HARGA
No. URAIAN KODE SAT. ROYALTY JARAK
(Rp) ( km )
Quarry tanah
biasa
Quarry tanah 12 km
halaman 1
padas
9 km
batu belah, sirtu
& pasir urug
15 km
Quarry tanah
biasa
Quarry tanah 12 km
padas
Quarry
pasir beton
halaman 2
ANALISA HARGA DASAR SATUAN BAHAN
I. Asumsi
1 Menggunakan alat berat
2 Kondisi jalan : sedang
3 Jarak quarry ke lokasi base camp L
4 Harga satuan dasar pasir beton (quarry) bahan 1.
5 Harga satuan dasar excavator 80-140 HP alat 33.
6 Harga satuan dasar dump truck 40 ton alat 30.
7 Berat volume pasir beton Bil
III. Perhitungan
3.a excavator 80-140 HP alat 33.
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi alat Fa
Waktu siklus - Menggali / memuat T1
- Lain-lain T2
Ts1
Kap. Prod. / jam = V x Fb x Fa x 60 Q1
Ts1
Biaya excavator / m³ = (1 : Q1) x alat 33. biaya alat 33.
3.b dump truck 40 ton alat 30.
Kapasitas bak V
Faktor efisiensi alat Fa
Kecepatan rata-rata bermuatan v1
Kecepatan rata-rata kosong v2
Waktu siklus - Muat = (V x 60)/Q1 x Bil) T1
- Waktu tempuh isi = (L/v1) x 60 T2
- Waktu tempuh kosong = (L/v2) x 60 T3
- Lain-lain T4
Ts2
Kapasitas Produksi / Jam = V x Fa x 60 Q2
Ts2 x Bil
Biaya dump truck / m³ = (1 : Q2) x alat 30. biaya alat 30.
IV. Harga Satuan Dasar Bahan Pasir Beton (Quarry - Base Camp)
= bahan 1.+biaya alat 33.+biaya alat 30. bahan 2.
Dibulatkan : bahan 2.
halaman 3
Jenis : Pasir beton (quarry - lokasi pekerjaan)
Lokasi : Quarry
Tujuan : Lokasi pekerjaan
I. Asumsi
1 Menggunakan alat berat
2 Kondisi jalan : sedang
3 Jarak Quarry ke lokasi pekerjaan L
4 Harga satuan dasar pasir beton (quarry) bahan 1.
5 Harga satuan dasar excavator 80-140 HP alat 33.
6 Harga satuan dasar dump truck 40 ton alat 30.
7 Berat volume pasir beton Bil
III. Perhitungan
3.a excavator 80-140 HP alat 33.
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi alat Fa
Waktu siklus - Menggali / memuat T1
- Lain-lain T2
Ts1
Kap. Prod. / jam = V x Fb x Fa x 60 Q1
Ts1
Biaya excavator / m³ = (1 : Q1) x alat 33. biaya alat 33.
3.b dump truck 40 ton alat 30.
Kapasitas bak V
Faktor efisiensi alat Fa
Kecepatan rata-rata bermuatan v1
Kecepatan rata-rata kosong v2
Waktu siklus - Muat = (V x 60)/Q1 x Bil) T1
- Waktu tempuh isi = (L/v1) x 60 T2
- Waktu tempuh kosong = (L/v2) x 60 T3
- Lain-lain T4
Ts2
Kapasitas Produksi / Jam = V x Fa x 60 Q2
Ts2 x Bil
Biaya dump truck / m³ = (1 : Q2) x alat 30. biaya alat 30.
IV. Harga Satuan Dasar Bahan Pasir Beton (Quarry - Lokasi Pekerjaan)
= bahan 1.+biaya alat 33.+biaya alat 30. bahan 3.
Dibulatkan : bahan 3.
halaman 4
Jenis : Pasir beton (base camp - lokasi pekerjaan)
Lokasi : Base camp
Tujuan : Lokasi pekerjaan
I. Asumsi
1 Menggunakan alat berat
2 Kondisi jalan : sedang
3 Jarak base camp ke lokasi pekerjaan L
4 Harga satuan dasar pasir beton (quarry - base camp) bahan 2.
5 Harga satuan dasar wheel loader 1,0-1,6 m³ alat 58.
6 Harga satuan dasar dump truck 7,5 ton alat 32.
7 Berat isi volume pasir beton Bil
III. Perhitungan
3.a wheel loader 1,0-1,6 m³ alat 58.
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi Alat Fa
Waktu sklus - Muat T1
- Lain-lain T2
Ts1
Kapasitas Produksi / Jam = V x Fb x Fa x 60 Q2
Ts1
Biaya wheel loader / m³ = (1 : Q1) x alat 58. biaya alat 58.
3.b dump truck 7,5 ton alat 32.
Kapasitas bak V
Faktor efisiensi alat Fa
Kecepatan rata-rata bermuatan v1
Kecepatan rata-rata kosong v2
Waktu siklus - Muat = (V x 60)/(Q1 x Bil) T1
- Waktu tempuh isi = (L/v1) x 60 T1
- Waktu tempuh kosong = (L/v2) x 60 T2
- Lain-lain T4
Ts2
Kapasitas Produksi / Jam = V x Fa x 60 Q2
Ts2 x Bil
Biaya dump truck / m³ = (1 : Q2) x alat 32. biaya alat 32.
IV. Harga Satuan Dasar Bahan Pasir Beton (Base Camp - Lokasi Pekerjaan)
= alat 58.+alat 32.+biaya alat 32. bahan 4.
Dibulatkan : bahan 4.
halaman 5
Jenis : Batu kali (quarry - base camp)
Lokasi : Quarry
Tujuan : Base camp
I. Asumsi
1 Menggunakan alat berat
2 Kondisi jalan : sedang
3 Jarak Quarry ke base camp L
4 Harga satuan dasar batu kali (quarry) bahan 5.
5 Harga satuan dasar excavator 80-140 HP alat 33.
6 Harga satuan dasar dump truck 7,5 ton alat 32.
7 Berat volume batu kali Bil
III. Perhitungan
3.a excavator 80-140 HP alat 33.
