Вы находитесь на странице: 1из 3

DOC. NO.

CREC/CIMTE/001
v

CREC CONSTRUCTION PTE LTD


CONTROL Rev. A
11 MANDAI STATE #07-04 EDLIX
SINGAPORE 729908 INSPECTION,MEASURING Date: 10/05/2018
TEL: 67107158 FAX: 67107159 Page No. Page 1 of 3
AND TEST EQUIPMENT

CONTROL INSPECTION,
MEASURING AND TEST
EQUIPMENT
DOC. NO. CREC/CIMTE/001
v

CREC CONSTRUCTION PTE LTD


CONTROL Rev. A
11 MANDAI STATE #07-04 EDLIX
SINGAPORE 729908 INSPECTION,MEASURING Date: 10/05/2018
TEL: 67107158 FAX: 67107159 Page No. Page 2 of 3
AND TEST EQUIPMENT

Control of Inspection, Measuring and Test Equipment

1. Purpose

This document describes the procedure for identifying the inspection and test status
of work, supplies, parts, and materials in the care of CREC CONSTRUCTION.

2. Scope

This procedure describes the control of inspection measuring and test equipment used
by CREC CONSTRUCTION.

3. Procedure
CREC CONSTRUCTION ensures all Inspection, Measuring and Test Equipment is
selected, used, maintained and calibrated to an extent consistent with its type and service
duty, appropriate to the degree of accuracy and precision required.

All Inspection, Measuring and Test Equipment, affecting product quality, is identified, and
calibrated at least annually by either:

a. Appropriately approved sub contractors against certified equipment having a known


relationship to recognised Standards,
or

b. In-house by the Senior Factory Technician against a Transfer Standard instrument calibrated
as above.
Where no such Standards exist, the basis for calibration is documented. Technical data
pertaining to measurement devices is made available, on request, to the client, or the client's
representative, for verification that the devices are functionally adequate.
DOC. NO. CREC/CIMTE/001
v

CREC CONSTRUCTION PTE LTD


CONTROL Rev. A
11 MANDAI STATE #07-04 EDLIX
SINGAPORE 729908 INSPECTION,MEASURING Date: 10/05/2018
TEL: 67107158 FAX: 67107159 Page No. Page 3 of 3
AND TEST EQUIPMENT

Records of calibration status, test documentation, and calibration certificates (where


applicable) are maintained by the Production Manager. Re-calibrations are scheduled by the
Production Manager from these records.

In the event of a significant non conformance of any Inspection, Measuring and Test
Equipment, the validity of previous inspection and test results is assessed. Any non
conforming item of equipment is marked and removed from service.

Items that require calibration are clearly marked to show calibration status.