Академический Документы
Профессиональный Документы
Культура Документы
+35
+30
+25
20
+20
Level of catenary wires
+15 Roxas boulevard Bradco Aseana Ave
Top of rail R=5 000 m
0.00 %
-0.79 % R=5 000 m
0,8
0,8
10
+10 R=3 000 m 0.30 %
2,5
+5
5
Redemptorist Road
6,9
Reduced clearance 5 m
6,6
p1 p2 p3 p4 p5 p6 p7 p8 p9 p10 p11 p12 p17 p18 p19 p27
p13 p14 p15 p16
p21 p22 p23 p24 p25 p26
+0 0
p28
p20 p29 p30 p31 p32 p33 p34 p35 p36 p37 p38 p39 p40 p41 p42 p43 p44 p45 p46 p47 p48 p49 p50 p51 p52
Rail 11.835 11.835 11.835 11.835 11.835 11.835 11.835 11.835 11.835 11.835 11.835 11.804 11.623 11.395 11.16711.04110.913 10.716 10.479 10.266 10.054 9.842 9.630 9.417 9.205 8.993 8.781 8.568 8.356 8.144 7.936 7.889 7.969 8.050 8.131 8.212 8.293 8.374 8.455 8.536 8.617 8.698 8.779 8.860 8.923 8.985 9.065 9.145 9.226 9.306 9.361 9.346
Piers
GL -10
2.7 2.7 2.7 2.7 2.7 2.6 2.6 2.6 2.5 2.5 2.5 2.3 2.1 2.0 2.1 2.1 2.3 2.5 2.3 -0.5 1.0 1.1 1.5 1.3 1.4 1.2 2.4 0.7 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5
7.970
7.891
9.343
9.343
11.835 7.886 9.388
Level 11.796 7.842 9.366
100 341.099
100 832.752
100 849.044
100 865.337
101 349.554
101 364.554
101 379.554
Chainage
Chainage 100009.163 100059.894 100097.348 100148.080 100343.296 100394.920 100563.165 100614.790 100952.472 101004.289 101054.820 101106.638 101377.666
Horizontal Alignments
100
R=135.00
200 CL 168.245 CL
25 51.6
51.6 25
500 AL AL AL AL
Straight CL R=900.00 CL
500 307.015 C 195.216 337.682 51.817 50.531 51.817 271.028
200 50. L CL 2
732 73
R=102.00 50.
100
37.454
00
p61
998
p60
ST.
STRU
CONCCTURES
p59
CONC
UEZ
p1 SIDEW
ALK
RETE
DRIG
p58
RETE
00
E. RO
ALK
p57
TAFT EW
STRU
SID
999
AVEN
UE
EXTE p2
p56
CTUR
SIDE
NSIO
WAL N
K
ES
SIDEWAL
K p55 EW
ALK TE
STR
UCT
URE
S
SID CRE
p54
CON URE
00
UCT
EL STR
STE
000
1016
p3
p53
K
00+
p52
WAL
SIDE
p51
PURE
500
G ST
RIP ALK
Pk 1
p50
EW
GO
TIN SID
PLAN
O
LD
p4
TAMB
101
p49
RIP
G ST
Jolli
TIN
PLAN
bee
1 00 p48 SID
EW
ALK
CONCCTUR
STRU
00 ANDE
1 ST.
p47 E GR
A
SIDE
L BELL
400
RETEES
RIE
AN
AB ALK
WAL
p5
J. G EW
p46
SID
K
ASE
101
p45
STRU
CO CTUR
p44
NCRE ES
ANDE
E GR
TE
p43
BELL
p6
300
Z ST.
CONCCTUR
STRU
p42
RU
.C
G.G
101
RETEES
TIN
G ST
RIP
p41 E GR
ANDE
PLAN BELL
p7
p40
K
WAL
SIDE
p39
00
DE
GRAN
2
E
BELL
101
p38
SIDE
E.
200 RIP
p8
G ST
100
V
WAL
CONC
TIN
A
AN
K
p37
PL
K
WAL
RE
SIDE
TE ST
N
A
p36
100
RUCT
E
S
p9
PA REA
A
URES
101
K
p35
WAL
RK
A
ING
SIDE
ALK
EW
SID
ng
wki
Cho
p34
E
NC
FE
TE
RE
K
NC
AL
CO
EW
SID
p10
K
p33
AL
0
EW
SID
+00
K
WAL
SIDE
p32
ES
UR
CT
RU
SIDE
101
ST
TE
Bacl
RE
WAL
NC
p31
CO
p11
aran
K
Chu
Pk
p30 NOTES :
rch
300 AR
D
100 EV
900
K
UL
WAL
p29 S
BO
1)
SIDE
XA
p12
100
RO
K
K
WAL
WAL
SIDE
p28
K
SIDE
WAL
SIDE
CENTERLINE OF ES
U-Beams - P20 to P120, P124 to P235, P239 to P338, P341 to P368, P371 to P436,
UR
CT
RU
p27
ST
TE
ALIGNMENT AS SHOWN IN CO
NC
RE
P439 to P446
p13
p25
L
Berm nter
100
FENC
aM
A
p14
p24
Y
all
p23 M1E00-CC-DWG-CWK-STAT-SYSTRA-10-002
A
p1
N
E
5
ST
NC
EE K
700
p22
.
00
ST WAL
KING SIDE
WAL
CHOW
04
O
K
10 drawing M1E00-CC-DWG-CWK-SYSTRA-10-010
100
C
D
p1
p21
AN
A
BACLAR 8
R
FARM
ACIA
p19 p20 4) Civil works at junction at Baclaran with existing LRT Line 1 out of Systra's scope.
B
WAL
K
ENVISAGED CURVE REDEMPTORIST ROAD /
SIDE
ROXAS BLVD.
