Вы находитесь на странице: 1из 8

BACLARAN ASEANA

+35

+30

+25

20
+20
Level of catenary wires
+15 Roxas boulevard Bradco Aseana Ave
Top of rail R=5 000 m
0.00 %
-0.79 % R=5 000 m

0,8

0,8
10
+10 R=3 000 m 0.30 %

2,5
+5

5
Redemptorist Road

6,9
Reduced clearance 5 m

6,6
p1 p2 p3 p4 p5 p6 p7 p8 p9 p10 p11 p12 p17 p18 p19 p27
p13 p14 p15 p16
p21 p22 p23 p24 p25 p26
+0 0
p28
p20 p29 p30 p31 p32 p33 p34 p35 p36 p37 p38 p39 p40 p41 p42 p43 p44 p45 p46 p47 p48 p49 p50 p51 p52

Rail 11.835 11.835 11.835 11.835 11.835 11.835 11.835 11.835 11.835 11.835 11.835 11.804 11.623 11.395 11.16711.04110.913 10.716 10.479 10.266 10.054 9.842 9.630 9.417 9.205 8.993 8.781 8.568 8.356 8.144 7.936 7.889 7.969 8.050 8.131 8.212 8.293 8.374 8.455 8.536 8.617 8.698 8.779 8.860 8.923 8.985 9.065 9.145 9.226 9.306 9.361 9.346
Piers
GL -10
2.7 2.7 2.7 2.7 2.7 2.6 2.6 2.6 2.5 2.5 2.5 2.3 2.1 2.0 2.1 2.1 2.3 2.5 2.3 -0.5 1.0 1.1 1.5 1.3 1.4 1.2 2.4 0.7 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5

566.120 m R=5 000 m -0.79 % R=3 000 m 484.218 m R=5 000 m


Type 0.00 % 39.308 m 471.999 m 32.585 m 0.30 % 30.000 m

100 321.445 11.835

100 360.753 11.680

7.970

7.891

9.343

9.343
11.835 7.886 9.388
Level 11.796 7.842 9.366

100 341.099

100 832.752

100 849.044

100 865.337

101 349.554

101 364.554

101 379.554
Chainage

Chainage 100009.163 100059.894 100097.348 100148.080 100343.296 100394.920 100563.165 100614.790 100952.472 101004.289 101054.820 101106.638 101377.666
Horizontal Alignments

100
R=135.00
200 CL 168.245 CL
25 51.6
51.6 25
500 AL AL AL AL
Straight CL R=900.00 CL
500 307.015 C 195.216 337.682 51.817 50.531 51.817 271.028
200 50. L CL 2
732 73
R=102.00 50.
100
37.454
00

p61
998

p60
ST.
STRU
CONCCTURES

p59
CONC
UEZ

p1 SIDEW
ALK
RETE

DRIG

p58
RETE
00

E. RO

ALK

p57
TAFT EW
STRU

SID
999

AVEN
UE
EXTE p2
p56
CTUR

SIDE
NSIO
WAL N
K
ES

SIDEWAL
K p55 EW
ALK TE
STR
UCT
URE
S

SID CRE

p54
CON URE

00
UCT
EL STR
STE
000

1016
p3

p53
K
00+

p52
WAL
SIDE

p51
PURE

500
G ST
RIP ALK
Pk 1

p50
EW
GO

TIN SID
PLAN
O
LD

p4

TAMB

101
p49
RIP
G ST
Jolli

TIN
PLAN
bee

1 00 p48 SID
EW
ALK
CONCCTUR
STRU

00 ANDE
1 ST.
p47 E GR

A
SIDE

L BELL

400
RETEES

RIE

AN
AB ALK
WAL

p5

J. G EW

p46
SID
K

ASE

101
p45
STRU
CO CTUR

p44
NCRE ES

ANDE
E GR
TE

p43
BELL
p6

300
Z ST.
CONCCTUR
STRU

p42
RU
.C
G.G

101
RETEES

TIN
G ST
RIP
p41 E GR
ANDE
PLAN BELL
p7

p40

K
WAL
SIDE
p39

00
DE
GRAN

2
E
BELL

101
p38
SIDE

E.
200 RIP
p8

G ST
100

V
WAL
CONC

TIN

A
AN
K

p37
PL

K
WAL
RE

SIDE
TE ST

N
A
p36

100
RUCT

E
S
p9
PA REA

A
URES

101

K
p35

WAL
RK
A
ING

SIDE
ALK
EW
SID
ng
wki
Cho
p34
E
NC
FE
TE
RE

K
NC

AL
CO

EW
SID
p10

K
p33

AL
0

EW
SID
+00
K
WAL
SIDE

p32
ES
UR
CT
RU
SIDE

101
ST
TE
Bacl

RE
WAL

NC

p31
CO
p11

aran
K

Chu

Pk
p30 NOTES :
rch

300 AR
D

100 EV

900

K
UL

WAL
p29 S
BO
1)

SIDE
XA
p12

100
RO

K
K

WAL
WAL
SIDE

p28
K

SIDE
WAL
SIDE
CENTERLINE OF ES

U-Beams - P20 to P120, P124 to P235, P239 to P338, P341 to P368, P371 to P436,
UR
CT
RU

p27
ST
TE

ALIGNMENT AS SHOWN IN CO
NC
RE

P439 to P446
p13

PROJECT EXECUTION PLAN p26


Other than Redemptorist street : P121 to P124, P235 to P238, P338 to P341, P368 to
800
STEE

p25
L
Berm nter

100
FENC

P371, P437 to P439.


Ce
B

aM
A

p14

p24
Y

all

2) I-Beams - Redemptorist street : please refer to drawing


A
N
I H

p23 M1E00-CC-DWG-CWK-STAT-SYSTRA-10-002
A

p1
N

E
5
ST

NC

3) U-Beams : please refer to drawing M1E00-CC-DWG-CWK-STAT-SYSTRA-10-001 and


L FE
SIDE

EE K
700

p22
.

00
ST WAL
KING SIDE
WAL

CHOW
04
O
K

10 drawing M1E00-CC-DWG-CWK-SYSTRA-10-010
100

C
D

p1
p21
AN
A

BACLAR 8
R

FARM
ACIA
p19 p20 4) Civil works at junction at Baclaran with existing LRT Line 1 out of Systra's scope.
B

WAL
K
ENVISAGED CURVE REDEMPTORIST ROAD /
SIDE

ROXAS BLVD.
Pier P1 and P2 locations may be subject to change at next design stage along with
00

RAILWAY PROFILE AND PIER LAYOUT TO BE


6
p1

5) Pier locations may change during detailed design.


