PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias
R-1 29/11/12 1.0 3 3/4" 13/12/12 27/12/12 Solado de Buzones 3,4,5,6 39730 0 179.00 221.96 0.00 100.00
R-2 Av. Bolognesi 46585 181.00 0.00 257.38 100.00 257 257%
R-3 30/11/12 1.0 3 3/4" 14/12/12 28/12/12 Losa de fondo de buzones 4,5,6 49853 179.00 278.51 210.00
R-4 30/11/12 1.0 3 3/4" 14/12/12 28/12/12 Av. Bolognesi 45893 181.00 253.55 210.00
R-6 30/11/12 1.0 3 3/4" 28/12/12 65036 181.00 359.31 210.00 358 170%
R-7 01/12/12 1.0 3 3/4" 15/12/12 29/12/12 Fuste de Buzones 4y 5, Losa de Fondo Bz 09 54209 181.00 299.50 210.00
R-8 01/12/12 1.0 3 3/4" 15/12/12 29/12/12 Av. Bolognesi 52061 197.00 264.27 210.00
R-10 01/12/12 1.0 3 3/4" 29/12/12 63279 179.00 353.51 210.00 355 169%
R-11 03/12/12 1.0 3 3/4" 17/12/12 31/12/12 Fuste Bz -3 (1° Parte)-Fuste Bz-6 51080 181.00 282.21 210.00
R-12 03/12/12 1.0 3 3/4" 17/12/12 31/12/12 Av. Bolognesi 51629 181.00 285.24 210.00
R-14 03/12/12 1.0 3 3/4" 31/12/12 64630 179.00 361.06 210.00 357 170%
R-15 04/12/12 1.0 3 3/4" 11/12/12 Fuste(parte II) Bz 03 49359 177.00 278.86 210.00
R-16 04/12/12 1.0 3 3/4" 11/12/12 Av. Bolognesi 45361 179.00 253.41 210.00
R-18 04/12/12 1.0 3 3/4" 01/01/13 63305 181.00 349.75 210.00 354 169%
R-19 05/12/12 1.0 3 3/4" 12/12/12 Fuste (parte III) Bz 03 y Techo Bz 05,06 46201 177.00 261.02 210.00
R-22 05/12/12 1.0 3 3/4" 02/01/13 63713 179.00 355.94 210.00 358 170%
R-23 06/12/12 1.0 3 3/4" 13/12/12 Techo Bz 03 y Fuste Bz 04 44362 181.00 245.09 210.00
R-26 06/12/12 1.0 3 3/4" 03/01/13 58919 179.00 329.16 210.00 342 163%
R-27 07/12/12 1.0 3 3/4" 14/12/12 Buzon 04 42429 181.00 234.41 210.00
R-28 07/12/12 1.0 3 3/4" 14/12/12 Av. Bolognesi-Año Nuevo 35441 179.00 197.99 210.00
1
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=210KG/CM2,BUZONES
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias
R-30 07/12/12 1.0 3 3/4" 04/01/13 59633 179.00 355.34 210.00 355 169%
R-31 18/12/12 1.0 3 3/4" 01/01/13 Losa BZ 415A Y Fuste 48930 179.00 273.35 210.00
R-32 18/12/12 1.0 3 3/4" 01/01/13 Av. Bolognesi 54944 179.00 306.95 210.00
R-34 18/12/12 1.0 3 3/4" 15/01/13 60347 179.00 337.13 210.00 335 160%
R-35 19/12/12 1.0 3 3/4" 02/01/13 Encimado Fuste 58206 181.00 321.58 210.00
R-36 19/12/12 1.0 3 3/4" 02/01/13 BZ 4158A 56983 179.00 318.34 210.00
R-38 19/12/12 1.0 3 3/4" 16/01/13 57696 179.00 322.33 210.00 355 169%
R-39 20/12/12 1.0 3 3/4" 03/01/13 Techo BZ 07 y BZ-4258A 57696 179.00 322.33 210.00
R-42 20/12/12 1.0 3 3/4" 17/01/13 64220 181.00 354.81 210.00 370 176%
R-43 20/12/12 1.0 4 1/2" 03/01/13 Meia caña BZ. 4-BZ .5 42100 179.00 235.19 210.00
R-46 20/12/12 1.0 4 1/2" 17/01/13 48420 179.00 270.50 210.00 266 127%
R-47 04/01/13 1.0 4 1/2" 11/01/13 Falso Solado BZ. 7A 42100 179.00 235.19 210.00
R-50 04/01/13 1.0 4 1/2" 01/02/13 38736 179.00 216.40 210.00 265 126%
R-51 04/01/13 1.0 4 1/2" 11/01/13 Losa de fondo BZ 7A 31498 179.00 175.97 210.00
R-54 04/01/13 1.0 4 1/2" 01/02/13 51172 181.00 282.72 210.00 282 134%
R-55 04/01/13 1.0 4 1/2" 11/01/13 Cuerpo BZ 7A 40163 179.00 224.37 210.00
R-58 04/01/13 1.0 4 1/2" 01/02/13 59735 177.00 337.49 210.00 358 170%
2
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=210KG/CM2,BUZONES
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias
R-59 05/01/13 1.0 4 1/2" 12/01/13 Enimamado(Muro) BZ.7A 39653 177.00 224.03 210.00
R-62 05/01/13 1.0 4 1/2" 02/02/13 54230 181.00 299.61 210.00 307 146%
R-63 07/01/13 1.0 4 1/2" 14/01/13 Solado de BZ 23 30989 179.00 173.12 210.00
R-64 07/01/13 1.0 4 1/2" 14/01/13 41794 181.00 230.91 210.00 231 110%
R-65 08/01/13 1.0 4 1/2" 15/01/13 Losa de fondo BZ.21- BZ.23 35372 179.00 197.61 210.00
R-68 08/01/13 1.0 4 1/2" 05/02/13 45260 181.00 250.06 210.00 249 118%
R-69 09/01/13 1.0 4 1/2" 16/01/13 Losa de fondo y cuerpo BZ.31A 35372 179.00 197.61 210.00
R-72 09/01/13 1.0 4 1/2" 06/02/13 42304 179.00 236.34 210.00 248 118%
R-73 10/01/13 1.0 4 1/2" 17/01/13 2dO Cuerpo-Buzon 31A 37411 179.00 209.00 210.00
R-76 10/01/13 1.0 4 1/2" 07/02/13 45872 181.00 253.44 210.00 237 113%
R-77 10/01/13 1.0 4 1/2" 17/01/13 2dO Cuerpo BZ.21-BZ .23 36493 181.00 201.62 210.00
R-80 10/01/13 1.0 4 1/2" 07/02/13 41692 179.00 232.92 210.00 249 119%
R-81 11/01/13 1.0 4 1/2" 18/01/13 Techo BZ.21-BZ.23 38226 179.00 213.55 210.00
R-84 11/01/13 1.0 4 1/2" 08/02/13 55250 180.00 306.94 210.00 302 144%
R-85 15/01/13 1.0 4 1/2" 22/01/13 1ro Cuerpo BZ.21-BZ .23 41284 181.00 228.09 210.00
3
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=210KG/CM2,BUZONES
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias
R-88 15/01/13 1.0 4 1/2" 12/02/13 51988 179.00 290.44 210.00 280 133%
R-90 14/01/13 1.0 4 1/2" 21/01/13 BZ.24- BZ.26 41896 179.00 234.06 210.00
R-92 14/01/13 1.0 4 1/2" 11/02/13 44343 179.00 247.73 210.00 240 114%
R-96 15/01/13 1.0 4 1/2" 12/02/13 41998 179.00 234.63 210.00 237 113%
R-98 16/01/13 1.0 4 1/2" 23/01/13 BZ.22,24,28 42100 181.00 232.60 210.00
R-100 16/01/13 1.0 4 1/2" 13/02/13 57696 179.00 322.32 210.00 317 151%
R-102 17/01/13 1.0 3 1/2" 24/01/13 BZ.22,27,28,30,32 29052 181.00 160.51 210.00
R-104 17/01/13 1.0 3 1/2" 14/02/13 40556 179.00 226.57 210.00 236 112%
R-105 18/01/13 1.0 3 3/4" 25/01/13 Techo/Cuerpo/Losa de fondo 27421 181.00 151.50 210.00
R-106 18/01/13 1.0 3 3/4" 25/01/13 BZ.26,29,32 29052 181.00 160.51 210.00
R-108 18/01/13 1.0 3 3/4" 15/02/13 45566 179.00 254.56 210.00 254 121%
R-109 21/01/13 1.0 4 1/2" 28/01/13 2do Cuerpo BZ 28,29 26606 181.00 146.99 210.00
R-110 21/01/13 1.0 4 1/2" 28/01/13 Techo BZ.30 28848 181.00 159.38 210.00
R-112 21/01/13 1.0 4 1/2" 18/02/13 42813 179.00 239.18 210.00 242 115%
R-113 25/01/13 1.0 4 3/4" 01/02/13 Buzon N° 16/Buzon N° 27 30889 179.00 172.56 210.00
R-114 25/01/13 1.0 4 3/4" 01/02/13 Muro Total / Losa de fondo 31804 181.00 175.71 210.00
R-116 25/01/13 1.0 4 3/4" 22/02/13 47604 181.00 263.01 210.00 270 128%
4
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=210KG/CM2,BUZONES
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias
R-121 02/01/13 1.0 3 1/2" 09/01/13 Buzon N° 20 32212 179.00 179.96 210.00
R-122 02/01/13 1.0 3 1/2" 09/01/13 1° cuerpo 37717 181.00 208.38 210.00
R-124 02/01/13 1.0 3 1/2" 30/01/13 44036.70 181.00 243.30 210.00 252 120%
R-125 06/02/13 1.0 3 1/2" 13/02/13 Buzon N° 17/Buzon 18-19 28338 181.00 156.56 210.00
R-126 06/02/13 1.0 3 1/2" 13/02/13 2° Cuerpo /Dados de anclaje 31498 179.00 175.97 210.00
R-128 06/02/13 1.0 3 1/2" 06/03/13 49643 179.00 277.34 210.00 289 138%
R-129 07/02/13 1.0 4" 14/02/13 JR. VENUS / JR NEPTUNO - Lima Norte 23445 181.00 129.53 210.00
R-130 07/02/13 1.0 4" 14/02/13 BUZON 11 24057 179.00 134.40 210.00
R-131 07/02/13 1.0 4" 07/03/13 PRIMER CUERPO 47503 181.00 262.45 210.00
R-132 07/02/13 1.0 4" 07/03/13 46381 181.00 256.25 210.00 259 123%
R-137 14/02/13 1.0 3 1/2" 21/02/13 Buzon N° 14 38124 181.00 210.63 210.00
R-138 14/02/13 1.0 3 1/2" 21/02/13 1 ° Cuerpo 39246 179.00 219.25 210.00
R-140 14/02/13 1.0 3 1/2" 14/03/13 50357 178.00 282.90 210.00 279 133%
R-145 06/02/13 1.0 3 1/2" 13/02/13 JR. VENUS / JR. JUPITER - Lima Norte 25688 179.00 143.51 210.00
R-146 06/02/13 1.0 3 1/2" 13/02/13 BUZON 12 26606 179.00 148.64 210.00
R-147 06/02/13 1.0 3 1/2" 06/03/13 2° CUERPO 38328.24 179 214.12 210.00
R-148 06/02/13 1.0 3 1/2" 06/03/13 37512.74 179 209.57 210.00 212 101%
R-149 06/02/13 1.0 3 1/2" 13/02/13 JR. VENUS / JR. JUPITER - Lima Norte 25688 179.00 143.51 210.00
R-150 06/02/13 1.0 3 1/2" 13/02/13 BUZON 12 / BUZON 11 26606 179.00 148.64 210.00
R-151 06/02/13 1.0 3 1/2" 06/03/13 TECHO BUZON / CUERPO BUZON 46788.99 179 261.39 210.00
R-152 06/02/13 1.0 3 1/2" 06/03/13 45565.75 179 254.56 210.00 258 123%
R-157 19/02/13 1.0 3 1/2" 26/02/13 JR. MANUEL VILLARAN - Lima Norte 35882 179.00 200.46 210.00
R-158 19/02/13 1.0 3 1/2" 26/02/13 DADOS DE ANCLAJE - BUZON 39246 179.00 219.25 210.00
R-160 19/02/13 1.0 3 1/2" 19/03/13 55657.49 179 310.94 210.00 310 148%
R-161 23/02/13 1.0 3 1/2" 02/03/13 JR. TOMAS GARRIDO - Lima Norte 41692 179.00 232.92 210.00
5
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=210KG/CM2,BUZONES
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias
R-162 23/02/13 1.0 3 1/2" 02/03/13 BUZON 18 - 19 41692 179.00 232.92 210.00
R-163 23/02/13 1.0 3 1/2" 23/03/13 TECHO DE BUZON 51885.83 179 289.86 210.00
R-164 23/02/13 1.0 3 1/2" 23/03/13 45565.75 179 254.56 210.00 272 130%
R-165 01/03/13 1.0 3 1/2" 08/03/13 BUZON 13 - 15 29766 179.00 166.29 210.00
R-166 01/03/13 1.0 3 1/2" 08/03/13 CUERPO DE BUZON 30887 181.00 170.65 210.00 168 80%
R-168 01/03/13 1.0 3 1/2" 29/03/13 38022.00 179 212.41 210.00 212 101%
R-169 02/03/13 1.0 3 1/2" 09/03/13 JR. JUPITER / JR. JUAN VELASCO - Lima Norte 23140 179.00 129.27 210.00
R-170 02/03/13 1.0 3 1/2" 09/03/13 BUZON 13 - 15 21814 181.00 120.52 210.00
R-171 02/03/13 1.0 3 1/2" 30/03/13 2° CUERPO DE BUZON 37717.00 176 214.30 210.00
R-172 02/03/13 1.0 3 1/2" 30/03/13 40469.00 182 222.36 210.00 218 104%
R-177 08/03/13 1.0 4 1/4" 15/03/13 JR. JUAN PEÑA - Lima Norte 21407 179.00 119.59 210.00
R-178 08/03/13 1.0 4 1/4" 15/03/13 BUZON 25 21814 181.00 120.52 210.00
R-179 08/03/13 1.0 4 1/4" 05/04/13 2° CUERPO DE BUZON 37309.00 176 211.98 210.00
R-180 08/03/13 1.0 4 1/4" 05/04/13 38226.00 179 213.55 210.00 213 101%
R-185 15/03/13 1.0 3 1/2" 22/03/13 JR. JUAN PEÑA - Lima Norte 32314 179.00 180.52 210.00
R-186 15/03/13 1.0 3 1/2" 22/03/13 BUZON 25 30785 181.00 170.08 210.00
R-188 15/03/13 1.0 2 1/2" 12/04/13 44852.00 181 247.80 210.00 252 120%
R-189 16/03/13 1.0 3 1/4" 23/03/13 JR. ANGEL MORALES - Lima Norte 26504 176.00 150.59 210.00
R-190 16/03/13 1.0 3 1/4" 23/03/13 BUZON 3963 27013 181.00 149.24 210.00
R-191 16/03/13 1.0 3 1/4" 13/04/13 CUERPO 38736.00 179 216.40 210.00
R-192 16/03/13 1.0 3 1/4" 13/04/13 39144.00 181 216.27 210.00 216 103%
R-189 16/03/13 1.0 3 1/4" 23/03/13 JR. ANGEL MORALES - Lima Norte 26504 176.00 150.59 210.00
R-190 16/03/13 1.0 3 1/4" 23/03/13 BUZON 3963 27013 181.00 149.24 210.00
R-191 16/03/13 1.0 3 1/4" 13/04/13 CUERPO 38736.00 179 216.40 210.00
R-192 16/03/13 1.0 3 1/4" 13/04/13 39144.00 181 216.27 210.00 216 103%
R-201 21/03/13 1.0 2 1/2" 28/03/13 JR. TOMAS GARRIDO - Lima Norte 30071 176.00 170.86 210.00
R-202 21/03/13 1.0 2 1/2" 28/03/13 BUZON 19 30479 181.00 168.39 210.00
6
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=210KG/CM2,BUZONES
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias
R-203 21/03/13 1.0 2 1/2" 18/04/13 MEDIA CAÑA 40673.00 179 227.22 210.00
R-204 21/03/13 1.0 2 1/2" 18/04/13 41488.00 181 229.22 210.00 228 109%
R-245 11/04/13 1.0 3" 18/04/13 CALLE 2-VIRGEN DEL ROSARIO 29562 176.00 167.97 210.00
R-246 11/04/13 1.0 3" 18/04/13 BUZON #2997 31091 181.00 171.77 210.00
R-247 11/04/13 1.0 3" 09/05/13 PRIMER CUERPO 40978.59 179 228.93 210.00
R-248 11/04/13 1.0 3" 09/05/13 42813.46 179 239.18 210.00 234 111%
R-253 12/04/13 1.0 3 1/2" 19/04/13 CALLE 2-VIRGEN DEL ROSARIO 31804 176.00 180.70 210.00
R-254 12/04/13 1.0 3 1/2" 19/04/13 BUZON #2997 31091 181.00 171.77 210.00
R-255 12/04/13 1.0 3 1/2" 10/05/13 SEGUNDO CUERPO 49745.16 179 277.91 210.00
R-256 12/04/13 1.0 3 1/2" 10/05/13 50254.84 181 277.65 210.00 278 132%
R-261 13/04/13 1.0 3 1/2" 20/04/13 JR. VISCARDO Y GUSMAN 29460 176.00 167.39 210.00
R-262 13/04/13 1.0 3 1/2" 20/04/13 BUZON #3797 30683 181.00 169.52 210.00
R-263 13/04/13 1.0 3 1/2" 11/05/13 PRIMER CUERPO 48114.17 179 268.79 210.00
R-264 13/04/13 1.0 3 1/2" 11/05/13 47400.61 181 261.88 210.00 265 126%
R-269 15/04/13 1.0 3 3/4" 22/04/13 JR. ANGEL MORALES - Lima Norte 31600 176.00 179.55 210.00
R-270 15/04/13 1.0 3 3/4" 22/04/13 BUZON #3965 32518 179.00 181.66 210.00
R-271 15/04/13 1.0 3 3/4" 13/05/13 SEGUNDO CUERPO 43628.95 179 243.74 210.00
R-272 15/04/13 1.0 3 3/4" 13/05/13 44750.25 181 247.24 210.00 245 117%
R-273 16/04/13 1.0 3 1/2" 23/04/13 AV. JAMAICA 33537 181.00 185.29 210.00
R-274 16/04/13 1.0 3 1/2" 23/04/13 BUZON #17 34047 181.00 188.10 210.00
R-275 16/04/13 1.0 3 1/2" 14/05/13 PRIMER CUERPO 49235.47 179 275.06 210.00
R-276 16/04/13 1.0 3 1/2" 14/05/13 49541.28 181 273.71 210.00 274 131%
R-277 16/04/13 1.0 4 1/2" 23/04/13 JR. ANGEL MORALES - Lima Norte 32620 176.00 185.34 210.00
