ARBA MINCH UNIVERSITY

INSTITUTE OF TECHNOLOGY
DEPARTMENT OF ELECTRICAL & COMPUTER
ENGINEERING
(INDUSTRIAL CONTROL STREAM)

A REPORT ON INTERNSHIP WORK AT


DAN LIFT TECHNOLOGY PLC.
BY
DIRES BEHAIELU
ID no: RAMIT/409/06
Phone no: +251912148682
www.diresbehaiylu@gmail.com
February, 21, 2018
Arab Minch university 2017/1018

Acknowledgment

First of all, I would like to say thanks to God for giving me the strength and health during
my four months internship program. Next my appreciation and heart full thanks goes to
my internship supervisors; Mr. Eshet Mr.Filimon, Ms.helen for their guidance to follow
the right way in my internship program and heart full thanks to all workers Dan lift
technology for their encouragement, love and emotional supports that they had given to
me throughout the progress of my internship period as well as my project .my special
thanks also goes to Engineer Sebastian, Mr.Adolf Abebe, Mr.Yonatan and Mr. Mistre
manager of the company for their encouragement, guidance and support for my project
and they have played important role in the time that I have spent four months in the
company.

Finally I want to express my deepest gratitude to my family for providing things what I
need during internship. Words can’t express my gratitude for all they support.

Dan lift technology PLC Page i


Arab Minch university 2017/1018

Executive summary

This paper contains the internship report and project which includes like back ground of
my internship hosting company, some materials & methodology of data collection, data
analysis & design that I have used frequently of my project, Over all benefit I gained
from the internship, Conclusion and recommendation using easy understanding
techniques with detail description and pictures. Dan lift technology is one of lift
companies located in Addis Ababa Ethiopia. They fabricate lifts use motors like gearless,
geared and hydraulic and supplied for the end users. This company has been playing
important role in the production of quality lift. In the time that I was in the company, I
have observed the overall working process and I have searched problems to solve within
four months. I have developed my theoretical and practical knowledge during my
internship and also seen what real job life seems like. The most and interesting things that
I gained from the internship are, identification of problems and coming with solutions,
improving team playing ,interpersonal communication, interpreuneral skill, leadership
skill and the like.

Dan lift technology PLC Page ii


Arab Minch university 2017/1018

Contents
Acknowledgment ..............................................................................................................
Executive summary ......................................................................................................... ii
Acronyms ..................................................................................................................................... viii
CHAPTER ONE ............................................................................................................. 1
INTRODUCTION ........................................................................................................... 1
1 BACKGROUND OF THE COMPANY .................................................................. 1
1.1 Background ............................................................................................................ 1
1.2 Vision, Mission and Values of the company ......................................................... 2
1.3. Objective of the company ..................................................................................... 2
1.4 Main products and services of the company ......................................................... 3
1.6 End users of company’s products or services ........................................................ 6
1.7 Work flow of company .......................................................................................... 7
1.8 Product costumers.................................................................................................. 8
CHAPTER TWO............................................................................................................. 9
2. MATERIALS AND METDOLOGIES.................................................................... 9
2.1 Assignments and responsibilities that I have taken in internship .......................... 9
2.2 Assignment Ones ................................................................................................. 34
2.3 Assignment two ................................................................................................... 35
2.4. Component used for software ............................................................................ 36
CHAPTER THREE ....................................................................................................... 37
PROJECT ...................................................................................................................... 37
3. Motor used to drive load horizontal ...................................................................... 37
3.1 Abstracts .............................................................................................................. 37
3.2 Introductions ........................................................................................................ 37
3.3 Statement of the problem ..................................................................................... 37
3.4 Objective .............................................................................................................. 38
3.4.1 General Objective ............................................................................................. 38
3.4.2 Specific Objective............................................................................................. 38
3.5 Methodology of the project ................................................................................. 38
3.6 Used components ................................................................................................. 39

Dan lift technology PLC Page iii


Arab Minch university 2017/1018

3.7 Software Design .................................................................................................. 39


3.8. Hardware Design ................................................................................................ 40
3.9 System design ...................................................................................................... 40
3.10 Desktop application software ............................................................................ 41
3.11 Conclusion ......................................................................................................... 42
CHAPTER FOUR ......................................................................................................... 43
ASSESMENT OF INTERNSHIP ................................................................................. 43
4. Overall benefits I have gained from internship ..................................................... 43
4.1. Upgrading (Increasing) my theoretical knowledge ............................................ 43
4.2 Improving my practical skills .............................................................................. 43
4.3. Improving Interpersonal communication skill ................................................... 44
4.4. Understanding about work ethics issues ............................................................. 45
4.5 My entrepreneurship skill .................................................................................... 45
CHAPTER FIVE ........................................................................................................... 47
5. CONCLUSION AND RECOMMENDATION ........................................................ 47
5.1 Problems Encountered During the Internship Period .......................................... 47
5.2 General Suggestions and Comments to the Company......................................... 47
5.3 Summary and Conclusion .................................................................................... 47
5.4 Recommendation for university linkage............................................................ 49
5.5 Recommendation for institute ............................................................................. 49
REFERENCES .......................................................................................................... 50

Dan lift technology PLC Page iv


Arab Minch university 2017/1018

List of figures

Fig.1 work flow chart of the company………………………………….…………….….7

Fig.2 organization structure of Dan lift technology plc.…………………….…………....8

Fig.3 main controller of elevator……………………………………………..…..….….10

Fig.4 BG15card…………………………………………………………………….…...12
Fig.5 motor drive.......................................................................................................…...17

Fig.6 control connection diagram.............................................................................…...19

Fig.7 step down transformer………………………………………………………….…20

Fig.8 ckt of bridge rectifier………………………………………………………………20

Fig.9 relay…………………………………………………………………………….…23

Fig. 10 contactor………………………………………………………………………...24

Fig.11 fuses………………………………………………………………………….….25

Fig.12 UPS (battery used for emergence)………………………………………………26

Fig.13 technical description…….…………………………………………………........27

Fig.14 emergence board…………………..………………………………..…….……28

Fig.15 safety device…………………….…………………………………………..…30

Fig.16 speed governor………………………………………………………………....30

Fig.17 top limit switch………………………………………………………………...31

Fig.18 inspection stop………………………………………………………………...32

Fig.19 door operator……………………………………………………………….…32

Fig.20 external control………………………………..…………………...................33

Dan lift technology PLC Page v


Arab Minch university 2017/1018

Fig.21 proximity switch…………………………………………………….......34

Fig.22 taped and flag………………………………………………………........34

Fig.23 motor……………………………………………………………….........35

Fig.24 position indicator before and after I connect with wire…………..…….37

Fig.25 fig of nine floors simulation…………………………………….............38

Fig. 26 software design…………………………………………………..….....41

Fig.27 hardware design…………………………………………………….…42

Fig.28 desktop application………………………………………………….…43

Dan lift technology PLC Page vi


Arab Minch university 2017/1018

List of tables

Table 1 function of power terminals............................................................…...18