100
6

CONFIRMED DURING DETAILED DESIGN


100500

p1 G
7

G 12/10/15 Updated J. ORMILLA J.FIOT J.C DAIRE J. Ormilla Manila LRT1 Cavite Extension
APPENDIX TO EPC CONTRACT
F 01/07/13 Modif. Niyog Y. SKIFIC R. CHES. A. C. MHA
E 05/06/13 Modif. Niyog & Pulang lupa Y. SKIFIC R. CHES. A. C. MHA
12/10/2015
Manilla Line 1 Cavite Extension
D 23/05/13 Revised track layout Y. SKIFIC R. CHES. A. C. MHA J. Fiot General Arrangement / Horizontal
C 28/03/13 Second issue Y. SKIFIC R. CHES. A. C. MHA
A3 1/4000 and Vertical Alignments / Pier layout
B 15/03/13 Internal issue Y. SKIFIC R. CHES. A. C. MHA J.C. Daire A1 1/2000 Sheet 1 of 8
A 01/03/13 First issue Y. SKIFIC R. CHES. A. C. MHA
THE OWNERSHIP OF THE COPYRIGHT IN THIS DRAWING IS RETAINED BY
Department of Transportation and
Communication & Light Rail Transit Authority
BOUYGUES - ALSTOM EPC Consortium THE ISSUER WHOSE CONSENT MUST BE OBTAINED BEFORE ANY USE OR
REPRODUCTION OF THE DRAWING OR ANY PART THEREOF CAN BE MADE. M1E00-CC-DWG-ALG-STAT-SYSTRA-01-001 G
ASEANA MIA

+35

+30

+25

+20

+15
Naia Rd
R=5 000 m
+10 R=5 000 m 0.30 %
-0.30 % R=5 000 m

6,2
6,4
+5
6,9

p78 p79 p80 p81 p82 p83 p84 p85 p86 p87 p88 p89 p90 p91 p92 p98 p99 p100 p101
p73 p74 p75 p76 p77 p93 p94 p95 p97 p102 p103 p104
p67 p68 p69 p70 p71 p72 p96 p105 p106 p107
+0 p66
p50 p51 p52 p53 p54 p55 p56 p57 p58 p59 p60 p61 p62 p63 p64 p65

Rail 9.306 9.361 9.346 9.265 9.184 9.103 9.022 8.941 8.860 8.779 8.698 8.617 8.536 8.459 8.481 8.562 8.643 8.724 8.805 8.886 8.967 9.048 9.133 9.218 9.298 9.379 9.459 9.539 9.624 9.709 9.790 9.871 9.952 10.033 10.114 10.195 10.276 10.357 10.438 10.519 10.600 10.681 10.762 10.843 10.924 11.005 11.086 11.167 11.248 11.297 11.220 11.117 11.014 10.911 10.808 10.706 10.603 10.500
Piers
GL -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 0.2 2.4 2.2 2.5 2.5 2.5 2.5 2.8 3.0 3.1 3.0 3.3 3.7 3.8 3.9 3.8 3.9 3.8 3.8 3.8 3.9 4.0 4.0 4.0 4.0 3.9 3.9 3.1 2.9 2.8 2.7 3.2 3.7 3.8 3.9 3.6 3.2 2.8 2.7 2.6 2.5 2.6

R=5 000 m -0.30 % R=5 000 m 934.179 m R=5 000 m


Type 30.000 m 290.197 m 30.000 m 0.30 % 34.047 m
9.343

9.343

8.473

8.473

102 633.931 11.275

102 667.977 11.261


9.388 8.450 11.326
Level 9.366 8.428 11.297
101 349.554

101 364.554

101 379.554

101 669.751

101 684.751

101 699.751

102 650.954
Chainage

Chainage
Horizontal Alignments

101377.666 101560.867101585.153101610.177 101677.091101702.115 102334.075 102391.835 102499.714102524.738 102624.604102649.628 102811.830


102826.841

100

200
500
Straight R=4000.00 AL CL R=1500.00 CL AL R=4000.00 AL CL R=1500.00 CL AL CL R=2000.00
500 183.201 24.286 25.024 66.914 25.024 631.960 57.760 107.879 25.024 99.866 25.024 162.202 15.011 83.391
200

100

GUARD RAIL

p85 p86 p87 p88 p89 p90 p91 p92 p93 p94 p95 p96 p97
PLANTING STRIP
PLANTING STRIP

p79 p80 p81 p82 p83 p84 CYCLONE WIRE FENCE p98 p99
PLANTING STRIP
p73 p74 p75 p76 p77 p78 CYCLONE WIRE FENCE CYCLONE WIRE FENCE
p100
p67 p68 p69 p70 p71 p72 p101 p102
p63 p64 p65 p66 CYCLONE WIRE FENCE

p103
p61 p62 p104 p105
p59 p60 p106
p58 GUARD RAIL
GUARD RAIL

p53
p54
p55 p56 p57

SIDEWALK
SIDEWALK STEEL
FENCE SIDEWALK
LOADING & UNLOADING BAY

SIDEWALK MIA GUARD RAIL


CYCLONE WIRE FENCE
CYCLONE WIRE FENCE CYCLONE WIRE FENCE
CYCLONE WIRE FENCE

SIDEWALK

SIDEWALK

p51 p52 SIDEWALK


SIDEWALK FOOT BRIDGE
p50 PLANTING
STRIP SIDEWALK
p49 STRIP
SIDEWALK
Seven Eleven
p48 PLANTING

102500
102400
102300

102600
p47

102200
102100
K D Caltex
Pk 102+000

SIDEWAL ABANDONE

102700
101900

S
BUILDING
STRUCTURE
CONCRETE
101800
101700

SIDEWALK

ASEANA

102800
101600

SIDEWALK STEEL STRUCTURE


101500

AL MALL
MALL COAST
AL
MANILA BAY
PARK
MALL COAST
101400

RITY AL
DEVELOPME
NT AUTHO COAST

DE TAMBO
BELLE GRAN
101300

BELLE GRAN
DE NOTES :
BELLE GRAN
DE 1)
DE
BELLE GRAN

U-Beams - P20 to P120, P124 to P235, P239 to P338, P341 to P368, P371 to P436,
P439 to P446
Other than Redemptorist street : P121 to P124, P235 to P238, P338 to P341, P368 to
P371, P437 to P439.
2) I-Beams - Redemptorist street : please refer to drawing
M1E00-CC-DWG-CWK-STAT-SYSTRA-10-002
3) U-Beams : please refer to drawing M1E00-CC-DWG-CWK-STAT-SYSTRA-10-001 and
drawing M1E00-CC-DWG-CWK-SYSTRA-10-010
4) Civil works at junction at Baclaran with existing LRT Line 1 out of Systra's scope.
Pier P1 and P2 locations may be subject to change at next design stage along with

5) Pier locations may change during detailed design.

G 12/10/15 Updated J. ORMILLA J.FIOT J.C DAIRE J. Ormilla Manila LRT1 Cavite Extension
APPENDIX TO EPC CONTRACT
F 01/07/13 Modif. Niyog Y. SKIFIC R. CHES. A. C. MHA
E 05/06/13 Modif. Niyog & Pulang lupa Y. SKIFIC R. CHES. A. C. MHA
12/10/2015
Manilla Line 1 Cavite Extension
D 23/05/13 Revised track layout Y. SKIFIC R. CHES. A. C. MHA J. Fiot General Arrangement / Horizontal
C 28/03/13 Second issue Y. SKIFIC R. CHES. A. C. MHA
A3 1/4000 and Vertical Alignments / Pier layout
B 15/03/13 Internal issue Y. SKIFIC R. CHES. A. C. MHA J.C. Daire A1 1/2000 Sheet 2 of 8
A 01/03/13 First issue Y. SKIFIC R. CHES. A. C. MHA
THE OWNERSHIP OF THE COPYRIGHT IN THIS DRAWING IS RETAINED BY
Department of Transportation and
Communication & Light Rail Transit Authority
BOUYGUES - ALSTOM EPC Consortium THE ISSUER WHOSE CONSENT MUST BE OBTAINED BEFORE ANY USE OR
REPRODUCTION OF THE DRAWING OR ANY PART THEREOF CAN BE MADE. M1E00-CC-DWG-ALG-STAT-SYSTRA-01-002 G
ASIAWORLD

+35

+30

+25

+20
Roxas boulvard
+15 Pacific Ave Quirino Ave
R=3 000 m

0,8
R=12 500 m
R=5 000 m 1.50 % -1.00 %
0.55 %
-0.38 % R=3 000 m
R=5 000 m 0.30 %
+10

