Evacuation
Welcome to the Timings and meals
Eastwood Harris Pty Ltd Facilities
Page 1 Page 2
Course Agenda
Module 1 – Introduction
Day 3 Modules
Module 19 – Resource Optimization Purpose
Module 20 – Updating a Resourced Schedule Required Background Knowledge
Module 21 – Other Methods of Organizing Project
Data Purpose of Planning
Module 22 – Global Change
g and Utilities Project Planning Metrics
Module 23 – Managing the Enterprise Environment Planning Cycle
Module 24 – Multiple Project Scheduling Levels of Planning
Module 25 - Utilities
Monitoring and Controlling a Project
5
Page 5 Page 6
1
Purpose of the course Required Background Knowledge
Provide a method for planning, scheduling and The ability to use a personal computer and
controlling projects using Primavera, understand the fundamentals of the operating
system,
Within an established Enterprise Project database or
a blank database, Experience using application software such as
Microsoft Office and
Up to an intermediate level.
An understanding of how projects are planned,
scheduled and controlled, including understanding
the project management processes applicable to
your projects.
Page 7 Page 8
Resources Costs
Page 11 Page 12
2
Planning Plan
Techniques Used to Develop a
Cycle the Project Project Plan
Work Breakdown Structure (WBS), a hierarchical
structure which usually identifies the major deliverables
Sub-projects, allowing different organisations of
Execute schedulers to use the planning software
Work
Phase development such as Design, Procure, Install and
Test allow each phase to be broken out into more detail
as each phase approaches and more detail is available
Revise Plan
Monitor A project may be divided into Stages which do not
Progress overlap in time and Stage Plans developed before each
Stage commences
Work Packages may be created from one or WBS node
and detailed out by a contractor when the work is
Evaluate and awarded
Report
The Rolling Wave technique adds more detail to a
schedule as the work approaches and a two week look
ahead schedule is a typical example.
Page 13 Page 14
Compare progress against the original plan Resources Planning with Tracking progress with
Resources Resources
Amend the plan for scope changes etc. and
Produce management reports.
Page 17 Page 18
3
Enterprise Project Management Understanding Your Project
Primavera is an Enterprise Project Management Before you start the process of creating a project
software package that allows many projects to be schedule in Primavera, it is important to:
managed in one database Develop an understanding of the project and how it
These projects may be summarized under a will be executed, which should result in the
hierarchical structure titled the Enterprise Project development a project delivery methodology
Structure (EPS) statement
This function is similar to summarizing activities of a Create a strong WBS
project under a Work Breakdown Structure (WBS). Consider conducting a Stakeholder Analysis
Create a detailed project plan, and
Conduct a Risk Analysis.
Page 19 Page 20
Page 21 Page 22
Page 23 Page 24
4
Total Float Free Float
The Total Float is the amount of time an activity The Free Float is the amount of time an
may be delayed without delaying the end of a activity may be delayed without delaying
project.
another activity.
An activity with Total Float may delay another activity,
Displayed only in a column and
May be displayed in a column and in the Gantt Chart,
as per the thin black bar below and Is never in the negative.
May be negative.
Page 25 Page 26
Page 29 Page 30
5
Activity Early Start Constraint Activity Late Finish Constraint
An activity will no longer start on the Data This picture shows a Finish Date On or
Date when a Start On or After constraint is Before constraint assigned 4 days earlier than
assigned the calculated finish date
This is more commonly known as an Early Thus Negative Float is created, representing
Start constraint. the amount of time that needs to be caught up
This is more commonly known as a Late
Finish constraint.
Page 31 Page 32
Page 33 Page 34
6
Module 3 – Starting Up and
Navigation
Now lets get our hand dirty! Terminology Differences between Industry Versions
Logging In and the Welcome Form
The Home Workspace and the Projects Workspace
Opening One or More Projects and Opening a Portfolio
Navigating Around a Project
User Preferences - Date and Time Display
Right-clicking with the Mouse
Accessing Help
Application of Options within Forms
Closing Down
Workshop 1 – Navigating Around the Workspaces.
Page 37 Page 38
Page 39 Page 40
Saving Project and EPS Information with Notebook XML – A new Primavera PM format introduced with Primavera
Version 6.0 which is used to import data from the Project
Topics Manager module.
Workshop 2 – Creating Your Project.