Table 2 main difference of motors…………………………………………….36

Dan lift technology PLC Page vii


Arab Minch university 2017/1018

Acronyms
PLC……………………………………………….. Programming logic controller

ED………………………………………………….Extremely down

LED ……………………………………………… Light emitting diode

VVVF ……………………………………………Variable voltage variable frequency

AC……………………………………………….Alternate current

DC………………………………………………Direct current

KS……………………………………………….Main contactor

KER…………………………………………….Breaker contactor

UPS…………………………………………….Uninterruptable power supply

FRW……………………………………………Forward

REV…………………………………………….Reverse

NGO…………………………………………..Non-governmental organization

EN……………………………………………. European

Dan lift technology PLC Page viii


CHAPTER ONE

INTRODUCTION

1 BACKGROUND OF THE COMPANY

1.1 Background

Dan lift technology plc is the 1st company in Ethiopia to acquire ISO 9001:2000
certificate in design, manufacturing, installation of lift and escalators. Dan Lift
Technology plc is the sister company of Dan Technocrat plc which is established in 1976.
Dan Lift Technology plc is a well-organized company with modern management
systems, engineering workshop & with well-equipped laboratories.
The company has one manufacturing plant on total area of 1200 sqm in Bishoftu road in
the southern part of Addis in the sub city of Kality.It has also one sales office in Bole
road & branch offices & sales representative in all most all regional states.
Dan Lift Technology PLC with a total number of 190 employees including highly
qualified Engineers & very well trained technicians plays a key role in transferring of the
know-how (the lift technology) in to the country beyond its commitment to give the best
service to the customers. Dan Lift Technology PLC supply, install & modernize lifts with
the basic principle of not letting customers alone without permanent technical back-
service for them.
The company has reached a remarkable achievement in the Lift Technology. This has
successfully supplied, installed & modernized 324 different types of elevators, such as
Bed lift, Passenger lift, Dumbwaiter & freight lifts as well as six escalators in the country
and one lift in Djibouti. These days the company has a major share of the lift market in
Ethiopia. The company works its duty based on BS, European Norm (EN-81) and
Ethiopian standard (which is adopted from EN-81) in cooperation with well-known world
companies in the elevator sector and give attention to assure the very high safety standard
of the elevators. Professionals in the various developments, supported by the modern
management, are working tireless together towards the company’s service quality and the
enhancement of its innovation capacity. In addition to fabrication of lifts , the company is
highly engaged and has achieved remarkable progress in rehabilitating over 30 different
Arab Minch university 2017/1018

brand lifts and modernizing about 10 elevators previously installed by other companies
and lift for many years without proper attention and due services. Besides, preventive
maintenance service is being provided to over 65 old and modern lifts of different brands.

1.2 Vision, Mission and Values of the company

Vision
To be a primary choice and competitive in local and international markets by producing
lifts and lift materials confirming to high quality standard requirement.
Mission
Achieving customer satisfaction by producing and supplying lifts and lift materials to
local and export market at optimum price;
 Maximizing returns to the owners;
 Establishing strong relationship and partnership with the following main
stakeholders.
Value
 Customer focused: Understand customer needs and ensure their satisfaction.
 Trustworthy: We do what we say we will. Honour our promises and obligations
 Learning & growth: Learning and continuously improve, people, technology and
work processes.
 Participatory and team sprit management: people involvement and feedback as a
tool to ensure continual improvement.
 Goodwill of the company.
 Professional (well experience) Oenologist and skilled labour.

1.3. Objective of the company

To create broadband sustainable market by supplying competitive lift products that fulfils
customer's requirements.
 Enhance property ownership and ensure sustainable profit.
 To continuously develop modern and scientific methodology, work culture, and
systems.
 Develop human resources and create job opportunities.

Dan lift technology PLC Page 2


Arab Minch university 2017/1018

 Create conducive work environment.

1.4 Main products and services of the company

Dan lift technology plc is producing and supplying lifts by using three types of lift motor
products to local markets. There are three types of motor used for lift product i.e.
depending on that the type of motor used .These motors are:- geared, gearless and
hydraulic motors.

The main products of the company are

Lift (Elevator)

Dan Lift Technology Plc intends to manufacture and assemble the measure parts of the
lift such as:
 Car , car frame and car frame accessories
 Door panels and door frames
 Landing door mechanisms
 Counter weight frame and filter
 Controller and controller box
 Brackets and motor seats
Elevator or lift is a vertical transportation system (vertical vehicle) that efficiently
moves people or goods between floors of a building. They are generally powered by
electric motors that either drive traction cables and counter weight system or pump
hydraulic fluid to raise a cylindrical piston
 Company giving two types lift service for customers
Traction elevators

According to electric motor they are traction motors are also classified in to two parts
which are Geared and gearless traction elevators.
Geared traction elevators are driven by AC or DC electric motors. Geared machines are
use warm gears to control mechanical movement of elevator cars by rolling steel hoist
ropes over a drive sheave which is attached to a gearbox driven by a high speed motor.

Dan lift technology PLC Page 3


Arab Minch university 2017/1018

These machines are generally the best options for basement or overhead traction use for
speeds up to 2.5 m/s
Gearless traction elevators use low speed, high torque electric motors powered by either
AC or DC supply. In these case the drive sheaves is directly attached to the end of the
motor. Gearless traction elevators can reach speeds up to 10 m/s or even higher. A brake
is mounted between the motor and drive sheaves to hold the elevator stationary at floor
level. This brake is usually an external drum type and actuated by spring force and hold
open electrically a power failure will cause the brake to engage and prevent the elevator
from falling.
Hydraulic elevator

A hydraulic elevator system lifts a car using a hydraulic ram, a fluid driven piston
mounted inside a cylinder. The fluid is connected to a fluid pumping system (typically,
hydraulic system uses oil, but other incompressible fluid would also work). The hydraulic
system has three parts
 A tank (the fluid reservoir)
 A pump, powered by an electric motor
 A valve between the cylinder and the reservoir.
The pump forces fluid from the tank into a pipe leading to the cylinder. When the valve is
opened, the pressurized fluid will take the path of least resistance and return to the fluid
reservoir, but when the valve is closed, it pushes the piston up, lifting the elevator car.
When the car approaches the correct floor, the control system sends a signal to the
electric motor to gradually shut off the pump. With the pump off there is no more fluid
flowing into the cylinder but the fluid that is already. In the cylinder cannot escape (it
can’t flow backward through the pump, and the valve is still closed). The piston resets on
the fluid and the car stays where it is.
To lower the car, the elevator control system sends a signal to the valve. The valve is
operated electrically by a base solenoid switch. When the solenoid opens the valve, the
fluid that has reserved in the cylinder can flow out in to the fluid reservoir. The weight of
the car and the cargo pushes down on the piston, which drives the fluid into the reservoir.

Dan lift technology PLC Page 4


Arab Minch university 2017/1018

The car gradually descends. To stop the car at a lower floor, the control system closes the
valve again.
1.5 Use of elevator
 Passenger Elevator
A passenger elevator is designed to move people between building floors. It is also
very helpful for handicaps that use wheelchairs, for blind peoples and for older
peoples who can walk hardly. It is very important in hospitals to move patients from
floor to floor.
 Freight Elevator
A freight elevator, or goods lift, is an elevator designed to carry goods, rather than
passengers, freight elevators are typically larger and capable of carrying heavier
loads than a passenger elevator; generally from 2,300 to 4,500Kg. Freight elevators
may have manually operated doors.
 Vehicle Elevator
Vehicle elevators are used with in buildings with limited space (in lieu of ramps) to
move cars into the parking garage. Geared hydraulic chains (not unlike bicycle
chains) generate lift for the platform and there is no counterweight.
 Boat Elevator
In some smaller canals, boat and small ships can pass between different levels of a
canal with a boat lift rather than through a canal lock.
 Aircraft Elevator
On aircraft carriers, elevators carry aircraft between the flight deck and the hanger
deck for operations or repairs. These elevators are designed for much greater
capacity than any other elevator ever built, up to 20,000 pounds (90 tones) of
aircraft and equipment.
 Dumbwaiter
Dumbwaiters are small freight elevators that are intended to carry food rather than
passengers. They often link kitchens with rooms on other floors.
1.5.1 Power supply
 Check the power connections before powering up the controller.
 The motor cables must be at least 0.5 m (20 in.) long.