R-278 16/04/13 1.0 4 1/2" 23/04/13 BUZON #3965 33741 181.00 186.41 210.00
R-279 16/04/13 1.0 4 1/2" 14/05/13 PRIMER ENCIMADO DE CUERPO 44852.19 179 250.57 210.00
R-280 16/04/13 1.0 4 1/2" 14/05/13 43730.89 181 241.61 210.00 246 117%
R-281 17/04/13 1.0 3 1/2" 24/04/13 AV. JAMAICA 28542 179.00 159.45 210.00
R-282 17/04/13 1.0 3 1/2" 24/04/13 BUZON #17 29867 179.00 166.85 210.00
R-283 17/04/13 1.0 3 1/2" 15/05/13 LOSA DE FONDO 40876.66 179 228.36 210.00
7
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=210KG/CM2,BUZONES
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias
R-284 17/04/13 1.0 3 1/2" 15/05/13 41794.09 181 230.91 210.00 230 109%
R-288 17/04/13 1.0 4 1/2" 24/04/13 JR. ANGEL MORALES 29766 181.00 164.45 210.00
R-289 17/04/13 1.0 4 1/2" 24/04/13 BUZON #3965 30377 179.00 169.70 210.00
R-290 17/04/13 1.0 4 1/2" 15/05/13 SEGUNDO ENCIMADO 45056.07 179 251.71 210.00
R-291 17/04/13 1.0 4 1/2" 15/05/13 44648.32 181 246.68 210.00 249 119%
R-292 18/04/13 1.0 3 1/2" 25/04/13 AV. JAMAICA 28542 181.00 157.69 210.00
R-293 18/04/13 1.0 3 1/2" 25/04/13 BUZON #15 28440 179.00 158.88 210.00
R-294 18/04/13 1.0 3 1/2" 16/05/13 LOSA DE FONDO DE BUZON 44750.25 179 250.00 210.00
R-295 18/04/13 1.0 3 1/2" 16/05/13 45158.00 181 249.49 210.00 250 119%
R-300 19/04/13 1.0 4 1/4" 26/04/13 CALLE 4 - LIMA 30581 181.00 210.00
R-301 19/04/13 1.0 4 1/4" 26/04/13 DADOS DE ANCLAJE 31600 179.00 210.00
R-302 19/04/13 1.0 4 1/4" 17/05/13 BZ. N° 2964 , 2963 46177.37 179 257.97 210.00
R-303 19/04/13 1.0 4 1/4" 17/05/13 44852.19 181 247.80 210.00 253 120%
R-304 20/04/13 1.0 3 1/2" 27/04/13 JR. ANGEL MORALES - Lima Norte 29562 181.00 210.00
R-307 20/04/13 1.0 3 1/2" 18/05/13 44648.00 181 246.67 210.00 245 117%
R-308 22/04/13 1.0 4" 29/04/13 JR. 9 E DICIEMBRE 31600 181.00 210.00
R-309 22/04/13 1.0 4" 29/04/13 DADOS DE ANCLAJE DE BUZON 32926 179.00 210.00
R-311 22/04/13 1.0 4" 20/05/13 58104.00 181 321.02 210.00 326 155%
R-317 24/04/13 1.0 3 1/2" 01/05/13 DADOS DE ANCLAJE DE BUZON 32212 179.00 210.00
R-318 24/04/13 1.0 3 1/2" 22/05/13 BZ N° 2979 Y 2976 51274.00 181 283.28 210.00
R-319 24/04/13 1.0 3 1/2" 22/05/13 50663.00 181 279.91 210.00 282 134%
R-328 26/04/13 1.0 3 1/2" 03/05/13 AV. JAMAICA 36391 179.00 210.00
R-329 26/04/13 1.0 3 1/2" 03/05/13 TECHO DE BUZON 31804 181.00 210.00
R-331 26/04/13 1.0 3 1/2" 24/05/13 49949.00 179 279.04 210.00 281 134%
8
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=210KG/CM2,BUZONES
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias
R-360 02/05/13 1.0 3 1/2" 09/05/13 AV. MICAELA BASTIDAS 31600 179.00 176.54 210.00
R-361 02/05/13 1.0 3 1/2" 09/05/13 2 DO CUERPO DE BZ 30683 181.00 169.52 210.00 173 82%
R-362 02/05/13 1.0 3 1/2" 30/05/13 BZ N° 3006 40775.00 181 225.28 210.00
R-363 02/05/13 1.0 3 1/2" 30/05/13 42915.00 181 237.10 210.00 231 110%
R-364 02/05/13 1.0 4" 09/05/13 AV. MARIANO IGNACION PRADO 32518 181.00 179.66 210.00
R-365 02/05/13 1.0 4" 09/05/13 1 DO CUERPO DE BZ 32518 181.00 179.66 210.00 180 86%
R-366 02/05/13 1.0 4" 30/05/13 BZ N° 3006 44037.00 181 243.30 210.00
R-367 02/05/13 1.0 4" 30/05/13 44037.00 179 246.02 210.00 245 117%
R-374 06/05/13 1.0 3 1/2" 13/05/13 JR. LA UNION 31804 181.00 175.71 210.00
R-375 06/05/13 1.0 3 1/2" 13/05/13 LOSA DE BUZON 33129 181.00 183.03 210.00 179 85%
R-376 06/05/13 1.0 3 1/2" 03/06/13 BUZON N° 3369 43629.00 179 243.74 210.00
R-377 06/05/13 1.0 3 1/2" 03/06/13 44343.00 179 247.73 210.00 246 117%
R-404 17/05/13 1.0 4 1/2" 24/05/13 JR. LORD COCRANE 32620 181.00 180.22 210.00
R-405 17/05/13 1.0 4 1/2" 24/05/13 DADOS DE ANCLAJE 31702 181.00 175.15 210.00 178 85%
R-406 17/05/13 1.0 4 1/2" 14/06/13 BR- 4775 Y BR-4758 55250.00 181 305.25 210.00
R-407 17/05/13 1.0 4 1/2" 14/06/13 53925.00 181 297.93 210.00 302 144%
R-424 25/05/13 1.0 3 3/4" 01/06/13 CALLE 1 29562 181.00 163.33 210.00
R-425 25/05/13 1.0 3 3/4" 01/06/13 CUERPO DE BUZON 29052 181.00 160.51 210.00 162 77%
R-426 25/05/13 1.0 3 3/4" 22/06/13 BUZON PREFABRICADO 54587.00 181 301.59 210.00
R-427 25/05/13 1.0 3 3/4" 22/06/13 56707.00 181 313.30 210.00 307 146%
R-428 31/05/13 1.0 4" 07/06/13 PSJ 16 DE JULIO-COOPERATIVA J.V.A 30275 181.00 167.27 210.00
R-429 31/05/13 1.0 4" 07/06/13 CUERPO TOTAL DE BUZON 28542 176.00 162.17 210.00 165 78%
R-430 31/05/13 1.0 4" 28/06/13 BUZON 3459 51274.00 181 283.28 210.00
R-431 31/05/13 1.0 4" 28/06/13 52803.00 181 291.73 210.00 288 137%
R-432 03/06/13 1.0 3 3/4" 10/06/13 PSJ # 3 -ASOCIACION 9 DE SETIEMBRE 27523 181.00 152.06 210.00
R-433 03/06/13 1.0 3 3/4" 10/06/13 CUERPO TOTAL DE BUZON 28236 176.00 160.43 210.00 156 74%
R-434 03/06/13 1.0 3 3/4" 01/07/13 BUZON 3474 52396.00 181 289.48 210.00
R-435 03/06/13 1.0 3 3/4" 01/07/13 50765.00 181 280.47 210.00 285 136%
R-440 04/06/13 1.0 4" 11/06/13 JR. LAS DELICIAS 28338 179.00 158.31 210.00
9
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=210KG/CM2,BUZONES
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias
R-441 04/06/13 1.0 4" 11/06/13 1° CUERPO TOTAL DE BUZON 28542 181.00 157.69 210.00 158 75%
R-442 04/06/13 1.0 4" 02/07/13 BZ 5174 45973.00 181 253.99 210.00
R-443 04/06/13 1.0 4" 02/07/13 45464.00 181 251.18 210.00 253 120%
R-452 03/06/13 1.0 3 3/4" 10/06/13 JR. LAS DELICIAS 29562 181.00 163.33 210.00
R-453 03/06/13 1.0 3 3/4" 10/06/13 2 °CUERPO TOTAL DE BUZON 29358 181.00 162.20 210.00 163 78%
R-454 03/06/13 1.0 3 3/4" 01/07/13 BZ 5174 41386.00 179 231.21 210.00
R-455 03/06/13 1.0 3 3/4" 01/07/13 41794.00 179 233.49 210.00 232 111%
R-460 10/06/13 1.0 4 1/2" 17/06/13 JR. LAS DELICIAS 34862 179.00 194.76 210.00
R-461 10/06/13 1.0 4 1/2" 17/06/13 1 °CUERPO TOTAL DE BUZON 35678 179.00 199.32 210.00 197 94%
R-462 10/06/13 1.0 4 1/2" 08/07/13 BZ 5181 47808.00 179 267.08 210.00
R-463 10/06/13 1.0 4 1/2" 08/07/13 48114.00 181 265.82 210.00 266 127%
R-464 11/06/13 1.0 4" 18/06/13 JR. LAS DELICIAS 29460 181.00 162.76 210.00
R-465 11/06/13 1.0 4" 18/06/13 2 °CUERPO TOTAL DE BUZON 27523 181.00 152.06 210.00 157 75%
R-466 11/06/13 1.0 4" 09/07/13 BZ 5181 43527.00 179 243.17 210.00
R-467 11/06/13 1.0 4" 09/07/13 44241.00 181 244.43 210.00 244 116%
R-472 13/06/13 1.0 4" 20/06/13 JR. VENUS/JR. JUPITER 31702 181.00 175.15 210.00
R-473 13/06/13 1.0 4" 20/06/13 1°CUERPO TOTAL DE BUZON 31600 181.00 174.59 210.00 175 83%
R-474 13/06/13 1.0 4" 11/07/13 BZ 12-A 47197.00 181 260.76 210.00
R-475 13/06/13 1.0 4" 11/07/13 46483.00 181 256.81 210.00 259 123%
R-484 15/06/13 1.0 4" 22/06/13 JR. VENUS/JR. JUPITER 39195 181.00 216.55 210.00
R-485 15/06/13 1.0 4" 22/06/13 2° CUERPO TOTAL DE BUZON 37044 181.00 204.66 210.00 211 100%
R-486 15/06/13 1.0 4" 13/07/13 BZ 12-A 51254.00 181 283.17 210.00
R-487 15/06/13 1.0 4" 13/07/13 50591.00 181 279.51 210.00 281 134%
R-496 17/06/13 1.0 4 1/2 " 24/06/13 JR. VENUS/JR. JUPITER 36626 181.00 202.35 210.00
R-497 17/06/13 1.0 4 1/2 " 24/06/13 TECHO DE BUZON 37849 181.00 209.11 210.00 206 98%
R-498 17/06/13 1.0 4 1/2 " 15/07/13 BZ 12-A 49021.00 181 270.83 210.00
R-499 17/06/13 1.0 4 1/2 " 15/07/13 49256.00 181 272.13 210.00 271 129%
R-508 19/06/13 1.0 4 " 26/06/13 AV. PEDRO DE LA GASCA CUADRO 8 39011 181.00 215.53 210.00
19/06/13 1.0 4 " 26/06/13 BALCON 39011 181.00 215.53 210.00 216 103%
10
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=210KG/CM2,BUZONES
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias
R-509 19/06/13 1.0 4 " 17/07/13 CASA 51397.00 181 283.96 210.00
19/06/13 1.0 4 " 17/07/13 51397.00 181 283.96 210.00 284 135%
R-522 25/06/13 1.0 4 " 02/07/13 JR. PRÑA/AV. JAMAICA 36188 181.00 199.93 210.00
R-523 25/06/13 1.0 4 " 02/07/13 1°CUERPO TOTAL DE BUZON 37003 181.00 204.44 210.00 202 96%
R-525 25/06/13 1.0 4 " 23/07/13 52273 181 288.80 210.00 291 138%
R-534 26/06/13 1.0 3 3/4 " 03/07/13 JR. PEÑA/AV. JAMAICA 35576 179.00 198.75 210.00
R-535 26/06/13 1.0 3 3/4 " 03/07/13 1° CUERPO TOTAL DE BUZON 37003 179.00 206.72 210.00 203 97%
R-536 26/06/13 1.0 3 3/4 " 24/07/13 BZ 01 48267 179 269.65 210.00
R-537 26/06/13 1.0 3 3/4 " 24/07/13 49113 181 271.34 210.00 270 129%
R-538 26/06/13 1.0 3 3/4 " 03/07/13 JR. PEÑA/AV. JAMAICA 37309 181.00 206.13 210.00
R-539 26/06/13 1.0 3 3/4 " 03/07/13 2° CUERPO TOTAL DE BUZON 37105 181.00 205.00 210.00 206 98%
R-540 26/06/13 1.0 3 3/4 " 24/07/13 BZ 01 53242.00 181 294.15 210.00
R-541 26/06/13 1.0 3 3/4 " 24/07/13 53700.00 181 296.69 210.00 295 141%
R-542 27/06/13 1.0 3 1/4 " 04/07/13 CALLE #26-URB LOS CHASQUIS 40571 179.00 226.65 210.00
R-543 27/06/13 1.0 3 1/4 " 04/07/13 1° CUERPO TOTAL DE BUZON 40469 181.00 223.59 210.00 225 107%
R-544 27/06/13 1.0 3 1/4 " 25/07/13 BZ 2819 53282.00 181 294.38 210.00
R-545 27/06/13 1.0 3 1/4 " 25/07/13 54353.00 181 300.29 210.00 297 142%
R-550 28/06/13 1.0 4" 05/07/13 JR. PEÑA/AV. JAMAICA 38430 179.00 214.69 210.00
R-551 28/06/13 1.0 4" 05/07/13 LOSA DE TECHO 39042 179.00 218.11 210.00 216 103%
R-552 28/06/13 1.0 4" 26/07/13 BUZON 01 51437.00 181 284.18 210.00
R-553 28/06/13 1.0 4" 26/07/13 52069.00 181 287.67 210.00 286 136%
R-554 01/07/13 1.0 4" 08/07/13 AV. ANDREZ AVELINO CACERES 37309 181.00 206.13 210.00
R-555 01/07/13 1.0 4" 08/07/13 1° CUERPO TOTAL DE BUZON 37513 181.00 207.25 210.00 207 98%
R-556 01/07/13 1.0 4" 29/07/13 BUZON 03 54740.00 181 302.43 210.00
R-557 01/07/13 1.0 4" 29/07/13 52803.00 181 291.73 210.00 297 141%
R-570 09/07/13 1.0 4" 16/07/13 CALLE #17 33262 181.00 183.77 210.00
R-571 09/07/13 1.0 4" 16/07/13 LOSA DE FONDO DE BUZON 33853 179.00 189.12 210.00 186 89%
R-572 09/07/13 1.0 4" 06/08/13 BUZON -2825 44750.00 181 247.24 210.00
11
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=210KG/CM2,BUZONES
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias
R-573 09/07/13 1.0 4" 06/08/13 45291.00 181 250.23 210.00 249 118%
R-574 10/07/13 1.0 4" 17/07/13 CALLE #17 39715 181.00 219.42 210.00
R-575 10/07/13 1.0 4" 17/07/13 1° Y 2° CUERPO TOTAL DE BUZON 38216 179.00 213.50 210.00 216 103%
R-576 10/07/13 1.0 4" 07/08/13 BUZON -2825 47350.00 181 261.60 210.00
R-577 10/07/13 1.0 4" 07/08/13 48226.00 181 266.44 210.00 264 126%
R-586 16/07/13 1.0 4" 23/07/13 AV. ANDREZ AVELINO CACERES 33262 179.00 185.82 210.00
R-587 16/07/13 1.0 4" 23/07/13 1° CUERPO TOTAL DE BUZON 33884 179.00 189.30 210.00 188 89%
R-588 16/07/13 1.0 4" 13/08/13 BUZON -30-A 47350.00 181 261.60 210.00
R-589 16/07/13 1.0 4" 13/08/13 48226.00 181 266.44 210.00 264 126%
R-594 18/07/13 1.0 4" 25/07/13 AV. ANDREZ AVELINO CACERES 34618 179.00 193.40 210.00
R-595 18/07/13 1.0 4" 25/07/13 2° CUERPO TOTAL DE BUZON 34903 179.00 194.99 210.00 194 92%
R-596 18/07/13 1.0 4" 15/08/13 BUZON -30-A 51682.00 181 285.54 210.00
R-597 18/07/13 1.0 4" 15/08/13 51988.00 181 287.23 210.00 286 136%
R-602 19/07/13 1.0 4" 26/07/13 AV. ANDREZ AVELINO CACERES 35515 179.00 198.41 210.00
R-603 19/07/13 1.0 4" 26/07/13 LOSA SUPERIOR 34944 179.00 195.22 210.00 197 94%
R-604 19/07/13 1.0 4" 16/08/13 BUZON -30-A 46504.00 179 259.80 210.00
R-605 19/07/13 1.0 4" 16/08/13 46249.00 179 258.37 210.00 259 123%
R-610 19/07/13 1.0 3 3/4 " 26/07/13 PASAJE 19/JR, TACNA 34037 179.00 190.15 210.00
R-611 19/07/13 1.0 3 3/4 " 26/07/13 CUERPO DEL BUZON 35535 179.00 198.52 210.00 194 93%
R-612 19/07/13 1.0 3 3/4 " 16/08/13 BUZON 3336 54251.00 179 303.08 210.00
R-613 19/07/13 1.0 3 3/4 " 16/08/13 54077.00 179 302.11 210.00 303 144%
R-745 24/07/13 1.0 4" 31/07/13 JR. LOS FUNDADORES. 28145 179.00 157.23 210.00
R-746 24/07/13 1.0 4" 31/07/13 CUERPO DEL BUZON 30826 179.00 172.21 210.00 165 78%
R-747 24/07/13 1.0 4" 21/08/13 DADOS DE ANCLAJE - CUADRA 2 45015.29 179 251.48 210.00
R-748 24/07/13 1.0 4" 21/08/13 45820.59 179 255.98 210.00 254 121%
R-845 28/09/13 1.0 4" 05/10/13 AV. CASANAVE. - LIMA NORTE 37136 179.00 207.46 210.00
R-846 28/09/13 1.0 4" 05/10/13 BUZON - 14 38644 183.00 211.17 210.00 209 100%
R-847 28/09/13 1.0 4" 26/10/13 1° CUERPO DEL BUZON 44811.42 185 242.22 210.00
R-848 28/09/13 1.0 4" 26/10/13 47624.87 183 260.82 210.00 252 120%
12
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=210KG/CM2,BUZONES
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias
R-849 28/09/13 1.0 4" 05/10/13 AV. UNIVERSITARIA. - LIMA NORTE 30214 180.30 167.58 210.00
