RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=210KG/CM2,BUZONES

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2

REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-1 29/11/12 1.0 3 3/4" 13/12/12 27/12/12 Solado de Buzones 3,4,5,6 39730 0 179.00 221.96 0.00 100.00

R-2 Av. Bolognesi 46585 181.00 0.00 257.38 100.00 257 257%

R-3 30/11/12 1.0 3 3/4" 14/12/12 28/12/12 Losa de fondo de buzones 4,5,6 49853 179.00 278.51 210.00

R-4 30/11/12 1.0 3 3/4" 14/12/12 28/12/12 Av. Bolognesi 45893 181.00 253.55 210.00

R-5 30/11/12 1.0 3 3/4" 28/12/12 63710 179.00 355.92 210.00

R-6 30/11/12 1.0 3 3/4" 28/12/12 65036 181.00 359.31 210.00 358 170%

R-7 01/12/12 1.0 3 3/4" 15/12/12 29/12/12 Fuste de Buzones 4y 5, Losa de Fondo Bz 09 54209 181.00 299.50 210.00

R-8 01/12/12 1.0 3 3/4" 15/12/12 29/12/12 Av. Bolognesi 52061 197.00 264.27 210.00

R-9 01/12/12 1.0 3 3/4" 29/12/12 63814 179.00 356.50 210.00

R-10 01/12/12 1.0 3 3/4" 29/12/12 63279 179.00 353.51 210.00 355 169%

R-11 03/12/12 1.0 3 3/4" 17/12/12 31/12/12 Fuste Bz -3 (1° Parte)-Fuste Bz-6 51080 181.00 282.21 210.00

R-12 03/12/12 1.0 3 3/4" 17/12/12 31/12/12 Av. Bolognesi 51629 181.00 285.24 210.00

R-13 03/12/12 1.0 3 3/4" 31/12/12 63953 181.00 353.33 210.00

R-14 03/12/12 1.0 3 3/4" 31/12/12 64630 179.00 361.06 210.00 357 170%

R-15 04/12/12 1.0 3 3/4" 11/12/12 Fuste(parte II) Bz 03 49359 177.00 278.86 210.00

R-16 04/12/12 1.0 3 3/4" 11/12/12 Av. Bolognesi 45361 179.00 253.41 210.00

R-17 04/12/12 1.0 3 3/4" 01/01/13 64936 181.00 358.76 210.00

R-18 04/12/12 1.0 3 3/4" 01/01/13 63305 181.00 349.75 210.00 354 169%

R-19 05/12/12 1.0 3 3/4" 12/12/12 Fuste (parte III) Bz 03 y Techo Bz 05,06 46201 177.00 261.02 210.00

R-20 05/12/12 1.0 3 3/4" 12/12/12 45893 177.00 259.28 210.00

R-21 05/12/12 1.0 3 3/4" 02/01/13 63719 177.00 359.99 210.00

R-22 05/12/12 1.0 3 3/4" 02/01/13 63713 179.00 355.94 210.00 358 170%

R-23 06/12/12 1.0 3 3/4" 13/12/12 Techo Bz 03 y Fuste Bz 04 44362 181.00 245.09 210.00

R-24 06/12/12 1.0 3 3/4" 13/12/12 47431 183.00 259.19 210.00

R-25 06/12/12 1.0 3 3/4" 03/01/13 62895 177.00 355.34 210.00

R-26 06/12/12 1.0 3 3/4" 03/01/13 58919 179.00 329.16 210.00 342 163%

R-27 07/12/12 1.0 3 3/4" 14/12/12 Buzon 04 42429 181.00 234.41 210.00

R-28 07/12/12 1.0 3 3/4" 14/12/12 Av. Bolognesi-Año Nuevo 35441 179.00 197.99 210.00

R-29 07/12/12 1.0 3 3/4" 04/01/13 55657 181.00 355.34 210.00

1
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=210KG/CM2,BUZONES

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2

REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-30 07/12/12 1.0 3 3/4" 04/01/13 59633 179.00 355.34 210.00 355 169%

R-31 18/12/12 1.0 3 3/4" 01/01/13 Losa BZ 415A Y Fuste 48930 179.00 273.35 210.00

R-32 18/12/12 1.0 3 3/4" 01/01/13 Av. Bolognesi 54944 179.00 306.95 210.00

R-33 18/12/12 1.0 3 3/4" 15/01/13 59735 179.00 333.71 210.00

R-34 18/12/12 1.0 3 3/4" 15/01/13 60347 179.00 337.13 210.00 335 160%

R-35 19/12/12 1.0 3 3/4" 02/01/13 Encimado Fuste 58206 181.00 321.58 210.00

R-36 19/12/12 1.0 3 3/4" 02/01/13 BZ 4158A 56983 179.00 318.34 210.00

R-37 19/12/12 1.0 3 3/4" 16/01/13 70234 181.00 388.04 210.00

R-38 19/12/12 1.0 3 3/4" 16/01/13 57696 179.00 322.33 210.00 355 169%

R-39 20/12/12 1.0 3 3/4" 03/01/13 Techo BZ 07 y BZ-4258A 57696 179.00 322.33 210.00

R-40 20/12/12 1.0 3 3/4" 03/01/13 48624 181.00 268.64 210.00

R-41 20/12/12 1.0 3 3/4" 17/01/13 69011 179.00 385.54 210.00

R-42 20/12/12 1.0 3 3/4" 17/01/13 64220 181.00 354.81 210.00 370 176%

R-43 20/12/12 1.0 4 1/2" 03/01/13 Meia caña BZ. 4-BZ .5 42100 179.00 235.19 210.00

R-44 20/12/12 1.0 4 1/2" 03/01/13 38736 181.00 214.01 210.00

R-45 20/12/12 1.0 4 1/2" 17/01/13 47503 181.00 262.45 210.00

R-46 20/12/12 1.0 4 1/2" 17/01/13 48420 179.00 270.50 210.00 266 127%

R-47 04/01/13 1.0 4 1/2" 11/01/13 Falso Solado BZ. 7A 42100 179.00 235.19 210.00

R-48 04/01/13 1.0 4 1/2" 11/01/13 38736 181.00 214.01 210.00

R-49 04/01/13 1.0 4 1/2" 01/02/13 56269 179.00 314.35 210.00

R-50 04/01/13 1.0 4 1/2" 01/02/13 38736 179.00 216.40 210.00 265 126%

R-51 04/01/13 1.0 4 1/2" 11/01/13 Losa de fondo BZ 7A 31498 179.00 175.97 210.00

R-52 04/01/13 1.0 4 1/2" 11/01/13 33435 181.00 184.73 210.00

R-53 04/01/13 1.0 4 1/2" 01/02/13 50866 181.00 281.03 210.00

R-54 04/01/13 1.0 4 1/2" 01/02/13 51172 181.00 282.72 210.00 282 134%

R-55 04/01/13 1.0 4 1/2" 11/01/13 Cuerpo BZ 7A 40163 179.00 224.37 210.00

R-56 04/01/13 1.0 4 1/2" 11/01/13 42712 181.00 235.98 210.00

R-57 04/01/13 1.0 4 1/2" 01/02/13 68400 181.00 377.90 210.00

R-58 04/01/13 1.0 4 1/2" 01/02/13 59735 177.00 337.49 210.00 358 170%

2
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=210KG/CM2,BUZONES

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2

REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-59 05/01/13 1.0 4 1/2" 12/01/13 Enimamado(Muro) BZ.7A 39653 177.00 224.03 210.00

R-60 05/01/13 1.0 4 1/2" 12/01/13 34964 181.00 193.17 210.00

R-61 05/01/13 1.0 4 1/2" 02/02/13 56881 181.00 314.26 210.00

R-62 05/01/13 1.0 4 1/2" 02/02/13 54230 181.00 299.61 210.00 307 146%

R-63 07/01/13 1.0 4 1/2" 14/01/13 Solado de BZ 23 30989 179.00 173.12 210.00

R-64 07/01/13 1.0 4 1/2" 14/01/13 41794 181.00 230.91 210.00 231 110%

R-65 08/01/13 1.0 4 1/2" 15/01/13 Losa de fondo BZ.21- BZ.23 35372 179.00 197.61 210.00

R-66 08/01/13 1.0 4 1/2" 15/01/13 34557 179.00 193.05 210.00

R-67 08/01/13 1.0 4 1/2" 05/02/13 44241 179.00 247.16 210.00

R-68 08/01/13 1.0 4 1/2" 05/02/13 45260 181.00 250.06 210.00 249 118%

R-69 09/01/13 1.0 4 1/2" 16/01/13 Losa de fondo y cuerpo BZ.31A 35372 179.00 197.61 210.00

R-70 09/01/13 1.0 4 1/2" 16/01/13 34557 177.00 195.23 210.00

R-71 09/01/13 1.0 4 1/2" 06/02/13 47095 181.00 260.19 210.00

R-72 09/01/13 1.0 4 1/2" 06/02/13 42304 179.00 236.34 210.00 248 118%

R-73 10/01/13 1.0 4 1/2" 17/01/13 2dO Cuerpo-Buzon 31A 37411 179.00 209.00 210.00

R-74 10/01/13 1.0 4 1/2" 17/01/13 38736 181.00 214.01 210.00

R-75 10/01/13 1.0 4 1/2" 07/02/13 39551 179.00 220.96 210.00

R-76 10/01/13 1.0 4 1/2" 07/02/13 45872 181.00 253.44 210.00 237 113%

R-77 10/01/13 1.0 4 1/2" 17/01/13 2dO Cuerpo BZ.21-BZ .23 36493 181.00 201.62 210.00

R-78 10/01/13 1.0 4 1/2" 17/01/13 44546 181.00 246.11 210.00

R-79 10/01/13 1.0 4 1/2" 07/02/13 47401 179.00 264.81 210.00

R-80 10/01/13 1.0 4 1/2" 07/02/13 41692 179.00 232.92 210.00 249 119%

R-81 11/01/13 1.0 4 1/2" 18/01/13 Techo BZ.21-BZ.23 38226 179.00 213.55 210.00

R-82 11/01/13 1.0 4 1/2" 18/01/13 39857 179.00 222.67 210.00

R-83 11/01/13 1.0 4 1/2" 08/02/13 53109 179.00 296.70 210.00

R-84 11/01/13 1.0 4 1/2" 08/02/13 55250 180.00 306.94 210.00 302 144%

R-85 15/01/13 1.0 4 1/2" 22/01/13 1ro Cuerpo BZ.21-BZ .23 41284 181.00 228.09 210.00

R-86 15/01/13 1.0 4 1/2" 22/01/13 43119 179.00 240.89 210.00

R-87 15/01/13 1.0 4 1/2" 12/02/13 48318 179.00 269.93 210.00

3
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=210KG/CM2,BUZONES

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2

REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-88 15/01/13 1.0 4 1/2" 12/02/13 51988 179.00 290.44 210.00 280 133%

R-89 14/01/13 1.0 4 1/2" 21/01/13 2d Cuerpo y losa de fondo


o
43935 179.00 245.45 210.00

R-90 14/01/13 1.0 4 1/2" 21/01/13 BZ.24- BZ.26 41896 179.00 234.06 210.00

R-91 14/01/13 1.0 4 1/2" 11/02/13 42202 181.00 233.16 210.00

R-92 14/01/13 1.0 4 1/2" 11/02/13 44343 179.00 247.73 210.00 240 114%

R-93 15/01/13 1.0 4 1/2" 22/01/13 1 Cuerpo y losa de fondo


ro
34557 179.00 193.05 210.00

R-94 15/01/13 1.0 4 1/2" 22/01/13 38022 179.00 212.42 210.00

R-95 15/01/13 1.0 4 1/2" 12/02/13 43323 181.00 239.35 210.00

R-96 15/01/13 1.0 4 1/2" 12/02/13 41998 179.00 234.63 210.00 237 113%

R-97 16/01/13 1.0 4 1/2" 23/01/13 2d Cuerpo y losa de fondo


o
39959 181.00 220.77 210.00

R-98 16/01/13 1.0 4 1/2" 23/01/13 BZ.22,24,28 42100 181.00 232.60 210.00

R-99 16/01/13 1.0 4 1/2" 13/02/13 56371 181.00 311.44 210.00

R-100 16/01/13 1.0 4 1/2" 13/02/13 57696 179.00 322.32 210.00 317 151%

R-101 17/01/13 1.0 3 1/2" 24/01/13 Techo/1 er


Cuerpo/Losa de Fondo 27421 181.00 151.50 210.00

R-102 17/01/13 1.0 3 1/2" 24/01/13 BZ.22,27,28,30,32 29052 181.00 160.51 210.00

R-103 17/01/13 1.0 3 1/2" 14/02/13 44343 181.00 244.99 210.00

R-104 17/01/13 1.0 3 1/2" 14/02/13 40556 179.00 226.57 210.00 236 112%

R-105 18/01/13 1.0 3 3/4" 25/01/13 Techo/Cuerpo/Losa de fondo 27421 181.00 151.50 210.00

R-106 18/01/13 1.0 3 3/4" 25/01/13 BZ.26,29,32 29052 181.00 160.51 210.00

R-107 18/01/13 1.0 3 3/4" 15/02/13 45464 179.00 253.99 210.00

R-108 18/01/13 1.0 3 3/4" 15/02/13 45566 179.00 254.56 210.00 254 121%

R-109 21/01/13 1.0 4 1/2" 28/01/13 2do Cuerpo BZ 28,29 26606 181.00 146.99 210.00

R-110 21/01/13 1.0 4 1/2" 28/01/13 Techo BZ.30 28848 181.00 159.38 210.00

R-111 21/01/13 1.0 4 1/2" 18/02/13 43935 179.00 245.45 210.00

R-112 21/01/13 1.0 4 1/2" 18/02/13 42813 179.00 239.18 210.00 242 115%

R-113 25/01/13 1.0 4 3/4" 01/02/13 Buzon N° 16/Buzon N° 27 30889 179.00 172.56 210.00

R-114 25/01/13 1.0 4 3/4" 01/02/13 Muro Total / Losa de fondo 31804 181.00 175.71 210.00

R-115 25/01/13 1.0 4 3/4" 22/02/13 49439 179.00 276.20 210.00

R-116 25/01/13 1.0 4 3/4" 22/02/13 47604 181.00 263.01 210.00 270 128%

4
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=210KG/CM2,BUZONES

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2

REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-121 02/01/13 1.0 3 1/2" 09/01/13 Buzon N° 20 32212 179.00 179.96 210.00

R-122 02/01/13 1.0 3 1/2" 09/01/13 1° cuerpo 37717 181.00 208.38 210.00

R-123 02/01/13 1.0 3 1/2" 30/01/13 46788.99 179.00 261.39 210.00

R-124 02/01/13 1.0 3 1/2" 30/01/13 44036.70 181.00 243.30 210.00 252 120%

R-125 06/02/13 1.0 3 1/2" 13/02/13 Buzon N° 17/Buzon 18-19 28338 181.00 156.56 210.00

R-126 06/02/13 1.0 3 1/2" 13/02/13 2° Cuerpo /Dados de anclaje 31498 179.00 175.97 210.00

R-127 06/02/13 1.0 3 1/2" 06/03/13 53925 179.00 301.25 210.00

R-128 06/02/13 1.0 3 1/2" 06/03/13 49643 179.00 277.34 210.00 289 138%

R-129 07/02/13 1.0 4" 14/02/13 JR. VENUS / JR NEPTUNO - Lima Norte 23445 181.00 129.53 210.00

R-130 07/02/13 1.0 4" 14/02/13 BUZON 11 24057 179.00 134.40 210.00

R-131 07/02/13 1.0 4" 07/03/13 PRIMER CUERPO 47503 181.00 262.45 210.00

R-132 07/02/13 1.0 4" 07/03/13 46381 181.00 256.25 210.00 259 123%

R-137 14/02/13 1.0 3 1/2" 21/02/13 Buzon N° 14 38124 181.00 210.63 210.00

R-138 14/02/13 1.0 3 1/2" 21/02/13 1 ° Cuerpo 39246 179.00 219.25 210.00

R-139 14/02/13 1.0 3 1/2" 14/03/13 48930 178.00 274.89 210.00

R-140 14/02/13 1.0 3 1/2" 14/03/13 50357 178.00 282.90 210.00 279 133%

R-145 06/02/13 1.0 3 1/2" 13/02/13 JR. VENUS / JR. JUPITER - Lima Norte 25688 179.00 143.51 210.00

R-146 06/02/13 1.0 3 1/2" 13/02/13 BUZON 12 26606 179.00 148.64 210.00

R-147 06/02/13 1.0 3 1/2" 06/03/13 2° CUERPO 38328.24 179 214.12 210.00

R-148 06/02/13 1.0 3 1/2" 06/03/13 37512.74 179 209.57 210.00 212 101%

R-149 06/02/13 1.0 3 1/2" 13/02/13 JR. VENUS / JR. JUPITER - Lima Norte 25688 179.00 143.51 210.00

R-150 06/02/13 1.0 3 1/2" 13/02/13 BUZON 12 / BUZON 11 26606 179.00 148.64 210.00

R-151 06/02/13 1.0 3 1/2" 06/03/13 TECHO BUZON / CUERPO BUZON 46788.99 179 261.39 210.00

R-152 06/02/13 1.0 3 1/2" 06/03/13 45565.75 179 254.56 210.00 258 123%

R-157 19/02/13 1.0 3 1/2" 26/02/13 JR. MANUEL VILLARAN - Lima Norte 35882 179.00 200.46 210.00

R-158 19/02/13 1.0 3 1/2" 26/02/13 DADOS DE ANCLAJE - BUZON 39246 179.00 219.25 210.00

R-159 19/02/13 1.0 3 1/2" 19/03/13 55249.75 179 308.66 210.00

R-160 19/02/13 1.0 3 1/2" 19/03/13 55657.49 179 310.94 210.00 310 148%

R-161 23/02/13 1.0 3 1/2" 02/03/13 JR. TOMAS GARRIDO - Lima Norte 41692 179.00 232.92 210.00

5
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=210KG/CM2,BUZONES

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2

REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-162 23/02/13 1.0 3 1/2" 02/03/13 BUZON 18 - 19 41692 179.00 232.92 210.00

R-163 23/02/13 1.0 3 1/2" 23/03/13 TECHO DE BUZON 51885.83 179 289.86 210.00

R-164 23/02/13 1.0 3 1/2" 23/03/13 45565.75 179 254.56 210.00 272 130%

R-165 01/03/13 1.0 3 1/2" 08/03/13 BUZON 13 - 15 29766 179.00 166.29 210.00

R-166 01/03/13 1.0 3 1/2" 08/03/13 CUERPO DE BUZON 30887 181.00 170.65 210.00 168 80%

R-167 01/03/13 1.0 3 1/2" 29/03/13 37207.00 176 211.40 210.00

R-168 01/03/13 1.0 3 1/2" 29/03/13 38022.00 179 212.41 210.00 212 101%

R-169 02/03/13 1.0 3 1/2" 09/03/13 JR. JUPITER / JR. JUAN VELASCO - Lima Norte 23140 179.00 129.27 210.00

R-170 02/03/13 1.0 3 1/2" 09/03/13 BUZON 13 - 15 21814 181.00 120.52 210.00

R-171 02/03/13 1.0 3 1/2" 30/03/13 2° CUERPO DE BUZON 37717.00 176 214.30 210.00

R-172 02/03/13 1.0 3 1/2" 30/03/13 40469.00 182 222.36 210.00 218 104%

R-177 08/03/13 1.0 4 1/4" 15/03/13 JR. JUAN PEÑA - Lima Norte 21407 179.00 119.59 210.00

R-178 08/03/13 1.0 4 1/4" 15/03/13 BUZON 25 21814 181.00 120.52 210.00

R-179 08/03/13 1.0 4 1/4" 05/04/13 2° CUERPO DE BUZON 37309.00 176 211.98 210.00

R-180 08/03/13 1.0 4 1/4" 05/04/13 38226.00 179 213.55 210.00 213 101%

R-185 15/03/13 1.0 3 1/2" 22/03/13 JR. JUAN PEÑA - Lima Norte 32314 179.00 180.52 210.00

R-186 15/03/13 1.0 3 1/2" 22/03/13 BUZON 25 30785 181.00 170.08 210.00

R-187 15/03/13 1.0 2 1/2" 12/04/13 46483.00 181 256.81 210.00

R-188 15/03/13 1.0 2 1/2" 12/04/13 44852.00 181 247.80 210.00 252 120%

R-189 16/03/13 1.0 3 1/4" 23/03/13 JR. ANGEL MORALES - Lima Norte 26504 176.00 150.59 210.00

R-190 16/03/13 1.0 3 1/4" 23/03/13 BUZON 3963 27013 181.00 149.24 210.00

R-191 16/03/13 1.0 3 1/4" 13/04/13 CUERPO 38736.00 179 216.40 210.00

R-192 16/03/13 1.0 3 1/4" 13/04/13 39144.00 181 216.27 210.00 216 103%

R-189 16/03/13 1.0 3 1/4" 23/03/13 JR. ANGEL MORALES - Lima Norte 26504 176.00 150.59 210.00

