RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN : PEMANGUAN RUMAH MASYARAKAT


PEKERJAAN : PEMANGUAN RUMAH MASYARAKAT TYPE 42 M2 KOPEL DI KAMPUNG TRIK
WULLU DOMME
LOKASI : DISTRIK MULIA
HARGA
NO. URAIAN PEKERJAAN KODE SAT. VOLUME SATUAN
( Rp )
1 2 3 4 5 6

I. PEKERJAAN PERSIAPAN
1 Pembersihan lokasi dan perataan tanah A.6 Ls. 94.500 20,075.00
2 Pasang bowplank A.3 M' 39.000 171,694.13
3 Papan nama proyek - Bh 1.000 1,000,000.00
4 Gudang bahan / los kerja A.5 M2 - Err:509

II. PEKERJAAN TANAH DAN PASIR


1 Galian tanah B.4 M3 2.940 115,808.00
2 Urugan Tanah B.9 M3 0.980 38,602.66
3 Urugan pasir dibawah lantai B.11 M3 0.150 Err:509
4 Timbunan tanah B.14 M3 1.050 758,037.50

III. PEKERJAAN PONDASI DAN BETON


1 Pasang batu kosong C.3 M3 1.764 2,456,173.50
2 Pondasi titik batu gunung 1 : 4 C.2 M3 1.523 11,395,870.10
3 Pondasi jalur batu gunung 1 : 4 C.2 M3 1.225 11,395,870.10
4 Plesteran 1 : 4 E.3 M3 6.930 Err:509
5 Cor lantai tebal 5 cm, 1 : 3 : 5 G.1 M3 0.150 14,097,356.09
6 Tangga batu kali Q.7 Bh 2.000 Err:509

IV. PEKERJAAN LANTAI DAN DINDING


1 Pasangan dinding CB D.2 M3 11.340 Err:509
2 Plesteran 1 : 4 E.3 M3 11.340 Err:509
3 Balok gelagar 10/10 cm F.2 M3 0.515 Err:509
4 Balok lantai 5/10 cm F.16 M3 0.501 Err:509
5 Lantai papan 3/20 cm F.29 M2 40.500 Err:509
6 Lantai keramik KM/WC 20/20 cm M.4 M2 - Err:509
7 Dinding keramik KM/WC 20/20 cm M.10 M2 - Err:509
8 Kolom kayu 10/10 cm F.2 M3 0.496 Err:509
9 Ring balk kayu 10/10 cm F.2 M3 0.470 Err:509
10 Rangka dinding 5/10 cm F.3 M3 2.088 Err:509
11 Dinding papan 2/20 cm F.27 M2 70.096 Err:509
12 Dinding tripleks 3 mm tunggal F.30 M2 57.436 Err:509
13 Dinding tripleks 3 mm rangkap F.32 M2 69.110 Err:509
14 List dinding 1,5/4 cm F.27 M2 14.019 Err:509
15 Plint papan 2/18 cm M.16 M' 27.000 Err:509
16 Plint papan 2/10 cm M.15 M' 43.500 Err:509
17 Relling pagar pengaman Q3 M' 10.000 Err:509
V. PEKERJAAN ATAP DAN PLAFON
1 Kuda - kuda kayu 5/10 cm F.14 M3 0.739 Err:509
2 Gording kayu 5/10 cm F.15 M3 0.765 Err:509
3 Atap senk gelombang BJLS 20 H.3 M2 87.310 Err:509
4 Nok senk plat BJLS 20 H.4 M' 12.000 Err:509
5 Talang miring senk plat BJLS 20 K.14 M' 6.320 Err:509
6 Listplank papan 2 x 3 x 20 cm F.20 M' 38.360 Err:509
7 Rangka plafon F.18 M2 76.980 Err:509
8 Plafon tripleks 60/120 cm I.1 M2 76.980 Err:509
9 List plafon 1/4 cm I.6 M' 144.020 Err:509
10 Grill papan 2/20 cm F.27 M2 13.653 Err:509
11 Ventilasi top gevel Q.2 Bh 3.000 Err:509
1 2 3 4 5 6

VI. PEKERJAAN PINTU, JENDELA & KUNCI


1 Kosen pintu dan jendela 5/10 cm F.1 M3 0.255 Err:509
2 Pintu panel papan 3,5 cm F.5 M2 6.720 Err:509
3 Pintu panel papan lapis seng plat Bjls 20 F.6 M2 1.470 Err:509
4 Bingkai jendela panel kaca F.7 M2 5.040 Err:509
5 Kaca jendela panel tebal 5 mm L.13 M2 3.494 Err:509
6 Jelusi kayu F.10 M2 0.704 Err:509
7 Kunci tanam 2 slag L.1 Bh 5.000 Err:509
8 Engsel pintu L.4 BH 15.000 Err:509
9 Engsel jendela L.5 BH 12.000 Err:509
10 Grendel pintu L.8 Bh 5.000 Err:509
11 Grendel jendela L.9 Bh 6.000 Err:509
12 Hak/kait angin L.6 Bh 12.000 Err:509

VII. PEKERJAAN INSTALASI LISTRIK


1 Pasang instalasi titik lampu O.1 Ttk 13.000 Err:509
2 Lampu phlips SL 8 watt O.2 Bh 4.000 Err:509
3 Lampu phlips SL 14 watt O.3 Bh 5.000 Err:509
4 Stop kontak 220 watt O.10 Bh 4.000 Err:509
5 Saklar tunggal O.11 Bh 4.000 Err:509
6 Saklar ganda O.12 Bh 2.000 Err:509
7 Box sekring/limit O.13 Bh 1.000 Err:509

VIII. PEKERJAAN SANITAIR


1 Bak air viber glass 110 ltr + keramik J.7 Bh 1.0000 Err:509
2 Kloset jongkok keramik J.2 Bh 1.0000 Err:509
3 Flor drain J.31 Bh 1.0000 Err:509
4 Kran air dia. 1/2 " J.27 Ttk 1.0000 Err:509
5 Stop kran air dia. 1/2 " J.28 Ttk 1.0000 Err:509
6 Pipa GIP dia. 1/2" J.13 M' 31.5000 Err:509
7 Pipa PVC dia. 2" J.23 M' 4.0000 120,360.59
8 Septiktank dan peresapannya Q5&Q4 Unit 1.0000 Err:509

IX. PEKERJAAN CAT


1 Residu kap dan gording N.6 M2 90.264 Err:509
2 Residu gelagar dan balok lantai N.6 M2 50.651 Err:509
3 Cat kosen N.3 M2 10.200 Err:509
4 Cat kolom N.3 M2 2.400 Err:509
5 Cat daun pintu dan jendela N.3 M2 28.035 Err:509
6 Cat listplank N.3 M2 14.193 Err:509
7 Cat list tepi plafon N.3 M2 7.921 Err:509
8 Cat plint papan 2/18 cm N.3 M2 5.400 Err:509
9 Cat plint papan 2/10 cm N.3 M2 5.220 Err:509
10 Cat plafon N.8 M2 76.980 Err:509
11 Cat dinding N.8 M2 265.752 Err:509
12 Cat atap N.10 M2 87.310 Err:509

X. PEKERJAAN LAIN-LAIN
1 Photo dokumentasi - Ls 1.000 750,000.00
2 Biaya pembersihan dan perapian - Ls 1.000 1,000,000.00
REKAPITULASI
KEGIATAN : PEMANGUAN RUMAH MASYARAKAT

PEKERJAAN : PEMANGUAN RUMAH MASYARAKAT TYPE 42 M2 KOPEL DI KAMPUNG TRIK

WULLU DOMME

LOKASI : DISTRIK MULIA

NO. URAIAN HARGA ( Rp

I. PEKERJAAN PERSIAPAN

II. PEKERJAAN TANAH DAN PASIR

III. PEKERJAAN PONDASI DAN BETON

IV. PEKERJAAN LANTAI DAN DINDING

V. PEKERJAAN ATAP DAN PLAFON

VI. PEKERJAAN PINTU, JENDELA & KUNCI

VII. PEKERJAAN INSTALASI LISTRIK

VIII. PEKERJAAN SANITAIR

IX. PEKERJAAN CAT

X. PEKERJAAN LAIN-LAIN
`

JUMLAH

PPN 10 %

TOTAL

DIBULATKAN

TERBILANG : SATU MILYAR DELAPAN RATUS TUJUH PULUH ENAM JUTA SEMBILAN RATUS TI
PULUH RIBU RUPIAH

MULIA, APRIL 2015

DIBUAT OLEH,
KONSULTAN PERENCANA
CV. PAGALEME PRIMA KONSULTAN

EKO ARIEFIANTO H.,ST


TEAM LEADER
MENGETAHUI, DIPERIKSA OLEH,
KEPALA DINAS PEKERJAAN UMUM KABID CIPTA KARYA DINAS PEKERJAAN
KABUPATEN PUNCAK JAYA KABUPATEN PUNCAK JAYA

PILEMON TABUNI, S.PAK, S.IP, M.Si MISLAM LASNAM


NIP. 1971110 200112 1 003 NIP. 19681010 200012 1 006
ANGGARAN BIAYA (RAB)

MASYARAKAT TYPE 42 M2 KOPEL DI KAMPUNG TRIKORA

JUMLAH
HARGA
( Rp )
7

1,897,087.50
6,696,071.07
1,000,000.00
Err:509
Err:509

340,475.52
37,830.61
Err:509
795,939.38
Err:509

4,332,690.05
17,355,910.16
13,959,940.87
Err:509
2,114,603.41
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
7

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
481,442.36
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
750,000.00
1,000,000.00
1,750,000.00
REKAPITULASI

MASYARAKAT TYPE 42 M2 KOPEL DI KAMPUNG TRIKORA

HARGA ( Rp.)

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

1,750,000.00

Err:509

Err:509

Err:509

Err:509

RATUS TUJUH PULUH ENAM JUTA SEMBILAN RATUS TIGA

MULIA, APRIL 2015

KONSULTAN PERENCANA
CV. PAGALEME PRIMA KONSULTAN

EKO ARIEFIANTO H.,ST


DIPERIKSA OLEH,
KABID CIPTA KARYA DINAS PEKERJAAN UMUM
KABUPATEN PUNCAK JAYA

MISLAM LASNAM
NIP. 19681010 200012 1 006
RENCANA ANGGARAN BIAYA (RAB)
KEGIATAN : PEMBANGUNAN RUMAH DINAS KEPALA SEKOLAH, GURU, PENJAGA
(OTSUS)
PEKERJAAN : PEMANGUAN RUMAH GURU SD INPRES PAGALEME DISTRIK MULIA
LOKASI : DISTRIK MULIA

NO. URAIAN PEKERJAAN KODE SAT. VOLUME

1 2 3 4 5

I. PEKERJAAN PERSIAPAN
1 Pembersihan lokasi dan perataan tanah A.6 Ls. 157.500
2 Pasang bowplank A.3 M' 51.000
3 Papan nama proyek - Bh 1.000
4 Gudang bahan / los kerja A.5 M2 -

II. PEKERJAAN TANAH DAN PASIR


1 Galian tanah B.4 M3 8.976
2 Urugan Tanah B.9 M3 2.992
3 Urugan pasir dibawah lantai B.11 M3 0.300
4 Timbunan tanah B.14 M3 1.980

III. PEKERJAAN PONDASI DAN BETON


1 Pasang batu kosong C.3 M3 3.366
2 Pondasi titik batu gunung 1 : 4 C.2 M3 2.535
3 Pondasi jalur batu gunung 1 : 4 C.2 M3 2.450
4 Plesteran 1 : 4 E.3 M2 12.870
5 Cor lantai tebal 5 cm, 1 : 3 : 5 G.1 M3 0.300
6 Tangga batu kali Q.7 Bh 4.000

IV. PEKERJAAN LANTAI DAN DINDING


1 Pasangan dinding CB D.2 M2 22.680
2 Plesteran 1 : 4 E.3 M2 22.680
3 Balok gelagar 10/10 cm F.2 M3 1.020
4 Balok lantai 5/10 cm F.16 M3 0.928
5 Lantai papan 3/20 cm F.29 M2 75.000
6 Lantai keramik KM/WC 20/20 cm M.4 M2 3.000
7 Dinding keramik KM/WC 20/20 cm M.10 M2 -
8 Kolom kayu 10/10 cm F.2 M3 0.899
9 Ring balk kayu 10/10 cm F.2 M3 0.880
10 Rangka dinding 5/10 cm F.3 M3 2.595
11 Dinding papan 2/20 cm F.27 M2 100.880
12 Dinding tripleks 3 mm tunggal F.30 M2 83.960
13 Dinding tripleks 3 mm rangkap F.32 M2 72.140
14 List dinding 1,5/4 cm F.27 M2 20.176
15 Plint papan 2/18 cm M.16 M' 39.000
16 Plint papan 2/10 cm M.15 M' 87.800
17 Relling pagar pengaman Q3 M' 20.000
V. PEKERJAAN ATAP DAN PLAFON
1 Kuda - kuda kayu 5/10 cm F.14 M3 1.557
2 Gording kayu 5/10 cm F.15 M3 1.379
3 Atap senk gelombang BJLS 20 H.3 M2 157.340
4 Nok senk plat BJLS 20 H.4 M' 22.000
5 Talang miring senk plat BJLS 20 K.14 M' 15.480
6 Listplank papan 2 x (2 x 15) cm F.23 M' 54.520
7 Rangka plafon F.18 M2 131.720
8 Plafon tripleks 60/120 cm I.1 M2 131.720
9 List plafon 1/4 cm I.6 M' 228.520
10 Grill papan 2/20 cm F.27 M2 15.490
11 Ventilasi top gevel Q.2 Bh 4.000
1 2 3 4 5

VI. PEKERJAAN PINTU, JENDELA & KUNCI


1 Kosen pintu dan jendela 5/10 cm F.1 M3 0.502
2 Pintu panel papan 3,5 cm F.5 M2 13.440
3 Pintu panel papan lapis seng plat Bjls 20 F.6 M2 2.940
4 Bingkai jendela panel kaca F.7 M2 10.080
5 Kaca jendela panel tebal 5 mm L.13 M2 6.989
6 Jelusi kayu F.10 M2 1.120
7 Kunci tanam 2 slag L.1 Bh 10.000
8 Engsel pintu L.4 BH 30.000
9 Engsel jendela L.5 BH 24.000
10 Grendel pintu L.8 Bh 10.000
11 Grendel jendela L.9 Bh 12.000
12 Hak/kait angin L.6 Bh 24.000

VII. PEKERJAAN INSTALASI LISTRIK


1 Pasang instalasi titik lampu O.1 Ttk 22.000
2 Lampu phlips SL 8 watt O.2 Bh 4.000
3 Lampu phlips SL 14 watt O.3 Bh 10.000
4 Stop kontak 220 watt O.10 Bh 8.000
5 Saklar tunggal O.11 Bh 6.000
6 Saklar ganda O.12 Bh 4.000
7 Box sekring/limit O.13 Bh 2.000

VIII. PEKERJAAN SANITAIR


1 Bak air viber glass 110 ltr + keramik J.7 Bh 2.0000
2 Kloset jongkok keramik J.2 Bh 2.0000
3 Flor drain J.31 Bh 2.0000
4 Kran air dia. 1/2 " J.27 Ttk 2.0000
5 Stop kran air dia. 1/2 " J.28 Ttk 2.0000
6 Pipa GIP dia. 1/2" J.13 M' 63.0000
7 Pipa PVC dia. 2" J.23 M' 8.0000
8 Septiktank dan peresapannya Q5&Q4 Unit 2.0000

IX. PEKERJAAN CAT


1 Residu kap dan gording N.6 M2 176.178
2 Residu gelagar dan balok lantai N.6 M2 96.450
3 Cat kosen N.3 M2 20.080
4 Cat kolom N.3 M2 4.800
5 Cat daun pintu dan jendela N.3 M2 56.070
6 Cat listplank N.3 M2 20.172
7 Cat list tepi plafon N.3 M2 12.569
8 Cat plint papan 2/18 cm N.3 M2 7.800
9 Cat plint papan 2/10 cm N.3 M2 10.536
10 Cat plafon N.8 M2 131.720
11 Cat dinding N.8 M2 329.120
12 Cat atap N.10 M2 157.340

X. PEKERJAAN LAIN-LAIN
1 Photo dokumentasi - Ls 1.000
2 Biaya pembersihan dan perapian - Ls 1.000
REKAPITULASI
KEGIATAN : PEMBANGUNAN RUMAH DINAS KEPALA SEKOLAH, GURU, PENJAG

(OTSUS)

PEKERJAAN : PEMANGUAN RUMAH GURU SD INPRES PAGALEME DISTRIK MULIA

LOKASI : DISTRIK MULIA

NO. URAIAN

I. PEKERJAAN PERSIAPAN

II. PEKERJAAN TANAH DAN PASIR

III. PEKERJAAN PONDASI DAN BETON

IV. PEKERJAAN LANTAI DAN DINDING

V. PEKERJAAN ATAP DAN PLAFON

VI. PEKERJAAN PINTU, JENDELA & KUNCI

VII. PEKERJAAN INSTALASI LISTRIK

VIII. PEKERJAAN SANITAIR

IX. PEKERJAAN CAT

X. PEKERJAAN LAIN-LAIN

JUMLAH

PPN 10 %

TOTAL

DIBULATKAN

TERBILANG : DELAPAN RATUS TIGA PULUH ENAM JUTA DELAPAN RATUS TUJUH PUL
RIBU RUPIAH

MULIA, APRIL 2

KONSULTAN PEREN
CV. PAGALEME PRIMA K

EKO ARIEFIANTO
MENGETAHUI,
KEPALA DINAS PEKERJAAN UMUM KABID CIPTA KARYA DINAS PE
KABUPATEN PUNCAK JAYA KABUPATEN PUNCA

PILEMON TABUNI, S.PAK, S.IP, M.Si MISLAM LASN


NIP. 1971110 200112 1 003 NIP. 19681010 2000
ANA ANGGARAN BIAYA (RAB)
RUMAH DINAS KEPALA SEKOLAH, GURU, PENJAGA SD

UMAH GURU SD INPRES PAGALEME DISTRIK MULIA TYPE 72 M2 KOPEL

HARGA JUMLAH
SATUAN HARGA
( Rp ) ( Rp )
6 7

20,075.00 3,161,812.50
171,694.13 8,756,400.63
1,000,000.00 1,000,000.00
Err:509 Err:509
Err:509

115,808.00 1,039,492.61
38,602.66 115,499.16
Err:509 Err:509
758,037.50 1,500,914.25
Err:509

2,456,173.50 8,267,480.00
11,395,870.10 28,888,530.70
11,395,870.10 27,919,881.75
Err:509 Err:509
14,097,356.09 4,229,206.83
Err:509 Err:509
Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
6 7

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
120,360.59 962,884.72
Err:509 Err:509
Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
2,250,000.00 2,250,000.00
3,000,000.00 3,000,000.00
5,250,000.00
REKAPITULASI
RUMAH DINAS KEPALA SEKOLAH, GURU, PENJAGA SD

UMAH GURU SD INPRES PAGALEME DISTRIK MULIA TYPE 72 M2 KOPEL

HARGA ( Rp.)

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

5,250,000.00
`

Err:509

Err:509

Err:509

Err:509

TIGA PULUH ENAM JUTA DELAPAN RATUS TUJUH PULUH DUA

MULIA, APRIL 2015

DIBUAT OLEH,
KONSULTAN PERENCANA
CV. PAGALEME PRIMA KONSULTAN

EKO ARIEFIANTO H.,ST


TEAM LEADER
DIPERIKSA OLEH,
KABID CIPTA KARYA DINAS PEKERJAAN UMUM
KABUPATEN PUNCAK JAYA

MISLAM LASNAM
NIP. 19681010 200012 1 006
- JUMLAH PONDASI TITIK
6.00 LUAS LANTAI
- LUAS TERAS
6.00 LUAS TOTAL

- PANJANG RABAT KELILING

- LUAS RABAT KELILING


15.00 PANJANG PONDASI JALUR
- PANJANG PONDASI DALAM
15.00 JUMLAH PONDASI
- PANJANG SLOOF
12.00 PANJANG RING BALK
- PONDASI KECIL/KM
- JUMLAH PONDASI TITIK
6.00 LUAS LANTAI
3.00 LUAS TERAS
9.00 LUAS TOTAL
20.00 PANJANG RABAT KELILING

16.00 LUAS RABAT KELILING


15.00 PANJANG PONDASI JALUR
- PANJANG PONDASI DALAM
15.00 JUMLAH PONDASI
- PANJANG SLOOF
15.00 PANJANG RING BALK
- PONDASI KECIL/KM
Tabel G.12. Rencana Aanggaran Biaya Bangunan Rumah Dinas Tipe 54 M2
-

NO. URAIAN PEKERJAAN KODE SAT. VOLUME

1 2 3 4 5

I. PEKERJAAN PERSIAPAN
1 Pembersihan lokasi dan perataan tanah A.6 Ls. 165.000
2 Pasang bowplank A.3 M' 52.000
3 Papan nama proyek - Bh 1.000
4 Gudang bahan / los kerja A.5 M2 -

II. PEKERJAAN TANAH DAN PASIR


1 Galian tanah B.4 M3 3.390
2 Urugan Tanah B.9 M3 1.130
3 Urugan pasir dibawah lantai B.11 M3 0.150
4 Timbunan tanah B.14 M3 1.050

III. PEKERJAAN PONDASI DAN BETON


1 Pasang batu kosong C.3 M3 2.034
2 Pondasi titik batu gunung 1 : 4 C.2 M3 1.690
3 Pondasi jalur batu gunung 1 : 4 C.2 M3 1.225
4 Plesteran 1 : 4 E.3 M3 8.580
5 Cor lantai tebal 5 cm, 1 : 3 : 5 G.1 M3 0.150
6 Tangga batu kali Q.7 Bh 2.000

IV. PEKERJAAN LANTAI DAN DINDING


1 Pasangan dinding CB D.2 M3 11.340
2 Plesteran 1 : 4 E.3 M3 11.340
3 Balok gelagar 10/10 cm F.2 M3 0.610
4 Balok lantai 5/10 cm F.16 M3 0.705
5 Lantai papan 3/20 cm F.29 M2 57.000
6 Lantai keramik KM/WC 20/20 cm M.4 M2 3.000
7 Dinding keramik KM/WC 20/20 cm M.10 M2 11.340
8 Kolom kayu 10/10 cm F.2 M3 0.558
9 Ring balk kayu 10/10 cm F.2 M3 0.565
10 Rangka dinding 5/10 cm F.3 M3 1.870
11 Dinding papan 2/20 cm F.27 M2 84.600
12 Dinding teakwood 3 mm tunggal F.31 M2 65.560
13 Dinding teakwood 3 mm rangkap F.33 M2 40.070
14 List dinding 1,5/4 cm F.27 M2 16.920
15 Plint papan 2/18 cm M.16 M' 33.000
16 Plint papan 2/10 cm M.15 M' 59.500
17 Relling pagar pengaman Q3 M' 15.000

V. PEKERJAAN ATAP DAN PLAFON


1 Kuda - kuda kayu 5/10 cm F.14 M3 0.987
2 Gording kayu 5/10 cm F.15 M3 1.030
3 Atap senk gelombang BJLS 20 H.3 M2 117.457
4 Nok senk plat BJLS 20 H.4 M' 25.710
5 Listplank papan 2 x 3 x 20 cm F.20 M' 49.200
6 Rangka plafon F.18 M2 104.450
7 Plafon tripleks 60/120 cm I.1 M2 104.450
8 List plafon 1/4 cm I.6 M' 167.600
9 Grill papan 2/20 cm F.27 M2 10.200
1 2 3 4 5

VI. PEKERJAAN PINTU, JENDELA & KUNCI


1 Kosen pintu dan jendela 5/10 cm F.1 M3 0.317
2 Pintu panel papan 3,5 cm F.5 M2 6.720
3 Pintu panel papan lapis seng plat Bjls 20 F.6 M2 1.470
4 Bingkai jendela panel kaca F.7 M2 6.720
5 Kaca jendela panel tebal 5 mm L.13 M2 4.659
6 Kaca mati tebal 5 mm L.13 M2 0.640
7 Jelusi kayu F.10 M2 0.380
8 Kunci tanam 2 slag L.1 Bh 5.000
9 Engsel pintu L.4 BH 15.000
10 Engsel jendela L.5 BH 16.000
11 Grendel pintu L.8 Bh 5.000
12 Grendel jendela L.9 Bh 8.000
13 Hak/kait angin L.6 Bh 16.000

VII. PEKERJAAN INSTALASI LISTRIK


1 Pasang instalasi titik lampu O.1 Ttk 13.000
2 Lampu phlips SL 8 watt O.2 Bh 3.000
3 Lampu phlips SL 14 watt O.3 Bh 4.000
4 Lampu phlips SL 18 watt O.4 Bh 1.000
5 Stop kontak 220 watt O.10 Bh 5.000
6 Saklar tunggal O.11 Bh 4.000
7 Saklar ganda O.12 Bh 2.000
8 Box sekring/limit O.13 Bh 1.000

VIII. PEKERJAAN SANITAIR


1 Bak air viber glass 110 ltr + keramik J.7 Bh 1.0000
2 Kloset jongkok keramik J.2 Bh 1.0000
3 Flor drain J.31 Bh 1.0000
4 Kran air dia. 1/2 " J.27 Ttk 1.0000
5 Stop kran air dia. 1/2 " J.28 Ttk 1.0000
6 Pipa GIP dia. 1/2" J.13 M' 29.5000
7 Pipa PVC dia. 2" J.23 M' 4.0000
8 Septiktank dan peresapannya Q5&Q4 Unit 1.0000

IX. PEKERJAAN CAT


1 Residu kap dan gording N.6 M2 121.000
2 Residu gelagar dan balok lantai N.6 M2 66.694
3 Cat kosen N.3 M2 12.680
4 Cat kolom N.3 M2 2.400
5 Cat daun pintu dan jendela N.3 M2 30.555
6 Cat listplank N.3 M2 18.204
7 Cat list tepi plafon N.3 M2 9.218
8 Cat plint papan 2/18 cm N.3 M2 6.600
9 Cat plint papan 2/10 cm N.3 M2 7.140
10 Cat plafon N.8 M2 104.450
11 Cat dinding N.8 M2 84.600
12 Cat atap N.10 M2 117.457
13 Vernis dinding teakwood N.7 M2 145.700
X. PEKERJAAN LAIN-LAIN
1 Photo dokumentasi - Ls 1.000
2 Biaya pembersihan dan perapian - Ls 1.000
Rekapitulasi Aanggaran Biaya Bangunan Rumah Dinas Tipe 54 M2

NO. URAIAN

I. PEKERJAAN PERSIAPAN

II. PEKERJAAN TANAH DAN PASIR

III. PEKERJAAN PONDASI DAN BETON

IV. PEKERJAAN LANTAI DAN DINDING

V. PEKERJAAN ATAP DAN PLAFON

VI. PEKERJAAN PINTU, JENDELA & KUNCI

VII. PEKERJAAN INSTALASI LISTRIK

VIII. PEKERJAAN SANITAIR

IX. PEKERJAAN CAT

X. PEKERJAAN LAIN-LAIN

JUMLAH

IMB 1%

JUMLAH

PPN 10 %

TOTAL
HARGA JUMLAH
SATUAN HARGA
( Rp ) ( Rp )
6 7

20,075.00 3,312,375.00
171,694.13 8,928,094.76
1,000,000.00 1,000,000.00
Err:509 Err:509
Err:509

115,808.00 392,589.12
38,602.66 43,621.01
Err:509 Err:509
758,037.50 795,939.38
Err:509

2,456,173.50 4,995,856.90
11,395,870.10 19,259,020.47
11,395,870.10 13,959,940.87
Err:509 Err:509
14,097,356.09 2,114,603.41
Err:509 Err:509
Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
6 7

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
120,360.59 481,442.36
Err:509 Err:509
Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509

1,500,000.00 1,500,000.00
2,000,000.00 2,000,000.00
3,500,000.00
HARGA ( Rp.)