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi alat Fa
Waktu siklus - Menggali / memuat T1
- Lain-lain T2
Ts1
Kap. Prod. / jam = V x Fb x Fa x 60 Q1
Ts1
Biaya excavator / m³ = (1 : Q1) x alat 33. biaya alat 33.
3.b dump truck 7,5 ton alat 32.
Kapasitas bak V
Faktor efisiensi alat Fa
Kecepatan rata-rata bermuatan v1
Kecepatan rata-rata kosong v2
Waktu siklus - Muat = (V x 60)/(Q1 x Bil) T1
- Waktu tempuh isi = (L/v1) x 60 T2
- Waktu tempuh kosong = (L/v2) x 60 T3
- Lain-lain T4
Ts2
Kapasitas Produksi / Jam = V x Fa x 60 Q2
Ts2 x Bil
Biaya dump truck / m³ = (1 : Q2) x alat 32. biaya alat 32.
IV. Harga satuan dasar bahan batu kali (quarry - base camp)
= alat 33.+alat 32.+biaya alat 32. bahan 6.
Dibulatkan : bahan 6.
halaman 6
Jenis : Batu belah (quarry - base camp)
Lokasi : Quarry
Tujuan : Lokasi pekerjaan
I. Asumsi
1 Menggunakan alat berat
2 Kondisi jalan : sedang
3 Jarak quarry ke lokasi pekerjaan L
4 Harga satuan dasar batu belah (quarry) bahan 7.
5 Harga satuan dasar excavator 80-140 HP alat 33.
6 Harga satuan dasar dump truck 7,5 ton alat 32.
7 Harga satuan dasar wheel loader 1,0-1,6 m³ alat 58.
8 pekerja upah 1.
9 Berat volume batu belah Bil
III. Perhitungan
3.a excavator 80-140 HP alat 33.
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi alat Fa
Waktu siklus - Menggali / memuat T1
- Lain-lain T2
Ts1
Kap. Prod. / jam = V x Fb x Fa x 60 Q1
Ts1
Biaya excavator / m³ = (1 : Q1) x alat 33. biaya alat 33.
3.b wheel loader 1,0-1,6 m³ alat 58.
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi Alat Fa
Waktu sklus - Muat T1
- Lain-lain T2
Ts1
Kapasitas Produksi / Jam = V x Fb x Fa x 60 Q2
Ts1
Biaya wheel loader / m³ = (1 : Q1) x alat 58. biaya alat 58.
3.c dump truck 7,5 ton alat 32.
Kapasitas bak V
Faktor efisiensi alat Fa
Kecepatan rata-rata bermuatan v1
Kecepatan rata-rata kosong v2
Waktu siklus - Muat = (V x 60)/(Q1 x Bil) T1
- Waktu tempuh isi = (L/v1) x 60 T2
- Waktu tempuh kosong = (L/v2) x 60 T3
- Lain-lain T4
Ts2
Kapasitas Produksi / Jam = V x Fa x 60 Q3
Ts2 x Bil
Biaya dump truck / m³ = (1 : Q2) x alat 32. biaya alat 32.
halaman 7
3.d PEKERJA upah 1.
Produksi menentukan : Excavator Q1
Hasil galian batu / hari = Q1 x 7 Jam Qt
Kebutuhan Pekerja P
Biaya Pekerja / M3 =
{ (7 Jam x P) : Qt } x upah 1. biaya upah 1.
IV. Harga satuan dasar bahan batu belah (quarry - base camp)
= bahan 7.+biaya alat 33.+biaya alat 58.+biaya alat 32.+biaya upah 1. bahan 8.
Dibulatkan : bahan 8.
halaman 8
Jenis : Batu belah (quarry - lokasi pekerjaan)
Lokasi : Quarry
Tujuan : Lokasi pekerjaan
I. Asumsi
1 Menggunakan alat berat
2 Kondisi jalan : sedang
3 Jarak quarry ke lokasi pekerjaan L
4 Harga satuan dasar batu belah (quarry) bahan 7.
5 Harga satuan dasar excavator 80-140 HP alat 33.
6 Harga satuan dasar dump truck 7,5 ton alat 32.
7 Harga satuan dasar wheel loader 1,0-1,6 m³ alat 58.
8 pekerja upah 1.
9 Berat volume batu belah Bil
III. Perhitungan
3.a excavator 80-140 HP alat 33.
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi alat Fa
Waktu siklus - Menggali / memuat T1
- Lain-lain T2
Ts1
Kap. Prod. / jam = V x Fb x Fa x 60 Q1
Ts1
Biaya excavator / m³ = (1 : Q1) x alat 33. biaya alat 33.
3.b wheel loader 1,0-1,6 m³ alat 58.
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi Alat Fa
Waktu sklus - Muat T1
- Lain-lain T2
Ts1
Kapasitas Produksi / Jam = V x Fb x Fa x 60 Q2
Ts1
Biaya wheel loader / m³ = (1 : Q1) x alat 58. biaya alat 58.
3.c dump truck 7,5 ton alat 32.
Kapasitas bak V
Faktor efisiensi alat Fa
Kecepatan rata-rata bermuatan v1
Kecepatan rata-rata kosong v2
Waktu siklus - Muat = (V x 60)/(Q1 x Bil) T1
- Waktu tempuh isi = (L/v1) x 60 T2
- Waktu tempuh kosong = (L/v2) x 60 T3
- Lain-lain T4
Ts2
Kapasitas Produksi / Jam = V x Fa x 60 Q3
Ts2 x Bil
Biaya dump truck / m³ = (1 : Q2) x alat 32. biaya alat 32.
halaman 9
3.d PEKERJA upah 1.
Produksi menentukan : Excavator Q1
Hasil galian batu / hari = Q1 x 7 Jam Qt
Kebutuhan Pekerja P
Biaya Pekerja / M3 =
{ (7 Jam x P) : Qt } x upah 1. biaya upah 1.
