Вы находитесь на странице: 1из 6

ATS REVIEWER

4790.8
SHIPS 3M manual
4790.1
Force 3M cert program
3M READE 1
Quarterly self assessment
3M cert requirement
Min CMD total score of 85%,
Min CMD total spot check 80%,
Conduct min 13 weeks after 1.3
ARQ
Aviation readiness qualification
AAV
Aviation Assist Visit
TAB D F3300.53
Navy anti terrorism program
OPNAVINST 5530.14
Navy physical security & law enforcement
3300.1 at program
ECP THREAT
IED THREAT
SMALL BOAT ATTACK
BOMB THREAT
PROTEST
SWIMMER ATTACK
SHOOTER
CNSP/CNSLINST 8820.2
BMD TAB F
LOK MIN 70%
Must be done independently with exception of SW/AW
Tab P NAVIGATION
3530.4 NAVDORM
ROR 88%
PRECISION ANCHORAGE MUST BE WITHIN 100 YDS
HARBOR NAV PACKAGE
TAB R SAR
OPNAVINST 3130.6 SAR PROGRAM
LOK 85% Or greater
TMNSAWC 3-03.1-004
Employment of tomahawk land attack missile BLK IV
COMNAVSURFORINST 8820.1
cruise missile quality / cert program
CMTQ
Done within a minimum of 24 months or significant system upgrades
STW 2.3A
Scenario (ATG) to validate CSTT
STW 2.3B
NSFS TRAINER ( CSCS)
STW 2.4A
ATG CMQT
STW 2.4 B
NSFS LIVE FIRE (CSCS)
SW323
DI-MMO 5 inch
SW360
AF-MMO 25MM
TB SUW 03-01
MK95 MOD 1 twin 50cal employment
TB SUW 03-02
MK 44 MOD 1 7.62 GwS
COMNAVSURFPAC 3361.1
USW
CRUDES USW CERT
Can't be extended. Ship must conduct full USWQ
USW 2.4A
CE02 track ex underway
USW 2.4B
OBT/TCW (ATG) underway
maintenance phase
Material foundation to support basic phase training, subsequent ops, and maintenance
modernization

RMC will certify


TSRA 3
2 week ship wide assessment
Focus on ship hull
Mechanical and electrical
Assist in eng light off
Achieve maint phase exit criteria
READ E 4
TYCOM assessment of ships readiness to exit maintenance phase usually last 3 weeks
of maintenance phase
TYCOM 5 events READE4
LOA
CREW CERT
DOCK TRIALS FAST CRUISE
NAV ASSESSMENT
CONTRACTOR SEA TRIALS
Shakedown phase
Verify ships material condition is able to support basic phase training
READ E5
TYCOM LED READINESS TO COMMENCE BASIC PHASE 1 month long
READ E5 4 EVENTS
TIER 1 / 2 MATERIAL CHECKS
CONT MAINTENANCE AVAILABILITY
TSRA 4
TYCOM SEA TRIAL
TIER 1
MOBILITY
TIER 2
UNIT TACTICAL
READ E6
TYCOM ASSESSMENT, TRANSITION FROM TIER 1 TO TIER 2, 3 WEEKS WITH1.5
days underway
FUNDAMENTAL TENANTS OF SFRM
TRAIN WATCH STANDSTERS/MAINTAINERS
STANDARD/PREDICTABLE PATH TO READINESS
PESTO PILLARS MEET EXIT CRITERIA
SHIPBOARD REPORTING ACROSS PESTO PILLARS
SEQUENCED BUILDING BLOCK APPROACH TO READINESS
CONSISTENT MATERIAL ASSESSMENT STANDARD
Other AGENCIES ALLOWED TO CERTIFY
TYCOM
RMC
EWTGP
TTGP
CSFTP
NETC
EAP
EXIT CRITERIA
TYCOM WILL DETERMINE IF SHIPS HAVE ACHIEVED REQUIRED EXIT CRITERIA
TO ADVANCE TO NEXT PHASE
FRTP 5 PHASES
SUSTAINMENT
MAINTENANCE
SHAKEDOWN
BASIC
INTEGRATED/ADNVANCED
QUALIFICATION
Event conducted to support mission area certification
DEPENDENCY
EVENT CONDUCTED BY EXTERNAL ORGANIZATION WHOSE PERIODICITY MUST
BE CURRENT FOR MISSION CERTIFICATION
USFF FJO/C3F
WILL CERTIFY SHIPS FOR DEPLOYMENT
Must maintained proficiency throughout maintenance and shakedown phases
AT
MOB DC
3M
FSOM
SUPPLY
EXPSAF
TRACKING PESTO
Personnel - FLTMPS
EQUIP - discrepancies doc in ships CSMP
SUPPLY - continuos monitoring program
TRAINING - TORIS TRACK
ORDINANCE - ORD info sys prog
DOCS CO NEED TO SIGN WITHIN 90 days TAKING COMMAND
BATTLE ORDERS
STANDING ORDERS
NAV BILL
CRUISE MISSILE DOCTRINE
FP SECURITY PLAN
TEMP STANDING ORDERS
DERANGED EQUIPMENT BILL
FRP CERTS
Basic phase completion
Deployment cert
FRTP
5 phases
27 months sched
TFOM SUSTAINMENT 80% or greater
LOA
Ensure ship is capable of safely lighting off and operating its engineering plant
ABBRV BASIC PHASE
When ship is not allocated sufficient time to complete a full basic phase
4 Principles of training
Educate
Training
Assessment
Certification
OPNAVINST 3539
ORM
OPNAVINST 3500.11
SURFACE FORCE EXERCISE MANUAL
4400.1
SURFACE FORCE SUPPLY PROCEDURES
COMNAVSURFORPAC 3591.1
SMALL ARMS TRAINING AND QUALIFICATION
3 TIERS
Tier 1 mobility