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

3,500,000.00
`

Err:509

Err:509

Err:509

Err:509

Err:509
RENCANA ANGGARAN BIAYA (RAB)
KEGIATAN : PEMBANGUNAN RUMAH DINAS PEGAWAI DI KABUPATEN PUNCAK J
PEKERJAAN : PEMBANGUNAN RUMAH DINAS TYPE 80 M2 (BANGUNAN KAYU)
LOKASI : DISTRIK MULIA

NO. URAIAN PEKERJAAN KODE SAT. VOLUME

1 2 3 4 5

I. PEKERJAAN PERSIAPAN
1 Pembersihan lokasi dan perataan tanah A.6 Ls. 222.000
2 Pasang bowplank A.3 M' 61.000
3 Papan nama proyek - Bh 1.000

II. PEKERJAAN TANAH DAN PASIR


1 Galian tanah B.4 M3 6.300
2 Urugan Tanah B.9 M3 2.100
3 Urugan pasir dibawah lantai B.11 M3 0.413
4 Timbunan tanah B.14 M3 2.475

III. PEKERJAAN PONDASI DAN BETON


1 Pasang batu kosong C.3 M3 3.780
2 Pondasi titik batu gunung 1 : 4 C.2 M3 2.900
3 Pondasi jalur batu gunung 1 : 4 C.2 M3 3.150
4 Plesteran 1 : 4 E.3 M3 13.200
5 Cor lantai tebal 5 cm, 1 : 3 : 5 G.1 M3 0.413
6 Tangga batu kali Q.7 Bh 2.000

IV. PEKERJAAN LANTAI DAN DINDING


1 Pasangan dinding CB D.2 M3 26.180
2 Plesteran 1 : 4 E.3 M3 29.780
3 Balok gelagar 10/10 cm F.2 M3 2.302
4 Balok lantai 5/10 cm F.16 M3 1.138
5 Lantai papan 3/20 cm F.29 M2 92.000
6 Lantai keramik KM/WC 20/20 cm M.4 M2 8.250
7 Dinding keramik KM/WC 20/20 cm M.10 M2 29.780
8 Kolom kayu 10/10 cm F.2 M3 0.930
9 Kolom kayu dia. 15 cm F.2 M3 0.329
10 Ring balk kayu 10/10 cm F.2 M3 0.853
11 Rangka dinding 5/10 cm F.3 M3 2.506
12 Dinding papan 2/20 cm F.27 M2 109.750
13 Dinding teakwood 3 mm tunggal F.31 M2 87.830
14 Dinding teakwood 3 mm rangkap F.33 M2 57.336
15 List dinding 1,5/4 cm F.27 M2 22.196
16 Plint papan 2/18 cm M.16 M' 44.420
17 Plint papan 2/10 cm M.15 M' 79.520
18 Relling pagar pengaman Q3 M' 37.000
V. PEKERJAAN ATAP DAN PLAFON
1 Kuda - kuda kayu 5/10 cm F.14 M3 1.799
2 Gording kayu 5/10 cm F.15 M3 1.754
3 Atap senk gelombang BJLS 20 H.3 M2 200.124
4 Nok senk plat BJLS 20 H.4 M' 41.140
5 Listplank papan 2 x 3 x 20 cm F.20 M' 71.260
6 Rangka plafon F.18 M2 154.895
7 Plafon tripleks 60/120 cm I.1 M2 154.895
8 List plafon 1/4 cm I.6 M' 250.120
9 Grill papan 2/20 cm F.27 M2 1.231
10 Top gevel Q.1 Bh 1.000
1 2 3 4 5

VI. PEKERJAAN PINTU, JENDELA & KUNCI


1 Kosen pintu dan jendela 5/10 cm F.1 M3 0.571
2 Pintu panel papan 3,5 cm F.5 M2 10.080
3 Pintu panel papan lapis seng plat Bjls 20 F.6 M2 2.940
4 Bingkai jendela panel kaca F.7 M2 12.240
5 Kaca jendela panel tebal 5 mm L.13 M2 8.424
6 Kaca mati tebal 5 mm L.13 M2 0.925
7 Jelusi kayu F.10 M2 0.625
8 Pasang raam # 5 cm K.11 M2 2.160
9 Kunci tanam 2 slag L.1 Bh 8.000
10 Engsel pintu L.4 BH 24.000
11 Engsel jendela L.5 BH 28.000
12 Grendel pintu L.8 Bh 8.000
13 Grendel jendela L.9 Bh 14.000
14 Hak/kait angin L.6 Bh 28.000

VII. PEKERJAAN INSTALASI LISTRIK


1 Pasang instalasi titik lampu O.1 Ttk 19.000
2 Lampu phlips SL 8 watt O.2 Bh 4.000
3 Lampu phlips SL 14 watt O.3 Bh 8.000
4 Lampu phlips SL 18 watt O.4 Bh 1.000
5 Stop kontak 220 watt O.10 Bh 6.000
6 Saklar tunggal O.11 Bh 6.000
7 Saklar ganda O.12 Bh 1.000
8 Box sekring/limit O.13 Bh 1.000

VIII. PEKERJAAN SANITAIR


1 Bak air viber glass 110 ltr + keramik J.7 Bh 2.0000
2 Kloset jongkok keramik J.2 Bh 2.0000
3 Wasbak stainles steel J.26 Bh 1.0000
4 Flor drain J.31 Bh 3.0000
5 Kran air dia. 1/2 " J.27 Ttk 4.0000
6 Stop kran air dia. 1/2 " J.28 Ttk 1.0000
7 Pipa GIP dia. 1/2" J.13 M' 59.0000
8 Pipa PVC dia. 2" J.23 M' 6.0000
9 Septiktank dan peresapannya Q5&Q6 Unit 1.0000

IX. PEKERJAAN CAT


1 Residu kap dan gording N.6 M2 213.202
2 Residu gelagar dan balok lantai N.6 M2 160.344
3 Cat kosen N.3 M2 22.840
4 Cat kolom dia. 15 cm N.3 M2 8.486
5 Cat daun pintu dan jendela N.3 M2 50.910
6 Cat listplank N.3 M2 26.366
7 Cat list tepi plafon N.3 M2 13.757
8 Cat plint papan 2/18 cm N.3 M2 8.884
9 Cat plint papan 2/10 cm N.3 M2 9.542
10 Cat plafon N.8 M2 154.895
11 Cat dinding N.8 M2 109.750
12 Cat atap N.10 M2 200.124
13 Vernis dinding teakwood N.7 M2 202.502

X. PEKERJAAN LAIN-LAIN
1 Photo dokumentasi - Ls 1.000
2 Biaya pembersihan dan perapian - Ls 1.000
REKAPITULASI
KEGIATAN : PEMBANGUNAN RUMAH DINAS PEGAWAI DI KABUPATEN PUNCAK J

PEKERJAAN : PEMBANGUNAN RUMAH DINAS TYPE 80 M2 (BANGUNAN KAYU)

LOKASI : DISTRIK MULIA

NO. URAIAN

I. PEKERJAAN PERSIAPAN

II. PEKERJAAN TANAH DAN PASIR

III. PEKERJAAN PONDASI DAN BETON

IV. PEKERJAAN LANTAI DAN DINDING

V. PEKERJAAN ATAP DAN PLAFON

VI. PEKERJAAN PINTU, JENDELA & KUNCI

VII. PEKERJAAN INSTALASI LISTRIK

VIII. PEKERJAAN SANITAIR

IX. PEKERJAAN CAT

X. PEKERJAAN LAIN-LAIN

JUMLAH

PPN 10 %

TOTAL

DIBULATKAN

TERBILANG : SATU MILYAR ENAM JUTA TIGA RATUS TUJUH PULUH TIGA RIBU RUPIA

CATATAN : MULIA, APRIL 2


Belum Termasuk :
- Biaya perencanaan Teknis
- Biaya Pengawasan Teknis KABID CIPATA KARYA DINAS PE
- Penunjang Kegiatan KABUPATEN PUNCA

MISLAM LASN
NIP. 19681010 20001
ANA ANGGARAN BIAYA (RAB)
RUMAH DINAS PEGAWAI DI KABUPATEN PUNCAK JAYA
RUMAH DINAS TYPE 80 M2 (BANGUNAN KAYU)

HARGA JUMLAH
SATUAN HARGA
( Rp ) ( Rp )
6 7

20,075.00 4,456,650.00
171,694.13 10,473,341.93
1,000,000.00 1,000,000.00
Err:509

115,808.00 729,590.40
38,602.66 81,065.59
Err:509 Err:509
758,037.50 1,876,142.81
Err:509

2,456,173.50 9,284,335.83
11,395,870.10 33,048,023.29
11,395,870.10 35,896,990.82
Err:509 Err:509
14,097,356.09 5,822,208.07
Err:509 Err:509
Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
6 7

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
120,360.59 722,163.54
Err:509 Err:509
Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509

2,250,000.00 2,250,000.00
3,000,000.00 3,000,000.00
5,250,000.00
REKAPITULASI
RUMAH DINAS PEGAWAI DI KABUPATEN PUNCAK JAYA

RUMAH DINAS TYPE 80 M2 (BANGUNAN KAYU)

HARGA ( Rp.)

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

5,250,000.00
`

Err:509

Err:509

Err:509

Err:509

M JUTA TIGA RATUS TUJUH PULUH TIGA RIBU RUPIAH

MULIA, APRIL 2015

DIBUAT OLEH,
KABID CIPATA KARYA DINAS PEKERJAAN UMUM
KABUPATEN PUNCAK JAYA

MISLAM LASNAM
NIP. 19681010 200012 1 006
RENCANA ANGGARAN BIAYA (RAB)
KEGIATAN : PEMBANGUNAN RUMAH DINAS PEGAWAI DI KABUPATEN PUNCAK J
PEKERJAAN : PEMBANGUNAN RUMAH DINAS TYPE 80 M2 (BANGUNAN SEMI PER
LOKASI : DISTRIK MULIA

NO. URAIAN PEKERJAAN KODE SAT. VOLUME

1 2 3 4 5

I. PEKERJAAN PERSIAPAN
1 Pembersihan lokasi dan perataan tanah A.6 Ls. 176.000
2 Pasang bowplank A.3 M' 54.000

II. PEKERJAAN TANAH DAN PASIR


1 Galian tanah B.4 M3 14.800
2 Urugan Tanah B.9 M3 4.933
3 Urugan pasir dibawah lantai B.11 M3 4.650
4 Urugan pasir dibawah rabat B.11 M3 2.000
5 Timbunan tanah B.14 M3 19.950

III. PEKERJAAN PONDASI DAN BETON


1 Pasang batu kosong C.3 M3 1.140
2 Pondasi jalur batu gunung 1 : 4 C.2 M3 12.758
3 Cor lantai tebal 5 cm, 1 : 3 : 5 G.1 M3 4.650
4 Cor rabat beton tebal 5 cm, 1 : 3 : 5 G.1 M3 2.000
5 Cor duk tinggi 10 cm 1 : 3 : 5 G.1 M3 0.410

IV. PEKERJAAN LANTAI DAN DINDING


1 Pasangan dinding CB D.2 M3 25.120
2 Plesteran 1 : 4 E.3 M3 31.520
3 Lantai keramik 40/40 cm M.2 M2 81.000
4 Plint keramik 10/40 cm M.7 M' 85.700
5 Lantai keramik KM/WC 20/20 cm M.4 M2 12.000
6 Dinding keramik KM/WC 20/20 cm M.10 M2 31.520
7 Kolom kayu 10/10 cm F.2 M3 0.992
8 Ring balk kayu 10/10 cm F.2 M3 0.650
9 Rangka dinding 5/10 cm F.3 M3 2.241
10 Dinding papan 2/20 cm F.27 M2 86.938
11 Dinding teakwood 3 mm tunggal F.31 M2 79.938
12 Dinding teakwood 3 mm rangkap F.33 M2 62.450
13 List dinding 1,5/4 cm F.27 M2 17.388
14 Relling pagar pengaman Q3 M' 8.400

V. PEKERJAAN ATAP DAN PLAFON


1 Kuda - kuda kayu 5/10 cm F.14 M3 2.385
2 Gording kayu 5/10 cm F.15 M3 1.479
3 Atap senk gelombang BJLS 20 H.3 M2 168.679
4 Nok senk plat BJLS 20 H.4 M' 38.960
5 Talang miring senk plat BJLS 20 K.14 M' 17.320
6 Listplank papan 2 x 3 x 20 cm F.20 M' 55.280
7 Rangka plafon F.18 M2 147.744
8 Plafon tripleks 60/120 cm I.1 M2 147.744
9 List plafon 1/4 cm I.6 M' 215.840
10 Grill papan 2/20 cm F.27 M2 7.980
11 Top gevel Q.1 Bh 1.000
1 2 3 4 5

VI. PEKERJAAN PINTU, JENDELA & KUNCI


1 Kosen pintu dan jendela 5/10 cm F.1 M3 0.658
2 Pintu panel papan 3,5 cm F.5 M2 10.080
3 Pintu panel papan lapis seng plat Bjls 20 F.6 M2 2.940
4 Bingkai jendela panel kaca F.7 M2 11.760
5 Kaca jendela panel tebal 5 mm L.13 M2 7.862
6 Kaca mati tebal 5 mm L.13 M2 5.742
7 Kunci tanam 2 slag L.1 Bh 8.000
8 Engsel pintu L.4 BH 24.000
9 Engsel jendela L.5 BH 28.000
10 Grendel pintu L.8 Bh 8.000
11 Grendel jendela L.9 Bh 14.000
12 Hak/kait angin L.6 Bh 28.000

VII. PEKERJAAN INSTALASI LISTRIK


1 Pasang instalasi titik lampu O.1 Ttk 24.000
2 Lampu phlips SL 14 watt O.3 Bh 4.000
3 Lampu phlips SL 18 watt O.4 Bh 12.000
4 Stop kontak 220 watt O.10 Bh 8.000
5 Saklar tunggal O.11 Bh 5.000
6 Saklar ganda O.12 Bh 4.000
7 Box sekring/limit O.13 Bh 1.000

VIII. PEKERJAAN SANITAIR


1 Bak air viber glass 110 ltr + keramik J.7 Bh 2.0000
2 Kloset jongkok keramik J.2 Bh 2.0000
3 Wasbak stainles steel J.26 Bh 1.0000
4 Flor drain J.31 Bh 2.0000
5 Kran air dia. 1/2 " J.27 Ttk 3.0000
6 Stop kran air dia. 1/2 " J.28 Ttk 1.0000
7 Pipa GIP dia. 1/2" J.13 M' 35.0000
8 Pipa PVC dia. 2" J.23 M' 6.0000
9 Septiktank dan peresapannya Q3&Q4 Unit 1.0000
10 Saluran air hujan keliling Q.6 Bh 44.000
11 Bak kontrol J.12 Bh 4.000

IX. PEKERJAAN CAT


1 Residu kap dan gording N.6 M2 231.822
2 Cat kosen N.3 M2 26.320
3 Cat kolom N.3 M2 2.400
4 Cat daun pintu dan jendela N.3 M2 50.190
5 Cat listplank N.3 M2 20.454
6 Cat list tepi plafon N.3 M2 11.871
7 Cat plafon N.8 M2 147.744
8 Cat dinding N.8 M2 94.918
9 Cat atap N.10 M2 168.679
10 Vernis dinding teakwood N.7 M2 204.838
X. PEKERJAAN LAIN-LAIN
1 Pantri ukuran 2.4 x 0.6 m Q.9 Bh 1.000
2 Photo dokumentasi - Ls 1.000
3 Biaya pembersihan dan perapian - Ls 1.000
REKAPITULASI
KEGIATAN : PEMBANGUNAN RUMAH DINAS PEGAWAI DI KABUPATEN PUNCAK

PEKERJAAN : PEMBANGUNAN RUMAH DINAS TYPE 80 M2 (BANGUNAN SEMI PER

LOKASI : DISTRIK MULIA

NO. URAIAN

I. PEKERJAAN PERSIAPAN

II. PEKERJAAN TANAH DAN PASIR

III. PEKERJAAN PONDASI DAN BETON

IV. PEKERJAAN LANTAI DAN DINDING

V. PEKERJAAN ATAP DAN PLAFON

VI. PEKERJAAN PINTU, JENDELA & KUNCI

VII. PEKERJAAN INSTALASI LISTRIK

VIII. PEKERJAAN SANITAIR

IX. PEKERJAAN CAT

X. PEKERJAAN LAIN-LAIN

JUMLAH

PPN 10 %

TOTAL

DIBULATKAN

TERBILANG : SATU MILYAR EMPAT RATUS LIMA PULUH EMPAT JUTA ENAM RATUS DU
SEMBILAN RIBU RUPIAH

CATATAN : MULIA, APRIL 2


Belum Termasuk :
- Biaya perencanaan Teknis
- Biaya Pengawasan Teknis KABID CIPATA KARYA DINAS P
- Penunjang Kegiatan KABUPATEN PUNCA

MISLAM LASN
NIP. 19681010 2000
ANA ANGGARAN BIAYA (RAB)
RUMAH DINAS PEGAWAI DI KABUPATEN PUNCAK JAYA
RUMAH DINAS TYPE 80 M2 (BANGUNAN SEMI PERMANEN)

HARGA JUMLAH
SATUAN HARGA
( Rp ) ( Rp )
6 7

20,075.00 3,533,200.00
171,694.13 9,271,483.02
Err:509

115,808.00 1,713,958.40
38,602.66 190,439.79
Err:509 Err:509
Err:509 Err:509
758,037.50 15,122,848.13
Err:509

2,456,173.50 2,800,037.79
11,395,870.10 145,388,510.74
14,097,356.09 65,552,705.82
14,097,356.09 28,194,712.18
14,097,356.09 5,779,916.00
247,715,882.53

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
6 7

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
120,360.59 722,163.54
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
Err:509 Err:509
2,250,000.00 2,250,000.00
3,000,000.00 3,000,000.00
Err:509
REKAPITULASI
RUMAH DINAS PEGAWAI DI KABUPATEN PUNCAK JAYA

RUMAH DINAS TYPE 80 M2 (BANGUNAN SEMI PERMANEN)

HARGA ( Rp.)

Err:509

Err:509

247,715,882.53

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509
`

Err:509

Err:509

Err:509

Err:509

PAT RATUS LIMA PULUH EMPAT JUTA ENAM RATUS DUA PULUH

MULIA, APRIL 2015

DIBUAT OLEH,
KABID CIPATA KARYA DINAS PEKERJAAN UMUM
KABUPATEN PUNCAK JAYA

MISLAM LASNAM
NIP. 19681010 200012 1 006
Tabel G.10. Rencana Aanggaran Biaya Bangunan Rumah Dinas Tipe 100 M2

NO. URAIAN PEKERJAAN KODE SAT. VOLUME

1 2 3 4 5

I. PEKERJAAN PERSIAPAN
1 Pembersihan lokasi dan perataan tanah A.6 Ls. 229.500
2 Pasang bowplank A.3 M' 61.000
3 Papan nama proyek - Bh 1.000
4 Gudang bahan / los kerja A.5 M2 -

II. PEKERJAAN TANAH DAN PASIR


1 Galian tanah B.4 M3 31.824
2 Urugan Tanah B.9 M3 10.608
3 Urugan pasir dibawah lantai B.11 M3 5.738
4 Urugan pasir dibawah rabat B.11 M3 2.650
5 Timbunan tanah B.14 M3 45.293

III. PEKERJAAN PONDASI DAN BETON


1 Pasang batu kosong C.3 M3 6.384
2 Pondasi titik batu gunung 1 : 4 C.2 M3 0.348
3 Pondasi jalur batu gunung 1 : 4 C.2 M3 10.150
4 Lantai kerja G.3 M2 4.500
5 Sloof beton 15/20 cm, 1 : 2 : 3 G.4 M3 2.640
6 Besi beton polos G.6 Kg 483.925
7 Bekisting G.8 M2 35.199
8 Cor lantai tebal 5 cm, 1 : 3 : 5 G.1 M3 5.740
9 Cor rabat beton tebal 5 cm, 1 : 3 : 5 G.1 M3 2.650
1 Cor plint dinding tinggi 10 cm 1 : 3 : 5 G.1 M3 0.730

IV. PEKERJAAN LANTAI DAN DINDING


1 Pasangan dinding CB D.2 M3 26.680
2 Plesteran 1 : 4 E.3 M3 26.680
3 Lantai keramik 40/40 cm M.2 M2 108.750
4 Lantai keramik rabat 40/40 cm M.2 M2 -
5 Plint keramik 10/40 cm M.7 M' 85.700
6 Lantai keramik KM/WC 20/20 cm M.4 M2 6.000
7 Dinding keramik KM/WC 20/20 cm M.10 M2 29.880
8 Kolom kayu 10/10 cm F.2 M3 0.744
9 Ring balk kayu 10/10 cm F.2 M3 0.880
10 Rangka dinding 5/10 cm F.3 M3 2.730
11 Dinding papan 2/20 cm F.27 M2 118.800
12 Dinding teakwood 3 mm tunggal F.31 M2 104.200
13 Dinding teakwood 3 mm rangkap F.33 M2 63.190
14 List dinding 1,5/4 cm F.27 M2 23.760
15 Relling pagar pengaman Q3 M' 14.000

V. PEKERJAAN ATAP DAN PLAFON


1 Kuda - kuda kayu 5/10 cm F.14 M3 1.746
2 Gording kayu 5/10 cm F.15 M3 1.824
3 Atap senk gelombang BJLS 20 H.3 M2 208.057
4 Nok senk plat BJLS 20 H.4 M' 39.130
5 Talang miring senk plat BJLS 20 K.14 M' 23.100
6 Listplank papan 2 x 3 x 20 cm F.20 M' 81.740
7 Rangka plafon F.18 M2 189.792
8 Plafon tripleks 60/120 cm I.1 M2 189.792
9 List plafon 1/4 cm I.6 M' 281.280
10 Grill papan 2/20 cm F.27 M2 4.373
11 Top gevel Q.1 Bh 3.000
1 2 3 4 5