IV. Harga satuan dasar bahan batu belah (quarry - lokasi pekerjaan)
= bahan 7.+biaya alat 33.+biaya alat 58.+biaya alat 32.+biaya upah 1. bahan 9.
Dibulatkan : bahan 9.
halaman 10
Jenis : Batu belah (base camp - lokasi pekerjaan)
Lokasi : Base camp
Tujuan : Lokasi pekerjaan
I. Asumsi
1 Menggunakan alat berat
2 Kondisi jalan : sedang
3 Jarak base camp ke lokasi pekerjaan L
4 Harga satuan dasar batu belah (quarry - base camp) bahan 8.
5 Harga satuan dasar wheel loader 1,0-1,6 m³ alat 58.
6 Harga satuan dasar dump truck 7,5 ton alat 32.
7 Berat isi volume pasir beton Bil
III. Perhitungan
3.a wheel loader 1,0-1,6 m³ alat 58.
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi Alat Fa
Waktu sklus - Muat T1
- Lain-lain T2
Ts1
Kapasitas Produksi / Jam = V x Fb x Fa x 60 Q2
Ts1
Biaya wheel loader / m³ = (1 : Q1) x alat 58. biaya alat 58.
3.b dump truck 7,5 ton alat 32.
Kapasitas bak V
Faktor efisiensi alat Fa
Kecepatan rata-rata bermuatan v1
Kecepatan rata-rata kosong v2
Waktu siklus - Muat = (V x 60)/(Q1 x Bil) T1
- Waktu tempuh isi = (L/v1) x 60 T1
- Waktu tempuh kosong = (L/v2) x 60 T2
- Lain-lain T4
Ts2
Kapasitas Produksi / Jam = V x Fa x 60 Q2
Ts2 x Bil
Biaya dump truck / m³ = (1 : Q2) x alat 32. biaya alat 32.
IV. Harga satuan dasar bahan batu belah (base camp - lokasi pekerjaan)
= alat 58.+alat 32.+biaya alat 32. bahan 10.
halaman 11
Jenis : Sirtu (quarry - base camp)
Lokasi : Quarry
Tujuan : Base camp
I. Asumsi
1 Menggunakan alat berat
2 Kondisi jalan : sedang
3 Jarak Quarry ke lokasi Base Camp L
4 Harga satuan dasar sirtu (quarry) bahan 11.
5 Harga satuan dasar excavator 80-140 HP alat 33.
6 Harga satuan dasar dump truck 7,5 ton alat 32.
7 Berat volume sirtu Bil
III. Perhitungan
3.a excavator 80-140 HP alat 33.
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi alat Fa
Waktu siklus - Menggali / memuat T1
- Lain-lain T2
Ts1
Kap. Prod. / jam = V x Fb x Fa x 60 Q1
Ts1
Biaya excavator / m³ = (1 : Q1) x alat 33. biaya alat 33.
3.b dump truck 7,5 ton alat 32.
Kapasitas bak V
Faktor efisiensi alat Fa
Kecepatan rata-rata bermuatan v1
Kecepatan rata-rata kosong v2
Waktu siklus - Muat = (V x 60)/Q1 x Bil) T1
- Waktu tempuh isi = (L/v1) x 60 T2
- Waktu tempuh kosong = (L/v2) x 60 T3
- Lain-lain T4
Ts2
Kapasitas Produksi / Jam = V x Fa x 60 Q2
Ts2 x Bil
Biaya dump truck / m³ = (1 : Q2) x alat 32. biaya alat 32.
halaman 12
Jenis : Sirtu (quarry - lokasi pekerjaan)
Lokasi : Quarry
Tujuan : Lokasi pekerjaan
I. Asumsi
1 Menggunakan alat berat
2 Kondisi jalan : sedang
3 Jarak quarry ke lokasi pekerjaan L
4 Harga satuan dasar sirtu (quarry) bahan 11.
5 Harga satuan dasar excavator 80-140 HP alat 33.
6 Harga satuan dasar dump truck 7,5 ton alat 32.
7 Berat volume sirtu Bil
III. Perhitungan
3.a excavator 80-140 HP alat 33.
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi alat Fa
Waktu siklus - Menggali / memuat T1
- Lain-lain T2
Ts1
Kap. Prod. / jam = V x Fb x Fa x 60 Q1
Ts1
Biaya excavator / m³ = (1 : Q1) x alat 33. biaya alat 33.
3.b dump truck 7,5 ton alat 32.
Kapasitas bak V
Faktor efisiensi alat Fa
Kecepatan rata-rata bermuatan v1
Kecepatan rata-rata kosong v2
Waktu siklus - Muat = (V x 60)/(Q1 x Bil) T1
- Waktu tempuh isi = (L/v1) x 60 T2
- Waktu tempuh kosong = (L/v2) x 60 T3
- Lain-lain T4
Ts2
Kapasitas Produksi / Jam = V x Fa x 60 Q2
Ts2 x Bil
Biaya dump truck / m³ = (1 : Q2) x alat 32. biaya alat 32.
halaman 13
Jenis : Sirtu (base camp - lokasi pekerjaan)
Lokasi : Base camp
Tujuan : Lokasi pekerjaan
I. Asumsi
1 Menggunakan alat berat
2 Kondisi jalan : sedang
3 Jarak base camp ke lokasi pekerjaan L
4 Harga satuan dasar sirtu (quarry - base camp) bahan 12.
5 Harga satuan dasar wheel loader 1,0-1,6 m³ alat 58.
6 Harga satuan dasar dump truck 7,5 ton alat 32.
7 Berat isi volume pasir beton Bil
III. Perhitungan
3.a wheel loader 1,0-1,6 m³ alat 58.
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi Alat Fa
Waktu sklus - Muat T1
- Lain-lain T2
Ts1
Kapasitas Produksi / Jam = V x Fb x Fa x 60 Q2
Ts1
Biaya wheel loader / m³ = (1 : Q1) x alat 58. biaya alat 58.