Dan lift technology PLC Page 5


Arab Minch university 2017/1018

 Ensure maximum separation between the power cable (line supply) and the motor
cable.
 Ensure the reading of main supply voltage is similar to rating for the lift.
 Applying input line voltage to the output terminals (U/T1, V/T2, and W/T3) will
damage the ATV71.
1.5.2 Ground and neutral
Ground equipment using the ground connecting point provided as illustrated. The drive
panel must be properly grounded before power is applied.
Check whether the resistance to the protective ground is one ohm or less.

Grounds between drive, motor and cable shielding must have "high frequency"
equipotentiality.

1.6 End users of company’s products or services

The company has many customers from public, private and non-governmental
organizations (NGO).
The public customers are hospitals (e.g Tikur anbesa, Yordanos Hospital), Federal
Ministry of Health, Ethiopia Map Authorities, Gehon Hotel, Ethiopia telecommunication
corporation and so on.

Some of the private customers are Friendship building, Yirga Haile building, Kurtu
international and etc.

And from NGO Sunshine head office, Real estate and so on.

Not only in Addis Ababa but the company also have several customers in regional states
and in the future it has a plan to export to neighbour countries.
In Dan Lift Technology Plc. first customer informs its need to sales and business
operation.
Customer preferences:-
 Type of Elevator: - Traction or Hydraulic Elevator.
 Purpose of Elevator: - Passenger, Bed or Freight Elevator.

Dan lift technology PLC Page 6


Arab Minch university 2017/1018

 Capacity of Elevator: - Number of person (in case of passenger elevator) and


maximum payload the elevator can carry.
 Number of stops: - can be the same as or different from the number of floors of the
building on which the Elevators is to be installed.
 Speed of Elevator
 Type of Elevator Door Mechanism: - side opening, centre opening, etc

1.7 Work flow of company

Customer

Sales /Business
Operation

Engineering Department

Electrical Mechanical

Production

Electrical Mechanical

Installation

Final Product

Maintenance & Service

Fig 1 Work flow chart of the company

Dan lift technology PLC Page 7


Arab Minch university 2017/1018

1.8 Product costumers

Dan lift technology plc. has many customers in Ethiopia especially in Addis Ababa
.therefore Dan lift technology plc has the following end users throughout all parts of the
country. These end users are;

 Hotels
 Guest houses
1.9 Organizational structure of Dan lift technology plc.

In Dan lift technology plc. There are departments or sections for the quality and fast
production of lift. Each department has their own responsibility and accountability doing
every working action in the company.

Fig 2 Organizational structure of Dan lift technology plc.

Dan lift technology PLC Page 8


Arab Minch university 2017/1018

CHAPTER TWO

2. MATERIALS AND METDOLOGIES

2.1 Assignments and responsibilities that I have taken in internship

During the four months working period as an Intern in Dan lift technology plc. I had the
opportunity to observe in each and every department of the organization. As soon as I
joined the company for my internship, a schedule of the internship program was given to
me, which consisted of the working schedule along with the maintenance departments in
which I would be working. The management of the company believes that an intern
should work in all the departments rather than concentrating on only a specific
department because, the main goal behind an internship is learning and that can be
achieved greatly by having an exposure of all the departments together. It is also because
it gives an intern a broader perspective of how an organization really works all together.
However, as my main field of study and interest lies in Electrical and Computer
Engineering stream of Industrial control and Instrumentation, the company has thus given
me an opportunity to work in maintenance, installation, production department of Dan lift
technology plc.

The section I have been working on and work flow in each section

I have been working on almost all of the company’s section, since electricity has a wide
application in everywhere of the company. The sections that I have been working on are;

 Maintenance
 Installation
 Production
For the first two week of my intern I looked on the maintenance of lifts in Dan lift
technology plc. And I got knowledge how the lifts maintained. After the maintenance
time for two weeks I was working in installation and I knew how lift installation is.
Finally I work in production department in the production of main controller and
emergence board and I got knowledge how to produce main controller and emergence
board.

Dan lift technology PLC Page 9


Arab Minch university 2017/1018

2.1.1 Task one production of Main Controller

Elevator controller is the main (brain) of the elevator system so that elevator controller
must be manufactured and installed very carefully and with full attention because its risk
is very high and fatal
It’s the system responsible for coordinating all aspects of elevator service such as travel,
speed, and accelerating, decelerating, door opening speed and delay, levelling and hall
lantern signals.
It accepts inputs button signals and produces outputs elevator car moving, door opening,
etc.
The main objectives of the elevator control system are:
 To bring the lift car to the correct floor.
 To minimize travel time.
 To maximize passenger comfort by providing a smooth ride
 To accelerate decelerate and travel within safe speed limits

Figure 3 main controller of elevator

Dan lift technology PLC Page 10


Arab Minch university 2017/1018

Elevator controller has different parts

 BG15 card
 Motor Drive
 Transformer (step down)
 Rectifiers
 Relays
 Contactors and
 fuse

BG 15 Card
This card is the most important part of the controller which analyse and performs all the
input data and the output commands. BG 15 card is microprocessor based controller
which helps to control
 Safety chains
 Lift movement and thermal states using the motor drive
 Controls relays and contactors
 Controls the doors
 Controls landing calls and car calls
 Controls photo cell
 Controls position indicator
 Direction of the elevator
 Fire man services

Dan lift technology PLC Page 11


Arab Minch university 2017/1018

Fig 4 BG15 card

Input of BG15 card

There are input terminals that give feedback and requests to BG 15 to perform all the
tasks.

KT2

 The operating voltage BG15 card is 19 VDC supplier terminal but its output
Voltage for the control purpose is 24VDC which is distributed through different
terminals There is also 110VAC input supplier through K30 terminal this is not
the operating voltage for BG15 card rather used for extra controlling purpose for
the devices Which need 110 VAC rather than 24VDC. It is used for safety chain
purpose and also used for the operating voltage for MONTE, DESENTE, PV and
GV relays coil through the output terminals K28 and K29.

