METHOD STATEMENT
For
Location:
Page 1 of 8
PROJECT DETAILS
PROJECT
CONTRACTOR DETAILS
NAME PO Box:
Tel No:
Fax No:
OFFICE LOCATION
CONTRACT MANAGER
METHOD STATEMENT
1. To ensure that the Activity that are within the Scope of the Contract is executed in a safe manner.
2. To ensure that all Hazard Related to the Contract and its Activity are Identified, Assessed and
Controlled to an acceptable level.
1 PURPOSE 3. To ensure that the Contractor conducts their job according to the Approved Method Statement.
The Scope of the Method Statement Shall cover all the Activities Covered by the Scope of the Contract
2 SCOPE:
as described above.
1. Code of Construction Safety Best Practices- Dubai Municipality
2. Contractor HSE Plan
3 REFERENCE
3. DPR HSE Policy
4. Any other relevant standards for the required work (Dubai or UAE standards)
1. It is the Responsibility of the Contractor to ensure that the Activity is conducted in accordance to
the approved Method Statement
2. The Contractor is responsible for obtaining necessary permit to conduct the work.
3. The Site Engineer/ Site Supervisor/ Foreman shall ensure that the personnel working under his
4 RESPONSIBILITY
care execute their task in accordance to this method statement
4. Contractor safety officer shall ensure implementation of all safety procedures, safety measures
related to the nature of works being carried out and in accordance to the client, employer and
governmental HSE requirements
PERSONNEL Name Task/ Trade Trade Qualification
5
(Please provide
additional sheet when
Page 2 of 8
the space provided is
not sufficient)
Others:
S
6 Required PPE a H
fe ar
ty d Safety Hearing Eye Respiratory
B H Gloves Protection Protection Protection
o at
o s
ts
Inspection
Equipment Name Specification
Certificate
Scaffolding
(Please provide
7
additional sheet when
the space provided is
not sufficient)
Page 3 of 8
Material Safety
Materials/ Chemicals/ Substances
Data Sheet
Materials To Be Used
(Please provide
7
additional sheet when
the space provided is
not sufficient)
8 Storage Of Material
House Keeping
9
Arrangement
As a first step the brackets are installed after inspection of bolts &
alignments using necessary scaffolding.
Page 4 of 8
The second step is erection of steel frame members using light
weight scaffoldings.
Once the frames are installed they will be aligned properly and a
thorough inspection is carried out on all the fastening systems to
make it sure that proper Tightening of the bolts has been ended
before installation of fabric on top.
Now, starts fabric installation, the factory made fabric is opened and
checked for any damages & dimensions.
Emergency
Procedures:
Page 5 of 8
Welfare Requirements
Services to be
supplied by
Subcontractor
Arrangement to
Manage the
Subcontractor
All work will be undertaken by qualified competent persons with experience of the type of work described above, and in all cases in full
accordance with safety procedures specified in the Contractor and in compliance to Legoland HSE Policy.
Prepared By Reviewed By
Date
Page 6 of 8
METHOD STATEMENT BREIFING
Date
Briefing for:
Location:
Company: Designation:
We (the undersigned) have read and understood the attached method statement and have commit to comply with the
specified requirements and control measures.
No Name Signature
10
Page 7 of 8
11
12
13
14
15
16
17
Page 8 of 8