17 Revisi SMQC U900 site Sungai Buluh
21 selasa 5-Sep-17 Perapihan dan SMQC U900 site Tandun
22 Rabu 6-Sep-17 SMQC minas timur
23 kamis 7-Sep-17 SMQC U900 site Tandun
24 Jumat 8-Sep-17 Revisi SMQC site Pangkalan Baru Barat
25 Sabtu 9-Sep-17 ambil capture at huawei office
26 minggu 10-Sep-17 smqc sidumulyo barat
27 senin 11-Sep-17 ambil capture at huawei office
28 selasa 12-Sep-17 Revisi SMQC site Meranti Pengkalan kuras
29 Rabu 13-Sep-17 Revisi SMQC site Meranti Pengkalan kuras
30 kamis 14-Sep-17 Revisi SMQC site 4443 PKL kerinci
31 Jumat 15-Sep-17 Perapihan dan SMQC site sidomulyo barat

Dibuat oleh: Diperiksa :

………………………………………… …………………………………………
Nama Personil Supervisor
LAPORAN JAM KERJA

15 September 2017

Jam Kerja Absent


Aktivitas Allowance
Dengan
Mulai Selesai Lembur konfirmasi
Install site U900 Tandun 8:00 18:00
install site Tandun & Integrasi site Rambah Samo(Done) 8:00 18:00
Perapihan dan Integrasi site Tandun (Done) 8:00 18:00
T-Shoot sector 3 site Tandun (done) 9:00 23:00 14 jam
OFF DAY 0:00 0:00
Mos dan Install site LTE Delik 8:00 23:00 5 jam
Integrasi site LTE Delik 9:00 18:00 8 Jam
s, Install dan Integrasi site LTE Pangkalan Baru Barat (Done) 8:00 3:00 8 jam
Perapihan dan Labelling site LTE Pangkalan Baru Barat 8:00 18:00
SMQC site LTE Pangkalan Baru Barat 8:00 18:00
Mos dan Install U900 mulia Subur 8:00 20:00 Duty 2
lanjut Install U900 Mulia Subur 8:00 19:00 Duty 2
perapian and smqc site minas timur 8:00 18:00

Training E-Survey at huawei office 8:00 17:00


Training E-Survey at huawei office 8:00 17:00
revisi smqc pangkalan baru barat 8:00 19:00
Libur hari raya idul adha
off day
off day
Revisi SMQC U900 site Sungai Buluh 8:00 18:00
Perapihan dan SMQC U900 site Tandun 8:00 19:00
SMQC minas timur 8:00 17:00
SMQC U900 site Tandun 8:00 18:00
Revisi SMQC site Pangkalan Baru Barat 8:00 17:00
ambil capture at huawei office 8:00 17:30
smqc sidumulyo barat 8:00 17:00
ambil capture at huawei office 8:00 18:00
Revisi SMQC site Meranti Pengkalan kuras 9:00 19:00
Revisi SMQC site Meranti Pengkalan kuras 8:00 19:00
Revisi SMQC site 4443 PKL kerinci 8:00 17:00
Perapihan dan SMQC site sidomulyo barat 8:00 17:00

Disetujui :

…………………………………………
Project Manager
Absent
Tanpa
konfirmasi
………………………