Dan lift technology PLC Page 12


Arab Minch university 2017/1018

KC22

 The other input to BG 15 card is the one that comes through terminal KC22 from
Tap head which floor to go and which floor to stop and also helps to change the
speed accordingly i.e. high speed and low speed.
 The operating voltage for Tap head is 24VDC, it gets this operating voltage
through the same terminal i.e. KC22 and it gives input through its CAA and CAB
terminal.
KM11

 Another input comes from the motor though KM11, which is the temperature of the
motor. This protects the motor from damaging because BG 15 after receiving a signal
from the motor thermostat it will announce an error and stops from giving any
command, this will stop the motor from moving.
KC23

 To control the lift manually we have to announce the controller (BG 15) that the
elevator is in inspection/maintenance mode so we give this input through KC23
terminal.
KP26

 The purpose of tap head is to help the elevator know where it is. But in addition to
this there is a method that the elevator knows it reached the end floor. This is done by
placing Extreme down (ED) limit switch at the bottom floor and this input is
delivered to BG 15 through KP26 terminal. This input to the BG 15 is very important
because sometimes tape head may not work properly or the flag that the tape head
may not be placed at their exact places the placement of ED switch is necessary.
KA13

 The controller especially BG 15 must know the status or feedback of fermator and
also communicate with the elevator door operation i.e. when the door is opened or
closed if the end limit is reached, if the photocell is interrupted, if any alarm calls are
made etc. this kind of inputs are supplied to the BG 15 through terminal KA 13.

Dan lift technology PLC Page 13


Arab Minch university 2017/1018

KC21

 Inside the cabin a passenger gives call to the elevator to go to some floor and before
action the controller receives the message and checks safety lines if they are complete
it will register the command and give command to the motor drive and starts to move.
The passenger calls are entered to the BG 15 through the terminal KC21.
KP21

 In the same way passenger outside the cabin gives down call signals to the elevator
and this call is taken in to BG 15 through terminal KP21 if it is a down call and
processed in BG 15 if the car is going down it will serve the passenger but if the
elevator is going to the up direction it will hold the call until it comes back.
KP27

 If the call from outside the cabin is an up call, it will be inserted to the BG 15 through
the terminal KP27.
KP34

 The other input comes from KP34 terminal; the use of this terminal is to receive
message from the smoke and/or heat detectors in each floor if fire exists and there is,
BG 15 card takes this message and performs different actions as per the program. The
program may be to stop the elevator completely or to take the elevator to another
floor, etc.
KC28
 BG 15 also controls the carrying capacity of the elevator, for example if the carrying
capacity of the elevator is 6 passenger i.e. around 480kg and if the total weight of the
passengers is the same as 480kg then BG 15 will automatically reject landing calls
and takes the passengers. But if the weight of the passengers is greater than 480 kg
then BG 15 card will give a command to stop the elevator from moving and
announces the carrying capacity of the elevator is excited. This all data from the
weight sensor is entered to BG 15 card through KC 28 terminal.
 If we want the elevator to be out of service for other users i.e. if we need the elevator
for special gust we can make the elevator out of service for other passengers using the

Dan lift technology PLC Page 14


Arab Minch university 2017/1018

key inside the car or from outside the car at first floor. This is possible by sending the
data to BG 15 through terminal KC 28.
KP22

 KP22 terminal is used to supply 0V voltage to over load, full load and out service
keys because they get 24VDC from KC28 and it is obvious that they should get 0V to
work properly.
K62

 In DAN elevator controller there is a phase sequence relay which controls phase loss,
phase reverse, over voltage and under voltage conditions. If any one of them from
above listed things occurs phase sequence relay will deactivate itself. BG 15 card uses
this feedback coming through terminal K62 to terminate every action performed
because those problems listed are very hazards to the equipment’s including the
motor drive, and also analysis’s the operating conditions or status of the Monte,
Decent, PV and G relays ordered by the BG15.
Output of BG15 cards
The out puts of BG 15 card to perform different tasks.
KC24
 Bg15 card has an output to alarm buzzer which is 24 VDC and 0v, it gives this out
put through terminal KC24. The control voltage which is distributed to different parts
is 24 VDC.
KP24
 Position indicators get their operating voltage which is 24 VDC and CREP signal
from this terminal of BG15 card.
KC29
 This terminal gives operating voltage to car calls; we have discussed where the car
calls came to BG15 card.
KP29
 This terminal of the card is an output supply to landing calls i.e. 24 VDC

Dan lift technology PLC Page 15


Arab Minch university 2017/1018

K23
 From the input terminals BG15 card decides many important things including the
direction of the elevator. We know the direction of the elevator from the position
indicator whether it is going up or down, position indicator gets this information from
this terminal.
KA14
 Door open and door close commands comes from BG15 card i.e. terminal KA14 and
goes to FERMATOR and the fermator in the other end gives command and operating
voltage to the door motor.
K29
 Any elevator should go forward and back ward in low or high speed. To manage
these things accordingly an intelligent system is necessary. BG 15 card is an
intelligent controlling system which can manage the above things by receiving
different calls and commands through input terminals and gives out output signal to
the motor and drive. These commands in Dan elevator system are MONTE,
DESENTE, PV and GV which are send through terminal k28 and k29.
K30

 In an elevator system the main thing that should be given emphasis is the safely
system of the elevator because if in any point the safety chain is not complete and the
elevator starts moving then the consequence will be very fatal. So, BG15 card
controls every safety chain starting from speed governor, buffer, stop switch, up and
down limit switches, stop switch [inspection box], cabin door, landing doors through
terminal k. on BG15 card we can see which safety line is disconnected by visually
watching 6,8,10 LEDs.
 If the 6th LED is not lit then safety line between speed governor, buffer, stop switch,
up and down limit switches and stop switch [inspection box] is not complete so that
must be checked.
 If the 8th LED is not lit then the door of the elevator is not closed so if the elevator has
to move the door must be closed.

Dan lift technology PLC Page 16


Arab Minch university 2017/1018

 If the 10th LED is not lit, one or more than one of the landing doors are opened so it
must be closed.
ATV 71 MOTOR DRIVE

INTRODUTION TO ATV71 DRIVE

Motor drive is very important part of the elevator controller. It is mostly known as an
INVERTER, which is also called VVVF [variable voltage frequency] because voltage is
inversely proportion to frequency i.e. it controls the speed by changing voltage and
frequency at the same time.

Motor drive is the one which controls the speed of the motor accordingly. Most of the
time the speed of the motor is given on the name plate and the motor runs at that speed
but the

Speed which is given on the name plate is very high and difficult to use for elevator
system. Motor drives resolve this problem and help to manage the speed as we like using
binary inputs.

Fig 5 motor derive

INPUT OF ATV71 MOTOR DRIVE

The section is main input supply to motor drive is 380 VAC, three phases, 50 Hz i.e. R,
S, T. But in emergency (when power failure occurs) motor drives operates in 220Vac

Dan lift technology PLC Page 17


Arab Minch university 2017/1018

single phase voltage and the second output section is control input section which receives
a command signal from a BG15.

OUTPUT OF ATV71 DRIVE

The main output of motor drive goes in to sections

The first one is power output section which gives three phase 380Vac voltage to the
motor U, V, W terminals. And there is also a brake resistor output terminals (PA+, PB)
which helps for electrical braking system.

The second section is control output section’s which a programmable relay are and those
terminals are R1A, R1B and R1C and the other relay output terminal is R2A and R2C.

Table 1 function of power terminals

Control connection diagram

Fig 6 control connection diagram

TRANSFORMER

As it is known there are three types of transformer according to the jobs they execute.

Dan lift technology PLC Page 18


Arab Minch university 2017/1018

 Step up transformer
 Step down transformer
 Impendence matching transformer

The company uses in controller the step down transformer.

The main objective of step down transformer in controller is to step down the voltages.

It accepts380 VAC three phase input and it gives 110VAC single phase for safety chain,
60 VAC single phase to rectifier i.e. For motor break and 19VAC single phase for BG 15
card but first it has to pass through rectifier and converted to DC voltage output.