R-190 16/03/13 1.0 3 1/4" 23/03/13 BUZON 3963 27013 181.00 149.24 210.00

R-191 16/03/13 1.0 3 1/4" 13/04/13 CUERPO 38736.00 179 216.40 210.00

R-192 16/03/13 1.0 3 1/4" 13/04/13 39144.00 181 216.27 210.00 216 103%

R-201 21/03/13 1.0 2 1/2" 28/03/13 JR. TOMAS GARRIDO - Lima Norte 30071 176.00 170.86 210.00

R-202 21/03/13 1.0 2 1/2" 28/03/13 BUZON 19 30479 181.00 168.39 210.00

6
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=210KG/CM2,BUZONES

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2

REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-203 21/03/13 1.0 2 1/2" 18/04/13 MEDIA CAÑA 40673.00 179 227.22 210.00

R-204 21/03/13 1.0 2 1/2" 18/04/13 41488.00 181 229.22 210.00 228 109%

R-245 11/04/13 1.0 3" 18/04/13 CALLE 2-VIRGEN DEL ROSARIO 29562 176.00 167.97 210.00

R-246 11/04/13 1.0 3" 18/04/13 BUZON #2997 31091 181.00 171.77 210.00

R-247 11/04/13 1.0 3" 09/05/13 PRIMER CUERPO 40978.59 179 228.93 210.00

R-248 11/04/13 1.0 3" 09/05/13 42813.46 179 239.18 210.00 234 111%

R-253 12/04/13 1.0 3 1/2" 19/04/13 CALLE 2-VIRGEN DEL ROSARIO 31804 176.00 180.70 210.00

R-254 12/04/13 1.0 3 1/2" 19/04/13 BUZON #2997 31091 181.00 171.77 210.00

R-255 12/04/13 1.0 3 1/2" 10/05/13 SEGUNDO CUERPO 49745.16 179 277.91 210.00

R-256 12/04/13 1.0 3 1/2" 10/05/13 50254.84 181 277.65 210.00 278 132%

R-261 13/04/13 1.0 3 1/2" 20/04/13 JR. VISCARDO Y GUSMAN 29460 176.00 167.39 210.00

R-262 13/04/13 1.0 3 1/2" 20/04/13 BUZON #3797 30683 181.00 169.52 210.00

R-263 13/04/13 1.0 3 1/2" 11/05/13 PRIMER CUERPO 48114.17 179 268.79 210.00

R-264 13/04/13 1.0 3 1/2" 11/05/13 47400.61 181 261.88 210.00 265 126%

R-269 15/04/13 1.0 3 3/4" 22/04/13 JR. ANGEL MORALES - Lima Norte 31600 176.00 179.55 210.00

R-270 15/04/13 1.0 3 3/4" 22/04/13 BUZON #3965 32518 179.00 181.66 210.00

R-271 15/04/13 1.0 3 3/4" 13/05/13 SEGUNDO CUERPO 43628.95 179 243.74 210.00

R-272 15/04/13 1.0 3 3/4" 13/05/13 44750.25 181 247.24 210.00 245 117%

R-273 16/04/13 1.0 3 1/2" 23/04/13 AV. JAMAICA 33537 181.00 185.29 210.00

R-274 16/04/13 1.0 3 1/2" 23/04/13 BUZON #17 34047 181.00 188.10 210.00

R-275 16/04/13 1.0 3 1/2" 14/05/13 PRIMER CUERPO 49235.47 179 275.06 210.00

R-276 16/04/13 1.0 3 1/2" 14/05/13 49541.28 181 273.71 210.00 274 131%

R-277 16/04/13 1.0 4 1/2" 23/04/13 JR. ANGEL MORALES - Lima Norte 32620 176.00 185.34 210.00

R-278 16/04/13 1.0 4 1/2" 23/04/13 BUZON #3965 33741 181.00 186.41 210.00

R-279 16/04/13 1.0 4 1/2" 14/05/13 PRIMER ENCIMADO DE CUERPO 44852.19 179 250.57 210.00

R-280 16/04/13 1.0 4 1/2" 14/05/13 43730.89 181 241.61 210.00 246 117%

R-281 17/04/13 1.0 3 1/2" 24/04/13 AV. JAMAICA 28542 179.00 159.45 210.00

R-282 17/04/13 1.0 3 1/2" 24/04/13 BUZON #17 29867 179.00 166.85 210.00

R-283 17/04/13 1.0 3 1/2" 15/05/13 LOSA DE FONDO 40876.66 179 228.36 210.00

7
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=210KG/CM2,BUZONES

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2

REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-284 17/04/13 1.0 3 1/2" 15/05/13 41794.09 181 230.91 210.00 230 109%

R-288 17/04/13 1.0 4 1/2" 24/04/13 JR. ANGEL MORALES 29766 181.00 164.45 210.00

R-289 17/04/13 1.0 4 1/2" 24/04/13 BUZON #3965 30377 179.00 169.70 210.00

R-290 17/04/13 1.0 4 1/2" 15/05/13 SEGUNDO ENCIMADO 45056.07 179 251.71 210.00

R-291 17/04/13 1.0 4 1/2" 15/05/13 44648.32 181 246.68 210.00 249 119%

R-292 18/04/13 1.0 3 1/2" 25/04/13 AV. JAMAICA 28542 181.00 157.69 210.00

R-293 18/04/13 1.0 3 1/2" 25/04/13 BUZON #15 28440 179.00 158.88 210.00

R-294 18/04/13 1.0 3 1/2" 16/05/13 LOSA DE FONDO DE BUZON 44750.25 179 250.00 210.00

R-295 18/04/13 1.0 3 1/2" 16/05/13 45158.00 181 249.49 210.00 250 119%

R-300 19/04/13 1.0 4 1/4" 26/04/13 CALLE 4 - LIMA 30581 181.00 210.00

R-301 19/04/13 1.0 4 1/4" 26/04/13 DADOS DE ANCLAJE 31600 179.00 210.00

R-302 19/04/13 1.0 4 1/4" 17/05/13 BZ. N° 2964 , 2963 46177.37 179 257.97 210.00

R-303 19/04/13 1.0 4 1/4" 17/05/13 44852.19 181 247.80 210.00 253 120%

R-304 20/04/13 1.0 3 1/2" 27/04/13 JR. ANGEL MORALES - Lima Norte 29562 181.00 210.00

R-305 20/04/13 1.0 3 1/2" 27/04/13 TECHO DE BZ 29256 179.00 210.00

R-306 20/04/13 1.0 3 1/2" 18/05/13 BZ # 44037.00 181 243.30 210.00

R-307 20/04/13 1.0 3 1/2" 18/05/13 44648.00 181 246.67 210.00 245 117%

R-308 22/04/13 1.0 4" 29/04/13 JR. 9 E DICIEMBRE 31600 181.00 210.00

R-309 22/04/13 1.0 4" 29/04/13 DADOS DE ANCLAJE DE BUZON 32926 179.00 210.00

R-310 22/04/13 1.0 4" 20/05/13 BZ N° 37 59939.00 181 331.15 210.00

R-311 22/04/13 1.0 4" 20/05/13 58104.00 181 321.02 210.00 326 155%

R-316 24/04/13 1.0 3 1/2" 01/05/13 CALLE 3 32110 181.00 210.00

R-317 24/04/13 1.0 3 1/2" 01/05/13 DADOS DE ANCLAJE DE BUZON 32212 179.00 210.00

R-318 24/04/13 1.0 3 1/2" 22/05/13 BZ N° 2979 Y 2976 51274.00 181 283.28 210.00

R-319 24/04/13 1.0 3 1/2" 22/05/13 50663.00 181 279.91 210.00 282 134%

R-328 26/04/13 1.0 3 1/2" 03/05/13 AV. JAMAICA 36391 179.00 210.00

R-329 26/04/13 1.0 3 1/2" 03/05/13 TECHO DE BUZON 31804 181.00 210.00

R-330 26/04/13 1.0 3 1/2" 24/05/13 BZ N° 13 51172.00 181 282.72 210.00

R-331 26/04/13 1.0 3 1/2" 24/05/13 49949.00 179 279.04 210.00 281 134%

8
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=210KG/CM2,BUZONES

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2

REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-360 02/05/13 1.0 3 1/2" 09/05/13 AV. MICAELA BASTIDAS 31600 179.00 176.54 210.00

R-361 02/05/13 1.0 3 1/2" 09/05/13 2 DO CUERPO DE BZ 30683 181.00 169.52 210.00 173 82%

R-362 02/05/13 1.0 3 1/2" 30/05/13 BZ N° 3006 40775.00 181 225.28 210.00

R-363 02/05/13 1.0 3 1/2" 30/05/13 42915.00 181 237.10 210.00 231 110%

R-364 02/05/13 1.0 4" 09/05/13 AV. MARIANO IGNACION PRADO 32518 181.00 179.66 210.00

R-365 02/05/13 1.0 4" 09/05/13 1 DO CUERPO DE BZ 32518 181.00 179.66 210.00 180 86%

R-366 02/05/13 1.0 4" 30/05/13 BZ N° 3006 44037.00 181 243.30 210.00

R-367 02/05/13 1.0 4" 30/05/13 44037.00 179 246.02 210.00 245 117%

R-374 06/05/13 1.0 3 1/2" 13/05/13 JR. LA UNION 31804 181.00 175.71 210.00

R-375 06/05/13 1.0 3 1/2" 13/05/13 LOSA DE BUZON 33129 181.00 183.03 210.00 179 85%

R-376 06/05/13 1.0 3 1/2" 03/06/13 BUZON N° 3369 43629.00 179 243.74 210.00

R-377 06/05/13 1.0 3 1/2" 03/06/13 44343.00 179 247.73 210.00 246 117%

R-404 17/05/13 1.0 4 1/2" 24/05/13 JR. LORD COCRANE 32620 181.00 180.22 210.00

R-405 17/05/13 1.0 4 1/2" 24/05/13 DADOS DE ANCLAJE 31702 181.00 175.15 210.00 178 85%

R-406 17/05/13 1.0 4 1/2" 14/06/13 BR- 4775 Y BR-4758 55250.00 181 305.25 210.00

R-407 17/05/13 1.0 4 1/2" 14/06/13 53925.00 181 297.93 210.00 302 144%

R-424 25/05/13 1.0 3 3/4" 01/06/13 CALLE 1 29562 181.00 163.33 210.00

R-425 25/05/13 1.0 3 3/4" 01/06/13 CUERPO DE BUZON 29052 181.00 160.51 210.00 162 77%

R-426 25/05/13 1.0 3 3/4" 22/06/13 BUZON PREFABRICADO 54587.00 181 301.59 210.00

R-427 25/05/13 1.0 3 3/4" 22/06/13 56707.00 181 313.30 210.00 307 146%

R-428 31/05/13 1.0 4" 07/06/13 PSJ 16 DE JULIO-COOPERATIVA J.V.A 30275 181.00 167.27 210.00

R-429 31/05/13 1.0 4" 07/06/13 CUERPO TOTAL DE BUZON 28542 176.00 162.17 210.00 165 78%

R-430 31/05/13 1.0 4" 28/06/13 BUZON 3459 51274.00 181 283.28 210.00

R-431 31/05/13 1.0 4" 28/06/13 52803.00 181 291.73 210.00 288 137%

R-432 03/06/13 1.0 3 3/4" 10/06/13 PSJ # 3 -ASOCIACION 9 DE SETIEMBRE 27523 181.00 152.06 210.00

R-433 03/06/13 1.0 3 3/4" 10/06/13 CUERPO TOTAL DE BUZON 28236 176.00 160.43 210.00 156 74%

R-434 03/06/13 1.0 3 3/4" 01/07/13 BUZON 3474 52396.00 181 289.48 210.00

R-435 03/06/13 1.0 3 3/4" 01/07/13 50765.00 181 280.47 210.00 285 136%

R-440 04/06/13 1.0 4" 11/06/13 JR. LAS DELICIAS 28338 179.00 158.31 210.00

9
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=210KG/CM2,BUZONES

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2

REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-441 04/06/13 1.0 4" 11/06/13 1° CUERPO TOTAL DE BUZON 28542 181.00 157.69 210.00 158 75%

R-442 04/06/13 1.0 4" 02/07/13 BZ 5174 45973.00 181 253.99 210.00

R-443 04/06/13 1.0 4" 02/07/13 45464.00 181 251.18 210.00 253 120%

R-452 03/06/13 1.0 3 3/4" 10/06/13 JR. LAS DELICIAS 29562 181.00 163.33 210.00

R-453 03/06/13 1.0 3 3/4" 10/06/13 2 °CUERPO TOTAL DE BUZON 29358 181.00 162.20 210.00 163 78%

R-454 03/06/13 1.0 3 3/4" 01/07/13 BZ 5174 41386.00 179 231.21 210.00

R-455 03/06/13 1.0 3 3/4" 01/07/13 41794.00 179 233.49 210.00 232 111%

R-460 10/06/13 1.0 4 1/2" 17/06/13 JR. LAS DELICIAS 34862 179.00 194.76 210.00

R-461 10/06/13 1.0 4 1/2" 17/06/13 1 °CUERPO TOTAL DE BUZON 35678 179.00 199.32 210.00 197 94%

R-462 10/06/13 1.0 4 1/2" 08/07/13 BZ 5181 47808.00 179 267.08 210.00

R-463 10/06/13 1.0 4 1/2" 08/07/13 48114.00 181 265.82 210.00 266 127%

R-464 11/06/13 1.0 4" 18/06/13 JR. LAS DELICIAS 29460 181.00 162.76 210.00

R-465 11/06/13 1.0 4" 18/06/13 2 °CUERPO TOTAL DE BUZON 27523 181.00 152.06 210.00 157 75%

R-466 11/06/13 1.0 4" 09/07/13 BZ 5181 43527.00 179 243.17 210.00

R-467 11/06/13 1.0 4" 09/07/13 44241.00 181 244.43 210.00 244 116%

R-472 13/06/13 1.0 4" 20/06/13 JR. VENUS/JR. JUPITER 31702 181.00 175.15 210.00

R-473 13/06/13 1.0 4" 20/06/13 1°CUERPO TOTAL DE BUZON 31600 181.00 174.59 210.00 175 83%

R-474 13/06/13 1.0 4" 11/07/13 BZ 12-A 47197.00 181 260.76 210.00

R-475 13/06/13 1.0 4" 11/07/13 46483.00 181 256.81 210.00 259 123%

R-484 15/06/13 1.0 4" 22/06/13 JR. VENUS/JR. JUPITER 39195 181.00 216.55 210.00

R-485 15/06/13 1.0 4" 22/06/13 2° CUERPO TOTAL DE BUZON 37044 181.00 204.66 210.00 211 100%

R-486 15/06/13 1.0 4" 13/07/13 BZ 12-A 51254.00 181 283.17 210.00

R-487 15/06/13 1.0 4" 13/07/13 50591.00 181 279.51 210.00 281 134%

R-496 17/06/13 1.0 4 1/2 " 24/06/13 JR. VENUS/JR. JUPITER 36626 181.00 202.35 210.00

R-497 17/06/13 1.0 4 1/2 " 24/06/13 TECHO DE BUZON 37849 181.00 209.11 210.00 206 98%

R-498 17/06/13 1.0 4 1/2 " 15/07/13 BZ 12-A 49021.00 181 270.83 210.00

R-499 17/06/13 1.0 4 1/2 " 15/07/13 49256.00 181 272.13 210.00 271 129%

R-508 19/06/13 1.0 4 " 26/06/13 AV. PEDRO DE LA GASCA CUADRO 8 39011 181.00 215.53 210.00

19/06/13 1.0 4 " 26/06/13 BALCON 39011 181.00 215.53 210.00 216 103%

10
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=210KG/CM2,BUZONES

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2

REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-509 19/06/13 1.0 4 " 17/07/13 CASA 51397.00 181 283.96 210.00

19/06/13 1.0 4 " 17/07/13 51397.00 181 283.96 210.00 284 135%

R-522 25/06/13 1.0 4 " 02/07/13 JR. PRÑA/AV. JAMAICA 36188 181.00 199.93 210.00

R-523 25/06/13 1.0 4 " 02/07/13 1°CUERPO TOTAL DE BUZON 37003 181.00 204.44 210.00 202 96%

R-524 25/06/13 1.0 4 " 23/07/13 BZ 01 52966 181 292.63 210.00

R-525 25/06/13 1.0 4 " 23/07/13 52273 181 288.80 210.00 291 138%

R-534 26/06/13 1.0 3 3/4 " 03/07/13 JR. PEÑA/AV. JAMAICA 35576 179.00 198.75 210.00

R-535 26/06/13 1.0 3 3/4 " 03/07/13 1° CUERPO TOTAL DE BUZON 37003 179.00 206.72 210.00 203 97%

R-536 26/06/13 1.0 3 3/4 " 24/07/13 BZ 01 48267 179 269.65 210.00

R-537 26/06/13 1.0 3 3/4 " 24/07/13 49113 181 271.34 210.00 270 129%

R-538 26/06/13 1.0 3 3/4 " 03/07/13 JR. PEÑA/AV. JAMAICA 37309 181.00 206.13 210.00

R-539 26/06/13 1.0 3 3/4 " 03/07/13 2° CUERPO TOTAL DE BUZON 37105 181.00 205.00 210.00 206 98%

R-540 26/06/13 1.0 3 3/4 " 24/07/13 BZ 01 53242.00 181 294.15 210.00

R-541 26/06/13 1.0 3 3/4 " 24/07/13 53700.00 181 296.69 210.00 295 141%

R-542 27/06/13 1.0 3 1/4 " 04/07/13 CALLE #26-URB LOS CHASQUIS 40571 179.00 226.65 210.00

R-543 27/06/13 1.0 3 1/4 " 04/07/13 1° CUERPO TOTAL DE BUZON 40469 181.00 223.59 210.00 225 107%

R-544 27/06/13 1.0 3 1/4 " 25/07/13 BZ 2819 53282.00 181 294.38 210.00

R-545 27/06/13 1.0 3 1/4 " 25/07/13 54353.00 181 300.29 210.00 297 142%

R-550 28/06/13 1.0 4" 05/07/13 JR. PEÑA/AV. JAMAICA 38430 179.00 214.69 210.00

R-551 28/06/13 1.0 4" 05/07/13 LOSA DE TECHO 39042 179.00 218.11 210.00 216 103%

R-552 28/06/13 1.0 4" 26/07/13 BUZON 01 51437.00 181 284.18 210.00

R-553 28/06/13 1.0 4" 26/07/13 52069.00 181 287.67 210.00 286 136%

R-554 01/07/13 1.0 4" 08/07/13 AV. ANDREZ AVELINO CACERES 37309 181.00 206.13 210.00

R-555 01/07/13 1.0 4" 08/07/13 1° CUERPO TOTAL DE BUZON 37513 181.00 207.25 210.00 207 98%

R-556 01/07/13 1.0 4" 29/07/13 BUZON 03 54740.00 181 302.43 210.00

R-557 01/07/13 1.0 4" 29/07/13 52803.00 181 291.73 210.00 297 141%

R-570 09/07/13 1.0 4" 16/07/13 CALLE #17 33262 181.00 183.77 210.00

R-571 09/07/13 1.0 4" 16/07/13 LOSA DE FONDO DE BUZON 33853 179.00 189.12 210.00 186 89%

R-572 09/07/13 1.0 4" 06/08/13 BUZON -2825 44750.00 181 247.24 210.00

11
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=210KG/CM2,BUZONES

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2

REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-573 09/07/13 1.0 4" 06/08/13 45291.00 181 250.23 210.00 249 118%