3.b dump truck 7,5 ton alat 32.
Kapasitas bak V
Faktor efisiensi alat Fa
Kecepatan rata-rata bermuatan v1
Kecepatan rata-rata kosong v2
Waktu siklus - Muat = (V x 60)/(Q1 x Bil) T1
- Waktu tempuh isi = (L/v1) x 60 T1
- Waktu tempuh kosong = (L/v2) x 60 T2
- Lain-lain T4
Ts2
Kapasitas Produksi / Jam = V x Fa x 60 Q2
Ts2 x Bil
Biaya dump truck / m³ = (1 : Q2) x alat 32. biaya alat 32.
IV. Harga satuan dasar bahan sirtu (base camp - lokasi pekerjaan)
= alat 58.+alat 32.+biaya alat 32. bahan 14.
halaman 14
Jenis : Pasir urug (quarry - base camp)
Lokasi : Quarry
Tujuan : Base camp
I. Asumsi
1 Menggunakan alat berat
2 Kondisi jalan : sedang
3 Jarak quarry ke lokasi base camp L
4 Harga satuan dasar pasir urug (quarry) bahan 15.
5 Harga satuan dasar excavator 80-140 HP alat 33.
6 Harga satuan dasar dump truck 20 ton alat 31.
7 Berat volume pasir urug Bil
III. Perhitungan
3.a excavator 80-140 HP alat 33.
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi alat Fa
Waktu siklus - Menggali / memuat T1
- Lain-lain T2
Ts1
Kap. Prod. / jam = V x Fb x Fa x 60 Q1
Ts1
Biaya excavator / m³ = (1 : Q1) x alat 33. biaya alat 33.
3.b dump truck 20 ton alat 31.
Kapasitas bak V
Faktor efisiensi alat Fa
Kecepatan rata-rata bermuatan v1
Kecepatan rata-rata kosong v2
Waktu siklus - Muat = (V x 60)/Q1 x Bil) T1
- Waktu tempuh isi = (L/v1) x 60 T2
- Waktu tempuh kosong = (L/v2) x 60 T3
- Lain-lain T4
Ts2
Kapasitas Produksi / Jam = V x Fa x 60 Q2
Ts2 x Bil
Biaya dump truck / m³ = (1 : Q2) x alat 31. biaya alat 31.
IV. Harga satuan dasar bahan pasir urug (quarry - base camp)
= alat 33.+alat 31.+biaya alat 31. bahan 16.
halaman 15
Jenis : Pasir urug (quarry - lokasi pekerjaan)
Lokasi : Quarry
Tujuan : Lokasi pekerjaan
I. Asumsi
1 Menggunakan alat berat
2 Kondisi jalan : sedang
3 Jarak quarry ke lokasi pekerjaan L
4 Harga satuan dasar pasir urug (quarry) bahan 15.
5 Harga satuan dasar excavator 80-140 HP alat 33.
6 Harga satuan dasar dump truck 7,5 ton alat 32.
7 Berat volume pasir urug Bil
III. Perhitungan
3.a excavator 80-140 HP alat 33.
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi alat Fa
Waktu siklus - Menggali / memuat T1
- Lain-lain T2
Ts1
Kap. Prod. / jam = V x Fb x Fa x 60 Q1
Ts1
Biaya excavator / m³ = (1 : Q1) x alat 33. biaya alat 33.
3.b dump truck 7,5 ton alat 32.
Kapasitas bak V
Faktor efisiensi alat Fa
Kecepatan rata-rata bermuatan v1
Kecepatan rata-rata kosong v2
Waktu siklus - Muat = (V x 60)/(Q1 x Bil) T1
- Waktu tempuh isi = (L/v1) x 60 T1
- Waktu tempuh kosong = (L/v2) x 60 T2
- Lain-lain T4
Ts2
Kapasitas Produksi / Jam = V x Fa x 60 Q2
Ts2 x Bil
Biaya dump truck / m³ = (1 : Q2) x alat 32. biaya alat 32.
IV. Harga satuan dasar bahan pasir urug (quarry - lokasi pekerjaan)
= alat 33.+alat 32.+biaya alat 32. bahan 17.
halaman 16
Jenis : Pasir urug (base camp - lokasi pekerjaan)
Lokasi : Base camp
Tujuan : Lokasi pekerjaan
I. Asumsi
1 Menggunakan alat berat
2 Kondisi jalan : sedang
3 Jarak base camp ke lokasi pekerjaan L
4 Harga satuan dasar pasir urug (quarry - base camp) bahan 16.
5 Harga satuan dasar wheel loader 1,0-1,6 m³ alat 58.
6 Harga satuan dasar dump truck 7,5 ton alat 32.
7 Berat isi volume pasir beton Bil
III. Perhitungan
3.a wheel loader 1,0-1,6 m³ alat 58.
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi Alat Fa
Waktu sklus - Muat T1
- Lain-lain T2
Ts1
Kapasitas Produksi / Jam = V x Fb x Fa x 60 Q2
Ts1
Biaya wheel loader / m³ = (1 : Q1) x alat 58. biaya alat 58.
3.b dump truck 7,5 ton alat 32.
Kapasitas bak V
Faktor efisiensi alat Fa
Kecepatan rata-rata bermuatan v1
Kecepatan rata-rata kosong v2
Waktu siklus - Muat = (V x 60)/(Q1 x Bil) T1
- Waktu tempuh isi = (L/v1) x 60 T1
- Waktu tempuh kosong = (L/v2) x 60 T2
- Lain-lain T4
Ts2
Kapasitas Produksi / Jam = V x Fa x 60 Q2
Ts2 x Bil
Biaya dump truck / m³ = (1 : Q2) x alat 32. biaya alat 32.