1
6,2
6,3
p140
+5
p141
p121 p122 p123 p124 p125 p126 p127 p128 p129 p130 p131 p132 p133
p105 p106 p107 p108 p109 p110 p111 p112 p113 p114 p115 p116 p117 p118 p119 p120 p134 p135 p136 p137 p138 p139

+0 p142 p143 p164


p144 p145 p151 p161 p162 p163
p146 p147 p148 p149 p150 p156 p157 p158 p159 p160
p152 p155
p154
p153
Rail
10.706 10.603 10.500 10.397 10.294 10.191 10.088 9.986 9.883 9.780 9.677 9.574 9.471 9.368 9.288 9.230 9.254 9.323 9.392 9.461 9.518 9.598 9.679 9.759 9.839 9.911 9.984 10.075 10.276 10.632 11.037 11.442 11.885 12.327 12.741 12.908 12.823 12.561 12.291 12.021 11.751 11.481 11.211 10.941 10.671 10.415 10.158 9.981 10.042 10.189 10.337 10.484 10.632 10.779 10.926 11.074 11.221 11.369 11.516 11.660
Piers
GL 2.5 2.6 2.5 2.6 2.9 2.9 2.8 2.8 2.6 2.5 2.5 2.5 2.5 2.9 3.0 3.0 3.2 3.1 3.2 3.2 3.5 3.5 3.4 3.6 3.5 3.0 3.1 3.1 3.0 2.7 2.5 2.5 2.7 2.9 6.5 4.5 0.3 0.3 -0.4 -0.8 -1.3 -1.6 -1.6 -1.8 -1.5 -0.9 -1.9 -3.3 -2.5 -2.0 -1.7 -1.4 -1.7 -1.3 -1.3 -0.8 -0.6 -0.5 0.2

-0.38 % R=5 000 m 256.794 m R=5 000 m 134.239 m R=3 000 m -1.00 % R=3 000 m 315.124 m R=12 500 m
Type 524.412 m 34.047 m 0.30 % 60.000 m 1.50 % 75.000 m 263.729 m 46.379 m 0.55 % 30.748 m

9.264

9.250

103 483.230 10.020

103 543.230 10.560

103 677.469 12.574

103 752.469 12.762

104 016.198 10.124

104 062.578 10.019

104 377.702 11.739


9.228 10.200 13.137 9.982
Level 9.199 10.110 12.902 9.892

103 192.389

103 209.412

103 226.435

103 513.230

103 714.969

104 039.388
Chainage

Chainage
102811.830
102826.841 102910.231
102925.242 103084.562 103121.939 103175.283 103212.661 103514.533 103561.319 103831.433 103878.219 103978.911 104015.358 104284.255 104320.701
Horizontal Alignments

100
R=172.00
200
CL 270.114 CL
500
CL R=2000.00 CL AL CL AL 86 46.7 AL
Straight R=900.00 CL 46.7 86 CL
15.
500011 83.391 15.011 159.320 37.377 37.377 301.872 100.693 36.4 CL
53.344 R=208.00 46
200 46
268.898 36.4
100

SIDE
WAL
K p163
7
p1
08 p15 FENCE INFORMA
L SET
TLERS p164
CONCRETE INFORMA
p165

RS
L SET
800

TLERS

LE
6 p166

TT
p1 15

LERS

E
SE

NC
09 p
102

p167

AL

FE
RM

E
RET
SETT

INFO
p168

NC
p1

CO
55

RMAL
10 p169
p1 NINO
RES
IDE
NTI
p170

INFO
AL

Y AQ

104300
SIDE
p1

00
WAL
K
11

SIDEWALK
1042
UINO

SIDEWALK
p1 54
0

1 p1
0

2
29

00
10

RES
p1 IDE

1044
NTI
13 AL

53

W
RES

OO STRU
IDE

DE
NTI
p1

RS
p1
AL

N CTUR
I AL

RE
14

SETTLE
RESID

SI ES
ENTIA

DE
00
L

00

NT
NT

IA
SID

L
EW

41

MAL

1045
AL

IDE
K
p1

10

INFOR
15

5R2E S
0

p1

p1
00

IMELDA B
16
3+

p1
17
10

RIDGE
1
p15
Pk

p1
SIDE 18
WAL

URES
K
p1
19
00

RUCT
0
31

p1

p15
ALK

TE ST
EW
10

20 0 SID

+00

RE
p1
4
k 10

CONC
21 P
TA

9
M

p14
BO p1
SIDE
WAL
22
K

p1
23
00

8
32

p14
p1
24
10

p1
25

7
p14
p1
26

POTENTIAL NEW LOCATION FOR ASIAWORLD


AS p1
IA 27

6
900
00

p14
STATION SUBJECT TO AGREEMENT WITH W 103
33

p1
OR 28
10

GRANTORS AND FURTHER DESIGN DEVELOPMENT

FENCE
E
NC
NOTES :

FE
LD p1

TE

ETE
p14
29

RE

CONCR
NC
1)

CO
p1
30

44
GU
AR
D RA

STRU RETE
p1
E
IL
p1

CTUR
31 U-Beams - P20 to P120, P124 to P235, P239 to P338, P341 to P368, P371 to P436,

NC
NCE

CO
00

TE FE
P439 to P446

43
34

p1

RE
p1
CONC
32
10

GU
AR
D RA
IL

p1 4 2 Other than Redemptorist street : P121 to P124, P235 to P238, P338 to P341, P368 to
p1

PARK O

RS
33 P371, P437 to P439.

GAL

SETTLE
DON
TA
41
MB
O
2) I-Beams - Redemptorist street : please refer to drawing

MAL
p1 GUA
p1
plex 0
34 RD

INFOR
RA
Com
ort
0
IL o Sp 38
M1E00-CC-DWG-CWK-STAT-SYSTRA-10-002
Gal
p13 Don 10
5
p136 p139
.

3) U-Beams : please refer to drawing M1E00-CC-DWG-CWK-STAT-SYSTRA-10-001 and


DET QUE
ANA RD

p138
PAR L GUA

p137
STA
00

COA
GU
AR
D
35

RA
IL
RIP

drawing M1E00-CC-DWG-CWK-SYSTRA-10-010
ST

10

DE
NG

MO
TI

LIS
AN

ALK
HE
PL

4) Civil works at junction at Baclaran with existing LRT Line 1 out of Systra's scope.
IL
STR

SIDEW
D RA
UC
AR
GU
TU
RE DEM
ST OLI
RU SH
CTU ED
RE
Pier P1 and P2 locations may be subject to change at next design stage along with

700

p1
40
00

5) Pier locations may change during detailed design.


103
1036

K
WAL
SIDE

G 12/10/15 Updated J. ORMILLA J.FIOT J.C DAIRE J. Ormilla Manila LRT1 Cavite Extension
APPENDIX TO EPC CONTRACT
F 01/07/13 Modif. Niyog Y. SKIFIC R. CHES. A. C. MHA
E 05/06/13 Modif. Niyog & Pulang lupa Y. SKIFIC R. CHES. A. C. MHA
12/10/2015
Manilla Line 1 Cavite Extension
D 23/05/13 Revised track layout Y. SKIFIC R. CHES. A. C. MHA J. Fiot General Arrangement / Horizontal
C 28/03/13 Second issue Y. SKIFIC R. CHES. A. C. MHA
A3 1/4000 and Vertical Alignments / Pier layout
B 15/03/13 Internal issue Y. SKIFIC R. CHES. A. C. MHA J.C. Daire
First issue Y. SKIFIC R. CHES. A. C. MHA
A1 1/2000 Sheet 3 of 8
A 01/03/13
THE OWNERSHIP OF THE COPYRIGHT IN THIS DRAWING IS RETAINED BY
Department of Transportation and
Communication & Light Rail Transit Authority
BOUYGUES - ALSTOM EPC Consortium THE ISSUER WHOSE CONSENT MUST BE OBTAINED BEFORE ANY USE OR
REPRODUCTION OF THE DRAWING OR ANY PART THEREOF CAN BE MADE. M1E00-CC-DWG-ALG-STAT-SYSTRA-01-003 G
NINOY AQUINO