R-574 10/07/13 1.0 4" 17/07/13 CALLE #17 39715 181.00 219.42 210.00

R-575 10/07/13 1.0 4" 17/07/13 1° Y 2° CUERPO TOTAL DE BUZON 38216 179.00 213.50 210.00 216 103%

R-576 10/07/13 1.0 4" 07/08/13 BUZON -2825 47350.00 181 261.60 210.00

R-577 10/07/13 1.0 4" 07/08/13 48226.00 181 266.44 210.00 264 126%

R-586 16/07/13 1.0 4" 23/07/13 AV. ANDREZ AVELINO CACERES 33262 179.00 185.82 210.00

R-587 16/07/13 1.0 4" 23/07/13 1° CUERPO TOTAL DE BUZON 33884 179.00 189.30 210.00 188 89%

R-588 16/07/13 1.0 4" 13/08/13 BUZON -30-A 47350.00 181 261.60 210.00

R-589 16/07/13 1.0 4" 13/08/13 48226.00 181 266.44 210.00 264 126%

R-594 18/07/13 1.0 4" 25/07/13 AV. ANDREZ AVELINO CACERES 34618 179.00 193.40 210.00

R-595 18/07/13 1.0 4" 25/07/13 2° CUERPO TOTAL DE BUZON 34903 179.00 194.99 210.00 194 92%

R-596 18/07/13 1.0 4" 15/08/13 BUZON -30-A 51682.00 181 285.54 210.00

R-597 18/07/13 1.0 4" 15/08/13 51988.00 181 287.23 210.00 286 136%

R-602 19/07/13 1.0 4" 26/07/13 AV. ANDREZ AVELINO CACERES 35515 179.00 198.41 210.00

R-603 19/07/13 1.0 4" 26/07/13 LOSA SUPERIOR 34944 179.00 195.22 210.00 197 94%

R-604 19/07/13 1.0 4" 16/08/13 BUZON -30-A 46504.00 179 259.80 210.00

R-605 19/07/13 1.0 4" 16/08/13 46249.00 179 258.37 210.00 259 123%

R-610 19/07/13 1.0 3 3/4 " 26/07/13 PASAJE 19/JR, TACNA 34037 179.00 190.15 210.00

R-611 19/07/13 1.0 3 3/4 " 26/07/13 CUERPO DEL BUZON 35535 179.00 198.52 210.00 194 93%

R-612 19/07/13 1.0 3 3/4 " 16/08/13 BUZON 3336 54251.00 179 303.08 210.00

R-613 19/07/13 1.0 3 3/4 " 16/08/13 54077.00 179 302.11 210.00 303 144%

R-745 24/07/13 1.0 4" 31/07/13 JR. LOS FUNDADORES. 28145 179.00 157.23 210.00

R-746 24/07/13 1.0 4" 31/07/13 CUERPO DEL BUZON 30826 179.00 172.21 210.00 165 78%

R-747 24/07/13 1.0 4" 21/08/13 DADOS DE ANCLAJE - CUADRA 2 45015.29 179 251.48 210.00

R-748 24/07/13 1.0 4" 21/08/13 45820.59 179 255.98 210.00 254 121%

R-845 28/09/13 1.0 4" 05/10/13 AV. CASANAVE. - LIMA NORTE 37136 179.00 207.46 210.00

R-846 28/09/13 1.0 4" 05/10/13 BUZON - 14 38644 183.00 211.17 210.00 209 100%

R-847 28/09/13 1.0 4" 26/10/13 1° CUERPO DEL BUZON 44811.42 185 242.22 210.00

R-848 28/09/13 1.0 4" 26/10/13 47624.87 183 260.82 210.00 252 120%

12
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=210KG/CM2,BUZONES

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2

REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-849 28/09/13 1.0 4" 05/10/13 AV. UNIVERSITARIA. - LIMA NORTE 30214 180.30 167.58 210.00

R-849 28/09/13 1.0 4" 05/10/13 BUZON - BR-3070 30214 180.30 167.58 210.00 168 80%

R-850 28/09/13 1.0 4" 26/10/13 DADOS DE ANCLAJE DE BUZON 38705.40 177 219.05 210.00

R-850 28/09/13 1.0 4" 26/10/13 38705.40 177 219.05 210.00 219 104%

R-859 30/09/13 1.0 4" 07/10/13 AV. CASANAVE. - LIMA NORTE 43894 183.80 238.81 210.00

R-860 30/09/13 1.0 4" 07/10/13 BUZON - 14 45943 176.70 260.01 210.00 249 119%

R-861 30/09/13 1.0 4" 28/10/13 2 DO CUERPO DE BUZON 57155.96 183 313.01 210.00

R-862 30/09/13 1.0 4" 28/10/13 55015.29 183 301.29 210.00 307 146%

R-863 01/10/13 1.0 4" 08/10/13 AV. CASANAVE. - LIMA NORTE 40805 183.00 222.98 210.00

R-864 01/10/13 1.0 4" 08/10/13 BUZON - 14 44577 181.00 246.28 210.00 235 112%

R-865 01/10/13 1.0 4" 29/10/13 LOSA DE TECHO DE BUZÓN. 58562.69 186 314.35 210.00

R-866 01/10/13 1.0 4" 29/10/13 57624.87 179 321.75 210.00 318 151%

R-875 03/10/13 1.0 4" 10/10/13 AV. CASANAVE. - LIMA NORTE 34893 180.00 193.85 210.00

R-876 03/10/13 1.0 4" 10/10/13 BUZON - 13 37054 177.00 209.34 210.00 202 96%

R-877 03/10/13 1.0 4" 31/10/13 LOSA INFERIOR DE BUZÓN 55280.33 176 314.99 210.00

R-878 03/10/13 1.0 4" 31/10/13 53659.53 178 301.63 210.00 308 147%

R-883 04/10/13 1.0 4" 11/10/13 AV. CASANAVE. - LIMA NORTE 38135 178.00 214.24 210.00

R-884 04/10/13 1.0 4" 11/10/13 BUZON - 13 36524 177.00 206.35 210.00 210 100%

R-885 04/10/13 1.0 4" 01/11/13 1ER. CUERPO DE BUZÓN 49469.93 180 274.38 210.00

R-886 04/10/13 1.0 4" 01/11/13 47920.49 180 265.78 210.00 270 129%

R-895 05/10/13 1.0 4" 12/10/13 CALLE # 1-A.A.H.H. 9 DE SETIEMBRE. - LIMA 38502 175.50 219.38 210.00

R-896 05/10/13 1.0 4" 12/10/13 BUZÓN - BR- 3499 36004 181.40 198.48 210.00 209 99%

R-897 05/10/13 1.0 4" 02/11/13 1ER. CUERPO DE BUZÓN 50825.69 179 283.78 210.00

R-898 05/10/13 1.0 4" 02/11/13 51141.69 184 278.25 210.00 281 134%

R-907 08/10/13 1.0 4" 15/10/13 AV. CASANAVE. - LIMA NORTE 37757 183 206.78 210.00

R-908 08/10/13 1.0 4" 15/10/13 BUZÓN - 13 37044 181 204.44 210.00 206 98%

R-909 08/10/13 1.0 4" 05/11/13 1 LOSA DE TECHO DE BUZÓN. 43384.30 178 243.87 210.00

R-910 08/10/13 1.0 4" 05/11/13 44097.86 183 241.50 210.00 243 116%

R-911 08/10/13 1.0 4" 15/10/13 CALLE # 1 - A.A.H.H. 9 DE SETIEMBRE. - LIMA 32253 183 176.63 210.00

13
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=210KG/CM2,BUZONES

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2

REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-912 08/10/13 1.0 4" 15/10/13 BUZÓN - 13 31427 181 173.44 210.00 175 83%

R-913 08/10/13 1.0 4" 05/11/13 BUZÓN - 3499 42976.55 183 235.36 210.00

R-914 08/10/13 1.0 4" 05/11/13 41722.73 180 231.41 210.00 233 111%

R-927 10/10/13 1.0 4" 17/10/13 AV. CASANAVE. - LIMA NORTE 41407 184 225.04 210.00

R-928 10/10/13 1.0 4" 17/10/13 BUZÓN - 13 41182 183 225.04 210.00 225 107%

R-929 10/10/13 1.0 4" 07/11/13 2 ER. CUERPO DE BUZÓN 49500.51 180 274.55 210.00

R-930 10/10/13 1.0 4" 07/11/13 48369.01 180 268.27 210.00 271 129%

R-935 11/10/13 1.0 4" 18/10/13 AV. CASANAVE. - LIMA NORTE 37339 178 210.01 210.00

R-936 11/10/13 1.0 4" 18/10/13 BUZÓN - 13 39286 179 219.35 210.00 215 102%

R-937 11/10/13 1.0 4" 08/11/13 LOSA SUPERIOR 49898.06 183 273.26 210.00

R-938 11/10/13 1.0 4" 08/11/13 50611.62 179 282.59 210.00 278 132%

R-939 12/10/13 1.0 4" 19/10/13 AV. CASANAVE. - LIMA NORTE 36320 181 200.22 210.00

R-940 12/10/13 1.0 4" 19/10/13 BUZÓN - 1 38746 179 216.34 210.00 208 99%

R-941 12/10/13 1.0 4" 09/11/13 1ER. CUERPO DE BUZÓN 50611.62 179 282.59 210.00

R-942 12/10/13 1.0 4" 09/11/13 48939.86 181 269.79 210.00 276 132%

R-943 12/10/13 1.0 4" 19/10/13 AV. UNIVERSITARIA. - LIMA NORTE 36320 181 200.22 210.00

R-944 12/10/13 1.0 4" 19/10/13 BUZÓN - 1 38746 179 216.34 210.00 208 99%

R-945 12/10/13 1.0 4" 09/11/13 2 CUERPO DE BUZÓN 45015.29 179 251.48 210.00

R-946 12/10/13 1.0 4" 09/11/13 45820.59 179 255.98 210.00 254 121%

R-947 12/10/13 1.0 4" 19/10/13 CALLE #1 - A.A.H.H. 9 DE SETIEMBRE. 25515 178 143.42 210.00

R-948 12/10/13 1.0 4" 19/10/13 BUZÓN - 3491 26555 178 149.27 210.00 146 70%

R-949 12/10/13 1.0 4" 09/11/13 1ER. CUERPO DE BUZÓN 38878.70 178 218.54 210.00

R-950 12/10/13 1.0 4" 09/11/13 37869.52 179 211.44 210.00 215 102%

R-951 14/10/13 1.0 4" 21/10/13 AV. UNIVERSITARIA. - LIMA NORTE 42936 179 239.73 210.00

R-952 14/10/13 1.0 4" 21/10/13 BUZÓN - 1 44475 179 248.33 210.00 244 116%

R-953 14/10/13 1.0 4" 11/11/13 REMATE DEL CUERPO 52629.97 183 288.23 210.00

R-954 14/10/13 1.0 4" 11/11/13 53058.10 183 290.57 210.00 289 138%

R-955 14/10/13 1.0 4" 21/10/13 AV. UNIVERSITARIA. - LIMA NORTE 42161 178 236.99 210.00

R-956 14/10/13 1.0 4" 21/10/13 BUZÓN - 5 44353 178 249.31 210.00 243 116%

14
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=210KG/CM2,BUZONES

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2

REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-957 14/10/13 1.0 4" 11/11/13 LOSA DE FONDO 54862.39 179 306.32 210.00

R-958 14/10/13 1.0 4" 11/11/13 53649.34 183 293.81 210.00 300 143%

R-959 14/10/13 1.0 4" 21/10/13 AV.CASANAVE. - LIMA NORTE 38848 177 219.85 210.00

R-960 14/10/13 1.0 4" 21/10/13 BUZÓN - 6 41927 180 232.54 210.00 226 108%

R-961 14/10/13 1.0 4" 11/11/13 LOSA INFERIOR DE BUZÓN 53873.60 180 298.80 210.00

R-962 14/10/13 1.0 4" 11/11/13 52976.55 181 292.04 210.00 295 141%

R-963 14/10/13 1.0 4" 21/10/13 CALLE # 1 A.A.H.H. 9 DE SETIEMBRE. - LIMA 25872 179 144.45 210.00

R-964 14/10/13 1.0 4" 21/10/13 BUZÓN - 3491 26228 183 143.64 210.00 144 69%

R-965 14/10/13 1.0 4" 11/11/13 2DO.CUERPO DE BUZÓN. 43577.98 179 243.32 210.00

R-966 14/10/13 1.0 4" 11/11/13 42589.19 181 234.78 210.00 239 114%

R-967 15/10/13 1.0 4" 22/10/13 AV. CASANAVE. - LIMA NORTE 39837 181 219.61 210.00

R-968 15/10/13 1.0 4" 22/10/13 BUZÓN - 5 38869 179 217.02 210.00 218 104%

R-969 15/10/13 1.0 4" 12/11/13 1ER.CUERPO DE BUZÓN. 47859.33 181 263.83 210.00

R-970 15/10/13 1.0 4" 12/11/13 49500.51 179 276.38 210.00 270 129%

R-975 16/10/13 1.0 4" 23/10/13 AV. CASANAVE. - LIMA NORTE 33048 181 182.18 210.00

R-976 16/10/13 1.0 4" 23/10/13 BUZÓN - 5 37156 179 207.46 210.00 195 93%

R-977 16/10/13 1.0 4" 13/11/13 2DO.CUERPO DE BUZÓN. 44831.80 179 250.46 210.00

R-978 16/10/13 1.0 4" 13/11/13 46483.18 179 259.68 210.00 255 121%

R-987 17/10/13 1.0 4" 24/10/13 AV. CASANAVE. - LIMA NORTE 41386 179 231.08 210.00

R-988 17/10/13 1.0 4" 24/10/13 BUZÓN - 1 38899 178 218.66 210.00 225 107%

R-989 17/10/13 1.0 4" 14/11/13 LOSA SUPERIOR DE BUZÓN 47247.71 178 265.59 210.00

R-990 17/10/13 1.0 4" 14/11/13 47869.52 178 269.08 210.00 267 127%

R-991 17/10/13 1.0 4" 24/10/13 AV. CASANAVE. - LIMA NORTE 43965 179 245.48 210.00

R-992 17/10/13 1.0 4" 24/10/13 BUZÓN - 6 46106 177 260.93 210.00 253 121%

R-993 17/10/13 1.0 4" 14/11/13 1ER. CUERPO DE BUZÓN. 54260.96 181 299.12 210.00

R-994 17/10/13 1.0 4" 14/11/13 56075.43 181 309.13 210.00 304 145%

R-995 17/10/13 1.0 4" 24/10/13 AV. CASANAVE. - LIMA NORTE 43965 181 242.37 210.00

R-996 17/10/13 1.0 4" 24/10/13 BUZÓN - 5 46106 180 255.72 210.00 249 119%

R-997 17/10/13 1.0 4" 14/11/13 2 DO. CUERPO DE BUZÓN. 55005.10 181 303.23 210.00

15
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=210KG/CM2,BUZONES

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2

REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-998 17/10/13 1.0 4" 14/11/13 54077.47 181 298.11 210.00 301 143%

R-999 18/10/13 1.0 4" 25/10/13 AV. 8 DE ENERO. 34373 178 193.22 210.00

R-1000 18/10/13 1.0 4" 25/10/13 LOSA SUPERIOR 36014 184 195.94 210.00 195 93%

R-1001 18/10/13 1.0 4" 15/11/13 BUZÓN - 4721 44801 44801.22 181 246.97 210.00

R-1002 18/10/13 1.0 4" 15/11/13 45881.75 45881.75 178 257.91 210.00 252 120%

R-1003 18/10/13 1.0 4" 25/10/13 AV. 8 DE ENERO. 39052 178 219.52 210.00

R-1004 18/10/13 1.0 4" 25/10/13 BUZÓN - B-5 Y B-6 39817 184 216.63 210.00 218 104%

R-1005 18/10/13 1.0 4" 15/11/13 LOSA SUPERIOR DE BUZÓN. 49501 49500.51 181 272.88 210.00

R-1006 18/10/13 1.0 4" 15/11/13 50774.72 50774.72 178 285.41 210.00 279 133%

R-1031 22/10/13 1.0 4" 29/10/13 AV. CASANAVE. - LIMA NORTE 40428 177 228.80 210.00

R-1032 22/10/13 1.0 4" 29/10/13 BZ. - 7 Y BZ. - 8A. 38665 183 211.74 210.00 220 105%

R-1033 22/10/13 1.0 4" 19/11/13 LOSA SUPERIOR DE BUZÓN. 46239 46238.53 183 253.22 210.00

R-1034 22/10/13 1.0 4" 19/11/13 47064.22 47064.22 183 257.74 210.00 255 122%

R-1035 23/10/13 1.0 4" 30/10/13 AV. CASANAVE. - LIMA NORTE 33598 180 186.35 210.00

R-1036 23/10/13 1.0 4" 30/10/13 BZ. - 7 Y BZ. - 8A. 32294 184 175.70 210.00 181 86%

R-1037 23/10/13 1.0 4" 20/11/13 1ER. CUERPO DE BUZÓN. 39786 39785.93 179 222.14 210.00

R-1038 23/10/13 1.0 4" 20/11/13 42976.55 42976.55 178 241.58 210.00 232 110%

R-1043 24/10/13 1.0 4" 31/10/13 AV. CASANAVE. - LIMA NORTE 32671 180 181.20 210.00

R-1044 24/10/13 1.0 4" 31/10/13 BUZON - 7 Y 8A 31662 184 172.26 210.00 177 84%

R-1045 24/10/13 1.0 4" 21/11/13 2 DO. CUERPO DE BUZÓN. 0.00 179 0.00 210.00

R-1046 24/10/13 1.0 4" 21/11/13 0.00 178 0.00 210.00 0 0%

R-1051 24/10/13 1.0 4" 31/10/13 AV. CASANAVE. - LIMA NORTE 35301 183 193.32 210.00

R-1052 24/10/13 1.0 4" 31/10/13 BUZON - 7 Y 8A 36137 178 203.13 210.00 198 94%

R-1053 24/10/13 1.0 4" 21/11/13 LOSA SUPERIOR DE BUZON. 0.00 179 0.00 210.00

R-1054 24/10/13 1.0 4" 21/11/13 0.00 178 0.00 210.00 0 0%

R-1067 29/10/13 1.0 4" 05/11/13 AV. CASANAVE. - LIMA NORTE 34995 179 195.39 210.00

R-1068 29/10/13 1.0 4" 05/11/13 BUZON - 8 . 35474 180 196.75 210.00 196 93%

R-1069 29/10/13 1.0 4" 26/11/13 1ER. CUERPO DE BUZÓN. 0.00 179 0.00 210.00

R-1070 29/10/13 1.0 4" 26/11/13 0.00 178 0.00 210.00 0 0%

16
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=210KG/CM2,BUZONES

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2

REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-1075 30/10/13 1.0 4" 06/11/13 AV. CASANAVE. - LIMA NORTE 45902 179 256.29 210.00

R-1076 30/10/13 1.0 4" 06/11/13 BUZON - 8 . 44098 180 244.58 210.00 250 119%

R-1077 30/10/13 1.0 4" 27/11/13 2 DO. CUERPO DE BUZÓN. 0.00 179 0.00 210.00

R-1078 30/10/13 1.0 4" 27/11/13 0.00 178 0.00 210.00 0 0%

R-1119 07/11/13 1.0 4" 14/11/13 AV. MARIANO IGNACIO PRADO. 41040 180 227.62 210.00

R-1120 07/11/13 1.0 4" 14/11/13 BZ. - 4 42151 177 238.54 210.00 233 111%

R-1121 07/11/13 1.0 4" 05/12/13 LOSA INFERIOR Y 1ER. CUERPO DE BUZON 0.00 179 0.00 210.00

R-1122 07/11/13 1.0 4" 05/12/13 0.00 178 0.00 210.00 0 0%

R-1127 08/11/13 1.0 4" 15/11/13 AV. MARIANO IGNACIO PRADO. 40622 179 226.81 210.00

R-1128 08/11/13 1.0 4" 15/11/13 BZ. - 4 40938 180 227.05 210.00 227 108%

R-1129 08/11/13 1.0 4" 06/12/13 2DO. CUERPO DE BUZON. 0.00 179 0.00 210.00

R-1130 08/11/13 1.0 4" 06/12/13 0.00 178 0.00 210.00 0 0%

R-1151 13/11/13 1.0 4" 20/11/13 AV. MARIANO IGNACIO PRADO. 40979 179 228.80 210.00

R-1152 13/11/13 1.0 4" 20/11/13 BZ. - 4 39786 180 220.67 210.00 225 107%

R-1153 13/11/13 1.0 4" 11/12/13 LOSA SUPERIOR DE BUZON. 0.00 179 0.00 210.00

R-1154 13/11/13 1.0 4" 11/12/13 0.00 178 0.00 210.00 0 0%

R-1155 13/11/13 1.0 4" 20/11/13 JR. LOS CIPRECES. - L 34822 179 194.43 210.00

R-1156 13/11/13 1.0 4" 20/11/13 BZ. - 18. 36932 180 204.83 210.00 200 95%

R-1157 13/11/13 1.0 4" 11/12/13 CUERPO DE BUZON. 0.00 179 0.00 210.00

R-1158 13/11/13 1.0 4" 11/12/13 0.00 178 0.00 210.00 0 0%

17
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=210KG/CM2,BUZONES

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2

REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

GRAFICA RESISTENCIA REAL ALCANZADA( A LOS 28 DIAS) VS RESISTENCIA REFERENCIAL

REAL REFERENCIAL
REGISTRO 28 DIAS(KG/CM2) (100%) F'C (KG/CM2)
R-748 303 210
R-845 252 210
370
R-849 AL 853 219 210
R-859 307 210 REISTENCIA REAL
R-863 318 210 RESISTENCIA REFERENCIAL
R-875 308 210 320
R-883 270 210
R-895 281 210
R-907 243 210 KG/CM2
270
R-911 233 210
R-927 271 210
R-935 278 210
R-939 276 210 220

18

170
370

REISTENCIA REAL

RESISTENCIA REFERENCIAL

320

RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=210KG/CM2,BUZONES

KG/CM2
270
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2

REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias
220
R-943 254 210
R-947 217 210
R-951 289 210
R-955 300 210 170