Pier P1 and P2 locations may be subject to change at next design stage along with
00
p1 G
7
G 12/10/15 Updated J. ORMILLA J.FIOT J.C DAIRE J. Ormilla Manila LRT1 Cavite Extension
APPENDIX TO EPC CONTRACT
F 01/07/13 Modif. Niyog Y. SKIFIC R. CHES. A. C. MHA
E 05/06/13 Modif. Niyog & Pulang lupa Y. SKIFIC R. CHES. A. C. MHA
12/10/2015
Manilla Line 1 Cavite Extension
D 23/05/13 Revised track layout Y. SKIFIC R. CHES. A. C. MHA J. Fiot General Arrangement / Horizontal
C 28/03/13 Second issue Y. SKIFIC R. CHES. A. C. MHA
A3 1/4000 and Vertical Alignments / Pier layout
B 15/03/13 Internal issue Y. SKIFIC R. CHES. A. C. MHA J.C. Daire A1 1/2000 Sheet 1 of 8
A 01/03/13 First issue Y. SKIFIC R. CHES. A. C. MHA
THE OWNERSHIP OF THE COPYRIGHT IN THIS DRAWING IS RETAINED BY
Department of Transportation and
Communication & Light Rail Transit Authority
BOUYGUES - ALSTOM EPC Consortium THE ISSUER WHOSE CONSENT MUST BE OBTAINED BEFORE ANY USE OR
REPRODUCTION OF THE DRAWING OR ANY PART THEREOF CAN BE MADE. M1E00-CC-DWG-ALG-STAT-SYSTRA-01-001 G
ASEANA MIA
+35
+30
+25
+20
+15
Naia Rd
R=5 000 m
+10 R=5 000 m 0.30 %
-0.30 % R=5 000 m
6,2
6,4
+5
6,9
p78 p79 p80 p81 p82 p83 p84 p85 p86 p87 p88 p89 p90 p91 p92 p98 p99 p100 p101
p73 p74 p75 p76 p77 p93 p94 p95 p97 p102 p103 p104
p67 p68 p69 p70 p71 p72 p96 p105 p106 p107
+0 p66
p50 p51 p52 p53 p54 p55 p56 p57 p58 p59 p60 p61 p62 p63 p64 p65
Rail 9.306 9.361 9.346 9.265 9.184 9.103 9.022 8.941 8.860 8.779 8.698 8.617 8.536 8.459 8.481 8.562 8.643 8.724 8.805 8.886 8.967 9.048 9.133 9.218 9.298 9.379 9.459 9.539 9.624 9.709 9.790 9.871 9.952 10.033 10.114 10.195 10.276 10.357 10.438 10.519 10.600 10.681 10.762 10.843 10.924 11.005 11.086 11.167 11.248 11.297 11.220 11.117 11.014 10.911 10.808 10.706 10.603 10.500
Piers
GL -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 0.2 2.4 2.2 2.5 2.5 2.5 2.5 2.8 3.0 3.1 3.0 3.3 3.7 3.8 3.9 3.8 3.9 3.8 3.8 3.8 3.9 4.0 4.0 4.0 4.0 3.9 3.9 3.1 2.9 2.8 2.7 3.2 3.7 3.8 3.9 3.6 3.2 2.8 2.7 2.6 2.5 2.6
9.343
8.473
8.473
101 364.554
101 379.554
101 669.751
101 684.751
101 699.751
102 650.954
Chainage
Chainage
Horizontal Alignments
100
200
500
Straight R=4000.00 AL CL R=1500.00 CL AL R=4000.00 AL CL R=1500.00 CL AL CL R=2000.00
500 183.201 24.286 25.024 66.914 25.024 631.960 57.760 107.879 25.024 99.866 25.024 162.202 15.011 83.391
200
100
GUARD RAIL
p85 p86 p87 p88 p89 p90 p91 p92 p93 p94 p95 p96 p97
PLANTING STRIP
PLANTING STRIP
p79 p80 p81 p82 p83 p84 CYCLONE WIRE FENCE p98 p99
PLANTING STRIP
p73 p74 p75 p76 p77 p78 CYCLONE WIRE FENCE CYCLONE WIRE FENCE
p100
p67 p68 p69 p70 p71 p72 p101 p102
p63 p64 p65 p66 CYCLONE WIRE FENCE
p103
p61 p62 p104 p105
p59 p60 p106
p58 GUARD RAIL
GUARD RAIL
p53
p54
p55 p56 p57
SIDEWALK
SIDEWALK STEEL
FENCE SIDEWALK
LOADING & UNLOADING BAY
SIDEWALK
SIDEWALK
102500
102400
102300
102600
p47
102200
102100
K D Caltex
Pk 102+000
SIDEWAL ABANDONE
102700
101900
S
BUILDING
STRUCTURE
CONCRETE
101800
101700
SIDEWALK
ASEANA
102800
101600
AL MALL
MALL COAST
AL
MANILA BAY
PARK
MALL COAST
101400
RITY AL
DEVELOPME
NT AUTHO COAST
DE TAMBO
BELLE GRAN
101300
BELLE GRAN
DE NOTES :
BELLE GRAN
DE 1)
DE
BELLE GRAN
U-Beams - P20 to P120, P124 to P235, P239 to P338, P341 to P368, P371 to P436,
P439 to P446
Other than Redemptorist street : P121 to P124, P235 to P238, P338 to P341, P368 to
P371, P437 to P439.
2) I-Beams - Redemptorist street : please refer to drawing
M1E00-CC-DWG-CWK-STAT-SYSTRA-10-002
3) U-Beams : please refer to drawing M1E00-CC-DWG-CWK-STAT-SYSTRA-10-001 and
drawing M1E00-CC-DWG-CWK-SYSTRA-10-010
4) Civil works at junction at Baclaran with existing LRT Line 1 out of Systra's scope.
Pier P1 and P2 locations may be subject to change at next design stage along with
G 12/10/15 Updated J. ORMILLA J.FIOT J.C DAIRE J. Ormilla Manila LRT1 Cavite Extension
APPENDIX TO EPC CONTRACT
F 01/07/13 Modif. Niyog Y. SKIFIC R. CHES. A. C. MHA
E 05/06/13 Modif. Niyog & Pulang lupa Y. SKIFIC R. CHES. A. C. MHA
12/10/2015
Manilla Line 1 Cavite Extension
D 23/05/13 Revised track layout Y. SKIFIC R. CHES. A. C. MHA J. Fiot General Arrangement / Horizontal
C 28/03/13 Second issue Y. SKIFIC R. CHES. A. C. MHA
A3 1/4000 and Vertical Alignments / Pier layout
B 15/03/13 Internal issue Y. SKIFIC R. CHES. A. C. MHA J.C. Daire A1 1/2000 Sheet 2 of 8
A 01/03/13 First issue Y. SKIFIC R. CHES. A. C. MHA
THE OWNERSHIP OF THE COPYRIGHT IN THIS DRAWING IS RETAINED BY
Department of Transportation and
Communication & Light Rail Transit Authority
BOUYGUES - ALSTOM EPC Consortium THE ISSUER WHOSE CONSENT MUST BE OBTAINED BEFORE ANY USE OR
REPRODUCTION OF THE DRAWING OR ANY PART THEREOF CAN BE MADE. M1E00-CC-DWG-ALG-STAT-SYSTRA-01-002 G
ASIAWORLD
+35
+30
+25
+20
Roxas boulvard
+15 Pacific Ave Quirino Ave
R=3 000 m
0,8
R=12 500 m
R=5 000 m 1.50 % -1.00 %
0.55 %
-0.38 % R=3 000 m
R=5 000 m 0.30 %
+10
1
6,2
6,3
p140
+5
p141
p121 p122 p123 p124 p125 p126 p127 p128 p129 p130 p131 p132 p133
p105 p106 p107 p108 p109 p110 p111 p112 p113 p114 p115 p116 p117 p118 p119 p120 p134 p135 p136 p137 p138 p139
-0.38 % R=5 000 m 256.794 m R=5 000 m 134.239 m R=3 000 m -1.00 % R=3 000 m 315.124 m R=12 500 m
Type 524.412 m 34.047 m 0.30 % 60.000 m 1.50 % 75.000 m 263.729 m 46.379 m 0.55 % 30.748 m
9.264
9.250
103 192.389
103 209.412
103 226.435
103 513.230
103 714.969
104 039.388
Chainage
Chainage
102811.830
102826.841 102910.231
102925.242 103084.562 103121.939 103175.283 103212.661 103514.533 103561.319 103831.433 103878.219 103978.911 104015.358 104284.255 104320.701
Horizontal Alignments
100
R=172.00
200
CL 270.114 CL
500
CL R=2000.00 CL AL CL AL 86 46.7 AL
Straight R=900.00 CL 46.7 86 CL
15.