IV. Harga satuan dasar bahan sirtu (base camp - lokasi pekerjaan)
= alat 58.+alat 32.+biaya alat 32. bahan 14.
halaman 17
Jenis : Tanah biasa (quarry - lokasi pekerjaan)
Lokasi : Quarry
Tujuan : Lokasi pekerjaan
I. Asumsi
1 Menggunakan alat berat
2 Kondisi jalan : sedang
3 Jarak quarry ke lokasi pekerjaan L
4 Harga satuan dasar tanah biasa (quarry) bahan 19.
5 Harga satuan dasar excavator 80-140 HP alat 33.
6 Harga satuan dasar dump truck 7,5 ton alat 32.
7 Berat volume tanah biasa Bil
III. Perhitungan
3.a excavator 80-140 HP alat 33.
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi alat Fa
Waktu siklus - Menggali / memuat T1
- Lain-lain T2
Ts1
Kap. Prod. / jam = V x Fb x Fa x 60 Q1
Ts1
Biaya excavator / m³ = (1 : Q1) x alat 33. biaya alat 33.
3.b dump truck 7,5 ton alat 32.
Kapasitas bak V
Faktor efisiensi alat Fa
Kecepatan rata-rata bermuatan v1
Kecepatan rata-rata kosong v2
Waktu siklus - Muat = (V x 60)/(Q1 x Bil) T1
- Waktu tempuh isi = (L/v1) x 60 T1
- Waktu tempuh kosong = (L/v2) x 60 T2
- Lain-lain T4
Ts2
Kapasitas Produksi / Jam = V x Fa x 60 Q2
Ts2 x Bil
Biaya dump truck / m³ = (1 : Q2) x alat 32. biaya alat 32.
IV. Harga satuan dasar bahan tanah biasa (quarry - lokasi pekerjaan)
= alat 33.+alat 32.+biaya alat 32. bahan 20.
halaman 18
Jenis : Tanah padas (quarry - lokasi pekerjaan)
Lokasi : Quarry
Tujuan : Lokasi pekerjaan
I. Asumsi
1 Menggunakan alat berat
2 Kondisi jalan : sedang
3 Jarak quarry ke lokasi pekerjaan L
4 Harga satuan dasar tanah padas (quarry) bahan 21.
5 Harga satuan dasar excavator 80-140 HP alat 33.
6 Harga satuan dasar dump truck 7,5 ton alat 32.
7 Berat volume tanah padas Bil
III. Perhitungan
3.a excavator 80-140 HP alat 33.
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi alat Fa
Waktu siklus - Menggali / memuat T1
- Lain-lain T2
Ts1
Kap. Prod. / jam = V x Fb x Fa x 60 Q1
Ts1
Biaya Excavator / M3 = (1 : Q1) x RpE10 biaya alat 33.
3.b dump truck 7,5 ton alat 32.
Kapasitas bak V
Faktor efisiensi alat Fa
Kecepatan rata-rata bermuatan v1
Kecepatan rata-rata kosong v2
Waktu siklus - Muat = (V x 60)/(Q1 x Bil) T1
- Waktu tempuh isi = (L/v1) x 60 T1
- Waktu tempuh kosong = (L/v2) x 60 T2
- Lain-lain T4
Ts2
Kapasitas Produksi / Jam = V x Fa x 60 Q2
Ts2 x Bil
Biaya Dump Truck / M3 = (1 : Q2) x RpE08 biaya alat 32.
IV. Harga satuan dasar bahan tanah padas (quarry - lokasi pekerjaan)
= alat 33.+alat 32.+biaya alat 32. bahan 22.
halaman 19
PERATURAN WALIKOTA SEMARANG
KETERANGAN
Quarry
Quarry ke Base camp
Quarry ke Lokasi pekerjaan
Base camp ke Lokasi pekerjaan
Quarry
Quarry ke Base camp
Quarry
Quarry ke Base camp
Quarry ke Lokasi pekerjaan
Base camp ke Lokasi pekerjaan
Quarry
Quarry ke Base camp
Quarry ke Lokasi pekerjaan
Base camp ke Lokasi pekerjaan
Quarry
Quarry ke Base camp
Quarry ke Lokasi pekerjaan
Base camp ke Lokasi pekerjaan
Quarry
Quarry ke Lokasi pekerjaan
Quarry
Quarry ke Lokasi pekerjaan
Quarry tanah
biasa
Radius wilayah
lokasi pekerjaan
12 km
halaman 20
Quarry tanah
padas
9 km
Quarry tanah
biasa
Radius wilayah
lokasi pekerjaan
12 km
Quarry tanah
padas
Quarry
pasir beton
halaman 21
NALISA HARGA DASAR SATUAN BAHAN
HARGA
KOEF. SAT. SATUAN
(Rp.)
83.33 km
1.00 m³ 85,416.00
1.00 jam 749,012.00
1.00 jam 784,494.00
1.69 ton/m³
0.90 m³
0.90 -
0.85 -
0.40 menit
0.10 menit
0.50 menit
82.62 m³/jam
9,065.75 rupiah
40.00 ton
0.85 -
30.00 km/jam
60.00 km/jam
17.19 menit
166.66 menit
83.33 menit
0.10 menit
267.28 menit
4.52 m³/jam
173,704.18 Rupiah
268,185.93 Rupiah
268,100.00 Rupiah
halaman 22
HARGA
KOEF. SAT. SATUAN
(Rp.)
106.59 km
1.00 m³ 85,416.00
1.00 jam 749,012.00
1.00 jam 784,494.00
1.69 ton/m³
0.90 m³
0.90 -
0.85 -
0.40 menit
0.10 menit
0.50 menit
82.62 m³/jam
9,065.75 rupiah
40.00 ton
0.85 -
30.00 km/jam
60.00 km/jam
17.19 menit
213.18 menit
106.59 menit
0.10 menit
337.06 menit
3.58 m³/jam
219,054.17 rupiah
313,535.91 rupiah
313,500.00 rupiah
halaman 23
HARGA
KOEF. SAT. SATUAN
(Rp.)