R-849 28/09/13 1.0 4" 05/10/13 BUZON - BR-3070 30214 180.30 167.58 210.00 168 80%
R-850 28/09/13 1.0 4" 26/10/13 DADOS DE ANCLAJE DE BUZON 38705.40 177 219.05 210.00
R-850 28/09/13 1.0 4" 26/10/13 38705.40 177 219.05 210.00 219 104%
R-859 30/09/13 1.0 4" 07/10/13 AV. CASANAVE. - LIMA NORTE 43894 183.80 238.81 210.00
R-860 30/09/13 1.0 4" 07/10/13 BUZON - 14 45943 176.70 260.01 210.00 249 119%
R-861 30/09/13 1.0 4" 28/10/13 2 DO CUERPO DE BUZON 57155.96 183 313.01 210.00
R-862 30/09/13 1.0 4" 28/10/13 55015.29 183 301.29 210.00 307 146%
R-863 01/10/13 1.0 4" 08/10/13 AV. CASANAVE. - LIMA NORTE 40805 183.00 222.98 210.00
R-864 01/10/13 1.0 4" 08/10/13 BUZON - 14 44577 181.00 246.28 210.00 235 112%
R-865 01/10/13 1.0 4" 29/10/13 LOSA DE TECHO DE BUZÓN. 58562.69 186 314.35 210.00
R-866 01/10/13 1.0 4" 29/10/13 57624.87 179 321.75 210.00 318 151%
R-875 03/10/13 1.0 4" 10/10/13 AV. CASANAVE. - LIMA NORTE 34893 180.00 193.85 210.00
R-876 03/10/13 1.0 4" 10/10/13 BUZON - 13 37054 177.00 209.34 210.00 202 96%
R-877 03/10/13 1.0 4" 31/10/13 LOSA INFERIOR DE BUZÓN 55280.33 176 314.99 210.00
R-878 03/10/13 1.0 4" 31/10/13 53659.53 178 301.63 210.00 308 147%
R-883 04/10/13 1.0 4" 11/10/13 AV. CASANAVE. - LIMA NORTE 38135 178.00 214.24 210.00
R-884 04/10/13 1.0 4" 11/10/13 BUZON - 13 36524 177.00 206.35 210.00 210 100%
R-885 04/10/13 1.0 4" 01/11/13 1ER. CUERPO DE BUZÓN 49469.93 180 274.38 210.00
R-886 04/10/13 1.0 4" 01/11/13 47920.49 180 265.78 210.00 270 129%
R-895 05/10/13 1.0 4" 12/10/13 CALLE # 1-A.A.H.H. 9 DE SETIEMBRE. - LIMA 38502 175.50 219.38 210.00
R-896 05/10/13 1.0 4" 12/10/13 BUZÓN - BR- 3499 36004 181.40 198.48 210.00 209 99%
R-897 05/10/13 1.0 4" 02/11/13 1ER. CUERPO DE BUZÓN 50825.69 179 283.78 210.00
R-898 05/10/13 1.0 4" 02/11/13 51141.69 184 278.25 210.00 281 134%
R-907 08/10/13 1.0 4" 15/10/13 AV. CASANAVE. - LIMA NORTE 37757 183 206.78 210.00
R-908 08/10/13 1.0 4" 15/10/13 BUZÓN - 13 37044 181 204.44 210.00 206 98%
R-909 08/10/13 1.0 4" 05/11/13 1 LOSA DE TECHO DE BUZÓN. 43384.30 178 243.87 210.00
R-910 08/10/13 1.0 4" 05/11/13 44097.86 183 241.50 210.00 243 116%
R-911 08/10/13 1.0 4" 15/10/13 CALLE # 1 - A.A.H.H. 9 DE SETIEMBRE. - LIMA 32253 183 176.63 210.00
13
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=210KG/CM2,BUZONES
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias
R-912 08/10/13 1.0 4" 15/10/13 BUZÓN - 13 31427 181 173.44 210.00 175 83%
R-913 08/10/13 1.0 4" 05/11/13 BUZÓN - 3499 42976.55 183 235.36 210.00
R-914 08/10/13 1.0 4" 05/11/13 41722.73 180 231.41 210.00 233 111%
R-927 10/10/13 1.0 4" 17/10/13 AV. CASANAVE. - LIMA NORTE 41407 184 225.04 210.00
R-928 10/10/13 1.0 4" 17/10/13 BUZÓN - 13 41182 183 225.04 210.00 225 107%
R-929 10/10/13 1.0 4" 07/11/13 2 ER. CUERPO DE BUZÓN 49500.51 180 274.55 210.00
R-930 10/10/13 1.0 4" 07/11/13 48369.01 180 268.27 210.00 271 129%
R-935 11/10/13 1.0 4" 18/10/13 AV. CASANAVE. - LIMA NORTE 37339 178 210.01 210.00
R-936 11/10/13 1.0 4" 18/10/13 BUZÓN - 13 39286 179 219.35 210.00 215 102%
R-937 11/10/13 1.0 4" 08/11/13 LOSA SUPERIOR 49898.06 183 273.26 210.00
R-938 11/10/13 1.0 4" 08/11/13 50611.62 179 282.59 210.00 278 132%
R-939 12/10/13 1.0 4" 19/10/13 AV. CASANAVE. - LIMA NORTE 36320 181 200.22 210.00
R-940 12/10/13 1.0 4" 19/10/13 BUZÓN - 1 38746 179 216.34 210.00 208 99%
R-941 12/10/13 1.0 4" 09/11/13 1ER. CUERPO DE BUZÓN 50611.62 179 282.59 210.00
R-942 12/10/13 1.0 4" 09/11/13 48939.86 181 269.79 210.00 276 132%
R-943 12/10/13 1.0 4" 19/10/13 AV. UNIVERSITARIA. - LIMA NORTE 36320 181 200.22 210.00
R-944 12/10/13 1.0 4" 19/10/13 BUZÓN - 1 38746 179 216.34 210.00 208 99%
R-945 12/10/13 1.0 4" 09/11/13 2 CUERPO DE BUZÓN 45015.29 179 251.48 210.00
R-946 12/10/13 1.0 4" 09/11/13 45820.59 179 255.98 210.00 254 121%
R-947 12/10/13 1.0 4" 19/10/13 CALLE #1 - A.A.H.H. 9 DE SETIEMBRE. 25515 178 143.42 210.00
R-948 12/10/13 1.0 4" 19/10/13 BUZÓN - 3491 26555 178 149.27 210.00 146 70%
R-949 12/10/13 1.0 4" 09/11/13 1ER. CUERPO DE BUZÓN 38878.70 178 218.54 210.00
R-950 12/10/13 1.0 4" 09/11/13 37869.52 179 211.44 210.00 215 102%
R-951 14/10/13 1.0 4" 21/10/13 AV. UNIVERSITARIA. - LIMA NORTE 42936 179 239.73 210.00
R-952 14/10/13 1.0 4" 21/10/13 BUZÓN - 1 44475 179 248.33 210.00 244 116%
R-953 14/10/13 1.0 4" 11/11/13 REMATE DEL CUERPO 52629.97 183 288.23 210.00
R-954 14/10/13 1.0 4" 11/11/13 53058.10 183 290.57 210.00 289 138%
R-955 14/10/13 1.0 4" 21/10/13 AV. UNIVERSITARIA. - LIMA NORTE 42161 178 236.99 210.00
R-956 14/10/13 1.0 4" 21/10/13 BUZÓN - 5 44353 178 249.31 210.00 243 116%
14
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=210KG/CM2,BUZONES
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias
R-957 14/10/13 1.0 4" 11/11/13 LOSA DE FONDO 54862.39 179 306.32 210.00
R-958 14/10/13 1.0 4" 11/11/13 53649.34 183 293.81 210.00 300 143%
R-959 14/10/13 1.0 4" 21/10/13 AV.CASANAVE. - LIMA NORTE 38848 177 219.85 210.00
R-960 14/10/13 1.0 4" 21/10/13 BUZÓN - 6 41927 180 232.54 210.00 226 108%
R-961 14/10/13 1.0 4" 11/11/13 LOSA INFERIOR DE BUZÓN 53873.60 180 298.80 210.00
R-962 14/10/13 1.0 4" 11/11/13 52976.55 181 292.04 210.00 295 141%
R-963 14/10/13 1.0 4" 21/10/13 CALLE # 1 A.A.H.H. 9 DE SETIEMBRE. - LIMA 25872 179 144.45 210.00
R-964 14/10/13 1.0 4" 21/10/13 BUZÓN - 3491 26228 183 143.64 210.00 144 69%
R-965 14/10/13 1.0 4" 11/11/13 2DO.CUERPO DE BUZÓN. 43577.98 179 243.32 210.00
R-966 14/10/13 1.0 4" 11/11/13 42589.19 181 234.78 210.00 239 114%
R-967 15/10/13 1.0 4" 22/10/13 AV. CASANAVE. - LIMA NORTE 39837 181 219.61 210.00
R-968 15/10/13 1.0 4" 22/10/13 BUZÓN - 5 38869 179 217.02 210.00 218 104%
R-969 15/10/13 1.0 4" 12/11/13 1ER.CUERPO DE BUZÓN. 47859.33 181 263.83 210.00
R-970 15/10/13 1.0 4" 12/11/13 49500.51 179 276.38 210.00 270 129%
R-975 16/10/13 1.0 4" 23/10/13 AV. CASANAVE. - LIMA NORTE 33048 181 182.18 210.00
R-976 16/10/13 1.0 4" 23/10/13 BUZÓN - 5 37156 179 207.46 210.00 195 93%
R-977 16/10/13 1.0 4" 13/11/13 2DO.CUERPO DE BUZÓN. 44831.80 179 250.46 210.00
R-978 16/10/13 1.0 4" 13/11/13 46483.18 179 259.68 210.00 255 121%
R-987 17/10/13 1.0 4" 24/10/13 AV. CASANAVE. - LIMA NORTE 41386 179 231.08 210.00
R-988 17/10/13 1.0 4" 24/10/13 BUZÓN - 1 38899 178 218.66 210.00 225 107%
R-989 17/10/13 1.0 4" 14/11/13 LOSA SUPERIOR DE BUZÓN 47247.71 178 265.59 210.00
R-990 17/10/13 1.0 4" 14/11/13 47869.52 178 269.08 210.00 267 127%
R-991 17/10/13 1.0 4" 24/10/13 AV. CASANAVE. - LIMA NORTE 43965 179 245.48 210.00
R-992 17/10/13 1.0 4" 24/10/13 BUZÓN - 6 46106 177 260.93 210.00 253 121%
R-993 17/10/13 1.0 4" 14/11/13 1ER. CUERPO DE BUZÓN. 54260.96 181 299.12 210.00
R-994 17/10/13 1.0 4" 14/11/13 56075.43 181 309.13 210.00 304 145%
R-995 17/10/13 1.0 4" 24/10/13 AV. CASANAVE. - LIMA NORTE 43965 181 242.37 210.00
R-996 17/10/13 1.0 4" 24/10/13 BUZÓN - 5 46106 180 255.72 210.00 249 119%
R-997 17/10/13 1.0 4" 14/11/13 2 DO. CUERPO DE BUZÓN. 55005.10 181 303.23 210.00
15
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=210KG/CM2,BUZONES
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias
R-998 17/10/13 1.0 4" 14/11/13 54077.47 181 298.11 210.00 301 143%
R-999 18/10/13 1.0 4" 25/10/13 AV. 8 DE ENERO. 34373 178 193.22 210.00
R-1000 18/10/13 1.0 4" 25/10/13 LOSA SUPERIOR 36014 184 195.94 210.00 195 93%
R-1001 18/10/13 1.0 4" 15/11/13 BUZÓN - 4721 44801 44801.22 181 246.97 210.00
R-1002 18/10/13 1.0 4" 15/11/13 45881.75 45881.75 178 257.91 210.00 252 120%
R-1003 18/10/13 1.0 4" 25/10/13 AV. 8 DE ENERO. 39052 178 219.52 210.00
R-1004 18/10/13 1.0 4" 25/10/13 BUZÓN - B-5 Y B-6 39817 184 216.63 210.00 218 104%
R-1005 18/10/13 1.0 4" 15/11/13 LOSA SUPERIOR DE BUZÓN. 49501 49500.51 181 272.88 210.00
R-1006 18/10/13 1.0 4" 15/11/13 50774.72 50774.72 178 285.41 210.00 279 133%
R-1031 22/10/13 1.0 4" 29/10/13 AV. CASANAVE. - LIMA NORTE 40428 177 228.80 210.00
R-1032 22/10/13 1.0 4" 29/10/13 BZ. - 7 Y BZ. - 8A. 38665 183 211.74 210.00 220 105%
R-1033 22/10/13 1.0 4" 19/11/13 LOSA SUPERIOR DE BUZÓN. 46239 46238.53 183 253.22 210.00
R-1034 22/10/13 1.0 4" 19/11/13 47064.22 47064.22 183 257.74 210.00 255 122%
R-1035 23/10/13 1.0 4" 30/10/13 AV. CASANAVE. - LIMA NORTE 33598 180 186.35 210.00
R-1036 23/10/13 1.0 4" 30/10/13 BZ. - 7 Y BZ. - 8A. 32294 184 175.70 210.00 181 86%
R-1037 23/10/13 1.0 4" 20/11/13 1ER. CUERPO DE BUZÓN. 39786 39785.93 179 222.14 210.00
R-1038 23/10/13 1.0 4" 20/11/13 42976.55 42976.55 178 241.58 210.00 232 110%
R-1043 24/10/13 1.0 4" 31/10/13 AV. CASANAVE. - LIMA NORTE 32671 180 181.20 210.00
R-1044 24/10/13 1.0 4" 31/10/13 BUZON - 7 Y 8A 31662 184 172.26 210.00 177 84%
R-1045 24/10/13 1.0 4" 21/11/13 2 DO. CUERPO DE BUZÓN. 0.00 179 0.00 210.00
R-1051 24/10/13 1.0 4" 31/10/13 AV. CASANAVE. - LIMA NORTE 35301 183 193.32 210.00
R-1052 24/10/13 1.0 4" 31/10/13 BUZON - 7 Y 8A 36137 178 203.13 210.00 198 94%
R-1053 24/10/13 1.0 4" 21/11/13 LOSA SUPERIOR DE BUZON. 0.00 179 0.00 210.00
R-1067 29/10/13 1.0 4" 05/11/13 AV. CASANAVE. - LIMA NORTE 34995 179 195.39 210.00
R-1068 29/10/13 1.0 4" 05/11/13 BUZON - 8 . 35474 180 196.75 210.00 196 93%
R-1069 29/10/13 1.0 4" 26/11/13 1ER. CUERPO DE BUZÓN. 0.00 179 0.00 210.00
16
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=210KG/CM2,BUZONES
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias
R-1075 30/10/13 1.0 4" 06/11/13 AV. CASANAVE. - LIMA NORTE 45902 179 256.29 210.00
R-1076 30/10/13 1.0 4" 06/11/13 BUZON - 8 . 44098 180 244.58 210.00 250 119%
R-1077 30/10/13 1.0 4" 27/11/13 2 DO. CUERPO DE BUZÓN. 0.00 179 0.00 210.00
R-1119 07/11/13 1.0 4" 14/11/13 AV. MARIANO IGNACIO PRADO. 41040 180 227.62 210.00
R-1120 07/11/13 1.0 4" 14/11/13 BZ. - 4 42151 177 238.54 210.00 233 111%
R-1121 07/11/13 1.0 4" 05/12/13 LOSA INFERIOR Y 1ER. CUERPO DE BUZON 0.00 179 0.00 210.00
R-1127 08/11/13 1.0 4" 15/11/13 AV. MARIANO IGNACIO PRADO. 40622 179 226.81 210.00
R-1128 08/11/13 1.0 4" 15/11/13 BZ. - 4 40938 180 227.05 210.00 227 108%
R-1129 08/11/13 1.0 4" 06/12/13 2DO. CUERPO DE BUZON. 0.00 179 0.00 210.00
R-1151 13/11/13 1.0 4" 20/11/13 AV. MARIANO IGNACIO PRADO. 40979 179 228.80 210.00
R-1152 13/11/13 1.0 4" 20/11/13 BZ. - 4 39786 180 220.67 210.00 225 107%
R-1153 13/11/13 1.0 4" 11/12/13 LOSA SUPERIOR DE BUZON. 0.00 179 0.00 210.00
R-1155 13/11/13 1.0 4" 20/11/13 JR. LOS CIPRECES. - L 34822 179 194.43 210.00
R-1156 13/11/13 1.0 4" 20/11/13 BZ. - 18. 36932 180 204.83 210.00 200 95%
R-1157 13/11/13 1.0 4" 11/12/13 CUERPO DE BUZON. 0.00 179 0.00 210.00
17
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=210KG/CM2,BUZONES
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias
REAL REFERENCIAL
REGISTRO 28 DIAS(KG/CM2) (100%) F'C (KG/CM2)
R-748 303 210
R-845 252 210
370
R-849 AL 853 219 210
R-859 307 210 REISTENCIA REAL
R-863 318 210 RESISTENCIA REFERENCIAL
R-875 308 210 320
R-883 270 210
R-895 281 210
R-907 243 210 KG/CM2
270
R-911 233 210
R-927 271 210
R-935 278 210
R-939 276 210 220
18
170
370
REISTENCIA REAL
RESISTENCIA REFERENCIAL
320
KG/CM2
270
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias
220
R-943 254 210
R-947 217 210
R-951 289 210
R-955 300 210 170
19
100
RESISTECIA REAL VS REISTENCIA REFENCIAL
300 RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=210KG/CM2,BUZONES
RESISTENCIA REFERENCIAL
RESISTENCIA REAL
250
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
Axis Title
FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2
200
REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
14 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias
R-1119 150
233 147
R-1127 227 147
R-1151 225 147 100
R-1155 200 147
50
0
R-1043 R-1051 R-1067 R-1075 REGISTROS R-1119 R-1127 R-1151 R-1155
20
MARZO
21
hasta el mes de matzo a los 28 dias
22
0
23
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
R-117 31/01/13 1.0 3 3/4" 07/02/13 Veredas 32722 179.00 182.80 175.00
R-118 31/01/13 1.0 3 3/4" 07/02/13 Conexiones (#132,#142,#152,#141) 32722 181.00 180.78 175.00
R-120 31/01/13 1.0 3 3/4" 43832.82 185.00 236.93 175.00 244 139%
R-133 14/02/13 1.0 4" 21/02/13 Veredas 37003 177.00 209.06 175.00
R-134 14/02/13 1.0 4" 21/02/13 Conexiones (#370,#142,#375,#373 37717 179.00 210.71 175.00