Page 41 Page 42
7
Other File Types 6.0 and 6.1 Other File Types Primavera 6.2
Project (*.mpp). This is the default file format that Microsoft Project Primavera will import and/or export to the following file types:
uses to create and save files. Microsoft Project 2007 is a different
format to the 2000 – 2003 format, which is different to 98 format Microsoft Project MPP 2002/2003 is imported and exported,
Note: Primavera 6.0 and 6.1 will not import any mpp file when
but require Microsoft Project to be loaded.
Microsoft Project 2007 is installed as MSP 2007 disables this function Microsoft Project 2000/2003 and 2007 XML files are
Primavera 6.0 and 6.1 will import or export to the following file types: exported and imported by Primavera Version 6.2, removing the
Project 2000 - 2003 (*.mpp) requirement to have Microsoft Project loaded.
Microsoft Project 98 ((*.mpp)
.mpp) MPX (
(*.mpx).
.mpx). files are imported and exported by Primavera 6.2.
MPX (*.mpx). This is a text format data file created by Microsoft Primavera Project Planner P3 and SureTrak files saved in P3
Project 98 and earlier versions
format. A SureTrak project in SureTrak format should be saved in
Microsoft Project formats such as Project Database (*.mpd), Concentric (P3) format before importing.
Microsoft Access Database (*.mdb) and (*.mpt) can be imported,
however Microsoft Project is required to be installed on the computer. XLS. Primavera Version 5.0 has a new function allowing the
Primavera Project Planner P3 and SureTrak files saved in P3 format. import and export of data in Excel format.
A SureTrak project in SureTrak format should be saved in Concentric
(P3) format before importing. Note: The following Microsoft Project formats are no longer imported
XLS. Primavera Version 5.0 has a new function allowing the import by Primavera 6.2
and export of data in Excel format. Microsoft Project formats such as Project Database (*.mpd),
Microsoft Access Database (*.mdb) and (*.mpt)
Page 43 Page 44
Page 45 Page 46
Page 47 Page 48
8
Calendar Calculation Calendars Categories
• The finish date (and time) of an activity is Primavera has three categories for calendars:
calculated from the start date (and time) plus • Global – These calendars are available to all Projects
the duration over the calendar associated with and Resources,
the activity • Project – These calendars are only available to the
• Therefore, a five-day duration activity that projects they are created in,
starts at the start of the workday on a • Resource – A Resource calendar may be assigned to
Wednesday, and is associated with a five-day one or more Resources, which in turn may be
workweek calendar (with Saturday and assigned to an activity in any project,
Sunday as non-work days) will finish at the NOTE: When an activity is made Resource
end of the workday on the following Tuesday. Dependent, unlike some other software, it still
acknowledges the Activity Calendar for calculating the
start of the resource work.
Page 49 Page 50
Page 51 Page 52
Database Default Calendar, WBS and Database Default Calendar, WBS and
Project Durations – Version 6.2 & Earlier Project Durations – Version 6.2 & Earlier
The durations of all bands such as Project, WBS, and Now with the Default Calendar changed to a 7
Resources are calculated from: day/week 24 hour per day the duration of 139 days is
The Database Default Calendar and clearly misleading,
The Hours/Day setting in the Edit, User
Preferences…, Time Units tab.
The following picture show the duration of the
workshop used in this publication set at firstly 5 days
per week, 8 hours per day and a duration of 35 days The duration of the Project Summary WBS Nodes are
with an Hours/Day setting of 8 hours. also clearly misleading, the Research Node is not 31
days long.
Page 53 Page 54
9
Database Default Calendar, WBS and
Calculation of Activity Duration in
Project Durations – Version 6.2 & Earlier
There are some issues that need to be carefully Days – Version 7
considered when planning and controlling multiple In earlier version of P6 the calculation of the
projects with different calendars in one database durations in hours for all calendars was set either by
when the correct durations in days are important, the Administrator in Admin, Admin Preferences…,
Time Periods tab or by the User in the Edit, User
Primavera performs best when the all calendars in all Preferences…, Time Units tab.
the p
projects
j are set with the same hours p
per day,
y,
Primavera Version 7 has
h removed d these
h two options
If this is not possible you may consider: above and has created of a new calendar function for
Showing durations in hours only, each titled Hours per Time Period:
Creating a separate database for projects that require a
different hours per day,
Not displaying the durations against Project nodes, WBS
nodes and any other summary nodes by not checking
the Show Group Totals in the Group and Sort form,
Create a global change to put the correct duration in a
text field.