+35

+30

+25
OLS (2%)
ated Landing -off OLS (1.6%)
Airport estim rt estimated Take
+20 Max height of
catenary poles
Ninoy Aquino Ninoy Aquino Airpo
Ninoy Aquino Ave

8
+15
R=12 500 m R=3 000 m R=5 000 m R=3 000 m
0.30 % -1.50 % R=3 000 m -0.30 % R=5 000 m 0.30 %
0.30 % -2.50 %
1,5

R=3 000 m

3,4
+10

3,5
7,2
11

+5 p168 p169 p170 p171


Ninoy Aquino Ave
p167 p183 p214
p182 p184 p188 p189 p190 p191 p192 p193 p194 p195 p196 p197 p198 p199 p200 p201 p202 p203 p204 p205 p206 p207 p208 p212 p213 p215 p216 p217 p218 p219 p220 p221
p185 p186 p187 p209 p210 p211
p176
+0 p166 p175 p177 p181
p164 p165 p172 p178 p180
p163 p173 p174 p179

Rail 11.516 11.660 11.798 11.892 11.972 12.052 12.132 12.213 12.274 12.161 11.815 11.410 11.016 10.806 10.828 10.909 10.990 11.071 11.152 11.233 11.314 11.375 11.437 11.521 11.605 11.686 11.767 11.848 11.915 11.868 11.787 11.706 11.625 11.544 11.463 11.382 11.301 11.254 11.321 11.402 11.483 11.564 11.645 11.726 11.807 11.888 11.964 12.039 12.114 12.195 12.248 12.092 11.766 11.165 10.490 9.835 9.377 9.168 9.090
Piers
GL -0.5 0.2 0.2 0.8 3.4 5.0 5.0 5.0 4.8 0.4 -0.5 -0.1 0.9 1.9 1.0 0.0 -0.2 0.1 0.6 2.9 3.8 3.1 2.5 2.5 2.5 2.7 2.7 2.8 2.6 2.6 2.8 2.8 2.8 2.8 2.9 2.8 2.8 3.0 2.9 2.9 2.9 2.9 2.8 2.8 2.7 2.6 2.5 2.5 2.5 2.7 2.8 3.2 2.8 2.8 2.9 3.1 3.0 2.9 2.9

R=12 500 m 130.482 m R=3 000 m -1.50 % R=3 000 m 363.545 m R=5 000 m -0.30 % R=5 000 m 320.678 m R=3 000 m -2.50 % R=3 000 m
Type 30.748 m 0.30 % 54.000 m 53.966 m 54.000 m 0.30 % 29.998 m 206.285 m 29.998 m 0.30 % 84.000 m 49.208 m 66.000 m
104 377.702 11.739

104 408.450 11.870

104 538.932 12.261

104 592.932 11.937

104 646.898 11.127

104 700.898 10.803

105 064.443 11.894

105 094.441 11.894

105 300.726 11.275

105 330.724 11.275

105 651.402 12.237

105 735.402 11.313

105 784.609 10.083

9.159
11.823 12.342 10.844 11.939 11.253 12.363 9.440
Level 11.814 12.220 10.722 11.917 11.230 12.069 9.258
104 393.076

104 565.932

104 673.898

105 079.442

105 315.725

105 693.402

105 817.609

105 850.609
Chainage

Chainage
104320.701 104541.997 104580.034 104697.490 104735.527 104843.792 104879.087 104975.866 105011.161 105596.334 105631.294 105685.917 105720.876 105803.323 105842.930
Horizontal Alignments

100

200 R=225.00
CL CL R=620.00
500 AL AL 96.778 35.2 AL AL CL
95
Straight
500 221.295
CL CL 108.265 35.2 95
585.173
CL CL 82.447 39.606 51.017
38.0 R=202.00 37 34.9 R=215.00 60
200 37 38.0 60 34.9
117.457 54.623
100

p173 p174
p172 p175
p171 p17
6
p170
p169 p17
7
p168
p167
UINO
p1
78
p166
SIDE

Q
OY A
WAL

p165
O
p1 SAN DIONISI
104600

LA
K
FENCE

HUE 79
p164
NIN
IAL RT
EN
T WO
A SAN DIONISIO
SIDE
CONCRETE

SID
OD
EN
RE ST
LA HUERTA
p163
RU RESID
CT
p1
WAL

UR ENTIA
ES L

80 SAN DIONISIO
K

p162
INFOR
700

MAL
00

SETT CONCRETE
LERS CONCRETE
1 p1 STRUCTURES
1045

p16
104

STRUCTURES
81 Transteam Freight Inc.
ge p211 p212
Forwarders Brokera
p209 p210 p213
p1 p207 p208 p214
60 p206
p1 82 p204 p205

CO
AL
p203
00

NTI
p202 p21

NC
IDE
RES
p201 5

RE
p1 p200 SIDEWALK
1044

TE
8 3 p198 p199 CONCRETE le SIDEWALK
p21

ST
Orange Apartel
p197 STRUCTURES

RU
p18 p196 6
IM

H
AT
NCE
CE

CT
p195 TP
SIDEWALK
4 p p194
FEN

UR
EL

FO
L FE

TTLER
S
185 p193 p21

E
SE
p192
0

MAL
7
RETE
DA

CONCRETE STRUCTURES
STEE

Shakey's
INFOR Olivarez Plaza
p191
0

p186 p190
00

p189
48

CONC

p187 p188 p21


BR

Pizza Hut
8
E
1043

E
10

CTUR
TUR
ID

CONCRETE FENCE

CO CT
p21

ST
STRUC
GE

105600
STRU

NC UR
RU
CONCRETE
9

RE E
STRUCTURES CONCRETE
TE
rter

TE
RETE

105500
NTI
AL SIDEWALK
p22
STRUCTURES
NCRE
Racal Motors

IDE
Tiles Expo

TIONAL FREIGHT 0

700
RES MANILA INTERNA
CONC

FORWARDERS INC.

105400
p221
CO

SIDEWALK

Fuelsave

105
Gasoline

105300
Station HOTEL
OYSTER PLAZA
ALLIED BANK

105200
900

CONCRETE
0

STRUCTURES
20

105100
MC DONALDS CONCRETE STRUCTUR
104

ES
4
10

L
Pk 105+000
IA
NT

800
DE
SI

STEEL STRUCTURE
RE CALTEX

105
SIDEWALK
CONCRETE CONCRETE

SID
CONCRETE
CONCRETE STRUCTURES STRUCTURES

EW
STRUCTURES
CONCRETE STRUCTURES CONCRETE STRUCTUR

SIDEWALK
STRUCTURES AIRPORT CITY MALL

AL
ES

K
CONCRETE

SIDEWALK
STRUCTURES

NOTES :
Dampa Seafoods Markets

1)

U-Beams - P20 to P120, P124 to P235, P239 to P338, P341 to P368, P371 to P436,
P439 to P446
Other than Redemptorist street : P121 to P124, P235 to P238, P338 to P341, P368 to
P371, P437 to P439.
2) I-Beams - Redemptorist street : please refer to drawing
M1E00-CC-DWG-CWK-STAT-SYSTRA-10-002
3) U-Beams : please refer to drawing M1E00-CC-DWG-CWK-STAT-SYSTRA-10-001 and
drawing M1E00-CC-DWG-CWK-SYSTRA-10-010
4) Civil works at junction at Baclaran with existing LRT Line 1 out of Systra's scope.
Pier P1 and P2 locations may be subject to change at next design stage along with

5) Pier locations may change during detailed design.

