Академический Документы
Профессиональный Документы
Культура Документы
`91)
KEMENTERIAN PELAJARAN MALAYSIA
PRELIMINARY DETAILED ABSTRACT FOR
CADANGAN MEMBINA 2 TINGKAT RUANG NIAGA DAN TEMPAT PARKIR KERETA DENGAN 2 BLOCK 7 TING
APARTMENT DI UNIVERSITY MALAYA, KUALA LUMPUR
Sanitary appliances
Plumbing Installation
Refuse Disposal
RM14,176,027.96
RM11,365,177.37
Window Standard
Normal
Normal
Normal
COST (RM)
RM541,198.92
RM972,108.60
RM972,108.60
RM7,913,008.92
RM3,215,405.25
RM2,308,214.51
RM2,389,389.16
RM782,587.64
RM249,281.07
RM113,338.11
RM44,267.79
RM5,860.51
RM97,849.62
RM218,513.37
RM2,197.69
RM24,488.57
RM26,790.91
RM10,208,904.08
BREAKDOWN OF PRELIMINARY COST ESTIMATE (CONT'D)
SUBTOTAL brought forward
5 EXTERNAL WORKS (6% of item 2-4)
a Site Preparations and Earthworks
b Roads, Carpark and Pavement
c Surface Water Drainage
d Fencing and Gates
e Water Reticulation
f Sewer System and Reticulation
g Open Walkway
h TNB Sub Station
i Laluan Bomba
###
9 MISCELLANEOUS
a Soil Investigation & Survey Works
b Land Surveyor Fees
RM271,300.00
RM 576,210.98
RM271,300.00
RM307,432.95
RM 150,000.00
RM150,000.00
RM80,000.00
RM50,000.00
RM30,000.00
204,955.35
RM12,107,565.67
RM13,000.00
RM227,303.55
RM1,841,158.73
RM1,363,821.28
RM68,191.06
RM409,146.39
RM14,176,027.96
Bhgn. Pembangunan & Perolehan
NOTES ON FILLING OF PRELIMINARY DETAILED ABSTRACT FORM (PDA)
1.1 The information given on this Detailed Abstract is for Government use only.
1.2 No portion of the form is to be left blank. Items not applicable in any particular c
them. If any item is included under 'BUILDING' this shall be stated in the 'COST' c
2.1 Total Provision shall be the amount given by the Client Department as the amoun
shall be given together with the project brief. If this information is not available i
3.1 Provision with Construction shall be the Total Cost of Project as shown. For revise
shall be the Total Cost of project in previously approved PDA.
4.1 The following abbreviations shall be used in completing the 'Brief description of B
Both the base material and the finish shall be given in the case of floors, walls an
Con./VT RC/WCR
Both the base material or the type of suspension/framing and the finish shall be
T/WCB Al./MFB
4.2 The standard of the building relates to the general standard of finishes rather tha
one the following three categories :
(i)
5.1 Each type and size of Piling/Special Faoundation and its cost shall be stated sepa
6.0 BUILDING
6.1 The cost for the building shall be exclusive of all services.
6.2 The buildings to be listed under item 3 shall refer to the same buildings as listed
6.3 The Floor Area shall mean the Gross Floor Area of all enclosed spaces fulfilling th
measured flat on plan to the internal face of the enclosing walls.
6.4 The Drawing Numbers to be stated shall only be those of the Architectural floors
Structural and other detailed drawing numbers need not be stated.
7.1 The cost for the internal services shall be inclusive of Profit and Attendance and
where applicable.
8.1 The amount to be allowed for Variation of Price shall be based on the projected in
index as issued by the Department of Statistics, or 5% of the value of the builder
9.0 CONTIGENCIES
10 The amount of Professional fees for each Consultant shall be inserted in the 'Cos
(ii)
ny particular case shall have a dash inserted against
in the 'COST' column.