Page 55 Page 56
Page 57 Page 58
Page 59 Page 60
10
Project Breakdown Structures Project Breakdown Structures
The main purposes of the Primavera WBS function are:
Users converting from P3 and SureTrak will be
used to using Activity Codes and Activity ID User Access may be assigned at this level, so two
Codes, schedulers may open the same project and one only
change activities in WBS Nodes assigned to each
Primavera Project Manager does not have user ,
Activity ID Code, Earned Value calculations and Project Performance
They may be tempted to ignore the WBS and may be preformed at this level,
use Activity Codes instead. Progress at the WBS level may be measured with
the use of WBS Milestones,
Anticipated Dates may be assigned at the WBS
level to provide a bar when no activities have been
added to a WBS Node,
The Tracking Workspace operates down to WBS
Node level,
There are a number Standard Reports that
function at WBS Node level.
Page 61 Page 62
Page 63 Page 64
Page 65 Page 66
11
Adding Activities and Module 8 – Formatting the
Organizing Under the WBS Display
Topics:
The instructor will demonstrate the software
functions. Formatting the Project Workspace
Understanding Forms
Formatting Columns
Formatting the Bars
Row Height
Format Fonts and Font Colours
Format Colours
Format Timescale
Inserting Attachments - Text Boxes and Curtain
Workshop 6 - Formatting the Bar Chart.
Page 67 Page 68
Page 69 Page 70
Relationship Types
What is Network Logic The FS (or conventional)
dependency looks like this:
The next phase of a schedule is to add logic to
the activities,
There are two types of logic: While the SS dependency is like
Relationships (Dependencies or Logic or Links this:
between activities), and
Imposed Constraints to activity start or finish
dates. These are covered in the Constraints
chapter. The SF dependency looks like:
Page 71 Page 72
12
Leads and Lags Adding Relationships
A Lag is a duration that is applied to a dependency to
make the successor start or finish earlier or later, The instructor will demonstrate the software
functions.
The calendar that the lead or lag is calculated on is
selected in the Tools, Schedule, Options tab,
This calendar is selected for all activities in a schedule
and
The calendar may be the predecessor’s, the successor’s,
24 hour or the Project Default calendar.
Page 73 Page 74
Page 75 Page 76
Page 77 Page 78
13
Activity Constraint Types Continued
Activity Constraint Types
Other Constraint Types continued:
Other Constraint Types:
Mandatory Start sets the Early and Late
Start On initially sets the Early and Late
Start to the constraint date and therefore has Start dates and prevents float from travelling
no Total Float, but may develop Negative through the constraint,
Float, Mandatory Finish sets the Early and Late
Start On or Before more commonly called Finish dates and prevents float from travelling
an Late
L t Start
St t constraint
t i t and
d affects
ff t the
th through
h h the
h constraint,
i
activities Late Start date,
Expected Finish calculates the Remaining
Finish On and initially sets the Early and Duration of an activity and requires the check
Late Finish to the constraint date and box in the Scheduling Options form to be
therefore has no Total Float, but may develop
check before it operates,
Negative Float,
Finish On or After more commonly called an As Late as Possible consumes Free Float
Early Finish constraint and affects the and sets the Early and Late date to be as late
activities Early Finish date calculation, as possible but without delaying successor
activities and does not develop Total Float.
Continued…..
Page 79 Page 80
Page 81 Page 82
Filters
Filters
Filters reduce the number of activities that are The instructor will demonstrate the software
displayed based on a user defined criteria, functions.
They may be used for working of specific sections of a
project or providing reports on specific subject areas
Primavera does not have:
Drop down filters, or
Interactive filters, or
Project filters, but a Layout filter may be created and
associated with a Project Layout.
Page 83 Page 84
14
Module 13 – Group, Sort and Group, Sort and Layouts
Layouts
Topics: Grouping activities allows the grouping of
activities under a band on the screen,
Group and Sort Activities
Sorting activities sorts the activities within a band.
Understanding Layouts
Layouts allow the user to save all the screen
Copying a Layout To and From Another Database
g including
formatting g timescale,, columns,, grouping,
g p g,
Workshop 11 - Organizing Your Data. sorting and print settings,
Layouts DO NOT save date, time and resource
assignment formats. These are assigned in User
Preferences and apply to every layout and
workspace.