24.26 km
1.00 m³ 268,100.00
1.00 jam 506,005.00
1.00 jam 384,386.00
1.60 ton/m³
1.50 m³
1.00 -
0.83 -
0.30 menit
0.10 menit
0.40 menit
186.75 m³/jam
1,435.61 rupiah
7.50 ton
0.83 -
40.00 km/jam
60.00 km/jam
1.51 menit
36.39 menit
24.26 menit
1.00 menit
63.16 menit
3.70 m³/jam
103,994.82 rupiah
373,530.43 rupiah
373,500.00 rupiah
halaman 24
HARGA
KOEF. SAT. SATUAN
(Rp.)
9.00 km
1.00 m³ 105,000.00
1.00 jam 749,012.00
1.00 jam 384,386.00
1.44 ton/m³
0.80 m³
0.75 -
0.83 -
0.25 menit
0.10 menit
0.35 menit
85.37 m³/jam
8,773.57 rupiah
7.50 ton
0.83 -
40.00 km/jam
60.00 km/jam
3.66 menit
13.50 menit
9.00 menit
1.00 menit
27.16 menit
9.55 m³/jam
40,251.01 rupiah
154,024.58 rupiah
154,000.00 rupiah
halaman 25
HARGA
KOEF. SAT. SATUAN
(Rp.)
9.00 km
1.00 m³ 150,000.00
1.00 jam 749,012.00
1.00 jam 384,386.00
1.00 jam 506,005.00
1.00 hari 0.00
1.60 ton/m3
0.80 m³
0.75 -
0.83 -
0.50 menit
0.20 menit
0.70 menit
42.69 m³/jam
17,547.14 rupiah
1.50 m³
0.75 -
0.83 -
0.30 menit
0.20 menit
0.50 menit
112.05 m³/jam
4,515.89 rupiah
7.50 ton
0.83 -
40.00 km/jam
60.00 km/jam
6.59 menit
13.50 menit
9.00 menit
1.00 menit
30.09 menit
7.76 m³/jam
49,545.32 rupiah
halaman 26
42.69 m³/jam
298.80 m³/7jam
15.00 orang
0.00 rupiah
221,608.34 rupiah
221,600.00 rupiah
halaman 27
HARGA
KOEF. SAT. SATUAN
(Rp.)
33.26 km
1.00 m³ 150,000.00
1.00 jam 749,012.00
1.00 jam 384,386.00
1.00 jam 506,005.00
1.00 hari 0.00
1.60 ton/m3
0.80 m³
0.75 -
0.83 -
0.50 menit
0.20 menit
0.70 menit
42.69 m³/jam
17,547.14 rupiah
1.50 m³
0.75 -
0.83 -
0.30 menit
0.20 menit
0.50 menit
112.05 m³/jam
4,515.89 rupiah
7.50 ton
0.83 -
40.00 km/jam
60.00 km/jam
6.59 menit
49.89 menit
33.26 menit
1.00 menit
90.74 menit
2.57 m³/jam
149,413.64 rupiah
halaman 28
42.69 m³/jam
298.80 m³/7jam
15.00 orang
0.00 rupiah
321,476.66 rupiah
321,400.00 rupiah
halaman 29
HARGA
KOEF. SAT. SATUAN
(Rp.)
24.26 km
1.00 m³ 221,600.00
1.00 jam 506,005.00
1.00 jam 384,386.00
1.69 ton/m³
1.50 m³
1.00 -
0.83 -
0.50 menit
0.20 menit
0.70 menit
106.71 m³/jam
2,076.57 rupiah
7.50 ton
0.83 -
40.00 km/jam
60.00 km/jam
2.50 menit
36.39 menit
24.26 menit
1.00 menit
64.15 menit
3.45 m³/jam
111,564.94 rupiah
335,241.51 rupiah
335,200.00 rupiah
halaman 30
HARGA
KOEF. SAT. SATUAN
(Rp.)
9.00 km
1.00 m³ 71,458.00
1.00 jam 749,012.00
1.00 jam 384,386.00
1.51 ton/m³
0.80 m³
0.90 -
0.83 -
0.50 menit
0.50 menit
1.00 menit
35.86 m³/jam
20,889.45 rupiah
7.50 ton
0.83 -
40.00 km/jam
60.00 km/jam
8.31 menit
13.50 menit
9.00 menit
1.00 menit
31.81 menit
7.78 m³/jam
49,435.23 rupiah
141,782.68 rupiah
141,700.00 rupiah
halaman 31
HARGA
KOEF. SAT. SATUAN
(Rp.)
33.26 km
1.00 m³ 71,458.00
1.00 jam 749,012.00
1.00 jam 384,386.00
1.51 ton/m³
0.80 m³
0.90 -
0.83 -
0.50 menit
0.20 menit
0.70 menit
51.22 m³/jam
14,622.61 rupiah
7.50 ton
0.83 -
40.00 km/jam
60.00 km/jam
5.82 menit
49.89 menit
33.26 menit
1.00 menit
89.97 menit
2.75 m³/jam
139,811.16 rupiah
225,891.77 rupiah
225,800.00 rupiah
halaman 32
HARGA
KOEF. SAT. SATUAN
(Rp.)
24.26 km
1.00 m³ 141,700.00
1.00 jam 506,005.00
1.00 jam 384,386.00
1.69 ton/m³
1.50 m³
1.00 -
0.83 -
0.50 menit
0.20 menit
0.70 menit
106.71 m³/jam
1,327.84 rupiah
7.50 ton
0.83 -
40.00 km/jam
60.00 km/jam
2.50 menit
36.39 menit
24.26 menit
1.00 menit
64.15 menit
3.45 m³/jam
111,564.94 rupiah
254,592.79 rupiah
254,500.00 rupiah
halaman 33
HARGA
KOEF. SAT. SATUAN
(Rp.)