Figure 7 step down transformer

RECTIFIER

In general rectifier is the one that converts AC voltage in to DC voltage.

There are different types of rectifiers, for example, half wave rectifier, full wave
rectifier, bridge rectifier etc.

Dan lift technology PLC Page 19


Arab Minch university 2017/1018

In company they use bridge rectifier to change AC voltage into DC voltage which comes
direct from the transformer.

Fig8 ckt of bridge rectifier

The objective of rectifier in controller

The operating voltage of BG 15 card in 19VDC but the output voltage of the transformer
is 19VAC so it must be rectified so this work is done by the rectifier.

The operating voltage of motor break is 60VDC but the output voltage of the transformer
is 60VAC this is also rectified using the rectifier.

RELAY

In Dan elevator controller there are more than 7 relays with different purposes. For
geared (induction) motor the following relays are necessary.

 Phase sequence relay: - this relay is used to control phase sequence, phase
reverse, over voltage and under voltage. If one of the above listed problems occur
phase sequence relay will be deactivated and sends message to BG 15 card through
its normally open contact.
 Monte relay: - this relay accepts it operating voltage from BG 15 card (A1) and
safety chain (A2) to operate properly. The use of this relay is it sends signal to the
drive to go upward (forward) through its contact points.
 Descente relay: - This relay accepts its operating voltage from BG 15 card (A1)
and safety chain (A2) to operate properly. The use of this relay is it sends signal to
the drive to go sown (reverse) through its contact points.

Dan lift technology PLC Page 20


Arab Minch university 2017/1018

 PV relay: - this relay accepts its operating voltage from BG 15 card (A1) and
safety chin (A2) to operate properly. The use of this relay is it sends signal to the
drive to go in high speed through its contact points.
 GV relay: - this relay accepts its operating voltage from BG 15 card (A1) and
safety chain (A2) to operate properly. The use of this relay is it sends signal to the
drive to go in low sped through its contact points.
 Up direction relay: - this relay accepts its operating voltage (24VDC) from BG 15
card and sends message to all position indicators found in all floors that the lift is
going in upward direction.
 Down direction relay: - this relay accepts its operating voltage (24VDC) from BG
15 card and sends message to all position indicators found in all floors that the lift
is going in upward direction.

For Gearless Motor the following relays are added on the above ones

 Enable relay: - this relay is used only in gearless motors because the drive used is
different from the one which is used for the other controllers. The motor drive
needs enable signal to start working properly. This relay gets its coil voltage from
the safety chain i.e. 110VAC. When it is energized its sends the enable signal
through its contact points.
 Main contactor controlling relay: - this relay is an important relay in gearless
motor, elevator controller, which helps the motor drive to control the time delay of
the input supply of the motor through the main contactor i.e. it controls the main
contactor when to be energized and de – energized.

Dan lift technology PLC Page 21


Arab Minch university 2017/1018

Fig9 relay

CONTACTOR

In DAN elevator controller there are around two contactors used but when emergency
system is added the number of contactors increases.

 Main contactor (KS):- the main purpose of this contactor is the main supply to
the motor passes through the contact of KS contactor.
 Break contactor (KER):- this contactor is directly controlled by the motor drive
out put relay contact. The supply voltage comes from the safety chain passes
through motor drive internal relay contact and reaches A2. The purpose of this
contactor is that the supply voltage to the motor break i.e. 60VDC which comes
from the rectifier passes through this contactor.
 Emergency contactor (KA):- the main purpose of emergency contactor is to
separate the safety chain voltage during emergency and with line voltage. The
voltage that comes through safety chain during line voltage is 110VAC but in
emergency time the voltage that comes through the safety chain is 220VAC, so
these two different voltages must be separated if in case line voltage comes during
emergency period.

Dan lift technology PLC Page 22


Arab Minch university 2017/1018

Fig 10 contactor

 Main contactor (KS):- the main purpose of this contactor is the main supply to the
motor passes through the contact of KS contactor.
 Break contactor (KER):- this contactor is directly controlled by the motor drive out
put relay contact. The supply voltage comes from the safety chain passes through
motor drive internal relay contact and reaches A2. The purpose of this contactor is
that the supply voltage to the motor break i.e. 60VDC which comes from the rectifier
passes through this contactor.
 Emergency contactor (KA):- the main purpose of emergency contactor is to separate
the safety chain voltage during emergency and with line voltage. The voltage that
comes through safety chain during line voltage is 110VAC but in emergency time the
voltage that comes through the safety chain is 220VAC, so these two different
voltages must be separated if in case line voltage comes during emergency period.

Fuses
Fuse is protective device it is nothing more than a Short length of wire design to melt and
separate in the event of excessive current. Fuse are always connected in series with the
component(s) to be protected from overcurrent, so that when the fuse is blows(opens) it
will open the entire circuit and stop current the components. A fuse connected in one

Dan lift technology PLC Page 23


Arab Minch university 2017/1018

branch of a parallel circuit, of course, would not affect current through any of the other
branches.
In this controller they use seven fuses the first three fuses are used to three phase supply
the forth fuse is used to the transformer that supply to card the fifth fuse are used to motor
break the six fuse are used to shaft power supply the seven fuse are used to emergency
supply and the seven fuse are used to fermator supply.

Figure 11 fuses

Emergency Evacuation Devices

In this room they build Emergency Controller circuit this circuit used to uninterruptable
Power supply, also uninterruptable power source it also has UPS or battery Flywheel
backup, it is an electrical apparatus that provides emergency power to a load when the
input power source or main power fails. A UPS differs from an auxiliary or emergency
power system or stand by generator in that in will provide near-instantaneous protection
from input power interruptions, by supplying energy stored in batteries, super capacitors,
or flywheels. The on- battery runtime of most uninterruptible power sources is relatively

Dan lift technology PLC Page 24


Arab Minch university 2017/1018

short (only a few minutes) but sufficient to start a standby power source or properly shut
down the protected equipment.

Fig 12 ups (battery used for emergence)

Technical Descriptions

Fig 13 Technical Description

This UPS is multi-modal system, i.e. it can work as off-line (standby) source or as on-line
(direct on) source. But in our case since the system in their phase and the ups in single

Dan lift technology PLC Page 25


Arab Minch university 2017/1018

phase we use it as STANDNY power supply. This means it stays charging the battery
until power is interrupted and called up on by power switching contactors.

2.1.2. Task two emergence board

Fig 14 emergence board

Emergency evacuation device is used to move the lift in case of main power failure
there is separate panel mode for this purpose and fitted in the main control panel cabinet.

The panels have three main contactors, namely KA1, KA2 and K1, KA1 and KA2 work
in normal mode (when main power is on) and k1 works when main power is gone.

The emergency device gets position information by magnet sensor when the magnet
sensor closes the lift stop and the cabin door is opened. (Letting the people get out).

The cabin does not move further after reaching the nearest floor until the main power is
come.

Emergency evacuation device employee’s automatic rechargeable device ups as a power


source. This device charges its own 48V battery when the power is present and works as
power source (220 ac) during the power is gone.

Dan lift technology PLC Page 26


Arab Minch university 2017/1018

NORMAL MODE

KA1-380 VAC Supply Contactor for drive.