R-136 14/02/13 1.0 4" 14/03/13 36085.63 181.00 199.37 175.00 204 116%
R-141 15/02/13 1.0 4 1/4" 22/02/13 Veredas ,CLL. CAHUIDE- Lima Norte 18247 181.00 100.81 175.00
R-142 15/02/13 1.0 4 1/4" 22/02/13 CONEXIONES (#115,#121,#111,#109,#107) 21509 179.00 120.16 175.00
R-144 15/02/13 1.0 4 1/4" 15/03/13 35575.94 179.00 198.75 175.00 196 112%
R-153 19/02/13 1.0 4" 26/02/13 Veredas ,CLL. CAHUIDE- Lima Norte 18247 179.00 101.94 175.00
R-154 19/02/13 1.0 4" 26/02/13 CONEXIONES ( #210,#234,#221,#201) 21509 179.00 120.16 175.00
R-156 19/02/13 1.0 4" 19/03/13 40061.16 181.00 221.33 175.00 227 129%
R-173 05/03/13 1.0 4" 12/03/13 JR. RICARDO PALMA - Lima Norte 25280 179.00 141.23 175.00
R-174 05/03/13 1.0 4" 12/03/13 CONEX. ( #124,#123,#114,#113,#117) 23649 179.00 132.12 175.00
R-175 05/03/13 1.0 4" 02/04/13 VEREDAS 32212.00 179.00 179.96 175.00
R-176 05/03/13 1.0 4" 02/04/13 33333.00 179.00 186.22 175.00 183 105%
R-181 09/03/13 1.0 4" 16/03/13 JR. MANUEL VILLARAN - Lima Norte 19776 179.00 110.48 175.00
R-182 09/03/13 1.0 4" 16/03/13 VEREDA 20591 181.00 113.76 175.00
R-184 09/03/13 1.0 4" 06/04/13 36086.00 181 199.37 175.00 204 116%
R-205 21/03/13 1.0 3 1/2" 28/03/13 JR. ANGELMORALES 24465 179.00 136.68 175.00
R-206 21/03/13 1.0 3 1/2" 28/03/13 VEREDA 26809 181.00 148.12 175.00
R-208 21/03/13 1.0 3 1/2" 18/04/13 42813.00 181 236.54 175.00 245 140%
24
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
R-209 23/03/13 1.0 3" 30/03/13 JR. ANGELMORALES 28542 179.00 159.45 175.00
R-210 23/03/13 1.0 3" 30/03/13 VEREDA 27829 181.00 153.75 175.00
R-211 23/03/13 1.0 3" 20/04/13 44546.00 179 248.86 175.00 250 143%
R-212 02/04/13 1.0 4" 09/04/13 JR. SAN PEDRO-LINEA DE AGUA 26198 179.00 146.36 175.00
R-213 02/04/13 1.0 4" 09/04/13 VEREDA 26096 179.00 145.79 175.00
R-215 02/04/13 1.0 4" 30/04/13 36901.12 181 203.87 175.00 200 115%
R-217 02/04/13 1.0 3 1/2 " 09/04/13 JR. MARIAEGUI CUADRA 1 28542 181.00 157.69 175.00
R-218 02/04/13 1.0 3 1/2 " 09/04/13 CONEXIONES 163,149,175,185 Y 195 28950 179.00 161.73 175.00
R-219 02/04/13 1.0 3 1/2 " 30/04/13 43119.27 179 240.89 175.00
R-220 02/04/13 1.0 3 1/2 " 30/04/13 41794.09 179 233.49 175.00 237 136%
R-221 04/04/13 1.0 3 1/2" 11/04/13 CALLE CESAR CALLEJO 25484 179.00 142.37 175.00
R-222 04/04/13 1.0 3 1/2" 11/04/13 VEREDAS 26707 181.00 147.55 175.00
R-223 04/04/13 1.0 3 1/2" 02/05/13 CONEXIONES 188,182,176,378,372,158,154,148 43323.14 179 242.03 175.00
R-224 04/04/13 1.0 3 1/2" 02/05/13 42711.52 179 238.61 175.00 240 137%
R-225 05/04/13 1.0 3 3/4" 12/04/13 JR. GENERAL LARA 24465 181.00 135.17 175.00
R-226 05/04/13 1.0 3 3/4" 12/04/13 VEREDAS 25586 181.00 141.36 175.00
R-227 05/04/13 1.0 3 3/4" 03/05/13 CONEXIONES 238,234,228,224 Y 222 40468.91 179 226.08 175.00
R-228 05/04/13 1.0 3 3/4" 03/05/13 42303.77 179 236.33 175.00 231 132%
R-229 05/04/13 1.0 4 1/2" 12/04/13 JR. SAN ISIDRO 26504 181.00 146.43 175.00
R-230 05/04/13 1.0 4 1/2" 12/04/13 VEREDAS 26300 179.00 146.93 175.00
R-231 05/04/13 1.0 4 1/2" 03/05/13 CONEXIONES 133,125,117 Y 112 40774.72 179 227.79 175.00
R-232 05/04/13 1.0 4 1/2" 03/05/13 40265.04 179 224.94 175.00 226 129%
R-233 08/04/13 1.0 3 1/4" 15/04/13 JR. HUSARES DE JUNIN 30683 181.00 169.52 175.00
R-234 08/04/13 1.0 3 1/4" 15/04/13 VEREDAS 28440 179.00 158.88 175.00
R-235 08/04/13 1.0 3 1/4" 06/05/13 CONEXIONES # 205,207,211,217, Y 219 37512.74 179 209.57 175.00
R-236 08/04/13 1.0 3 1/4" 06/05/13 36697.25 179 205.01 175.00 207 118%
25
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
R-237 10/04/13 1.0 3 3/4" 17/04/13 JR. ENRRIQUE PALLARDELLI 25484 179.00 142.37 175.00
R-238 10/04/13 1.0 3 3/4" 17/04/13 VEREDAS 25994 181.00 143.61 175.00
R-239 10/04/13 1.0 3 3/4" 08/05/13 CONEXIONES # 402,403,409,412,416 Y 427 39755.35 179 222.10 175.00
R-240 10/04/13 1.0 3 3/4" 08/05/13 40774.72 179 227.79 175.00 225 129%
R-241 10/04/13 1.0 3 1/2" 17/04/13 JR. GENERAL SUCRE 26809 181.00 148.12 175.00
R-242 10/04/13 1.0 3 1/2" 17/04/13 VEREDAS 27625 181.00 152.62 175.00
R-243 10/04/13 1.0 3 1/2" 08/05/13 CONEXIONES # 483,498,503 Y 509 41794.09 179 233.49 175.00
R-244 10/04/13 1.0 3 1/2" 08/05/13 43323.14 181 239.35 175.00 236 135%
R-249 12/04/13 1.0 3 1/4" 19/04/13 CALLE WIRACOCHA 25688 181.00 141.92 175.00
R-250 12/04/13 1.0 3 1/4" 19/04/13 VEREDAS 25382 176.00 144.22 175.00
R-251 12/04/13 1.0 3 1/4" 10/05/13 CONEXIONES # 237,235,231,227,223,221 40978.59 179 228.93 175.00
R-252 12/04/13 1.0 3 1/4" 10/05/13 214,222,226,230,236,240,242,248,239 Y 241 42813.46 179 239.18 175.00 234 134%
R-257 12/04/13 1.0 3 3/4" 19/04/13 JR. GENERAL LARA 24261 181.00 134.04 175.00
R-258 12/04/13 1.0 3 3/4" 19/04/13 VEREDAS 22426 176.00 127.42 175.00
R-259 12/04/13 1.0 3 3/4" 10/05/13 CONEXIONES #256,245,249,264,270 Y 265 35677.88 179 199.32 175.00
R-260 12/04/13 1.0 3 3/4" 10/05/13 35474.01 179 198.18 175.00 199 114%
R-265 15/04/13 1.0 3 1/2" 22/04/13 JR. FAUSTINO SANCHEZ CARRION 25280 181.00 139.67 175.00
R-266 15/04/13 1.0 3 1/2" 22/04/13 SARDINAL 24975 176.00 141.90 175.00
R-268 15/04/13 1.0 3 1/2" 13/05/13 36085.63 179 201.60 175.00 203 116%
R-285 17/04/13 1.0 3 1/2" 24/04/13 JR. GENERAL LARA 27013 181.00 149.24 175.00
R-286 17/04/13 1.0 3 1/2" 24/04/13 VEREDA Y SARDINEL 27013 181.00 149.24 175.00
R-288 17/04/13 1.0 3 1/2" 15/05/13 37614.68 179 210.14 175.00 205 117%
R-296 18/04/13 1.0 4" 25/04/13 JR. SAN ISIDRO 24465 179.00 136.68 175.00
R-297 18/04/13 1.0 4" 25/04/13 RAMPAS 25586 176.00 145.38 175.00
R-298 18/04/13 1.0 4" 16/05/13 CONEXIONES: #383,365,325 Y 317 38735.98 179 216.40 175.00
R-299 18/04/13 1.0 4" 16/05/13 39959.23 179 223.24 175.00 220 126%
26
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
R-312 23/04/13 1.0 4" 30/04/13 CALLE LAS ORQUIDEAS 26402 179.00 147.50 175.00
R-313 23/04/13 1.0 4" 30/04/13 REPOSICION DE VEREDAS 25280 176.00 143.64 175.00
R-314 23/04/13 1.0 4" 21/05/13 CONEX. #S. 184,158,152,144,143,142 38736.00 179 216.40 175.00
R-315 23/04/13 1.0 4" 21/05/13 140,138,134,122,108 Y 102 40571.00 179 226.65 175.00 222 127%
R-320 25/04/13 1.0 3 1/2" 02/05/13 CALLE 2 45566 179.00 254.56 175.00
R-321 25/04/13 1.0 3 1/2" 02/05/13 REPOSICION DE VEREDAS 46687 176.00 265.27 175.00
R-323 25/04/13 1.0 3 1/2" 23/05/13 71049.95 179 396.93 175.00 395 226%
R-324 25/04/13 1.0 4" 02/05/13 JR. LAS MAGNOLIAS 29358 181.00 162.20 175.00
R-325 25/04/13 1.0 4" 02/05/13 REPOSICION DE VEREDAS 27421 181.00 151.50 175.00
R-326 25/04/13 1.0 4" 23/05/13 CONX. #S. 261,257,253 Y 251 40774.72 179 227.79 175.00
R-327 25/04/13 1.0 4" 23/05/13 40570.85 181 224.15 175.00 226 129%
R-332 26/04/13 1.0 3 3/4" 03/05/13 JR. SAN MARTIN 26402 181.00 145.87 175.00
R-333 26/04/13 1.0 3 3/4" 03/05/13 REPOSICION DE VEREDAS 26300 179.00 146.93 175.00
R-335 26/04/13 1.0 3 3/4" 24/05/13 41284.40 179 230.64 175.00 232 133%
R-336 26/04/13 1.0 4" 03/05/13 JR. LOS CIPRECES 29460 181.00 162.76 175.00
R-337 26/04/13 1.0 4" 03/05/13 REPOSICION DE VEREDAS 29154 179.00 162.87 175.00
R-338 26/04/13 1.0 4" 24/05/13 CONEX #S. 428,458,486,450 Y 443 40468.91 179 226.08 175.00
R-339 26/04/13 1.0 4" 24/05/13 41590.21 179 232.35 175.00 229 131%
R-340 29/04/13 1.0 4 1/2" 06/05/13 JR. LOS CIPRECES 29460 181.00 162.76 175.00
R-341 29/04/13 1.0 4 1/2" 06/05/13 REPOSICION DE VEREDAS 29154 179.00 162.87 175.00 163 93%
R-342 29/04/13 1.0 4 1/2" 27/05/13 CONEX #S. 428,458,486,450 Y 443 43629.00 179 243.74 175.00
R-343 29/04/13 1.0 4 1/2" 27/05/13 40775.00 181 225.28 175.00 235 134%
R-344 29/04/13 1.0 4 1/2" 06/05/13 JR. LOS CIPRECES 26402 181.00 145.87 175.00
R-345 29/04/13 1.0 4 1/2" 06/05/13 REPOSICION DE VEREDAS 26809 179.00 149.77 175.00 148 84%
R-346 29/04/13 1.0 4 1/2" 27/05/13 CONEX #S. 428,458,486,450 Y 443 43629.00 179 243.74 175.00
R-347 29/04/13 1.0 4 1/2" 27/05/13 40775.00 181 225.28 175.00 235 134%
27
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
R-348 29/04/13 1.0 4" 06/05/13 JR. LOS CIPRECES 26300 181.00 145.30 175.00
R-349 29/04/13 1.0 4" 06/05/13 REPOSICION DE VEREDAS 25484 179.00 142.37 175.00 144 82%
R-350 29/04/13 1.0 4" 27/05/13 CONEX. #S. 357,361,371,320 Y 321 40469.00 179 226.08 175.00
R-351 29/04/13 1.0 4" 27/05/13 40673.00 181 224.71 175.00 225 129%
R-352 29/04/13 1.0 4" 06/05/13 AV. MARIA PARADO DE BELLIDO 25484 181.00 140.80 175.00
R-353 29/04/13 1.0 4" 06/05/13 REPOSICION DE VEREDAS 26606 179.00 148.63 175.00 145 83%
R-354 29/04/13 1.0 4" 27/05/13 CONEX. #S. 697,690,685,680 Y 673 40979.00 181 226.40 175.00
R-355 29/04/13 1.0 4" 27/05/13 40775.00 179 227.79 175.00 227 130%
R-356 30/04/13 1.0 3 1/2 " 07/05/13 JR. VIZCARDO Y GUZMAN 28033 181.00 154.88 175.00
R-357 30/04/13 1.0 3 1/2 " 07/05/13 REPOSICION DE VEREDAS 29052 179.00 162.30 175.00 159 91%
R-358 30/04/13 1.0 3 1/2 " 28/05/13 47197.00 179 263.67 175.00
R-359 30/04/13 1.0 3 1/2 " 28/05/13 45872.00 181 253.44 175.00 259 148%
R-366 02/05/13 1.0 4" 09/05/13 JR. VIZCARDO Y GUZMAN 25688 181.00 141.92 175.00
R-367 02/05/13 1.0 4" 09/05/13 REPOSICION DE VEREDAS 27319 179.00 152.62 175.00 147 84%
R-369 02/05/13 1.0 4" 30/05/13 40469.00 179 226.08 175.00 221 126%
R-370 04/05/13 1.0 4" 11/05/13 JR. VIZCARDO Y GUZMAN 25994 181.00 143.61 175.00
R-371 04/05/13 1.0 4" 11/05/13 REPOSICION DE VEREDAS 26504 179.00 148.06 175.00 146 83%
R-373 04/05/13 1.0 4" 01/06/13 39755.00 179 222.09 175.00 224 128%
R-378 11/05/13 1.0 3 3/4 " 18/05/13 PASAJE ILO CON CALLE 2 32416 181.00 179.09 175.00
R-379 11/05/13 1.0 3 3/4 " 18/05/13 REPOSICION DE VEREDAS 32824 179.00 183.37 175.00 181 104%
R-380 11/05/13 1.0 3 3/4 " 08/06/13 50663.00 179 283.03 175.00
R-381 11/05/13 1.0 3 3/4 " 08/06/13 49235.00 179 275.06 175.00 279 159%
R-382 13/05/13 1.0 3 3/4 " 20/05/13 JR. MAMA OCLLO 26504 181.00 146.43 175.00
R-383 13/05/13 1.0 3 3/4 " 20/05/13 REPOSICION DE VEREDAS 26606 179.00 148.63 175.00 148 84%
R-384 13/05/13 1.0 3 3/4 " 10/06/13 35066.00 179 195.90 175.00
R-385 13/05/13 1.0 3 3/4 " 10/06/13 34353.00 179 191.92 175.00 194 111%
28
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
R-388 13/05/13 1.0 3 1/2 " 20/05/13 PASAJE 13 28644 179.00 160.02 175.00
R-389 13/05/13 1.0 3 1/2 " 20/05/13 REPOSICION DE VEREDAS 28746 181.00 158.82 175.00 159 91%
R-390 13/05/13 1.0 3 1/2 " 10/06/13 39959.00 181 220.77 175.00
R-391 13/05/13 1.0 3 1/2 " 10/06/13 40775.00 179 227.79 175.00 224 128%
R-392 14/05/13 1.0 4" 21/05/13 AV.JOSE SUCRE 25484 179.00 142.37 175.00
R-393 14/05/13 1.0 4" 21/05/13 REPOSICION DE VEREDAS 25178 181.00 139.11 175.00 141 80%
R-394 14/05/13 1.0 4" 11/06/13 CONEX.779,732,691,660,587,601 y 627 40571.00 181 224.15 175.00
R-395 14/05/13 1.0 4" 11/06/13 40265.00 181 222.46 175.00 223 128%
R-396 17/05/13 1.0 4" 24/05/13 JR. MIGUEL IGLESIAS 25484 179.00 142.37 175.00
R-397 17/05/13 1.0 4" 24/05/13 REPOSICION DE VEREDAS 25178 181.00 139.11 175.00 141 80%
R-398 17/05/13 1.0 4" 14/06/13 CONEX.387,391 Y 303 39755.00 181 219.64 175.00
R-399 17/05/13 1.0 4" 14/06/13 40265.00 179 224.94 175.00 222 127%
R-400 17/05/13 1.0 4" 24/05/13 JR. MARTE - URB. COLLIQUE 27523 179.00 153.76 175.00
R-401 17/05/13 1.0 4" 24/05/13 REPOSICION DE VEREDAS 28440 181.00 157.13 175.00 155 89%
R-402 17/05/13 1.0 4" 14/06/13 CONEX. MZ 5-LT.47,MZ.2 LT.25 Y 274 48012.00 179 268.22 175.00
R-403 17/05/13 1.0 4" 14/06/13 50051.00 179 279.61 175.00 274 157%
R-408 17/05/13 1.0 4" 24/05/13 AV. CERRO DE PASCO 28848 179.00 161.16 175.00
R-409 17/05/13 1.0 4" 24/05/13 REPOSICION DE VEREDAS 29969 181.00 165.58 175.00 163 93%
R-410 17/05/13 1.0 4" 14/06/13 CONEX. 1199,1198,1197,1195,1191 Y 1170 50866.00 179 284.17 175.00
R-411 17/05/13 1.0 4" 14/06/13 50255.00 179 280.75 175.00 282 161%
R-412 23/05/13 1.0 3 1/2 " 30/05/13 JR. AREQUIPA 29565 179.00 165.17 175.00
R-413 23/05/13 1.0 3 1/2 " 30/05/13 REPOSICION DE VEREDAS 29256 181.00 161.64 175.00 163 93%
R-414 23/05/13 1.0 3 1/2 " 20/06/13 EN CONEXIONES 40571.00 181 224.15 175.00
R-415 23/05/13 1.0 3 1/2 " 20/06/13 40571.00 181 224.15 175.00 224 128%
R-416 23/05/13 1.0 3 1/4 " 30/05/13 JR. ATAHUALPA 27727 179.00 154.90 175.00
R-417 23/05/13 1.0 3 1/4 " 30/05/13 REPOSICION DE VEREDAS 28542 181.00 157.69 175.00 156 89%
R-418 23/05/13 1.0 3 1/4 " 20/06/13 EN CONEXIONES 48930.00 181 270.33 175.00