R-959 295 210


R-963 239 210
R-967 254 210
120
R-967 270 210 8 5 3 9 3 5 3 5 7 1 7 5 9 3 7 1 5 9 3 7 7 5 7 1 5 9 3 3 5
74 84 L 85 85 86 87 88 89 90 91 92 93 93 94 94 95 95 95 96 96 96 97 98 99 99 99 100 103 103
R-975 255 210 R- R- A R- R- R- R- R- R- R- R- R- R- R- R- R- R- R- R- R- R- R- R- R- R- R- R- R- R-
9
84
R-987 267 210 R-

R-991 304 210


REGISTROS
R-995 301 210
R-999 252 210
R-1003 279 210
R-1033 255 210
R-1035 232 210

RESISTECIA REAL VS REISTENCIA REFENCIAL


300
RESISTENCIA REFERENCIAL
REAL REFERENCIAL
REGISTRO RESISTENCIA REAL
7 DIAS(KG/CM2) (70 al 85 %) F'C (KG/CM2) 250
R-1043 177 147
Axis Title

R-1051 198 147


200
R-1067 196 147
R-1075 250 147
150

19
100
RESISTECIA REAL VS REISTENCIA REFENCIAL
300 RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=210KG/CM2,BUZONES
RESISTENCIA REFERENCIAL

RESISTENCIA REAL
250
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

Axis Title
FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2
200
REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-1119 150
233 147
R-1127 227 147
R-1151 225 147 100
R-1155 200 147

50

0
R-1043 R-1051 R-1067 R-1075 REGISTROS R-1119 R-1127 R-1151 R-1155

20
MARZO

21
hasta el mes de matzo a los 28 dias

22
0

23
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2


REGISTRO FECHA DE Resistencia
N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Diseño de % a los 28
N° MOLDEO 7 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-117 31/01/13 1.0 3 3/4" 07/02/13 Veredas 32722 179.00 182.80 175.00

R-118 31/01/13 1.0 3 3/4" 07/02/13 Conexiones (#132,#142,#152,#141) 32722 181.00 180.78 175.00

R-119 31/01/13 1.0 3 3/4" 45361.88 181.00 250.62 175.00

R-120 31/01/13 1.0 3 3/4" 43832.82 185.00 236.93 175.00 244 139%

R-133 14/02/13 1.0 4" 21/02/13 Veredas 37003 177.00 209.06 175.00

R-134 14/02/13 1.0 4" 21/02/13 Conexiones (#370,#142,#375,#373 37717 179.00 210.71 175.00

R-135 14/02/13 1.0 4" 14/03/13 36595.31 176.00 207.93 175.00

R-136 14/02/13 1.0 4" 14/03/13 36085.63 181.00 199.37 175.00 204 116%

R-141 15/02/13 1.0 4 1/4" 22/02/13 Veredas ,CLL. CAHUIDE- Lima Norte 18247 181.00 100.81 175.00

R-142 15/02/13 1.0 4 1/4" 22/02/13 CONEXIONES (#115,#121,#111,#109,#107) 21509 179.00 120.16 175.00

R-143 15/02/13 1.0 4 1/4" 15/03/13 34046.89 176.00 193.45 175.00

R-144 15/02/13 1.0 4 1/4" 15/03/13 35575.94 179.00 198.75 175.00 196 112%

R-153 19/02/13 1.0 4" 26/02/13 Veredas ,CLL. CAHUIDE- Lima Norte 18247 179.00 101.94 175.00

R-154 19/02/13 1.0 4" 26/02/13 CONEXIONES ( #210,#234,#221,#201) 21509 179.00 120.16 175.00

R-155 19/02/13 1.0 4" 19/03/13 41488.28 179.00 231.78 175.00

R-156 19/02/13 1.0 4" 19/03/13 40061.16 181.00 221.33 175.00 227 129%

R-173 05/03/13 1.0 4" 12/03/13 JR. RICARDO PALMA - Lima Norte 25280 179.00 141.23 175.00

R-174 05/03/13 1.0 4" 12/03/13 CONEX. ( #124,#123,#114,#113,#117) 23649 179.00 132.12 175.00

R-175 05/03/13 1.0 4" 02/04/13 VEREDAS 32212.00 179.00 179.96 175.00

R-176 05/03/13 1.0 4" 02/04/13 33333.00 179.00 186.22 175.00 183 105%

R-181 09/03/13 1.0 4" 16/03/13 JR. MANUEL VILLARAN - Lima Norte 19776 179.00 110.48 175.00

R-182 09/03/13 1.0 4" 16/03/13 VEREDA 20591 181.00 113.76 175.00

R-183 09/03/13 1.0 4" 06/04/13 36595.00 176 207.93 175.00

R-184 09/03/13 1.0 4" 06/04/13 36086.00 181 199.37 175.00 204 116%

R-205 21/03/13 1.0 3 1/2" 28/03/13 JR. ANGELMORALES 24465 179.00 136.68 175.00

R-206 21/03/13 1.0 3 1/2" 28/03/13 VEREDA 26809 181.00 148.12 175.00

R-207 21/03/13 1.0 3 1/2" 18/04/13 44750.00 176 254.26 175.00

R-208 21/03/13 1.0 3 1/2" 18/04/13 42813.00 181 236.54 175.00 245 140%

24
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2


REGISTRO FECHA DE Resistencia
N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Diseño de % a los 28
N° MOLDEO 7 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-209 23/03/13 1.0 3" 30/03/13 JR. ANGELMORALES 28542 179.00 159.45 175.00

R-210 23/03/13 1.0 3" 30/03/13 VEREDA 27829 181.00 153.75 175.00

R-211 23/03/13 1.0 3" 20/04/13 44852.00 179 250.57 175.00

R-211 23/03/13 1.0 3" 20/04/13 44546.00 179 248.86 175.00 250 143%

R-212 02/04/13 1.0 4" 09/04/13 JR. SAN PEDRO-LINEA DE AGUA 26198 179.00 146.36 175.00

R-213 02/04/13 1.0 4" 09/04/13 VEREDA 26096 179.00 145.79 175.00

R-214 02/04/13 1.0 4" 30/04/13 35677.88 181 197.12 175.00

R-215 02/04/13 1.0 4" 30/04/13 36901.12 181 203.87 175.00 200 115%

R-217 02/04/13 1.0 3 1/2 " 09/04/13 JR. MARIAEGUI CUADRA 1 28542 181.00 157.69 175.00

R-218 02/04/13 1.0 3 1/2 " 09/04/13 CONEXIONES 163,149,175,185 Y 195 28950 179.00 161.73 175.00

R-219 02/04/13 1.0 3 1/2 " 30/04/13 43119.27 179 240.89 175.00

R-220 02/04/13 1.0 3 1/2 " 30/04/13 41794.09 179 233.49 175.00 237 136%

R-221 04/04/13 1.0 3 1/2" 11/04/13 CALLE CESAR CALLEJO 25484 179.00 142.37 175.00

R-222 04/04/13 1.0 3 1/2" 11/04/13 VEREDAS 26707 181.00 147.55 175.00

R-223 04/04/13 1.0 3 1/2" 02/05/13 CONEXIONES 188,182,176,378,372,158,154,148 43323.14 179 242.03 175.00

R-224 04/04/13 1.0 3 1/2" 02/05/13 42711.52 179 238.61 175.00 240 137%

R-225 05/04/13 1.0 3 3/4" 12/04/13 JR. GENERAL LARA 24465 181.00 135.17 175.00

R-226 05/04/13 1.0 3 3/4" 12/04/13 VEREDAS 25586 181.00 141.36 175.00

R-227 05/04/13 1.0 3 3/4" 03/05/13 CONEXIONES 238,234,228,224 Y 222 40468.91 179 226.08 175.00

R-228 05/04/13 1.0 3 3/4" 03/05/13 42303.77 179 236.33 175.00 231 132%

R-229 05/04/13 1.0 4 1/2" 12/04/13 JR. SAN ISIDRO 26504 181.00 146.43 175.00

R-230 05/04/13 1.0 4 1/2" 12/04/13 VEREDAS 26300 179.00 146.93 175.00

R-231 05/04/13 1.0 4 1/2" 03/05/13 CONEXIONES 133,125,117 Y 112 40774.72 179 227.79 175.00

R-232 05/04/13 1.0 4 1/2" 03/05/13 40265.04 179 224.94 175.00 226 129%

R-233 08/04/13 1.0 3 1/4" 15/04/13 JR. HUSARES DE JUNIN 30683 181.00 169.52 175.00

R-234 08/04/13 1.0 3 1/4" 15/04/13 VEREDAS 28440 179.00 158.88 175.00

R-235 08/04/13 1.0 3 1/4" 06/05/13 CONEXIONES # 205,207,211,217, Y 219 37512.74 179 209.57 175.00

R-236 08/04/13 1.0 3 1/4" 06/05/13 36697.25 179 205.01 175.00 207 118%

25
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2


REGISTRO FECHA DE Resistencia
N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Diseño de % a los 28
N° MOLDEO 7 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-237 10/04/13 1.0 3 3/4" 17/04/13 JR. ENRRIQUE PALLARDELLI 25484 179.00 142.37 175.00

R-238 10/04/13 1.0 3 3/4" 17/04/13 VEREDAS 25994 181.00 143.61 175.00

R-239 10/04/13 1.0 3 3/4" 08/05/13 CONEXIONES # 402,403,409,412,416 Y 427 39755.35 179 222.10 175.00

R-240 10/04/13 1.0 3 3/4" 08/05/13 40774.72 179 227.79 175.00 225 129%

R-241 10/04/13 1.0 3 1/2" 17/04/13 JR. GENERAL SUCRE 26809 181.00 148.12 175.00

R-242 10/04/13 1.0 3 1/2" 17/04/13 VEREDAS 27625 181.00 152.62 175.00

R-243 10/04/13 1.0 3 1/2" 08/05/13 CONEXIONES # 483,498,503 Y 509 41794.09 179 233.49 175.00

R-244 10/04/13 1.0 3 1/2" 08/05/13 43323.14 181 239.35 175.00 236 135%

R-249 12/04/13 1.0 3 1/4" 19/04/13 CALLE WIRACOCHA 25688 181.00 141.92 175.00

R-250 12/04/13 1.0 3 1/4" 19/04/13 VEREDAS 25382 176.00 144.22 175.00

R-251 12/04/13 1.0 3 1/4" 10/05/13 CONEXIONES # 237,235,231,227,223,221 40978.59 179 228.93 175.00

R-252 12/04/13 1.0 3 1/4" 10/05/13 214,222,226,230,236,240,242,248,239 Y 241 42813.46 179 239.18 175.00 234 134%

R-257 12/04/13 1.0 3 3/4" 19/04/13 JR. GENERAL LARA 24261 181.00 134.04 175.00

R-258 12/04/13 1.0 3 3/4" 19/04/13 VEREDAS 22426 176.00 127.42 175.00

R-259 12/04/13 1.0 3 3/4" 10/05/13 CONEXIONES #256,245,249,264,270 Y 265 35677.88 179 199.32 175.00

R-260 12/04/13 1.0 3 3/4" 10/05/13 35474.01 179 198.18 175.00 199 114%

R-265 15/04/13 1.0 3 1/2" 22/04/13 JR. FAUSTINO SANCHEZ CARRION 25280 181.00 139.67 175.00

R-266 15/04/13 1.0 3 1/2" 22/04/13 SARDINAL 24975 176.00 141.90 175.00

R-267 15/04/13 1.0 3 1/2" 13/05/13 36697.25 179 205.01 175.00

R-268 15/04/13 1.0 3 1/2" 13/05/13 36085.63 179 201.60 175.00 203 116%

R-285 17/04/13 1.0 3 1/2" 24/04/13 JR. GENERAL LARA 27013 181.00 149.24 175.00

R-286 17/04/13 1.0 3 1/2" 24/04/13 VEREDA Y SARDINEL 27013 181.00 149.24 175.00

R-287 17/04/13 1.0 3 1/2" 15/05/13 35881.75 179 200.46 175.00

R-288 17/04/13 1.0 3 1/2" 15/05/13 37614.68 179 210.14 175.00 205 117%

R-296 18/04/13 1.0 4" 25/04/13 JR. SAN ISIDRO 24465 179.00 136.68 175.00

R-297 18/04/13 1.0 4" 25/04/13 RAMPAS 25586 176.00 145.38 175.00

R-298 18/04/13 1.0 4" 16/05/13 CONEXIONES: #383,365,325 Y 317 38735.98 179 216.40 175.00

R-299 18/04/13 1.0 4" 16/05/13 39959.23 179 223.24 175.00 220 126%

26
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2


REGISTRO FECHA DE Resistencia
N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Diseño de % a los 28
N° MOLDEO 7 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-312 23/04/13 1.0 4" 30/04/13 CALLE LAS ORQUIDEAS 26402 179.00 147.50 175.00

R-313 23/04/13 1.0 4" 30/04/13 REPOSICION DE VEREDAS 25280 176.00 143.64 175.00

R-314 23/04/13 1.0 4" 21/05/13 CONEX. #S. 184,158,152,144,143,142 38736.00 179 216.40 175.00

R-315 23/04/13 1.0 4" 21/05/13 140,138,134,122,108 Y 102 40571.00 179 226.65 175.00 222 127%

R-320 25/04/13 1.0 3 1/2" 02/05/13 CALLE 2 45566 179.00 254.56 175.00

R-321 25/04/13 1.0 3 1/2" 02/05/13 REPOSICION DE VEREDAS 46687 176.00 265.27 175.00

R-322 25/04/13 1.0 3 1/2" 23/05/13 70336.39 179 392.94 175.00

R-323 25/04/13 1.0 3 1/2" 23/05/13 71049.95 179 396.93 175.00 395 226%

R-324 25/04/13 1.0 4" 02/05/13 JR. LAS MAGNOLIAS 29358 181.00 162.20 175.00

R-325 25/04/13 1.0 4" 02/05/13 REPOSICION DE VEREDAS 27421 181.00 151.50 175.00

R-326 25/04/13 1.0 4" 23/05/13 CONX. #S. 261,257,253 Y 251 40774.72 179 227.79 175.00

R-327 25/04/13 1.0 4" 23/05/13 40570.85 181 224.15 175.00 226 129%

R-332 26/04/13 1.0 3 3/4" 03/05/13 JR. SAN MARTIN 26402 181.00 145.87 175.00

R-333 26/04/13 1.0 3 3/4" 03/05/13 REPOSICION DE VEREDAS 26300 179.00 146.93 175.00

R-334 26/04/13 1.0 3 3/4" 24/05/13 41794.09 179 233.49 175.00

R-335 26/04/13 1.0 3 3/4" 24/05/13 41284.40 179 230.64 175.00 232 133%

R-336 26/04/13 1.0 4" 03/05/13 JR. LOS CIPRECES 29460 181.00 162.76 175.00

R-337 26/04/13 1.0 4" 03/05/13 REPOSICION DE VEREDAS 29154 179.00 162.87 175.00

R-338 26/04/13 1.0 4" 24/05/13 CONEX #S. 428,458,486,450 Y 443 40468.91 179 226.08 175.00

R-339 26/04/13 1.0 4" 24/05/13 41590.21 179 232.35 175.00 229 131%

R-340 29/04/13 1.0 4 1/2" 06/05/13 JR. LOS CIPRECES 29460 181.00 162.76 175.00

R-341 29/04/13 1.0 4 1/2" 06/05/13 REPOSICION DE VEREDAS 29154 179.00 162.87 175.00 163 93%

R-342 29/04/13 1.0 4 1/2" 27/05/13 CONEX #S. 428,458,486,450 Y 443 43629.00 179 243.74 175.00

R-343 29/04/13 1.0 4 1/2" 27/05/13 40775.00 181 225.28 175.00 235 134%

R-344 29/04/13 1.0 4 1/2" 06/05/13 JR. LOS CIPRECES 26402 181.00 145.87 175.00

R-345 29/04/13 1.0 4 1/2" 06/05/13 REPOSICION DE VEREDAS 26809 179.00 149.77 175.00 148 84%

R-346 29/04/13 1.0 4 1/2" 27/05/13 CONEX #S. 428,458,486,450 Y 443 43629.00 179 243.74 175.00

R-347 29/04/13 1.0 4 1/2" 27/05/13 40775.00 181 225.28 175.00 235 134%

27
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2


REGISTRO FECHA DE Resistencia
N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Diseño de % a los 28
N° MOLDEO 7 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-348 29/04/13 1.0 4" 06/05/13 JR. LOS CIPRECES 26300 181.00 145.30 175.00

R-349 29/04/13 1.0 4" 06/05/13 REPOSICION DE VEREDAS 25484 179.00 142.37 175.00 144 82%

R-350 29/04/13 1.0 4" 27/05/13 CONEX. #S. 357,361,371,320 Y 321 40469.00 179 226.08 175.00

R-351 29/04/13 1.0 4" 27/05/13 40673.00 181 224.71 175.00 225 129%

R-352 29/04/13 1.0 4" 06/05/13 AV. MARIA PARADO DE BELLIDO 25484 181.00 140.80 175.00

R-353 29/04/13 1.0 4" 06/05/13 REPOSICION DE VEREDAS 26606 179.00 148.63 175.00 145 83%

R-354 29/04/13 1.0 4" 27/05/13 CONEX. #S. 697,690,685,680 Y 673 40979.00 181 226.40 175.00

R-355 29/04/13 1.0 4" 27/05/13 40775.00 179 227.79 175.00 227 130%

R-356 30/04/13 1.0 3 1/2 " 07/05/13 JR. VIZCARDO Y GUZMAN 28033 181.00 154.88 175.00

R-357 30/04/13 1.0 3 1/2 " 07/05/13 REPOSICION DE VEREDAS 29052 179.00 162.30 175.00 159 91%

R-358 30/04/13 1.0 3 1/2 " 28/05/13 47197.00 179 263.67 175.00

R-359 30/04/13 1.0 3 1/2 " 28/05/13 45872.00 181 253.44 175.00 259 148%

R-366 02/05/13 1.0 4" 09/05/13 JR. VIZCARDO Y GUZMAN 25688 181.00 141.92 175.00

R-367 02/05/13 1.0 4" 09/05/13 REPOSICION DE VEREDAS 27319 179.00 152.62 175.00 147 84%

R-368 02/05/13 1.0 4" 30/05/13 38736.00 179 216.40 175.00

R-369 02/05/13 1.0 4" 30/05/13 40469.00 179 226.08 175.00 221 126%

R-370 04/05/13 1.0 4" 11/05/13 JR. VIZCARDO Y GUZMAN 25994 181.00 143.61 175.00

R-371 04/05/13 1.0 4" 11/05/13 REPOSICION DE VEREDAS 26504 179.00 148.06 175.00 146 83%

R-372 04/05/13 1.0 4" 01/06/13 40775.00 181 225.28 175.00

R-373 04/05/13 1.0 4" 01/06/13 39755.00 179 222.09 175.00 224 128%

R-378 11/05/13 1.0 3 3/4 " 18/05/13 PASAJE ILO CON CALLE 2 32416 181.00 179.09 175.00

R-379 11/05/13 1.0 3 3/4 " 18/05/13 REPOSICION DE VEREDAS 32824 179.00 183.37 175.00 181 104%

R-380 11/05/13 1.0 3 3/4 " 08/06/13 50663.00 179 283.03 175.00

R-381 11/05/13 1.0 3 3/4 " 08/06/13 49235.00 179 275.06 175.00 279 159%

R-382 13/05/13 1.0 3 3/4 " 20/05/13 JR. MAMA OCLLO 26504 181.00 146.43 175.00

R-383 13/05/13 1.0 3 3/4 " 20/05/13 REPOSICION DE VEREDAS 26606 179.00 148.63 175.00 148 84%

R-384 13/05/13 1.0 3 3/4 " 10/06/13 35066.00 179 195.90 175.00

R-385 13/05/13 1.0 3 3/4 " 10/06/13 34353.00 179 191.92 175.00 194 111%

28
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2


REGISTRO FECHA DE Resistencia
N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Diseño de % a los 28
N° MOLDEO 7 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-388 13/05/13 1.0 3 1/2 " 20/05/13 PASAJE 13 28644 179.00 160.02 175.00