Page 85 Page 86
Page 87 Page 88
Page 89 Page 90
15
Module 15 – Tracking Progress
Tracking Progress Steps
Topics:
The main steps for monitoring progress are:
The process and understanding the date fields
Saving a Baseline schedule,
Schedule Options
Recording or marking-up progress as of a specific
Setting the Baseline date, often titled the Data Date, Status Date,
Practical Methods of Recording Progress Update Date, Current Date and As-Of-Date,
Understanding the Concepts and Updating the Schedule Updating or Updating the schedule with Actual Start
and Actual Finish dates where applicable, and
Progress Spotlight adjusting the activity’s Remaining Durations and
Suspend and Resume Percent Completes,
Scheduling the Project Scheduling, moving the Data Date to the new date
and recalculating all the activities,
Comparing Progress with Baseline
Comparing and Reporting actual progress against
Corrective Action planned progress and revising the plan and
Workshop 13 – Tracking Progress. schedule, if required.
Page 91 Page 92
Page 93 Page 94
Page 95 Page 96
16
Start and Finish Planned Dates
These are set to the Early Start when the activity The Planned Dates are very complex and their
has not started and the Actual Start when it has calculation method is outlined in the book, in
started. summary:
An “A” is placed after the date when an Actual Start When an activity is Complete or In-progress they
has been set, and match the status of the schedule before the last
An “*”is p
placed after the date when a start constraint update,
p
has been applied to the activity. When an activity has Not Started they match the
These date fields allow the Early and Actual Start and Early Start and Early Finish.
Finish dates to be displayed as expected when the
activity has not started, is in progress or complete.
Page 97 Page 98
Theses dates are used by the Apply Actuals They may be edited in the same way as Planned
Dates.
function, but only when tasks are set to Auto
Compute Actuals, and Update Progress function.
17
Ignore relationships to and from Make Open-ended Activities Critical
other projects Activities without a successor as displayed as critical
when they have float, this option makes the Late
Check this to ignore relationships/logic links Dates equal the Early Dates when an activity has no
with other projects that are not currently successor.
open, Open-ends Not Critical:
These relationships may be created between
two projects when two or more projects are
opened together,
Also activities which have been imported
with External Early Start and External Late Open-ends Critical:
Finish dates have these constraints ignored
when unchecked.
18
Retained Logic
Retained Logic and Progress • In the example following, the relationship is
Override maintained between the predecessor and successor
for the unworked portion of the activity (the
There are three options for calculating the finish Remaining Duration) and continued after the
date of the successor when the successor activity predecessor has finished,
has started before the predecessor activity is • In the following example the relationship forms part
finished, of the critical path and the predecessor has no float:
The selected option is applied to all activities in a
schedule when it is calculated,
Open the Advanced Schedule Options form by
selecting Tools, Schedule… and clicking on the
button where the options are found under When
scheduling progressed activities use:
19
Calculate float based on finish
Compute Total Float as
date of
There are three options for this calculation:
New to Primavera Version 6.2:
Start Float = Late Start – Early Start
Each project
Opened projects
24 Hour, or
Project Default Calendar.
A Role may
be assigned
A Resource ID may be This allows Timesheet
to one or
assigned as a Timesheet approval
more
approval Manager
Resources
Page 119 Page 120
20
Module 17 – Creating Roles
User and Administration Preferences and Resources
and Scheduling Options
Topics:
The instructor will demonstrate the software Understanding Resources
functions.
Creating Roles
g Resources and the Resources Workspace
Creating p
Editing Resource Calendars
Workshop 14 - Adding Roles and Resources.
21
Module 18 – Assigning Roles, Understanding Resource
Resources and Expenses Calculations and Terminology
Topics: A Resource has three principal components after it
has been assigned to an Activity:
Understanding Resource Calculations and Terminology
Quantity, in terms of Work in hours or days or
Project Workspace Resource Preferences
Material quantities required to complete the activity,
User Preferences Applicable to Assigning Resources which are referred to as Units by Primavera,
Activity Workspace Resource Preferences and Defaults The Resource Unit Rate is termed Price/Unit in
Primavera and
Assigning and Removing Roles and Resources
Cost, which is calculated from the Resource Unit Rate
Expenses x Units.