G 12/10/15 Updated J. ORMILLA J.FIOT J.C DAIRE J. Ormilla Manila LRT1 Cavite Extension
APPENDIX TO EPC CONTRACT
F 01/07/13 Modif. Niyog Y. SKIFIC R. CHES. A. C. MHA
E 05/06/13 Modif. Niyog & Pulang lupa Y. SKIFIC R. CHES. A. C. MHA
12/10/2015
Manilla Line 1 Cavite Extension
D 23/05/13 Revised track layout Y. SKIFIC R. CHES. A. C. MHA J. Fiot General Arrangement / Horizontal
C 28/03/13 Second issue Y. SKIFIC R. CHES. A. C. MHA
A3 1/4000 and Vertical Alignments / Pier layout
Y. SKIFIC R. CHES. A. C. MHA
B 15/03/13 Internal issue J.C. Daire A1 1/2000 Sheet 4 of 8
A 01/03/13 First issue Y. SKIFIC R. CHES. A. C. MHA
THE OWNERSHIP OF THE COPYRIGHT IN THIS DRAWING IS RETAINED BY
Department of Transportation and
Communication & Light Rail Transit Authority
BOUYGUES - ALSTOM EPC Consortium THE ISSUER WHOSE CONSENT MUST BE OBTAINED BEFORE ANY USE OR
REPRODUCTION OF THE DRAWING OR ANY PART THEREOF CAN BE MADE. M1E00-CC-DWG-ALG-STAT-SYSTRA-01-004 G
DR. SANTOS MANUYO UNO

+35

+30

+25

+20

+15
R=3 000 m 0.30 %
R=3 000 m
+10 2.00 %

3,4
-0.30 % R=3 000 m

10,1
9,8
+5 C-5 Extension

8,1
8,5
p225
p219 p220 p221 p224 p226 p255 p257 p258 p259 p260 p261 p262 p263 p264 p265 p266 p267 p268 p269 p270 p271 p272 p273 p274 p275 p276 p277 p278 p279 p280 p281
p222 p233 p234 p235
+0 p227 p228 p232 p236 p237 p238 p239 p240 p241 p242 p243 p244 p245 p246 p247 p248 p249 p250 p251 p252 p253 p254
p256
p223 p229 p230 p231

Rail9.377 9.168 9.090 9.013 8.936 8.859 8.790 8.721 8.652 8.588 8.525 8.461 8.381 8.301 8.220 8.1408.098 8.029 7.960 7.891 7.811 7.742 7.661 7.580 7.499 7.440 7.583 7.970 8.508 9.048 9.588 10.128 10.668 11.118 11.462 11.637 11.720 11.801 11.882 11.963 12.033 12.104 12.174 12.245 12.315 12.396 12.463 12.530 12.597 12.677 12.758 12.838 12.918 12.985 13.054 13.124 13.205 13.286 13.367 13.448 13.529 13.610 13.691
Piers
GL 3.0 2.9 2.9 1.1 -0.5 2.5 3.7 3.0 0.3 0.5 -0.5 -0.5 -0.5 0.2 1.5 1.5 1.2 0.7 0.3 0.4 0.4 0.0 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.2 0.5 0.5 0.5 0.5 0.5 2.8 -0.1 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8

R=3 000 m -0.30 % R=3 000 m 151.096 m R=3 000 m 743.877 m


Type 66.000 m 568.879 m 69.000 m 2.00 % 51.000 m 0.30 %
9.159

7.453

8.039

106 639.584 11.061

106 690.584 11.648


9.440 7.547 11.571
Level 9.258 7.349 11.463
105 817.609

105 850.609

106 419.488

106 453.988

106 488.488

106 665.084
Chainage

Chainage 105842.930 105893.947 105933.553 106645.579 106680.473 106797.385 106832.279


Horizontal Alignments

100

200
500 CL
R=620.00 CL AL CL AL
Straight 51.017 39.606 CL
39.606
500 712.026 34.894
R=430.00 724.187
200 116.912 34.894

100
ACCESS ROAD

PRQ-83-E
MODAL
SLOTS
10 JEEPNEY TERMINAL

SLOTS
5 JEEPNEY TERMINAL

4 BUS TERMINAL SLOTS

UNO
MANUYO
MANUYO UNO
NISIO
SAN DIO

p252 p253 p254 p255


FOR PD
SID
p250 p251 p256
SERVICE AREA
EW
ALK p248 p249 p257
p244 p245 p246 p247
p242 p243 SIDEWAL p258
p239 p240 p241 SIDEWALK K

p238 p259
p236 p237
p234 p235 p260
CE

p233
E FEN

p216 p231 p232


p217 p228 p229 p230 p26
RET

p227 1
R

p218 CONCR
ETE
p225 p226
CONC

p219 p26
DR. SANTOS
URES
IN
p224
E
RS

FO SIDEWALK
p220
STRUCT
p221 p222 p223 RIVER
2
I V
TTLE

RM
AL
SE
p263
R
L SE
R

TT IN
IV

LE FO

106700
ORMA

RS RM
E

AL
p26

106600
R

ETE SE
CONCR
4
INF

R
TURES TTL
STRUC
p26

106500
ER

I V
S MANU
5 YO UN

00
106400

p266 O

E
106300

1068
R
p26
7
106200

p26
106100

8
RIVER

MAN
Pk 106+000

R I p269
105800

V E
R I V E R
105900

ES

UYO

00
UR R
RUCT
CONC
RETE ST p270
IN

1069
SIDEW
FO

ALK

ATION UNO
RM

p271
AL

SANTOS ST
SE

p272
DR.
TT
LE

(Fut
RS

CTURES RIVER p273


ure)
STRU
RETE

00
CONC MANUYO UNO p274
p27

07+0
5 MAN
UYO
p27 U NO
6
NOTES : p277

Pk 1

00
p27
1) 8

1071
p27
ALK
SIDEW ALK
9
SIDEW
p280
U-Beams - P20 to P120, P124 to P235, P239 to P338, P341 to P368, P371 to P436, p28

00
1
P439 to P446

1072
Other than Redemptorist street : P121 to P124, P235 to P238, P338 to P341, P368 to MANU
YO UN
O
SIDE
WAL
K

P371, P437 to P439.

00
1073
2) I-Beams - Redemptorist street : please refer to drawing SIDEW
ALK

M1E00-CC-DWG-CWK-STAT-SYSTRA-10-002
3) U-Beams : please refer to drawing M1E00-CC-DWG-CWK-STAT-SYSTRA-10-001 and
drawing M1E00-CC-DWG-CWK-SYSTRA-10-010
4) Civil works at junction at Baclaran with existing LRT Line 1 out of Systra's scope.
Pier P1 and P2 locations may be subject to change at next design stage along with
DAN
IEL F
5) Pier locations may change during detailed design. AJA
RDO

G 12/10/15 Updated J. ORMILLA J.FIOT J.C DAIRE J. Ormilla Manila LRT1 Cavite Extension
APPENDIX TO EPC CONTRACT
F 01/07/13 Modif. Niyog Y. SKIFIC R. CHES. A. C. MHA
E 05/06/13 Modif. Niyog & Pulang lupa Y. SKIFIC R. CHES. A. C. MHA
12/10/2015
Manilla Line 1 Cavite Extension
D 23/05/13 Revised track layout Y. SKIFIC R. CHES. A. C. MHA J. Fiot General Arrangement / Horizontal
C 28/03/13 Second issue Y. SKIFIC R. CHES. A. C. MHA
A3 1/4000 and Vertical Alignments / Pier layout
B 15/03/13 Internal issue Y. SKIFIC R. CHES. A. C. MHA J.C. Daire
Y. SKIFIC R. CHES. A. C. MHA
A1 1/2000 Sheet 5 of 8
A 01/03/13 First issue
THE OWNERSHIP OF THE COPYRIGHT IN THIS DRAWING IS RETAINED BY
Department of Transportation and
Communication & Light Rail Transit Authority
BOUYGUES - ALSTOM EPC Consortium THE ISSUER WHOSE CONSENT MUST BE OBTAINED BEFORE ANY USE OR
REPRODUCTION OF THE DRAWING OR ANY PART THEREOF CAN BE MADE. M1E00-CC-DWG-ALG-STAT-SYSTRA-01-005 G
+35