R-389 13/05/13 1.0 3 1/2 " 20/05/13 REPOSICION DE VEREDAS 28746 181.00 158.82 175.00 159 91%

R-390 13/05/13 1.0 3 1/2 " 10/06/13 39959.00 181 220.77 175.00

R-391 13/05/13 1.0 3 1/2 " 10/06/13 40775.00 179 227.79 175.00 224 128%

R-392 14/05/13 1.0 4" 21/05/13 AV.JOSE SUCRE 25484 179.00 142.37 175.00

R-393 14/05/13 1.0 4" 21/05/13 REPOSICION DE VEREDAS 25178 181.00 139.11 175.00 141 80%

R-394 14/05/13 1.0 4" 11/06/13 CONEX.779,732,691,660,587,601 y 627 40571.00 181 224.15 175.00

R-395 14/05/13 1.0 4" 11/06/13 40265.00 181 222.46 175.00 223 128%

R-396 17/05/13 1.0 4" 24/05/13 JR. MIGUEL IGLESIAS 25484 179.00 142.37 175.00

R-397 17/05/13 1.0 4" 24/05/13 REPOSICION DE VEREDAS 25178 181.00 139.11 175.00 141 80%

R-398 17/05/13 1.0 4" 14/06/13 CONEX.387,391 Y 303 39755.00 181 219.64 175.00

R-399 17/05/13 1.0 4" 14/06/13 40265.00 179 224.94 175.00 222 127%

R-400 17/05/13 1.0 4" 24/05/13 JR. MARTE - URB. COLLIQUE 27523 179.00 153.76 175.00

R-401 17/05/13 1.0 4" 24/05/13 REPOSICION DE VEREDAS 28440 181.00 157.13 175.00 155 89%

R-402 17/05/13 1.0 4" 14/06/13 CONEX. MZ 5-LT.47,MZ.2 LT.25 Y 274 48012.00 179 268.22 175.00

R-403 17/05/13 1.0 4" 14/06/13 50051.00 179 279.61 175.00 274 157%

R-408 17/05/13 1.0 4" 24/05/13 AV. CERRO DE PASCO 28848 179.00 161.16 175.00

R-409 17/05/13 1.0 4" 24/05/13 REPOSICION DE VEREDAS 29969 181.00 165.58 175.00 163 93%

R-410 17/05/13 1.0 4" 14/06/13 CONEX. 1199,1198,1197,1195,1191 Y 1170 50866.00 179 284.17 175.00

R-411 17/05/13 1.0 4" 14/06/13 50255.00 179 280.75 175.00 282 161%

R-412 23/05/13 1.0 3 1/2 " 30/05/13 JR. AREQUIPA 29565 179.00 165.17 175.00

R-413 23/05/13 1.0 3 1/2 " 30/05/13 REPOSICION DE VEREDAS 29256 181.00 161.64 175.00 163 93%

R-414 23/05/13 1.0 3 1/2 " 20/06/13 EN CONEXIONES 40571.00 181 224.15 175.00

R-415 23/05/13 1.0 3 1/2 " 20/06/13 40571.00 181 224.15 175.00 224 128%

R-416 23/05/13 1.0 3 1/4 " 30/05/13 JR. ATAHUALPA 27727 179.00 154.90 175.00

R-417 23/05/13 1.0 3 1/4 " 30/05/13 REPOSICION DE VEREDAS 28542 181.00 157.69 175.00 156 89%

R-418 23/05/13 1.0 3 1/4 " 20/06/13 EN CONEXIONES 48930.00 181 270.33 175.00

R-419 23/05/13 1.0 3 1/4 " 20/06/13 47910.00 181 264.70 175.00 268 153%

29
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2


REGISTRO FECHA DE Resistencia
N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Diseño de % a los 28
N° MOLDEO 7 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-420 25/05/13 1.0 3 1/4 " 01/06/13 JR. ATAHUALPA 27421 179.00 153.19 175.00

R-421 25/05/13 1.0 3 1/4 " 01/06/13 REPOSICION DE VEREDAS 28542 181.00 157.69 175.00 155 89%

R-422 25/05/13 1.0 3 1/4 " 22/06/13 EN CONEXIONES 49664.00 179 277.45 175.00

R-423 25/05/13 1.0 3 1/4 " 22/06/13 52110.00 179 291.12 175.00 284 162%

R-436 04/06/13 1.0 4" 11/06/13 AV. CERRO DE PASCO 28542 179.00 159.45 175.00

R-437 04/06/13 1.0 4" 11/06/13 REPOSICION DE VEREDAS 29154 181.00 161.07 175.00 160 92%

R-438 04/06/13 1.0 4" 02/07/13 CONEXIONES 850,830,82,779,728 Y 703 41386.00 181 228.65 175.00

R-439 04/06/13 1.0 4" 02/07/13 42202.00 181 233.16 175.00 231 132%

R-448 05/06/13 1.0 4" 12/06/13 AV. PEDRO DE LA GASCA 28542 176.00 162.17 175.00

R-449 05/06/13 1.0 4" 12/06/13 REPOSICION DE VEREDAS 28746 179.00 160.59 175.00 161 92%

R-450 05/06/13 1.0 4" 03/07/13 CONEXIONES 1174,1171,1138,1097,1088 Y 1084 41081.00 181 226.97 175.00

R-451 05/06/13 1.0 4" 03/07/13 41386.00 179 231.21 175.00 229 131%

R-456 08/06/13 1.0 4" 15/06/13 JR. HIPOLITO UNANUE 26504 179.00 148.07 175.00

R-457 08/06/13 1.0 4" 15/06/13 REPOSICION DE VEREDAS 26198 179.00 146.36 175.00 147 84%

R-458 08/06/13 1.0 4" 06/07/13 CONEXIONES 34760.00 181 192.04 175.00

R-459 08/06/13 1.0 4" 06/07/13 35576.00 181 196.55 175.00 194 111%

R-468 13/06/13 1.0 4" 20/06/13 AV.3 DE OCTUBRE 27523 179.00 153.76 175.00

R-469 13/06/13 1.0 4" 20/06/13 REPOSICION DE VEREDAS Y SARDINELES 28542 179.00 159.45 175.00 157 89%

R-470 13/06/13 1.0 4" 11/07/13 CUADRAS 13,15 40367.00 181 223.02 175.00

R-471 13/06/13 1.0 4" 11/07/13 41081.00 181 226.97 175.00 225 129%

R-476 14/06/13 1.0 4" 21/06/13 JR. 9 DE DICIEMBRE 29867 179.00 166.85 175.00

R-477 14/06/13 1.0 4" 21/06/13 REPOSICION DE VEREDAS 30245 179.00 168.97 175.00 168 96%

R-478 14/06/13 1.0 4" 12/07/13 #383,389,393,397,370,360 Y 377 39062.00 181 215.81 175.00

R-479 14/06/13 1.0 4" 12/07/13 39694.00 181 219.30 175.00 218 124%

R-492 17/06/13 1.0 4" 24/06/13 JR. HUAYNA CAPAC 30408 179.00 169.88 175.00

R-493 17/06/13 1.0 4" 24/06/13 REPOSICION DE VEREDAS Y RAMPAS 31560 179.00 176.31 175.00 173 99%

R-494 17/06/13 1.0 4" 15/07/13 #303,313,328B,327,349,349,388 Y 391 42365.00 181 234.06 175.00

R-495 17/06/13 1.0 4" 15/07/13 42620.00 181 235.47 175.00 235 134%

30
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2


REGISTRO FECHA DE Resistencia
N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Diseño de % a los 28
N° MOLDEO 7 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-500 18/06/13 1.0 4" 25/06/13 AV. 3 DE OCTUBRE 28736 181.00 158.76 175.00

R-501 18/06/13 1.0 4" 25/06/13 REPOSICION DE VEREDAS 29867 181.00 165.01 175.00 162 93%

R-502 18/06/13 1.0 4" 16/07/13 CONEXIONES DE AGUA 43670.00 181 241.27 175.00

R-503 18/06/13 1.0 4" 16/07/13 43558.00 181 240.65 175.00 241 138%

R-504 18/06/13 1.0 4 1/4" 25/06/13 PSJ. MOQUEGUA 31458 181.00 173.80 175.00

R-505 18/06/13 1.0 4 1/4" 25/06/13 REPOSICION DE VEREDAS 30887 181.00 170.65 175.00 172 98%

R-506 18/06/13 1.0 4 1/4" 16/07/13 44740.00 181 247.18 175.00

R-507 18/06/13 1.0 4 1/4" 16/07/13 45189.00 181 249.66 175.00 248 142%

R-510 20/06/13 1.0 4 " 27/06/13 JR. 9 DE DICIEMBRE 28889 181.00 159.61 175.00

R-511 20/06/13 1.0 4 " 27/06/13 REPOSICION DE VEREDAS 29368 181.00 162.25 175.00 161 92%

R-512 20/06/13 1.0 4 " 18/07/13 37961.00 181 209.73 175.00

R-513 20/06/13 1.0 4 " 18/07/13 38838.00 181 214.57 175.00 212 121%

R-514 22/06/13 1.0 4 " 29/06/13 AV. HUAYA CAPAC 33843 181.00 186.98 175.00

R-515 22/06/13 1.0 4 " 29/06/13 REPOSICION DE VEREDAS 33843 181.00 186.98 175.00 187 107%

R-516 22/06/13 1.0 4 " 20/07/13 CUADRAS 2 Y 3 38226.00 179 213.55 175.00

R-517 22/06/13 1.0 4 " 20/07/13 38940.00 181 215.14 175.00 214 122%

R-518 24/06/13 1.0 4 " 01/07/13 CALLE #17-URB. LOS CHASQUIS 33843 181.00 186.98 175.00

R-519 24/06/13 1.0 4 " 01/07/13 REPOSICION DE VEREDAS 33843 181.00 186.98 175.00 187 107%

R-520 24/06/13 1.0 4 " 22/07/13 39551.00 179 220.96 175.00

R-521 24/06/13 1.0 4 " 22/07/13 40367.00 181 223.02 175.00 222 127%

R-526 25/06/13 1.0 4 " 02/07/13 JR. SAN MARTIN 31081 181.00 171.72 175.00

R-527 25/06/13 1.0 4 " 02/07/13 REPOSICION DE VEREDAS 30612 181.00 169.13 175.00 170 97%

R-528 25/06/13 1.0 4 " 23/07/13 #151,159,179,185 Y 189 40224.00 179 224.72 175.00

R-529 25/06/13 1.0 4 " 23/07/13 39990.00 181 220.94 175.00 223 127%

R-530 25/06/13 1.0 4 " 02/07/13 JR. RICARDO BENTIN 29358 181.00 162.20 175.00

R-531 25/06/13 1.0 4 " 02/07/13 REPOSICION DE VEREDAS 28236 181.00 156.00 175.00 159 91%

R-532 25/06/13 1.0 4 " 23/07/13 CONEXIONES DE AGUA 42161.00 179 235.54 175.00

R-533 25/06/13 1.0 4 " 23/07/13 40581.00 181 224.20 175.00 230 131%

31
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2


REGISTRO FECHA DE Resistencia
N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Diseño de % a los 28
N° MOLDEO 7 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-546 28/06/13 1.0 3 1/2 " 05/07/13 PSJ. LUIS PARDO-COOP. J. VELASCO 30377 181.00 167.83 175.00

R-547 28/06/13 1.0 3 1/2 " 05/07/13 REPOSICION DE VEREDAS 29460 179.00 164.58 175.00 166 95%

R-548 28/06/13 1.0 3 1/2 " 26/07/13 MZ. N° LT 32,31,28,26 Y25 42365.00 179 236.68 175.00

R-549 28/06/13 1.0 3 1/2 " 26/07/13 42946.00 181 237.27 175.00 237 135%

R-558 01/07/13 1.0 4 " 08/07/13 JR. RICARDO BENTIN 30275 181.00 167.27 175.00

R-559 01/07/13 1.0 4 " 08/07/13 REPOSICION DE VEREDAS 30071 179.00 167.99 175.00 168 96%

R-560 01/07/13 1.0 4 " 29/07/13 CONXIONES DE AGUA 41662.00 181 230.18 175.00

R-561 01/07/13 1.0 4 " 29/07/13 41325.00 181 228.31 175.00 229 131%

R-562 04/07/13 1.0 3 3/4 " 11/07/13 JR. PABLO DE OLAVIDE 30938 181.00 170.93 175.00

R-563 04/07/13 1.0 3 3/4 " 11/07/13 REPOSICION DE VEREDAS 31427 179.00 175.57 175.00 173 99%

R-564 04/07/13 1.0 3 3/4 " 01/08/13 CUADRA 5 43486.00 181 240.25 175.00

R-565 04/07/13 1.0 3 3/4 " 01/08/13 42640.00 181 235.58 175.00 238 136%

R-566 08/07/13 1.0 4 " 15/07/13 JR. PACHACUTEC 30938 181.00 170.93 175.00

R-567 08/07/13 1.0 4 " 15/07/13 REPOSICION DE VEREDAS 31427 181.00 173.63 175.00 172 98%

R-568 08/07/13 1.0 4 " 05/08/13 CONXIONES DE AGUA 45178.00 181 249.60 175.00

R-569 08/07/13 1.0 4 " 05/08/13 44740.00 181 247.18 175.00 248 142%

R-578 11/07/13 1.0 4 " 18/07/13 JR. USARES DE JUNIN 30245 179.00 168.97 175.00

R-579 11/07/13 1.0 4 " 18/07/13 REPOSICION DE VEREDAS 30000 179.00 167.60 175.00 168 96%

R-580 11/07/13 1.0 4 " 08/08/13 CONXIONES DE AGUA 41417.00 179 231.38 175.00

R-581 11/07/13 1.0 4 " 08/08/13 41254.00 181 227.92 175.00 230 131%

R-582 15/07/13 1.0 3 3/4 " 22/07/13 JR. JOSE PEZET 29521 179.00 164.92 175.00

R-583 15/07/13 1.0 3 3/4 " 22/07/13 REPOSICION DE VEREDAS 30815 181.00 170.25 175.00 168 96%

R-584 15/07/13 1.0 3 3/4 " 12/08/13 36300.00 179 202.79 175.00

R-585 15/07/13 1.0 3 3/4 " 12/08/13 37085.00 179 207.18 175.00 205 117%

R-590 16/07/13 1.0 4 " 23/07/13 AV. JULIO C. TELLO 30204 179.00 168.74 175.00

R-591 16/07/13 1.0 4 " 23/07/13 REPOSICION DE VEREDAS Y SARDINELES 31203 181.00 172.39 175.00 171 97%

R-592 16/07/13 1.0 4 " 13/08/13 CUADRA 9,10 41641.00 181 230.06 175.00

R-593 16/07/13 1.0 4 " 13/08/13 40856.00 181 225.72 175.00 228 130%

32
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2


REGISTRO FECHA DE Resistencia
N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Diseño de % a los 28
N° MOLDEO 7 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-598 18/07/13 1.0 4 " 25/07/13 AV. MARIANO IGNACIO PRADO 30948 181.00 170.98 175.00

R-599 18/07/13 1.0 4 " 25/07/13 REPOSICION DE VEREDAS Y SARDINELES 31274 181.00 172.78 175.00 172 98%

R-600 18/07/13 1.0 4 " 15/08/13 CUADRA 3 Y 4 39806.00 181 219.92 175.00

R-601 18/07/13 1.0 4 " 15/08/13 40398.00 181 223.19 175.00 222 127%

R-606 19/07/13 1.0 4 " 26/07/13 AV. VIRGEN DEL CAMNEN 31641 181.00 174.81 175.00

R-607 19/07/13 1.0 4 " 26/07/13 REPOSICION DE VEREDAS Y SARDINELES 31407 181.00 173.52 175.00 174 100%

R-608 19/07/13 1.0 4 " 16/08/13 CUADRA 6 Y 7 48165.00 181 266.10 175.00

R-609 19/07/13 1.0 4 " 16/08/13 48583.00 181 268.41 175.00 267 153%

R-614 24/07/13 1.0 3 1/2 " 31/07/13 JR. HUSARES DE JUNIN 30459 181.00 168.28 175.00

R-615 24/07/13 1.0 3 1/2 " 31/07/13 REPOSICION DE VEREDAS Y SARDINELES 31152 181.00 172.11 175.00

R-616 24/07/13 1.0 3 1/2 " 21/08/13 CUADRA 1 43771.66 181 241.83 175.00

R-617 24/07/13 1.0 3 1/2 " 21/08/13 44424.06 181 245.44 175.00 244 139%

R-618 25/07/13 1.0 3 1/2 " 01/08/13 JR. TACNA 30887 181.00 170.65 175.00

R-619 25/07/13 1.0 3 1/2 " 01/08/13 REPOSICION DE VEREDAS Y SARDINELES 31172 181.00 172.22 175.00 171 98%

R-620 25/07/13 1.0 3 1/2 " 22/08/13 CUADRA 1 Y 2 43353.72 181 239.52 175.00

R-621 25/07/13 1.0 3 1/2 " 22/08/13 44057.08 181 243.41 175.00 241 138%

R-622 08/08/13 1.0 4 " 15/08/13 JR. CARCAMO 30408 181.00 168.00 175.00

R-623 08/08/13 1.0 4 " 15/08/13 REPOSICION DE VEREDAS Y SARDINELES 30245 181.00 167.10 175.00

R-624 08/08/13 1.0 4 " 05/09/13 CUADRA 1 Y 2 41437.31 181 228.94 175.00

R-625 08/08/13 1.0 4 " 05/09/13 46636.09 181 257.66 175.00 243 139%

R-626 08/08/13 1.0 4 " 15/08/13 AV. JOSE ANTONIO DE SUCRE 30418 181.00 168.06 175.00

R-627 08/08/13 1.0 4 " 15/08/13 REPOSICION DE VEREDAS Y SARDINELES 31172 181.00 172.22 175.00

R-628 08/08/13 1.0 4 " 05/09/13 CUADRA 1 Y 2 43873.60 181 242.40 175.00

R-629 08/08/13 1.0 4 " 05/09/13 41671.76 181 230.23 175.00 236 135%

R-630 01/08/13 1.0 4 " 08/08/13 JR. MIGUEL GRAU 31121 181.00 171.94 175.00

R-631 01/08/13 1.0 4 " 08/08/13 REPOSICION DE VEREDAS Y SARDINELES 30765 181.00 169.97 175.00

R-632 01/08/13 1.0 4 " 29/08/13 CUADRA 1 45565.75 181 251.74 175.00

R-633 01/08/13 1.0 4 " 29/08/13 44495.41 181 245.83 175.00 249 142%

33
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2


REGISTRO FECHA DE Resistencia
N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Diseño de % a los 28
N° MOLDEO 7 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-634 02/08/13 1.0 4 " 09/08/13 JR. 3 DE OCTUBRE 31274 181.00 172.78 175.00

R-635 02/08/13 1.0 4 " 09/08/13 REPOSICION DE VEREDAS Y SARDINELES 31519 181.00 174.14 175.00

R-636 02/08/13 1.0 4 " 30/08/13 CUADRA 6,7 40030.58 181 221.16 175.00

R-637 02/08/13 1.0 4 " 30/08/13 37563.71 181 207.53 175.00 214 122%

R-638 02/08/13 1.0 3 1/2 " 09/08/13 JR. LA UNION/ JAMAICA 30917 181.00 170.81 175.00

R-639 02/08/13 1.0 3 1/2 " 09/08/13 REPOSICION DE VEREDAS Y SARDINELES 30917 181.00 170.81 175.00 171 98%

R-640 02/08/13 1.0 3 1/2 " 30/08/13 CUADRA 6,7 48950.05 181 270.44 175.00

R-641 02/08/13 1.0 3 1/2 " 30/08/13 44811.42 181 247.58 175.00 259 148%

R-641 03/08/13 1.0 3 1/2 " 10/08/13 AV. LORG COCRANE 27594 179.00 154.16 175.00

R-642 03/08/13 1.0 3 1/2 " 10/08/13 REPOSICION DE VEREDAS Y SARDINELES 28889 179.00 161.39 175.00

R-643 03/08/13 1.0 3 1/2 " 31/08/13 CUADRA 2,3 37370.03 181 206.46 175.00

R-644 03/08/13 1.0 3 1/2 " 31/08/13 36024.46 181 199.03 175.00 203 116%

R-645 05/08/13 1.0 4" 12/08/13 AV. 3 DE OCTUBRE 31223 181.00 172.50 175.00

R-646 05/08/13 1.0 4" 12/08/13 REPOSICION DE VEREDAS Y SARDINELES 31611 181.00 174.65 175.00 174 99%

R-647 05/08/13 1.0 4" 02/09/13 CUADRA 10 Y 11 41620.80 181 229.95 175.00

R-648 05/08/13 1.0 4" 02/09/13 37268.09 181 205.90 175.00 218 125%

R-649 06/08/13 1.0 4" 13/08/13 AV. 3 DE OCTUBRE 30612 181.00 169.13 175.00

R-650 06/08/13 1.0 4" 13/08/13 REPOSICION DE VEREDAS Y SARDINELES 30703 179.00 171.53 175.00 170 97%

R-651 06/08/13 1.0 4" 03/09/13 CUADRA 8 Y 9 36819.57 181 203.42 175.00

R-652 06/08/13 1.0 4" 03/09/13 39836.90 181 220.09 175.00 212 121%

R-653 06/08/13 1.0 4" 13/08/13 AV. 1° DE MAYO 31019 181.00 171.38 175.00

R-654 06/08/13 1.0 4" 13/08/13 REPOSICION DE VEREDAS Y SARDINELES 31478 181.00 173.91 175.00

R-655 06/08/13 1.0 4" 03/09/13 CUADRA 9 Y 10 43384.30 181 239.69 175.00

R-656 06/08/13 1.0 4" 03/09/13 51131.50 181 282.49 175.00 261 149%

R-657 06/08/13 1.0 4" 13/08/13 JR. PEDRO PAULET 31335 181.00 173.12 175.00

R-658 06/08/13 1.0 4" 13/08/13 REPOSICION DE VEREDAS Y SARDINELES 31152 181.00 172.11 175.00 173 99%

R-659 06/08/13 1.0 4" 03/09/13 CUADRA 2 51406.73 181 284.02 175.00

R-660 06/08/13 1.0 4" 03/09/13 50142.71 181 277.03 175.00 281 160%

34
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2


REGISTRO FECHA DE Resistencia
N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Diseño de % a los 28
N° MOLDEO 7 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-661 07/08/13 1.0 4" 14/08/13 Cll. JOAQUIN COPELO/J.C. MARIATEGUI 30683 181.00 169.52 175.00