500011 83.391 15.011 159.320 37.377 37.377 301.872 100.693 36.4 CL
53.344 R=208.00 46
200 46
268.898 36.4
100
SIDE
WAL
K p163
7
p1
08 p15 FENCE INFORMA
L SET
TLERS p164
CONCRETE INFORMA
p165
RS
L SET
800
TLERS
LE
6 p166
TT
p1 15
LERS
E
SE
NC
09 p
102
p167
AL
FE
RM
E
RET
SETT
INFO
p168
NC
p1
CO
55
RMAL
10 p169
p1 NINO
RES
IDE
NTI
p170
INFO
AL
Y AQ
104300
SIDE
p1
00
WAL
K
11
SIDEWALK
1042
UINO
SIDEWALK
p1 54
0
1 p1
0
2
29
00
10
RES
p1 IDE
1044
NTI
13 AL
53
W
RES
OO STRU
IDE
DE
NTI
p1
RS
p1
AL
N CTUR
I AL
RE
14
SETTLE
RESID
SI ES
ENTIA
DE
00
L
00
NT
NT
IA
SID
L
EW
41
MAL
1045
AL
IDE
K
p1
10
INFOR
15
5R2E S
0
p1
p1
00
IMELDA B
16
3+
p1
17
10
RIDGE
1
p15
Pk
p1
SIDE 18
WAL
URES
K
p1
19
00
RUCT
0
31
p1
p15
ALK
TE ST
EW
10
20 0 SID
+00
RE
p1
4
k 10
CONC
21 P
TA
9
M
p14
BO p1
SIDE
WAL
22
K
p1
23
00
8
32
p14
p1
24
10
p1
25
7
p14
p1
26
6
900
00
p14
STATION SUBJECT TO AGREEMENT WITH W 103
33
p1
OR 28
10
FENCE
E
NC
NOTES :
FE
LD p1
TE
ETE
p14
29
RE
CONCR
NC
1)
CO
p1
30
44
GU
AR
D RA
STRU RETE
p1
E
IL
p1
CTUR
31 U-Beams - P20 to P120, P124 to P235, P239 to P338, P341 to P368, P371 to P436,
NC
NCE
CO
00
TE FE
P439 to P446
43
34
p1
RE
p1
CONC
32
10
GU
AR
D RA
IL
p1 4 2 Other than Redemptorist street : P121 to P124, P235 to P238, P338 to P341, P368 to
p1
PARK O
RS
33 P371, P437 to P439.
GAL
SETTLE
DON
TA
41
MB
O
2) I-Beams - Redemptorist street : please refer to drawing
MAL
p1 GUA
p1
plex 0
34 RD
INFOR
RA
Com
ort
0
IL o Sp 38
M1E00-CC-DWG-CWK-STAT-SYSTRA-10-002
Gal
p13 Don 10
5
p136 p139
.
p138
PAR L GUA
p137
STA
00
COA
GU
AR
D
35
RA
IL
RIP
drawing M1E00-CC-DWG-CWK-SYSTRA-10-010
ST
10
DE
NG
MO
TI
LIS
AN
ALK
HE
PL
4) Civil works at junction at Baclaran with existing LRT Line 1 out of Systra's scope.
IL
STR
SIDEW
D RA
UC
AR
GU
TU
RE DEM
ST OLI
RU SH
CTU ED
RE
Pier P1 and P2 locations may be subject to change at next design stage along with
700
p1
40
00
K
WAL
SIDE
G 12/10/15 Updated J. ORMILLA J.FIOT J.C DAIRE J. Ormilla Manila LRT1 Cavite Extension
APPENDIX TO EPC CONTRACT
F 01/07/13 Modif. Niyog Y. SKIFIC R. CHES. A. C. MHA
E 05/06/13 Modif. Niyog & Pulang lupa Y. SKIFIC R. CHES. A. C. MHA
12/10/2015
Manilla Line 1 Cavite Extension
D 23/05/13 Revised track layout Y. SKIFIC R. CHES. A. C. MHA J. Fiot General Arrangement / Horizontal
C 28/03/13 Second issue Y. SKIFIC R. CHES. A. C. MHA
A3 1/4000 and Vertical Alignments / Pier layout
B 15/03/13 Internal issue Y. SKIFIC R. CHES. A. C. MHA J.C. Daire
First issue Y. SKIFIC R. CHES. A. C. MHA
A1 1/2000 Sheet 3 of 8
A 01/03/13
THE OWNERSHIP OF THE COPYRIGHT IN THIS DRAWING IS RETAINED BY
Department of Transportation and
Communication & Light Rail Transit Authority
BOUYGUES - ALSTOM EPC Consortium THE ISSUER WHOSE CONSENT MUST BE OBTAINED BEFORE ANY USE OR
REPRODUCTION OF THE DRAWING OR ANY PART THEREOF CAN BE MADE. M1E00-CC-DWG-ALG-STAT-SYSTRA-01-003 G
NINOY AQUINO
+35
+30
+25
OLS (2%)
ated Landing -off OLS (1.6%)
Airport estim rt estimated Take
+20 Max height of
catenary poles
Ninoy Aquino Ninoy Aquino Airpo
Ninoy Aquino Ave
8
+15
R=12 500 m R=3 000 m R=5 000 m R=3 000 m
0.30 % -1.50 % R=3 000 m -0.30 % R=5 000 m 0.30 %
0.30 % -2.50 %
1,5
R=3 000 m
3,4
+10
3,5
7,2
11
Rail 11.516 11.660 11.798 11.892 11.972 12.052 12.132 12.213 12.274 12.161 11.815 11.410 11.016 10.806 10.828 10.909 10.990 11.071 11.152 11.233 11.314 11.375 11.437 11.521 11.605 11.686 11.767 11.848 11.915 11.868 11.787 11.706 11.625 11.544 11.463 11.382 11.301 11.254 11.321 11.402 11.483 11.564 11.645 11.726 11.807 11.888 11.964 12.039 12.114 12.195 12.248 12.092 11.766 11.165 10.490 9.835 9.377 9.168 9.090