9.00 km
1.00 m³ 50,000.00
1.00 jam 749,012.00
1.00 jam 645,949.00
1.42 ton/m³
0.80 m³
0.90 -
0.83 -
0.50 menit
0.20 menit
0.70 menit
51.22 m³/jam
14,622.61 rupiah
20.00 ton
0.83 -
40.00 km/jam
60.00 km/jam
16.50 menit
13.50 menit
9.00 menit
1.00 menit
40.00 menit
17.54 m³/jam
36,835.33 rupiah
101,457.95 rupiah
101,400.00 rupiah
halaman 34
HARGA
KOEF. SAT. SATUAN
(Rp.)
33.26 km
1.00 m³ 50,000.00
1.00 jam 749,012.00
1.00 jam 384,386.00
1.42 ton/m³
0.80 m³
0.90 -
0.83 -
0.50 menit
0.20 menit
0.70 menit
51.22 m³/jam
14,622.61 rupiah
7.50 ton
0.83 -
40.00 km/jam
60.00 km/jam
6.19 menit
49.89 menit
33.26 menit
1.00 menit
90.34 menit
2.91 m³/jam
132,016.92 rupiah
196,639.54 rupiah
196,600.00 rupiah
halaman 35
HARGA
KOEF. SAT. SATUAN
(Rp.)
24.26 km
1.00 m³ 101,400.00
1.00 jam 506,005.00
1.00 jam 384,386.00
1.69 ton/m³
1.50 m³
1.00 -
0.83 -
0.75 menit
0.50 menit
1.25 menit
59.76 m³/jam
1,696.79 rupiah
7.50 ton
0.83 -
40.00 km/jam
60.00 km/jam
4.46 menit
36.39 menit
24.26 menit
1.00 menit
66.11 menit
3.34 m³/jam
114,974.76 rupiah
218,071.55 rupiah
218,000.00 rupiah
halaman 36
HARGA
KOEF. SAT. SATUAN
(Rp.)
22.09 km
1.00 m³ 35,000.00
1.00 jam 749,012.00
1.00 jam 384,386.00
1.60 ton/m³
0.80 m³
1.00 -
0.83 -
0.32 menit
0.32 menit
0.64 menit
62.25 m³/jam
12,032.32 rupiah
7.50 ton
0.83 -
40.00 km/jam
60.00 km/jam
4.52 menit
33.14 menit
22.09 menit
1.00 menit
60.74 menit
3.84 m³/jam
100,021.58 rupiah
147,053.90 rupiah
147,000.00 rupiah
halaman 37
HARGA
KOEF. SAT. SATUAN
(Rp.)
25.59 km
1.00 m³ 62,500.00
1.00 jam 749,012.00
1.00 jam 384,386.00
1.60 ton/m³
0.80 m³
1.00 -
0.83 -
0.32 menit
0.32 menit
0.64 menit
62.25 m³/jam
12,032.32 rupiah
7.50 ton
0.83 -
40.00 km/jam
60.00 km/jam
4.52 menit
38.39 menit
25.59 menit
1.00 menit
69.49 menit
3.36 m³/jam
114,429.62 rupiah
188,961.94 rupiah
188,900.00 rupiah
halaman 38
LAMPIRAN II
PERATURAN WALI
NOMOR :
TENTANG
STANDARISASI HA
DAN ALAT SERTA
PEKERJAAN UNTU
PEMBANGUNAN P
TAHUN ANGGARA
URAIAN SATUAN
1 2 3
I. TENAGA
1. Pekerja OH
2. Tukang Batu OH
3. Tukang Kayu OH
4. Tukang Besi OH
5. Tukang Besi Konstruksi OH
6. Tukang Pipa OH
7. Tukang Las Biasa OH
8. Tukang Cat OH
9. Tukang Vibrator OH
10. Tukang erection OH
11. Tukang Las Konstruksi OH
12. Tukang Khusus Alumunium OH
13. Tukang gali OH
14. Tukang aspal OH
15. Tukang listrik OH
16. Kepala Tukang OH
17. Mandor OH
18. Juru ukur OH
19. Operator alat berat OH
20. Operator pompa OH
21. Mekanik alat berat OH
22. Pembantu operator alat berat OH
23. Pembantu mekanik alat berat OH
24. Koordinator driller OH
halaman 39
URAIAN SATUAN
1 2 3
25. Driller OH
26. Pembantu driller OH
27. Crew driller OH
28. Ahli geologist OH
29. Administrasi bor OH
30. Sopir OH
31. Supir kendaraan < 2 ton (termasuk sedan) OH
32. Kenek OH
halaman 40
URAIAN SATUAN
1 2 3
30. Batu pecah 1/2 m³
31. Batu pecah 2/3 m³
32. Batu pecah 3/5 m³
33. Batu pecah 5/7 m³
34. Batu paras m³
35. Batu tempel hitam m³
36. Koral bulat m³
37. Batu alam andesit non bakar m²
38. Batu alam andesit bakar m²
39. Batu candi m²
40. Batu putih m²
41. Batu putih breksi m²
42. Batu sikat kg
MATERIAL KAYU
1. Kayu jati (balok) m³
2. Kayu jati (papan) m³
3. Kayu kamper (balok) m³
4. Kayu kamper (papan) m³
5. Kayu bengkirai (balok) m³
6. Kayu bengkirai (papan) m³
7. Kayu kruing (balok) m³
8. Kayu kruing (papan) m³
9. Kayu kelapa m³
10. Kayu bekisting m³
11. Kayu perancah m³
12. Dolken kayu jati Ø 10 cm batang
13. Dolken kayu galam Ø 8-10 cm, pjg 3 m batang
14. Bambu Ø 6 - 8 cm, pjg 6m batang
15. Bambu Ø 10 cm panjang 600 cm batang
16. Bambu cerucuk Ø 10 cm panjang 600 cm batang
17. Bambu cerucuk Ø 15 cm panjang 600 cm batang
18. Kayu balok utk bowplank,pagar dan kantor sementara m3
19. Kayu papan untuk bowplank m3
20. Kayu bengkirai (balok kaso 5x7) m3