KA2. Safety contactor

T1-On delay time to energize the contactor KA1 and KA2

T2-Off delay timer to separate the two modes (emergency and normal)

Emergency Mode

K1 220V Contactor used in emergency mode to connect the ups and drive

R1 220v UPS supply for Fermator, fan and car light through normally open contact open
contact point

R3 200v motor contactors (KS) supply through normally open contactor point

T3 On time delay timer for command signal (FRW or REV) to the drive

R2 car stop and door open signal through normally close and open contact respectively

2.1.3 Task three lift installation and motor tuning

Lift safety device installation

During my internship program I have doing lift safety device installation, shaft wire and
traveling cable distribution.

They have many safety devices in one lift system such safety devices can prevent the
passengers from any trouble. Those devices can interrupt the unnecessary lift travel in
both electrical and mechanical way.

Dan lift technology PLC Page 27


Arab Minch university 2017/1018

Fig 15 safety devices

1. Speed governor: - one of the devices used in elevator safety chain, they use the
normally close contact of the switch for electrically control circuit. Its principle of
operation is when the lift travel beyond its nominal speed, the mechanical coupled
device that is the speed governor will trip the switch means will open the
electrical safety circuit.

Fig16 speed governor


2. Top limit switch: - is a normally close limit switch it used when lift travels
towards upward and missed the top floor it will immediately open the safety line.

Dan lift technology PLC Page 28


Arab Minch university 2017/1018

Fig17 top limit switch

3. Bottom limit switch: - is a normally close limit switch it used when lift travels
towards downward and missed the bottom floor it will immediately open the
safety line.
4. Car oil buffer: - is one of our safety devices it is hydraulic type filled oil in the
cylindered will resisted up to 500 tones, when car sit on the buffer the switch will
open and the lift will stop.
5. Pit stop: - is a manually stop switch it used during a maintenance and servicing,
especially in the pit.
6. Inspection stop: - is a manually pressed stop switch it is used during a
maintenance, servicing, adjustment etc.

Fig 18 inspection stop (inspection box)

7. Car door contact: - is a normally open contact when the door is open but it will
be close when the door is closed

Dan lift technology PLC Page 29


Arab Minch university 2017/1018

8. Landing door contact: - is the same to the car door contact but the only
difference
Depends on the number of floor all the landing door contacts connect in series.
Other lift components
Door operator
The car and landing doors shall be fully automatic, two or more panels center or
side opening sliding doors.
The car door operator shall be operated by VVVF motor and VVVF control card
and arranged for harmonic motion

Figure 19 door operator

 VVVF Fermator control card


This control card supplies 220vac operating voltage and it has a three phase
230Vac for the door motor, by receiving a feedback signal from the motor encoder.
In order to drive the door motor either forward or reverse the fermator control card
needs an input command signals from the main control card (BG15) those
command signals are door open and door close command signals. The output of the
fermator card are relay contact inside the card which gives a feedback signal to the
BG15 card, this signals are door open end limit switch, door close end limit switch,
photocell and obstruction.
 Fermator door motor
Is a simple asynchronous three phase 220Vac motor; it is a variable speed motor.

Dan lift technology PLC Page 30


Arab Minch university 2017/1018

External Control
Elevators are typically controlled from the outside by a call box, which has up and down
buttons, at each stop. When pressed at a certain floor, the button calls the elevator to pick
up more passengers. If the particular elevator is currently serving traffic in a certain
direction, it will only answer calls in the same direction unless there are no more calls
beyond that floor.

Figure 20 external control

Photo Cell

Photo cells are a Non-Contact Sensor, Type B1. They can be used to protect entrapment
areas, when gate is moving open or closed.

The term Photocell (Photo-Beam, photo-eye) is a generic term that can apply to both
Retro- Reflective and Thru-Beam type devices. You will need to be very familiar with
the pros and cons of each type.

Proximity switch

Proximity switch’s are sensors which is used to detect where is the lift is located during
power loses or during emergence time.

Dan lift technology PLC Page 31


Arab Minch university 2017/1018

Fig 21 proximity switch

Taped and flag

Taped and flag are used to detect where the lift to go and to stop and it also used to the
lift to go in low and high speed.

Fig22 taped and flag

Motor Tuning

When I had been In Dan lift technology, I actively participated in motor tuning.

Dan lift technology PLC Page 32


Arab Minch university 2017/1018

Tuning is the process of introducing motors with drive system or parameters


configuration on name plate of motors with drive like pole, frequency, speed, voltage and
current.

There are two main types of motor that they use in their lift installation. These are geared
and gearless motors. But now days they are focusing more on gearless due to its
technological advancement and other advantages.

Figure 23 motor

Dan lift technology PLC Page 33


Arab Minch university 2017/1018

The main differences are stated as follows

Induction(asynchronous) Synchronous

high efficiency Very High efficiency

Lagging power factor We can choose lagging, unity or leading power


factor

Slower than stator field rotation Same speed as stator field rotation

Speed variation with load Fixed speed

Magnetization by induction DC or Permanent magnet

Starting current high for low torque out put Starting current low with high torque

Table 2 main differences of motors

2.2 Assignment Ones

My supervisor gave for me assignment to doing hardware builder for position indicator
and checking its continuity by giving supply 24V dc either each floor indicator properly
work or not before sent site.

Position Indicators

This floor indicator used to show the destiny of elevator mostly it is use common anode
seven segment because Seven-segment displays are very common and have been for
quite some time. They can be found everywhere from the price signs at gas stations to the
display on your microwave oven to digital wristwatches. LED seven-segment displays
have become very popular in consumer electronics, mainly because of their low power
usage, ease of production and cost effectiveness. Seven-segment LED displays, like all
technology, have advantages and disadvantages

Dan lift technology PLC Page 34


Arab Minch university 2017/1018

Fig 24 position indicator before and after I connect with wire

2.3 Assignment two

Company supervisor gave me an assignment to do software simulation of lift for nine


floors on proteus software.

A B C D E F G H J K

0 0

ARD1
1 1

AREF
2 D1 D2 2
13 LED-GREEN LED-RED
PB5/SCK
12
PB4/MISO
RESET 11
~PB3/MOSI/OC2A
10
~ PB2/SS/OC1B
9
~ PB1/OC1A
8
PB0/ICP1/CLKO
ATMEGA328P-PU

3 3
1121

DIGITAL (~PWM)

7
ANALOG IN

PD7/AIN1
6
A0 ~ PD6/AIN0
PC0/ADC0 5
A1 ~ PD5/T1
PC1/ADC1 4
A2 PD4/T0/XCK
PC2/ADC2 3
A3 ~ PD3/INT1
PC3/ADC3 2
A4 PD2/INT0
4 PC4/ADC4/SDA 1 4
A5 TX PD1/TXD
PC5/ADC5/SCL 0
RX PD0/RXD
1

ARDUINO UNO R3

5
A
1 2 3 5

B
4 5 6
6 C
7 8 9 6

D
0 #
7 7

8 8

FILE NAME: 8 Level Lift.pdsprj DATE:

DESIGN TITLE: 8 Level Lift.pdsprj 12/29/2017


PAGE:
9 C:\Users\Freeware Sys\Documents\Lift\81Level 9
PATH:
of Lift.pdsprj
1
BY: @AUTHOR REV:@REV TIME: 1:31:38 PM
A B C D E F G H J K

Fig 25 fig of nine floors simulation

Dan lift technology PLC Page 35


Arab Minch university 2017/1018

2.4. Component used for software


1 arduino uno r3
2 capacitor
3 crystal
4 keypad-phone
5 led-green
6 led-red
7 dc motor
8 pic 16f877

Dan lift technology PLC Page 36


Arab Minch university 2017/1018

CHAPTER THREE

PROJECT

3. Motor used to drive load horizontal

3.1 Abstracts

This project is software based horizontal load sliding machine it used to move load from
one place to another place horizontally which aimed to change the manual system of the
machine process to software automated system. This project reduces time conception and
human resource of manual system. This system is developed by using C# for windows
application software and Proteus for software’s. The system analysis phase shows that
what the existing system do and what the problems are. But the design phase shows the
new proposed system and it shows the solutions to the problems of the existing system.