Piers
GL -0.5 0.2 0.2 0.8 3.4 5.0 5.0 5.0 4.8 0.4 -0.5 -0.1 0.9 1.9 1.0 0.0 -0.2 0.1 0.6 2.9 3.8 3.1 2.5 2.5 2.5 2.7 2.7 2.8 2.6 2.6 2.8 2.8 2.8 2.8 2.9 2.8 2.8 3.0 2.9 2.9 2.9 2.9 2.8 2.8 2.7 2.6 2.5 2.5 2.5 2.7 2.8 3.2 2.8 2.8 2.9 3.1 3.0 2.9 2.9
R=12 500 m 130.482 m R=3 000 m -1.50 % R=3 000 m 363.545 m R=5 000 m -0.30 % R=5 000 m 320.678 m R=3 000 m -2.50 % R=3 000 m
Type 30.748 m 0.30 % 54.000 m 53.966 m 54.000 m 0.30 % 29.998 m 206.285 m 29.998 m 0.30 % 84.000 m 49.208 m 66.000 m
104 377.702 11.739
9.159
11.823 12.342 10.844 11.939 11.253 12.363 9.440
Level 11.814 12.220 10.722 11.917 11.230 12.069 9.258
104 393.076
104 565.932
104 673.898
105 079.442
105 315.725
105 693.402
105 817.609
105 850.609
Chainage
Chainage
104320.701 104541.997 104580.034 104697.490 104735.527 104843.792 104879.087 104975.866 105011.161 105596.334 105631.294 105685.917 105720.876 105803.323 105842.930
Horizontal Alignments
100
200 R=225.00
CL CL R=620.00
500 AL AL 96.778 35.2 AL AL CL
95
Straight
500 221.295
CL CL 108.265 35.2 95
585.173
CL CL 82.447 39.606 51.017
38.0 R=202.00 37 34.9 R=215.00 60
200 37 38.0 60 34.9
117.457 54.623
100
p173 p174
p172 p175
p171 p17
6
p170
p169 p17
7
p168
p167
UINO
p1
78
p166
SIDE
Q
OY A
WAL
p165
O
p1 SAN DIONISI
104600
LA
K
FENCE
HUE 79
p164
NIN
IAL RT
EN
T WO
A SAN DIONISIO
SIDE
CONCRETE
SID
OD
EN
RE ST
LA HUERTA
p163
RU RESID
CT
p1
WAL
UR ENTIA
ES L
80 SAN DIONISIO
K
p162
INFOR
700
MAL
00
SETT CONCRETE
LERS CONCRETE
1 p1 STRUCTURES
1045
p16
104
STRUCTURES
81 Transteam Freight Inc.
ge p211 p212
Forwarders Brokera
p209 p210 p213
p1 p207 p208 p214
60 p206
p1 82 p204 p205
CO
AL
p203
00
NTI
p202 p21
NC
IDE
RES
p201 5
RE
p1 p200 SIDEWALK
1044
TE
8 3 p198 p199 CONCRETE le SIDEWALK
p21
ST
Orange Apartel
p197 STRUCTURES
RU
p18 p196 6
IM
H
AT
NCE
CE
CT
p195 TP
SIDEWALK
4 p p194
FEN
UR
EL
FO
L FE
TTLER
S
185 p193 p21
E
SE
p192
0
MAL
7
RETE
DA
CONCRETE STRUCTURES
STEE
Shakey's
INFOR Olivarez Plaza
p191
0
p186 p190
00
p189
48
CONC
Pizza Hut
8
E
1043
E
10
CTUR
TUR
ID
CONCRETE FENCE
CO CT
p21
ST
STRUC
GE
105600
STRU
NC UR
RU
CONCRETE
9
RE E
STRUCTURES CONCRETE
TE
rter
TE
RETE
105500
NTI
AL SIDEWALK
p22
STRUCTURES
NCRE
Racal Motors
IDE
Tiles Expo
TIONAL FREIGHT 0
700
RES MANILA INTERNA
CONC
FORWARDERS INC.
105400
p221
CO
SIDEWALK
Fuelsave
105
Gasoline
105300
Station HOTEL
OYSTER PLAZA
ALLIED BANK
105200
900
CONCRETE
0
STRUCTURES
20
105100
MC DONALDS CONCRETE STRUCTUR
104
ES
4
10
L
Pk 105+000
IA
NT
800
DE
SI
STEEL STRUCTURE
RE CALTEX
105
SIDEWALK
CONCRETE CONCRETE
SID
CONCRETE
CONCRETE STRUCTURES STRUCTURES
EW
STRUCTURES
CONCRETE STRUCTURES CONCRETE STRUCTUR
SIDEWALK
STRUCTURES AIRPORT CITY MALL
AL
ES
K
CONCRETE
SIDEWALK
STRUCTURES
NOTES :
Dampa Seafoods Markets
1)
U-Beams - P20 to P120, P124 to P235, P239 to P338, P341 to P368, P371 to P436,
P439 to P446
Other than Redemptorist street : P121 to P124, P235 to P238, P338 to P341, P368 to
P371, P437 to P439.
2) I-Beams - Redemptorist street : please refer to drawing
M1E00-CC-DWG-CWK-STAT-SYSTRA-10-002
3) U-Beams : please refer to drawing M1E00-CC-DWG-CWK-STAT-SYSTRA-10-001 and
drawing M1E00-CC-DWG-CWK-SYSTRA-10-010
4) Civil works at junction at Baclaran with existing LRT Line 1 out of Systra's scope.