VI. PEKERJAAN PINTU, JENDELA & KUNCI


1 Kosen pintu dan jendela 5/10 cm F.1 M3 0.480
2 Pintu panel papan 3,5 cm F.5 M2 10.080
3 Pintu panel papan lapis seng plat Bjls 20 F.6 M2 2.940
4 Bingkai jendela panel kaca F.7 M2 11.760
5 Bingkai ventilasi panel kaca F.7 M2 0.840
5 Kaca jendela panel tebal 5 mm L.13 M2 8.770
6 Kaca ventilasi panel tebal 5 mm L.13 M2 0.487
6 Kaca mati tebal 5 mm L.13 M2 0.560
7 Pasang raam # 5 cm K.11 M2 0.560
8 Kunci tanam 2 slag L.1 Bh 8.000
9 Engsel pintu L.4 BH 24.000
10 Engsel jendela L.5 BH 34.000
11 Grendel pintu L.8 Bh 8.000
12 Grendel jendela L.9 Bh 17.000
13 Hak/kait angin L.6 Bh 34.000

VII. PEKERJAAN INSTALASI LISTRIK


1 Pasang instalasi titik lampu O.1 Ttk 22.000
2 Lampu phlips SL 8 watt O.2 Bh 7.000
3 Lampu phlips SL 14 watt O.3 Bh 1.000
4 Lampu phlips SL 18 watt O.4 Bh 7.000
5 Stop kontak 220 watt O.10 Bh 7.000
6 Saklar tunggal O.11 Bh 7.000
7 Saklar ganda O.12 Bh 3.000
8 Box sekring/limit O.13 Bh 1.000

VIII. PEKERJAAN SANITAIR


1 Bak air viber glass 110 ltr + keramik J.7 Bh 2.0000
2 Kloset jongkok keramik J.2 Bh 2.0000
3 Wasbak stainles steel J.26 Bh 1.0000
4 Flor drain J.31 Bh 2.0000
5 Kran air dia. 1/2 " J.27 Ttk 3.0000
6 Stop kran air dia. 1/2 " J.28 Ttk 1.0000
7 Pipa GIP dia. 1/2" J.13 M' 45.0000
8 Pipa PVC dia. 2" J.23 M' 6.0000
9 Septiktank dan peresapannya Q3&Q4 Unit 2.0000
10 Saluran air hujan keliling Q.6 Bh 57.000
11 Bak kontrol J.12 Bh 4.000

IX. PEKERJAAN CAT


1 Residu kap dan gording N.6 M2 214.194
2 Cat kosen N.3 M2 19.200
3 Cat kolom N.3 M2 2.400
4 Cat daun pintu dan jendela N.3 M2 51.450
5 Cat listplank N.3 M2 30.244
6 Cat list tepi plafon N.3 M2 15.470
7 Cat plafon N.8 M2 189.792
8 Cat dinding N.8 M2 123.173
7 Cat atap N.10 M2 208.057
9 Vernis dinding teakwood N.7 M2 230.580

X. PEKERJAAN LAIN-LAIN
1 Pantri ukuran 2.4 x 0.6 m Q.9 Bh 1.000
1 Photo dokumentasi - Ls 1.000
2 Biaya pembersihan dan perapian - Ls 1.000
Rekapitulasi Aanggaran Biaya Bangunan Rumah Dinas Tipe 100 M2

NO. URAIAN

I. PEKERJAAN PERSIAPAN

II. PEKERJAAN TANAH DAN PASIR

III. PEKERJAAN PONDASI DAN BETON

IV. PEKERJAAN LANTAI DAN DINDING

V. PEKERJAAN ATAP DAN PLAFON

VI. PEKERJAAN PINTU, JENDELA & KUNCI

VII. PEKERJAAN INSTALASI LISTRIK

VIII. PEKERJAAN SANITAIR

IX. PEKERJAAN CAT

X. PEKERJAAN LAIN-LAIN

JUMLAH

IMB 1%

JUMLAH

PPN 10 %

TOTAL
HARGA JUMLAH
SATUAN HARGA
( Rp ) ( Rp )
6 7

20,075.00 4,607,212.50
171,694.13 10,473,341.93
1,000,000.00 1,000,000.00
Err:509 Err:509
Err:509

115,808.00 3,685,473.79
38,602.66 409,497.02
Err:509 Err:509
Err:509 Err:509
758,037.50 34,333,792.49
Err:509

2,456,173.50 15,680,211.62
11,395,870.10 3,965,762.79
11,395,870.10 115,668,081.52
667,013.27 3,001,559.72
20,513,954.47 54,156,839.80
82,025.27 39,694,079.27
471,109.57 16,582,585.75
14,097,356.09 80,918,823.96
14,097,356.09 37,357,993.64
14,097,356.09 10,291,069.95
377,317,008.02

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
6 7

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
120,360.59 722,163.54
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
Err:509 Err:509
2,250,000.00 2,250,000.00
3,000,000.00 3,000,000.00
Err:509
HARGA ( Rp.)

Err:509

Err:509

377,317,008.02

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509
`

Err:509

Err:509

Err:509

Err:509

Err:509
Tabel G.15. Rencana Aanggaran Biaya Bangunan Rumah Dinas FRE-FAB Tipe 100 M2
-

NO. URAIAN PEKERJAAN KODE SAT. VOLUME

1 2 3 4 5

A. PEKERJAAN MENGUNAKAN BAHAN LOKAL

I. PEKERJAAN PERSIAPAN
1 Pembersihan lokasi dan perataan tanah A.6 Ls. 222.750
2 Pasang bowplank A.3 M' 60.000
3 Papan nama proyek - Bh 1.000
4 Gudang bahan / los kerja A.5 M2 -

II. PEKERJAAN TANAH DAN PASIR


1 Galian tanah B.4 M3 24.941
2 Urugan Tanah B.9 M3 8.314
3 Urugan pasir dibawah lantai B.11 M3 6.075
4 Urugan pasir dibawah rabat B.11 M3 2.874
5 Timbunan tanah B.14 M3 35.796

III. PEKERJAAN PONDASI DAN BETON


1 Pasang batu kosong C.3 M3 6.235
2 Pondasi titik batu gunung 1 : 4 C.2 M3 0.290
3 Pondasi jalur batu gunung 1 : 4 C.2 M3 11.704
4 Lantai kerja G.3 M2 10.500
5 Sloof beton 15/20 cm, 1 : 2 : 3 G.4 M3 2.670
6 Besi beton polos G.6 Kg 489.424
7 Bekisting G.8 M2 35.599
8 Cor lantai tebal 5 cm, 1 : 3 : 5 G.1 M3 6.080
9 Cor rabat beton tebal 5 cm, 1 : 3 : 5 G.1 M3 2.870
10 Cor duk tinggi 10 cm 1 : 3 : 5 G.1 M3 0.740

IV. PEKERJAAN LANTAI DAN DINDING


1 Pasangan dinding CB D.2 M3 26.680
2 Plesteran 1 : 4 E.3 M3 26.680
3 Lantai keramik 40/40 cm M.2 M2 111.500
4 Plint keramik 10/40 cm M.7 M' 86.700
5 Lantai keramik KM/WC 20/20 cm M.4 M2 10.000
6 Dinding keramik KM/WC 20/20 cm M.10 M2 28.680

V. PEKERJAAN ATAP DAN PLAFON

1 Pasang rangka plafon F.18 M2 134.000


1 Plafon tripleks 60/120 cm I.1 M2 134.000
2 List plafon 1/4 cm I.6 M' 118.000
1 2 3 4 5

VI. PEKERJAAN INSTALASI LISTRIK


1 Pasang instalasi titik lampu O.1 Ttk 24.000
2 Lampu phlips SL 8 watt O.2 Bh 2.000
3 Lampu phlips SL 14 watt O.3 Bh 6.000
4 Lampu phlips SL 18 watt O.4 Bh 8.000
5 Stop kontak 220 watt O.10 Bh 8.000
6 Saklar tunggal O.11 Bh 3.000
7 Saklar ganda O.12 Bh 6.000
8 Box sekring/limit O.13 Bh 1.000

VII. PEKERJAAN SANITAIR


1 Bak air viber glass 110 ltr + keramik J.7 Bh 2.0000
2 Kloset jongkok keramik J.2 Bh 2.0000
3 Wasbak stainles steel J.26 Bh 1.0000
4 Flor drain J.31 Bh 3.0000
5 Kran air dia. 1/2 " J.27 Ttk 3.0000
6 Stop kran air dia. 1/2 " J.28 Ttk 1.0000
7 Pipa GIP dia. 1/2" J.13 M' 36.0000
8 Pipa PVC dia. 2" J.23 M' 6.0000
9 Septiktank dan peresapannya Q3&Q4 Unit 2.0000
10 Saluran air hujan keliling Q.6 Bh 57.480
11 Bak kontrol J.12 Bh 4.000

VIII. PEKERJAAN CAT


1 Cat dinding dalam N.8 M2 357.000
2 Cat dinding luar N.8 M2 186.000

IX. PEKERJAAN LAIN-LAIN


1 Pantri ukuran 2.4 x 0.6 m Q.9 Bh 1.000
1 Photo dokumentasi - Ls 1.000
2 Biaya pembersihan dan perapian - Ls 1.000

B. PEKERJAAN MENGGUNAKAN BAJA RINGAN

I PEKERJAAN RANGKA WALL FRAME


BEARING WALL
1 Stud 75SGL73 Galvalume AZ - 100 M' 822.15
2 Plate 78SG73 Galvalume AZ - 100 M' 822.15
Assesories
1 HEADER L PLATE, tebal 1.0 mm Galvanized Z-22 M' 46.20
2 Flashing dinding M' 187.00
Screw
1 Rivet Steel to Steel Diameter 5 mm Standard Pcs 4,515.00
2 SDS HEXAGON #12 x 24T - 22/Rubber Standard Pcs 525.00
3 SDS PAN HEAD #8 x 18 x 13 Standard Pcs 367.50
4 DYNA BOLT M-12 Standard Pcs 152.25
1 2 3 4 5

II KUSEN
1 Kusen Jendela J1 Steel Unit 1.00
2 Kusen Jendela J2 Steel Unit 1.00
3 Kusen Jendela J3 Steel Unit 1.00
4 Kusen Jendela J4 Steel Unit 1.00
5 Kusen Jendela J5 Steel Unit 1.00
6 Kusen Jendela J6 Steel Unit 1.00
7 Kusen Jendela J7 Steel Unit 2.00
8 Kusen Jendela J8 Steel Unit 6.00
9 Kusen Pintu P1 Steel Unit 1.00
10 Kusen Pintu P2 Steel Unit 1.00
11 Kusen Pintu P3 Steel Unit 1.00
12 Kusen Jendela BV Steel Unit 2.00
III PEKERJAAN RANGKA KUDA-KUDA
TRUSSES
1 UK-60/0.53 @ 5.80 m = 97 Btg Galvalume AZ-150 M' 562.60
Gording
2 GD-C/0.43 @ 5.8 m = 167 Btg Galvalume AZ-150 M' 967.00
Assesories
3 PK-60/1.5 Galvanized Z-22 Pcs 65.00
4 PLD Clip UK-60/0.83 Galvanized Z-22 Pcs 1,000.00
5 VALLEY GUTTER/0.43/A Galvanized Z-22 M' 30.00
6 TRIMMER ANGLE/0.83 Galvanized Z-22 M' 62.50
Screw
7 SDS HEXAGON #8 x 18T - 13/Rubber Standard Pcs 4,000.00
8 SDS HEXAGON #12 x 24T - 19/Rubber Standard Pcs 3,500.00
IV PEKERJAAN PENUTUP ATAP
Spanroof 0.4 mm TCT colour one side Galvalume AZ-150 M2 300.00
SDS HEXAGON #12 x 24T - 75/Rubber CompleteStandard Pcs 1,200.00
Nock Spanroof Galvalume AZ-150 M' 50.00
Rivet Steel to Steel Diameter 3 mm Standard Pcs 200.00
V PEKERJAAN LISPLANK ATAP
Lisplank tebal 0.5 mm warna satu sisi snow white M' 69.00
VI PEKERJAAN PLAFOND LUAR
UKS colour one side t=0.3 mm Galvalume M2 121.00
Rivet All to Steel Diameter 3 mm Standard M' 280.00
MF-1/0.48 Galvalume AZ - 100 M' 145.00
SDS Pan Head #8x18x13 Standard M' 350.00
VII PEKERJAAN PENUTUP DINDING
Dinding dalam Superdeck 0.3 mm M2 357.00
Dinding luar Superdeck 0.3 mm M2 186.00

Non Jaindo
XI PEKERJAAN PINTU & JENDELA
Daun jendela alluminium Unit 13.00
Daun Pintu taekwood + accesorries Unit 9.00
JUMLAH (
HARGA JUMLAH
SATUAN HARGA
( Rp ) ( Rp )
6 7

20,075.00 4,471,706.25
171,694.13 10,301,647.80
1,000,000.00 1,000,000.00
Err:509 Err:509
Err:509

115,808.00 2,888,367.33
38,602.66 320,929.65
Err:509 Err:509
Err:509 Err:509
758,037.50 27,134,710.35
Err:509

2,456,173.50 15,314,241.77
11,395,870.10 3,304,802.33
11,395,870.10 133,377,263.65
667,013.27 7,003,639.34
20,513,954.47 54,772,258.43
82,025.27 40,145,136.23
471,109.57 16,771,029.58
14,097,356.09 85,711,925.03
14,097,356.09 40,459,411.98
14,097,356.09 10,432,043.51
407,291,751.85

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
6 7

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
120,360.59 722,163.54
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509

Err:509 Err:509
Err:509 Err:509
Err:509

Err:509 Err:509
2,250,000.00 2,250,000.00
3,000,000.00 3,000,000.00
Err:509

SUB TOTAL ( A ) Err:509

Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
6 7

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509

Err:509 Err:509

Err:509 Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509

Err:509 Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509

Jumlah ( B ) Err:509
Upah pasang Err:509
SUB TOTAL ( B ) Err:509

JUMLAH (A ) + ( B ) Err:509
PPN 10 % Err:509
TOTAL Err:509
RENCANA ANGGARAN BIAYA (RAB)
KEGIATAN : REHABILITASI SEDANG/BERAT BANGUNAN SEKOLAH SMA ( DAK )
PEKERJAAN : PEMBANGUNAN 3 RKB SMA NEGERI 1 MULIA DISTRIK MULIA
LOKASI : DISTRIK MULIA

HARGA
NO. URAIAN PEKERJAAN KODE SAT. VOLUME SATUAN
( Rp )
1 2 3 4 5 6

I. PEKERJAAN PERSIAPAN
1 Pembersihan lokasi dan perataan tanah A.6 Ls. 390.000 20,075.00
2 Pasang bowplank A.3 M' 86.000 171,694.13
3 Papan nama proyek - Bh 1.000 1,000,000.00
4 Gudang bahan / los kerja A.5 M2 36.000 Err:509

II. PEKERJAAN TANAH DAN PASIR


1 Galian tanah B.4 M3 59.290 115,808.00
2 Urugan Tanah B.9 M3 19.763 38,602.66
3 Urugan pasir dibawah lantai B.11 M3 13.500 Err:509
4 Urugan pasir dibawah rabat B.11 M3 4.875 Err:509
5 Timbunan tanah B.14 M3 58.800 758,037.50

III. PEKERJAAN PONDASI DAN BETON


1 Pasang batu kosong C.3 M3 12.705 2,456,173.50
2 Pondasi jalur batu gunung 1 : 4 C.2 M3 29.040 11,395,870.10
3 Sloof beton 15/20 cm, 1 : 2 : 3 G.4 M3 3.630 20,513,954.47
4 Besi beton polos G.6 Kg 665.397 82,025.27
5 Bekisting G.8 M2 13.333 471,109.57
6 Cor plint dinding tinggi 10 cm 1 : 3 : 5 G.1 M3 1.162 14,097,356.09
7 Cor lantai tebal 5 cm, 1 : 3 : 5 G.1 M3 13.500 14,097,356.09
8 Cor rabat beton tebal 5 cm, 1 : 3 : 5 G.1 M3 6.830 14,097,356.09

IV. PEKERJAAN LANTAI DAN DINDING


1 Lantai keramik 40/40 cm M.2 M2 270.000 Err:509
2 Lantai keramik 30/30 cm (rabat anti slip) M.1 M2 97.500 Err:509
3 Plint keramik 10/40 cm M.7 M' 119.400 Err:509
4 Plint keramik 10/30 cm M.6 M' 43.000 Err:509
5 Kolom kayu 10/10 cm F.2 M3 1.273 Err:509
6 Ring balk kayu 10/10 cm F.2 M3 1.210 Err:509
7 Rangka dinding 5/10 cm F.3 M3 2.716 Err:509
8 Dinding papan 2/20 cm F.27 M2 181.040 Err:509
9 Dinding tripleks 12 mm tunggal F.36 M2 175.636 Err:509
10 Dinding tripleks 12 mm rangkap F.37 M2 52.000 Err:509
11 List dinding 1,5/4 cm F.27 M2 36.208 Err:509

V. PEKERJAAN ATAP DAN PLAFON


1 Kuda - kuda kayu 5/10 cm F.14 M3 4.287 Err:509
2 Gording kayu 5/10 cm F.15 M3 4.141 Err:509
3 Atap senk gelombang BJLS 20 H.3 M2 472.348 Err:509
4 Nok senk plat BJLS 20 H.4 M' 44.960 Err:509
5 Listplank papan 2 x (2 x 15) cm F.23 M' 95.800 Err:509
6 Rangka plafon F.18 M2 326.645 Err:509
6 Plafon tripleks 60/120 cm I.1 M2 326.645 Err:509
7 List plafon 1/4 cm I.6 M' 279.600 Err:509
8 Top gevel Q.1 Bh 2.000 Err:509
1 2 3 4 5 6

VI. PEKERJAAN PINTU, JENDELA & KUNCI


1 Kosen pintu dan jendela 5/10 cm F.1 M3 1.189 Err:509
2 Pintu panel papan 3,5 cm F.5 M2 10.080 Err:509
3 Bingkai jendela panel kaca F.7 M2 28.140 Err:509
4 Kaca jendela panel tebal 5 mm L.13 M2 19.853 Err:509
5 Jelusi kayu F.10 M2 15.240 Err:509
6 Kunci tanam 2 slag L.1 Bh 3.000 Err:509
7 Engsel pintu L.4 BH 9.000 Err:509
8 Engsel jendela L.5 BH 96.000 Err:509
9 Grendel pintu L.8 Bh 6.000 Err:509
9 Grendel jendela L.9 Bh 48.000 Err:509
10 Hak/kait angin L.6 Bh 96.000 Err:509

VII. PEKERJAAN INSTALASI LISTRIK


1 Pasang instalasi titik lampu O.1 Ttk 29.000 Err:509
2 Lampu phlips SL 14 watt O.3 Bh 8.000 Err:509
3 Lampu phlips SL 18 watt O.4 Bh 18.000 Err:509
4 Stop kontak 220 watt O.10 Bh 3.000 Err:509
5 Saklar tunggal O.11 Bh 3.000 Err:509
6 Saklar ganda O.12 Bh 4.000 Err:509
7 Box sekring/limit O.13 Bh 1.000 Err:509

VIII. PEKERJAAN SANITAIR


1 Saluran air hujan keliling Q.6 Bh 84.000 Err:509
2 Bak kontrol Q.14 Bh 4.000 Err:509

IX. PEKERJAAN CAT


1 Residu kap dan gording N.6 M2 505.667 Err:509
2 Cat kosen N.3 M2 47.560 Err:509
3 Cat kolom N.3 M2 12.000 Err:509
4 Cat daun pintu dan jendela N.3 M2 67.410 Err:509
5 Cat listplank N.3 M2 35.446 Err:509
6 Cat list tepi plafon N.3 M2 15.378 Err:509
7 Cat plafon N.8 M2 326.645 Err:509
8 Cat dinding N.8 M2 460.676 Err:509
9 Cat atap N.10 M2 472.348 Err:509

X. PEKERJAAN LAIN-LAIN
1 Photo dokumentasi - Ls 1.000 4,000,000.00
2 Biaya pembersihan dan perapian - Ls 1.000 3,000,000.00

6,382.87
REKAPITULASI
KEGIATAN : REHABILITASI SEDANG/BERAT BANGUNAN SEKOLAH SMA ( DAK )

PEKERJAAN : PEMBANGUNAN 3 RKB SMA NEGERI 1 MULIA DISTRIK MULIA

LOKASI : DISTRIK MULIA

NO. URAIAN HARGA ( Rp

I. PEKERJAAN PERSIAPAN

II. PEKERJAAN TANAH DAN PASIR

III. PEKERJAAN PONDASI DAN BETON

IV. PEKERJAAN LANTAI DAN DINDING

V. PEKERJAAN ATAP DAN PLAFON

VI. PEKERJAAN PINTU, JENDELA & KUNCI

VII. PEKERJAAN INSTALASI LISTRIK

VIII. PEKERJAAN SANITAIR

IX. PEKERJAAN CAT

X. PEKERJAAN LAIN-LAIN
`

JUMLAH

PPN 10 %

TOTAL

DIBULATKAN

TERBILANG : TIGA MILYAR SERATUS DELAPAN PULUH DUA JUTA TIGA RATUS TUJUH PULU
SEMBILAN RIBU RUPIAH

MULIA, APRIL 2015

DIBUAT OLEH,
KONSULTAN PERENCANA
CV. PAGALEME PRIMA KONSULTAN

EKO ARIEFIANTO H.,ST


TEAM LEADER

MENGETAHUI, DIPERIKSA OLEH,


KEPALA DINAS PEKERJAAN UMUM KABID CIPTA KARYA DINAS PEKERJAAN
KABUPATEN PUNCAK JAYA KABUPATEN PUNCAK JAYA

PILEMON TABUNI, S.PAK, S.IP, M.Si MISLAM LASNAM


NIP. 1971110 200112 1 003 NIP. 19681010 200012 1 006
A ANGGARAN BIAYA (RAB)
NG/BERAT BANGUNAN SEKOLAH SMA ( DAK )

JUMLAH
HARGA
( Rp )
7

7,829,250.00
14,765,695.18
1,000,000.00
Err:509
Err:509

6,866,256.32
762,917.24
Err:509
Err:509
44,572,605.00
Err:509

31,205,684.32
330,936,067.70
74,465,654.73
54,579,381.55
6,281,303.90
16,381,127.78
190,314,307.22
96,284,942.09
800,448,469.29

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
7

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

4,000,000.00
3,000,000.00
7,000,000.00
REKAPITULASI
ANG/BERAT BANGUNAN SEKOLAH SMA ( DAK )

HARGA ( Rp.)