+30

+25

+20

+15 R=5 000 m


-0.30 % R=3 000 m

+10 -1.45 %
-1.45 %

10

9,9
R=3 000 m -0.20%
C-5
+5 Extension
p286
p279 p280 p281 p282 p283 p284 p287 p289 p290 p291 p292 p293 p294 p295 p296 p297 p298 p300 p301
p288 p299 p303 p304 p305 p306 p307 p312 p313 p314 p315 p316 p318 p319 p320 p321 p322
p308 p309 p310 p311 p325 p326 p327 p328 p329 p330 p331 p332 p333 p334
+0 p323 p324 p337 p338 p339
p285 p302 p317 p336
p335
G
Rail
13.529 13.610 13.691 13.772 13.853 13.901 13.834 13.753 13.678 13.604 13.530 13.456 13.371 13.285 13.204 13.123 13.042 12.961 12.880 12.799 12.718 12.648 12.577 12.507 12.430 12.352 12.280 12.199 12.114 12.034 11.954 11.874 11.793 11.722 11.617 11.341 10.997 10.653 10.239 9.901 9.562 9.170 8.778 8.386 7.993 7.601 7.209 6.817 6.425 6.033 5.774 5.706 5.652 5.608 5.563 5.518 5.464 5.410 5.366 5.325 5.284
Piers
GL 2.8 2.8 2.8 2.8 2.9 3.1 -0.4 4.3 3.0 2.6 2.6 2.7 2.8 2.9 2.6 2.6 2.6 2.9 2.8 2.7 2.5 2.9 2.9 -0.2 2.5 2.5 2.5 2.3 2.1 1.9 1.7 1.5 1.8 2.5 2.5 2.5 2.5 2.5 -0.1 2.5 2.5 2.5 2.5 2.5 0.9 0.9 1.5 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 -0.7 0.0 0.5 0.5 0.5

R=5 000 m -0.30 % R=3 000 m -1.45 % R=3 000 m


Type 30.000 m 728.248 m 34.580 m 488.400 m 34.580 m 268.752 m
107 434.462 13.879

107 464.462 13.879

108 192.710 11.694

108 227.290 11.391

4.297

3.994
13.924 11.643 4.095
Level 13.902 11.593 4.045
107 449.462

108 210.000

108 715.690

108 732.980

108 750.270
Chainage

Chainage 107556.465 107590.410 107904.766 107938.711 108268.761 108307.480 108552.761 108591.479


Horizontal Alignments

100

200
500 CL R=550.00 CL
CL AL
Straight
R=375.00 CL 38.719
245.281 38.719
500 33.945 330.050
200 314.356 33.945

100

NOTES :
1)

p294 p295 PULA NG LUPA


p296 UNO
p29 7
U-Beams - P20 to P120, P124 to P235, P239 to P338, P341 to P368, P371 to P436,
p298
p293
p299 P439 to P446
p292 p30
0 Other than Redemptorist street : P121 to P124, P235 to P238, P338 to P341, P368 to

S
1

RE
p29

TU
SIDEWALK
p30

UC
P371, P437 to P439.

R
1

ST
TE

ES
0
p29

RE

UR
p30

NC

CT
2) I-Beams - Redemptorist street : please refer to drawing

CO

RU
2

ST
TE
89

RE
p2 M1E00-CC-DWG-CWK-STAT-SYSTRA-10-002

NC
p3

CO
SID
EW
ALK
03
107800

SIDEWAL

88
107700

K
p30
p2
SIDEW
4 3) U-Beams : please refer to drawing M1E00-CC-DWG-CWK-STAT-SYSTRA-10-001 and
87 p30
drawing M1E00-CC-DWG-CWK-SYSTRA-10-010
ALK

p2 5
4) Civil works at junction at Baclaran with existing LRT Line 1 out of Systra's scope.
900
O 8 6 p30
UN p2 6
600

PA
107

LU
Pier P1 and P2 locations may be subject to change at next design stage along with
S

NG p30
RE

85
107

D
TU

LA LISHE
7
S

p2
UC

RE

DEMO RETE
PU CONC URES
R

TU
ST

CT
C

K SIDE
STRU
RU

AL
E

p30
T

WAL
DEW
RE

ST

84
SI K
8
NC

ET

p2
CO

RE

5) Pier locations may change during detailed design.


NC
CO

p30

CONC
CONC
O 9
83
ES
UN UCTUR

RETE
0
p2
STR
RETE

RET
O CONC
UY p31

+00

E FEN

FENCE
N
MA 0
0

8 2

CE
50

ILAYA
p2
NC

p31
FE

108
7

TE

1
RE
10

NC

81
CO

p2 PU p31
LAN 2
Pk
USES GL
80 ELIAS ALDANA
HO
EN
OD UP
A p31
p2 UN 3
WO

100
RES
RE RU
CTU
p31
79 CTU E ST
4

108
RU RET
p2 NC
RET
E ST
CO
NC

p31
00

K
AL CO
SID
EW

5
78
74

p2 p31
10

6
77 p31
p2 CONC
RETE 7

200
FENC
p31 PULANG
LUPA UN
76
E
K
NO 8 O
p2
WAL

AU p340

108
SIDE 9
L UP p31
p338 p339
NG
FIS CONCRE
p336 p337
75
H PO TE STR

LA
ND UCTURE
p320 p335
p2
S
p334
SIDE
0

PU p333
WAL
0

p321 p332
K

p331
73

p322
p329 p330
10

p323
ELIA
p324 p325 p326 p327 p328 INFORMAL SETTLERS
SA

RS
TLE
LDA

300

L SET
NA

MA
O

OR
RD

INF
108
A JA DUMP
SITE
LF
NIE CONC

DA
RETE
BAR

LERS
RIE

ER
R

TTL
0

108800
L SE
20

LERS
SETT
MA
00
CONC

OR
108700
7

RETE

INF

SETT
10

BARR

RMAL
1084
IER

108600

RMAL
INFO
108500

INFO
CO DUMP
NC SITE
RE
TE
BA
RR
IE
R

CO
NC
RE
TE
BA
RR PULANG LUPA UNO
IE
R

G 12/10/15 Updated J. ORMILLA J.FIOT J.C DAIRE J. Ormilla Manila LRT1 Cavite Extension
APPENDIX TO EPC CONTRACT
F 01/07/13 Modif. Niyog Y. SKIFIC R. CHES. A. C. MHA
E 05/06/13 Modif. Niyog & Pulang lupa Y. SKIFIC R. CHES. A. C. MHA
12/10/2015
Manilla Line 1 Cavite Extension
D 23/05/13 Revised track layout Y. SKIFIC R. CHES. A. C. MHA J. Fiot General Arrangement / Horizontal
C 28/03/13 Second issue Y. SKIFIC R. CHES. A. C. MHA
A3 1/4000 and Vertical Alignments / Pier layout
B 15/03/13 Internal issue Y. SKIFIC R. CHES. A. C. MHA J.C. Daire A1 1/2000 Sheet 6 of 8
A 01/03/13 First issue Y. SKIFIC R. CHES. A. C. MHA
THE OWNERSHIP OF THE COPYRIGHT IN THIS DRAWING IS RETAINED BY
Department of Transportation and
Communication & Light Rail Transit Authority
BOUYGUES - ALSTOM EPC Consortium THE ISSUER WHOSE CONSENT MUST BE OBTAINED BEFORE ANY USE OR
REPRODUCTION OF THE DRAWING OR ANY PART THEREOF CAN BE MADE. M1E00-CC-DWG-ALG-STAT-SYSTRA-01-006 G
ZAPOTE