Pier P1 and P2 locations may be subject to change at next design stage along with
G 12/10/15 Updated J. ORMILLA J.FIOT J.C DAIRE J. Ormilla Manila LRT1 Cavite Extension
APPENDIX TO EPC CONTRACT
F 01/07/13 Modif. Niyog Y. SKIFIC R. CHES. A. C. MHA
E 05/06/13 Modif. Niyog & Pulang lupa Y. SKIFIC R. CHES. A. C. MHA
12/10/2015
Manilla Line 1 Cavite Extension
D 23/05/13 Revised track layout Y. SKIFIC R. CHES. A. C. MHA J. Fiot General Arrangement / Horizontal
C 28/03/13 Second issue Y. SKIFIC R. CHES. A. C. MHA
A3 1/4000 and Vertical Alignments / Pier layout
Y. SKIFIC R. CHES. A. C. MHA
B 15/03/13 Internal issue J.C. Daire A1 1/2000 Sheet 4 of 8
A 01/03/13 First issue Y. SKIFIC R. CHES. A. C. MHA
THE OWNERSHIP OF THE COPYRIGHT IN THIS DRAWING IS RETAINED BY
Department of Transportation and
Communication & Light Rail Transit Authority
BOUYGUES - ALSTOM EPC Consortium THE ISSUER WHOSE CONSENT MUST BE OBTAINED BEFORE ANY USE OR
REPRODUCTION OF THE DRAWING OR ANY PART THEREOF CAN BE MADE. M1E00-CC-DWG-ALG-STAT-SYSTRA-01-004 G
DR. SANTOS MANUYO UNO
+35
+30
+25
+20
+15
R=3 000 m 0.30 %
R=3 000 m
+10 2.00 %
3,4
-0.30 % R=3 000 m
10,1
9,8
+5 C-5 Extension
8,1
8,5
p225
p219 p220 p221 p224 p226 p255 p257 p258 p259 p260 p261 p262 p263 p264 p265 p266 p267 p268 p269 p270 p271 p272 p273 p274 p275 p276 p277 p278 p279 p280 p281
p222 p233 p234 p235
+0 p227 p228 p232 p236 p237 p238 p239 p240 p241 p242 p243 p244 p245 p246 p247 p248 p249 p250 p251 p252 p253 p254
p256
p223 p229 p230 p231
Rail9.377 9.168 9.090 9.013 8.936 8.859 8.790 8.721 8.652 8.588 8.525 8.461 8.381 8.301 8.220 8.1408.098 8.029 7.960 7.891 7.811 7.742 7.661 7.580 7.499 7.440 7.583 7.970 8.508 9.048 9.588 10.128 10.668 11.118 11.462 11.637 11.720 11.801 11.882 11.963 12.033 12.104 12.174 12.245 12.315 12.396 12.463 12.530 12.597 12.677 12.758 12.838 12.918 12.985 13.054 13.124 13.205 13.286 13.367 13.448 13.529 13.610 13.691
Piers
GL 3.0 2.9 2.9 1.1 -0.5 2.5 3.7 3.0 0.3 0.5 -0.5 -0.5 -0.5 0.2 1.5 1.5 1.2 0.7 0.3 0.4 0.4 0.0 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.2 0.5 0.5 0.5 0.5 0.5 2.8 -0.1 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8
7.453
8.039
105 850.609
106 419.488
106 453.988
106 488.488
106 665.084
Chainage
100
200
500 CL
R=620.00 CL AL CL AL
Straight 51.017 39.606 CL
39.606
500 712.026 34.894
R=430.00 724.187
200 116.912 34.894
100
ACCESS ROAD
PRQ-83-E
MODAL
SLOTS
10 JEEPNEY TERMINAL
SLOTS
5 JEEPNEY TERMINAL
UNO
MANUYO
MANUYO UNO
NISIO
SAN DIO
p238 p259
p236 p237
p234 p235 p260
CE
p233
E FEN
p227 1
R
p218 CONCR
ETE
p225 p226
CONC
p219 p26
DR. SANTOS
URES
IN
p224
E
RS
FO SIDEWALK
p220
STRUCT
p221 p222 p223 RIVER
2
I V
TTLE
RM
AL
SE
p263
R
L SE
R
TT IN
IV
LE FO
106700
ORMA
RS RM
E
AL
p26
106600
R
ETE SE
CONCR
4
INF
R
TURES TTL
STRUC
p26
106500
ER
I V
S MANU
5 YO UN
00
106400
p266 O
E
106300
1068
R
p26
7
106200
p26
106100
8
RIVER
MAN
Pk 106+000
R I p269
105800
V E
R I V E R
105900
ES
UYO
00
UR R
RUCT
CONC
RETE ST p270
IN
1069
SIDEW
FO
ALK
ATION UNO
RM
p271
AL
SANTOS ST
SE
p272
DR.
TT
LE
(Fut
RS
00
CONC MANUYO UNO p274
p27
07+0
5 MAN
UYO
p27 U NO
6
NOTES : p277
Pk 1
00
p27
1) 8
1071
p27
ALK
SIDEW ALK
9
SIDEW
p280
U-Beams - P20 to P120, P124 to P235, P239 to P338, P341 to P368, P371 to P436, p28
00
1
P439 to P446
1072
Other than Redemptorist street : P121 to P124, P235 to P238, P338 to P341, P368 to MANU
YO UN
O
SIDE
WAL
K
00
1073
2) I-Beams - Redemptorist street : please refer to drawing SIDEW
ALK
M1E00-CC-DWG-CWK-STAT-SYSTRA-10-002
3) U-Beams : please refer to drawing M1E00-CC-DWG-CWK-STAT-SYSTRA-10-001 and
drawing M1E00-CC-DWG-CWK-SYSTRA-10-010
4) Civil works at junction at Baclaran with existing LRT Line 1 out of Systra's scope.