3.2 Introductions

The main purpose of this project is to increase production rate and reduces human
resources of manual system.

This project used move load horizontal from one place to another during production of
controller. But in horizontal movement motor is not mattered by load but friction will the
matters and also surface either smooth or roughs.

Our project different from the existing system company used in mechanical department
that move load horizontal .but in electrical department for controller production they
move load by human labor ,so we solved this problem during our internship period in
this company.

3.3 Statement of the problem

For many years the controlling method held by the operator is manually operate to move
load from one place to another.

Dan lift technology PLC Page 37


Arab Minch university 2017/1018

This highly consumes the working hour and speed of production so, the amount of
product per day became decrease and per year there is highly decreasing of products in
the company

3.4 Objective

3.4.1 General Objective

The main objective of this project is moving load from one space to another space using
computer software.

3.4.2 Specific Objective

The specific objectives of this project are:

 To reduce time conception during moving one object from one space to another
space.
 To avoid human labor during moving one object from one space to another
space.
 To increase speed of company products

3.5 Methodology of the project

Methodology for data collection

 Primary data collection: - We use primary data collection methods have been
implemented for the identification of the problem and understanding the existing
system. Some of the methods we use: -
 Interview: - It is a method of collecting data involves presentation of oral-verbal
stimuli and reply in terms of oral-verbal responses.

We use this method to collect data by direct asking peoples who work on this position.

 Observation: - this method is also used to collect data, done by direct seeing the
Working environment. We gathered the information related to our system from
the working place through observing their activities. This method helped us for
understanding more about the system and what should the system operate.

Dan lift technology PLC Page 38


Arab Minch university 2017/1018

 Identification material used for project


 Software implementation
 Finally hardware implementation us material available
3.6 Used components

1. Arduino mega Microcontroller


2. 7 button (as limit switch)
3. Compim(Serial Connector)
4. Motor Drive
5. 2 5v Relay
6. Three phase motor
7. Led

3.7 Software Design


ARD2
ARDUINO MEGA1280

A B C D E F G H J K

0 0

RESET
AREF
13
1 PB7/OC0A/OC1C/PCINT7 1
12
PB6/OC1B/PCINT6 Forward
11
A0 PB5/OC1A/PCINT5 Backward
PF0/ADC0 10
A1 PB4/OC2A/PCINT4 9
PF1/ADC1 9
A2 PH6/OC2B 8
PF2/ADC2 8
A3 PH5/OC4C 7
PWM

PF3/ADC3
A7
PF7/ADC7/TDI 7
2 A6 PH4/OC4B 6 2
ANALOG IN

PF6/ADC6/TDO 6
A5 PH3/OC4A 5
ATMEGA1280

PF5/ADC5/TMS 5
A4 PE3/OC3A/AIN1 4
PF4/ADC4/TCK 4
PG5/OC0B 3
3
A8 PE5/OC3C/INT5 2
PK0/ADC8/PCINT16 2
A9 PE4/OC3B/INT4 1
PK1/ADC9/PCINT17 1
A10 TX PE1/TXD0/PDO
3 PK2/ADC10/PCINT18 0 3
A11 RX PE0/RXD0/PCINT8
COMUNICATION

PK3/ADC11/PCINT19
A12
PK4/ADC12/PCINT20 14
A13 TX3 PJ1/TXD3/PCINT10
PK5/ADC13/PCINT21 15
1
6
2
7
3
8
4
9

A14 RX3 PJ0/RXD3/PCINT9


PK6/ADC14/PCINT22 16
A15 TX2 PH1/TXD2
PK7/ADC15/PCINT23 17
DCD
DSR
RXD

RI
RTS
TXD

DTR
CTS

RX2 PH0/RXD2
18
TX1 PD3/TXD1/INT3
ERROR

4 19 4
RX1 PD2/RXD1/INT2
20
PB2/MOSI/PCINT2
PB3/MISO/PCINT3

SDA PD1/SDA/INT1
PB1/SCK/PCINT1

21
PB0/SS/PCINT0

SCL PD0/SCL/INT0
DIGITAL
PL5/OC5C
PL3/OC5A
PL4/OC5B
PL0/ICP4
PL1/ICP5

PG2/ALE

PA7/AD7
PA6/AD6
PA5/AD5
PA4/AD4
PA3/AD3
PA2/AD2
PA1/AD1
PA0/AD0
PC2/A10

PC4/A12
PC5/A13
PC6/A14
PC7/A15
PG0/WR

PC3/A11

P1
PG1/RD

PC0/A8
PC1/A9
PD7/T0
PL2/T5

COMPIM
5 5
PL6
PL7

RL2
53
52
51
50
49
48
47
46
45
44
43
42
41
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22

RL1
12V
6 Q4 6

1 Q3
Q2 Backward
NPN 12V
2 Forward

7 3 Q1 7
NPN NPN
4
BAT1
12v NPN
5

6
8 8
7

8 FILE NAME: Horizontal Load Slider.pdsprjDATE:


9 DESIGN TITLE: Horizontal Load Slider.pdsprj
2/7/2018
PAGE:
9 PATH: C:\Users\Freeware Sys\Desktop\BT PROJECT\Horizontal 9 Slider.pdsprj
Load
1 of 1
BY: @AUTHOR REV:@REV TIME: 11:50:18 AM
A B C D E F G H J K

Fig 26 Software design

Dan lift technology PLC Page 39


Arab Minch university 2017/1018

3.8. Hardware Design

This part is used to do over all activity of the project this circuit move and stop the motor
based on computer command.
Schematic

Figure 27 hard ware design

This hardware simulation operates when microcontroller accept computer command


using serial communication and control the motor driver. The buttons used as a limit
switch when the moving body touch the button it sends the message to the
microcontroller “the body is arrived”, then the motor stop running

3.9 System design

Our system has two interfaces they are desktop application software and hardware
simulation. Desktop application software: These are computer software it used to send a
command from computer to hardware microcontroller. This software is build using C#
because this software is easy to develop desktop application.

Dan lift technology PLC Page 40


Arab Minch university 2017/1018

3.10 Desktop application software:

These are computer software it used to send a command from computer to hardware
microcontroller. This software is build using C# because this software is easy to develop
desktop application.

Fig 28 desktop application

This desktop application operates when the button is click during this process the
computers send the clicked number to the microcontroller.