Err:509

Err:509

800,448,469.29

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

7,000,000.00

Err:509

Err:509

Err:509

Err:509

S DELAPAN PULUH DUA JUTA TIGA RATUS TUJUH PULUH

MULIA, APRIL 2015

KONSULTAN PERENCANA
CV. PAGALEME PRIMA KONSULTAN

EKO ARIEFIANTO H.,ST


TEAM LEADER

DIPERIKSA OLEH,
KABID CIPTA KARYA DINAS PEKERJAAN UMUM
KABUPATEN PUNCAK JAYA

MISLAM LASNAM
NIP. 19681010 200012 1 006
Tabel G.8. Rencnana Aanggaran Biaya Bangunan Gedung Sekolah 2 RKB Semi Permanen
-

HARGA
NO. URAIAN PEKERJAAN KODE SAT. VOLUME SATUAN
( Rp )
1 2 3 4 5 6

I. PEKERJAAN PERSIAPAN
1 Pembersihan lokasi dan perataan tanah A.6 Ls. 228.000 20,075.00
2 Pasang bowplank A.3 M' 62.000 171,694.13
3 Papan nama proyek - Bh 1.000 1,000,000.00
4 Gudang bahan / los kerja A.5 M2 24.000 Err:509

II. PEKERJAAN TANAH DAN PASIR


1 Galian tanah B.4 M3 49.200 115,808.00
2 Urugan Tanah B.9 M3 16.400 38,602.66
3 Urugan pasir dibawah lantai B.11 M3 7.200 Err:509
4 Urugan pasir dibawah rabat B.11 M3 4.200 Err:509
5 Timbunan tanah B.14 M3 68.400 758,037.50

III. PEKERJAAN PONDASI DAN BETON


1 Pasang batu kosong C.3 M3 11.480 2,456,173.50
2 Pondasi jalur batu gunung 1 : 4 C.2 M3 14.350 11,395,870.10
3 Lantai kerja G.3 M2 2.450 667,013.27
4 Sloof beton 15/20 cm, 1 : 2 : 3 G.4 M3 2.040 20,513,954.47
5 Besi beton polos G.6 Kg 373.942 82,025.27
6 Bekisting G.8 M2 27.199 471,109.57
7 Cor plint dinding tinggi 10 cm 1 : 3 : 5 G.1 M3 0.664 14,097,356.09
8 Cor lantai tebal 5 cm, 1 : 3 : 5 G.1 M3 7.200 14,097,356.09
9 Cor rabat beton tebal 5 cm, 1 : 3 : 5 G.1 M3 4.200 14,097,356.09

IV. PEKERJAAN LANTAI DAN DINDING


1 Lantai keramik 40/40 cm M.2 M2 144.000 Err:509
2 Plint keramik 10/40 cm M.7 M' 102.800 Err:509
3 Kolom kayu 10/10 cm F.2 M3 0.720 Err:509
4 Ring balk kayu 10/10 cm F.2 M3 0.750 Err:509
5 Rangka dinding 5/10 cm F.3 M3 2.246 Err:509
6 Dinding papan 2/20 cm F.27 M2 128.730 Err:509
7 Dinding tripleks 3 mm tunggal F.30 M2 128.730 Err:509
8 Dinding tripleks 3 mm rangkap F.32 M2 21.000 Err:509
9 List dinding 1,5/4 cm F.27 M2 25.746 Err:509

V. PEKERJAAN ATAP DAN PLAFON


1 Kuda - kuda kayu 5/10 cm F.14 M3 2.812 Err:509
2 Gording kayu 5/10 cm F.15 M3 2.501 Err:509
3 Atap senk gelombang BJLS 20 H.3 M2 285.338 Err:509
4 Nok senk plat BJLS 20 H.4 M' 40.052 Err:509
5 Listplank papan 2 x 3 x 20 cm F.20 M' 66.000 Err:509
6 Rangka plafon F.18 M2 245.182 Err:509
6 Plafon tripleks 60/120 cm I.1 M2 245.182 Err:509
7 List plafon 1/4 cm I.6 M' 217.320 Err:509
8 Top gevel Q.1 Bh 2.000 Err:509
1 2 3 4 5 6

VI. PEKERJAAN PINTU, JENDELA & KUNCI


1 Kosen pintu dan jendela 5/10 cm F.1 M3 0.689 Err:509
2 Pintu panel papan 3,5 cm F.5 M2 3.360 Err:509
3 Bingkai jendela panel kaca F.7 M2 6.510 Err:509
4 Kaca jendela panel tebal 5 mm L.13 M2 4.698 Err:509
5 Jelusi kayu F.10 M2 4.000 Err:509
6 Kunci tanam 2 slag L.1 Bh 2.000 Err:509
7 Engsel pintu L.4 BH 6.000 Err:509
8 Engsel jendela L.5 BH 64.000 Err:509
9 Grendel jendela L.9 Bh 32.000 Err:509
10 Hak/kait angin L.6 Bh 64.000 Err:509

VII. PEKERJAAN INSTALASI LISTRIK


1 Pasang instalasi titik lampu O.1 Ttk 20.000 Err:509
2 Lampu phlips SL 14 watt O.3 Bh 6.000 Err:509
3 Lampu phlips SL 18 watt O.4 Bh 12.000 Err:509
4 Stop kontak 220 watt O.10 Bh 2.000 Err:509
5 Saklar ganda O.12 Bh 4.000 Err:509
6 Box sekring/limit O.13 Bh 1.000 Err:509

VIII. PEKERJAAN SANITAIR


1 Saluran air hujan keliling Q.6 Bh 62.000 Err:509
2 Bak kontrol J.12 Bh 8.000 Err:509

IX. PEKERJAAN CAT


1 Residu kap dan gording N.6 M2 318.803 Err:509
2 Cat kosen N.3 M2 27.560 Err:509
3 Cat kolom N.3 M2 12.000 Err:509
4 Cat daun pintu dan jendela N.3 M2 18.165 Err:509
5 Cat listplank N.3 M2 24.420 Err:509
6 Cat list tepi plafon N.3 M2 11.953 Err:509
7 Cat plafon N.8 M2 245.182 Err:509
8 Cat dinding N.8 M2 299.460 Err:509
9 Cat atap N.10 M2 285.338 Err:509

X. PEKERJAAN LAIN-LAIN
1 Photo dokumentasi - Ls 1.000 1,500,000.00
2 Biaya pembersihan dan perapian - Ls 1.000 2,000,000.00
Rekapitulasi Aanggaran Biaya Bangunan Gedung Sekolah 2 RKB Semi Permanen

NO. URAIAN HARGA ( R

I. PEKERJAAN PERSIAPAN

II. PEKERJAAN TANAH DAN PASIR

III. PEKERJAAN PONDASI DAN BETON

IV. PEKERJAAN LANTAI DAN DINDING

V. PEKERJAAN ATAP DAN PLAFON

VI. PEKERJAAN PINTU, JENDELA & KUNCI

VII. PEKERJAAN INSTALASI LISTRIK

VIII. PEKERJAAN SANITAIR

IX. PEKERJAAN CAT

X. PEKERJAAN LAIN-LAIN
`

JUMLAH

IMB 1%

JUMLAH

PPN 10 %

TOTAL
JUMLAH
HARGA
( Rp )
7

4,577,100.00
10,645,036.06
1,000,000.00
Err:509
Err:509

5,697,753.60
633,083.62
Err:509
Err:509
51,849,765.00
Err:509

28,196,871.78
163,530,735.94
1,634,182.51
41,848,467.12
30,672,693.89
12,813,709.19
9,360,644.44
101,500,963.85
59,208,895.58
448,767,164.30

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
7

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

1,500,000.00
2,000,000.00
3,500,000.00
HARGA ( Rp.)

Err:509

Err:509

448,767,164.30

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

3,500,000.00

Err:509

Err:509

Err:509

Err:509

Err:509
Tabel G.7. Rencana Aanggaran Biaya Bangunan Gedung Sekolah 1 RKB Semi Permanen
-

NO. URAIAN PEKERJAAN KODE SAT. VOLUME

1 2 3 4 5

I. PEKERJAAN PERSIAPAN
1 Pembersihan lokasi dan perataan tanah A.6 Ls. 132.000
2 Pasang bowplank A.3 M' 46.000
3 Papan nama proyek - Bh 1.000
4 Gudang bahan / los kerja A.5 M2 12.000

II. PEKERJAAN TANAH DAN PASIR


1 Galian tanah B.4 M3 25.200
2 Urugan Tanah B.9 M3 8.400
3 Urugan pasir dibawah lantai B.11 M3 3.600
4 Urugan pasir dibawah rabat B.11 M3 3.000
5 Timbunan tanah B.14 M3 39.600

III. PEKERJAAN PONDASI DAN BETON


1 Pasang batu kosong C.3 M3 5.880
2 Pondasi jalur batu gunung 1 : 4 C.2 M3 7.350
3 Sloof beton 15/20 cm, 1 : 2 : 3 G.4 M3 1.260
4 Besi beton polos G.6 Kg 230.964
5 Bekisting G.8 M2 16.800
6 Cor plint dinding tinggi 10 cm 1 : 3 : 5 G.1 M3 0.396
7 Cor lantai tebal 5 cm, 1 : 3 : 5 G.1 M3 3.600
8 Cor rabat beton tebal 5 cm, 1 : 3 : 5 G.1 M3 3.000

IV. PEKERJAAN LANTAI DAN DINDING


1 Lantai keramik 40/40 cm M.2 M2 72.000
2 Plint keramik 10/40 cm M.7 M' 58.400
3 Kolom kayu 10/10 cm F.2 M3 0.420
4 Ring balk kayu 10/10 cm F.2 M3 0.420
5 Rangka dinding 5/10 cm F.3 M3 1.291
6 Dinding papan 2/20 cm F.27 M2 86.065
7 Dinding tripleks 3 mm tunggal F.30 M2 86.065
8 List dinding 1,5/4 cm F.27 M2 17.213

V. PEKERJAAN ATAP DAN PLAFON


1 Kuda - kuda kayu 5/10 cm F.14 M3 1.719
2 Gording kayu 5/10 cm F.15 M3 1.449
3 Atap senk gelombang BJLS 20 H.3 M2 165.322
4 Nok senk plat BJLS 20 H.4 M' 32.052
5 Listplank papan 2 x 3 x 20 cm F.20 M' 56.000
6 Rangka plafon F.18 M2 146.270
6 Plafon tripleks 60/120 cm I.1 M2 146.270
7 List plafon 1/4 cm I.6 M' 153.320
8 Top gevel Q.1 Bh 2.000
1 2 3 4 5

VI. PEKERJAAN PINTU, JENDELA & KUNCI


1 Kosen pintu dan jendela 5/10 cm F.1 M3 0.345
2 Pintu panel papan 3,5 cm F.5 M2 1.680
3 Bingkai jendela panel kaca F.7 M2 3.255
4 Kaca jendela panel tebal 5 mm L.13 M2 2.349
5 Jelusi kayu F.10 M2 2.000
6 Kunci tanam 2 slag L.1 Bh 1.000
7 Engsel pintu L.4 BH 3.000
8 Engsel jendela L.5 BH 32.000
9 Grendel jendela L.9 Bh 16.000
10 Hak/kait angin L.6 Bh 32.000

VII. PEKERJAAN INSTALASI LISTRIK


1 Pasang instalasi titik lampu O.1 Ttk 11.000
2 Lampu phlips SL 14 watt O.3 Bh 4.000
3 Lampu phlips SL 18 watt O.4 Bh 6.000
4 Stop kontak 220 watt O.10 Bh 1.000
5 Saklar ganda O.12 Bh 2.000
6 Box sekring/limit O.13 Bh 1.000

VIII. PEKERJAAN SANITAIR


1 Saluran air hujan keliling Q.6 Bh 46.000
2 Bak kontrol J.12 Bh 8.000

IX. PEKERJAAN CAT


1 Residu kap dan gording N.6 M2 190.096
2 Cat kosen N.3 M2 13.800
3 Cat kolom N.3 M2 12.000
4 Cat daun pintu dan jendela N.3 M2 9.083
5 Cat listplank N.3 M2 20.720
6 Cat list tepi plafon N.3 M2 8.433
7 Cat plafon N.8 M2 146.270
8 Cat dinding N.8 M2 172.130
9 Cat atap N.10 M2 165.322

X. PEKERJAAN LAIN-LAIN
1 Photo dokumentasi - Ls 1.000
2 Biaya pembersihan dan perapian - Ls 1.000
Rekapitulasi Aanggaran Biaya Bangunan Gedung Sekolah 1 RKB Semi Permanen

NO. URAIAN

I. PEKERJAAN PERSIAPAN

II. PEKERJAAN TANAH DAN PASIR

III. PEKERJAAN PONDASI DAN BETON

IV. PEKERJAAN LANTAI DAN DINDING

V. PEKERJAAN ATAP DAN PLAFON

VI. PEKERJAAN PINTU, JENDELA & KUNCI

VII. PEKERJAAN INSTALASI LISTRIK

VIII. PEKERJAAN SANITAIR

IX. PEKERJAAN CAT

X. PEKERJAAN LAIN-LAIN

JUMLAH

IMB 1%

JUMLAH

PPN 10 %

TOTAL
nan Gedung Sekolah 1 RKB Semi Permanen

HARGA JUMLAH
SATUAN HARGA
( Rp ) ( Rp )
6 7

20,075.00 2,649,900.00
171,694.13 7,897,929.98
1,000,000.00 1,000,000.00
Err:509 Err:509
Err:509

115,808.00 2,918,361.60
38,602.66 324,262.34
Err:509 Err:509
Err:509 Err:509
758,037.50 30,018,285.00
Err:509

2,456,173.50 14,442,300.18
11,395,870.10 83,759,645.24
20,513,954.47 25,847,582.63
82,025.27 18,944,884.69
471,109.57 7,914,640.78
14,097,356.09 5,582,553.01
14,097,356.09 50,750,481.92
14,097,356.09 42,292,068.27
249,534,156.72

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
6 7

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509

Err:509 Err:509
Err:509 Err:509
Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509

750,000.00 750,000.00
1,000,000.00 1,000,000.00
1,750,000.00
HARGA ( Rp.)

Err:509

Err:509

249,534,156.72

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

1,750,000.00
`

Err:509

Err:509

Err:509

Err:509

Err:509
Tabel G.6. Rencana Aanggaran Biaya Bangunan Gedung Sekolah 3 RKB Bangunan Kayu
-

HARGA
NO. URAIAN PEKERJAAN KODE SAT. VOLUME SATUAN
( Rp )
1 2 3 4 5 6

I. PEKERJAAN PERSIAPAN
1 Pembersihan lokasi dan perataan tanah A.6 Ls. 324.000 20,075.00
2 Pasang bowplank A.3 M' 78.000 171,694.13
3 Papan nama proyek - Bh 1.000 1,000,000.00
4 Gudang bahan / los kerja A.5 M2 36.000 Err:509

II. PEKERJAAN TANAH DAN PASIR


1 Galian tanah B.4 M3 45.000 115,808.00
2 Urugan Tanah B.9 M3 15.000 38,602.66

III. PEKERJAAN PONDASI DAN BETON


1 Pasang batu kosong C.3 M3 12.000 2,456,173.50
2 Pondasi titik batu gunung 1 : 4 C.2 M3 16.860 11,395,870.10
3 Plesteran 1 : 4 E.3 M3 33.120 Err:509
4 Tangga batu kali Q.7 Bh 3.000 Err:509

IV. PEKERJAAN LANTAI DAN DINDING


1 Balok gelagar 10/10 cm F.2 M3 2.340 Err:509
2 Balok lantai 5/10 cm F.16 M3 2.671 Err:509
3 Lantai papan 3/20 cm F.29 M2 216.000 Err:509
4 Kolom kayu 10/10 cm F.2 M3 1.020 Err:509
5 Ring balk kayu 10/10 cm F.2 M3 1.080 Err:509
6 Rangka dinding 5/10 cm F.3 M3 3.201 Err:509
7 Dinding papan 2/20 cm F.27 M2 171.395 Err:509
8 Dinding tripleks 3 mm tunggal F.30 M2 171.395 Err:509
9 Dinding tripleks 3 mm rangkap F.32 M2 42.000 Err:509
10 List dinding 1,5/4 cm F.27 M2 34.279 Err:509
11 Plint papan 2/18 cm M.16 M' 66.000 Err:509
12 Plint papan 2/10 cm M.15 M' 109.200 Err:509
13 Relling pagar pengaman Q3 M' 25.000 Err:509

V. PEKERJAAN ATAP DAN PLAFON


1 Kuda - kuda kayu 5/10 cm F.14 M3 3.905 Err:509
2 Gording kayu 5/10 cm F.15 M3 3.553 Err:509
3 Atap senk gelombang BJLS 20 H.3 M2 405.354 Err:509
4 Nok senk plat BJLS 20 H.4 M' 48.052 Err:509
5 Listplank papan 2 x 3 x 20 cm F.20 M' 88.000 Err:509
6 Rangka plafon F.18 M2 344.094 Err:509
7 Plafon tripleks 60/120 cm I.1 M2 344.094 Err:509
8 List plafon 1/4 cm I.6 M' 249.320 Err:509
9 Top gevel Q.1 Bh 2.000 Err:509
1 2 3 4 5 6

VI. PEKERJAAN PINTU, JENDELA & KUNCI


1 Kosen pintu dan jendela 5/10 cm F.1 M3 1.034 Err:509
2 Pintu panel papan 3,5 cm F.5 M2 5.040 Err:509
3 Bingkai jendela panel kaca F.7 M2 9.765 Err:509
4 Kaca jendela panel tebal 5 mm L.13 M2 7.047 Err:509
5 Jelusi kayu F.10 M2 6.000 Err:509
6 Kunci tanam 2 slag L.1 Bh 3.000 Err:509
7 Engsel pintu L.4 BH 9.000 Err:509
8 Engsel jendela L.5 BH 96.000 Err:509
9 Grendel jendela L.9 Bh 48.000 Err:509
10 Hak/kait angin L.6 Bh 96.000 Err:509

VII. PEKERJAAN INSTALASI LISTRIK


1 Pasang instalasi titik lampu O.1 Ttk 29.000 Err:509
2 Lampu phlips SL 14 watt O.3 Bh 8.000 Err:509
3 Lampu phlips SL 18 watt O.4 Bh 18.000 Err:509
4 Stop kontak 220 watt O.10 Bh 3.000 Err:509
5 Saklar ganda O.12 Bh 6.000 Err:509
6 Box sekring/limit O.13 Bh 1.000 Err:509

VIII. PEKERJAAN CAT


1 Residu kap dan gording N.6 M2 447.509 Err:509
2 Residu gelagar dan balok lantai N.6 M2 253.872 Err:509
3 Cat kosen N.3 M2 41.360 Err:509
4 Cat kolom N.3 M2 12.000 Err:509
5 Cat daun pintu dan jendela N.3 M2 27.248 Err:509
6 Cat listplank N.3 M2 32.560 Err:509
7 Cat list tepi plafon N.3 M2 13.713 Err:509
8 Cat plint papan 2/18 cm N.3 M2 13.200 Err:509
9 Cat plint papan 2/10 cm N.3 M2 13.104 Err:509
10 Cat plafon N.8 M2 344.094 Err:509
11 Cat dinding N.8 M2 426.790 Err:509
12 Cat atap N.10 M2 405.354 Err:509

IX. PEKERJAAN LAIN-LAIN


1 Photo dokumentasi - Ls 1.000 2,250,000.00
2 Biaya pembersihan dan perapian - Ls 1.000 3,000,000.00
Rekapitulasi Aanggaran Biaya Bangunan Gedung Sekolah 3 RKB Bangunan Kayu

NO. URAIAN HARGA

I. PEKERJAAN PERSIAPAN

II. PEKERJAAN TANAH DAN PASIR

III. PEKERJAAN PONDASI DAN BETON

IV. PEKERJAAN LANTAI DAN DINDING

V. PEKERJAAN ATAP DAN PLAFON

VI. PEKERJAAN PINTU, JENDELA & KUNCI

VII. PEKERJAAN INSTALASI LISTRIK

VIII. PEKERJAAN CAT

IX. PEKERJAAN LAIN-LAIN


`

JUMLAH

IMB 1%

JUMLAH

PPN 10 %

TOTAL
JUMLAH
HARGA
( Rp )
7

6,504,300.00
13,392,142.14
1,000,000.00
Err:509
Err:509

5,211,360.00
579,039.90
5,790,399.90

29,474,082.00
192,134,369.89
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
7

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

2,250,000.00
3,000,000.00
5,250,000.00
HARGA ( Rp.)

Err:509

5,790,399.90

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

5,250,000.00

Err:509

Err:509

Err:509

Err:509

Err:509
Tabel G.5. Rencana Aanggaran Biaya Bangunan Gedung Sekolah 2 RKB Bangunan Kayu
-

HARGA
NO. URAIAN PEKERJAAN KODE SAT. VOLUME SATUAN
( Rp )
1 2 3 4 5 6

I. PEKERJAAN PERSIAPAN
1 Pembersihan lokasi dan perataan tanah A.6 Ls. 228.000 20,075.00
2 Pasang bowplank A.3 M' 62.000 171,694.13
3 Papan nama proyek - Bh 1.000 1,000,000.00
4 Gudang bahan / los kerja A.5 M2 24.000 Err:509

II. PEKERJAAN TANAH DAN PASIR


1 Galian tanah B.4 M3 31.500 115,808.00
2 Urugan Tanah B.9 M3 10.500 38,602.66

III. PEKERJAAN PONDASI DAN BETON


1 Pasang batu kosong C.3 M3 8.400 2,456,173.50
2 Pondasi titik batu gunung 1 : 4 C.2 M3 11.802 11,395,870.10
3 Plesteran 1 : 4 E.3 M3 23.184 Err:509
4 Tangga batu kali Q.7 Bh 2.000 Err:509

IV. PEKERJAAN LANTAI DAN DINDING


1 Balok gelagar 10/10 cm F.2 M3 1.590 Err:509
2 Balok lantai 5/10 cm F.16 M3 1.781 Err:509
3 Lantai papan 3/20 cm F.29 M2 144.000 Err:509
4 Kolom kayu 10/10 cm F.2 M3 0.720 Err:509
5 Ring balk kayu 10/10 cm F.2 M3 0.750 Err:509
6 Rangka dinding 5/10 cm F.3 M3 2.246 Err:509
7 Dinding papan 2/20 cm F.27 M2 128.730 Err:509
8 Dinding tripleks 3 mm tunggal F.30 M2 128.730 Err:509
9 Dinding tripleks 3 mm rangkap F.32 M2 21.000 Err:509
10 List dinding 1,5/4 cm F.27 M2 25.746 Err:509
11 Plint papan 2/18 cm M.16 M' 50.000 Err:509
12 Plint papan 2/10 cm M.15 M' 80.800 Err:509
13 Relling pagar pengaman Q3 M' 18.000 Err:509

V. PEKERJAAN ATAP DAN PLAFON


1 Kuda - kuda kayu 5/10 cm F.14 M3 2.812 Err:509
2 Gording kayu 5/10 cm F.15 M3 2.501 Err:509
3 Atap senk gelombang BJLS 20 H.3 M2 285.338 Err:509
4 Nok senk plat BJLS 20 H.4 M' 40.052 Err:509
5 Listplank papan 2 x 3 x 20 cm F.20 M' 72.000 Err:509
6 Rangka plafon F.18 M2 245.182 Err:509
7 Plafon tripleks 60/120 cm I.1 M2 245.182 Err:509
8 List plafon 1/4 cm I.6 M' 187.320 Err:509
9 Top gevel Q.1 Bh 2.000 Err:509
1 2 3 4 5 6

VI. PEKERJAAN PINTU, JENDELA & KUNCI


1 Kosen pintu dan jendela 5/10 cm F.1 M3 0.689 Err:509
2 Pintu panel papan 3,5 cm F.5 M2 3.360 Err:509
3 Bingkai jendela panel kaca F.7 M2 6.510 Err:509
4 Kaca jendela panel tebal 5 mm L.13 M2 4.698 Err:509
5 Jelusi kayu F.10 M2 4.000 Err:509
6 Kunci tanam 2 slag L.1 Bh 2.000 Err:509
7 Engsel pintu L.4 BH 6.000 Err:509
8 Engsel jendela L.5 BH 64.000 Err:509
9 Grendel jendela L.9 Bh 32.000 Err:509
10 Hak/kait angin L.6 Bh 64.000 Err:509

VII. PEKERJAAN INSTALASI LISTRIK


1 Pasang instalasi titik lampu O.1 Ttk 20.000 Err:509
2 Lampu phlips SL 14 watt O.3 Bh 6.000 Err:509
3 Lampu phlips SL 18 watt O.4 Bh 12.000 Err:509
4 Stop kontak 220 watt O.10 Bh 2.000 Err:509
5 Saklar ganda O.12 Bh 4.000 Err:509
6 Box sekring/limit O.13 Bh 1.000 Err:509

VIII. PEKERJAAN CAT


1 Residu kap dan gording N.6 M2 318.803 Err:509
2 Residu gelagar dan balok lantai N.6 M2 170.448 Err:509
3 Cat kosen N.3 M2 27.560 Err:509
4 Cat kolom N.3 M2 12.000 Err:509
5 Cat daun pintu dan jendela N.3 M2 18.165 Err:509
6 Cat listplank N.3 M2 26.640 Err:509
7 Cat list tepi plafon N.3 M2 10.303 Err:509
8 Cat plint papan 2/18 cm N.3 M2 10.000 Err:509
9 Cat plint papan 2/10 cm N.3 M2 9.696 Err:509
10 Cat plafon N.8 M2 245.182 Err:509
11 Cat dinding N.8 M2 299.460 Err:509
12 Cat atap N.10 M2 285.338 Err:509

IX. PEKERJAAN LAIN-LAIN


1 Photo dokumentasi - Ls 1.000 1,500,000.00
2 Biaya pembersihan dan perapian - Ls 1.000 2,000,000.00
Rekapitulasi Aanggaran Biaya Bangunan Gedung Sekolah 2 RKB Bangunan Kayu

NO. URAIAN HARGA ( R

I. PEKERJAAN PERSIAPAN

II. PEKERJAAN TANAH DAN PASIR

III. PEKERJAAN PONDASI DAN BETON

IV. PEKERJAAN LANTAI DAN DINDING

V. PEKERJAAN ATAP DAN PLAFON

VI. PEKERJAAN PINTU, JENDELA & KUNCI

VII. PEKERJAAN INSTALASI LISTRIK

VIII. PEKERJAAN CAT

IX. PEKERJAAN LAIN-LAIN


`

JUMLAH

IMB 1%

JUMLAH

PPN 10 %

TOTAL
JUMLAH
HARGA
( Rp )
7

4,577,100.00
10,645,036.06
1,000,000.00
Err:509
Err:509

3,647,952.00
405,327.93
4,053,279.93

20,631,857.40
134,494,058.92
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
7

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

1,500,000.00
2,000,000.00
3,500,000.00
HARGA ( Rp.)