Pier P1 and P2 locations may be subject to change at next design stage along with
DAN
IEL F
5) Pier locations may change during detailed design. AJA
RDO
G 12/10/15 Updated J. ORMILLA J.FIOT J.C DAIRE J. Ormilla Manila LRT1 Cavite Extension
APPENDIX TO EPC CONTRACT
F 01/07/13 Modif. Niyog Y. SKIFIC R. CHES. A. C. MHA
E 05/06/13 Modif. Niyog & Pulang lupa Y. SKIFIC R. CHES. A. C. MHA
12/10/2015
Manilla Line 1 Cavite Extension
D 23/05/13 Revised track layout Y. SKIFIC R. CHES. A. C. MHA J. Fiot General Arrangement / Horizontal
C 28/03/13 Second issue Y. SKIFIC R. CHES. A. C. MHA
A3 1/4000 and Vertical Alignments / Pier layout
B 15/03/13 Internal issue Y. SKIFIC R. CHES. A. C. MHA J.C. Daire
Y. SKIFIC R. CHES. A. C. MHA
A1 1/2000 Sheet 5 of 8
A 01/03/13 First issue
THE OWNERSHIP OF THE COPYRIGHT IN THIS DRAWING IS RETAINED BY
Department of Transportation and
Communication & Light Rail Transit Authority
BOUYGUES - ALSTOM EPC Consortium THE ISSUER WHOSE CONSENT MUST BE OBTAINED BEFORE ANY USE OR
REPRODUCTION OF THE DRAWING OR ANY PART THEREOF CAN BE MADE. M1E00-CC-DWG-ALG-STAT-SYSTRA-01-005 G
+35
+30
+25
+20
+10 -1.45 %
-1.45 %
10
9,9
R=3 000 m -0.20%
C-5
+5 Extension
p286
p279 p280 p281 p282 p283 p284 p287 p289 p290 p291 p292 p293 p294 p295 p296 p297 p298 p300 p301
p288 p299 p303 p304 p305 p306 p307 p312 p313 p314 p315 p316 p318 p319 p320 p321 p322
p308 p309 p310 p311 p325 p326 p327 p328 p329 p330 p331 p332 p333 p334
+0 p323 p324 p337 p338 p339
p285 p302 p317 p336
p335
G
Rail
13.529 13.610 13.691 13.772 13.853 13.901 13.834 13.753 13.678 13.604 13.530 13.456 13.371 13.285 13.204 13.123 13.042 12.961 12.880 12.799 12.718 12.648 12.577 12.507 12.430 12.352 12.280 12.199 12.114 12.034 11.954 11.874 11.793 11.722 11.617 11.341 10.997 10.653 10.239 9.901 9.562 9.170 8.778 8.386 7.993 7.601 7.209 6.817 6.425 6.033 5.774 5.706 5.652 5.608 5.563 5.518 5.464 5.410 5.366 5.325 5.284
Piers
GL 2.8 2.8 2.8 2.8 2.9 3.1 -0.4 4.3 3.0 2.6 2.6 2.7 2.8 2.9 2.6 2.6 2.6 2.9 2.8 2.7 2.5 2.9 2.9 -0.2 2.5 2.5 2.5 2.3 2.1 1.9 1.7 1.5 1.8 2.5 2.5 2.5 2.5 2.5 -0.1 2.5 2.5 2.5 2.5 2.5 0.9 0.9 1.5 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 -0.7 0.0 0.5 0.5 0.5
4.297
3.994
13.924 11.643 4.095
Level 13.902 11.593 4.045
107 449.462
108 210.000
108 715.690
108 732.980
108 750.270
Chainage
100
200
500 CL R=550.00 CL
CL AL
Straight
R=375.00 CL 38.719
245.281 38.719
500 33.945 330.050
200 314.356 33.945
100
NOTES :
1)
S
1
RE
p29
TU
SIDEWALK
p30
UC
P371, P437 to P439.
R
1
ST
TE
ES
0
p29
RE
UR
p30
NC
CT
2) I-Beams - Redemptorist street : please refer to drawing
CO
RU
2
ST
TE
89
RE
p2 M1E00-CC-DWG-CWK-STAT-SYSTRA-10-002
NC
p3
CO
SID
EW
ALK
03
107800
SIDEWAL
88
107700
K
p30
p2
SIDEW
4 3) U-Beams : please refer to drawing M1E00-CC-DWG-CWK-STAT-SYSTRA-10-001 and
87 p30
drawing M1E00-CC-DWG-CWK-SYSTRA-10-010
ALK
p2 5
4) Civil works at junction at Baclaran with existing LRT Line 1 out of Systra's scope.
900
O 8 6 p30
UN p2 6
600
PA
107
LU
Pier P1 and P2 locations may be subject to change at next design stage along with
S
NG p30
RE
85
107
D
TU
LA LISHE
7
S
p2
UC
RE
DEMO RETE
PU CONC URES
R
TU
ST
CT
C
K SIDE
STRU
RU
AL
E
p30
T
WAL
DEW
RE
ST
84
SI K
8
NC
ET
p2
CO
RE
p30
CONC
CONC
O 9
83
ES
UN UCTUR
RETE
0
p2
STR
RETE
RET
O CONC
UY p31
+00
E FEN
FENCE
N
MA 0
0
8 2
CE
50
ILAYA
p2
NC
p31
FE
108
7
TE
1
RE
10
NC
81
CO
p2 PU p31
LAN 2
Pk
USES GL
80 ELIAS ALDANA
HO
EN
OD UP
A p31
p2 UN 3
WO
100
RES
RE RU
CTU
p31
79 CTU E ST
4
108
RU RET
p2 NC
RET
E ST
CO
NC
p31
00
K
AL CO
SID
EW
5
78
74
p2 p31
10
6
77 p31
p2 CONC
RETE 7
200
FENC
p31 PULANG
LUPA UN
76
E
K
NO 8 O
p2
WAL
AU p340
108
SIDE 9
L UP p31
p338 p339
NG
FIS CONCRE
p336 p337
75
H PO TE STR
LA
ND UCTURE
p320 p335
p2
S
p334
SIDE
0
PU p333
WAL
0
p321 p332
K
p331
73
p322
p329 p330
10
p323
ELIA
p324 p325 p326 p327 p328 INFORMAL SETTLERS
SA
RS
TLE
LDA
300
L SET
NA
MA
O
OR
RD
INF
108
A JA DUMP
SITE
LF
NIE CONC
DA
RETE
BAR
LERS
RIE
ER
R
TTL
0
108800
L SE
20
LERS
SETT
MA
00
CONC
OR
108700
7
RETE
INF
SETT
10
BARR
RMAL
1084
IER
108600
RMAL
INFO
108500
INFO
CO DUMP
NC SITE
RE
TE
BA
RR
IE
R
CO
NC
RE
TE
BA
RR PULANG LUPA UNO
IE
R
G 12/10/15 Updated J. ORMILLA J.FIOT J.C DAIRE J. Ormilla Manila LRT1 Cavite Extension
APPENDIX TO EPC CONTRACT
F 01/07/13 Modif. Niyog Y. SKIFIC R. CHES. A. C. MHA
E 05/06/13 Modif. Niyog & Pulang lupa Y. SKIFIC R. CHES. A. C. MHA
12/10/2015