+35

+30

+25

+20

Emilio Aguinaldo Highway

11,7

11,5
+15 Longos Flyover
R=3 000 R=3
m 000 m
-2.50%

1,8
+10 R=3 000 m
3.00 %
R=3 000 m
+5 -1.50% R=3 000 m
R=3 000 m 0.20 %
p374
p375 p380

3,9
3,7
p373 p376 p377 p379 p386 p387 p388 p390 p391 p395
p345 p346 p350 p370 p371 p372 p378 p381 p382 p383 p384 p385 p389 p393 p394
p343 p344 p347 p348 p349 p351 p352 p353 p354 p355 p356 p357 p358 p359 p360 p361 p362 p363 p364 p365 p366 p367 p392
+0 p337 p338 p339 p340 p341 p342 p368 p369
p396
G
Rail5.366 5.325 5.284 5.230 5.176 5.040 4.683 4.278 3.873 3.481 3.278 3.294 3.348 3.401 3.452 3.502 3.555 3.608 3.661 3.713 3.766 3.819 3.872 3.925 3.967 4.010 4.135 4.398 4.960 5.737 6.547 7.357 8.167 8.977 9.667 10.357 10.972 11.470 11.733 11.727 11.477 10.984 10.317 9.642 9.088 8.777 8.709 8.788 8.869 8.950 9.031 9.112 9.193 9.274 9.355 9.436 9.517 9.598 9.679 9.760
Piers
GL 0.5 0.5 0.5 0.5 0.5 0.7 1.0 1.2 1.4 1.4 1.3 1.3 1.3 1.4 1.2 1.3 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 0.7 0.7 1.8 2.0 2.0 2.5 2.7 5.2 4.3 3.4 2.4 2.1 2.8 1.8 1.7 1.7 1.7 1.9 2.0 2.1 2.3 1.9 2.2 2.0 1.1 1.9 1.8 2.2 -0.4

-0.30 % R=5 000 m 452.271 m R=3 000 m 134.139 m R=3 000 m -1.00 % R=3 000 m
Type 268.752 m 24.887 m 0.20 % 84.068 m 3.00 % 120.000 m G 169.394 m 39.000 m
3.187

3.175

4.069

5.413

9.437

109 834.386 10.637

8.943

8.807
3.165 4.446 11.237 8.812
Level 3.150 4.152 10.637 8.748
109 019.021
109 031.465
109 043.908

109 496.178

109 538.212

109 580.247

109 714.386

109 774.386

110 003.780

110 023.280

110 042.780
Chainage

Chainage 109494.550 109528.320 109560.820 109594.590 109950.985 109984.755 110350.574 110384.344


Horizontal Alignments

100

200 R=365.00 R=365.00


500 CL CL CL CL
AL 32.500 33.770 AL 365.819 33.770
33.770 33.770
Straight
500 903.071 356.395
200

100

8
p39
NOTES :
1)

7
p39
400
U-Beams - P20 to P120, P124 to P235, P239 to P338, P341 to P368, P371 to P436, 110

P439 to P446

6
p39
S
LER

Other than Redemptorist street : P121 to P124, P235 to P238, P338 to P341, P368 to
TT
SE
AL
RM
INFO

P371, P437 to P439. RS

RS
LE

95
TT

LE
SE

p3
TT
2) I-Beams - Redemptorist street : please refer to drawing AL

SE
RM
FO

AL
IN

M1E00-CC-DWG-CWK-STAT-SYSTRA-10-002

RM
INFO

94
3) U-Beams : please refer to drawing M1E00-CC-DWG-CWK-STAT-SYSTRA-10-001 and

p3
drawing M1E00-CC-DWG-CWK-SYSTRA-10-010 BA
II LERS

93
LA
SETT
RMAL
TA INFO

p3
4) Civil works at junction at Baclaran with existing LRT Line 1 out of Systra's scope. 00
Pier P1 and P2 locations may be subject to change at next design stage along with 03

92
11

p3
V
TE
5) Pier locations may change during detailed design.

91
PO

p3
ZA

90
p3

URES
CONCRETE STRUCT
8 9
p3

RS
LE
TT
SE
88

AL
p3

RM
PACKAGE 3
PACKAGE 2

0O
20INF
87
p3

10
RS

1
S LE
6 ER TT
p38
p333 TL SE
p334 ET AL
LS
p335 p336 MA FO
RM
p337 5 OR
p38
IN
p338 INF
p339 p340 p341 p342
INFORMAL
SETTLERS p384
LERS

ZAPOTE STATION INFORMAL SETTLERS


p383
SETT

RS
p382 LE

LDO HIGHWAY
RMAL

ZAPOTE V TT
p381 SE
INFO

p379 p380 OR
MA
L

p377 p378 INF

p376

100
p375 RS

EMILIO AGUINA
p374
E
LERS

TL
p373 ET

110
L SETT

LS
p371 p372 MA
RMA

OR
TLERS

p370 INF
INFO

p369
108800

INFORMAL SETTLERS
p361 p362 p368
p363 p364 p367

R
AL SET

p365 p366
108900
RS

F L Y O V E
ZAPOTE
L SETTLE

INFORMAL

000
INFORMAL SETTLERS
INFORM

SETTLERS
Pk 109+000

109100
INFORMA

109900

+
109200

Pk 110
L O N G O S

109800
p343
109300

p344 p345

109700
p346 p347
109400

PULANG
LUPA UN
O
p348 p349 p350
109600
109500

p351 p352 INFORMAL


p353 p354
SETTLERS
INFORMAL SETTLERS
ZAPOTE V
p355 p356 INFORMAL SETTLERS
p357 p358 p359 p360 INFORMAL
SETTLERS
INFORMAL SETTLERS
WOODEN HOUSES

INFORMAL SETTLERS
PACKAGE 3
PACKAGE 2

G 12/10/15 Updated J. ORMILLA J.FIOT J.C DAIRE J. Ormilla Manila LRT1 Cavite Extension
APPENDIX TO EPC CONTRACT
F 01/07/13 Modif. Niyog Y. SKIFIC R. CHES. A. C. MHA
E 05/06/13 Modif. Niyog & Pulang lupa Y. SKIFIC R. CHES. A. C. MHA
12/10/2015
Manilla Line 1 Cavite Extension
D 23/05/13 Revised track layout Y. SKIFIC R. CHES. A. C. MHA J. Fiot General Arrangement / Horizontal
C 28/03/13 Second issue Y. SKIFIC R. CHES. A. C. MHA
A3 1/4000 and Vertical Alignments / Pier layout
B 15/03/13 Internal issue Y. SKIFIC R. CHES. A. C. MHA J.C. Daire A1 1/2000 Sheet 7 of 8
A 01/03/13 First issue Y. SKIFIC R. CHES. A. C. MHA
THE OWNERSHIP OF THE COPYRIGHT IN THIS DRAWING IS RETAINED BY
Department of Transportation and
Communication & Light Rail Transit Authority
BOUYGUES - ALSTOM EPC Consortium THE ISSUER WHOSE CONSENT MUST BE OBTAINED BEFORE ANY USE OR
REPRODUCTION OF THE DRAWING OR ANY PART THEREOF CAN BE MADE. M1E00-CC-DWG-ALG-STAT-SYSTRA-01-007 G
TALABA NIYOG