Err:509

4,053,279.93

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

3,500,000.00

Err:509

Err:509

Err:509

Err:509

Err:509
Tabel G.4. Rencana Aanggaran Biaya Bangunan Gedung Sekolah 1 RKB Bangunan Kayu
-

HARGA
NO. URAIAN PEKERJAAN KODE SAT. VOLUME SATUAN
( Rp )
1 2 3 4 5 6

I. PEKERJAAN PERSIAPAN
1 Pembersihan lokasi dan perataan tanah A.6 Ls. 132.000 20,075.00
2 Pasang bowplank A.3 M' 46.000 171,694.13
3 Papan nama proyek - Bh 1.000 1,000,000.00
4 Gudang bahan / los kerja A.5 M2 12.000 Err:509

II. PEKERJAAN TANAH DAN PASIR


1 Galian tanah B.4 M3 18.000 115,808.00
2 Urugan Tanah B.9 M3 6.000 38,602.66

III. PEKERJAAN PONDASI DAN BETON


1 Pasang batu kosong C.3 M3 4.800 2,456,173.50
2 Pondasi titik batu gunung 1 : 4 C.2 M3 6.744 11,395,870.10
3 Plesteran 1 : 4 E.3 M3 13.248 Err:509
4 Tangga batu kali Q.7 Bh 1.000 Err:509

IV. PEKERJAAN LANTAI DAN DINDING


1 Balok gelagar 10/10 cm F.2 M3 0.840 Err:509
2 Balok lantai 5/10 cm F.16 M3 0.890 Err:509
3 Lantai papan 3/20 cm F.29 M2 72.000 Err:509
4 Kolom kayu 10/10 cm F.2 M3 0.420 Err:509
5 Ring balk kayu 10/10 cm F.2 M3 0.420 Err:509
6 Rangka dinding 5/10 cm F.3 M3 1.291 Err:509
7 Dinding papan 2/20 cm F.27 M2 86.065 Err:509
8 Dinding tripleks 3 mm tunggal F.30 M2 86.065 Err:509
9 List dinding 1,5/4 cm F.27 M2 17.213 Err:509
10 Plint papan 2/18 cm M.16 M' 34.000 Err:509
11 Plint papan 2/10 cm M.15 M' 36.400 Err:509
12 Relling pagar pengaman Q3 M' 11.000 Err:509

V. PEKERJAAN ATAP DAN PLAFON


1 Kuda - kuda kayu 5/10 cm F.14 M3 1.719 Err:509
2 Gording kayu 5/10 cm F.15 M3 1.449 Err:509
3 Atap senk gelombang BJLS 20 H.3 M2 165.322 Err:509
4 Nok senk plat BJLS 20 H.4 M' 32.052 Err:509
5 Listplank papan 2 x 3 x 20 cm F.20 M' 56.000 Err:509
6 Rangka plafon F.18 M2 146.270 Err:509
7 Plafon tripleks 60/120 cm I.1 M2 146.270 Err:509
8 List plafon 1/4 cm I.6 M' 153.320 Err:509
9 Top gevel Q.1 Bh 2.000 Err:509
1 2 3 4 5 6

VI. PEKERJAAN PINTU, JENDELA & KUNCI


1 Kosen pintu dan jendela 5/10 cm F.1 M3 0.345 Err:509
2 Pintu panel papan 3,5 cm F.5 M2 1.680 Err:509
3 Bingkai jendela panel kaca F.7 M2 3.255 Err:509
4 Kaca jendela panel tebal 5 mm L.13 M2 2.349 Err:509
5 Jelusi kayu F.10 M2 2.000 Err:509
6 Kunci tanam 2 slag L.1 Bh 1.000 Err:509
7 Engsel pintu L.4 BH 3.000 Err:509
8 Engsel jendela L.5 BH 32.000 Err:509
9 Grendel jendela L.9 Bh 16.000 Err:509
10 Hak/kait angin L.6 Bh 32.000 Err:509

VII. PEKERJAAN INSTALASI LISTRIK


1 Pasang instalasi titik lampu O.1 Ttk 11.000 Err:509
2 Lampu phlips SL 14 watt O.3 Bh 4.000 Err:509
3 Lampu phlips SL 18 watt O.4 Bh 6.000 Err:509
4 Stop kontak 220 watt O.10 Bh 1.000 Err:509
5 Saklar ganda O.12 Bh 2.000 Err:509
6 Box sekring/limit O.13 Bh 1.000 Err:509

VIII. PEKERJAAN CAT


1 Residu kap dan gording N.6 M2 190.096 Err:509
2 Residu gelagar dan balok lantai N.6 M2 87.024 Err:509
3 Cat kosen N.3 M2 13.800 Err:509
4 Cat kolom N.3 M2 12.000 Err:509
5 Cat daun pintu dan jendela N.3 M2 9.083 Err:509
6 Cat listplank N.3 M2 20.720 Err:509
7 Cat list tepi plafon N.3 M2 8.433 Err:509
8 Cat plint papan 2/18 cm N.3 M2 6.800 Err:509
9 Cat plint papan 2/10 cm N.3 M2 4.368 Err:509
10 Cat plafon N.8 M2 146.270 Err:509
11 Cat dinding N.8 M2 172.130 Err:509
12 Cat atap N.10 M2 165.322 Err:509

IX. PEKERJAAN LAIN-LAIN


1 Photo dokumentasi - Ls 1.000 750,000.00
2 Biaya pembersihan dan perapian - Ls 1.000 1,000,000.00
Rekapitulasi Aanggaran Biaya Bangunan Gedung Sekolah 1 RKB Bangunan Kayu

NO. URAIAN HARGA ( R

I. PEKERJAAN PERSIAPAN

II. PEKERJAAN TANAH DAN PASIR

III. PEKERJAAN PONDASI DAN BETON

IV. PEKERJAAN LANTAI DAN DINDING

V. PEKERJAAN ATAP DAN PLAFON

VI. PEKERJAAN PINTU, JENDELA & KUNCI

VII. PEKERJAAN INSTALASI LISTRIK

VIII. PEKERJAAN CAT

IX. PEKERJAAN LAIN-LAIN


`

JUMLAH

IMB 1%

JUMLAH

PPN 10 %

TOTAL
JUMLAH
HARGA
( Rp )
7

2,649,900.00
7,897,929.98
1,000,000.00
Err:509
Err:509

2,084,544.00
231,615.96
2,316,159.96

11,789,632.80
76,853,747.95
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
7

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

750,000.00
1,000,000.00
1,750,000.00
HARGA ( Rp.)

Err:509

2,316,159.96

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

1,750,000.00

Err:509

Err:509

Err:509

Err:509

Err:509
Tabel G.1. Rencana Aanggaran Biaya Bangunan Gedung Kantor Type 200 M2 Bangunan Kayu
-

HARGA
NO. URAIAN PEKERJAAN KODE SAT. VOLUME SATUAN
( Rp )
1 2 3 4 5 6

I. PEKERJAAN PERSIAPAN
1 Pembersihan lokasi dan perataan tanah A.6 Ls. 379.500 20,075.00
2 Pasang bowplank A.3 M' 79.000 171,694.13
3 Papan nama proyek - Bh 1.000 1,000,000.00
4 Gudang bahan / los kerja A.5 M2 36.000 Err:509

II. PEKERJAAN TANAH DAN PASIR


1 Galian tanah B.4 M3 55.692 115,808.00
2 Urugan Tanah B.9 M3 18.564 38,602.66
3 Urugan pasir dibawah lantai B.11 M3 0.770 Err:509
4 Urugan pasir dibawah rabat B.11 M3 3.550 Err:509
5 Timbunan tanah B.14 M3 4.004 758,037.50

III. PEKERJAAN PONDASI DAN BETON


1 Pasang batu kosong C.3 M3 12.852 2,456,173.50
2 Pondasi titik batu gunung 1 : 4 C.2 M3 12.548 11,395,870.10
3 Pondasi jalur batu gunung 1 : 4 C.2 M3 7.115 11,395,870.10
4 Plesteran 1 : 4 E.3 M3 58.608 Err:509
5 Tangga batu kali lebar 2 m Q.11 Bh 2.000 Err:509
6 Tangga batu kali lebar 4 m Q.12 Bh 1.000 Err:509
7 Cor lantai tebal 5 cm, 1 : 3 : 5 G.1 M3 0.770 14,097,356.09

IV. PEKERJAAN LANTAI DAN DINDING


1 Balok gelagar 10/10 cm F.2 M3 2.601 Err:509
2 Balok lantai 5/10 cm F.16 M3 3.525 Err:509
3 Lantai papan 3/20 cm F.29 M2 285.000 Err:509
4 Kolom kayu 10/10 cm F.2 M3 1.376 Err:509
5 Pasangan dinding CB D.2 M3 41.505 Err:509
6 Plesteran 1 : 4 E.3 M3 47.445 Err:509
7 Lantai keramik KM/WC 20/20 cm M.4 M2 15.400 Err:509
8 Dinding keramik KM/WC 20/20 cm M.10 M2 47.445 Err:509
9 Ring balk kayu 10/10 cm F.2 M3 1.483 Err:509
10 Rangka dinding 5/10 cm F.3 M3 4.735 Err:509
11 Dinding papan 2/20 cm F.27 M2 167.515 Err:509
12 Dinding teakwood 3 mm tunggal F.30 M2 147.715 Err:509
13 Dinding teakwood 3 mm rangkap F.32 M2 148.155 Err:509
14 List dinding 1,5/4 cm F.27 M2 33.503 Err:509
15 Plint papan 2/18 cm M.16 M' 73.000 Err:509
16 Plint papan 2/10 cm M.15 M' 146.700 Err:509
17 Relling pagar pengaman Q3 M' 65.000 Err:509
V. PEKERJAAN ATAP DAN PLAFON
1 Kuda - kuda kayu 5/10 cm F.14 M3 3.085 Err:509
2 Gording kayu 5/10 cm F.15 M3 3.341 Err:509
3 Atap senk gelombang BJLS 20 H.3 M2 381.140 Err:509
4 Nok senk plat BJLS 20 H.4 M' 74.800 Err:509
5 Talang miring senk plat BJLS 20 K.14 M' 21.920 Err:509
6 Listplank papan 2 x 3 x 20 cm F.20 M' 94.480 Err:509
7 Rangka plafon F.18 M2 319.048 Err:509
8 Plafon tripleks 60/120 cm I.1 M2 319.048 Err:509
9 List plafon 1/4 cm I.6 M' 383.070 Err:509
10 Top gevel Q.1 Bh 4.000 Err:509
1 2 3 4 5 6

VI. PEKERJAAN PINTU, JENDELA & KUNCI


1 Kosen pintu dan jendela 5/10 cm F.1 M3 1.259 Err:509
2 Pintu panel papan 3,5 cm F.5 M2 19.110 Err:509
3 Pintu panel papan lapis seng plat Bjls 20 F.6 M2 4.410 Err:509
4 Bingkai jendela panel kaca F.7 M2 25.660 Err:509
5 Bingkai ventilasi panel kaca F.7 M2 12.720 Err:509
6 Kaca jendela panel tebal 5 mm L.13 M2 7.392 Err:509
7 Kaca mati tebal 5 mm L.13 M2 6.240 Err:509
8 Kunci tanam 2 slag L.1 Bh 13.000 Err:509
9 Engsel pintu L.4 BH 45.000 Err:509
10 Engsel jendela L.5 BH 54.000 Err:509
11 Grendel pintu L.8 Bh 7.000 Err:509
12 Grendel jendela L.9 Bh 27.000 Err:509
13 Hak/kait angin L.6 Bh 54.000 Err:509

VII. PEKERJAAN INSTALASI LISTRIK


1 Pasang instalasi titik lampu O.1 Ttk 31.000 Err:509
2 Lampu phlips SL 8 watt O.2 Bh 4.000 Err:509
3 Lampu phlips SL 14 watt O.3 Bh 10.000 Err:509
4 Lampu phlips SL 20 watt O.5 Bh 10.000 Err:509
5 Stop kontak 220 watt O.10 Bh 7.000 Err:509
6 Saklar tunggal O.11 Bh 6.000 Err:509
7 Saklar ganda O.12 Bh 2.000 Err:509
8 Box sekring/limit O.13 Bh 1.000 Err:509

VIII. PEKERJAAN SANITAIR


1 Bak air viber glass 110 ltr + keramik J.7 Bh 3.0000 Err:509
2 Kloset duduk J.1 Bh 1.0000 Err:509
3 Kloset jongkok J.2 Bh 2.0000 Err:509
4 Flor drain J.31 Bh 3.0000 Err:509
5 Kran air dia. 1/2 " J.27 Ttk 3.0000 Err:509
6 Stop kran air dia. 1/2 " J.28 Ttk 1.0000 Err:509
7 Pipa GIP dia. 1/2" J.13 M' 68.0000 Err:509
8 Pipa PVC dia. 2" J.23 M' 9.0000 120,360.59
9 Septiktank dan peresapannya Q3&Q4 Unit 2.0000 Err:509

IX. PEKERJAAN CAT


1 Residu kap dan gording N.6 M2 385.573 Err:509
2 Cat kosen N.3 M2 50.360 Err:509
3 Cat kolom N.3 M2 2.400 Err:509
4 Cat daun pintu dan jendela N.3 M2 116.370 Err:509
5 Cat listplank N.3 M2 34.958 Err:509
6 Cat list tepi plafon N.3 M2 21.069 Err:509
7 Cat plint papan 2/18 cm N.3 M2 14.600 Err:509
8 Cat plint papan 2/10 cm N.3 M2 17.604 Err:509
9 Cat plafon N.8 M2 319.048 Err:509
10 Cat dinding N.8 M2 201.018 Err:509
11 Cat atap N.10 M2 381.140 Err:509
12 Vernis dinding teakwood N.7 M2 136.395 Err:509
X. PEKERJAAN LAIN-LAIN
1 Pantri ukuran 2.4 x 0.6 m Q.9 Bh 1.000 Err:509
2 Photo dokumentasi - Ls 1.000 2,250,000.00
3 Biaya pembersihan dan perapian - Ls 1.000 3,000,000.00
Rekapitulasi Aanggaran Biaya Bangunan Gedung Kantor Type 200 M2 Bangunan Kayu

NO. URAIAN HARGA ( R

I. PEKERJAAN PERSIAPAN

II. PEKERJAAN TANAH DAN PASIR

III. PEKERJAAN PONDASI DAN BETON

IV. PEKERJAAN LANTAI DAN DINDING

V. PEKERJAAN ATAP DAN PLAFON

VI. PEKERJAAN PINTU, JENDELA & KUNCI

VII. PEKERJAAN INSTALASI LISTRIK

VIII. PEKERJAAN SANITAIR

IX. PEKERJAAN CAT

X. PEKERJAAN LAIN-LAIN
`

JUMLAH

IMB 1%

JUMLAH

PPN 10 %

TOTAL
JUMLAH
HARGA
( Rp )
7

7,618,462.50
13,563,836.27
1,000,000.00
Err:509
Err:509

6,449,579.14
716,619.78
Err:509
Err:509
3,035,182.15
Err:509

31,566,741.82
142,995,378.01
81,081,615.76
Err:509
Err:509
Err:509
10,854,964.19
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
7

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
1,083,245.31
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
2,250,000.00
3,000,000.00
Err:509
HARGA ( Rp.)

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509
RENCANA ANGGARAN BIAYA (RAB)
KEGIATAN : REHABILITASI SEDANG/BERAT RUANG KELAS SEKOLAH SMA
PEKERJAAN : PEMBANGUNAN 3 RKB SMA NEGERI 1 MULIA
LOKASI : DISTRIK MULIA

HARGA
NO. URAIAN PEKERJAAN KODE SAT. VOLUME SATUAN
( Rp )
1 2 3 4 5 6

I. PEKERJAAN PERSIAPAN
1 Pembersihan lokasi dan perataan tanah A.6 Ls. 379.500 20,075.00
2 Pasang bowplank A.3 M' 79.000 171,694.13
3 Papan nama proyek - Bh 1.000 1,000,000.00
4 Gudang bahan / los kerja A.5 M2 36.000 Err:509

II. PEKERJAAN TANAH DAN PASIR


1 Galian tanah B.4 M3 69.004 115,808.00
2 Urugan Tanah B.9 M3 23.001 38,602.66
3 Urugan pasir dibawah lantai B.11 M3 10.700 Err:509
4 Urugan pasir dibawah rabat B.11 M3 3.550 Err:509
5 Timbunan tanah B.14 M3 74.100 758,037.50

III. PEKERJAAN PONDASI DAN BETON


1 Pasang batu kosong C.3 M3 15.924 2,456,173.50
2 Pondasi titik batu gunung 1 : 4 C.2 M3 0.380 11,395,870.10
3 Pondasi jalur batu gunung 1 : 4 C.2 M3 33.227 11,395,870.10
4 Lantai kerja G.3 M2 5.600 667,013.27
5 Sloof beton 15/20 cm, 1 : 2 : 3 G.4 M3 4.479 20,513,954.47
6 Besi beton polos G.6 Kg 821.023 82,025.27
7 Bekisting G.8 M2 59.719 471,109.57
8 Cor plint dinding tinggi 10 cm 1 : 3 : 5 G.1 M3 1.258 14,097,356.09
9 Cor lantai tebal 5 cm, 1 : 3 : 5 G.1 M3 10.700 14,097,356.09
10 Cor rabat beton tebal 5 cm, 1 : 3 : 5 G.1 M3 3.550 14,097,356.09

IV. PEKERJAAN LANTAI DAN DINDING


1 Pasangan dinding CB D.2 M3 41.505 Err:509
2 Plesteran 1 : 4 E.3 M3 47.445 Err:509
3 Lantai keramik 40/40 cm M.2 M2 198.600 Err:509
4 Plint keramik 10/40 cm M.7 M' 146.700 Err:509
5 Lantai keramik KM/WC 20/20 cm M.4 M2 15.400 Err:509
6 Dinding keramik KM/WC 20/20 cm M.10 M2 47.445 Err:509
7 Kolom kayu 10/10 cm F.2 M3 1.376 Err:509
8 Ring balk kayu 10/10 cm F.2 M3 1.493 Err:509
9 Rangka dinding 5/10 cm F.3 M3 4.735 Err:509
10 Dinding papan 2/20 cm F.27 M2 167.515 Err:509
11 Dinding teakwood 3 mm tunggal F.30 M2 147.715 Err:509
12 Dinding teakwood 3 mm rangkap F.32 M2 148.155 Err:509
13 List dinding 1,5/4 cm F.27 M2 33.503 Err:509
V. PEKERJAAN ATAP DAN PLAFON
1 Kuda - kuda kayu 5/10 cm F.14 M3 3.085 Err:509
2 Gording kayu 5/10 cm F.15 M3 3.341 Err:509
3 Atap senk gelombang BJLS 20 H.3 M2 381.140 Err:509
4 Nok senk plat BJLS 20 H.4 M' 74.800 Err:509
5 Talang miring senk plat BJLS 20 K.14 M' 21.920 Err:509
6 Listplank papan 2 x 3 x 20 cm F.20 M' 94.480 Err:509
7 Rangka plafon F.18 M2 319.048 Err:509
8 Plafon tripleks 60/120 cm I.1 M2 319.048 Err:509
9 List plafon 1/4 cm I.6 M' 383.070 Err:509
10 Top gevel Q.1 Bh 4.000 Err:509
1 2 3 4 5 6
2 Pintu panel papan lapis seng plat Bjls 20 F.6 M2 4.410 Err:509
3 Bingkai jendela panel kaca F.7 M2 25.660 Err:509
4 Bingkai ventilasi panel kaca F.7 M2 12.720 Err:509
5 Kaca jendela panel tebal 5 mm L.13 M2 7.392 Err:509
6 Kaca mati tebal 5 mm L.13 M2 6.240 Err:509
7 Kunci tanam 2 slag L.1 Bh 13.000 Err:509
8 Engsel pintu L.4 BH 45.000 Err:509
9 Engsel jendela L.5 BH 54.000 Err:509
10 Grendel pintu L.8 Bh 7.000 Err:509
11 Grendel jendela L.9 Bh 27.000 Err:509
12 Hak/kait angin L.6 Bh 54.000 Err:509

VII. PEKERJAAN INSTALASI LISTRIK


1 Pasang instalasi titik lampu O.1 Ttk 31.000 Err:509
2 Lampu phlips SL 8 watt O.2 Bh 4.000 Err:509
3 Lampu phlips SL 14 watt O.3 Bh 10.000 Err:509
4 Lampu phlips SL 20 watt O.5 Bh 10.000 Err:509
5 Stop kontak 220 watt O.10 Bh 7.000 Err:509
6 Saklar tunggal O.11 Bh 6.000 Err:509
7 Saklar ganda O.12 Bh 2.000 Err:509
8 Box sekring/limit O.13 Bh 1.000 Err:509

VIII. PEKERJAAN SANITAIR


1 Bak air viber glass 110 ltr + keramik J.7 Bh 3.0000 Err:509
2 Kloset duduk J.1 Bh 1.0000 Err:509
3 Kloset jongkok J.2 Bh 2.0000 Err:509
4 Flor drain J.31 Bh 3.0000 Err:509
5 Kran air dia. 1/2 " J.27 Ttk 3.0000 Err:509
6 Stop kran air dia. 1/2 " J.28 Ttk 1.0000 Err:509
7 Pipa GIP dia. 1/2" J.13 M' 68.0000 Err:509
8 Pipa PVC dia. 2" J.23 M' 9.0000 120,360.59
9 Septiktank dan peresapannya Q3&Q4 Unit 2.0000 Err:509
10 Saluran air hujan keliling Q.6 Bh 76.600 Err:509
11 Bak kontrol J.12 Bh 8.000 Err:509
12 Screen penutup saluran dari besi beton Q.10 M' 8.000 Err:509

IX. PEKERJAAN CAT


1 Residu kap dan gording N.6 M2 385.573 Err:509
2 Cat kosen N.3 M2 - Err:509
3 Cat kolom N.3 M2 2.400 Err:509
4 Cat daun pintu dan jendela N.3 M2 81.095 Err:509
5 Cat listplank N.3 M2 34.958 Err:509
6 Cat list tepi plafon N.3 M2 21.069 Err:509
7 Cat plafon N.8 M2 319.048 Err:509
8 Cat dinding N.8 M2 201.018 Err:509
9 Cat atap N.10 M2 381.140 Err:509
10 Vernis dinding teakwood N.7 M2 136.395 Err:509

X. PEKERJAAN LAIN-LAIN
1 Pantri ukuran 2.4 x 0.6 m Q.9 Bh 1.000 Err:509
2 Photo dokumentasi - Ls 1.000 2,250,000.00
3 Biaya pembersihan dan perapian - Ls 1.000 3,000,000.00
REKAPITULASI
KEGIATAN : REHABILITASI SEDANG/BERAT RUANG KELAS SEKOLAH SMA

PEKERJAAN : PEMBANGUNAN 3 RKB SMA NEGERI 1 MULIA

LOKASI : DISTRIK MULIA

NO. URAIAN HARGA (

I. PEKERJAAN PERSIAPAN

II. PEKERJAAN TANAH DAN PASIR

III. PEKERJAAN PONDASI DAN BETON

IV. PEKERJAAN LANTAI DAN DINDING

V. PEKERJAAN ATAP DAN PLAFON

0 0

VII. PEKERJAAN INSTALASI LISTRIK

VIII. PEKERJAAN SANITAIR

IX. PEKERJAAN CAT

X. PEKERJAAN LAIN-LAIN
`

JUMLAH

IMB 1%

JUMLAH

PPN 10 %

TOTAL
ANGGARAN BIAYA (RAB)

JUMLAH
HARGA
( Rp )
7

7,618,462.50
13,563,836.27
1,000,000.00
Err:509
Err:509

7,991,215.23
887,912.65
Err:509
Err:509
56,170,578.75
Err:509

39,112,106.81
4,330,430.64
378,650,575.81
3,735,274.31
91,882,002.07
67,344,634.07
28,134,192.41
17,734,473.96
150,841,710.16
50,045,614.12
831,811,014.36

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
7
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
1,083,245.31
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
2,250,000.00
3,000,000.00
Err:509
REKAPITULASI

HARGA ( Rp.)