Tier 2 unit tactical

tier 3 group tactical


3MCA
Cert assessment
3MMCA
Mid cycle assessment
READ E1
Self assessment by ships
READ E2
TYCOM LED ASSESSMENT DURING SUSTAINMENT PHASE
READ E4
TYCOM LED ASSESSMENT OF SHIPS READINESS TO EXIT THE MAINTENANCE
PHASE.
READ E5
TYCOM ASSESSMENT OF SHIPS READINESS TO COMMENCE BASIC PHASE
READ E6
TYCOM ASSESSMENT THAT VERIFY SHIPS READINESS TO TRANSITION FROM
TIER 1 TO TIER 2
READ E7
A ONE MONTH PERIOD ALLOT D TO THE SHIP IN ORDER TO Prepare for and
conduct an INSUR inspectION
FST LEVELS
U units
WC warfare commanders
GC group commanders
S SUSTAINMENT
F FLEET
J JOINT
TEAM COMPOSITION
TEAM LEAD
TEAM COORDINATOR
WATCH STATION EVAL/TRAINER
SAFETY OBSERVERS
TRAINING DEVICE OPERATORS
TRUSTED AGENTS
MITES
Visual
EW
ASW
INTEL
LINK
SAR
GCCS-M
JTT BMD
4 EMBED TRAINING SYSTEMS REQUIRED
BFT
ACS
SQQ89
BEWT
DRILL REQUIREMents
TITLE #
REFERENCE
OBJECTIVES
SAFETY
SYMPTOMS
HOT COLD CHECKS APPROVED BY CO
PROCEDURES
RECOVERABLE/NON RECOVERABLE
CO APRVED
CS ALL TIER 2 except COMMS
...
TIER 1 warfare areas (OPERATE, NAVIGATE, COMMUNICATE)
ENG
SEAMANSHIP
NAVIGATION
3M
AT
SAR
DC
AVIATION
COMMS
EXPLOSIVE SAFETY
MEDICAL
TIER 2 WARFARE AREAS
AW
SW
AMW
BMD
USW
EW
IO
VBSS
STW
MIW
INT
TIER 3
INTEGRATE INTO AN ARG/CSG

Вам также может понравиться