R-419 23/05/13 1.0 3 1/4 " 20/06/13 47910.00 181 264.70 175.00 268 153%
29
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
R-420 25/05/13 1.0 3 1/4 " 01/06/13 JR. ATAHUALPA 27421 179.00 153.19 175.00
R-421 25/05/13 1.0 3 1/4 " 01/06/13 REPOSICION DE VEREDAS 28542 181.00 157.69 175.00 155 89%
R-422 25/05/13 1.0 3 1/4 " 22/06/13 EN CONEXIONES 49664.00 179 277.45 175.00
R-423 25/05/13 1.0 3 1/4 " 22/06/13 52110.00 179 291.12 175.00 284 162%
R-436 04/06/13 1.0 4" 11/06/13 AV. CERRO DE PASCO 28542 179.00 159.45 175.00
R-437 04/06/13 1.0 4" 11/06/13 REPOSICION DE VEREDAS 29154 181.00 161.07 175.00 160 92%
R-438 04/06/13 1.0 4" 02/07/13 CONEXIONES 850,830,82,779,728 Y 703 41386.00 181 228.65 175.00
R-439 04/06/13 1.0 4" 02/07/13 42202.00 181 233.16 175.00 231 132%
R-448 05/06/13 1.0 4" 12/06/13 AV. PEDRO DE LA GASCA 28542 176.00 162.17 175.00
R-449 05/06/13 1.0 4" 12/06/13 REPOSICION DE VEREDAS 28746 179.00 160.59 175.00 161 92%
R-450 05/06/13 1.0 4" 03/07/13 CONEXIONES 1174,1171,1138,1097,1088 Y 1084 41081.00 181 226.97 175.00
R-451 05/06/13 1.0 4" 03/07/13 41386.00 179 231.21 175.00 229 131%
R-456 08/06/13 1.0 4" 15/06/13 JR. HIPOLITO UNANUE 26504 179.00 148.07 175.00
R-457 08/06/13 1.0 4" 15/06/13 REPOSICION DE VEREDAS 26198 179.00 146.36 175.00 147 84%
R-458 08/06/13 1.0 4" 06/07/13 CONEXIONES 34760.00 181 192.04 175.00
R-459 08/06/13 1.0 4" 06/07/13 35576.00 181 196.55 175.00 194 111%
R-468 13/06/13 1.0 4" 20/06/13 AV.3 DE OCTUBRE 27523 179.00 153.76 175.00
R-469 13/06/13 1.0 4" 20/06/13 REPOSICION DE VEREDAS Y SARDINELES 28542 179.00 159.45 175.00 157 89%
R-470 13/06/13 1.0 4" 11/07/13 CUADRAS 13,15 40367.00 181 223.02 175.00
R-471 13/06/13 1.0 4" 11/07/13 41081.00 181 226.97 175.00 225 129%
R-476 14/06/13 1.0 4" 21/06/13 JR. 9 DE DICIEMBRE 29867 179.00 166.85 175.00
R-477 14/06/13 1.0 4" 21/06/13 REPOSICION DE VEREDAS 30245 179.00 168.97 175.00 168 96%
R-478 14/06/13 1.0 4" 12/07/13 #383,389,393,397,370,360 Y 377 39062.00 181 215.81 175.00
R-479 14/06/13 1.0 4" 12/07/13 39694.00 181 219.30 175.00 218 124%
R-492 17/06/13 1.0 4" 24/06/13 JR. HUAYNA CAPAC 30408 179.00 169.88 175.00
R-493 17/06/13 1.0 4" 24/06/13 REPOSICION DE VEREDAS Y RAMPAS 31560 179.00 176.31 175.00 173 99%
R-494 17/06/13 1.0 4" 15/07/13 #303,313,328B,327,349,349,388 Y 391 42365.00 181 234.06 175.00
R-495 17/06/13 1.0 4" 15/07/13 42620.00 181 235.47 175.00 235 134%
30
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
R-500 18/06/13 1.0 4" 25/06/13 AV. 3 DE OCTUBRE 28736 181.00 158.76 175.00
R-501 18/06/13 1.0 4" 25/06/13 REPOSICION DE VEREDAS 29867 181.00 165.01 175.00 162 93%
R-502 18/06/13 1.0 4" 16/07/13 CONEXIONES DE AGUA 43670.00 181 241.27 175.00
R-503 18/06/13 1.0 4" 16/07/13 43558.00 181 240.65 175.00 241 138%
R-504 18/06/13 1.0 4 1/4" 25/06/13 PSJ. MOQUEGUA 31458 181.00 173.80 175.00
R-505 18/06/13 1.0 4 1/4" 25/06/13 REPOSICION DE VEREDAS 30887 181.00 170.65 175.00 172 98%
R-507 18/06/13 1.0 4 1/4" 16/07/13 45189.00 181 249.66 175.00 248 142%
R-510 20/06/13 1.0 4 " 27/06/13 JR. 9 DE DICIEMBRE 28889 181.00 159.61 175.00
R-511 20/06/13 1.0 4 " 27/06/13 REPOSICION DE VEREDAS 29368 181.00 162.25 175.00 161 92%
R-513 20/06/13 1.0 4 " 18/07/13 38838.00 181 214.57 175.00 212 121%
R-514 22/06/13 1.0 4 " 29/06/13 AV. HUAYA CAPAC 33843 181.00 186.98 175.00
R-515 22/06/13 1.0 4 " 29/06/13 REPOSICION DE VEREDAS 33843 181.00 186.98 175.00 187 107%
R-516 22/06/13 1.0 4 " 20/07/13 CUADRAS 2 Y 3 38226.00 179 213.55 175.00
R-517 22/06/13 1.0 4 " 20/07/13 38940.00 181 215.14 175.00 214 122%
R-518 24/06/13 1.0 4 " 01/07/13 CALLE #17-URB. LOS CHASQUIS 33843 181.00 186.98 175.00
R-519 24/06/13 1.0 4 " 01/07/13 REPOSICION DE VEREDAS 33843 181.00 186.98 175.00 187 107%
R-521 24/06/13 1.0 4 " 22/07/13 40367.00 181 223.02 175.00 222 127%
R-526 25/06/13 1.0 4 " 02/07/13 JR. SAN MARTIN 31081 181.00 171.72 175.00
R-527 25/06/13 1.0 4 " 02/07/13 REPOSICION DE VEREDAS 30612 181.00 169.13 175.00 170 97%
R-528 25/06/13 1.0 4 " 23/07/13 #151,159,179,185 Y 189 40224.00 179 224.72 175.00
R-529 25/06/13 1.0 4 " 23/07/13 39990.00 181 220.94 175.00 223 127%
R-530 25/06/13 1.0 4 " 02/07/13 JR. RICARDO BENTIN 29358 181.00 162.20 175.00
R-531 25/06/13 1.0 4 " 02/07/13 REPOSICION DE VEREDAS 28236 181.00 156.00 175.00 159 91%
R-532 25/06/13 1.0 4 " 23/07/13 CONEXIONES DE AGUA 42161.00 179 235.54 175.00
R-533 25/06/13 1.0 4 " 23/07/13 40581.00 181 224.20 175.00 230 131%
31
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
R-546 28/06/13 1.0 3 1/2 " 05/07/13 PSJ. LUIS PARDO-COOP. J. VELASCO 30377 181.00 167.83 175.00
R-547 28/06/13 1.0 3 1/2 " 05/07/13 REPOSICION DE VEREDAS 29460 179.00 164.58 175.00 166 95%
R-548 28/06/13 1.0 3 1/2 " 26/07/13 MZ. N° LT 32,31,28,26 Y25 42365.00 179 236.68 175.00
R-549 28/06/13 1.0 3 1/2 " 26/07/13 42946.00 181 237.27 175.00 237 135%
R-558 01/07/13 1.0 4 " 08/07/13 JR. RICARDO BENTIN 30275 181.00 167.27 175.00
R-559 01/07/13 1.0 4 " 08/07/13 REPOSICION DE VEREDAS 30071 179.00 167.99 175.00 168 96%
R-560 01/07/13 1.0 4 " 29/07/13 CONXIONES DE AGUA 41662.00 181 230.18 175.00
R-561 01/07/13 1.0 4 " 29/07/13 41325.00 181 228.31 175.00 229 131%
R-562 04/07/13 1.0 3 3/4 " 11/07/13 JR. PABLO DE OLAVIDE 30938 181.00 170.93 175.00
R-563 04/07/13 1.0 3 3/4 " 11/07/13 REPOSICION DE VEREDAS 31427 179.00 175.57 175.00 173 99%
R-564 04/07/13 1.0 3 3/4 " 01/08/13 CUADRA 5 43486.00 181 240.25 175.00
R-565 04/07/13 1.0 3 3/4 " 01/08/13 42640.00 181 235.58 175.00 238 136%
R-566 08/07/13 1.0 4 " 15/07/13 JR. PACHACUTEC 30938 181.00 170.93 175.00
R-567 08/07/13 1.0 4 " 15/07/13 REPOSICION DE VEREDAS 31427 181.00 173.63 175.00 172 98%
R-568 08/07/13 1.0 4 " 05/08/13 CONXIONES DE AGUA 45178.00 181 249.60 175.00
R-569 08/07/13 1.0 4 " 05/08/13 44740.00 181 247.18 175.00 248 142%
R-578 11/07/13 1.0 4 " 18/07/13 JR. USARES DE JUNIN 30245 179.00 168.97 175.00
R-579 11/07/13 1.0 4 " 18/07/13 REPOSICION DE VEREDAS 30000 179.00 167.60 175.00 168 96%
R-580 11/07/13 1.0 4 " 08/08/13 CONXIONES DE AGUA 41417.00 179 231.38 175.00
R-581 11/07/13 1.0 4 " 08/08/13 41254.00 181 227.92 175.00 230 131%
R-582 15/07/13 1.0 3 3/4 " 22/07/13 JR. JOSE PEZET 29521 179.00 164.92 175.00
R-583 15/07/13 1.0 3 3/4 " 22/07/13 REPOSICION DE VEREDAS 30815 181.00 170.25 175.00 168 96%
R-584 15/07/13 1.0 3 3/4 " 12/08/13 36300.00 179 202.79 175.00
R-585 15/07/13 1.0 3 3/4 " 12/08/13 37085.00 179 207.18 175.00 205 117%
R-590 16/07/13 1.0 4 " 23/07/13 AV. JULIO C. TELLO 30204 179.00 168.74 175.00
R-591 16/07/13 1.0 4 " 23/07/13 REPOSICION DE VEREDAS Y SARDINELES 31203 181.00 172.39 175.00 171 97%
R-592 16/07/13 1.0 4 " 13/08/13 CUADRA 9,10 41641.00 181 230.06 175.00
R-593 16/07/13 1.0 4 " 13/08/13 40856.00 181 225.72 175.00 228 130%
32
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
R-598 18/07/13 1.0 4 " 25/07/13 AV. MARIANO IGNACIO PRADO 30948 181.00 170.98 175.00
R-599 18/07/13 1.0 4 " 25/07/13 REPOSICION DE VEREDAS Y SARDINELES 31274 181.00 172.78 175.00 172 98%
R-600 18/07/13 1.0 4 " 15/08/13 CUADRA 3 Y 4 39806.00 181 219.92 175.00
R-601 18/07/13 1.0 4 " 15/08/13 40398.00 181 223.19 175.00 222 127%
R-606 19/07/13 1.0 4 " 26/07/13 AV. VIRGEN DEL CAMNEN 31641 181.00 174.81 175.00
R-607 19/07/13 1.0 4 " 26/07/13 REPOSICION DE VEREDAS Y SARDINELES 31407 181.00 173.52 175.00 174 100%
R-608 19/07/13 1.0 4 " 16/08/13 CUADRA 6 Y 7 48165.00 181 266.10 175.00
R-609 19/07/13 1.0 4 " 16/08/13 48583.00 181 268.41 175.00 267 153%
R-614 24/07/13 1.0 3 1/2 " 31/07/13 JR. HUSARES DE JUNIN 30459 181.00 168.28 175.00
R-615 24/07/13 1.0 3 1/2 " 31/07/13 REPOSICION DE VEREDAS Y SARDINELES 31152 181.00 172.11 175.00
R-616 24/07/13 1.0 3 1/2 " 21/08/13 CUADRA 1 43771.66 181 241.83 175.00
R-617 24/07/13 1.0 3 1/2 " 21/08/13 44424.06 181 245.44 175.00 244 139%
R-618 25/07/13 1.0 3 1/2 " 01/08/13 JR. TACNA 30887 181.00 170.65 175.00
R-619 25/07/13 1.0 3 1/2 " 01/08/13 REPOSICION DE VEREDAS Y SARDINELES 31172 181.00 172.22 175.00 171 98%
R-620 25/07/13 1.0 3 1/2 " 22/08/13 CUADRA 1 Y 2 43353.72 181 239.52 175.00
R-621 25/07/13 1.0 3 1/2 " 22/08/13 44057.08 181 243.41 175.00 241 138%
R-622 08/08/13 1.0 4 " 15/08/13 JR. CARCAMO 30408 181.00 168.00 175.00
R-623 08/08/13 1.0 4 " 15/08/13 REPOSICION DE VEREDAS Y SARDINELES 30245 181.00 167.10 175.00
R-624 08/08/13 1.0 4 " 05/09/13 CUADRA 1 Y 2 41437.31 181 228.94 175.00
R-625 08/08/13 1.0 4 " 05/09/13 46636.09 181 257.66 175.00 243 139%
R-626 08/08/13 1.0 4 " 15/08/13 AV. JOSE ANTONIO DE SUCRE 30418 181.00 168.06 175.00
R-627 08/08/13 1.0 4 " 15/08/13 REPOSICION DE VEREDAS Y SARDINELES 31172 181.00 172.22 175.00
R-628 08/08/13 1.0 4 " 05/09/13 CUADRA 1 Y 2 43873.60 181 242.40 175.00
R-629 08/08/13 1.0 4 " 05/09/13 41671.76 181 230.23 175.00 236 135%
R-630 01/08/13 1.0 4 " 08/08/13 JR. MIGUEL GRAU 31121 181.00 171.94 175.00
R-631 01/08/13 1.0 4 " 08/08/13 REPOSICION DE VEREDAS Y SARDINELES 30765 181.00 169.97 175.00
R-632 01/08/13 1.0 4 " 29/08/13 CUADRA 1 45565.75 181 251.74 175.00
R-633 01/08/13 1.0 4 " 29/08/13 44495.41 181 245.83 175.00 249 142%
33
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
R-634 02/08/13 1.0 4 " 09/08/13 JR. 3 DE OCTUBRE 31274 181.00 172.78 175.00
R-635 02/08/13 1.0 4 " 09/08/13 REPOSICION DE VEREDAS Y SARDINELES 31519 181.00 174.14 175.00
R-636 02/08/13 1.0 4 " 30/08/13 CUADRA 6,7 40030.58 181 221.16 175.00
R-637 02/08/13 1.0 4 " 30/08/13 37563.71 181 207.53 175.00 214 122%
R-638 02/08/13 1.0 3 1/2 " 09/08/13 JR. LA UNION/ JAMAICA 30917 181.00 170.81 175.00
R-639 02/08/13 1.0 3 1/2 " 09/08/13 REPOSICION DE VEREDAS Y SARDINELES 30917 181.00 170.81 175.00 171 98%
R-640 02/08/13 1.0 3 1/2 " 30/08/13 CUADRA 6,7 48950.05 181 270.44 175.00
R-641 02/08/13 1.0 3 1/2 " 30/08/13 44811.42 181 247.58 175.00 259 148%
R-641 03/08/13 1.0 3 1/2 " 10/08/13 AV. LORG COCRANE 27594 179.00 154.16 175.00
R-642 03/08/13 1.0 3 1/2 " 10/08/13 REPOSICION DE VEREDAS Y SARDINELES 28889 179.00 161.39 175.00
R-643 03/08/13 1.0 3 1/2 " 31/08/13 CUADRA 2,3 37370.03 181 206.46 175.00
R-644 03/08/13 1.0 3 1/2 " 31/08/13 36024.46 181 199.03 175.00 203 116%
R-645 05/08/13 1.0 4" 12/08/13 AV. 3 DE OCTUBRE 31223 181.00 172.50 175.00
R-646 05/08/13 1.0 4" 12/08/13 REPOSICION DE VEREDAS Y SARDINELES 31611 181.00 174.65 175.00 174 99%
R-647 05/08/13 1.0 4" 02/09/13 CUADRA 10 Y 11 41620.80 181 229.95 175.00
R-648 05/08/13 1.0 4" 02/09/13 37268.09 181 205.90 175.00 218 125%
R-649 06/08/13 1.0 4" 13/08/13 AV. 3 DE OCTUBRE 30612 181.00 169.13 175.00
R-650 06/08/13 1.0 4" 13/08/13 REPOSICION DE VEREDAS Y SARDINELES 30703 179.00 171.53 175.00 170 97%
R-651 06/08/13 1.0 4" 03/09/13 CUADRA 8 Y 9 36819.57 181 203.42 175.00
R-652 06/08/13 1.0 4" 03/09/13 39836.90 181 220.09 175.00 212 121%
R-653 06/08/13 1.0 4" 13/08/13 AV. 1° DE MAYO 31019 181.00 171.38 175.00
R-654 06/08/13 1.0 4" 13/08/13 REPOSICION DE VEREDAS Y SARDINELES 31478 181.00 173.91 175.00
R-655 06/08/13 1.0 4" 03/09/13 CUADRA 9 Y 10 43384.30 181 239.69 175.00
R-656 06/08/13 1.0 4" 03/09/13 51131.50 181 282.49 175.00 261 149%
R-657 06/08/13 1.0 4" 13/08/13 JR. PEDRO PAULET 31335 181.00 173.12 175.00
R-658 06/08/13 1.0 4" 13/08/13 REPOSICION DE VEREDAS Y SARDINELES 31152 181.00 172.11 175.00 173 99%
R-659 06/08/13 1.0 4" 03/09/13 CUADRA 2 51406.73 181 284.02 175.00
R-660 06/08/13 1.0 4" 03/09/13 50142.71 181 277.03 175.00 281 160%
34
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
R-661 07/08/13 1.0 4" 14/08/13 Cll. JOAQUIN COPELO/J.C. MARIATEGUI 30683 181.00 169.52 175.00
R-662 07/08/13 1.0 4" 14/08/13 REPOSICION DE VEREDAS Y SARDINELES 31397 181.00 173.46 175.00 171 98%
R-663 07/08/13 1.0 4" 04/09/13 CUADRA 2 44087.67 181 243.58 175.00
R-664 07/08/13 1.0 4" 04/09/13 42986.75 181 237.50 175.00 241 137%
R-665 07/08/13 1.0 4" 14/08/13 AV. JOSE ANTONIO DE SUCRE 30785 181.00 170.08 175.00
R-666 07/08/13 1.0 4" 14/08/13 REPOSICION DE VEREDAS Y SARDINELES 30377 181.00 167.83 175.00 169 97%
R-667 07/08/13 1.0 4" 04/09/13 CUADRA 2 Y 3 50978.59 181 281.65 175.00
R-668 07/08/13 1.0 4" 04/09/13 48552.50 181 268.25 175.00 275 157%
R-669 07/08/13 1.0 4" 14/08/13 AV. JOSÉ ANTNIO DE SUCRE - LIMA NORTE 30785 179.00 171.98 175.00