Err:509

Err:509

831,811,014.36

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509
Tabel G.3. Rencana Aanggaran Biaya Bangunan Gedung Kantor Type 200 M2 Permanen
-

HARGA
NO. URAIAN PEKERJAAN KODE SAT. VOLUME SATUAN
( Rp )
1 2 3 4 5 6

I. PEKERJAAN PERSIAPAN
1 Pembersihan lokasi dan perataan tanah A.6 Ls. 379.500 20,075.00
2 Pasang bowplank A.3 M' 79.000 171,694.13
3 Papan nama proyek - Bh 1.000 1,000,000.00
4 Gudang bahan / los kerja A.5 M2 36.000 Err:509

II. PEKERJAAN TANAH DAN PASIR


1 Galian tanah B.4 M3 77.636 115,808.00
2 Urugan Tanah B.9 M3 25.879 38,602.66
3 Urugan pasir dibawah lantai B.11 M3 10.700 Err:509
4 Urugan pasir dibawah rabat B.11 M3 3.550 Err:509
5 Timbunan tanah B.14 M3 74.100 758,037.50

III. PEKERJAAN PONDASI DAN BETON


1 Pasang batu kosong C.3 M3 17.916 2,456,173.50
2 Pondasi titik batu gunung 1 : 4 C.2 M3 - 11,395,870.10
3 Pondasi jalur batu gunung 1 : 4 C.2 M3 38.072 11,395,870.10
4 Lantai kerja G.3 M2 5.600 667,013.27
5 Sloof beton 15/20 cm, 1 : 2 : 3 G.4 M3 4.479 20,513,954.47
6 Besi beton polos G.6 Kg 821.023 82,025.27
7 Bekisting G.8 M2 59.719 471,109.57
8 Kolom beton 10/10 cm, 1 : 2 : 3 G.4 M3 1.376 20,513,954.47
9 Besi beton polos G.6 Kg 642.551 82,025.27
10 Bekisting G.9 M2 55.040 Err:509
11 Ring balk beton 10/15 cm, 1 : 2 : 3 G.4 M3 2.240 20,513,954.47
12 Besi beton polos G.6 Kg 738.471 82,025.27
13 Bekisting G.10 M2 44.790 1,085,559.35
14 Cor lantai tebal 5 cm, 1 : 3 : 5 G.1 M3 10.700 14,097,356.09
15 Cor rabat beton tebal 5 cm, 1 : 3 : 5 G.1 M3 3.550 14,097,356.09

IV. PEKERJAAN LANTAI DAN DINDING


1 Pasangan dinding CB D.2 M3 344.665 Err:509
2 Plesteran 1 : 4 E.3 M3 689.330 Err:509
3 Lantai keramik 40/40 cm M.2 M2 198.600 Err:509
4 Plint keramik 10/40 cm M.7 M' 146.700 Err:509
5 Lantai keramik KM/WC 20/20 cm M.4 M2 15.400 Err:509
6 Dinding keramik KM/WC 20/20 cm M.10 M2 38.700 Err:509

V. PEKERJAAN ATAP DAN PLAFON


1 Kuda - kuda kayu 5/10 cm F.14 M3 3.085 Err:509
2 Gording kayu 5/10 cm F.15 M3 3.341 Err:509
3 Atap senk gelombang BJLS 20 H.3 M2 381.140 Err:509
4 Nok senk plat BJLS 20 H.4 M' 74.800 Err:509
5 Talang miring senk plat BJLS 20 K.14 M' 21.920 Err:509
6 Listplank papan 2 x 3 x 20 cm F.20 M' 94.480 Err:509
7 Rangka plafon F.18 M2 319.048 Err:509
8 Plafon tripleks 60/120 cm I.1 M2 319.048 Err:509
9 List plafon 1/4 cm I.6 M' 383.070 Err:509
10 Top gevel Q.1 Bh 4.000 Err:509
1 2 3 4 5 6

VI. PEKERJAAN PINTU, JENDELA & KUNCI


1 Kosen pintu dan jendela 5/10 cm F.1 M3 1.259 Err:509
2 Pintu panel papan 3,5 cm F.5 M2 19.110 Err:509
3 Pintu panel papan lapis seng plat Bjls 20 F.6 M2 4.410 Err:509
4 Bingkai jendela panel kaca F.7 M2 25.660 Err:509
5 Bingkai ventilasi panel kaca F.7 M2 12.720 Err:509
6 Kaca jendela panel tebal 5 mm L.13 M2 7.392 Err:509
7 Kaca mati tebal 5 mm L.13 M2 6.240 Err:509
8 Kunci tanam 2 slag L.1 Bh 13.000 Err:509
9 Engsel pintu L.4 BH 45.000 Err:509
10 Engsel jendela L.5 BH 54.000 Err:509
11 Grendel pintu L.8 Bh 7.000 Err:509
12 Grendel jendela L.9 Bh 27.000 Err:509
13 Hak/kait angin L.6 Bh 54.000 Err:509

VII. PEKERJAAN INSTALASI LISTRIK


1 Pasang instalasi titik lampu O.1 Ttk 31.000 Err:509
2 Lampu phlips SL 8 watt O.2 Bh 4.000 Err:509
3 Lampu phlips SL 14 watt O.3 Bh 10.000 Err:509
4 Lampu phlips SL 20 watt O.5 Bh 10.000 Err:509
5 Stop kontak 220 watt O.10 Bh 7.000 Err:509
6 Saklar tunggal O.11 Bh 6.000 Err:509
7 Saklar ganda O.12 Bh 2.000 Err:509
8 Box sekring/limit O.13 Bh 1.000 Err:509

VIII. PEKERJAAN SANITAIR


1 Bak air viber glass 110 ltr + keramik J.7 Bh 3.0000 Err:509
2 Kloset duduk J.1 Bh 1.0000 Err:509
3 Kloset jongkok J.2 Bh 2.0000 Err:509
4 Flor drain J.31 Bh 3.0000 Err:509
5 Kran air dia. 1/2 " J.27 Ttk 3.0000 Err:509
6 Stop kran air dia. 1/2 " J.28 Ttk 1.0000 Err:509
7 Pipa GIP dia. 1/2" J.13 M' 68.0000 Err:509
8 Pipa PVC dia. 2" J.23 M' 9.0000 120,360.59
9 Septiktank dan peresapannya Q3&Q4 Unit 2.0000 Err:509
10 Saluran air hujan keliling Q.6 Bh 76.600 Err:509
11 Bak kontrol J.12 Bh 8.000 Err:509
12 Screen penutup saluran dari besi beton Q.10 M' 8.000 Err:509

IX. PEKERJAAN CAT


1 Residu kap dan gording N.6 M2 385.573 Err:509
2 Cat kosen N.3 M2 50.360 Err:509
3 Cat kolom N.3 M2 2.400 Err:509
4 Cat daun pintu dan jendela N.3 M2 116.370 Err:509
5 Cat listplank N.3 M2 34.958 Err:509
6 Cat list tepi plafon N.3 M2 21.069 Err:509
7 Cat plafon N.8 M2 319.048 Err:509
8 Cat dinding N.8 M2 650.630 Err:509
9 Cat atap N.10 M2 381.140 Err:509
10 Vernis dinding teakwood N.7 M2 1,723.325 Err:509

X. PEKERJAAN LAIN-LAIN
1 Pantri ukuran 2.4 x 0.6 m Q.9 Bh 1.000 Err:509
2 Photo dokumentasi - Ls 1.000 2,250,000.00
3 Biaya pembersihan dan perapian - Ls 1.000 3,000,000.00
Rekapitulasi Anggaran Biaya Bangunan Gedung Kantor Tipe 200 M2 Permanen

NO. URAIAN HARGA (

I. PEKERJAAN PERSIAPAN

II. PEKERJAAN TANAH DAN PASIR

III. PEKERJAAN PONDASI DAN BETON

IV. PEKERJAAN LANTAI DAN DINDING

V. PEKERJAAN ATAP DAN PLAFON

VI. PEKERJAAN PINTU, JENDELA & KUNCI

VII. PEKERJAAN INSTALASI LISTRIK

VIII. PEKERJAAN SANITAIR

IX. PEKERJAAN CAT

X. PEKERJAAN LAIN-LAIN
`

JUMLAH

IMB 1%

JUMLAH

PPN 10 %

TOTAL
JUMLAH
HARGA
( Rp )
7

7,618,462.50
13,563,836.27
1,000,000.00
Err:509
Err:509

8,990,869.89
998,985.37
Err:509
Err:509
56,170,578.75
Err:509

44,004,804.43
-
433,863,566.45
3,735,274.31
91,882,002.07
67,344,634.07
28,134,192.41
28,227,201.35
52,705,419.91
Err:509
45,941,001.04
60,573,283.90
48,622,203.29
150,841,710.16
50,045,614.12
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
7

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
1,083,245.31
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
2,250,000.00
3,000,000.00
Err:509
HARGA ( Rp.)

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509
ENGINEER ESTIMATE ( EE )
ISNTALASI GAWAT DARURAT (IGD) RSUD MULIA TAHAP II

NO. URAIAN PEKERJAAN KODE SAT. VOLUME

1 2 3 4 5

II. PEKERJAAN TANAH DAN PASIR


3 Urugan pasir dibawah lantai B.11 M3 3.648
5 Timbunan tanah B.14 M3 14.592

III. PEKERJAAN PONDASI DAN BETON


14 Cor lantai tebal 5 cm, 1 : 3 : 5 G.1 M3 3.649

IV. PEKERJAAN LANTAI DAN DINDING


3 Lantai keramik 40/40 cm M.2 M2 391.650
4 Plint keramik 10/40 cm M.7 M' 291.350

VIII. PEKERJAAN SANITAIR


10 Saluran air hujan keliling Q.6 Bh 78.000
11 Bak kontrol J.12 Bh 6.000
12 Screen penutup saluran dari besi beton Q.10 M' 8.000

X. PEKERJAAN LAIN-LAIN
3 Biaya pembersihan dan perapian - Ls 1.000
REKAPITULASI

ISNTALASI GAWAT DARURAT (IGD) RSUD MULIA TAHAP II

NO. URAIAN

II. PEKERJAAN TANAH DAN PASIR

III. PEKERJAAN PONDASI DAN BETON

IV. PEKERJAAN LANTAI DAN DINDING

VIII. PEKERJAAN SANITAIR

X. PEKERJAAN LAIN-LAIN

JUMLAH

PPN 10 %

TOTAL

DIBULATKAN

PENGAWASAN TEKNIS

JUMLAH

Mengetahui,

Direktur RSUD Mulia a.n. Kepala Bidang Cipta Karya


Dinas Pekerjaan Umum Kabupaten Puncak Ja
Kepala Seksi Perencanaan Teknis

dr. BEARLY LOKOPESSY


NIP. 19730717 200605 1 001 NIP. 19760102 200712 1 027
TE ( EE )
RSUD MULIA TAHAP II

HARGA JUMLAH
SATUAN HARGA
( Rp ) ( Rp )
6 7

Err:509 Err:509
758,037.50 11,061,283.20
Err:509

14,097,356.09 51,441,252.37
Err:509

Err:509 Err:509
Err:509 Err:509
Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509

3,000,000.00 3,000,000.00
Err:509
ASI

) RSUD MULIA TAHAP II

HARGA ( Rp.)

Err:509

Err:509

Err:509

Err:509

Err:509
`

Err:509

Err:509

Err:509

Err:509

48,984,000.00

Err:509

Dibuat Oleh,

a.n. Kepala Bidang Cipta Karya


inas Pekerjaan Umum Kabupaten Puncak Jaya
Kepala Seksi Perencanaan Teknis

YONATHAN, ST
NIP. 19760102 200712 1 027
PERHITUNGAN BESI BETON UNTUK 1 M3 BETON

I. SLOOF 15/20 CM

Ukuran 15/20 cm Luas = 0.15 x 0.2 = 0.030

Panjang untuk 1 m3 = 1/ 0.03 = 33.333

Diameter besi = 12 mm

Berat besi dia. 12 mm = 0.888 kg

Jadi berat besi untuk 1 m3 = 0.888 x 33.333 x 4

Besi Begel dia. 8 mm = 8 mm

Berat besi dia. 8 mm = 0.395 kg

Jadi berat besi begel untuk 1 m3 = 0.395 x 0.64 x 222.22

JUMLAH
Sambungan besi 5 %
TOTAL

II. SLOOF 20/30 CM

Ukuran 20/30 cm Luas = 0.2 x 0.3 = 0.060

Panjang untuk 1 m3 = 1/ 0.06 = 16.667

Diameter besi = 12 mm

Berat besi dia. 12 mm = 0.888 kg

Jadi berat besi untuk 1 m3 = 0.888 x 16.667 x 5

Diameter besi (tulangan geser) = 10 mm

Berat besi dia. 12 mm = 0.617 kg

Jadi berat besi untuk 1 m3 = 0.617 x 16.667 x 2

Besi Begel dia. 8 mm = 8 mm

Berat besi dia. 8 mm = 0.395 kg

Jadi berat besi begel untuk 1 m3 = 0.395 x 0.94 x 111.113

JUMLAH
Sambungan besi 5 %
TOTAL
III. KOLOM 10/10 CM

Ukuran 10/10 cm Luas = 0.1 x 0.1 = 0.010

Panjang untuk 1 m3 = 1/ 0.01 = 100

Diameter besi = 12 mm

Berat besi dia. 12 mm = 0.888 kg

Jadi berat besi untuk 1 m3 = 0.888 x 100 x 4

Besi Begel dia. 8 mm = 8 mm

Berat besi dia. 8 mm = 0.395 kg

Jadi berat besi begel untuk 1 m3 = 0.395 x 0.34 x 666.667

JUMLAH
Sambungan besi 5 %
TOTAL

IV. KOLOM 15/15 CM

Ukuran 15/15 cm Luas = 0.15 x 0.15 = 0.023

Panjang untuk 1 m3 = 1/ 0.023 = 43.478

Diameter besi = 12 mm

Berat besi dia. 12 mm = 0.888 kg

Jadi berat besi untuk 1 m3 = 0.888 x 43.478 x 4

Besi Begel dia. 8 mm = 8 mm

Berat besi dia. 8 mm = 0.395 kg

Jadi berat besi begel untuk 1 m3 = 0.395 x 0.54 x 289.853

JUMLAH
Sambungan besi 5 %
TOTAL

V. KOLOM 20/20 CM

Ukuran 20/20 cm Luas = 0.2 x 0.2 = 0.040

Panjang untuk 1 m3 = 1/ 0.04 = 25

Diameter besi = 12 mm
Berat besi dia. 12 mm = 0.888 kg

Jadi berat besi untuk 1 m3 = 0.888 x 25 x 4

Besi Begel dia. 8 mm = 8 mm

Berat besi dia. 8 mm = 0.395 kg

Jadi berat besi begel untuk 1 m3 = 0.395 x 0.74 x 166.667

JUMLAH
Sambungan besi 5 %
TOTAL
VI. KOLOM 25/25 CM

Ukuran 25/25 cm Luas = 0.25 x 0.25 = 0.063

Panjang untuk 1 m3 = 1/ 0.063 = 15.873

Diameter besi = 12 mm

Berat besi dia. 12 mm = 0.888 kg

Jadi berat besi untuk 1 m3 = 0.888 x 15.873 x 8

Besi Begel dia. 8 mm = 8 mm

Berat besi dia. 8 mm = 0.395 kg

Jadi berat besi begel untuk 1 m3 = 0.395 x 0.94 x 105.82

JUMLAH
Sambungan besi 5 %
TOTAL

VII. KOLOM 30/30 CM

Ukuran 30/30 cm Luas = 0.3 x 0.3 = 0.090

Panjang untuk 1 m3 = 1/ 0.09 = 11.111

Diameter besi = 12 mm

Berat besi dia. 12 mm = 0.888 kg

Jadi berat besi untuk 1 m3 = 0.888 x 11.111 x 8

Besi Begel dia. 8 mm = 8 mm

Berat besi dia. 8 mm = 0.395 kg

Jadi berat besi begel untuk 1 m3 = 0.395 x 1.14 x 74.073

JUMLAH
Sambungan besi 5 %
TOTAL

VIII. RING BALK 10/15 CM

Ukuran 10/15 cm Luas = 0.1 x 0.15 = 0.015

Panjang untuk 1 m3 = 1/ 0.015 = 66.667

Diameter besi = 12 mm
Berat besi dia. 12 mm = 0.888 kg

Jadi berat besi untuk 1 m3 = 0.888 x 66.667 x 4

Besi Begel dia. 8 mm = 8 mm

Berat besi dia. 8 mm = 0.395 kg

Jadi berat besi begel untuk 1 m3 = 0.395 x 0.44 x 444.447

JUMLAH
Sambungan besi 5 %
TOTAL
IX. RING BALK 15/20 CM

Ukuran 15/20 cm Luas = 0.15 x 0.2 = 0.030

Panjang untuk 1 m3 = 1/ 0.03 = 33.333

Diameter besi = 12 mm

Berat besi dia. 12 mm = 0.888 kg

Jadi berat besi untuk 1 m3 = 0.888 x 33.333 x 4

Besi Begel dia. 8 mm = 8 mm

Berat besi dia. 8 mm = 0.395 kg

Jadi berat besi begel untuk 1 m3 = 0.395 x 0.64 x 222.22

JUMLAH
Sambungan besi 5 %
TOTAL

X. PLAT LANTAI TULANGAN TUNGGAL TEBAL 12 CM

Ukuran tebal 12 cm Luas = 0.12 x 1= 0.12

Panjang untuk 1 m3 = 1/ 0.12 = 8.33

Berat besi dia. 10 mm = 0.617 kg

Jadi berat besi tulangan induk untuk 1 m3 = 0.617 x 8.33 x 11

Lebar 1 m

Berat besi dia. 10 mm = 0.617 kg

Jadi berat besi tulangan pembangi untuk 1 m3 = 0.617 x 1x 84.3

JUMLAH
Sambungan besi 5 %
TOTAL

XI. PLAT LANTAI TULANGAN RANGKAP TEBAL 12 CM

Ukuran tebal 12 cm Luas = 0.12 x 1= 0.12

Panjang untuk 1 m3 = 1/ 0.12 = 8.33

Berat besi dia. 10 mm = 0.617 kg

Jadi berat besi tulangan induk untuk 1 m3 = 0.617 x 8.33 x 22


Lebar 1 m

Berat besi dia. 10 mm = 0.617 kg

Jadi berat besi tulangan pembangi untuk 1 m3 = 0.617 x 1x 168.6

JUMLAH
Sambungan besi 5 %
TOTAL
XI. PLAT LANTAI TULANGAN TUNGGAL TEBAL 10 CM

Ukuran tebal 10 cm Luas = 0.1 x 1= 0.1

Panjang untuk 1 m3 = 1/ 0.1 = 10

Berat besi dia. 10 mm = 0.617 kg

Jadi berat besi tulangan induk untuk 1 m3 = 0.617 x 10 x 11

Lebar 1 m

Berat besi dia. 10 mm = 0.617 kg

Jadi berat besi tulangan pembangi untuk 1 m3 = 0.617 x 1x 101.0

JUMLAH
Sambungan besi 5 %
TOTAL

XIII. PLAT LANTAI TULANGAN RANGKAP TEBAL 10 CM

Ukuran tebal 10 cm Luas = 0.1 x 1= 0.1

Panjang untuk 1 m3 = 1/ 0.1 = 10

Berat besi dia. 10 mm = 0.617 kg

Jadi berat besi tulangan induk untuk 1 m3 = 0.617 x 10 x 22

Lebar 1 m

Berat besi dia. 10 mm = 0.617 kg

Jadi berat besi tulangan pembangi untuk 1 m3 = 0.617 x 1x 202.0

JUMLAH
Sambungan besi 5 %
TOTAL
TON UNTUK 1 M3 BETON BEKISTING

m2

m'

= 118.399 Kg 13.333 M2

= 56.177 Kg

= 174.576 Kg
= 8.729 Kg
= 183.305 Kg

m2

m'

= 74.001 Kg 10 M2

= 20.567 Kg

= 41.256 Kg

= 135.824 Kg
= 6.791 Kg
= 142.615 Kg
m2

m'

= 355.2 Kg 40 M2

= 89.533 Kg

= 444.733 Kg
= 22.237 Kg
= 466.97 Kg

m2

m'

= 154.434 Kg 26.087 M2

= 61.826 Kg

= 216.26 Kg
= 10.813 Kg
= 227.073 Kg

m2

m'
= 88.8 Kg 20 M2

= 48.717 Kg

= 137.517 Kg
= 6.876 Kg
= 144.393 Kg
m2

m'

= 112.762 Kg 15.873 M2

= 39.291 Kg

= 152.053 Kg
= 7.603 Kg
= 159.656 Kg

m2

m'

= 78.933 Kg 13.333 M2

= 33.355 Kg

= 112.288 Kg
= 5.614 Kg
= 117.902 Kg

m2

m'
= 236.801 Kg 20 M2

= 77.245 Kg

= 314.046 Kg
= 15.702 Kg
= 329.748 Kg
m2

m'

= 118.399 Kg 13.333 M2

= 56.177 Kg

= 174.576 Kg
= 8.729 Kg
= 183.305 Kg

m2

m'

= 56.536 Kg 8.33 M2

= 52.013 Kg

= 108.549 Kg
= 10.855 Kg
= 119.404 Kg

m2

m'

= 113.071 Kg 8.33 M2
= 104.026 Kg

= 217.097 Kg
= 21.71 Kg
= 238.807 Kg
m2

m'

= 67.87 Kg 10 M2

= 62.317 Kg

= 130.187 Kg
= 13.019 Kg
= 143.206 Kg

m2

m'

= 135.74 Kg 10 M2

= 124.634 Kg

= 260.374 Kg
= 26.037 Kg
= 286.411 Kg
ANALISA BIAYA KONSTRUKSI (ABK)
BANGUNAN GEDUNG DAN PERUMAHAN
DISTRIK MULIA

A. PEKERJAAN PERSIAPAN

A.3 SNI 2002. 6.4 (Pek. Persiapan)


1 M' Pengukuran dan pemasangan bowplank
6.4.1 Bahan
- Kayu 5/7 0.012 M3 X Rp
- Paku biasa 0.020 Kg X Rp
- Kayu papan 3/20 0.007 M3 X Rp

6.4.2 Tenaga
- Pekerja 0.100 Oh X Rp
- Tukang 0.100 Oh X Rp
- Kepala tukang 0.010 Oh X Rp
- Mandor 0.005 Oh X Rp

Overhead cost & prof

A.6 SNI 2002. 6.8 (Pek. Persiapan)


1 M2 Membersihkan lapangan dan perataan
6.8.1 Tenaga
- Pekerja 0.100 Oh X Rp
- Mandor 0.050 Oh X Rp

Overhead cost & prof

B. PEKERJAAN TANAH

B.4 SNI 2835 : 2008. 6.4


Menggali 1 M3 tanah keras sedalam 1 m
6.4.1 Tenaga
- Pekerja 1.000 Oh X Rp
- Mandor 0.032 Oh X Rp

Overhead cost & prof

B.9 SNI 2835 : 2008. 6.9


Mengurug kembali 1 M3 galian
6.9.1 Tenaga
- Pekerja 0.333 Oh X Rp
- Mandor 0.011 Oh X Rp

Overhead cost & prof

B.14 SNI 2835 : 2008. 6.15a


Mengurug 1 M3 tanah timbunan
6.15a.1 Bahan
- Timbunan pilihan 1.200 M3 X Rp

6.15a.2 Tenaga
- Pekerja 0.250 Oh X Rp
- Mandor 0.025 Oh X Rp

Overhead cost & prof


C. PEKERJAAN PONDASI

C.2 SNI 2836 : 2008. 6.2


Memasang 1 M3 pondasi batu belah, campuran 1 PC : 4 PP
6.2.1 Bahan
- Batu belah 15/20 cm 1.200 M3 X Rp
- Semen Portland 163.000 Kg X Rp
- Pasir pasangan 0.520 M3 X Rp

6.2.2 Tenaga
- Pekerja 1.500 Oh X Rp
- Tukang 0.750 Oh X Rp
- Kepala tukang 0.075 Oh X Rp
- Mandor 0.075 Oh X Rp

Overhead cost & prof

C.3 SNI 2836 : 2008. 6.9


Memasang 1 M3 batu kosong (anstamping)
6.9.1 Bahan
- Batu belah 15/20 cm 1.200 M3 X Rp
- Pasir urug 0.432 M3 X Rp

6.9.2 Tenaga
- Pekerja 0.780 Oh X Rp
- Tukang 0.390 Oh X Rp
- Kepala tukang 0.039 Oh X Rp
- Mandor 0.039 Oh X Rp

Overhead cost & prof

E. PEKERJAAN PLESTERAN

E.3 SNI 2837 : 2008. 6.3


Membuat 1 M2 Plesteran 1 PC : 3 PP, tebal 15 mm
6.4.1 Bahan
- Semen Portland 7.776 Kg X Rp
- Pasir pasangan 0.023 M3 X Rp

6.4.2 Tenaga
- Pekerja 0.300 Oh X Rp
- Tukang 0.150 Oh X Rp
- Kepala tukang 0.015 Oh X Rp
- Mandor 0.015 Oh X Rp

Overhead cost & prof

E.8 SNI 2837 : 2008. 6.26


Membuat 1 M2 finishing siar pasangan batu kali adukan 1 PC : 2 PP
6.26.1 Bahan
- Semen Portland 6.340 Kg X Rp
- Pasir pasangan 0.012 M 3
X Rp
6.26.2 Tenaga
- Pekerja 0.300 Oh X Rp
- Tukang 0.150 Oh X Rp
- Kepala tukang 0.015 Oh X Rp
- Mandor 0.015 Oh X Rp

Overhead cost & prof


G. PEKERJAAN BETON

G.1 SNI 2002. 6.1 (Pek. Beton)