Manilla Line 1 Cavite Extension
D 23/05/13 Revised track layout Y. SKIFIC R. CHES. A. C. MHA J. Fiot General Arrangement / Horizontal
C 28/03/13 Second issue Y. SKIFIC R. CHES. A. C. MHA
A3 1/4000 and Vertical Alignments / Pier layout
B 15/03/13 Internal issue Y. SKIFIC R. CHES. A. C. MHA J.C. Daire A1 1/2000 Sheet 6 of 8
A 01/03/13 First issue Y. SKIFIC R. CHES. A. C. MHA
THE OWNERSHIP OF THE COPYRIGHT IN THIS DRAWING IS RETAINED BY
Department of Transportation and
Communication & Light Rail Transit Authority
BOUYGUES - ALSTOM EPC Consortium THE ISSUER WHOSE CONSENT MUST BE OBTAINED BEFORE ANY USE OR
REPRODUCTION OF THE DRAWING OR ANY PART THEREOF CAN BE MADE. M1E00-CC-DWG-ALG-STAT-SYSTRA-01-006 G
ZAPOTE
+35
+30
+25
+20
11,7
11,5
+15 Longos Flyover
R=3 000 R=3
m 000 m
-2.50%
1,8
+10 R=3 000 m
3.00 %
R=3 000 m
+5 -1.50% R=3 000 m
R=3 000 m 0.20 %
p374
p375 p380
3,9
3,7
p373 p376 p377 p379 p386 p387 p388 p390 p391 p395
p345 p346 p350 p370 p371 p372 p378 p381 p382 p383 p384 p385 p389 p393 p394
p343 p344 p347 p348 p349 p351 p352 p353 p354 p355 p356 p357 p358 p359 p360 p361 p362 p363 p364 p365 p366 p367 p392
+0 p337 p338 p339 p340 p341 p342 p368 p369
p396
G
Rail5.366 5.325 5.284 5.230 5.176 5.040 4.683 4.278 3.873 3.481 3.278 3.294 3.348 3.401 3.452 3.502 3.555 3.608 3.661 3.713 3.766 3.819 3.872 3.925 3.967 4.010 4.135 4.398 4.960 5.737 6.547 7.357 8.167 8.977 9.667 10.357 10.972 11.470 11.733 11.727 11.477 10.984 10.317 9.642 9.088 8.777 8.709 8.788 8.869 8.950 9.031 9.112 9.193 9.274 9.355 9.436 9.517 9.598 9.679 9.760
Piers
GL 0.5 0.5 0.5 0.5 0.5 0.7 1.0 1.2 1.4 1.4 1.3 1.3 1.3 1.4 1.2 1.3 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 0.7 0.7 1.8 2.0 2.0 2.5 2.7 5.2 4.3 3.4 2.4 2.1 2.8 1.8 1.7 1.7 1.7 1.9 2.0 2.1 2.3 1.9 2.2 2.0 1.1 1.9 1.8 2.2 -0.4
-0.30 % R=5 000 m 452.271 m R=3 000 m 134.139 m R=3 000 m -1.00 % R=3 000 m
Type 268.752 m 24.887 m 0.20 % 84.068 m 3.00 % 120.000 m G 169.394 m 39.000 m
3.187
3.175
4.069
5.413
9.437
8.943
8.807
3.165 4.446 11.237 8.812
Level 3.150 4.152 10.637 8.748
109 019.021
109 031.465
109 043.908
109 496.178
109 538.212
109 580.247
109 714.386
109 774.386
110 003.780
110 023.280
110 042.780
Chainage
100
100
8
p39
NOTES :
1)
7
p39
400
U-Beams - P20 to P120, P124 to P235, P239 to P338, P341 to P368, P371 to P436, 110
P439 to P446
6
p39
S
LER
Other than Redemptorist street : P121 to P124, P235 to P238, P338 to P341, P368 to
TT
SE
AL
RM
INFO
RS
LE
95
TT
LE
SE
p3
TT
2) I-Beams - Redemptorist street : please refer to drawing AL
SE
RM
FO
AL
IN
M1E00-CC-DWG-CWK-STAT-SYSTRA-10-002
RM
INFO
94
3) U-Beams : please refer to drawing M1E00-CC-DWG-CWK-STAT-SYSTRA-10-001 and
p3
drawing M1E00-CC-DWG-CWK-SYSTRA-10-010 BA
II LERS
93
LA
SETT
RMAL
TA INFO
p3
4) Civil works at junction at Baclaran with existing LRT Line 1 out of Systra's scope. 00
Pier P1 and P2 locations may be subject to change at next design stage along with 03
92
11
p3
V
TE
5) Pier locations may change during detailed design.
91
PO
p3
ZA
90
p3
URES
CONCRETE STRUCT
8 9
p3
RS
LE
TT
SE
88
AL
p3
RM
PACKAGE 3
PACKAGE 2
0O
20INF
87
p3
10
RS
1
S LE
6 ER TT
p38
p333 TL SE
p334 ET AL
LS
p335 p336 MA FO
RM
p337 5 OR
p38
IN
p338 INF
p339 p340 p341 p342
INFORMAL
SETTLERS p384
LERS
RS
p382 LE
LDO HIGHWAY
RMAL
ZAPOTE V TT
p381 SE
INFO
p379 p380 OR
MA
L
p376
100
p375 RS
EMILIO AGUINA
p374
E
LERS
TL
p373 ET
110
L SETT
LS
p371 p372 MA
RMA
OR
TLERS
p370 INF
INFO
p369
108800
INFORMAL SETTLERS
p361 p362 p368
p363 p364 p367
R
AL SET
p365 p366
108900
RS
F L Y O V E
ZAPOTE
L SETTLE
INFORMAL
000
INFORMAL SETTLERS
INFORM
SETTLERS
Pk 109+000
109100
INFORMA
109900
+
109200
Pk 110
L O N G O S
109800
p343
109300
p344 p345
109700
p346 p347
109400
PULANG
LUPA UN
O
p348 p349 p350
109600
109500
INFORMAL SETTLERS
PACKAGE 3
PACKAGE 2
G 12/10/15 Updated J. ORMILLA J.FIOT J.C DAIRE J. Ormilla Manila LRT1 Cavite Extension
APPENDIX TO EPC CONTRACT
F 01/07/13 Modif. Niyog Y. SKIFIC R. CHES. A. C. MHA
E 05/06/13 Modif. Niyog & Pulang lupa Y. SKIFIC R. CHES. A. C. MHA
12/10/2015
Manilla Line 1 Cavite Extension
D 23/05/13 Revised track layout Y. SKIFIC R. CHES. A. C. MHA J. Fiot General Arrangement / Horizontal
C 28/03/13 Second issue Y. SKIFIC R. CHES. A. C. MHA
A3 1/4000 and Vertical Alignments / Pier layout
B 15/03/13 Internal issue Y. SKIFIC R. CHES. A. C. MHA J.C. Daire A1 1/2000 Sheet 7 of 8