description of Buildings' :
T - Timber
Tyn - Tyrolean
Tz - Insitu Terrazo
TB - Timber Boarding
TS - Timber Strip
TT - Terazzo Tiles
VT - Vinyl Tiles
WCB - Wood Cement Board
be stated separately
3.3 External Wall, Floor and Ceiling Finishes 130,222.00 2.14 2.9%
B/I/1
CADANGAN MEMBINA 2 TINGKAT RUANG NIAGA DAN TEMPAT PARKIR KERETA DENGAN 2 BLOCK 7 TING
APARTMENT DI UNIVERSITY MALAYA, KUALA LUMPUR
B/I/2
CADANGAN MEMBINA 2 TINGKAT RUANG NIAGA DAN TEMPAT PARKIR KERETA DENGAN 2 BLOCK 7 TING
APARTMENT DI UNIVERSITY MALAYA, KUALA LUMPUR
6.0 SERVICES
B/I/3
ERETA DENGAN 2 BLOCK 7 TINGKAT SERVIS
Remarks
B/I/4
ERETA DENGAN 2 BLOCK 7 TINGKAT SERVIS
Remarks
B/I/5
ERETA DENGAN 2 BLOCK 7 TINGKAT SERVIS
Remarks
B/I/6
CADANGAN MEMBINA 2 TINGKAT RUANG NIAGA DAN TEMPAT PARKIR KERETA DENGAN 2 BLOCK 7 TING
APARTMENT DI UNIVERSITY MALAYA, KUALA LUMPUR
B/I/3
CADANGAN MEMBINA 2 TINGKAT RUANG NIAGA DAN TEMPAT PARKIR KERETA DENGAN 2 BLOCK 7 TING
APARTMENT DI UNIVERSITY MALAYA, KUALA LUMPUR
3.3 External Wall, Floor and Ceiling Finishes 128,036.59 2.29 4.5%
127,776.67
4.2 Doors - 0.0%
B/I/4
CADANGAN MEMBINA 2 TINGKAT RUANG NIAGA DAN TEMPAT PARKIR KERETA DENGAN 2 BLOCK 7 TING
APARTMENT DI UNIVERSITY MALAYA, KUALA LUMPUR
6.0 SERVICES
B/I/5
ERETA DENGAN 2 BLOCK 7 TINGKAT SERVIS
Remarks
B/I/6
ERETA DENGAN 2 BLOCK 7 TINGKAT SERVIS
Remarks
B/I/7
ERETA DENGAN 2 BLOCK 7 TINGKAT SERVIS
Remarks
B/I/8
CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH SEKOLAH KEBANGSAAN BANDAR BARU SUNGAI L
YANG MENGANDUNGI 24 BILIK DARJAH DAN KEMUDAHAN BERKAITAN DI DAERAH KUALA MUDA, KEDAH
B / II / 1
CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH SEKOLAH KEBANGSAAN BANDAR BARU SUNGAI L
YANG MENGANDUNGI 24 BILIK DARJAH DAN KEMUDAHAN BERKAITAN DI DAERAH KUALA MUDA, KEDAH
B / II / 2
SAAN BANDAR BARU SUNGAI LALANG 2
DAERAH KUALA MUDA, KEDAH
Remarks
B / II / 3
SAAN BANDAR BARU SUNGAI LALANG 2
DAERAH KUALA MUDA, KEDAH
Remarks
B / II / 4
CADANGAN MEMBINA 2 TINGKAT RUANG NIAGA DAN TEMPAT PARKIR KERETA DENGAN 2 BLOCK 7 TING
APARTMENT DI UNIVERSITY MALAYA, KUALA LUMPUR
ELEMENTAL COST PLAN : TOWER B
3.3 External Wall, Floor and Ceiling Finishes 129,721.28 2.29 4.4%
B/I/5
CADANGAN MEMBINA 2 TINGKAT RUANG NIAGA DAN TEMPAT PARKIR KERETA DENGAN 2 BLOCK 7 TING
APARTMENT DI UNIVERSITY MALAYA, KUALA LUMPUR
ELEMENTAL COST PLAN : TOWER B
B/I/6
CADANGAN MEMBINA 2 TINGKAT RUANG NIAGA DAN TEMPAT PARKIR KERETA DENGAN 2 BLOCK 7 TING
APARTMENT DI UNIVERSITY MALAYA, KUALA LUMPUR
ELEMENTAL COST PLAN : TOWER B
6.0 SERVICES
B/I/7
ERETA DENGAN 2 BLOCK 7 TINGKAT SERVIS
Remarks
B/I/8
ERETA DENGAN 2 BLOCK 7 TINGKAT SERVIS
Remarks
B/I/9
ERETA DENGAN 2 BLOCK 7 TINGKAT SERVIS
Remarks
B / I / 10