Pls Refer Point 4.2(2) which states that
As per our understanding router is required on Capex. Routers for Internet and Leased lines
1 Supply of routers for Lease line and Internet
Need to reconfirm will be procured by SCI through this
RFP and the bidder agrees to supply.
The bidder must provide links, router, network
operating system, modems and other What does Network Operating System means in this
3.4 (9) IOS/OS running on hardware.
communication accessories for Lease Line based point
WAN network and Internet connectivity
Supply hardware including network router,
modems at customer premises, network links / Connectivity between Mux and the router to be taken
Bidder will have to do the connectivity
4.4 (1) cabling till router network operation system with care SCI since SCI will be having their internal cabling
till router
associated peripherals, accessories, and services vendor to do this activity
as required in the RFP
The bidder will need to provide a detailed
implementation plan including the architecture
diagram, IP scheme, strategy, approach, and
delivery of links, specific issues, and their IP Schema will be provided during the implemention IP Schema may be provided during the
4.4 (5)
resolutions. Detailed implementation and post‐ phase. Hope this will be fine with SCI implementation phase
implementation processes and procedures for
Lease Line and Internet services should be
provided.
Technically point to point leased circuits are
commissioned from point A to point B and unlike layer Bidder has to manage the routers and
03 circuits where in band monitoring is possible by Link. Moreover, Managed Leased Line
The bidder will be responsible for managing all
remote login, same is not possible in point to point implies that till Mux it can be managed
4.7 (2) components including routers used for lease line
leased circuits. The best way to monitor performance of through their NOC and till the router it
network
point to point leased circuit is by monitoring the layer 03 can be managed re‐actviely, as and
device connected to the circuit, which globally as a when call is raised by SCI / DR Vendor.
standard practice is done in house by customer
The bidder will schedule, coordinate, and perform
support activities for Transport Systems (Managed
4.7 (7) Need clarity on this point
Leased Line links) in accordance with schedules
Shifting of Hardware, Devices and
approved by SCI.
Links from one place to another as per
The bidder will plan, schedule, manage, and/or SCI's requirement.
4.7 (8) perform Install Move Add Change (IMAC) as Need clarity on this point
requested and approved by the SCI.
The bidder must maintain an uptime of 98%
4.7.2(2)
measured on a quarterly basis. Routers (Hardware) Uptime should be
Conflecting points. Need clarity 98% and
The bidder must maintain site uptime of more
4.7.2(3) Link Uptime should be 99%
than 99.0%, calculated on monthly basis
Queries Raised By M/S Reliance Communications
The bidder should also provide high speed point –
Please clarify whether there are any additional links to
to – point Lease Line links between SCI – DR and
3.4 be provided as the word "also" seems to be wrongly Word "Also" is misprinted
SCI – HO and between SCI – DR and MDC – Powai
printed.
Data Centre.
For Point‐to‐Point Leased Line
For Point – to – Point Leased Line Reliance can provide maximum latency of less than 80
3.4 Maximum latency should be less than
• Maximum latency should be less than 50 msec msec.
50 msec.
Bidder should provide IP of IPV4.
Bidder to provide Minimum LAN Public IPs at DR – Reliance intends to know that IP required should be But should ensure and support
10.1
DC Kolkata IPV4 or IPV6. migration to IPv6 in future (if
required)(Refer 3.4 (8))
Queries Raised By M/S Sify Technologies Limited
As per the RFP , Routers to be supplied only at the Table 2 on Page No. 10 gives the
Routers for Internet and Leased lines will be
mentioned in Table 2 Routers required for DR‐WAN are Locationwise router(s) requirement.
4.2 procured by SCI through this RFP and the bidder
as mentioned in below table. Pg 10. Please refer"Annexure A" on page 56‐
agrees to supply.
Kindly Confirm 58 for Specifications of the routers
As asked, Would the desired 2Mbps be sufficient to
2 Mbps Internet Link for providing internet access.
address the DR application access. Upgradation of BW will be done in
3.3 If required by SCI, the Kolkata internet bandwidth
Request you to kindly upgrade the same with higher future, if required.
may also be used to provide DR application access
BW.
Queries Raised By M/S Tulip Telecom Ltd.
Details requires on Application wise Number of Queus
Class of Service implementation for its Details will be provided at the time of
3.3 to be configured and Bandwidth Allocation to be done
applications. implemention.
for each Queue?
SCI does not suggest any specific OEM
All routers provided in scope of this RFP should be
3.4(11) Is there any specific OEM is prefered by SCI for Routers? for Routers.
of the same brand
The bidder will be solely responsible for seeking
Need more detais on this clause, As per our undestading
statutory and regulatory approvals including Inside SCI Campus permission will be
4.4 permission require to be fiber laying in SCI campus will
follow up jobs with the external agencies and arranged by SCI.
be arranged by SCI?
concerned government departments
The selected bidder will be required to implement
Should we supply UTM/Firewall device for DR Internet
4.4 the network security measures in consultation No need to supply UTM/Firewall.
link?
with SCI during the Implementation phase
The bidder should provide the necessary software,
documents with internet and leased line router For NMS we have to procure the software and Install at
All the Links deployed should be
4.5 hardware and components. DR Location or all the Links deployed in DR should be
monitored from NOC.
monitor from SPs NOC?
Can we provide the IP Address Scheme and Subnet mask
A comprehensive documentation detailing address LAN IP will be provided by SCI whereas
4.6 infromation for WAN pool during project
scheme, and sub‐net mask addresses. WAN IP should be provided by SP.
implementation phase?
The onsite comprehensive warranty for
The onsite comprehensive warranty for Internet
Internet and Leased Line routers purchased Support for three years should be
4.7 and Leased Line routers purchased from OEM? Or
through this RFP should be for a minimum period provided by SP.
this support to be extended by SPs
of three (3) years
The bidder must maintain an uptime of 98%
4,7,1
measured on a quarterly basis. How Uptime of links will be monitored? 98% measured Routers (Hardware) Uptime should be
on a quarterly basis. & 99.0%, calculated on monthly 98% and
The bidder must maintain site uptime of more
4.7.2 basis Link Uptime should be 99% as per RFP
than 99.0%, calculated on monthly basis