A 01/03/13 First issue Y. SKIFIC R. CHES. A. C. MHA
THE OWNERSHIP OF THE COPYRIGHT IN THIS DRAWING IS RETAINED BY
Department of Transportation and
Communication & Light Rail Transit Authority
BOUYGUES - ALSTOM EPC Consortium THE ISSUER WHOSE CONSENT MUST BE OBTAINED BEFORE ANY USE OR
REPRODUCTION OF THE DRAWING OR ANY PART THEREOF CAN BE MADE. M1E00-CC-DWG-ALG-STAT-SYSTRA-01-007 G
TALABA NIYOG
+35
+30
+25
+20
5,8
-0.30 %
R=5 000 m R=3 000 m 1.01 %
-0.30 %
0.30 %
+10
11
11,4
2,8
8,8
9,6
+5 Emilio Aguinaldo Highway Molino Boulvard
p427 p428 p429 p441 p442
p395 p399 p400 p401 p410 p411 p412 p413 p414 p415 p416 p417 p418 p419 p420 p421 p422 p423 p424 p425 p426 p432 p433 p434 p435 p438 p439 p440 p443 p444 p445 p446
p398 p402 p403 p404 p409 p430 p431 p437
p397 p405 p406 p407 p408 p436
+0
p396
Rail 9.679 9.760 9.841 9.922 10.003 10.084 10.160 10.235 10.310 10.390 10.471 10.551 10.631 10.700 10.769 10.838 10.907 10.997 11.078 11.159 11.240 11.321 11.402 11.483 11.549 11.498 11.417 11.336 11.253 11.254 11.478 11.755 12.011 12.267 12.543 12.819 13.095 13.374 13.645 13.907 14.129 14.126 14.057 13.988 13.919
13.877 13.797 13.716 13.636 13.556 13.473 13.389
Piers
GL 2.2 -0.4 1.2 1.6 2.1 2.4 2.1 1.6 1.5 1.4 1.1 1.0 1.0 1.2 1.9 2.5 2.5 2.5 2.7 2.7 2.8 3.0 2.9 2.9 2.9 2.9 2.8 2.8 2.5 2.5 2.6 2.8 3.3 3.6 3.6 1.8 1.6 2.5 2.5 2.5 2.3 1.2 1.6 2.4 2.5 3.0 3.2 3.2 2.5 2.2 2.2 2.2
906.722 m R=5 000 m -0.30 % R=3 000 m 261.415 m R=3 000 m -0.30 %
Type 0.30 % 30.000 m 96.181 m 39.155 m 1.01 % 39.155 m 250.940 m
110 964.502
111 095.261
111 395.831
Chainage
Chainage 110350.574 110384.344 110681.809 110718.458 111023.111 111061.094 111091.129 111129.111 111157.644 111196.305 111242.783 111281.443
111304.630 111339.758 111373.814 111408.942 111666.348
Horizontal Alignments
100
200
CL R=1000.00 CL R=450.00 CL
500 AL R=4000.00 AL CL CL AL AL AL
Straight 33.770 46.478 38.661 C
500 297.465 36.648 304.654 37.983 30.035 37.983 28.533 38.661 23.187 35 L CL 257.406
.128 R=220.00 28
200
34.056 35.1
100
TA
LAB
A p434 p435 p436 p437 p438 p439 p440 p441 p442 p443 p444
II p445
ANIBAN I p446 NIOG III
p433
TALABA IV p432
03 01 05 06
10 08
ANIBAN I
09
17 16 02 SIDEWALK
NIYOG
14 18
12
1
19-1
SIDEWALK
p43
11 20-1
07
15
04
TALABA V
p429 p430
3
CONCRETE STRUCTURES
St. Dominic College
p428
INFORMAL SETTLERS
2
p427
CONCRETE SIDEWALK
p426
STRUCTURES
Talaba IV Elementary School
1
p425
111400
111500
p424
111600
Ta
lab
a
II
p421 p422 p423 CONCRETE FENCE
p420
CO
03
Brg
p418 p419
N
yH
p417
CR
p416
20-2
all
SID
p415
ET
300
p414
CO
EW
p413 SIDEWALK
E ST
19-2
p392 p412
AL
NC
CONCRETE STRUCTURE
CONCRETE STRUCTURES
p410
K
CONCRETE STRUCTURES
p409
RU
p408
RE
p406 p407 Art Science
CTU
111
p393 p404 p405
TE
p402 p403
RES
FE
p395 p397 p398 p399 SIDEWALK
INFORMAL SETTLERS
p396
NC
Talaba IV Brgy Hall
EM SIDEWALK
CONCRETE STRUCTURES CONCRETE STRUCTURES
E
ILIO SIDEWALK I H G F E
AG
D
TALABA (Future)
C B A
111200
UIN
ALD
OH
IGH
WA
Y
111100
Pk 111+000
110900
NOTES :
110800
Planters Bank
110600
1)
CONCRETE
CONCRETE STRUCTURES
110500
110300
CONCRETE STRUCTURES
CONCRETE STRUCTURES CONCRETE STRUCTURES
CONCRETE STRUCTURES
RS
STRUCTUR
TTLE
U-Beams - P20 to P120, P124 to P235, P239 to P338, P341 to P368, P371 to P436,
SE
CONCRETE STRUCTURES
ES
RMAL
WOODEN HOUSES
P439 to P446
INFO
CONCRETE STRUCTURES
Other than Redemptorist street : P121 to P124, P235 to P238, P338 to P341, P368 to
TLERS
TALABA II
TALABA III
INFORMA
G 12/10/15 Updated J. ORMILLA J.FIOT J.C DAIRE J. Ormilla Manila LRT1 Cavite Extension
APPENDIX TO EPC CONTRACT
F 01/07/13 Modif. Niyog Y. SKIFIC R. CHES. A. C. MHA
E 05/06/13 Modif. Niyog & Pulang lupa Y. SKIFIC R. CHES. A. C. MHA
12/10/2015
Manilla Line 1 Cavite Extension
D 23/05/13 Revised track layout Y. SKIFIC R. CHES. A. C. MHA J. Fiot General Arrangement / Horizontal
C 28/03/13 Second issue Y. SKIFIC R. CHES. A. C. MHA
A3 1/4000 and Vertical Alignments / Pier layout
B 15/03/13 Internal issue Y. SKIFIC R. CHES. A. C. MHA J.C. Daire
First issue Y. SKIFIC R. CHES. A. C. MHA
A1 1/2000 Sheet 8 of 8
A 01/03/13
THE OWNERSHIP OF THE COPYRIGHT IN THIS DRAWING IS RETAINED BY
Department of Transportation and
Communication & Light Rail Transit Authority
BOUYGUES - ALSTOM EPC Consortium THE ISSUER WHOSE CONSENT MUST BE OBTAINED BEFORE ANY USE OR
REPRODUCTION OF THE DRAWING OR ANY PART THEREOF CAN BE MADE. M1E00-CC-DWG-ALG-STAT-SYSTRA-01-008 G