Suggested Setup for Creating a Resourced Schedule
Workshop 15 Assigning Roles and Resources to Activities.
Each Resource and Expense has the same four fields for
Costs and Units: Budget, Remaining, Actual and At
Completion, The Budget values for Costs and Units are linked to the At
When an activity is Not Started and the % Complete is zero Completion values until:
then: An Activity has been marked as Started or has a % Complete,
Budget may be linked to Remaining and At Completion and or
therefore a change to one will change the other two and they The Link Budget and At Completion for not started
will always be equal, and activities in the Project Workspace, Calculations tab is
Actual will be zero, unchecked, see the following picture,
When the activity is marked Started and would normally be N
Note:
t This
Thi this
thi function
f ti also
l unlinks
li k OOriginal
i i l and
dRRemaining
i i
In-Progress and the % Complete is between 1% and 99% Durations:
then:
Budget becomes unlinked from Remaining and At
Completion, and
At Completion = Actual + Remaining and have a link to %
Complete,
When the activity is Complete and the % Complete is
100% then:
Remaining is set to zero, and
At Completion = Actual.
Page 129 Page 130
22
Drive activity dates by default Calculations Tab
Activities – Default Price/Unit for activities without
When this option is switched OFF it is possible for a resource Price/Units assignees a rate when:
resource to calculate outside the activity duration, A resource or role does not have a rate, or
When it is switched ON the resource durations are Activity has quantities set in the Project, Status tab but no
linked to the activity duration: resources then the resource rate may be set in this tab,
Note: Be careful if you change this rate as it is linked,
The other functions in this tab affect the updating
p g of
resourced activities and are covered in the Updating a
Resourced Schedule chapter.
23
Activity Type Duration Type
The Duration Type becomes effective after a resource has
The following task types are available:
been assigned to an activity,
Task Dependent – ignores resource calendars, The Duration Type is set in the Defaults tab in the
Resource Dependent – like P3 and SureTrak Projects Workspace and all new activities are assigned
Independent Activities but acknowledges the Activity this Duration Type,
Calendar for the start of a task, The Duration Type for each new activity may be changed
Level of Effort (LOE) – similar to P3 and SureTrak in the General tab in the Activities Workspace or by
H
Hammocks k b butt may also
l span from
f the
th finish
fi i h off one task
t k di l i
displaying th
the Duration
D ti Type
T column,
l
to the start of another and span a gap, Note: The Duration Type works in conjunction with the
Start Milestone – scheduled at the start of a work Edit, User Preferences, Calculations, Resource
period and has a start date and time and no finish date Assignments option.
and time,
Finish Milestone – scheduled at the finish of a work
period and has a finish date and time and no start date
and time,
WBS Summary Activity – spans all other activities
with the same or lower level WBS code, the same as a
Page 139P3 and SureTrak WBS Summary Activity. Page 140
24
Setup for Creating a Resourced Assigning Roles, Resources
Schedule and Expenses
The simplest calculation options should be used as a
default, and more complex options considered only when
there is a specific scheduling requirement, The instructor will demonstrate the software
It is important to set all the parameters before the
functions.
activities are added otherwise a lot of time is wasted
changing parameters on a number of activities:
Set the Units/Time format in the User Preferences, Time
Units tab,
Set the Resource Assignments option in the User
Preferences form Calculations tab,
Set the default Activity Type in the Project Workspace,
Defaults tab,
Set the default Duration Type in the Project Workspace,
Defaults tab,
Set the default Percent Complete Type in the Project
Workspace, Defaults tab,
Set the default Resource Assignment Defaults in the
Project Workspace, Resource tab.
Page 145 Page 146
Module 19 – Resource
Optimization Why Optimise Resources
Topics:
Reviewing Resource Loading The schedule may be resource optimized to:
Editing the Resource Usage Spreadsheet Reduce peaks and smooth the resource
Methods of Resolving Resource Peaks and Conflicts requirements, thus reducing the mobilization and
Resource Levelling demobilization costs, or to reduce the demand for
site facilities,, or
R
Resource L
Levelling
lli F
Function
ti
Levelling Examples Reduce resource demand to the available number of
resources, or
Resource Shifts
Guidelines for Levelling Reduce demand to an available cash flow when a
project is financed on income.