R-662 07/08/13 1.0 4" 14/08/13 REPOSICION DE VEREDAS Y SARDINELES 31397 181.00 173.46 175.00 171 98%

R-663 07/08/13 1.0 4" 04/09/13 CUADRA 2 44087.67 181 243.58 175.00

R-664 07/08/13 1.0 4" 04/09/13 42986.75 181 237.50 175.00 241 137%

R-665 07/08/13 1.0 4" 14/08/13 AV. JOSE ANTONIO DE SUCRE 30785 181.00 170.08 175.00

R-666 07/08/13 1.0 4" 14/08/13 REPOSICION DE VEREDAS Y SARDINELES 30377 181.00 167.83 175.00 169 97%

R-667 07/08/13 1.0 4" 04/09/13 CUADRA 2 Y 3 50978.59 181 281.65 175.00

R-668 07/08/13 1.0 4" 04/09/13 48552.50 181 268.25 175.00 275 157%

R-669 07/08/13 1.0 4" 14/08/13 AV. JOSÉ ANTNIO DE SUCRE - LIMA NORTE 30785 179.00 171.98 175.00

R-670 07/08/13 1.0 4" 14/08/13 REPOSICION DE VEREDAS Y SARDINELES 30377 179.00 169.70 175.00 171 98%

R-671 07/08/13 1.0 4" 04/09/13 CUADRA 2 ,3 39541.28 183 216.07 175.00

R-672 07/08/13 1.0 4" 04/09/13 38216.11 177 215.91 175.00 216 123%

R-673 07/08/13 1.0 4" 14/08/13 JR. CARCAMO 36351 181.00 200.83 175.00

R-674 07/08/13 1.0 4" 14/08/13 REPOSICION DE VEREDAS Y SARDINELES 33160 181.00 183.20 175.00 192 110%

R-675 07/08/13 1.0 4" 04/09/13 CUADRA 2 42059.12 181 232.37 175.00

R-676 07/08/13 1.0 4" 04/09/13 47757.39 181 263.85 175.00 248 142%

R-677 08/08/13 1.0 4" 15/08/13 JR. LAS AMERICAS 32650 181.00 180.39 175.00

R-678 08/08/13 1.0 4" 15/08/13 REPOSICION DE VEREDAS Y SARDINELES 30836 181.00 170.36 175.00 175 100%

R-679 08/08/13 1.0 4" 05/09/13 CUADRA 6 39806.00 181 219.92 175.00

R-680 08/08/13 1.0 4" 05/09/13 40398.00 181 223.19 175.00 222 127%

R-681 08/08/13 1.0 4" 15/08/13 PROLONGACION AV. A.J. DE SUCRE-AA. HH 38573 181.00 213.11 175.00

R-682 08/08/13 1.0 4" 15/08/13 MZ. "B" Y MZ "F" ENTRE AV. SANTA ROSA 33700 181.00 186.19 175.00 200 114%

R-683 08/08/13 1.0 4" 05/09/13 Y JR. GENERAL SAN MARTIN 47237.51 181 260.98 175.00

R-684 08/08/13 1.0 4" 05/09/13 49367.99 181 272.75 175.00 267 152%

R-685 09/08/13 1.0 4" 16/08/13 PSJ. JAVIER PRODO 36249 179.00 202.51 175.00

R-686 09/08/13 1.0 4" 16/08/13 REPOSICION DE VEREDAS Y SARDINELES 32802 181.00 181.23 175.00 192 110%

R-687 09/08/13 1.0 4" 06/09/13 CUADRAS 7 Y 8 51610.60 181 285.14 175.00

R-688 09/08/13 1.0 4" 06/09/13 50112.13 181 276.86 175.00 281 161%

35
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2


REGISTRO FECHA DE Resistencia
N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Diseño de % a los 28
N° MOLDEO 7 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-689 09/08/13 1.0 4" 16/08/13 JR. 8 DE ENERO Y JR. CARCAMO 37248 181.00 205.79 175.00

R-690 09/08/13 1.0 4" 16/08/13 REPOSICION DE VEREDAS Y SARDINELES 35708 181.00 197.28 175.00 202 115%

R-691 09/08/13 1.0 4" 06/09/13 JR. 8 DE NERO CUADRA 13 Y JR. CARCAMO 47288.48 181 261.26 175.00

R-692 09/08/13 1.0 4" 06/09/13 53068.30 181 293.20 175.00 277 158%

R-693 09/08/13 1.0 4" 16/08/13 CLL. FEDERICO BARRETO Y RICARDO PALMA 25270 181.00 139.61 175.00

R-694 09/08/13 1.0 4" 16/08/13 REPOSICION DE VEREDAS Y SARDINELES 27207 181.00 150.31 175.00 145 83%

R-695 09/08/13 1.0 4" 06/09/13 CUADRA 1 EN AMBOS LADOS 37512.74 181 207.25 175.00

R-696 09/08/13 1.0 4" 06/09/13 37074.41 181 204.83 175.00 206 118%

R-697 12/08/13 1.0 4" 19/08/13 JR. CANDAMO 29490 181.00 162.93 175.00

R-698 12/08/13 1.0 4" 19/08/13 REPOSICION DE VEREDAS Y SARDINELES 30031 181.00 165.92 175.00 164 94%

R-699 12/08/13 1.0 4" 09/09/13 CUADRAS 5 Y 6 53037.72 181 293.03 175.00

R-700 12/08/13 1.0 4" 09/09/13 50468.91 181 278.83 175.00 286 163%

R-701 12/08/13 1.0 4" 19/08/13 JR. LORD COCRANE 30051 181.00 166.03 175.00

R-702 12/08/13 1.0 4" 19/08/13 REPOSICION DE VEREDAS Y SARDINELES 30826 181.00 170.31 175.00 168 96%

R-703 12/08/13 1.0 4" 09/09/13 CUADRA 4 39643.22 181 219.02 175.00

R-704 12/08/13 1.0 4" 09/09/13 35545.36 181 196.38 175.00 208 119%

R-705 13/08/13 1.0 4" 20/08/13 CALLE ANDRES BELLO 31427 181.00 173.63 175.00

R-706 13/08/13 1.0 4" 20/08/13 REPOSICION DE VEREDAS Y SARDINELES 30775 181.00 170.03 175.00 172 98%

R-707 13/08/13 1.0 4" 10/09/13 CUADRA 1 46024.46 181 254.28 175.00

R-708 13/08/13 1.0 4" 10/09/13 50417.94 181 278.55 175.00 266 152%

R-709 15/08/13 1.0 3 3/4" 22/08/13 AA. HH 9 DE SETIEMBRE 31794 181.00 175.66 175.00

R-710 15/08/13 1.0 3 3/4" 22/08/13 REPOSICION DE VEREDAS Y SARDINELES 31774 181.00 175.55 175.00 176 100%

R-711 15/08/13 1.0 3 3/4" 12/09/13 SECTOR DE LAS MZ "A" Y "B" 44699.29 181 246.96 175.00

R-712 15/08/13 1.0 3 3/4" 12/09/13 46248.73 181 255.52 175.00 251 144%

R-713 15/08/13 1.0 4" 22/08/13 AV. JOSE PARDO 31549 181.00 174.31 175.00

R-714 15/08/13 1.0 4" 22/08/13 REPOSICION DE VEREDAS Y SARDINELES 31019 181.00 171.38 175.00 173 99%

R-715 15/08/13 1.0 4" 12/09/13 CUADRA 2 52528.03 179 293.29 175.00

R-716 15/08/13 1.0 4" 12/09/13 51100.92 179 285.48 175.00 289 165%

36
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2


REGISTRO FECHA DE Resistencia
N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Diseño de % a los 28
N° MOLDEO 7 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-717 17/08/13 1.0 4" 24/08/13 JR. LARCO HERRERA 31845 181.00 174.31 175.00

R-718 17/08/13 1.0 4" 24/08/13 REPOSICION DE VEREDAS Y SARDINELES 31305 181.00 171.38 175.00 173 99%

R-719 17/08/13 1.0 4" 14/09/13 CUADRA 1 50438.33 179 281.62 175.00

R-720 17/08/13 1.0 4" 14/09/13 50998.98 179 284.91 175.00 283 162%

R-721 17/08/13 1.0 3 3/4" 24/08/13 JR. GENERAL SUCRE 32080 181.00 174.31 175.00

R-722 17/08/13 1.0 3 3/4" 24/08/13 REPOSICION DE VEREDAS Y SARDINELES 31641 181.00 171.38 175.00 173 99%

R-723 17/08/13 1.0 3 3/4" 14/09/13 CUADRA 1 43914.37 183 239.97 175.00

R-724 17/08/13 1.0 3 3/4" 14/09/13 45494.39 183 248.47 175.00 244 140%

R-725 17/08/13 1.0 3 3/4" 24/08/13 AV. PEDRO DE LA GASCA 25892 183.00 141.49 175.00

R-726 17/08/13 1.0 3 3/4" 24/08/13 REPOSICION DE VEREDAS Y SARDINELES 26891 179.00 150.23 175.00 146 83%

R-727 17/08/13 1.0 3 3/4" 14/09/13 CUADRA 2 41946.99 182 230.99 175.00

R-728 17/08/13 1.0 3 3/4" 14/09/13 41141.69 181 226.80 175.00 229 131%

R-729 20/08/13 1.0 3 3/4" 27/08/13 JR. PARRARDELLI Y FRANCISCO DE ZALA 29134 181.00 160.96 175.00

R-730 20/08/13 1.0 3 3/4" 27/08/13 REPOSICION DE VEREDAS Y SARDINELES 30143 181.00 166.53 175.00 164 94%

R-731 20/08/13 1.0 3 3/4" 17/09/13 CUADRA 4,F. ZELA CUADRA 1 Y2 34209.99 183 186.94 175.00

R-732 20/08/13 1.0 3 3/4" 17/09/13 36156.98 177 204.28 175.00 196 112%

R-733 23/08/13 1.0 4" 30/08/13 AV.MANUEL GONZALES PRADA 23170 178.00 130.17 175.00

R-734 23/08/13 1.0 4" 30/08/13 REPOSICION DE VEREDAS Y SARDINELES 21458 181.00 118.55 175.00 124 71%

R-735 23/08/13 1.0 4" 20/09/13 CUADRA 8 31661.57 179 176.88 175.00

R-736 23/08/13 1.0 4" 20/09/13 32099.90 179 179.33 175.00 178 102%

R-737 23/08/13 1.0 4" 30/08/13 JR. REVOLUCION Y CIRO ALEGRIA 27839 181.00 153.81 175.00

R-738 23/08/13 1.0 4" 30/08/13 REPOSICION DE VEREDAS Y SARDINELES 29113 181.00 160.85 175.00 157 90%

R-739 23/08/13 1.0 4" 20/09/13 CUADRA 1 AMBOS JIRONES 32782.87 177 185.21 175.00

R-740 23/08/13 1.0 4" 20/09/13 34281.35 177 193.68 175.00 189 108%

R-741 23/08/13 1.0 4" 30/08/13 AV. JULIO C. TELLO 32508 184.00 176.67 175.00

R-742 23/08/13 1.0 4" 30/08/13 REPOSICION DE VEREDAS Y SARDINELES 30928 175.00 176.73 175.00 177 101%

R-743 23/08/13 1.0 4" 20/09/13 CUADRA 2 44882.77 181 247.97 175.00

R-744 23/08/13 1.0 4" 20/09/13 44495.41 181 245.83 175.00 247 141%

37
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2


REGISTRO FECHA DE Resistencia
N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Diseño de % a los 28
N° MOLDEO 7 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-749 27/08/13 1.0 4" 03/09/13 AV.3 DE OCTUBRE Y PSJE. CERRO DE PASCO 40540 184.00 220.33 175.00

R-750 27/08/13 1.0 4" 03/09/13 REPOSICION DE VEREDAS Y SARDINELES 36391 175.00 207.95 175.00 214 122%

R-751 27/08/13 1.0 4" 24/09/13 CUADRA 6 DE AV. 3 DE OCTUBRE 44373.09 181 245.16 175.00

R-752 27/08/13 1.0 4" 24/09/13 CUADRA 1 PSJ. CERRO DE PASCO 45728.85 181 252.65 175.00 249 142%

R-753 27/08/13 1.0 4" 03/09/13 JR. PALLARDELLI Y JR. PUMACAHUA 32528 184.00 176.78 175.00

R-754 27/08/13 1.0 4" 03/09/13 REPOSICION DE VEREDAS Y SARDINELES 34332 175.00 196.18 175.00 186 107%

R-755 27/08/13 1.0 4" 24/09/13 JR. PALLARDELLI - CUADRA 4 37655.45 181 208.04 175.00

R-756 27/08/13 1.0 4" 24/09/13 Y JR. PUMACAHUA CUADRA - 3 37482.16 181 207.08 175.00 208 119%

R-7457 29/08/13 1.0 4" 05/09/13 AV. SR. DE LOS MILAGROS. 25291 184.00 137.45 175.00

R-758 29/08/13 1.0 4" 05/09/13 REPOSICION DE VEREDAS Y SARDINELES 26249 175.00 149.99 175.00 144 82%

R-759 29/08/13 1.0 4" 26/09/13 CUADRA 1 Y 2 39418.96 181 217.78 175.00

R-760 29/08/13 1.0 4" 26/09/13 38644.24 181 213.50 175.00 216 123%

R-761 29/08/13 1.0 4" 05/09/13 JR. POTOCARRERO 35229 184.00 191.46 175.00

R-762 29/08/13 1.0 4" 05/09/13 REPOSICION DE VEREDAS Y SARDINELES 33466 175.00 191.23 175.00 191 109%

R-763 29/08/13 1.0 4" 26/09/13 CUADRA 3 41406.73 181 228.77 175.00

R-764 29/08/13 1.0 4" 26/09/13 42844.04 181 236.71 175.00 233 133%

R-765 05/09/13 1.0 4" 12/09/13 JR. MIGUEL IGLESIAS. 27380 183.00 149.62 175.00

R-766 05/09/13 1.0 4" 12/09/13 REPOSICION DE VEREDAS Y SARDINELES 24832 181.00 137.19 175.00 143 82%

R-767 05/09/13 1.0 4" 03/10/13 CUADRAS - 1 Y 2 33669.72 181 186.02 175.00

R-768 05/09/13 1.0 4" 03/10/13 33211.01 181 183.49 175.00 185 106%

R-769 07/09/13 1.0 4" 14/09/13 JR. MANUEL VILLARAN 29399 183.00 160.65 175.00

R-770 07/09/13 1.0 4" 14/09/13 REPOSICION DE VEREDAS Y SARDINELES 28318 181.00 156.45 175.00 159 91%

R-771 07/09/13 1.0 4" 05/10/13 CUADRAS - 1 Y 2 32640.16 181 180.33 175.00

R-772 07/09/13 1.0 4" 05/10/13 33516.82 181 185.18 175.00 183 104%

R-773 09/09/13 1.0 4" 16/09/13 JR. MANUEL CANDAMO. 28583 181.30 157.66 175.00

R-774 09/09/13 1.0 4" 16/09/13 REPOSICION DE VEREDAS Y SARDINELES 27696 179.10 154.64 175.00 156 89%

R-775 09/09/13 1.0 4" 07/10/13 CUADRAS - 4 Y 5 40377.17 181 223.08 175.00

R-776 09/09/13 1.0 4" 07/10/13 36972.48 181 204.27 175.00 214 122%

38
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2


REGISTRO FECHA DE Resistencia
N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Diseño de % a los 28
N° MOLDEO 7 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-777 10/09/13 1.0 4" 17/09/13 PSJE. LOS ALAMOS Y PSJE. LOS CLAVELES 33405 180.30 185.27 175.00

R-778 10/09/13 1.0 4" 17/09/13 REPOSICION DE VEREDAS Y SARDINELES 33170 182.60 181.66 175.00 183 105%

R-779 10/09/13 1.0 4" 08/10/13 MZ. - H 50835.88 181 280.86 175.00

R-780 10/09/13 1.0 4" 08/10/13 49480.12 181 273.37 175.00 277 158%

R-781 12/09/13 1.0 4" 19/09/13 PSJE. SANTA FE / VILLARAN. 26575 183.80 144.59 175.00

R-782 12/09/13 1.0 4" 19/09/13 REPOSICION DE VEREDAS Y SARDINELES 27992 181.30 154.40 175.00 149 85%

R-783 12/09/13 1.0 4" 10/10/13 CUADRA - 1 34709.48 181 191.77 175.00

R-784 12/09/13 1.0 4" 10/10/13 35739.04 181 197.45 175.00 195 111%

R-785 13/09/13 1.0 4" 20/09/13 JR. MANUEL CANDAMO 30143 182.30 165.35 175.00

R-786 13/09/13 1.0 4" 20/09/13 REPOSICION DE VEREDAS Y SARDINELES 29083 183.10 158.83 175.00 162 93%

R-787 13/09/13 1.0 4" 11/10/13 CUADRA - 1 39989.81 181 220.94 175.00

R-788 13/09/13 1.0 4" 11/10/13 40632.01 181 224.49 175.00 223 127%

R-789 14/09/13 1.0 4" 21/09/13 JR. CAHUIDE. 40061 185.00 216.55 175.00

R-790 14/09/13 1.0 4" 21/09/13 REPOSICION DE VEREDAS Y SARDINELES 41825 178.00 234.97 175.00 226 129%

R-791 14/09/13 1.0 4" 12/10/13 CUADRA - 1 49398.57 185 267.02 175.00

R-792 14/09/13 1.0 4" 12/10/13 48593.27 183 266.12 175.00 267 152%

R-793 14/09/13 1.0 4" 21/09/13 PSJE. SAN JOSE 36116 178.10 202.79 175.00

R-794 14/09/13 1.0 4" 21/09/13 REPOSICION DE VEREDAS Y SARDINELES 33904 180.30 188.04 175.00 195 112%

R-795 14/09/13 1.0 4" 12/10/13 CUADRA - 1 46167.18 183 252.83 175.00

R-796 14/09/13 1.0 4" 12/10/13 47889.91 181 264.00 175.00 258 148%

R-797 16/09/13 1.0 4" 23/09/13 PSJE. GONZALES PRADA 34709 180.20 192.62 175.00

R-798 16/09/13 1.0 4" 23/09/13 REPOSICION DE VEREDAS Y SARDINELES 36045 179.30 201.03 175.00 197 112%

R-799 16/09/13 1.0 4" 14/10/13 CUADRA - 1 43730.89 178 245.82 175.00

R-800 16/09/13 1.0 4" 14/10/13 48552.50 178 272.92 175.00 259 148%

R-801 17/09/13 1.0 4" 24/09/13 AV. HUAYNA CAPAC. 26391 180.30 146.38 175.00

R-802 17/09/13 1.0 4" 24/09/13 REPOSICION DE VEREDAS Y SARDINELES 26585 177.90 149.44 175.00 148 85%

R-803 17/09/13 1.0 4" 15/10/13 CUADRA - 1 35056.07 178 197.05 175.00

R-804 17/09/13 1.0 4" 15/10/13 32059.12 178 180.21 175.00 189 108%

39
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2


REGISTRO FECHA DE Resistencia
N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Diseño de % a los 28
N° MOLDEO 7 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-805 17/09/13 1.0 4" 24/09/13 CALLE MANCO INCA 33486 176.70 189.51 175.00