R-670 07/08/13 1.0 4" 14/08/13 REPOSICION DE VEREDAS Y SARDINELES 30377 179.00 169.70 175.00 171 98%
R-671 07/08/13 1.0 4" 04/09/13 CUADRA 2 ,3 39541.28 183 216.07 175.00
R-672 07/08/13 1.0 4" 04/09/13 38216.11 177 215.91 175.00 216 123%
R-673 07/08/13 1.0 4" 14/08/13 JR. CARCAMO 36351 181.00 200.83 175.00
R-674 07/08/13 1.0 4" 14/08/13 REPOSICION DE VEREDAS Y SARDINELES 33160 181.00 183.20 175.00 192 110%
R-675 07/08/13 1.0 4" 04/09/13 CUADRA 2 42059.12 181 232.37 175.00
R-676 07/08/13 1.0 4" 04/09/13 47757.39 181 263.85 175.00 248 142%
R-677 08/08/13 1.0 4" 15/08/13 JR. LAS AMERICAS 32650 181.00 180.39 175.00
R-678 08/08/13 1.0 4" 15/08/13 REPOSICION DE VEREDAS Y SARDINELES 30836 181.00 170.36 175.00 175 100%
R-679 08/08/13 1.0 4" 05/09/13 CUADRA 6 39806.00 181 219.92 175.00
R-680 08/08/13 1.0 4" 05/09/13 40398.00 181 223.19 175.00 222 127%
R-681 08/08/13 1.0 4" 15/08/13 PROLONGACION AV. A.J. DE SUCRE-AA. HH 38573 181.00 213.11 175.00
R-682 08/08/13 1.0 4" 15/08/13 MZ. "B" Y MZ "F" ENTRE AV. SANTA ROSA 33700 181.00 186.19 175.00 200 114%
R-683 08/08/13 1.0 4" 05/09/13 Y JR. GENERAL SAN MARTIN 47237.51 181 260.98 175.00
R-684 08/08/13 1.0 4" 05/09/13 49367.99 181 272.75 175.00 267 152%
R-685 09/08/13 1.0 4" 16/08/13 PSJ. JAVIER PRODO 36249 179.00 202.51 175.00
R-686 09/08/13 1.0 4" 16/08/13 REPOSICION DE VEREDAS Y SARDINELES 32802 181.00 181.23 175.00 192 110%
R-687 09/08/13 1.0 4" 06/09/13 CUADRAS 7 Y 8 51610.60 181 285.14 175.00
R-688 09/08/13 1.0 4" 06/09/13 50112.13 181 276.86 175.00 281 161%
35
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
R-689 09/08/13 1.0 4" 16/08/13 JR. 8 DE ENERO Y JR. CARCAMO 37248 181.00 205.79 175.00
R-690 09/08/13 1.0 4" 16/08/13 REPOSICION DE VEREDAS Y SARDINELES 35708 181.00 197.28 175.00 202 115%
R-691 09/08/13 1.0 4" 06/09/13 JR. 8 DE NERO CUADRA 13 Y JR. CARCAMO 47288.48 181 261.26 175.00
R-692 09/08/13 1.0 4" 06/09/13 53068.30 181 293.20 175.00 277 158%
R-693 09/08/13 1.0 4" 16/08/13 CLL. FEDERICO BARRETO Y RICARDO PALMA 25270 181.00 139.61 175.00
R-694 09/08/13 1.0 4" 16/08/13 REPOSICION DE VEREDAS Y SARDINELES 27207 181.00 150.31 175.00 145 83%
R-695 09/08/13 1.0 4" 06/09/13 CUADRA 1 EN AMBOS LADOS 37512.74 181 207.25 175.00
R-696 09/08/13 1.0 4" 06/09/13 37074.41 181 204.83 175.00 206 118%
R-697 12/08/13 1.0 4" 19/08/13 JR. CANDAMO 29490 181.00 162.93 175.00
R-698 12/08/13 1.0 4" 19/08/13 REPOSICION DE VEREDAS Y SARDINELES 30031 181.00 165.92 175.00 164 94%
R-699 12/08/13 1.0 4" 09/09/13 CUADRAS 5 Y 6 53037.72 181 293.03 175.00
R-700 12/08/13 1.0 4" 09/09/13 50468.91 181 278.83 175.00 286 163%
R-701 12/08/13 1.0 4" 19/08/13 JR. LORD COCRANE 30051 181.00 166.03 175.00
R-702 12/08/13 1.0 4" 19/08/13 REPOSICION DE VEREDAS Y SARDINELES 30826 181.00 170.31 175.00 168 96%
R-703 12/08/13 1.0 4" 09/09/13 CUADRA 4 39643.22 181 219.02 175.00
R-704 12/08/13 1.0 4" 09/09/13 35545.36 181 196.38 175.00 208 119%
R-705 13/08/13 1.0 4" 20/08/13 CALLE ANDRES BELLO 31427 181.00 173.63 175.00
R-706 13/08/13 1.0 4" 20/08/13 REPOSICION DE VEREDAS Y SARDINELES 30775 181.00 170.03 175.00 172 98%
R-707 13/08/13 1.0 4" 10/09/13 CUADRA 1 46024.46 181 254.28 175.00
R-708 13/08/13 1.0 4" 10/09/13 50417.94 181 278.55 175.00 266 152%
R-709 15/08/13 1.0 3 3/4" 22/08/13 AA. HH 9 DE SETIEMBRE 31794 181.00 175.66 175.00
R-710 15/08/13 1.0 3 3/4" 22/08/13 REPOSICION DE VEREDAS Y SARDINELES 31774 181.00 175.55 175.00 176 100%
R-711 15/08/13 1.0 3 3/4" 12/09/13 SECTOR DE LAS MZ "A" Y "B" 44699.29 181 246.96 175.00
R-712 15/08/13 1.0 3 3/4" 12/09/13 46248.73 181 255.52 175.00 251 144%
R-713 15/08/13 1.0 4" 22/08/13 AV. JOSE PARDO 31549 181.00 174.31 175.00
R-714 15/08/13 1.0 4" 22/08/13 REPOSICION DE VEREDAS Y SARDINELES 31019 181.00 171.38 175.00 173 99%
R-715 15/08/13 1.0 4" 12/09/13 CUADRA 2 52528.03 179 293.29 175.00
R-716 15/08/13 1.0 4" 12/09/13 51100.92 179 285.48 175.00 289 165%
36
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
R-717 17/08/13 1.0 4" 24/08/13 JR. LARCO HERRERA 31845 181.00 174.31 175.00
R-718 17/08/13 1.0 4" 24/08/13 REPOSICION DE VEREDAS Y SARDINELES 31305 181.00 171.38 175.00 173 99%
R-719 17/08/13 1.0 4" 14/09/13 CUADRA 1 50438.33 179 281.62 175.00
R-720 17/08/13 1.0 4" 14/09/13 50998.98 179 284.91 175.00 283 162%
R-721 17/08/13 1.0 3 3/4" 24/08/13 JR. GENERAL SUCRE 32080 181.00 174.31 175.00
R-722 17/08/13 1.0 3 3/4" 24/08/13 REPOSICION DE VEREDAS Y SARDINELES 31641 181.00 171.38 175.00 173 99%
R-723 17/08/13 1.0 3 3/4" 14/09/13 CUADRA 1 43914.37 183 239.97 175.00
R-724 17/08/13 1.0 3 3/4" 14/09/13 45494.39 183 248.47 175.00 244 140%
R-725 17/08/13 1.0 3 3/4" 24/08/13 AV. PEDRO DE LA GASCA 25892 183.00 141.49 175.00
R-726 17/08/13 1.0 3 3/4" 24/08/13 REPOSICION DE VEREDAS Y SARDINELES 26891 179.00 150.23 175.00 146 83%
R-727 17/08/13 1.0 3 3/4" 14/09/13 CUADRA 2 41946.99 182 230.99 175.00
R-728 17/08/13 1.0 3 3/4" 14/09/13 41141.69 181 226.80 175.00 229 131%
R-729 20/08/13 1.0 3 3/4" 27/08/13 JR. PARRARDELLI Y FRANCISCO DE ZALA 29134 181.00 160.96 175.00
R-730 20/08/13 1.0 3 3/4" 27/08/13 REPOSICION DE VEREDAS Y SARDINELES 30143 181.00 166.53 175.00 164 94%
R-731 20/08/13 1.0 3 3/4" 17/09/13 CUADRA 4,F. ZELA CUADRA 1 Y2 34209.99 183 186.94 175.00
R-732 20/08/13 1.0 3 3/4" 17/09/13 36156.98 177 204.28 175.00 196 112%
R-733 23/08/13 1.0 4" 30/08/13 AV.MANUEL GONZALES PRADA 23170 178.00 130.17 175.00
R-734 23/08/13 1.0 4" 30/08/13 REPOSICION DE VEREDAS Y SARDINELES 21458 181.00 118.55 175.00 124 71%
R-735 23/08/13 1.0 4" 20/09/13 CUADRA 8 31661.57 179 176.88 175.00
R-736 23/08/13 1.0 4" 20/09/13 32099.90 179 179.33 175.00 178 102%
R-737 23/08/13 1.0 4" 30/08/13 JR. REVOLUCION Y CIRO ALEGRIA 27839 181.00 153.81 175.00
R-738 23/08/13 1.0 4" 30/08/13 REPOSICION DE VEREDAS Y SARDINELES 29113 181.00 160.85 175.00 157 90%
R-739 23/08/13 1.0 4" 20/09/13 CUADRA 1 AMBOS JIRONES 32782.87 177 185.21 175.00
R-740 23/08/13 1.0 4" 20/09/13 34281.35 177 193.68 175.00 189 108%
R-741 23/08/13 1.0 4" 30/08/13 AV. JULIO C. TELLO 32508 184.00 176.67 175.00
R-742 23/08/13 1.0 4" 30/08/13 REPOSICION DE VEREDAS Y SARDINELES 30928 175.00 176.73 175.00 177 101%
R-743 23/08/13 1.0 4" 20/09/13 CUADRA 2 44882.77 181 247.97 175.00
R-744 23/08/13 1.0 4" 20/09/13 44495.41 181 245.83 175.00 247 141%
37
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
R-749 27/08/13 1.0 4" 03/09/13 AV.3 DE OCTUBRE Y PSJE. CERRO DE PASCO 40540 184.00 220.33 175.00
R-750 27/08/13 1.0 4" 03/09/13 REPOSICION DE VEREDAS Y SARDINELES 36391 175.00 207.95 175.00 214 122%
R-751 27/08/13 1.0 4" 24/09/13 CUADRA 6 DE AV. 3 DE OCTUBRE 44373.09 181 245.16 175.00
R-752 27/08/13 1.0 4" 24/09/13 CUADRA 1 PSJ. CERRO DE PASCO 45728.85 181 252.65 175.00 249 142%
R-753 27/08/13 1.0 4" 03/09/13 JR. PALLARDELLI Y JR. PUMACAHUA 32528 184.00 176.78 175.00
R-754 27/08/13 1.0 4" 03/09/13 REPOSICION DE VEREDAS Y SARDINELES 34332 175.00 196.18 175.00 186 107%
R-755 27/08/13 1.0 4" 24/09/13 JR. PALLARDELLI - CUADRA 4 37655.45 181 208.04 175.00
R-756 27/08/13 1.0 4" 24/09/13 Y JR. PUMACAHUA CUADRA - 3 37482.16 181 207.08 175.00 208 119%
R-7457 29/08/13 1.0 4" 05/09/13 AV. SR. DE LOS MILAGROS. 25291 184.00 137.45 175.00
R-758 29/08/13 1.0 4" 05/09/13 REPOSICION DE VEREDAS Y SARDINELES 26249 175.00 149.99 175.00 144 82%
R-759 29/08/13 1.0 4" 26/09/13 CUADRA 1 Y 2 39418.96 181 217.78 175.00
R-760 29/08/13 1.0 4" 26/09/13 38644.24 181 213.50 175.00 216 123%
R-761 29/08/13 1.0 4" 05/09/13 JR. POTOCARRERO 35229 184.00 191.46 175.00
R-762 29/08/13 1.0 4" 05/09/13 REPOSICION DE VEREDAS Y SARDINELES 33466 175.00 191.23 175.00 191 109%
R-763 29/08/13 1.0 4" 26/09/13 CUADRA 3 41406.73 181 228.77 175.00
R-764 29/08/13 1.0 4" 26/09/13 42844.04 181 236.71 175.00 233 133%
R-765 05/09/13 1.0 4" 12/09/13 JR. MIGUEL IGLESIAS. 27380 183.00 149.62 175.00
R-766 05/09/13 1.0 4" 12/09/13 REPOSICION DE VEREDAS Y SARDINELES 24832 181.00 137.19 175.00 143 82%
R-767 05/09/13 1.0 4" 03/10/13 CUADRAS - 1 Y 2 33669.72 181 186.02 175.00
R-768 05/09/13 1.0 4" 03/10/13 33211.01 181 183.49 175.00 185 106%
R-769 07/09/13 1.0 4" 14/09/13 JR. MANUEL VILLARAN 29399 183.00 160.65 175.00
R-770 07/09/13 1.0 4" 14/09/13 REPOSICION DE VEREDAS Y SARDINELES 28318 181.00 156.45 175.00 159 91%
R-771 07/09/13 1.0 4" 05/10/13 CUADRAS - 1 Y 2 32640.16 181 180.33 175.00
R-772 07/09/13 1.0 4" 05/10/13 33516.82 181 185.18 175.00 183 104%
R-773 09/09/13 1.0 4" 16/09/13 JR. MANUEL CANDAMO. 28583 181.30 157.66 175.00
R-774 09/09/13 1.0 4" 16/09/13 REPOSICION DE VEREDAS Y SARDINELES 27696 179.10 154.64 175.00 156 89%
R-775 09/09/13 1.0 4" 07/10/13 CUADRAS - 4 Y 5 40377.17 181 223.08 175.00
R-776 09/09/13 1.0 4" 07/10/13 36972.48 181 204.27 175.00 214 122%
38
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
R-777 10/09/13 1.0 4" 17/09/13 PSJE. LOS ALAMOS Y PSJE. LOS CLAVELES 33405 180.30 185.27 175.00
R-778 10/09/13 1.0 4" 17/09/13 REPOSICION DE VEREDAS Y SARDINELES 33170 182.60 181.66 175.00 183 105%
R-779 10/09/13 1.0 4" 08/10/13 MZ. - H 50835.88 181 280.86 175.00
R-780 10/09/13 1.0 4" 08/10/13 49480.12 181 273.37 175.00 277 158%
R-781 12/09/13 1.0 4" 19/09/13 PSJE. SANTA FE / VILLARAN. 26575 183.80 144.59 175.00
R-782 12/09/13 1.0 4" 19/09/13 REPOSICION DE VEREDAS Y SARDINELES 27992 181.30 154.40 175.00 149 85%
R-783 12/09/13 1.0 4" 10/10/13 CUADRA - 1 34709.48 181 191.77 175.00
R-784 12/09/13 1.0 4" 10/10/13 35739.04 181 197.45 175.00 195 111%
R-785 13/09/13 1.0 4" 20/09/13 JR. MANUEL CANDAMO 30143 182.30 165.35 175.00
R-786 13/09/13 1.0 4" 20/09/13 REPOSICION DE VEREDAS Y SARDINELES 29083 183.10 158.83 175.00 162 93%
R-787 13/09/13 1.0 4" 11/10/13 CUADRA - 1 39989.81 181 220.94 175.00
R-788 13/09/13 1.0 4" 11/10/13 40632.01 181 224.49 175.00 223 127%
R-789 14/09/13 1.0 4" 21/09/13 JR. CAHUIDE. 40061 185.00 216.55 175.00
R-790 14/09/13 1.0 4" 21/09/13 REPOSICION DE VEREDAS Y SARDINELES 41825 178.00 234.97 175.00 226 129%
R-791 14/09/13 1.0 4" 12/10/13 CUADRA - 1 49398.57 185 267.02 175.00
R-792 14/09/13 1.0 4" 12/10/13 48593.27 183 266.12 175.00 267 152%
R-793 14/09/13 1.0 4" 21/09/13 PSJE. SAN JOSE 36116 178.10 202.79 175.00
R-794 14/09/13 1.0 4" 21/09/13 REPOSICION DE VEREDAS Y SARDINELES 33904 180.30 188.04 175.00 195 112%
R-795 14/09/13 1.0 4" 12/10/13 CUADRA - 1 46167.18 183 252.83 175.00
R-796 14/09/13 1.0 4" 12/10/13 47889.91 181 264.00 175.00 258 148%
R-797 16/09/13 1.0 4" 23/09/13 PSJE. GONZALES PRADA 34709 180.20 192.62 175.00
R-798 16/09/13 1.0 4" 23/09/13 REPOSICION DE VEREDAS Y SARDINELES 36045 179.30 201.03 175.00 197 112%
R-799 16/09/13 1.0 4" 14/10/13 CUADRA - 1 43730.89 178 245.82 175.00
R-800 16/09/13 1.0 4" 14/10/13 48552.50 178 272.92 175.00 259 148%
R-801 17/09/13 1.0 4" 24/09/13 AV. HUAYNA CAPAC. 26391 180.30 146.38 175.00
R-802 17/09/13 1.0 4" 24/09/13 REPOSICION DE VEREDAS Y SARDINELES 26585 177.90 149.44 175.00 148 85%
R-803 17/09/13 1.0 4" 15/10/13 CUADRA - 1 35056.07 178 197.05 175.00
R-804 17/09/13 1.0 4" 15/10/13 32059.12 178 180.21 175.00 189 108%
39
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
R-805 17/09/13 1.0 4" 24/09/13 CALLE MANCO INCA 33486 176.70 189.51 175.00
R-806 17/09/13 1.0 4" 24/09/13 REPOSICION DE VEREDAS Y SARDINELES 32273 179.10 180.20 175.00 185 106%
R-808 17/09/13 1.0 4" 15/10/13 44475.03 177 251.70 175.00 258 147%
R-809 19/09/13 1.0 4" 26/09/13 JR. LOS CEDROS 23812 182.60 130.41 175.00
R-810 19/09/13 1.0 4" 26/09/13 REPOSICION DE VEREDAS Y SARDINELES 25607 179.10 142.97 175.00 137 78%
R-812 19/09/13 1.0 4" 17/10/13 36360.86 178 204.39 175.00 196 112%
R-813 20/09/13 1.0 4" 27/09/13 CALLE WIRACOCHA 38828 179.10 216.79 175.00
R-814 20/09/13 1.0 4" 27/09/13 REPOSICION DE VEREDAS Y SARDINELES 37176 181.40 204.94 175.00 211 120%
R-816 20/09/13 1.0 4" 18/10/13 47461.77 177 268.60 175.00 266 152%
R-817 21/09/13 1.0 4" 28/09/13 AV. HUAYNA CAPAC. - LIMA NORTE 35780 180.20 198.56 175.00
R-818 21/09/13 1.0 4" 28/09/13 REPOSICION DE VEREDAS Y SARDINELES 34873 182.60 190.98 175.00 195 111%
R-819 21/09/13 1.0 4" 19/10/13 CUADRA - 1. 47359.84 177 268.02 175.00
R-820 21/09/13 1.0 4" 19/10/13 44678.90 177 252.85 175.00 260 149%