What to Look For if Resources Are Not Levelling
Resource Curves
Workshop 16 – Resource Optimization.
25
Module 20 – Updating a
Resource Optimization Resourced Schedule
The instructor will demonstrate the software Topics:
functions.
Understanding Budget Values and Baseline Projects
Store Period Performance
Understanding the Current Data Date
Information Required to Update a Resourced Schedule
Project Workspace Defaults for Updating a Resourced Schedule
Activity Workspace - Percent Complete Types
Using Steps to Calculate Activity Percent Complete
Updating the Schedule
Updating Resources and Updating Expenses
Workshop 17 – Updating a Resourced Schedule.
26
Understanding the Current Data
Baseline Project and Values
Date
A Baseline project is a complete copy of a project The Current Data Date is the date that divides the
including the relationships, resource assignments and past from the future in the schedule. It is not normally
expenses, in the future but is often in the recent past due to the
time it may take to collect the information required to
The Baseline values are values against which project update the schedule,
progress
p g is measured. All these values may
y be read Actual Costs and Quantities/Hours or Actual Work
by and compared with the current project values and occur before the data date,
show variances from the original plan,
Costs and Quantities/Hours to Complete or Work
A Baseline would normally be created prior to to Complete are scheduled after the Data Date,
updating a project for the first time and
Actual Duration is calculated from the Actual Start
The Primavera Variance columns use Baseline data to the Current Data Date,
from Baseline Projects to calculate variances. Remaining Duration is the duration required to
complete an activity. The Early Finish date of an in-
progress activity is normally calculated from the
Current Data Date and the Remaining Duration.
Page 157 Page 158
27
Project Workspace Calculations Project Workspace Calculations
Tab Resource Assignments Section Tab Resource Assignments Section
When updating Actual Units or Costs. There are two Update units when costs change on resource assignments.
options: With this option checked a change in Costs will recalculate the Units,
Add Actual to Remaining. When Actual Costs are entered, With this option unchecked, a change in costs may be made independently
the At Completion increases by the amount of the Actual Costs, of units after units have been changed,
Subtract Actual from At Completion. When Actual Costs are Link Actual and Actual This Period Units and Cost. With this
entered, the At Complete does not change and the To option checked, when you enter an Actual this period, the Actual
p
Complete is reduced by
y the value of the Actual,, to date will be calculated by increasing the original value by the
value
l off the
th Actual
A t l this
thi period.
i d
Recalculate Actual Units and Cost when duration %
complete changes. This option links the % Complete of Alternatively, you may enter the Actual to date and Primavera will
calculate the Actual this period. When unchecked, the two fields are
Duration Type activities to the Actual and To Complete, unlinked and you may enter any figure in each field. This option is
thus an increase in % Complete will increase the Actual and grayed out if the project is not open and is used to fix errors in data
decrease the To Complete values. entry when Period Actuals are being recorded.
28
Updating a Resourced
Store Period Performance
Schedule
This new function to Primavera Version 5.0 enables: The instructor will demonstrate the software
The creation of user definable financial periods, say functions.
monthly or weekly, and
The ability to record the actual and earned costs and
quantities for each period,
Therefore, actual costs and quantities which span
over more than one past period will be accurately
reflected per period in all reports,
If Store Period Performance is not used then the
actuals are spread equally over the actual duration of
an activity, which may not accurately reflect when
the work performed and what was achieved in each
period,
These Periods apply to all projects in the database.
29
Module 22 – Global Change Introduction into Global
and Utilities Change and Utilities
Topics:
Global Change is a facility for changing more than one
The Basic Concepts of Global Change
data item in one step. Examples of uses of Global
Specifying the Change Statements Change are:
Examples of Simple Global Changes
Assigning Resources to Roles,
Selecting the Activities for the Global Change
Increasing or decreasing durations of selected activities by
Temporary Values and Global Change Functions a factor,
Reflection Projects Creating new activity descriptions by placing activity codes
Advanced Scheduling Options at the beginning or at the end of the original description
Audit Trail Columns Removing constraints,
Excel Import and Export Tool Changing Calendars.The instructor will demonstrate the
Project Import and Export and Check In and Check Out software functions.
Workshop 19 – Global Change.
30
Multiple Project Baseline Multiple Project Scheduling
The instructor will demonstrate the software
functions.
Review Expectations
Complete Feedback Sheet
Have we met your expectations?