1 M3 Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr
6.1.1 Bahan
- Semen Portland 218.000 Kg X Rp
- Pasir beton 0.520 M3 X Rp
- Koral beton 0.870 M3 X Rp

6.1.2 Tenaga
- Pekerja 1.650 Oh X Rp
- Tukang 0.250 Oh X Rp
- Kepala tukang 0.025 Oh X Rp
- Mandor 0.080 Oh X Rp

Overhead cost & prof

G.3 SNI 2002. 6.4 (Pek. Beton)


1 M2 Membuat lantai kerja beton tumbuk, 1 Pc : 3 Ps : 5 Kr, tebal 5 cm
6.4.1 Bahan
- Semen Portland 10.000 Kg X Rp
- Pasir beton 0.026 M 3
X Rp
- Koral beton 0.044 M 3
X Rp

6.4.2 Tenaga
- Pekerja 0.150 Oh X Rp
- Tukang 0.020 Oh X Rp
- Kepala tukang 0.002 Oh X Rp
- Mandor 0.006 Oh X Rp

Overhead cost & prof

G.4 SNI 2002. 6.13 (Pek. Beton)


1 M3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr
6.13.1 Bahan
- Semen Portland 336.000 Kg X Rp
- Pasir beton 0.540 M3 X Rp
- Koral beton 0.810 M3 X Rp

6.13.2 Tenaga
- Pekerja 2.000 Oh X Rp
- Tukang 0.350 Oh X Rp
- Kepala tukang 0.035 Oh X Rp
- Mandor 1.000 Oh X Rp

Overhead cost & prof

G.6 SNI 7394 : 2008. 6.17


Pembesian 10 kg dengan besi polos atau besi ulir
6.17.1 Bahan
- Besi beton (polos/ulir) 10.500 Kg X Rp
- Kawat beton 0.150 Kg X Rp
6.17.1 Tenaga
- Pekerja 0.070 Oh X Rp
- Tukang 0.070 Oh X Rp
- Kepala tukang 0.007 Oh X Rp
- Mandor 0.004 Oh X Rp

Overhead cost & prof


G.8 SNI 7394 : 2008. 6.21
Memasang 1 M2 bekisting untuk sloof
6.21.1 Bahan
- Kayu Kelas III 0.045 M3 X Rp
- Paku biasa 0.300 Kg X Rp
- Minyak bekisting 0.100 Lt X Rp

6.21.2 Tenaga
- Pekerja 0.520 Oh X Rp
- Tukang 0.260 Oh X Rp
- Kepala tukang 0.026 Oh X Rp
- Mandor 0.026 Oh X Rp

Overhead cost & prof

G.10 SNI 7394 : 2008. 6.23


Memasang 1 M2 bekisting untuk balok
6.23.1 Bahan
- Kayu Kelas III 0.040 M3 X Rp
- Paku biasa 0.400 Kg X Rp
- Minyak bekisting 0.200 Lt X Rp
- Balok kayu 0.018 M3 X Rp
- Papan 0.024 M3 X Rp
- Balok 5/10 cm, panjang 4 m 0.040 M3 X Rp

6.23.2 Tenaga
- Pekerja 0.660 Oh X Rp
- Tukang 0.330 Oh X Rp
- Kepala tukang 0.033 Oh X Rp
- Mandor 0.033 Oh X Rp

Overhead cost & prof

J. PEKERJAAN SANITASI

J.23 SNI 2002. 6.29 (Pek. Sanitasi)


Memasang 1 m' pipa PVC type AW diameter 2"
6.29.1 Bahan
- Pipa PVC dia. 2" 1.200 M' X Rp
- Perlengkapan ( 35% harga pipa) 1.000 X Rp

6.29.2 Tenaga
- Pekerja 0.054 Oh X Rp
- Tukang 0.090 Oh X Rp
- Kepala tukang 0.009 Oh X Rp
- Mandor 0.0027 Oh X Rp

Overhead cost & prof

N. PEKERJAAN PENGECATAN

N.4 SNI 2002. 6.9 (Pek. Pengecatan)


1 M2 pengecatan bidang kayu baru ( 1 lapis dempul, 1 lapis cat dasar, 3 lapis cat penut
6.9.1 Bahan
- Cat meni 0.200 Kg X Rp
- Dembul kayu 0.150 Kg X Rp
- Cat dasar 0.170 Kg X Rp
- Cat penutup 2 kali 0.350 Kg X Rp

6.9.2 Tenaga
- Pekerja 0.070 Oh X Rp
- Tukang 0.105 Oh X Rp
- Kepala tukang 0.004 Oh X Rp
- Mandor 0.0025 Oh X Rp

Overhead cost & prof


ANALISA BIAYA KONSTRUKSI (ABK)
BANGUNAN GEDUNG DAN PERUMAHAN
DISTRIK MULIA

6,750,000.00 = Rp 81,000.00
75,528.57 = Rp 1,510.57
6,750,000.00 = Rp 47,250.00
Jumlah ( 1 ) = Rp 129,760.57

100,000.00 = Rp 10,000.00
140,000.00 = Rp 14,000.00
150,000.00 = Rp 1,500.00
165,000.00 = Rp 825.00
Jumlah ( 2 ) = Rp 26,325.00
Jumlah ( 1 ) + ( 2 ) = Rp 156,085.57
Overhead cost & profit 10 % = Rp 15,608.56
Total = Rp 171,694.13

100,000.00 = Rp 10,000.00
165,000.00 = Rp 8,250.00
Jumlah ( 1 ) = Rp 18,250.00
Overhead cost & profit 10 % = Rp 1,825.00
Total = Rp 20,075.00

100,000.00 = Rp 100,000.00
165,000.00 = Rp 5,280.00
Jumlah ( 1 ) = Rp 105,280.00
Overhead cost & profit 10 % = Rp 10,528.00
Total = Rp 115,808.00

100,000.00 = Rp 33,333.33
165,000.00 = Rp 1,760.00
Jumlah ( 1 ) = Rp 35,093.33
Overhead cost & profit 10 % = Rp 3,509.33
Total = Rp 38,602.66

550,000.00 = Rp 660,000.00
Jumlah ( 1 ) = Rp 660,000.00

100,000.00 = Rp 25,000.00
165,000.00 = Rp 4,125.00
Jumlah ( 2 ) = Rp 29,125.00
Jumlah ( 1 ) + ( 2 ) = Rp 689,125.00
Overhead cost & profit 10 % = Rp 68,912.50
Total = Rp 758,037.50
1,200,000.00 = Rp 1,440,000.00
48,228.57 = Rp 7,861,256.91
1,500,000.00 = Rp 780,000.00
Jumlah ( 1 ) = Rp 10,081,256.91

100,000.00 = Rp 150,000.00
140,000.00 = Rp 105,000.00
150,000.00 = Rp 11,250.00
165,000.00 = Rp 12,375.00
Jumlah ( 2 ) = Rp 278,625.00
Jumlah ( 1 ) + ( 2 ) = Rp 10,359,881.91
Overhead cost & profit 10 % = Rp 1,035,988.19
Total = Rp 11,395,870.10

1,200,000.00 = Rp 1,440,000.00
1,500,000.00 = Rp 648,000.00
Jumlah ( 1 ) = Rp 2,088,000.00

100,000.00 = Rp 78,000.00
140,000.00 = Rp 54,600.00
150,000.00 = Rp 5,850.00
165,000.00 = Rp 6,435.00
Jumlah ( 2 ) = Rp 144,885.00
Jumlah ( 1 ) + ( 2 ) = Rp 2,232,885.00
Overhead cost & profit 10 % = Rp 223,288.50
Total = Rp 2,456,173.50

48,228.57 = Rp 375,025.36
1,500,000.00 = Rp 34,500.00
Jumlah ( 1 ) = Rp 409,525.36

100,000.00 = Rp 30,000.00
140,000.00 = Rp 21,000.00
150,000.00 = Rp 2,250.00
165,000.00 = Rp 2,475.00
Jumlah ( 2 ) = Rp 55,725.00
Jumlah ( 1 ) + ( 2 ) = Rp 465,250.36
Overhead cost & profit 10 % = Rp 46,525.04
Total = Rp 511,775.40

48,228.57 = Rp 305,769.13
1,500,000.00 = Rp 18,000.00
Jumlah ( 1 ) = Rp 323,769.13
100,000.00 = Rp 30,000.00
140,000.00 = Rp 21,000.00
150,000.00 = Rp 2,250.00
165,000.00 = Rp 2,475.00
Jumlah ( 2 ) = Rp 55,725.00
Jumlah ( 1 ) + ( 2 ) = Rp 379,494.13
Overhead cost & profit 10 % = Rp 37,949.41
Total = Rp 417,443.54
48,228.57 = Rp 10,513,828.26
1,500,000.00 = Rp 780,000.00
1,500,000.00 = Rp 1,305,000.00
Jumlah ( 1 ) = Rp 12,598,828.26

100,000.00 = Rp 165,000.00
140,000.00 = Rp 35,000.00
150,000.00 = Rp 3,750.00
165,000.00 = Rp 13,200.00
Jumlah ( 2 ) = Rp 216,950.00
Jumlah ( 1 ) + ( 2 ) = Rp 12,815,778.26
Overhead cost & profit 10 % = Rp 1,281,577.83
Total = Rp 14,097,356.09

48,228.57 = Rp 482,285.70
1,500,000.00 = Rp 39,000.00
1,500,000.00 = Rp 66,000.00
Jumlah ( 1 ) = Rp 587,285.70

100,000.00 = Rp 15,000.00
140,000.00 = Rp 2,800.00
150,000.00 = Rp 300.00
165,000.00 = Rp 990.00
Jumlah ( 2 ) = Rp 19,090.00
Jumlah ( 1 ) + ( 2 ) = Rp 606,375.70
Overhead cost & profit 10 % = Rp 60,637.57
Total = Rp 667,013.27

48,228.57 = Rp 16,204,799.52
1,500,000.00 = Rp 810,000.00
1,500,000.00 = Rp 1,215,000.00
Jumlah ( 1 ) = Rp 18,229,799.52

100,000.00 = Rp 200,000.00
140,000.00 = Rp 49,000.00
150,000.00 = Rp 5,250.00
165,000.00 = Rp 165,000.00
Jumlah ( 2 ) = Rp 419,250.00
Jumlah ( 1 ) + ( 2 ) = Rp 18,649,049.52
Overhead cost & profit 10 % = Rp 1,864,904.95
Total = Rp 20,513,954.47

68,128.57 = Rp 715,349.99
78,828.57 = Rp 11,824.29
Jumlah ( 1 ) = Rp 727,174.28
100,000.00 = Rp 7,000.00
140,000.00 = Rp 9,800.00
150,000.00 = Rp 1,050.00
165,000.00 = Rp 660.00
Jumlah ( 2 ) = Rp 18,510.00
Jumlah ( 1 ) + ( 2 ) = Rp 745,684.28
Overhead cost & profit 10 % = Rp 74,568.43
Total = Rp 820,252.71
Untuk 1 Kg = Rp 82,025.27
6,750,000.00 = Rp 303,750.00
75,528.57 = Rp 22,658.57
52,828.57 = Rp 5,282.86
Jumlah ( 1 ) = Rp 331,691.43

100,000.00 = Rp 52,000.00
140,000.00 = Rp 36,400.00
150,000.00 = Rp 3,900.00
165,000.00 = Rp 4,290.00
Jumlah ( 2 ) = Rp 96,590.00
Jumlah ( 1 ) + ( 2 ) = Rp 428,281.43
Overhead cost & profit 10 % = Rp 42,828.14
Total = Rp 471,109.57

6,750,000.00 = Rp 270,000.00
75,528.57 = Rp 30,211.43
52,828.57 = Rp 10,565.71
6,750,000.00 = Rp 121,500.00
6,750,000.00 = Rp 162,000.00
6,750,000.00 = Rp 270,000.00
Jumlah ( 1 ) = Rp 864,277.14

100,000.00 = Rp 66,000.00
140,000.00 = Rp 46,200.00
150,000.00 = Rp 4,950.00
165,000.00 = Rp 5,445.00
Jumlah ( 2 ) = Rp 122,595.00
Jumlah ( 1 ) + ( 2 ) = Rp 986,872.14
Overhead cost & profit 10 % = Rp 98,687.21
Total = Rp 1,085,559.35

57,821.43 = Rp 69,385.72
20,237.50 = Rp 20,237.50
Jumlah ( 1 ) = Rp 89,623.22

100,000.00 = Rp 5,400.00
140,000.00 = Rp 12,600.00
150,000.00 = Rp 1,350.00
165,000.00 = Rp 445.50
Jumlah ( 2 ) = Rp 19,795.50
Jumlah ( 1 ) + ( 2 ) = Rp 109,418.72
Overhead cost & profit 10 % = Rp 10,941.87
Total = Rp 120,360.59

( 1 lapis dempul, 1 lapis cat dasar, 3 lapis cat penutup).

83,828.57 = Rp 16,765.71
76,728.57 = Rp 11,509.29
131,628.57 = Rp 22,376.86
131,628.57 = Rp 46,070.00
Jumlah ( 1 ) = Rp 96,721.86

100,000.00 = Rp 7,000.00
140,000.00 = Rp 14,700.00
150,000.00 = Rp 600.00
165,000.00 = Rp 412.50
Jumlah ( 2 ) = Rp 22,712.50
Jumlah ( 1 ) + ( 2 ) = Rp 119,434.36
Overhead cost & profit 10 % = Rp 11,943.44
Total = Rp 131,377.80
DAFTAR HARGA BAHAN & UPAH TENAGA KERJA
DISTRIK MULIA

A. UPAH KERJA

1 Pekerja Rp 100,000.00 / OH
2 Tukang Rp 140,000.00 / OH
3 Kepala Tukang Rp 150,000.00 / OH
4 Mandor Rp 165,000.00 / OH

B. HARGA BAHAN

1 Batu Gunung Rp 1,200,000.00 / M3


2 Batu Kali Rp 1,200,000.00 / M3
3 Pasir Urug Rp 1,500,000.00 / M3
4 Pasir Pasangan Rp 1,500,000.00 / M3
5 Pasir Beton Rp 1,500,000.00 / M3
6 Kerikil Rp 1,500,000.00 / M3
7 Timbunan Biasa Rp 550,000.00 / M3
8 Kayu Balok Rp 6,750,000.00 / M3
9 Kayu Papan Rp 6,750,000.00 / M3
10 Semen PC Rp 48,228.57 / Kg
11 Besi Beton Polos Rp 68,128.57 / Kg
12 Paku Biasa Rp 75,528.57 / Kg
13 Kawat Ikat Rp 78,828.57 / Kg
14 Meni Kayu Rp 83,828.57 / Kg
15 Cat Kayu Rp 131,628.57 / Kg
16 Dempul Kayu Rp 76,728.57 / Kg
17 Minyak bekisting Rp 52,828.57 / Ltr
18 Pipa PVC dia. 2" Rp 231,285.71 / Btg
REKAPITULASI ANALISA BIAYA KONSTRUKSI (ABK) BANGUNAN GEDUNG DAN PERUMAHAN
DISTRIK MULIA

KODE
NO. KODE SNI
ANALISA

A. PEKERJAAN PERSIAPAN

1 A.1 SNI 2002. 6.2 (Pek. Persiapan)


2 A.2 SNI 2002. 6.3 (Pek. Persiapan)
3 A.3 SNI 2002. 6.4 (Pek. Persiapan)
4 A.4 SNI 2002. 6.7 (Pek. Persiapan)
5 A.5 SNI 2002. 6.7a (Pek. Persiapan)
6 A.6 SNI 2002. 6.8 (Pek. Persiapan)
7 A.7 SNI 2002. 6.13 (Pek. Persiapan)
8 A.8 SNI 2002. 6.14 (Pek. Persiapan)

B. PEKERJAAN TANAH
9 B.1 SNI 2835 : 2008. 6.1
10 B.2 SNI 2835 : 2008. 6.2
11 B.3 SNI 2835 : 2008. 6.3
12 B.4 SNI 2835 : 2008. 6.4
13 B.5 SNI 2835 : 2008. 6.5
14 B.6 SNI 2835 : 2008. 6.6
15 B.7 SNI 2835 : 2008. 6.7
16 B.8 SNI 2835 : 2008. 6.8
17 B.9 SNI 2835 : 2008. 6.9
18 B.10 SNI 2835 : 2008. 6.10
19 B.11 SNI 2835 : 2008. 6.11
20 B.12 SNI 2835 : 2008. 6.14
21 B.13 SNI 2835 : 2008. 6.15
22 B.14 SNI 2835 : 2008. 6.15a
KODE
NO. KODE SNI
ANALISA

C. PEKERJAAN PONDASI
23 C.1 SNI 2836 : 2008. 6.1
24 C.2 SNI 2836 : 2008. 6.2
25 C.3 SNI 2836 : 2008. 6.9

D. PEKERJAAN DINDING
26 D.1 SNI 6897 : 2008. 6.20
27 D.2 SNI 6897 : 2008. 6.21

E. PEKERJAAN PLESTERAN
28 E.1 SNI 2837 : 2008. 6.2
29 E.2 SNI 2837 : 2008. 6.3
30 E.3 SNI 2837 : 2008. 6.4
31 E.4 SNI 2837 : 2008. 6.13
32 E.5 SNI 2837 : 2008. 6.14
33 E.6 SNI 2837 : 2008. 6.15
34 E.7 SNI 2837 : 2008. 6.20
35 E.8 SNI 2837 : 2008. 6.26
36 E.9 SNI 2837 : 2008. 6.27

F. PEKERJAAN KAYU
37 F.1 SNI 3434 : 2008. 6.2
38 F.2 SNI 3434 : 2008. 6.2a
39 F.3 SNI 3434 : 2008. 6.2b
40 F.4 SNI 3434 : 2008. 6.3
41 F.5 SNI 3434 : 2008. 6.5
42 F.6 SNI 3434 : 2008. 6.5a
43 F.7 SNI 3434 : 2008. 6.6
44 F.8 SNI 3434 : 2008. 6.7
KODE
NO. KODE SNI
ANALISA

45 F.9 SNI 3434 : 2008. 6.9


46 F.10 SNI 3434 : 2008. 6.10
47 F.11 SNI 3434 : 2008. 6.11
48 F.12 SNI 3434 : 2008. 6.12
49 F.13 SNI 3434 : 2008. 6.12a
50 F.14 SNI 3434 : 2008. 6.13
51 F.15 SNI 3434 : 2008. 6.15
52 F.16 SNI 3434 : 2008. 6.15a
53 F.17 SNI 3434 : 2008. 6.16
54 F.18 SNI 3434 : 2008. 6.19
55 F.19 SNI 3434 : 2008. 6.21
56 F.20 SNI 3434 : 2008. 6.21a
57 F.21 SNI 3434 : 2008. 6.21b
58 F.22 SNI 3434 : 2008. 6.21c
59 F.23 SNI 3434 : 2008. 6.21d
60 F.24 SNI 3434 : 2008. 6.23
61 F.25 SNI 3434 : 2008. 6.24
62 F.26 SNI 3434 : 2008. 6.25
63 F.27 SNI 3434 : 2008. 6.26
64 F.28 SNI 3434 : 2008. 6.26a
65 F.29 SNI 3434 : 2008. 6.26b
66 F.30 SNI 3434 : 2008. 6.27
67 F.31 SNI 3434 : 2008. 6.27a
68 F.32 SNI 3434 : 2008. 6.27b
69 F.33 SNI 3434 : 2008. 6.27c
KODE
NO. KODE SNI
ANALISA

G. PEKERJAAN BETON
70 G.1 SNI 2002. 6.1 (Pek. Beton)
71 G.2 SNI 2002. 6.1a (Pek. Beton)

72 G.3 SNI 2002. 6.4 (Pek. Beton)


73 G.4 SNI 2002. 6.13 (Pek. Beton)
74 G.5 SNI 2002. 6.13a (Pek. Beton)
75 G.6 SNI 7394 : 2008. 6.17
76 G.7 SNI 7394 : 2008. 6.20
77 G.8 SNI 7394 : 2008. 6.21
78 G.9 SNI 7394 : 2008. 6.22
79 G.10 SNI 7394 : 2008. 6.23
80 G.11 SNI 7394 : 2008. 6.24
81 G.12 SNI 7394 : 2008. 6.25
82 G.13 SNI 7394 : 2008. 6.26
83 G.14 SNI 7394 : 2008. 6.27

H. PEKERJAAN PENUTUP ATAP


84 H.1 SNI 2002. 6.32 (Pek. Atap)
85 H.2 SNI 2002. 6.36 (Pek. Atap)
86 H.3 SNI 2002. 6.38 (Pek. Atap)
87 H.4 SNI 2002. 6.39 (Pek. Atap)

I. PEKERJAAN LANGIT-LANGIT
88 I.1 SNI 2839 : 2008. 6.5
89 I.2 SNI 2839 : 2008. 6.5a
90 I.3 SNI 2839 : 2008. 6.6
91 I.4 SNI 2839 : 2008. 6.7
92 I.5 SNI 2839 : 2008. 6.8
93 I.6 SNI 2839 : 2008. 6.10
KODE
NO. KODE SNI
ANALISA

J. PEKERJAAN SANITASI
94 J.1 SNI 2002. 6.1 (Pek. Sanitasi)
95 J.2 SNI 2002. 6.2 (Pek. Sanitasi)
96 J.3 SNI 2002. 6.3 (Pek. Sanitasi)
97 J.4 SNI 2002. 6.5 (Pek. Sanitasi)
98 J.5 SNI 2002. 6.7 (Pek. Sanitasi)
99 J.6 SNI 2002. 6.7a (Pek. Sanitasi)
100 J.7
101 J.8
102 J.9 SNI 2002. 6.8 (Pek. Sanitasi)
103 J.10 SNI 2002. 6.10 (Pek. Sanitasi)
104 J.11 SNI 2002. 6.11 (Pek. Sanitasi)
105 J.12 SNI 2002. 6.16 (Pek. Sanitasi)
106 J.13 SNI 2002. 6.19 (Pek. Sanitasi)
107 J.14 SNI 2002. 6.20 (Pek. Sanitasi)
108 J.15 SNI 2002. 6.21 (Pek. Sanitasi)
109 J.16 SNI 2002. 6.22 (Pek. Sanitasi)
110 J.17 SNI 2002. 6.22a (Pek. Sanitasi)
111 J.18 SNI 2002. 6.23 (Pek. Sanitasi)
112 J.19 SNI 2002. 6.24 (Pek. Sanitasi)
113 J.20 SNI 2002. 6.25 (Pek. Sanitasi)
114 J.21 SNI 2002. 6.26 (Pek. Sanitasi)
115 J.22 SNI 2002. 6.27 (Pek. Sanitasi)
116 J.23 SNI 2002. 6.29 (Pek. Sanitasi)
117 J.24 SNI 2002. 6.31 (Pek. Sanitasi)
118 J.25 SNI 2002. 6.32 (Pek. Sanitasi)
119 J.26 SNI 2002. 6.33 (Pek. Sanitasi)
120 J.27 SNI 2002. 6.35 (Pek. Sanitasi)
121 J.28 SNI 2002. 6.35a (Pek. Sanitasi)
KODE
NO. KODE SNI
ANALISA

122 J.29 SNI 2002. 6.35b (Pek. Sanitasi)


123 J.30 SNI 2002. 6.35c (Pek. Sanitasi)
124 J.31 SNI 2002. 6.25 (Pek. Sanitasi)

K. PEKERJAAN BESI DAN ALLUMINIUM


125 K.1 SNI 7393 : 2008. 6.3
126 K.2 SNI 7393 : 2008. 6.4
127 K.3 SNI 7393 : 2008. 6.5
128 K.4 SNI 7393 : 2008. 6.10
129 K.5 SNI 7393 : 2008. 6.11
130 K.6 SNI 7393 : 2008. 6.12
131 K.7 SNI 7393 : 2008. 6.13
132 K.8 SNI 7393 : 2008. 6.15
133 K.9 SNI 7393 : 2008. 6.17
134 K.10 SNI 2002. 6.13 (Pek. Besi & Alluminium)
135 K.11 SNI 2002. 6.13a (Pek. Besi & Alluminium)
136 K.12 SNI 2002. 6.14 (Pek. Besi & Alluminium)
137 K.13 SNI 2002. 6.18 (Pek. Besi & Alluminium)
138 K.14 SNI 2002. 6.18 (Pek. Besi & Alluminium)

L. PEKERJAAN KUNCI DAN KACA


139 L.1 SNI 2002. 6.2 (Pek. Kunci & Kaca)
140 L.2 SNI 2002. 6.2a (Pek. Kunci & Kaca)
141 L.3 SNI 2002. 6.3 (Pek. Kunci & Kaca)
142 L.4 SNI 2002. 6.5 (Pek. Kunci & Kaca)
143 L.5 SNI 2002. 6.6 (Pek. Kunci & Kaca)
KODE
NO. KODE SNI
ANALISA