R-821 23/09/13 1.0 4" 30/09/13 CALLE MANCO INCA Y WIRACOCHA. - LIMA N 28552 182.60 156.37 175.00
R-822 23/09/13 1.0 4" 30/09/13 REPOSICION DE VEREDAS Y SARDINELES 30714 177.90 172.65 175.00 165 94%
R-823 23/09/13 1.0 4" 21/10/13 CUADRA - 2 . (AMBAS CALLES) 34230.38 181 188.70 175.00
R-824 23/09/13 1.0 4" 21/10/13 32874.62 179 183.55 175.00 186 106%
R-825 23/09/13 1.0 4" 30/09/13 CALLE MANCO INCA Y WIRACOCHA. - LIMA N 33772 181.40 186.17 175.00
R-826 23/09/13 1.0 4" 30/09/13 REPOSICION DE VEREDAS Y SARDINELES 33649 180.30 186.63 175.00 186 107%
R-827 23/09/13 1.0 4" 21/10/13 CUADRA - 2 . (AMBAS CALLES) 41009 41009.17 183 224.58 175.00
R-828 23/09/13 1.0 4" 21/10/13 39918 39918.45 177 225.91 175.00 225 129%
R-829 24/09/13 1.0 4" 01/10/13 JR. LOS NOGALES. - LIMA NORTE 33017 177.90 185.59 175.00
R-830 24/09/13 1.0 4" 01/10/13 REPOSICION DE VEREDAS Y SARDINELES 31967 180.30 177.30 175.00 181 104%
R-831 24/09/13 1.0 4" 22/10/13 CUADRA - 1 38104 38103.98 179 212.75 175.00
R-832 24/09/13 1.0 4" 22/10/13 38899 38899.08 183 213.03 175.00 213 122%
40
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
R-833 25/09/13 1.0 4" 02/10/13 JR. HUASCAR / PSJE. SANTA ROSA. - LIMA N 36871 177.90 207.25 175.00
R-834 25/09/13 1.0 4" 02/10/13 REPOSICION DE VEREDAS Y SARDINELES 34913 180.30 193.64 175.00 200 115%
R-835 25/09/13 1.0 4" 23/10/13 CUADRA - 1 43996 43995.92 181 242.54 175.00
R-836 25/09/13 1.0 4" 23/10/13 42773 42772.68 179 238.82 175.00 241 138%
R-837 26/09/13 1.0 4" 03/10/13 JR. HUASCAR / PSJE. SANTA ROSA. - LIMA N 36871 177.90 207.25 175.00
R-838 26/09/13 1.0 4" 03/10/13 REPOSICION DE VEREDAS Y SARDINELES 34913 179.10 194.94 175.00 201 115%
R-839 26/09/13 1.0 4" 24/10/13 CUADRA - 1 43996 43995.92 181 242.54 175.00
R-840 26/09/13 1.0 4" 24/10/13 42773 42772.68 179 238.82 175.00 241 138%
R-841 28/09/13 1.0 4" 05/10/13 PSJE. LOS OLIVOS. - LIMA NORTE 27268 177.90 153.28 175.00
R-842 28/09/13 1.0 4" 05/10/13 REPOSICION DE VEREDAS Y SARDINELES 28675 179.10 160.11 175.00 157 90%
R-843 28/09/13 1.0 4" 26/10/13 CUADRA - 1 38970 38970.44 181 214.83 175.00
R-844 28/09/13 1.0 4" 26/10/13 37268 37268.09 179 208.09 175.00 211 121%
R-851 28/09/13 1.0 4" 05/10/13 AV. UNIVERSITARIA. - 40133 181.40 221.24 175.00
R-852 28/09/13 1.0 4" 05/10/13 REPOSICION DE VEREDAS Y SARDINELES 40907 176.70 231.51 175.00 226 129%
R-853 28/09/13 1.0 4" 26/10/13 CUADRA - 75 . 52222 52222.22 179 291.58 175.00
R-854 28/09/13 1.0 4" 26/10/13 48552 48552.50 179 271.09 175.00 281 161%
R-867 01/10/13 1.0 4" 08/10/13 AV. JULIO C. TELLO. 32895 180.30 182.45 175.00
R-868 01/10/13 1.0 4" 08/10/13 REPOSICION DE VEREDAS Y SARDINELES 36014 180.20 199.86 175.00 191 109%
R-869 01/10/13 1.0 4" 29/10/13 CUADRA 11 50999 50998.98 183 279.29 175.00
R-870 01/10/13 1.0 4" 29/10/13 49959 49959.23 183 273.60 175.00 276 158%
R-871 02/10/13 1.0 4" 09/10/13 AV. UNIVERSITARIA 34322 183.80 186.74 175.00
R-872 02/10/13 1.0 4" 09/10/13 REPOSICION DE VEREDAS Y SARDINELES 37370 181.40 206.01 175.00 196 112%
R-873 02/10/13 1.0 4" 30/10/13 CUADRA 76 48073 48073.39 179 268.42 175.00
R-874 02/10/13 1.0 4" 30/10/13 49613 49612.64 177 280.77 175.00 275 157%
R-879 03/10/13 1.0 4" 10/10/13 PSJE. SALCEDO 37360 179.00 208.71 175.00
R-880 03/10/13 1.0 4" 10/10/13 REPOSICION DE VEREDAS Y SARDINELES 35403 179.00 197.78 175.00 203 116%
R-881 03/10/13 1.0 4" 31/10/13 CUADRA 04 46442 46442.41 181 256.02 175.00
R-882 03/10/13 1.0 4" 31/10/13 44801 44801.22 179 250.15 175.00 253 145%
41
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
R-887 04/10/13 1.0 4" 11/10/13 AV. UNIVERSITARIA. 33405 182.60 182.94 175.00
R-888 04/10/13 1.0 4" 11/10/13 REPOSICION DE VEREDAS Y SARDINELES 31621 177.90 177.74 175.00 180 103%
R-889 04/10/13 1.0 4" 01/11/13 CUADRA 78 42977 42976.55 181 236.92 175.00
R-890 04/10/13 1.0 4" 01/11/13 41743 41743.12 179 233.07 175.00 235 134%
R-891 04/10/13 1.0 4" 11/10/13 CALLE INCA GARCILAZO DE LA VEGA. 31223 177.90 175.51 175.00
R-892 04/10/13 1.0 4" 11/10/13 REPOSICION DE VEREDAS Y SARDINELES 33262 179.10 185.72 175.00 181 103%
R-893 04/10/13 1.0 4" 01/11/13 CUADRA x 43792 43792.05 181 241.41 175.00
R-894 04/10/13 1.0 4" 01/11/13 45902 45902.14 179 256.29 175.00 249 142%
R-899 05/10/13 1.0 4" 12/10/13 AV. JULIO C. TELLO 29185 181.20 161.06 175.00
R-900 05/10/13 1.0 4" 12/10/13 REPOSICION DE VEREDAS Y SARDINELES 26167 181.20 144.41 175.00 153 87%
R-901 05/10/13 1.0 4" 02/11/13 CUADRA 11 36626 36625.89 181 201.91 175.00
R-902 05/10/13 1.0 4" 02/11/13 39613 39612.64 179 221.18 175.00 212 121%
R-903 08/10/13 1.0 4" 15/10/13 AV. TUPAC AMARU 26646 176.70 150.80 175.00
R-904 08/10/13 1.0 4" 15/10/13 REPOSICION DE VEREDAS Y SARDINELES 24455 181.20 134.96 175.00 143 82%
R-904 08/10/13 1.0 4" 05/11/13 CUADRA 46 36962 36962.28 181 203.76 175.00
R-905 08/10/13 1.0 4" 05/11/13 38073 38073.39 179 212.58 175.00 208 119%
R-915 09/10/13 1.0 4" 16/10/13 AV. UNIVERSITARIA 28359 182.60 155.31 175.00
R-916 09/10/13 1.0 4" 16/10/13 REPOSICION DE VEREDAS Y SARDINELES 26126 182.60 143.08 175.00 149 85%
R-917 09/10/13 1.0 4" 06/11/13 CUADRA 78 - CARRIL DERECHO 33313 33312.95 181 183.64 175.00
R-918 09/10/13 1.0 4" 06/11/13 34669 34668.71 179 193.57 175.00 189 108%
R-919 09/10/13 1.0 4" 16/10/13 AV. UNIVERSITARIA 36728 179.00 205.18 175.00
R-920 09/10/13 1.0 4" 16/10/13 REPOSICION DE VEREDAS Y SARDINELES 32630 179.00 182.29 175.00 194 111%
R-921 09/10/13 1.0 4" 06/11/13 CUADRA 78 - CARRIL DE IZQUIERDO 41855 41855.25 181 230.73 175.00
R-922 09/10/13 1.0 4" 06/11/13 41131 41131.50 179 229.66 175.00 230 132%
R-923 10/10/13 1.0 4" 17/10/13 CALLE AMARU INCA YUPANQUI 32742 182.60 179.31 175.00
R-924 10/10/13 1.0 4" 17/10/13 REPOSICION DE VEREDAS Y SARDINELES 33986 176.70 192.34 175.00 186 106%
R-925 10/10/13 1.0 4" 07/11/13 CUADRA 1 42661 42660.55 181 235.17 175.00
R-926 10/10/13 1.0 4" 07/11/13 41549 41549.44 179 231.99 175.00 234 133%
42
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
R-931 10/10/13 1.0 4" 17/10/13 CALLE #10 Y 29 - URB. PRIMAVERA. 32752 179.00 182.97 175.00
R-932 10/10/13 1.0 4" 17/10/13 REPOSICION DE VEREDAS Y SARDINELES 34210 179.00 191.12 175.00 187 107%
R-933 10/10/13 1.0 4" 07/11/13 CUADRAS 1 Y 6 RESPECTIVAMENTE 43782 43781.86 181 241.36 175.00
R-934 10/10/13 1.0 4" 07/11/13 44516 44515.80 179 248.55 175.00 245 140%
R-943 12/10/13 1.0 4" 19/10/13 AV. UNIVERSITARIA. 31244 177.90 175.62 175.00
R-944 12/10/13 1.0 4" 19/10/13 REPOSICION DE VEREDAS Y SARDINELES 32141 177.90 180.67 175.00 178 102%
R-945 12/10/13 1.0 4" 09/11/13 'CUADRAS 86 Y 87 39918 39918.45 181 220.06 175.00
R-946 12/10/13 1.0 4" 09/11/13 40836 40835.88 179 228.01 175.00 224 128%
R-971 16/10/13 1.0 4" 23/10/13 JR. LIBERTAD. - LIMA NORTE. 31916 177.90 179.41 175.00
R-972 16/10/13 1.0 4" 23/10/13 REPOSICION DE VEREDAS Y SARDINELES 35107 177.90 197.34 175.00 188 108%
R-973 16/10/13 1.0 4" 13/11/13 CUADRAS 9,10 Y 11 43741 43741.08 181 241.13 175.00
R-974 16/10/13 1.0 4" 13/11/13 44495 44495.41 179 248.44 175.00 245 140%
R-979 16/10/13 1.0 4" 23/10/13 CALLE 7 Y 31 - COOP. PRIMAVERA. 32548 177.90 182.96 175.00
R-980 16/10/13 1.0 4" 23/10/13 REPOSICION DE VEREDAS Y SARDINELES 31621 180.30 175.38 175.00 179 102%
R-981 16/10/13 1.0 4" 13/11/13 CUADRA 1 DE AMBAS CALLES 40296 40295.62 178 226.51 175.00
R-982 16/10/13 1.0 4" 13/11/13 40785 40784.91 177 230.81 175.00 229 131%
R-1007 18/10/13 1.0 4" 25/10/13 JR. BRUNO TERREROS. - 29949 185.00 161.89 175.00
R-1008 18/10/13 1.0 4" 25/10/13 REPOSICION DE VEREDAS Y SARDINELES 29572 176.70 167.36 175.00 165 94%
R-1009 18/10/13 1.0 4" 15/11/13 CUADRA - 1 36850 36850.15 184 200.16 175.00
R-1010 18/10/13 1.0 4" 15/11/13 39174 39174.31 183 214.54 175.00 207 118%
R-1011 18/10/13 1.0 4" 25/10/13 JR. BRESCIA. - LIMA NORTE 28155 180.30 156.16 175.00
R-1012 18/10/13 1.0 4" 25/10/13 REPOSICION DE VEREDAS Y SARDINELES 29898 177.90 168.06 175.00 162 93%
R-1013 18/10/13 1.0 4" 15/11/13 CUADRA - 1 34822 34821.61 178 195.74 175.00
R-1014 18/10/13 1.0 4" 15/11/13 35943 35942.92 178 202.04 175.00 199 114%
R-1015 21/10/13 1.0 4" 28/10/13 CALLE # 1 - A.A.H.H. 9 DE SETIEMBRE. - 20520 179.10 114.57 175.00
R-1016 21/10/13 1.0 4" 28/10/13 REPOSICION DE VEREDAS Y SARDINELES 20754 182.60 113.66 175.00 114 65%
R-1017 21/10/13 1.0 4" 18/11/13 CUADRA - 1 32365 32364.93 181 178.42 175.00
R-1018 21/10/13 1.0 4" 18/11/13 33721 33720.69 179 188.28 175.00 183 105%
43
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
R-1019 22/10/13 1.0 4" 29/10/13 JR. LIBERTAD, JR. EL SOL Y JR. ATAHUALPA. - 32283 183.80 175.64 175.00
R-1020 22/10/13 1.0 4" 29/10/13 REPOSICION DE VEREDAS Y SARDINELES 30744 181.40 169.48 175.00 173 99%
R-1021 22/10/13 1.0 4" 19/11/13 CUADRA - 9 ; CUADRA - 1 39286 39286.44 177 222.33 175.00
R-1022 22/10/13 1.0 4" 19/11/13 39888 39887.87 177 225.74 175.00 224 128%
R-1023 22/10/13 1.0 4" 29/10/13 JR. SAN PEDRO. - LIMA NORTE 31152 183.80 169.49 175.00
R-1024 22/10/13 1.0 4" 29/10/13 REPOSICION DE VEREDAS Y SARDINELES 29633 181.40 163.36 175.00 166 95%
R-1025 22/10/13 1.0 4" 19/11/13 CUADRAS - 1 , 2 Y 3 . 37370 37370.03 177 211.49 175.00
R-1026 22/10/13 1.0 4" 19/11/13 35831 35830.78 177 202.78 175.00 207 118%
R-1027 22/10/13 1.0 4" 29/10/13 JR. LEOPOLDO MEZA Y JR. JOSE A. LÓPEZ. - 36575 177.90 205.59 175.00
R-1028 22/10/13 1.0 4" 29/10/13 REPOSICION DE VEREDAS Y SARDINELES 33598 182.60 184.00 175.00 195 111%
R-1029 22/10/13 1.0 4" 19/11/13 CUADRA - 1 Y 2 ; CUADRA - 3 . 40785 40784.91 178 229.26 175.00
R-1030 22/10/13 1.0 4" 19/11/13 40581 40581.04 183 222.24 175.00 226 129%
R-1039 23/10/13 1.0 4" 30/10/13 JR. HUASCAR. - LIMA NORTE 31845 183.80 173.26 175.00
R-1040 23/10/13 1.0 4" 30/10/13 REPOSICION DE VEREDAS Y SARDINELES 30234 180.30 167.69 175.00 170 97%
R-1041 23/10/13 1.0 4" 20/11/13 37054 37054.03 183 202.92 175.00
R-1042 23/10/13 1.0 4" 20/11/13 35637 35637.10 183 195.16 175.00 199 114%
R-1055 28/10/13 1.0 4" 04/11/13 AV. JOSE SUCRE. - 26147 183.80 142.26 175.00
R-1056 28/10/13 1.0 4" 04/11/13 REPOSICION DE VEREDAS Y SARDINELES 24118 180.30 133.77 175.00 138 79%
R-1057 28/10/13 1.0 4" 25/11/13 37054 37054.03 183 202.92 175.00
R-1058 28/10/13 1.0 4" 25/11/13 35637 35637.10 183 195.16 175.00 199 114%
R-1059 29/10/13 1.0 4" 05/11/13 JR. SAN MARTIN. - LIMA NORTE 28022 181.40 154.48 175.00
R-1060 29/10/13 1.0 4" 05/11/13 REPOSICION DE VEREDAS Y SARDINELES 27085 177.90 152.25 175.00 153 88%
R-1061 29/10/13 1.0 4" 26/11/13 CUADRA - 1 Y 2 ; CUADRA - 3 . 37054 37054.03 183 202.92 175.00
R-1062 29/10/13 1.0 4" 26/11/13 35637 35637.10 183 195.16 175.00 199 114%
R-1063 29/10/13 1.0 4" 05/11/13 AV. LORD COCHRANE. 28022 176.70 158.59 175.00
R-1064 29/10/13 1.0 4" 05/11/13 REPOSICION DE VEREDAS Y SARDINELES 27085 182.60 148.33 175.00 153 88%
R-1065 29/10/13 1.0 4" 26/11/13 CUADRA - 1 Y 2 ; CUADRA - 3 . 37054 37054.03 183 202.92 175.00
R-1066 29/10/13 1.0 4" 26/11/13 35637 35637.10 183 195.16 175.00 199 114%
44
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
R-1071 30/10/13 1.0 4" 06/11/13 AV. GONZALES PRADA. 32783 181.40 180.72 175.00
R-1072 30/10/13 1.0 4" 06/11/13 REPOSICION DE VEREDAS Y SARDINELES 30561 179.10 170.63 175.00 176 100%
R-1073 30/10/13 1.0 4" 27/11/13 CUADRAS - 3 Y 4 37054 37054.03 183 202.92 175.00
R-1074 30/10/13 1.0 4" 27/11/13 35637 35637.10 183 195.16 175.00 199 114%
R-1079 31/10/13 1.0 4" 07/11/13 JR. HUARAZ. 23517 180.30 130.43 175.00
R-1080 31/10/13 1.0 4" 07/11/13 REPOSICION DE VEREDAS Y SARDINELES 24628 180.30 136.59 175.00 134 76%
R-1081 31/10/13 1.0 4" 28/11/13 CUADRAS 6 Y 10 37054 37054.03 183 202.92 175.00
R-1082 31/10/13 1.0 4" 28/11/13 35637 35637.10 183 195.16 175.00 199 114%
R-1083 31/10/13 1.0 4" 07/11/13 AV. GONZALES PRADA. - 23914 176.70 135.34 175.00
R-1084 31/10/13 1.0 4" 07/11/13 REPOSICION DE VEREDAS Y SARDINELES 21427 180.30 118.84 175.00 127 73%
R-1085 31/10/13 1.0 4" 28/11/13 CUADRAS - 9 Y 10 37054 37054.03 183 202.92 175.00
R-1086 31/10/13 1.0 4" 28/11/13 35637 35637.10 183 195.16 175.00 199 114%
R-1087 31/10/13 1.0 4" 07/11/13 CALLE # 2 - COOP. PRIMAVERA. - LIMA NORTE 30765 176.70 174.11 175.00
R-1088 31/10/13 1.0 4" 07/11/13 REPOSICION DE VEREDAS Y SARDINELES 32640 180.30 181.03 175.00 178 101%
