Bar Bending Schedule

XYZ

DRG NO; S001,S002,S003,S100-S109,S500


No. of Cutting Cutting
No. of Total Cutting Length in Meters
Sl. No Shape of the bar Description Spacing Dia Membe Length Length in
rods
rs in mm M 8 10 12 16 20 25 32
Foundation
Total Cutting Length 13149.18
Unit Wt. In Kg/M 0.40 0.62 0.89 1.58 2.47 3.86 6.32
Wt.in Kg. 11688.16
Total Wt. In.M.T 11.69
Plinth Beams
1 PB1 GRID 1 - B to D
300 450

225 2490 225 TOP BARS 12 1 3 2868 2.87 8.60

2590 BOTTOM BARS 16 1 3 2590 2.59 7.77

400
250 STIRRUPS 250 8 2 4 1428 1.43 11.42

400
150 STIRRUPS 250 8 2 4 1228 1.23 9.82

Total Cutting Length 5063.50 209.62 1043.54 719.58


Unit Wt. In Kg/M 0.40 0.62 0.89 1.58 2.47 3.86 6.32
Wt.in Kg. 2000.08 186.33 1649.06 1776.74
Total Wt. In.M.T 5.61
Columns
Total Cutting Length 1602.04 312.00 584.00
Unit Wt. In Kg/M 0.40 0.62 0.89 1.58 2.47 3.86 6.32
Wt.in Kg. 632.81 277.33 922.86
Total Wt. In.M.T 1.83