+35

+30

+25

+20

+15 R=3 000 m

5,8
-0.30 %
R=5 000 m R=3 000 m 1.01 %
-0.30 %
0.30 %
+10

11

11,4
2,8
8,8

9,6
+5 Emilio Aguinaldo Highway Molino Boulvard
p427 p428 p429 p441 p442
p395 p399 p400 p401 p410 p411 p412 p413 p414 p415 p416 p417 p418 p419 p420 p421 p422 p423 p424 p425 p426 p432 p433 p434 p435 p438 p439 p440 p443 p444 p445 p446
p398 p402 p403 p404 p409 p430 p431 p437
p397 p405 p406 p407 p408 p436
+0
p396

Rail 9.679 9.760 9.841 9.922 10.003 10.084 10.160 10.235 10.310 10.390 10.471 10.551 10.631 10.700 10.769 10.838 10.907 10.997 11.078 11.159 11.240 11.321 11.402 11.483 11.549 11.498 11.417 11.336 11.253 11.254 11.478 11.755 12.011 12.267 12.543 12.819 13.095 13.374 13.645 13.907 14.129 14.126 14.057 13.988 13.919
13.877 13.797 13.716 13.636 13.556 13.473 13.389
Piers
GL 2.2 -0.4 1.2 1.6 2.1 2.4 2.1 1.6 1.5 1.4 1.1 1.0 1.0 1.2 1.9 2.5 2.5 2.5 2.7 2.7 2.8 3.0 2.9 2.9 2.9 2.9 2.8 2.8 2.5 2.5 2.6 2.8 3.3 3.6 3.6 1.8 1.6 2.5 2.5 2.5 2.3 1.2 1.6 2.4 2.5 3.0 3.2 3.2 2.5 2.2 2.2 2.2

906.722 m R=5 000 m -0.30 % R=3 000 m 261.415 m R=3 000 m -0.30 %
Type 0.30 % 30.000 m 96.181 m 39.155 m 1.01 % 39.155 m 250.940 m

110 949.502 11.527

110 979.502 11.527

111 075.683 11.238

111 114.838 11.376

111 376.253 14.004

111 415.408 14.142

111 666.348 13.389


11.572 11.244 14.201
Level 11.549 11.180 14.137

110 964.502

111 095.261

111 395.831
Chainage

Chainage 110350.574 110384.344 110681.809 110718.458 111023.111 111061.094 111091.129 111129.111 111157.644 111196.305 111242.783 111281.443
111304.630 111339.758 111373.814 111408.942 111666.348
Horizontal Alignments

100

200
CL R=1000.00 CL R=450.00 CL
500 AL R=4000.00 AL CL CL AL AL AL
Straight 33.770 46.478 38.661 C
500 297.465 36.648 304.654 37.983 30.035 37.983 28.533 38.661 23.187 35 L CL 257.406
.128 R=220.00 28
200
34.056 35.1
100

TA
LAB
A p434 p435 p436 p437 p438 p439 p440 p441 p442 p443 p444
II p445
ANIBAN I p446 NIOG III
p433
TALABA IV p432
03 01 05 06
10 08

ANIBAN I
09
17 16 02 SIDEWALK

NIYOG
14 18
12

1
19-1
SIDEWALK

p43
11 20-1
07
15
04

TALABA V
p429 p430

3
CONCRETE STRUCTURES
St. Dominic College
p428
INFORMAL SETTLERS

2
p427
CONCRETE SIDEWALK

p426
STRUCTURES
Talaba IV Elementary School

1
p425

111400

111500
p424

111600
Ta
lab
a
II
p421 p422 p423 CONCRETE FENCE
p420
CO

03
Brg
p418 p419
N

yH
p417
CR

p416
20-2
all
SID

p415
ET

300
p414

CO
EW

p413 SIDEWALK
E ST

19-2

p392 p412
AL

p411 St. Dominic College of

NC
CONCRETE STRUCTURE
CONCRETE STRUCTURES
p410
K

CONCRETE STRUCTURES
p409
RU

p408

RE
p406 p407 Art Science
CTU

111
p393 p404 p405

TE
p402 p403
RES

p394 p400 p401 Talaba IV Elementary School

FE
p395 p397 p398 p399 SIDEWALK
INFORMAL SETTLERS

p396

NC
Talaba IV Brgy Hall
EM SIDEWALK
CONCRETE STRUCTURES CONCRETE STRUCTURES

E
ILIO SIDEWALK I H G F E
AG
D

TALABA (Future)
C B A

111200
UIN
ALD
OH
IGH
WA
Y

111100
Pk 111+000
110900

NOTES :
110800

Talaba III Brgy Hall


Mc Donald's
110700

Planters Bank
110600

1)
CONCRETE

CONCRETE STRUCTURES
110500
110300

CONCRETE STRUCTURES Shakeys NIOG III


110400

CONCRETE STRUCTURES
CONCRETE STRUCTURES CONCRETE STRUCTURES
CONCRETE STRUCTURES
RS

STRUCTUR
TTLE

U-Beams - P20 to P120, P124 to P235, P239 to P338, P341 to P368, P371 to P436,
SE

CONCRETE STRUCTURES
ES
RMAL

WOODEN HOUSES

P439 to P446
INFO

CONCRETE STRUCTURES

Other than Redemptorist street : P121 to P124, P235 to P238, P338 to P341, P368 to
TLERS

TALABA II

P371, P437 to P439.


L SET

TALABA III
INFORMA

2) I-Beams - Redemptorist street : please refer to drawing


TALABA II M1E00-CC-DWG-CWK-STAT-SYSTRA-10-002
3) U-Beams : please refer to drawing M1E00-CC-DWG-CWK-STAT-SYSTRA-10-001 and
drawing M1E00-CC-DWG-CWK-SYSTRA-10-010
4) Civil works at junction at Baclaran with existing LRT Line 1 out of Systra's scope.
Pier P1 and P2 locations may be subject to change at next design stage along with

5) Pier locations may change during detailed design.

G 12/10/15 Updated J. ORMILLA J.FIOT J.C DAIRE J. Ormilla Manila LRT1 Cavite Extension
APPENDIX TO EPC CONTRACT
F 01/07/13 Modif. Niyog Y. SKIFIC R. CHES. A. C. MHA
E 05/06/13 Modif. Niyog & Pulang lupa Y. SKIFIC R. CHES. A. C. MHA
12/10/2015
Manilla Line 1 Cavite Extension
D 23/05/13 Revised track layout Y. SKIFIC R. CHES. A. C. MHA J. Fiot General Arrangement / Horizontal
C 28/03/13 Second issue Y. SKIFIC R. CHES. A. C. MHA
A3 1/4000 and Vertical Alignments / Pier layout
B 15/03/13 Internal issue Y. SKIFIC R. CHES. A. C. MHA J.C. Daire
First issue Y. SKIFIC R. CHES. A. C. MHA
A1 1/2000 Sheet 8 of 8
A 01/03/13
THE OWNERSHIP OF THE COPYRIGHT IN THIS DRAWING IS RETAINED BY
Department of Transportation and
Communication & Light Rail Transit Authority
BOUYGUES - ALSTOM EPC Consortium THE ISSUER WHOSE CONSENT MUST BE OBTAINED BEFORE ANY USE OR
REPRODUCTION OF THE DRAWING OR ANY PART THEREOF CAN BE MADE. M1E00-CC-DWG-ALG-STAT-SYSTRA-01-008 G

Вам также может понравиться