R-1089 31/10/13 1.0 4" 28/11/13 CUADRA 1 37054 37054.03 183 202.92 175.00
R-1090 31/10/13 1.0 4" 28/11/13 35637 35637.10 183 195.16 175.00 199 114%
R-1091 05/11/13 1.0 4" 12/11/13 AV. GONZALES PRADA. - 27360 177.90 153.79 175.00
R-1092 05/11/13 1.0 4" 12/11/13 REPOSICION DE VEREDAS Y SARDINELES 28400 177.90 159.64 175.00 157 90%
R-1093 05/11/13 1.0 4" 03/12/13 CUADRA - 1 Y ORQIDEAS - CUADRA - 1 37054 37054.03 183 202.92 175.00
R-1094 05/11/13 1.0 4" 03/12/13 35637 35637.10 183 195.16 175.00 199 114%
R-1095 05/11/13 1.0 4" 12/11/13 AV. LOS INCAS. - LIMA NORTE 34302 183.80 186.63 175.00
R-1096 05/11/13 1.0 4" 12/11/13 REPOSICION DE VEREDAS Y SARDINELES 35688 176.70 201.97 175.00 194 111%
R-1097 05/11/13 1.0 4" 03/12/13 CUADRA - 1,2 37054 37054.03 183 202.92 175.00
R-1098 05/11/13 1.0 4" 03/12/13 35637 35637.10 183 195.16 175.00 199 114%
R-1099 05/11/13 1.0 4" 12/11/13 AV. 3 DE OCTUBRE 30622 176.70 173.30 175.00
R-1100 05/11/13 1.0 4" 12/11/13 REPOSICION DE VEREDAS Y SARDINELES 29694 181.40 163.69 175.00 168 96%
R-1101 05/11/13 1.0 4" 03/12/13 CUADRA - 1,2 Y3 37054 37054.03 183 202.92 175.00
R-1102 05/11/13 1.0 4" 03/12/13 35637 35637.10 183 195.16 175.00 199 114%
45
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
R-1103 05/11/13 1.0 4" 12/11/13 AV. MANUEL GONZALES PRADAY ORQUIDEAS. 32253 180.30 178.88 175.00
R-1104 05/11/13 1.0 4" 12/11/13 REPOSICION DE VEREDAS Y SARDINELES 31223 182.60 170.99 175.00 175 100%
R-1105 05/11/13 1.0 4" 03/12/13 CUADRA - 1 . LAS ORQUIDEAS CUADRA - 1 37054 37054.03 183 202.92 175.00
R-1106 05/11/13 1.0 4" 03/12/13 35637 35637.10 183 195.16 175.00 199 114%
R-1107 06/11/13 1.0 4" 13/11/13 CALLE # 2 - COOP. PRIMAVERA. 31050 180.30 172.21 175.00
R-1108 06/11/13 1.0 4" 13/11/13 REPOSICION DE VEREDAS Y SARDINELES 33078 182.60 181.15 175.00 177 101%
R-1109 06/11/13 1.0 4" 04/12/13 CUADRA - 1 . LAS ORQUIDEAS CUADRA - 1 37054 37054.03 183 202.92 175.00
R-1110 06/11/13 1.0 4" 04/12/13 35637 35637.10 183 195.16 175.00 199 114%
R-1111 07/11/13 1.0 4" 14/11/13 AV. 3 DE OCTUBRE. - LIMA NORTE 30224 179.10 168.76 175.00
R-1112 07/11/13 1.0 4" 14/11/13 REPOSICION DE VEREDAS Y SARDINELES 30520 179.10 170.41 175.00 170 97%
R-1113 07/11/13 1.0 4" 05/12/13 CUADRAS - 5 , 6 Y 7 . 37054 37054.03 183 202.92 175.00
R-1114 07/11/13 1.0 4" 05/12/13 35637 35637.10 183 195.16 175.00 199 114%
R-1115 07/11/13 1.0 4" 14/11/13 CALLE # 30 - COOP. PRIMAVERA. 31244 179.10 174.45 175.00
R-1116 07/11/13 1.0 4" 14/11/13 REPOSICION DE VEREDAS Y SARDINELES 32171 179.10 179.63 175.00 177 101%
R-1117 07/11/13 1.0 4" 05/12/13 CUADRA - 1 . 37054 37054.03 183 202.92 175.00
R-1118 07/11/13 1.0 4" 05/12/13 35637 35637.10 183 195.16 175.00 199 114%
R-1123 08/11/13 1.0 4" 15/11/13 JR. LOS FUNDADORES Y JR. LIBERTAD. - LIM 28940 179.10 161.58 175.00
R-1124 08/11/13 1.0 4" 15/11/13 REPOSICION DE VEREDAS Y SARDINELES 30714 176.70 173.82 175.00 168 96%
R-1125 08/11/13 1.0 4" 06/12/13 'CUADRAS - 2 Y LIBERTAD CUADRA - 8 . 37054 37054.03 183 202.92 175.00
R-1126 08/11/13 1.0 4" 06/12/13 35637 35637.10 183 195.16 175.00 199 114%
R-1131 08/11/13 1.0 4" 15/11/13 CALLE 9 - COOP. PRIMAVERA. - LIMA NORTE. 31040 178.00 174.38 175.00
R-1132 08/11/13 1.0 4" 15/11/13 REPOSICION DE VEREDAS Y SARDINELES 30387 169.70 179.07 175.00 177 101%
R-1133 08/11/13 1.0 4" 06/12/13 'CUADRAS - 2 Y LIBERTAD CUADRA - 8 . 37054 37054.03 183 202.92 175.00
R-1134 08/11/13 1.0 4" 06/12/13 35637 35637.10 183 195.16 175.00 199 114%
R-1135 09/11/13 1.0 4" 16/11/13 JR. JOSÉ OLAYA Y JR. LIBERTAD. - LIMA NORT 28970 177.90 162.85 175.00
R-1136 09/11/13 1.0 4" 16/11/13 REPOSICION DE VEREDAS Y SARDINELES 27584 181.40 152.06 175.00 157 90%
R-1137 09/11/13 1.0 4" 07/12/13 CUADRAS - 1 Y LIBERTAD CUADRA - 5 Y 6 . 37054 37054.03 183 202.92 175.00
R-1138 09/11/13 1.0 4" 07/12/13 35637 35637.10 183 195.16 175.00 199 114%
46
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
R-1139 11/11/13 1.0 4" 18/11/13 AV. TUPAC AMARU Y JR. HERNANDO DE LA VAL 31244 176.70 176.82 175.00
R-1140 11/11/13 1.0 4" 18/11/13 REPOSICION DE VEREDAS Y SARDINELES 30387 177.90 170.81 175.00 174 99%
R-1141 11/11/13 1.0 4" 09/12/13 CUADRA 43 Y LA VALLE CUADRA - 1 37054 37054.03 183 202.92 175.00
R-1142 11/11/13 1.0 4" 09/12/13 35637 35637.10 183 195.16 175.00 199 114%
R-1143 13/11/13 1.0 4" 20/11/13 CALLE 4 Y CALLE 30 - COOP. PRIMAVERA. - L 30683 183.80 166.94 175.00
R-1144 13/11/13 1.0 4" 20/11/13 REPOSICION DE VEREDAS Y SARDINELES 31019 179.10 173.20 175.00 170 97%
R-1145 13/11/13 1.0 4" 11/12/13 CUADRA - 1 DE AMBAS CALLES . 37054 37054.03 183 202.92 175.00
R-1146 13/11/13 1.0 4" 11/12/13 35637 35637.10 183 195.16 175.00 199 114%
R-1147 13/11/13 1.0 4" 20/11/13 CALLES 17 , 18 Y 20 - URB. EL PINAR. - LIMA 25729 183.80 139.98 175.00
R-1148 13/11/13 1.0 4" 20/11/13 REPOSICION DE VEREDAS Y SARDINELES 27941 179.10 156.01 175.00 148 85%
R-1149 13/11/13 1.0 4" 11/12/13 'CUADRA - 1 DE LAS CALLES MENCIONADAS . 37054 37054.03 183 202.92 175.00
R-1150 13/11/13 1.0 4" 11/12/13 35637 35637.10 183 195.16 175.00 199 114%
R-1159 13/11/13 1.0 4" 20/11/13 PSJE. VALENCIA. - LIMA NORTE. 27278 181.40 150.38 175.00
R-1160 13/11/13 1.0 4" 20/11/13 REPOSICION DE VEREDAS Y SARDINELES 30326 179.10 169.33 175.00 160 91%
R-1161 13/11/13 1.0 4" 11/12/13 'CUADRA - 1 DE LAS CALLES MENCIONADAS . 37054 37054.03 183 202.92 175.00
R-1161 13/11/13 1.0 4" 11/12/13 35637 35637.10 183 195.16 175.00 199 114%
47
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
(REFERENCIAL)
DIAS RESISTENCIA(%F'C)
3 42 - 53%
7 70 - 85%
14 85 - 95%
28 100 - 120%
REAL REFERENCIAL
REGISTRO 28 DIAS(KG/CM2) 28 DIAS(KG/CM2)
REAL
R-813 290
266 175 RFERENCIAL
R-817 260 175
270
R-821 186 175
R-825 225 175 250
R-829 213 175
R-833
230
241 175
R-837 241 175 KG/CM2
210
R-841 211 175
R-851 281 175 190
R-867 276 175
170
R-871 275 175
R-879 253 175 150
R-887 235 175 13 81
7
82
1
82
5
82
9
83
3
83
7
84
1
85
1 67 87
1
87
9
88
7
89
1
89
9
90
3 15 91
9
92
3
93
1 00 97
1
97
9 07 11 .0
0
.0
0
.0
0
02
7 39
R-
8
R- R- R- R- R- R- R- R- R-
8
R- R- R- R- R- R- R-
9
R- R- R- 3. R- R- 10 10 15 19 23 R-1 10
R-891 94 R- R- 10 10 10 R-
249 175
REGISTROS
48
270
250
230
KG/CM2
210
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS
190
170
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
49
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=175KG/CM2,VEREDAS, SARDINELES Y RAMPAS
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
REAL REFERENCIAL
REGISTRO 7 DIAS(KG/CM2) (70-85%) F'C (KG/CM2)
R-1055 138 122.5
R-1059 200
153 122.5
R-1063 153 122.5
190
R-1079 134 122.5
RESISTENCIA REAL
R-1083 127 122.5
KG/CM2
180 RESISTENCIA REFERENCIAL
R-1087 178 122.5
R-1091 157 122.5 170
R-1095 194 122.5
R-1099 168 122.5 160
R-1103 175 122.5
R-1111 170 122.5 150
50
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=280KG/CM2 PAVIMENTO RIGIDO
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
7 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias
R-193 19/01/13 1.0 3 3/4" 26/01/13 Av. Bolognesi con AV. Tupac Amaru 45056 176.00 256.00 280.00
R-194 19/01/13 1.0 3 3/4" 26/01/13 Primer Tramo 45056 176.00 256.00 280.00
R-196 19/01/13 1.0 3 3/4" 16/02/13 51784.00 179.00 289.30 280.00 308 110%
R-197 20/01/13 1.0 3 3/4" 27/01/13 Av. Bolognesi con AV. Tupac Amaru 41998 176.00 238.63 280.00
R-198 20/01/13 1.0 3 3/4" 27/01/13 Segundo Tramo 40265 176.00 228.78 280.00
R-200 20/01/13 1.0 3 3/4" 17/02/13 56065.00 179.00 313.21 280.00 312 111%
R-480 14/06/13 1.0 3 3/4" 21/06/13 PSJ 17 COOP. AÑO NUEVO 48797 181.00 269.60 280.00
R-481 14/06/13 1.0 3 3/4" 21/06/13 PAVIMENTO RIRIDO 48002 181.00 265.20 280.00
R-482 14/06/13 1.0 3 3/4" 12/07/13 LOSA 65545.00 181.00 362.13 280.00
R-483 14/06/13 1.0 3 3/4" 12/07/13 64760.00 181.00 357.79 280.00 360 129%
R-488 15/06/13 1.0 4" 22/06/13 PSJ 14 COOP. SANGARARA 47900 181.00 264.64 280.00
R-489 15/06/13 1.0 4" 22/06/13 PAVIMENTO RIRIDO 46932 181.00 259.29 280.00
R-490 15/06/13 1.0 4" 13/07/13 LOSA 54975.00 181.00 303.73 280.00
R-491 15/06/13 1.0 4" 13/07/13 52987.00 181.00 292.75 280.00 298 107%
R-983 17/10/13 1.0 4" 24/10/13 PSJE. EL CARMEN. - LIMA NORTE. 43099 183.80 234.49 280.00
R-984 17/10/13 1.0 4" 24/10/13 PAVIMENTO RIRIDO 45943 177.90 258.25 280.00
R-985 17/10/13 1.0 4" 14/11/13 CUADRA 1 50611.62 177.90 284.49 280.00
R-896 17/10/13 1.0 4" 14/11/13 49898.06 177.90 280.48 280.00 282 101%
R-1047 24/10/13 1.0 4" 31/10/13 PSJE. EL CARMEN. - LIMA NORTE 40102 183.80 218.18 280.00
R-1048 24/10/13 1.0 4" 31/10/13 PAVIMENTO RIRIDO 38563 177.90 216.77 280.00 217 78%
R-1049 24/10/13 1.0 4" 21/11/13 CUADRA 1 50611.62 177.90 284.49 280.00
R-1050 24/10/13 1.0 4" 21/11/13 49898.06 177.90 280.48 280.00 282 101%
380
RESISTENCIA REAL
360 51
RESISTENCIA REFERENCIAL
340
FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2
REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
7 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias
380
RESISTENCIA REAL
360
RESISTENCIA REFERENCIAL
340
320
(REFERENCIAL) 280
DIAS RESISTENCIA(%F'C)
3 42 - 53% 260
7 70 - 85%
240
14 85 - 95% R-193 R-197 R-480 R-488 R-983
28 100 - 120%
REAL REFERENCIAL
REGISTRO 28 DIAS(KG/CM2) 28 DIAS(KG/CM2)
R-193 308 280
R-197 312 280
R-480 360 280
R-488 298 280
R-983 282 280
52
FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2
REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
7 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias
8
REAL TEORICA 12
1 2
REGISTRO 7 DIAS(KG/CM2) (70-85%) F'C (KG/CM2) 1
96
R-173,174,175,176 #REF! 122.5
80
64 REAL
TEORIC
48 A
32
16
0
R-173,174,175,176
REGISTROS
53
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=245KG/CM2 REHABILITACION DE BUZONES
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
7 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias
R-340 29/04/13 1.0 4 1/2" 06/05/13 JR. LORD COCRHANE 40265 176.00 228.78 245.00
R-341 29/04/13 1.0 4 1/2" 06/05/13 BUZON #4775 39755 176.00 225.88 245.00 227 93%
R-344 29/04/13 1.0 4 1/2" 27/05/13 60143.00 179.00 335.99 245.00 335 137%
R-386 13/05/13 1.0 4" 20/05/13 AV. JOSE GONZALES PRADA 32416 179.00 181.09 245.00
R-387 13/05/13 1.0 4" 20/05/13 BUZON BR-4814 Y 4810 32416 179.00 181.09 245.00 181 74%
R-389 13/05/13 1.0 4" 10/06/13 51886.00 181.00 286.66 245.00 287 117%
350
GRAFICA RESISTENCIA REAL ALCANZADA(A LOS 28 DIAS) VS RESISTENCIA REFERENCIAL
330
RESISTENCIA DEL CONCRETO EN FUNCION DE SU EDAD
310
(REFERENCIAL)
190
REAL REFERENCIAL
REGISTRO 28 DIAS(KG/CM2) 28 DIAS(KG/CM2) 170
R-340 AL 344 335 245 150
R-386 AL 389 R-340 AL 344 R-386 AL 389
287 245
REGISTROS
54
FECHA CARGA (KG) Kg/cm2 F'c Kg/cm2
REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
7 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias
8
REAL TEORICA 12
1 2
REGISTRO 7 DIAS(KG/CM2) (70-85%) F'C (KG/CM2) 1
96
R-173,174,175,176 #REF! 122.5
80
64 REAL
TEORIC
48 A
32
16
0
R-173,174,175,176
REGISTROS
55
RESUMEN DE REGISTRO DE ENSAYOS DE COMPRESION DE CONCRETO F'C=140 KG/CM2 RECUBRIMIENTO DE TUBERIA
PROYECTO: Contrato de Obra Nº 001-2012-CW-46000/JICA-KfW-SEDAPAL Lote 3- Rehabilitación de Redes Secundarias de Agua Potable y Alcantarillado
REGISTRO N° FECHA DE MOLDEO N° PROBETAS SLUMP DESCRIPCION / PROGRESIVA Area (cm2) Resistencia
Diseño de % a los 28
7 Dias 28 Dias 7 Dias 28 Dias 7 Dias 28 Dias promedio a los
Concreto dias
28 dias
R-444 04/06/13 1.0 4" 11/06/13 AV. CESAR VALLEJO 23445 181.00 129.53 140.00
R-445 04/06/13 1.0 4" 11/06/13 RECUBRIMIENTO DE TUBERIA 23140 181.00 127.85 140.00 129 92%
R-446 04/06/13 1.0 4" 02/07/13 BR-3599 AL BR-3611 58410.00 179.00 326.31 280.00
R-447 04/06/13 1.0 4" 02/07/13 51784.00 179.00 289.30 280.00 308 110%
(REFERENCIAL)
3 42 - 53% 330
7 70 - 85% 310 REAL
14 85 - 95% REFERENCIAL
290
Column A
28 100 - 120% KG/CM2
A LOS 14 DIAS
270
250
REAL REFERENCIAL
REGISTRO 28 DIAS(KG/CM2) 28 DIAS(KG/CM2) 230
170
150
R-340 AL 344 R-386 AL 389
REGISTROS
GRAFICA RESISTENCIA REAL ALCANZADA( A LOS 7 DIAS) VS RESISTENCIA TEORICA
8
REAL TEORICA 12
2
REGISTRO 7 DIAS(KG/CM2) (70-85%) F'C (KG/CM2) 11
96
R-173,174,175,176 #REF! 122.5
80
64 REAL
TEORIC
48 A
32
16
0
R-173,174,175,176
REGISTROS