144 L.6 SNI 2002. 6.9 (Pek. Kunci & Kaca)


145 L.7 SNI 2002. 6.11 (Pek. Kunci & Kaca)
146 L.8 SNI 2002. 6.11a (Pek. Kunci & Kaca)
147 L.9 SNI 2002. 6.11b(Pek. Kunci & Kaca)
148 L.10 SNI 2002. 6.12 (Pek. Kunci & Kaca)
149 L.11 SNI 2002. 6.14 (Pek. Kunci & Kaca)
150 L.12 SNI 2002. 6.15 (Pek. Kunci & Kaca)
151 L.13 SNI 2002. 6.17 (Pek. Kunci & Kaca)
152 L.14 SNI 2002. 6.17a (Pek. Kunci & Kaca)
153 L.15 SNI 2002. 6.20 (Pek. Kunci & Kaca)

M. PEKERJAAN PENUTUP LANTAI DAN DINDING


154 M.1 SNI 7395 : 2008. 6.35
155 M.2 SNI 7395 : 2008. 6.35a
156 M.3 SNI 7395 : 2008. 6.35b
157 M.4 SNI 7395 : 2008. 6.36
158 M.5 SNI 7395 : 2008. 6.39
159 M.6 SNI 7395 : 2008. 6.39a
160 M.7 SNI 7395 : 2008. 6.39b
161 M.8 SNI 7395 : 2008. 6.39c
162 M.9 SNI 7395 : 2008. 6.43
163 M.10 SNI 7395 : 2008. 6.54
164 M.11 SNI 7395 : 2008. 6.54a
165 M.12 SNI 7395 : 2008. 6.54b
166 M.13 SNI 7395 : 2008. 6.54c
167 M.14 SNI 7395 : 2008. 6.55
168 M.15 SNI 7395 : 2008. 6.63
169 M.16 SNI 7395 : 2008. 6.63a
170 M.17 SNI 7395 : 2008. 6.63b
KODE
NO. KODE SNI
ANALISA

N. PEKERJAAN PENGECATAN
171 N.1 SNI 2002. 6.6 (Pek. Pengecatan)
172 N.2 SNI 2002. 6.7 (Pek. Pengecatan)
173 N.3 SNI 2002. 6.8 (Pek. Pengecatan)
174 N.4 SNI 2002. 6.9 (Pek. Pengecatan)
175 N.5 SNI 2002. 6.11 (Pek. Pengecatan)
176 N.6 SNI 2002. 6.12 (Pek. Pengecatan)
177 N.7 SNI 2002. 6.13 (Pek. Pengecatan)
178 N.8 SNI 2002. 6.14 (Pek. Pengecatan)
179 N.9 SNI 2002. 6.15 (Pek. Pengecatan)
180 N.10 SNI 2002. 6.15a (Pek. Pengecatan)
181 N.11 SNI 2002. 6.20 (Pek. Pengecatan)
182 N.12 SNI 2002. 6.20a (Pek. Pengecatan)

O. PEKERJAAN INSTALASI LISTRIK


183 O.1
184 O.2
185 O.3
186 O.4
187 O.5
188 O.6
189 O.7
190 O.8
191 O.9
192 O.10
193 O.11
194 O.12
195 O.13
KODE
NO. KODE SNI
ANALISA

P. PEKERJAAN BONGKARAN
196 P.1 BOW L.8
197 P.2 BOW L.11
198 P.3 BOW L.12

Q. ANALISA GABUNGAN
199 Q.1
200 Q.2
201 Q.3
202 Q.4
203 Q.5
204 Q.6
205 Q.7
206 Q.8
207 Q.9
208 Q.10
209 Q.11
210 Q.12
211 Q.13
SI ANALISA BIAYA KONSTRUKSI (ABK) BANGUNAN GEDUNG DAN PERUMAHAN
DISTRIK MULIA

URAIAN HARGA SATUAN (Rp)

1 M' Pagar sementara dari seng gelombang tinggi 2 m Err:509


1 M' Pagar sementara dari kawat duri tinggi 1,8 m Err:509
1 M' Pengukuran dan pemasangan bowplank 171,694.13
1 M2 Pembuatan rumah jaga/konstruksi kayu Err:509
1 M2 Pembuatan gudang semen dan alat-alat/konstruksi kayu Err:509
1 M2 Membersihkan lapangan dan perataan 20,075.00
1 M3 Bongkaran beton bertulang Err:509
1 M3 Bongkaran dinding tembok batu tela Err:509

Menggali 1 M3 tanah biasa sedalam 1 m Err:509


Menggali 1 M3 tanah biasa sedalam 2 m Err:509
Menggali 1 M3 tanah biasa sedalam 3 m Err:509
Menggali 1 M3 tanah keras sedalam 1 m 115,808.00
Menggali 1 M3 tanah cadas sedalam 1 m Err:509
Menggali 1 M3 tanah lumpur sedalam 1 m Err:509
Mengerjakan 1 M2 stripping tebing setinggi 1 m Err:509
Membuang 1 M3 tanah sejauh 15 m Err:509
Mengurug kembali 1 M3 galian 38,602.66
Memadatkan 1 M3 tanah (per 20 cm) Err:509
Mengurug 1 M3 pasir urug Err:509
Memasang 1 M2 lapisan ijuk tebal 10 cm, untuk bidang resapan Err:509
Mengurug 1 M3 sirtu padat untuk peninggian lantai bangunan Err:509
Mengurug 1 M3 tanah timbunan 758,037.50
URAIAN HARGA SATUAN (Rp)

Memasang 1 M3 pondasi batu belah, campuran 1 PC : 3 PP Err:509


Memasang 1 M3 pondasi batu belah, campuran 1 PC : 4 PP 11,395,870.10
Memasang 1 M3 batu kosong (anstamping) 2,456,173.50

Memasang 1 M2 dinding Concreate Blok (CB) 10, campuran 1 PC : 3 PP Err:509


Memasang 1 M2 dinding Concreate Blok (CB) 10, campuran 1 PC : 4 PP Err:509

Membuat 1 M2 Plesteran 1 PC : 2 PP, tebal 15 mm Err:509


Membuat 1 M2 Plesteran 1 PC : 3 PP, tebal 15 mm Err:509
Membuat 1 M2 Plesteran 1 PC : 4 PP, tebal 15 mm Err:509
Membuat 1 M2 Plesteran 1 PC : 2 PP, tebal 20 mm Err:509
Membuat 1 M2 Plesteran 1 PC : 3 PP, tebal 20 mm Err:509
Membuat 1 M2 Plesteran 1 PC : 4 PP, tebal 20 mm Err:509
Membuat 1 M2 Plesteran Skoning lebar 10 mm 1 PC : 2 PP Err:509
Membuat 1 M2 finishing siar pasangan batu kali adukan 1 PC : 2 PP Err:509
Membuat 1 M2 acian Err:509

Membuat dan memasang 1 M3 Kusen pintu dan kusen jendela 5/10 cm Err:509
Membuat dan memasang 1 M3 Gelagar, Kolom dan ring balk 10/10 cm Err:509
Membuat dan memasang 1 M3 rangka dinding 5/10 cm Err:509
Membuat dan memasang 1 M2 pintu klamp standar Err:509
Membuat dan memasang 1 M2 daun pintu panel kayu Err:509
Membuat dan memasang 1 M2 daun pintu panel kayu lapis seng plat bjls 20 Err:509
Membuat dan memasang 1 M2 pintu dan jendela kaca, kayu Err:509
Membuat dan memasang 1 M2 pintu dan jendela jelusi kayu Err:509
URAIAN HARGA SATUAN (Rp)

Membuat 1 M2 pintu kayu lapis (plywood) rangkap rangka kayu Err:509


Memasang 1 M2 jelusi kusen, kayu Err:509
Membuat 1 M2 pintu teakwood rangkap rangka kayu Err:509
Membuat 1 M2 pintu teakwood rangkap lapis formika Err:509
Membuat 1 M2 pintu teakwood rangkap lapis seng plat Err:509
Memasang 1 M3 konstruksi kuda-kuda konvensional, kayu, bentang 6 meter Err:509
Memasang 1 M3 konstruksi gording, kayu Err:509
Memasang 1 M3 konstruksi balok lantai Err:509
Memasang 1 M2 Rangka atap genteng metal Err:509
Memasang 1 M2 Rangka langit-langit, kayu Err:509
Memasang 1 M' Lisplank ukuran (3 x 20 ) cm kayu Err:509
Memasang 1 M' Lisplank ukuran 2 X (3 x 20 ) cm kayu Err:509
Memasang 1 M' Lisplank ukuran (2 x 20 ) cm kayu Err:509
Memasang 1 M' Lisplank ukuran 2 X (2 x 20 ) cm kayu Err:509
Memasang 1 M' Lisplank ukuran 2 X (2 x 20 ) cm kayu Err:509
Memasang 1 M2 rangka dinding pemisah (60 x 120) cm, kayu Err:509
Memasang 1 M2 dinding pemisah teakwood rangkap, rangka kayu Err:509
Memasang 1 M2 dinding pemisah plywood rangkap, rangka kayu Err:509
Memasang 1 M2 dinding papan 2/20 cm Err:509
Memasang 1 M2 dinding lambriziring dari papan kayu cina Err:509
Memasang 1 M2 Lantai papan 3/20 cm Err:509
Memasang 1 M2 dinding plywood ( 120 x 240 ) cm tunggal Err:509
Memasang 1 M2 dinding teakwood ( 120 x 240 ) cm tunggal Err:509
Memasang 1 M2 dinding plywood ( 120 x 240 ) cm rangkap Err:509
Memasang 1 M2 dinding teakwood ( 120 x 240 ) cm tunggal Err:509
URAIAN HARGA SATUAN (Rp)

1 M3 Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr 14,097,356.09


1 M3 Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr, untuk Concreate Err:509
Blok (CB) ukuran ( 8 x 18 x 27 ) cm
1 M2 Membuat lantai kerja beton tumbuk, 1 Pc : 3 Ps : 5 Kr, tebal 5 cm 667,013.27
1 M3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr 20,513,954.47
1 M3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr Err:509
Pembesian 10 kg dengan besi polos atau besi ulir 82,025.27
Memasang 1 M2 bekisting untuk pondasi Err:509
Memasang 1 M2 bekisting untuk sloof 471,109.57
Memasang 1 M2 bekisting untuk kolom Err:509
Memasang 1 M2 bekisting untuk balok 1,085,559.35
Memasang 1 M2 bekisting untuk lantai Err:509
Memasang 1 M2 bekisting untuk dinding Err:509
Memasang 1 M2 bekisting untuk tangga Err:509
Memasang 1 M2 jembatan untuk pengecoran beton Err:509

1 M2 pasang atap genteng metal Err:509


1 M1 pasang nok genteng metal Err:509
1 M2 pasang atap seng belombang Err:509
1 M' Pasang nok atap seng Err:509

Memasang 1 M2 langit-langit tripleks ukuran ( 120 x 240 ) cm, tebal 3 mm Err:509


Memasang 1 M2 langit-langit tripleks ukuran ( 120 x 240 ) cm, tebal 5 mm Err:509
Memasang 1 M2 langit-langit lambriziring kayu, tebal 9 mm Err:509
Memasang 1 M2 langit-langit gypsum board ukuran (1200 x 2400 x 9) mm Err:509
Memasang 1 M1 list plafon gypsum profil Err:509
Memasang 1 M1 list langit-langit kayu profil Err:509
URAIAN HARGA SATUAN (Rp)

Memasang 1 buah kloset duduk Err:509


Memasang 1 buah kloset jongkok porselen Err:509
Memasang 1 buah urinoir Err:509
Memasang 1 buah wastafel Err:509
Memasang 1 buah bak mandi fibreglass volume 0.3 M3 Err:509
Memasang 1 buah bak mandi fibreglass volume 0.11 M3 Err:509
Memasang 1 buah bak mandi fiberglass volume 0.11 M3 + Lapis keramik Err:509
Memasang 1 buah bak mandi fiberglass volume 0.3 M3 + Lapis keramik Err:509
Memasang 1 buah bak mandi batu telah volume 0.3 M3 lapis porselin Err:509
Memasang 1 buah bak beton 1 M3 Err:509
Memasang 1 buah bak mandi fibreglass volume 1 M3 Err:509
Memasang 1 buah bak kontrol pasangan batu tela ukuran 30 x 30 cm tinggi 35 cm Err:509
Memasang 1 m' pipa galvanis diameter 1/2" Err:509
Memasang 1 m' pipa galvanis diameter 3/4" Err:509
Memasang 1 m' pipa galvanis diameter 1" Err:509
Memasang 1 m' pipa galvanis diameter 1 1/2" Err:509
Memasang 1 m' pipa galvanis diameter 2" Err:509
Memasang 1 m' pipa galvanis diameter 3" Err:509
Memasang 1 m' pipa galvanis diameter 4" Err:509
Memasang 1 m' pipa PVC type AW diameter 1/2" Err:509
Memasang 1 m' pipa PVC type AW diameter 3/4" Err:509
Memasang 1 m' pipa PVC type AW diameter 1" Err:509
Memasang 1 m' pipa PVC type AW diameter 2" 120,360.59
Memasang 1 m' pipa PVC type AW diameter 3" Err:509
Memasang 1 m' pipa PVC type AW diameter 4" Err:509
Memasang 1 m' pipa PVC type AW diameter 4" Err:509
Memasang 1 bh kran diameter 1/2" Err:509
Memasang 1 bh stop kran diameter 1/2" Err:509
URAIAN HARGA SATUAN (Rp)

Memasang 1 bh stop kran diameter 3/4" Err:509


Memasang 1 bh stop kran diameter 1" Err:509
Memasang 1 bh floor drain Err:509

Mengerjakan 100 kg pekerjaan perakitan Err:509


Membuat 1 M2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku Err:509
Mengerjakan 10 cm pengelasan dengan las listrik Err:509
Memasang 1 M2 rolling door alluminium Err:509
Memasang 1 M kusen pintu alluminium Err:509
Memasang 1 M2 pintu alluminium strip lebar 8 cm Err:509
Memasang 1 M2 pintu kaca rangka alluminium Err:509
Memasang 1 M2 trali besi strip ( 2 x 3 ) mm Err:509
Memasang 1 M2 jendela nako dan tralis Err:509
1 M2 Pasang kawat harmonika Err:509
1 M2 Pasang kawat raam # 5 cm Err:509
1 M2 Pasang kawat nyamuk Err:509
1 M' Pasang talang datar seng bjls 20 Err:509
1 M' Pasang talang miring seng bjls 20 Err:509

1 buah pasang kunci tanan biasa Err:509


1 buah pasang expanyolet Err:509
1 buah pasang kunci tanan kamar mandi Err:509
1 buah pasang engsel pintu Err:509
1 buah pasang engsel jendela Err:509
URAIAN HARGA SATUAN (Rp)

1 buah pasang kait angin Err:509


1 buah pasang kunci selot Err:509
1 buah pasang grendel pintu Err:509
1 buah pasang grendel jendela Err:509
1 buah pasang pegangan pintu/door holder Err:509
1 buah pasang rel pintu dorong Err:509
1 buah pasang kunci lemari Err:509
1 M2 pasang kaca bening tebal 5 mm Err:509
1 M2 pasang kaca ryben tebal 5 mm Err:509
1 M2 pasang kaca cermin tebal 3 mm Err:509

I DAN DINDING
Memasang 1 M2 lantai keramik ukuran ( 30 x 30 ) cm Err:509
Memasang 1 M2 lantai keramik ukuran ( 40 x 40 ) cm Err:509
Memasang 1 M2 lantai keramik ukuran ( 60 x 60 ) cm Err:509
Memasang 1 M2 lantai keramik ukuran ( 20 x 20 ) cm Err:509
Memasang 1 M1 plint keramik ukuran ( 10 x 20 ) cm Err:509
Memasang 1 M1 plint keramik ukuran ( 10 x 30 ) cm Err:509
Memasang 1 M1 plint keramik ukuran ( 10 x 40 ) cm Err:509
Memasang 1 M1 plint keramik ukuran ( 10 x 60 ) cm Err:509
Memasang 1 M2 lantai marmer ukuran ( 100 x 100 ) cm Err:509
Memasang 1 M2 dinding keramik ukuran ( 20 x 20 ) cm Err:509
Memasang 1 M2 dinding keramik ukuran ( 30 x 30 ) cm Err:509
Memasang 1 M2 dinding keramik ukuran ( 40 x 40 ) cm Err:509
Memasang 1 M2 dinding keramik ukuran ( 60 x 60 ) cm Err:509
Memasang 1 M2 dinding marmer ukuran ( 100 x 100 ) cm Err:509
Memasang 1 M1 plint kayu tebal 2 cm, lebar 10 cm Err:509
Memasang 1 M1 plint kayu tebal 2 cm, lebar 20 cm Err:509
Membuat 1 M1 list propil kayu Err:509
URAIAN HARGA SATUAN (Rp)

1 M2 mendempul dan menggosok kayu Err:509


1 M2 mengecat bidang kayu lama Err:509
1 M2 pengecatan bidang kayu baru ( 1 lapis dempul, 1 lapis cat dasar, 2 lapis cat penutup). Err:509
1 M2 pengecatan bidang kayu baru ( 1 lapis dempul, 1 lapis cat dasar, 3 lapis cat penutup). 131,377.80
1 M2 pelaburan bidang kayu dengan politur Err:509
1 M2 pelaburan bidang kayu dengan cat residu Err:509
1 M2 pelaburan bidang kayu dengan vernis Err:509
1 M2 pengecatan tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup). Err:509
1 M2 pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup). Err:509
1 M2 pengecatan atap ( 1 lapis cat dasar, 2 lapis cat penutup). Err:509
1 M2 pengecatan permukaan besi dengan meni besi Err:509
1 M2 pengecatan permukaan besi Err:509

Pasang 1 titik lampu Err:509


Pasang 1 buah lampu philips SL 8 watt Err:509
Pasang 1 buah lampu philips SL 14 watt Err:509
Pasang 1 buah lampu philips SL 18 watt Err:509
Pasang 1 buah lampu philips SL 20 watt Err:509
Pasang 1 buah lampu TL 20 watt Err:509
Pasang 1 buah lampu baret Err:509
Pasang 1 buah lampu pijar Err:509
Pasang 1 buah lampu hias besar komplit Err:509
Pasang 1 buah stop kontak Err:509
Pasang 1 buah saklar tunggal Err:509
Pasang 1 buah saklar ganda Err:509
Pasang 1 buah box sekering/limit Err:509
URAIAN HARGA SATUAN (Rp)

10 M2 Menurunkan atap seng Err:509


10 M2 Bongkaran lantai papan, dinding papan dan loteng Err:509
10 M3 Bongkaran kuda-kuda, gelagar, balok lantai dan rangka plafon Err:509

1 Buah top gevel kecil Err:509


1 Buah ventilasi top gevel Err:509
Riling pagar pengaman 2,55 m Err:509
Septiktank beton 1 x 2 x 1.5 m Err:509
Peresapan 1 x 2 x 1.25 m Err:509
Septiktank drum 2 bh Err:509
1 M' Pasangan saluran air hujan uk 25 x 25 m Err:509
Pasangan tangga batu kali lebar 1,2 m tinggi 0.60 m Err:509
Tangga kayu lebar 1 m tinggi 60 cm Err:509
Buat Pantri panjang 2.4 m, lebar 0.60 m, tinggi 0.60 m Err:509
Membuat 1 M' screen penutup saluran dar besi beton lebar 45 cm Err:509
Pasangan tangga batu kali lebar 2 m tinggi 0.60 m Err:509
Pasangan tangga batu kali lebar 4 m tinggi 0.60 m Err:509
DAFTAR ANALISA BIAYA KONSTRUKSI ( ABK )
BANGUNAN GEDUNG DAN PERUMAHAN
DISTRIK MULIA

A. PEKERJAAN PERSIAPAN

B. PEKERJAAN TANAH

C. PEKERJAAN PONDASI

D. PEKERJAAN DINDING

E. PEKERJAAN PLESTERAN

F. PEKERJAAN KAYU

G. PEKERJAAN BETON

H. PEKERJAAN PENUTUP ATAP

I. PEKERJAAN LANGIT-LANGIT

J. PEKERJAAN SANITASI

K. PEKERJAAN BESI DAN ALLUMINIUM

L. PEKERJAAN KUNCI DAN KACA

M. PEKERJAAN PENUTUP LANTAI DAN DINDING

N. PEKERJAAN PENGECATAN

O. PEKERJAAN INSTALASI LISTRIK

P. PEKERJAAN BONGKARAN

Q. PEKERJAAN GABUNGAN
BIIL OF QUANTITY
KEGIATAN : PEMBANGUNAN TAMAN KOTA DAN TALUD PENCEGAH TANAH LONGSOR (DAK)
PEKERJAAN : PEMBANGUNAN TALUD PENCEGAH TANAH LONGSOR TAMAN KOTA
LOKASI : DISTRIK MULIA

NO. URAIAN PEKERJAAN KODE SAT. VOLUME

1 2 3 4 5

I. PEKERJAAN PERSIAPAN
1 Pasang bowplank A.3 M' 44.50
2 Galian tanah berbatu B4 M3 21.01
3 Urugan Tanah B.9 M3 5.25
4 Timbunan tanah B.14 M3 216.81

II. PEKERJAAN PONDASI, PENGECORAN & PASANGAN BATU


1 Pasang batu kosong C.3 M3 3.60
2 Pasangan pondasi batu kali 1 : 4 C.2 M3 16.81
3 Pasangan talud batu kali 1 : 4 C.2 M3 104.23
4 Pasang slof beton 25/30 cm, 1 : 2 : 3 G.4 M3 2.25
5 Besi beton polos G.6 Kg 264.99
6 Bekisting G.8 M2 7.50
7 Pasang kolom beton 25/30 cm, 1 : 2 : 3 G.4 M3 6.67
8 Besi beton polos G.6 Kg 785.56
9 Bekisting G.9 M2 22.23
10 Pasang ring balk 25/30 cm, 1 : 2 : 3 G.4 M3 7.43
11 Besi beton polos G.6 Kg 875.07
12 Bekisting G.10 M2 24.76
13 Plesteran sloef 1 : 3 E.2 M2 7.50
14 Plesteran kolom 1 : 3 E.2 M2 22.25
15 Plesteran ring balk 1 : 3 E.2 M2 79.20
16 Plesteran siaran mata sapi 1 :3 E.8 M2 118.62
17 Pemasangan PVC 2" (sulingan) J.23 M' 60.29
18 Pengecatan permukaan talud N.4 M2 267.00

III. PEKERJAAN AKHIR


1 Foto dokumentasi - Ls 1.00
Y
TANAH LONGSOR (DAK)
TAMAN KOTA

HARGA JUMLAH
SATUAN HARGA
( Rp ) ( Rp )
6 7

171,694.13 7,640,388.79
-
-
-
7,640,388.79

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
OWNEER ESTIMATE
KEGIATAN : PEMBANGUNAN TAMAN KOTA DAN TALUD PENCEGAH TANAH LONGSOR (DAK)
PEKERJAAN : PEMBANGUNAN TALUD PENCEGAH TANAH LONGSOR TAMAN KOTA
LOKASI : DISTRIK MULIA

NO. URAIAN

I. PEKERJAAN PERSIAPAN

II. PEKERJAAN PONDASI, PENGECORAN & PASANGAN BATU

III. PEKERJAAN AKHIR

TERBILANG : Dua milyar empat ratus tujuh puluh satu juta delapan ratus delapan puluh delapan ribu

MULIA, 2016

MENGETAHUI,
KEPALA BADAN PERENCANAAN PEMBANGUNA
KABUPATEN PUNCAK JAYA

ISAEL MOM, SH, M.Si


NIP. 19721212 199712 1 003
E
TANAH LONGSOR (DAK)
TAMAN KOTA

HARGA (Rp)

7,640,388.79

JUMLAH 7,640,388.79

PPN 10% 764,038.88

TOTAL 8,404,427.66

DIBULATKAN 8,404,000.00

ratus delapan puluh delapan ribu rupiah

MULIA, 2016

MENGETAHUI,
PERENCANAAN PEMBANGUNAN DAEARAH
KABUPATEN PUNCAK JAYA

ISAEL MOM, SH, M.Si


NIP. 19721212 199712 1 003
PEMERINTAH KABUPATEN PUNCAK JAYA
BADAN PERENCANAAN PEMBANGUNAN DAEARAH
Papua Nomor : 01 Pagaleme–Distrik Mulia, Fax/Telp : 0411-402611

OWNEER ESTIMATE
( OE )

KEGIATAN

PEMBANGUNAN TALUD PENCEGAH TANAH


LONGSOR TAMAN KOTA (PENUNJANG DAK)

PEKERJAAN :

PERENCANAAN TEKNIS PEMBANGUNAN TALUD


PENCEGAH TANAH LONGSOR TAMAN KOTA
PEMBANGUNAN TALUD PENCEGAH TANAH LONGSOR
TAMAN KOTA

LOKASI
DISTRIK MULIA

TAHUN 2016