Dan lift technology PLC Page 41


Arab Minch university 2017/1018

3.11 Conclusion
This project is to move load horizontal from one place to another in production room.
The main purpose of this project is to increase production rate and reduces human
resources of manual system.
Our project different from the existing system company used in mechanical department
that move load horizontal .but in electrical department for controller production they
move load by human labor ,so we solved this problem during our internship period in this
company.
The preexisting system company used to move load horizontal is manually operating
system but our project to control this system by desktop application.

Dan lift technology PLC Page 42


Arab Minch university 2017/1018

CHAPTER FOUR

ASSESMENT OF INTERNSHIP

4. Overall benefits I have gained from internship

4.1. Upgrading (Increasing) my theoretical knowledge

This intern ship helped me to upgrading my theoretical knowledge. Sometimes, missing


of theories occurred in the practical scenario and it challenges my work area but, I tried to
solve these challenges by referring books that I have learnt before the internship. This
internship gives me awareness to change theoretical knowledge to practical and I state the
following points before starting any work it is necessary to know working procedure;

 how to work main lift controlle,emergence board


 what is the purpose main controller ,emergence board
 For whom to produce, for this theoretical knowledge
It is important to solve these problems. This internship program provided me with the
opportunity to expand my theoretical knowledge and practical skills. In this industry
there is a documentation room, this helps me to improve theoretical as well as practical
knowledge.

4.2 Improving my practical skills

In our university there are no enough machines and any electrical equipment because of
this it is difficult to generate skill full students. Now this internship period is very
important for me. I recognized the following questions and I have gained knowledge;

 How to increase my awareness in practical skill in maintenance of lift, installation of


lift and production of lift materials.
 How to improve my knowledge in the production of lift materials like main controller
emergence board etc.
 In which situation can apply?
 How to solve the problems,
 How to communicate the workers and the customers.

Dan lift technology PLC Page 43


Arab Minch university 2017/1018

In this internship I understood the operation of some machine and the process of the
elements to be provided, how to develop control circuit and different types of motors are
moreover my tasks. During my internship I have gained knowledge and could also
answer the following questions to myself;

 What are electrical components?


 How they are work?
 How to interface these components with machine and with each other?
There are many things that I have knew in my internship and knew the above electrical
components used in the company. These are;

 Contactor
 Overload relay
 Fuse
 Drive
 limit switches
 Sensors
 Transformers

By having knowledge and discover the working principles of the above electrical
components, I tried some circuit exercises and that is why I want to do project on . From
the project, I have gained information how to implement the project in the next my work
life to overcome the problems faced me. I get self confidence by improving practical
skills and understand the work now and sequence of product in terms of practical skills. I
have seen that learning practically is easier than learning theoretically especially if I ask
more I will get more knowledge.

4.3. Improving Interpersonal communication skill

At the beginning of my internship program I was almost new for everything in the
company. This makes me to ask more and more questions to the technicians and peoples
of the company who are experienced than me. This helps me to improve my 4.5.
Improving My Leader ship skills

Dan lift technology PLC Page 44


Arab Minch university 2017/1018

The leader ship skill that I developed in my hosting company is, by recognizing the work
flow starting from the department head to the lower workers. I observed that how the
leaders are responsible to solve a problem when occurred how they lead workers by
understanding their work performance and ability to work. In general, I learnt more thing
of leader ship skills like;

 The Ability to encourage team members to do their best


 Understanding the ideas and problems of supervisors, operators and methods of
solving their problems in the company
 Respecting every worker when he/she is coming to ask some problems.
 As a leader to have clear visions, goals and missions

4.4. Understanding about work ethics issues

In my internship program I developed a lot of professional work ethics in order to success


my goals. Working in a place I must order myself to work, be honest to do my work, give
attention to the working times schedule. Generally the work ethics I developed are
expressed as;

 Punctuality
 Honesty
 Reliability
 Responsibility
 being loyal and honest when doing professional judgments on issues of;
 Cost vs. benefit analysis
 Safety
 Quality when doing any project or assignment.

4.5 My entrepreneurship skill

The internship program contributes for me a lot of things knowing on the entrepreneurial
way of thinking and skills. The following points are some of that I developed during the
internship program; some of the common Entrepreneurship skills are:

Dan lift technology PLC Page 45


Arab Minch university 2017/1018

 Creative thinking
 Problem solving
 Need for achievement
 Recognizing Opportunities
 Willingness to take risk
 Self confidence
 Innovation
 Total commitment
 Need to seek refuge
 It helps me to understand the business concept.

Dan lift technology PLC Page 46


Arab Minch university 2017/1018

CHAPTER FIVE

5. CONCLUSION AND RECOMMENDATION

5.1 Problems Encountered During the Internship Period

Dan lift technology has the following basic problems

 Computer access
 Service like transportation, safety
 The documentation of the company was not arranged properly
 The webpage of the company was not arranged properly
 Some worker of the company discourage my morals
So we strongly suggest and recommend that the company must fulfil the
entire necessary thing above

5.2 General Suggestions and Comments to the Company

I strongly suggest that the company must fulfill all the necessary thing like:

 Computer access
 Transportation
 Safety
 Webpage arrangement
 Documentation arrangement

5.3 Summary and Conclusion

Elevator or lift is a vertical transportation system (vertical vehicle) that efficiently moves
people or goods between floors of a building. Dan lifts technology different from another
lift company by maintenance and material service. During internship period I got
practical knowledge about the machines in the company and their working principles,
how to control and how to maintain also general characteristics and component of hydro
power plant. My task during the internship was to observe electrical equipment’s and
understand their methods of operation Based on the major findings presented above its

Dan lift technology PLC Page 47


Arab Minch university 2017/1018

easy to understand that internship has a great significant in up grading student’s


theoretical knowledge and improving practical skill.

The overall internship program is very interesting for me. I have got something new
which including practical and theoretical knowledge. There were some challenges that I
personally encounter during our four month duration in the company but I have solved
those challenges by searching the solutions. I was happy and effective because I gained
basic skills both in practical and theoretical aspects. Internship program has helped me to
improve all my personalities, just like interpersonal communication skills and my team
playing skills. My task during this internship was to observe electrical equipment and
understand their methods of operation. Based on the major findings presented above, it is
easy to understand that internship has a great significant in up grading student’s
theoretical knowledge and improve practical skill. I can generally conclude that this
internship program helped me to improve and develop my:

 Practical and theoretical knowledge in production, installation and maintenance


 Interpersonal communication skills
 Team playing ability skills
 Leadership ability skills
 Work ethics related issues, etc.

Dan lift technology PLC Page 48


Arab Minch university 2017/1018

5.4 Recommendation for university linkage

First of all, the university industrial linkage office should request or announce to the
companies earlier to the internship period so that the company will have reserve place to
the intern to host him /her. The UIL has low communication skill with the companies and
students, so the UIL must improve this skill.

5.5 Recommendation for institute

I recommend to the school to know the specific companies of the intern students with
short period of time and check the mentor (advisor) to get the student at that specific
company with proper time interval.

 It is better to have good relation to company


 It is better to take important courses before internship.

Dan lift technology PLC Page 49


Arab Minch university 2017/1018

REFERENCES

[1]Searching and reading manuals of the machines and devices


[2]Dan Lift operation manual, maintenance manual, insurance manual and company
profile
[3]Asking the company technicians
[4]Reading different books (designed for elevating machinery frenic-lift instruction
manual)
[5]www.Dan lift technology plc.

Dan lift technology PLC Page 50

Вам также может понравиться