R-806 17/09/13 1.0 4" 24/09/13 REPOSICION DE VEREDAS Y SARDINELES 32273 179.10 180.20 175.00 185 106%

R-807 17/09/13 1.0 4" 15/10/13 46727.83 177 264.45 175.00

R-808 17/09/13 1.0 4" 15/10/13 44475.03 177 251.70 175.00 258 147%

R-809 19/09/13 1.0 4" 26/09/13 JR. LOS CEDROS 23812 182.60 130.41 175.00

R-810 19/09/13 1.0 4" 26/09/13 REPOSICION DE VEREDAS Y SARDINELES 25607 179.10 142.97 175.00 137 78%

R-811 19/09/13 1.0 4" 17/10/13 33414.88 178 187.83 175.00

R-812 19/09/13 1.0 4" 17/10/13 36360.86 178 204.39 175.00 196 112%

R-813 20/09/13 1.0 4" 27/09/13 CALLE WIRACOCHA 38828 179.10 216.79 175.00

R-814 20/09/13 1.0 4" 27/09/13 REPOSICION DE VEREDAS Y SARDINELES 37176 181.40 204.94 175.00 211 120%

R-815 20/09/13 1.0 4" 18/10/13 48267.07 183 264.33 175.00

R-816 20/09/13 1.0 4" 18/10/13 47461.77 177 268.60 175.00 266 152%

R-817 21/09/13 1.0 4" 28/09/13 AV. HUAYNA CAPAC. - LIMA NORTE 35780 180.20 198.56 175.00

R-818 21/09/13 1.0 4" 28/09/13 REPOSICION DE VEREDAS Y SARDINELES 34873 182.60 190.98 175.00 195 111%

R-819 21/09/13 1.0 4" 19/10/13 CUADRA - 1. 47359.84 177 268.02 175.00

R-820 21/09/13 1.0 4" 19/10/13 44678.90 177 252.85 175.00 260 149%

R-821 23/09/13 1.0 4" 30/09/13 CALLE MANCO INCA Y WIRACOCHA. - LIMA N 28552 182.60 156.37 175.00

R-822 23/09/13 1.0 4" 30/09/13 REPOSICION DE VEREDAS Y SARDINELES 30714 177.90 172.65 175.00 165 94%

R-823 23/09/13 1.0 4" 21/10/13 CUADRA - 2 . (AMBAS CALLES) 34230.38 181 188.70 175.00

R-824 23/09/13 1.0 4" 21/10/13 32874.62 179 183.55 175.00 186 106%

R-825 23/09/13 1.0 4" 30/09/13 CALLE MANCO INCA Y WIRACOCHA. - LIMA N 33772 181.40 186.17 175.00

R-826 23/09/13 1.0 4" 30/09/13 REPOSICION DE VEREDAS Y SARDINELES 33649 180.30 186.63 175.00 186 107%

R-827 23/09/13 1.0 4" 21/10/13 CUADRA - 2 . (AMBAS CALLES) 41009 41009.17 183 224.58 175.00

R-828 23/09/13 1.0 4" 21/10/13 39918 39918.45 177 225.91 175.00 225 129%

R-829 24/09/13 1.0 4" 01/10/13 JR. LOS NOGALES. - LIMA NORTE 33017 177.90 185.59 175.00

R-830 24/09/13 1.0 4" 01/10/13 REPOSICION DE VEREDAS Y SARDINELES 31967 180.30 177.30 175.00 181 104%

R-831 24/09/13 1.0 4" 22/10/13 CUADRA - 1 38104 38103.98 179 212.75 175.00

R-832 24/09/13 1.0 4" 22/10/13 38899 38899.08 183 213.03 175.00 213 122%

40
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2


REGISTRO FECHA DE Resistencia
N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Diseño de % a los 28
N° MOLDEO 7 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-833 25/09/13 1.0 4" 02/10/13 JR. HUASCAR / PSJE. SANTA ROSA. - LIMA N 36871 177.90 207.25 175.00

R-834 25/09/13 1.0 4" 02/10/13 REPOSICION DE VEREDAS Y SARDINELES 34913 180.30 193.64 175.00 200 115%

R-835 25/09/13 1.0 4" 23/10/13 CUADRA - 1 43996 43995.92 181 242.54 175.00

R-836 25/09/13 1.0 4" 23/10/13 42773 42772.68 179 238.82 175.00 241 138%

R-837 26/09/13 1.0 4" 03/10/13 JR. HUASCAR / PSJE. SANTA ROSA. - LIMA N 36871 177.90 207.25 175.00

R-838 26/09/13 1.0 4" 03/10/13 REPOSICION DE VEREDAS Y SARDINELES 34913 179.10 194.94 175.00 201 115%

R-839 26/09/13 1.0 4" 24/10/13 CUADRA - 1 43996 43995.92 181 242.54 175.00

R-840 26/09/13 1.0 4" 24/10/13 42773 42772.68 179 238.82 175.00 241 138%

R-841 28/09/13 1.0 4" 05/10/13 PSJE. LOS OLIVOS. - LIMA NORTE 27268 177.90 153.28 175.00

R-842 28/09/13 1.0 4" 05/10/13 REPOSICION DE VEREDAS Y SARDINELES 28675 179.10 160.11 175.00 157 90%

R-843 28/09/13 1.0 4" 26/10/13 CUADRA - 1 38970 38970.44 181 214.83 175.00

R-844 28/09/13 1.0 4" 26/10/13 37268 37268.09 179 208.09 175.00 211 121%

R-851 28/09/13 1.0 4" 05/10/13 AV. UNIVERSITARIA. - 40133 181.40 221.24 175.00

R-852 28/09/13 1.0 4" 05/10/13 REPOSICION DE VEREDAS Y SARDINELES 40907 176.70 231.51 175.00 226 129%

R-853 28/09/13 1.0 4" 26/10/13 CUADRA - 75 . 52222 52222.22 179 291.58 175.00

R-854 28/09/13 1.0 4" 26/10/13 48552 48552.50 179 271.09 175.00 281 161%

R-867 01/10/13 1.0 4" 08/10/13 AV. JULIO C. TELLO. 32895 180.30 182.45 175.00

R-868 01/10/13 1.0 4" 08/10/13 REPOSICION DE VEREDAS Y SARDINELES 36014 180.20 199.86 175.00 191 109%

R-869 01/10/13 1.0 4" 29/10/13 CUADRA 11 50999 50998.98 183 279.29 175.00

R-870 01/10/13 1.0 4" 29/10/13 49959 49959.23 183 273.60 175.00 276 158%

R-871 02/10/13 1.0 4" 09/10/13 AV. UNIVERSITARIA 34322 183.80 186.74 175.00

R-872 02/10/13 1.0 4" 09/10/13 REPOSICION DE VEREDAS Y SARDINELES 37370 181.40 206.01 175.00 196 112%

R-873 02/10/13 1.0 4" 30/10/13 CUADRA 76 48073 48073.39 179 268.42 175.00

R-874 02/10/13 1.0 4" 30/10/13 49613 49612.64 177 280.77 175.00 275 157%

R-879 03/10/13 1.0 4" 10/10/13 PSJE. SALCEDO 37360 179.00 208.71 175.00

R-880 03/10/13 1.0 4" 10/10/13 REPOSICION DE VEREDAS Y SARDINELES 35403 179.00 197.78 175.00 203 116%

R-881 03/10/13 1.0 4" 31/10/13 CUADRA 04 46442 46442.41 181 256.02 175.00

R-882 03/10/13 1.0 4" 31/10/13 44801 44801.22 179 250.15 175.00 253 145%

41
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2


REGISTRO FECHA DE Resistencia
N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Diseño de % a los 28
N° MOLDEO 7 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-887 04/10/13 1.0 4" 11/10/13 AV. UNIVERSITARIA. 33405 182.60 182.94 175.00

R-888 04/10/13 1.0 4" 11/10/13 REPOSICION DE VEREDAS Y SARDINELES 31621 177.90 177.74 175.00 180 103%

R-889 04/10/13 1.0 4" 01/11/13 CUADRA 78 42977 42976.55 181 236.92 175.00

R-890 04/10/13 1.0 4" 01/11/13 41743 41743.12 179 233.07 175.00 235 134%

R-891 04/10/13 1.0 4" 11/10/13 CALLE INCA GARCILAZO DE LA VEGA. 31223 177.90 175.51 175.00

R-892 04/10/13 1.0 4" 11/10/13 REPOSICION DE VEREDAS Y SARDINELES 33262 179.10 185.72 175.00 181 103%

R-893 04/10/13 1.0 4" 01/11/13 CUADRA x 43792 43792.05 181 241.41 175.00

R-894 04/10/13 1.0 4" 01/11/13 45902 45902.14 179 256.29 175.00 249 142%

R-899 05/10/13 1.0 4" 12/10/13 AV. JULIO C. TELLO 29185 181.20 161.06 175.00

R-900 05/10/13 1.0 4" 12/10/13 REPOSICION DE VEREDAS Y SARDINELES 26167 181.20 144.41 175.00 153 87%

R-901 05/10/13 1.0 4" 02/11/13 CUADRA 11 36626 36625.89 181 201.91 175.00

R-902 05/10/13 1.0 4" 02/11/13 39613 39612.64 179 221.18 175.00 212 121%

R-903 08/10/13 1.0 4" 15/10/13 AV. TUPAC AMARU 26646 176.70 150.80 175.00

R-904 08/10/13 1.0 4" 15/10/13 REPOSICION DE VEREDAS Y SARDINELES 24455 181.20 134.96 175.00 143 82%

R-904 08/10/13 1.0 4" 05/11/13 CUADRA 46 36962 36962.28 181 203.76 175.00

R-905 08/10/13 1.0 4" 05/11/13 38073 38073.39 179 212.58 175.00 208 119%

R-915 09/10/13 1.0 4" 16/10/13 AV. UNIVERSITARIA 28359 182.60 155.31 175.00

R-916 09/10/13 1.0 4" 16/10/13 REPOSICION DE VEREDAS Y SARDINELES 26126 182.60 143.08 175.00 149 85%

R-917 09/10/13 1.0 4" 06/11/13 CUADRA 78 - CARRIL DERECHO 33313 33312.95 181 183.64 175.00

R-918 09/10/13 1.0 4" 06/11/13 34669 34668.71 179 193.57 175.00 189 108%

R-919 09/10/13 1.0 4" 16/10/13 AV. UNIVERSITARIA 36728 179.00 205.18 175.00

R-920 09/10/13 1.0 4" 16/10/13 REPOSICION DE VEREDAS Y SARDINELES 32630 179.00 182.29 175.00 194 111%

R-921 09/10/13 1.0 4" 06/11/13 CUADRA 78 - CARRIL DE IZQUIERDO 41855 41855.25 181 230.73 175.00

R-922 09/10/13 1.0 4" 06/11/13 41131 41131.50 179 229.66 175.00 230 132%

R-923 10/10/13 1.0 4" 17/10/13 CALLE AMARU INCA YUPANQUI 32742 182.60 179.31 175.00

R-924 10/10/13 1.0 4" 17/10/13 REPOSICION DE VEREDAS Y SARDINELES 33986 176.70 192.34 175.00 186 106%

R-925 10/10/13 1.0 4" 07/11/13 CUADRA 1 42661 42660.55 181 235.17 175.00

R-926 10/10/13 1.0 4" 07/11/13 41549 41549.44 179 231.99 175.00 234 133%

42
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2


REGISTRO FECHA DE Resistencia
N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Diseño de % a los 28
N° MOLDEO 7 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-931 10/10/13 1.0 4" 17/10/13 CALLE #10 Y 29 - URB. PRIMAVERA. 32752 179.00 182.97 175.00

R-932 10/10/13 1.0 4" 17/10/13 REPOSICION DE VEREDAS Y SARDINELES 34210 179.00 191.12 175.00 187 107%

R-933 10/10/13 1.0 4" 07/11/13 CUADRAS 1 Y 6 RESPECTIVAMENTE 43782 43781.86 181 241.36 175.00

R-934 10/10/13 1.0 4" 07/11/13 44516 44515.80 179 248.55 175.00 245 140%

R-943 12/10/13 1.0 4" 19/10/13 AV. UNIVERSITARIA. 31244 177.90 175.62 175.00

R-944 12/10/13 1.0 4" 19/10/13 REPOSICION DE VEREDAS Y SARDINELES 32141 177.90 180.67 175.00 178 102%

R-945 12/10/13 1.0 4" 09/11/13 'CUADRAS 86 Y 87 39918 39918.45 181 220.06 175.00

R-946 12/10/13 1.0 4" 09/11/13 40836 40835.88 179 228.01 175.00 224 128%

R-971 16/10/13 1.0 4" 23/10/13 JR. LIBERTAD. - LIMA NORTE. 31916 177.90 179.41 175.00

R-972 16/10/13 1.0 4" 23/10/13 REPOSICION DE VEREDAS Y SARDINELES 35107 177.90 197.34 175.00 188 108%

R-973 16/10/13 1.0 4" 13/11/13 CUADRAS 9,10 Y 11 43741 43741.08 181 241.13 175.00

R-974 16/10/13 1.0 4" 13/11/13 44495 44495.41 179 248.44 175.00 245 140%

R-979 16/10/13 1.0 4" 23/10/13 CALLE 7 Y 31 - COOP. PRIMAVERA. 32548 177.90 182.96 175.00

R-980 16/10/13 1.0 4" 23/10/13 REPOSICION DE VEREDAS Y SARDINELES 31621 180.30 175.38 175.00 179 102%

R-981 16/10/13 1.0 4" 13/11/13 CUADRA 1 DE AMBAS CALLES 40296 40295.62 178 226.51 175.00

R-982 16/10/13 1.0 4" 13/11/13 40785 40784.91 177 230.81 175.00 229 131%

R-1007 18/10/13 1.0 4" 25/10/13 JR. BRUNO TERREROS. - 29949 185.00 161.89 175.00

R-1008 18/10/13 1.0 4" 25/10/13 REPOSICION DE VEREDAS Y SARDINELES 29572 176.70 167.36 175.00 165 94%

R-1009 18/10/13 1.0 4" 15/11/13 CUADRA - 1 36850 36850.15 184 200.16 175.00

R-1010 18/10/13 1.0 4" 15/11/13 39174 39174.31 183 214.54 175.00 207 118%

R-1011 18/10/13 1.0 4" 25/10/13 JR. BRESCIA. - LIMA NORTE 28155 180.30 156.16 175.00

R-1012 18/10/13 1.0 4" 25/10/13 REPOSICION DE VEREDAS Y SARDINELES 29898 177.90 168.06 175.00 162 93%

R-1013 18/10/13 1.0 4" 15/11/13 CUADRA - 1 34822 34821.61 178 195.74 175.00

R-1014 18/10/13 1.0 4" 15/11/13 35943 35942.92 178 202.04 175.00 199 114%

R-1015 21/10/13 1.0 4" 28/10/13 CALLE # 1 - A.A.H.H. 9 DE SETIEMBRE. - 20520 179.10 114.57 175.00

R-1016 21/10/13 1.0 4" 28/10/13 REPOSICION DE VEREDAS Y SARDINELES 20754 182.60 113.66 175.00 114 65%

R-1017 21/10/13 1.0 4" 18/11/13 CUADRA - 1 32365 32364.93 181 178.42 175.00

R-1018 21/10/13 1.0 4" 18/11/13 33721 33720.69 179 188.28 175.00 183 105%

43
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2


REGISTRO FECHA DE Resistencia
N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Diseño de % a los 28
N° MOLDEO 7 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-1019 22/10/13 1.0 4" 29/10/13 JR. LIBERTAD, JR. EL SOL Y JR. ATAHUALPA. - 32283 183.80 175.64 175.00

R-1020 22/10/13 1.0 4" 29/10/13 REPOSICION DE VEREDAS Y SARDINELES 30744 181.40 169.48 175.00 173 99%

R-1021 22/10/13 1.0 4" 19/11/13 CUADRA - 9 ; CUADRA - 1 39286 39286.44 177 222.33 175.00

R-1022 22/10/13 1.0 4" 19/11/13 39888 39887.87 177 225.74 175.00 224 128%

R-1023 22/10/13 1.0 4" 29/10/13 JR. SAN PEDRO. - LIMA NORTE 31152 183.80 169.49 175.00

R-1024 22/10/13 1.0 4" 29/10/13 REPOSICION DE VEREDAS Y SARDINELES 29633 181.40 163.36 175.00 166 95%

R-1025 22/10/13 1.0 4" 19/11/13 CUADRAS - 1 , 2 Y 3 . 37370 37370.03 177 211.49 175.00

R-1026 22/10/13 1.0 4" 19/11/13 35831 35830.78 177 202.78 175.00 207 118%

R-1027 22/10/13 1.0 4" 29/10/13 JR. LEOPOLDO MEZA Y JR. JOSE A. LÓPEZ. - 36575 177.90 205.59 175.00

R-1028 22/10/13 1.0 4" 29/10/13 REPOSICION DE VEREDAS Y SARDINELES 33598 182.60 184.00 175.00 195 111%

R-1029 22/10/13 1.0 4" 19/11/13 CUADRA - 1 Y 2 ; CUADRA - 3 . 40785 40784.91 178 229.26 175.00

R-1030 22/10/13 1.0 4" 19/11/13 40581 40581.04 183 222.24 175.00 226 129%

R-1039 23/10/13 1.0 4" 30/10/13 JR. HUASCAR. - LIMA NORTE 31845 183.80 173.26 175.00

R-1040 23/10/13 1.0 4" 30/10/13 REPOSICION DE VEREDAS Y SARDINELES 30234 180.30 167.69 175.00 170 97%

R-1041 23/10/13 1.0 4" 20/11/13 37054 37054.03 183 202.92 175.00

R-1042 23/10/13 1.0 4" 20/11/13 35637 35637.10 183 195.16 175.00 199 114%

R-1055 28/10/13 1.0 4" 04/11/13 AV. JOSE SUCRE. - 26147 183.80 142.26 175.00

R-1056 28/10/13 1.0 4" 04/11/13 REPOSICION DE VEREDAS Y SARDINELES 24118 180.30 133.77 175.00 138 79%

R-1057 28/10/13 1.0 4" 25/11/13 37054 37054.03 183 202.92 175.00

R-1058 28/10/13 1.0 4" 25/11/13 35637 35637.10 183 195.16 175.00 199 114%

R-1059 29/10/13 1.0 4" 05/11/13 JR. SAN MARTIN. - LIMA NORTE 28022 181.40 154.48 175.00

R-1060 29/10/13 1.0 4" 05/11/13 REPOSICION DE VEREDAS Y SARDINELES 27085 177.90 152.25 175.00 153 88%

R-1061 29/10/13 1.0 4" 26/11/13 CUADRA - 1 Y 2 ; CUADRA - 3 . 37054 37054.03 183 202.92 175.00

R-1062 29/10/13 1.0 4" 26/11/13 35637 35637.10 183 195.16 175.00 199 114%

R-1063 29/10/13 1.0 4" 05/11/13 AV. LORD COCHRANE. 28022 176.70 158.59 175.00

R-1064 29/10/13 1.0 4" 05/11/13 REPOSICION DE VEREDAS Y SARDINELES 27085 182.60 148.33 175.00 153 88%

R-1065 29/10/13 1.0 4" 26/11/13 CUADRA - 1 Y 2 ; CUADRA - 3 . 37054 37054.03 183 202.92 175.00

R-1066 29/10/13 1.0 4" 26/11/13 35637 35637.10 183 195.16 175.00 199 114%

44
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2


REGISTRO FECHA DE Resistencia
N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Diseño de % a los 28
N° MOLDEO 7 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-1071 30/10/13 1.0 4" 06/11/13 AV. GONZALES PRADA. 32783 181.40 180.72 175.00

R-1072 30/10/13 1.0 4" 06/11/13 REPOSICION DE VEREDAS Y SARDINELES 30561 179.10 170.63 175.00 176 100%

R-1073 30/10/13 1.0 4" 27/11/13 CUADRAS - 3 Y 4 37054 37054.03 183 202.92 175.00

R-1074 30/10/13 1.0 4" 27/11/13 35637 35637.10 183 195.16 175.00 199 114%

R-1079 31/10/13 1.0 4" 07/11/13 JR. HUARAZ. 23517 180.30 130.43 175.00

R-1080 31/10/13 1.0 4" 07/11/13 REPOSICION DE VEREDAS Y SARDINELES 24628 180.30 136.59 175.00 134 76%

R-1081 31/10/13 1.0 4" 28/11/13 CUADRAS 6 Y 10 37054 37054.03 183 202.92 175.00

R-1082 31/10/13 1.0 4" 28/11/13 35637 35637.10 183 195.16 175.00 199 114%

R-1083 31/10/13 1.0 4" 07/11/13 AV. GONZALES PRADA. - 23914 176.70 135.34 175.00

R-1084 31/10/13 1.0 4" 07/11/13 REPOSICION DE VEREDAS Y SARDINELES 21427 180.30 118.84 175.00 127 73%

R-1085 31/10/13 1.0 4" 28/11/13 CUADRAS - 9 Y 10 37054 37054.03 183 202.92 175.00

R-1086 31/10/13 1.0 4" 28/11/13 35637 35637.10 183 195.16 175.00 199 114%

R-1087 31/10/13 1.0 4" 07/11/13 CALLE # 2 - COOP. PRIMAVERA. - LIMA NORTE 30765 176.70 174.11 175.00

R-1088 31/10/13 1.0 4" 07/11/13 REPOSICION DE VEREDAS Y SARDINELES 32640 180.30 181.03 175.00 178 101%

R-1089 31/10/13 1.0 4" 28/11/13 CUADRA 1 37054 37054.03 183 202.92 175.00

R-1090 31/10/13 1.0 4" 28/11/13 35637 35637.10 183 195.16 175.00 199 114%

R-1091 05/11/13 1.0 4" 12/11/13 AV. GONZALES PRADA. - 27360 177.90 153.79 175.00

R-1092 05/11/13 1.0 4" 12/11/13 REPOSICION DE VEREDAS Y SARDINELES 28400 177.90 159.64 175.00 157 90%

R-1093 05/11/13 1.0 4" 03/12/13 CUADRA - 1 Y ORQIDEAS - CUADRA - 1 37054 37054.03 183 202.92 175.00

R-1094 05/11/13 1.0 4" 03/12/13 35637 35637.10 183 195.16 175.00 199 114%

R-1095 05/11/13 1.0 4" 12/11/13 AV. LOS INCAS. - LIMA NORTE 34302 183.80 186.63 175.00

R-1096 05/11/13 1.0 4" 12/11/13 REPOSICION DE VEREDAS Y SARDINELES 35688 176.70 201.97 175.00 194 111%

R-1097 05/11/13 1.0 4" 03/12/13 CUADRA - 1,2 37054 37054.03 183 202.92 175.00

R-1098 05/11/13 1.0 4" 03/12/13 35637 35637.10 183 195.16 175.00 199 114%

R-1099 05/11/13 1.0 4" 12/11/13 AV. 3 DE OCTUBRE 30622 176.70 173.30 175.00

R-1100 05/11/13 1.0 4" 12/11/13 REPOSICION DE VEREDAS Y SARDINELES 29694 181.40 163.69 175.00 168 96%

R-1101 05/11/13 1.0 4" 03/12/13 CUADRA - 1,2 Y3 37054 37054.03 183 202.92 175.00

R-1102 05/11/13 1.0 4" 03/12/13 35637 35637.10 183 195.16 175.00 199 114%

45
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2


REGISTRO FECHA DE Resistencia
N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Diseño de % a los 28
N° MOLDEO 7 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-1103 05/11/13 1.0 4" 12/11/13 AV. MANUEL GONZALES PRADAY ORQUIDEAS. 32253 180.30 178.88 175.00

