DPR/RL/MS/OOO

CONTRACTOR METHOD STATMENT

CONTRACTOR METHOD STATEMENT

METHOD STATEMENT
For

Suppply & Installation of Awnings

Location:

CONTRACTOR Mumtaz Tents

Rev No Rev Date Prepared By Reviewed By Approved By Revision History

00 21/3/2018 Ateeq Ateeq Khalid

APPROVAL BY RIVERLAND DUBAI

Review & Approval


Project Initiator (Contractor) Facility Management HSE Department Operation department

Date: Date: Date: Date:

CONTRACTOR METHOD STATEMENT

Page 1 of 8
PROJECT DETAILS

PROJECT

LOCATION Contract Reference No: (if any)

DETAILED CONTRACT DESCRIPTION/ SCOPE

Start Date/ Time: Target Completion Date:

CONTRACTOR DETAILS

NAME PO Box:
Tel No:
Fax No:

OFFICE LOCATION

CONTRACT MANAGER

HSE REPRESENTATIVE Contact No:

METHOD STATEMENT

1. To ensure that the Activity that are within the Scope of the Contract is executed in a safe manner.
2. To ensure that all Hazard Related to the Contract and its Activity are Identified, Assessed and
Controlled to an acceptable level.
1 PURPOSE 3. To ensure that the Contractor conducts their job according to the Approved Method Statement.

The Scope of the Method Statement Shall cover all the Activities Covered by the Scope of the Contract
2 SCOPE:
as described above.
1. Code of Construction Safety Best Practices- Dubai Municipality
2. Contractor HSE Plan
3 REFERENCE
3. DPR HSE Policy
4. Any other relevant standards for the required work (Dubai or UAE standards)
1. It is the Responsibility of the Contractor to ensure that the Activity is conducted in accordance to
the approved Method Statement
2. The Contractor is responsible for obtaining necessary permit to conduct the work.
3. The Site Engineer/ Site Supervisor/ Foreman shall ensure that the personnel working under his
4 RESPONSIBILITY
care execute their task in accordance to this method statement
4. Contractor safety officer shall ensure implementation of all safety procedures, safety measures
related to the nature of works being carried out and in accordance to the client, employer and
governmental HSE requirements
PERSONNEL Name Task/ Trade Trade Qualification
5
(Please provide
additional sheet when

Page 2 of 8
the space provided is
not sufficient)

Others:

 S
6 Required PPE a  H
fe ar
ty d Safety Hearing Eye Respiratory
B H Gloves Protection Protection Protection
o at
o s
ts
Inspection
Equipment Name Specification
Certificate

Scaffolding

EQUIPMENT Tightening Tools

(Please provide
7
additional sheet when
the space provided is
not sufficient)

Page 3 of 8
Material Safety
Materials/ Chemicals/ Substances
Data Sheet

Materials To Be Used

(Please provide
7
additional sheet when
the space provided is
not sufficient)

8 Storage Of Material

House Keeping
9
Arrangement

GENERAL WORK METHODOLOGY

1.1 Safety Check

 Once the materials is fabricated and delivered on site, prior to start


Detailed Sequence of
erection, a site meeting with all erection team is conducted to make
Operations:
- if include sketches them familiar with their job and the locations and a briefing is done
required on safety and health.
8
(Please provide  A safety check is performed which will make it sure that all site
additional sheet when personnel is wearing safety elements like hard hats, safety shoes,
the space provided is coverall and safety harness if necessary.
not sufficient)

1.2 Method of erection:

 As a first step the brackets are installed after inspection of bolts &
alignments using necessary scaffolding.

Page 4 of 8
 The second step is erection of steel frame members using light
weight scaffoldings.
 Once the frames are installed they will be aligned properly and a
thorough inspection is carried out on all the fastening systems to
make it sure that proper Tightening of the bolts has been ended
before installation of fabric on top.
 Now, starts fabric installation, the factory made fabric is opened and
checked for any damages & dimensions.

 At this point we start stretching the fabric on four sides


 After the final shape is achieved the alignment is checked with all the
erected canopies and required adjustments are done.
 As soon as the main erection is completed, a further inspection is
carried out to check the final alignments and if any damages is
caused to fabric and paint during erection.
 Any damages found will be rectified and the site will be cleaned and
handed over to the client.
 Proper care is taken throughout the process to ensure there are no
damages caused to the fabric and paint by means of protection rings
using some soft materials.

Temporary Supports (Scaffolding


and Props needed to
facilitate the works:
Method of Access and (N/A)
Egress to the work
area:
Fall Protection (N/A)
Measures: (Where
work at height cannot
be eliminated –
consider both
Personnel & Materials)

Emergency
Procedures:

Name of On-Site First Aider:

First Aid Box Location:

Location of Nearest Hospital:

Page 5 of 8
Welfare Requirements

Services to be
supplied by
Subcontractor

Arrangement to
Manage the
Subcontractor

Other information &


Comments

List Of Permits to be Obtained Obtained


1. O Yes O No
2. O Yes O No
Permit to Work 3. O Yes O No
4. O Yes O No
5. O Yes O No
6. O Yes O No
7. O Yes O No

The Contractor shall abide by the Approved Method Statement.

All work will be undertaken by qualified competent persons with experience of the type of work described above, and in all cases in full
accordance with safety procedures specified in the Contractor and in compliance to Legoland HSE Policy.

Prepared By Reviewed By

Date

Page 6 of 8
METHOD STATEMENT BREIFING

Date

Briefing for:

Location:

Briefing Delivered by:

Company: Designation:

We (the undersigned) have read and understood the attached method statement and have commit to comply with the
specified requirements and control measures.

No Name Signature

10

Page 7 of 8
11

12

13

14

15

16

17

Page 8 of 8