R-1104 05/11/13 1.0 4" 12/11/13 REPOSICION DE VEREDAS Y SARDINELES 31223 182.60 170.99 175.00 175 100%

R-1105 05/11/13 1.0 4" 03/12/13 CUADRA - 1 . LAS ORQUIDEAS CUADRA - 1 37054 37054.03 183 202.92 175.00

R-1106 05/11/13 1.0 4" 03/12/13 35637 35637.10 183 195.16 175.00 199 114%

R-1107 06/11/13 1.0 4" 13/11/13 CALLE # 2 - COOP. PRIMAVERA. 31050 180.30 172.21 175.00

R-1108 06/11/13 1.0 4" 13/11/13 REPOSICION DE VEREDAS Y SARDINELES 33078 182.60 181.15 175.00 177 101%

R-1109 06/11/13 1.0 4" 04/12/13 CUADRA - 1 . LAS ORQUIDEAS CUADRA - 1 37054 37054.03 183 202.92 175.00

R-1110 06/11/13 1.0 4" 04/12/13 35637 35637.10 183 195.16 175.00 199 114%

R-1111 07/11/13 1.0 4" 14/11/13 AV. 3 DE OCTUBRE. - LIMA NORTE 30224 179.10 168.76 175.00

R-1112 07/11/13 1.0 4" 14/11/13 REPOSICION DE VEREDAS Y SARDINELES 30520 179.10 170.41 175.00 170 97%

R-1113 07/11/13 1.0 4" 05/12/13 CUADRAS - 5 , 6 Y 7 . 37054 37054.03 183 202.92 175.00

R-1114 07/11/13 1.0 4" 05/12/13 35637 35637.10 183 195.16 175.00 199 114%

R-1115 07/11/13 1.0 4" 14/11/13 CALLE # 30 - COOP. PRIMAVERA. 31244 179.10 174.45 175.00

R-1116 07/11/13 1.0 4" 14/11/13 REPOSICION DE VEREDAS Y SARDINELES 32171 179.10 179.63 175.00 177 101%

R-1117 07/11/13 1.0 4" 05/12/13 CUADRA - 1 . 37054 37054.03 183 202.92 175.00

R-1118 07/11/13 1.0 4" 05/12/13 35637 35637.10 183 195.16 175.00 199 114%

R-1123 08/11/13 1.0 4" 15/11/13 JR. LOS FUNDADORES Y JR. LIBERTAD. - LIM 28940 179.10 161.58 175.00

R-1124 08/11/13 1.0 4" 15/11/13 REPOSICION DE VEREDAS Y SARDINELES 30714 176.70 173.82 175.00 168 96%

R-1125 08/11/13 1.0 4" 06/12/13 'CUADRAS - 2 Y LIBERTAD CUADRA - 8 . 37054 37054.03 183 202.92 175.00

R-1126 08/11/13 1.0 4" 06/12/13 35637 35637.10 183 195.16 175.00 199 114%

R-1131 08/11/13 1.0 4" 15/11/13 CALLE 9 - COOP. PRIMAVERA. - LIMA NORTE. 31040 178.00 174.38 175.00

R-1132 08/11/13 1.0 4" 15/11/13 REPOSICION DE VEREDAS Y SARDINELES 30387 169.70 179.07 175.00 177 101%

R-1133 08/11/13 1.0 4" 06/12/13 'CUADRAS - 2 Y LIBERTAD CUADRA - 8 . 37054 37054.03 183 202.92 175.00

R-1134 08/11/13 1.0 4" 06/12/13 35637 35637.10 183 195.16 175.00 199 114%

R-1135 09/11/13 1.0 4" 16/11/13 JR. JOSÉ OLAYA Y JR. LIBERTAD. - LIMA NORT 28970 177.90 162.85 175.00

R-1136 09/11/13 1.0 4" 16/11/13 REPOSICION DE VEREDAS Y SARDINELES 27584 181.40 152.06 175.00 157 90%

R-1137 09/11/13 1.0 4" 07/12/13 CUADRAS - 1 Y LIBERTAD CUADRA - 5 Y 6 . 37054 37054.03 183 202.92 175.00

R-1138 09/11/13 1.0 4" 07/12/13 35637 35637.10 183 195.16 175.00 199 114%

46
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2


REGISTRO FECHA DE Resistencia
N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Diseño de % a los 28
N° MOLDEO 7 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-1139 11/11/13 1.0 4" 18/11/13 AV. TUPAC AMARU Y JR. HERNANDO DE LA VAL 31244 176.70 176.82 175.00

R-1140 11/11/13 1.0 4" 18/11/13 REPOSICION DE VEREDAS Y SARDINELES 30387 177.90 170.81 175.00 174 99%

R-1141 11/11/13 1.0 4" 09/12/13 CUADRA 43 Y LA VALLE CUADRA - 1 37054 37054.03 183 202.92 175.00

R-1142 11/11/13 1.0 4" 09/12/13 35637 35637.10 183 195.16 175.00 199 114%

R-1143 13/11/13 1.0 4" 20/11/13 CALLE 4 Y CALLE 30 - COOP. PRIMAVERA. - L 30683 183.80 166.94 175.00

R-1144 13/11/13 1.0 4" 20/11/13 REPOSICION DE VEREDAS Y SARDINELES 31019 179.10 173.20 175.00 170 97%

R-1145 13/11/13 1.0 4" 11/12/13 CUADRA - 1 DE AMBAS CALLES . 37054 37054.03 183 202.92 175.00

R-1146 13/11/13 1.0 4" 11/12/13 35637 35637.10 183 195.16 175.00 199 114%

R-1147 13/11/13 1.0 4" 20/11/13 CALLES 17 , 18 Y 20 - URB. EL PINAR. - LIMA 25729 183.80 139.98 175.00

R-1148 13/11/13 1.0 4" 20/11/13 REPOSICION DE VEREDAS Y SARDINELES 27941 179.10 156.01 175.00 148 85%

R-1149 13/11/13 1.0 4" 11/12/13 'CUADRA - 1 DE LAS CALLES MENCIONADAS . 37054 37054.03 183 202.92 175.00

R-1150 13/11/13 1.0 4" 11/12/13 35637 35637.10 183 195.16 175.00 199 114%

R-1159 13/11/13 1.0 4" 20/11/13 PSJE. VALENCIA. - LIMA NORTE. 27278 181.40 150.38 175.00

R-1160 13/11/13 1.0 4" 20/11/13 REPOSICION DE VEREDAS Y SARDINELES 30326 179.10 169.33 175.00 160 91%

R-1161 13/11/13 1.0 4" 11/12/13 'CUADRA - 1 DE LAS CALLES MENCIONADAS . 37054 37054.03 183 202.92 175.00

R-1161 13/11/13 1.0 4" 11/12/13 35637 35637.10 183 195.16 175.00 199 114%

47
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2


REGISTRO FECHA DE Resistencia
N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Diseño de % a los 28
N° MOLDEO 7 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

GRAFICA RESISTENCIA REAL ALCANZADA(A LOS 28 DIAS) VS RESISTENCIA REFERENCIAL

RESISTENCIA DEL CONCRETO EN FUNCION DE SU EDAD

(REFERENCIAL)
DIAS RESISTENCIA(%F'C)

3 42 - 53%

7 70 - 85%

14 85 - 95%

28 100 - 120%

REAL REFERENCIAL
REGISTRO 28 DIAS(KG/CM2) 28 DIAS(KG/CM2)
REAL
R-813 290
266 175 RFERENCIAL
R-817 260 175
270
R-821 186 175
R-825 225 175 250
R-829 213 175
R-833
230
241 175
R-837 241 175 KG/CM2
210
R-841 211 175
R-851 281 175 190
R-867 276 175
170
R-871 275 175
R-879 253 175 150
R-887 235 175 13 81
7
82
1
82
5
82
9
83
3
83
7
84
1
85
1 67 87
1
87
9
88
7
89
1
89
9
90
3 15 91
9
92
3
93
1 00 97
1
97
9 07 11 .0
0
.0
0
.0
0
02
7 39
R-
8
R- R- R- R- R- R- R- R- R-
8
R- R- R- R- R- R- R-
9
R- R- R- 3. R- R- 10 10 15 19 23 R-1 10
R-891 94 R- R- 10 10 10 R-
249 175

REGISTROS
48
270

250

230

KG/CM2
210
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS
190

170
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

150 FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2


REGISTRO FECHA DE
N° PROBETAS
81
SLUMP3
81
7
82
1
82
5 29 83
3
83
7DESCRIPCION
84
1
85
1 / 6PROGRESIVA
7
87
1
87
9 7 91
88 7-8Dias
9 3
89 28-90Dias -91
5Area 1(cm2)
9 3 31
92 7-9Dias 00 97
1 9
97 Diseño
00
7 de11 promedio
00 .0
0
Resistencia
00 %02a7 los028
39
N° MOLDEO
R- R- R7- DiasR- -8 Dias
R28 R- R- R- R- R-
8
R- R- R- R- R-
9
R- 3. R-
R-28 Dias 10
1Concreto 5. 3.
19 a 2los 1 1
R R R R 94 R- R-
1 0 1
10 dias10
28 R- diasR-

R-899 212 175


R-903 REGISTROS
208 175
R-915 189 175
R-919 230 175
R-923 234 175
R-931 245 175
943.00 224 175
R-971 245 175
R-979 229 175
R-1007 207 175
R-1011 199 175
1015.00 183 175
1019.00 224 175
1023.00 207 175
R-1027 226 175
R-1039 199 175

49
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2


REGISTRO FECHA DE Resistencia
N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Diseño de % a los 28
N° MOLDEO 7 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

GRAFICA RESISTENCIA REAL ALCANZADA( A LOS 7 DIAS) VS RESISTENCIA REFERENCIAL

REAL REFERENCIAL
REGISTRO 7 DIAS(KG/CM2) (70-85%) F'C (KG/CM2)
R-1055 138 122.5
R-1059 200
153 122.5
R-1063 153 122.5
190
R-1079 134 122.5
RESISTENCIA REAL
R-1083 127 122.5
KG/CM2
180 RESISTENCIA REFERENCIAL
R-1087 178 122.5
R-1091 157 122.5 170
R-1095 194 122.5
R-1099 168 122.5 160
R-1103 175 122.5
R-1111 170 122.5 150

R-1115 177 122.5


R-1123
140
168 122.5
R-1131 177 122.5
130
R-1135 157 122.5
R-1139 174 122.5
120
R-1143 170 122.5
R-1147 148 122.5 110
R-1159 160 122.5
100
R-1055 R-1059 R-1063 R-1079 R-1083 R-1087 R-1091 R-1095 R-1099 R-1103 R-1111 R-1115 R-1123 R-1131 R-1135 R-1139 R-1143 R-1147 R-1159
REGISTROS

50
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=280KG/CM2 PAVIMENTO RIGIDO

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2

REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
7 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-193 19/01/13 1.0 3 3/4" 26/01/13 Av. Bolognesi con AV. Tupac Amaru 45056 176.00 256.00 280.00

R-194 19/01/13 1.0 3 3/4" 26/01/13 Primer Tramo 45056 176.00 256.00 280.00

R-195 19/01/13 1.0 3 3/4" 16/02/13 58410.00 179.00 326.31 280.00

R-196 19/01/13 1.0 3 3/4" 16/02/13 51784.00 179.00 289.30 280.00 308 110%

R-197 20/01/13 1.0 3 3/4" 27/01/13 Av. Bolognesi con AV. Tupac Amaru 41998 176.00 238.63 280.00

R-198 20/01/13 1.0 3 3/4" 27/01/13 Segundo Tramo 40265 176.00 228.78 280.00

R-199 20/01/13 1.0 3 3/4" 17/02/13 55556.00 179.00 310.37 280.00

R-200 20/01/13 1.0 3 3/4" 17/02/13 56065.00 179.00 313.21 280.00 312 111%

R-480 14/06/13 1.0 3 3/4" 21/06/13 PSJ 17 COOP. AÑO NUEVO 48797 181.00 269.60 280.00

R-481 14/06/13 1.0 3 3/4" 21/06/13 PAVIMENTO RIRIDO 48002 181.00 265.20 280.00

R-482 14/06/13 1.0 3 3/4" 12/07/13 LOSA 65545.00 181.00 362.13 280.00

R-483 14/06/13 1.0 3 3/4" 12/07/13 64760.00 181.00 357.79 280.00 360 129%

R-488 15/06/13 1.0 4" 22/06/13 PSJ 14 COOP. SANGARARA 47900 181.00 264.64 280.00

R-489 15/06/13 1.0 4" 22/06/13 PAVIMENTO RIRIDO 46932 181.00 259.29 280.00

R-490 15/06/13 1.0 4" 13/07/13 LOSA 54975.00 181.00 303.73 280.00

R-491 15/06/13 1.0 4" 13/07/13 52987.00 181.00 292.75 280.00 298 107%

R-983 17/10/13 1.0 4" 24/10/13 PSJE. EL CARMEN. - LIMA NORTE. 43099 183.80 234.49 280.00

R-984 17/10/13 1.0 4" 24/10/13 PAVIMENTO RIRIDO 45943 177.90 258.25 280.00

R-985 17/10/13 1.0 4" 14/11/13 CUADRA 1 50611.62 177.90 284.49 280.00

R-896 17/10/13 1.0 4" 14/11/13 49898.06 177.90 280.48 280.00 282 101%

R-1047 24/10/13 1.0 4" 31/10/13 PSJE. EL CARMEN. - LIMA NORTE 40102 183.80 218.18 280.00

R-1048 24/10/13 1.0 4" 31/10/13 PAVIMENTO RIRIDO 38563 177.90 216.77 280.00 217 78%

R-1049 24/10/13 1.0 4" 21/11/13 CUADRA 1 50611.62 177.90 284.49 280.00

R-1050 24/10/13 1.0 4" 21/11/13 49898.06 177.90 280.48 280.00 282 101%

380
RESISTENCIA REAL
360 51
RESISTENCIA REFERENCIAL

340
FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2

REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
7 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias
380
RESISTENCIA REAL
360
RESISTENCIA REFERENCIAL

340

320

GRAFICA RESISTENCIA REAL ALCANZADA(A LOS 28 DIAS) VS RESISTENCIA REFERENCIAL


300
RESISTENCIA DEL CONCRETO EN FUNCION DE SU EDAD

(REFERENCIAL) 280
DIAS RESISTENCIA(%F'C)

3 42 - 53% 260

7 70 - 85%
240
14 85 - 95% R-193 R-197 R-480 R-488 R-983
28 100 - 120%

REAL REFERENCIAL
REGISTRO 28 DIAS(KG/CM2) 28 DIAS(KG/CM2)
R-193 308 280
R-197 312 280
R-480 360 280
R-488 298 280
R-983 282 280

52
FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2

REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
7 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

GRAFICA RESISTENCIA REAL ALCANZADA( A LOS 7 DIAS) VS RESISTENCIA TEORICA

8
REAL TEORICA 12
1 2
REGISTRO 7 DIAS(KG/CM2) (70-85%) F'C (KG/CM2) 1
96
R-173,174,175,176 #REF! 122.5
80
64 REAL
TEORIC
48 A

32
16
0
R-173,174,175,176
REGISTROS

53
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=245KG/CM2 REHABILITACION DE BUZONES

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2

REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
7 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-340 29/04/13 1.0 4 1/2" 06/05/13 JR. LORD COCRHANE 40265 176.00 228.78 245.00

R-341 29/04/13 1.0 4 1/2" 06/05/13 BUZON #4775 39755 176.00 225.88 245.00 227 93%

R-342 29/04/13 1.0 4 1/2" 27/05/13 59633.00 179.00 333.15 245.00

R-344 29/04/13 1.0 4 1/2" 27/05/13 60143.00 179.00 335.99 245.00 335 137%

R-386 13/05/13 1.0 4" 20/05/13 AV. JOSE GONZALES PRADA 32416 179.00 181.09 245.00

R-387 13/05/13 1.0 4" 20/05/13 BUZON BR-4814 Y 4810 32416 179.00 181.09 245.00 181 74%

R-388 13/05/13 1.0 4" 10/06/13 51886.00 181.00 286.66 245.00

R-389 13/05/13 1.0 4" 10/06/13 51886.00 181.00 286.66 245.00 287 117%

350
GRAFICA RESISTENCIA REAL ALCANZADA(A LOS 28 DIAS) VS RESISTENCIA REFERENCIAL
330
RESISTENCIA DEL CONCRETO EN FUNCION DE SU EDAD
310
(REFERENCIAL)

DIAS RESISTENCIA(%F'C) 290


REAL
3 42 - 53% 270
KG/CM2
7 70 - 85% REFERENCIAL
250
14 85 - 95%
230
28 100 - 120% A LOS 14 DIAS
210

190
REAL REFERENCIAL
REGISTRO 28 DIAS(KG/CM2) 28 DIAS(KG/CM2) 170
R-340 AL 344 335 245 150
R-386 AL 389 R-340 AL 344 R-386 AL 389
287 245

REGISTROS

54
FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2

REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
7 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

GRAFICA RESISTENCIA REAL ALCANZADA( A LOS 7 DIAS) VS RESISTENCIA TEORICA

8
REAL TEORICA 12
1 2
REGISTRO 7 DIAS(KG/CM2) (70-85%) F'C (KG/CM2) 1
96
R-173,174,175,176 #REF! 122.5
80
64 REAL
TEORIC
48 A

32
16
0
R-173,174,175,176
REGISTROS

55
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=140 KG/CM2 RECUBRIMIENTO DE TUBERIA

PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado

FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2

REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
7 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias

R-444 04/06/13 1.0 4" 11/06/13 AV. CESAR VALLEJO 23445 181.00 129.53 140.00

R-445 04/06/13 1.0 4" 11/06/13 RECUBRIMIENTO DE TUBERIA 23140 181.00 127.85 140.00 129 92%

R-446 04/06/13 1.0 4" 02/07/13 BR-3599 AL BR-3611 58410.00 179.00 326.31 280.00

R-447 04/06/13 1.0 4" 02/07/13 51784.00 179.00 289.30 280.00 308 110%

GRAFICA RESISTENCIA REAL ALCANZADA(A LOS 7 DIAS) VS RESISTENCIA REFERENCIAL

RESISTENCIA DEL CONCRETO EN FUNCION DE SU EDAD

(REFERENCIAL)

DIAS RESISTENCIA(%F'C) 350

3 42 - 53% 330
7 70 - 85% 310 REAL
14 85 - 95% REFERENCIAL
290
Column A
28 100 - 120% KG/CM2
A LOS 14 DIAS
270

250
REAL REFERENCIAL
REGISTRO 28 DIAS(KG/CM2) 28 DIAS(KG/CM2) 230

R-340 AL 344 129 98 210


R-386 AL 389 129 98 190

170

150
R-340 AL 344 R-386 AL 389
REGISTROS
GRAFICA RESISTENCIA REAL ALCANZADA( A LOS 7 DIAS) VS RESISTENCIA TEORICA

8
REAL TEORICA 12
2
REGISTRO 7 DIAS(KG/CM2) (70-85%) F'C (KG/CM2) 11
96
R-173,174,175,176 #REF! 122.5
80
64 REAL
TEORIC
48 A

32
16
0
R-173,174,175,176
REGISTROS