21. Kayu bengkirai (balok reng 2x3) m3
22. Kayu bengkirai (balok reng 3x4) m3
23. Kayu kamper (balok kaso 5x7) m3
24. Kayu kamper (balok reng 2x3) m3
25. Kayu kamper (balok reng 3x4) m3
26. Kayu Sengon (balok) m3
halaman 41
URAIAN SATUAN
1 2 3
27. Kayu Sengon (papan) m3
28. Kayu Meranti (balok) m3
29. Kayu Meranti (papan) m3
30. Kayu terentang (bekisting) m3
31. List kayu profil m'
32. Teakwood 4 mm (90x220) lembar
33. Teakwood 4 mm (120x240) lembar
34. Teakwood 9 mm (90x210) lembar
35. Plywood 9 mm (120x240) lembar
36. Plywood 12 mm (120x240) lembar
37. Phenol film 12mm lembar
38. Multiplek tebal 18 mm lembar
39. Multiplek tebal 12 mm lembar
39. Multiplek tebal 0,9 cm lembar
40. Multiplek tebal 0,6 cm lembar
41. Formika lembar
42. Tripleks t=4mm, 120x240 cm lembar
halaman 42
URAIAN SATUAN
1 2 3
MATERIAL PIPA PVC & HDPE
1. Pipa PVC tipe AW Ø 1/2" panjang 4 m batang
2. Pipa PVC tipe AW Ø 3/4" panjang 4 m batang
3. Pipa PVC tipe AW Ø 1" panjang 4 m batang
4. Pipa PVC tipe AW Ø 1 1/2" panjang 4 m batang
5. Pipa PVC tipe AW Ø 2" panjang 4 m batang
6. Pipa PVC tipe AW Ø 21/2" panjang 4 m batang
7. Pipa PVC tipe AW Ø 3" panjang 4 m batang
8. Pipa PVC tipe AW Ø 4" panjang 4 m batang
9. Pipa PVC tipe D Ø 1 1/4" panjang 4 m batang
10. Pipa PVC tipe D Ø 1 1/2" panjang 4 m batang
11. Pipa PVC tipe D Ø 2" panjang 4 m batang
12. Pipa PVC tipe D Ø 2 1/2" panjang 4 m batang
13. Pipa PVC tipe D Ø 3" panjang 4 m batang
14. Pipa PVC tipe D Ø 4" panjang 4 m batang
15. Pipa PVC tipe D Ø 5" panjang 4 m batang
16. Pipa PVC tipe D Ø 6" panjang 4 m batang
17. Pipa PVC tipe D Ø 8" panjang 4 m batang
18. Pipa PVC tipe D Ø 10" panjang 4 m batang
19. Pipa PVC tipe D Ø 12" panjang 4 m batang
20. PVC Ø 1/2" s 10 tekanan nominal 10 bar (1,0 mpa) 4m batang
21. PVC Ø 3/4" s 10 tekanan nominal 10 bar (1,0 mpa) 4m batang
22. PVC Ø 1" s 10 tekanan nominal 10 bar (1,0 mpa) 4m batang
23. PVC Ø 1 1/4" s 10 tekanan nominal 10 bar (1,0 mpa) 4m batang
24. PVC Ø 1 1/5" s 10 tekanan nominal 10 bar (1,0 mpa) 6m batang
25. PVC Ø 2" s 12,5 tekanan nominal 10 bar (1,0 mpa) 6m batang
26. PVC Ø 3" s 12,5 tekanan nominal 10 bar (1,0 mpa) 6m batang
27. PVC Ø 4" s 12,5 tekanan nominal 10 bar (1,0 mpa) 6m batang
28. PVC Ø 6" s 12,5 tekanan nominal 10 bar (1,0 mpa) 6m batang
29. PVC Ø 8" s 12,5 tekanan nominal 10 bar (1,0 mpa) 6m batang
30. Pipa PVC tipe D Ø 2" m'
31. Assesoris PVC m¹
32. Pipa HDPE 40/33 mm m¹
halaman 43
URAIAN SATUAN
1 2 3
6. Pipa galvanis medium B Ø 3" panjang 6 m batang
7. Pipa galvanis medium B Ø 4" panjang 6 m batang
8. Pipa galvanis medium B Ø 5" panjang 6 m batang
9. Pipa galvanis medium B Ø 6" panjang 6 m batang
10. Pipa galvanis medium B Ø 8" panjang 6 m batang
11. Pipa galvanis medium A Ø 1/2" panjang 6 m batang
12. Pipa galvanis medium A Ø 3/4" panjang 6 m batang
13. Pipa galvanis medium A Ø 1" panjang 6 m batang
14. Pipa galvanis medium A Ø 1 1/2" panjang 6 m batang
15. Pipa galvanis medium A Ø 2" panjang 6 m batang
16. Pipa galvanis medium A Ø 3" panjang 6 m batang
17. Pipa galvanis medium A Ø 4" panjang 6 m batang
18. Pipa galvanis medium A Ø 5" panjang 6 m batang
19. Pipa galvanis medium A Ø 6" panjang 6 m batang
20. Pipa galvanis medium A Ø 8" panjang 6 m batang
21. Assesoris galvanis m¹
halaman 44
URAIAN SATUAN
1 2 3
11. Jaring Kawat Baja dilas kg
12. Baja Tahan Karat ( Stainless Steel ) kg
13. Kawat galvanis Ø 3 mm kg
14. Kawat galvanis Ø 4 mm kg
15. Kawat galvanis Ø 5 mm kg
16. Kawat beton kg
17. Paku kg
18. Paku sekrup kg
19. Paku payung kg
20. Paku pancing 6x23 kg
21. Paku hak panj 15cm kg
22. Kawat las listrik kg
23. Kawat nyamuk m3
24. Saringan pasir m'
25. Sekrup kait buah
26. Kawat duri m'
27. Kawat bronjong kg
28. Kawat nyamuk nylon m2
29. Besi lis kaca (1 x 1) cm m'
30. Dinabolt dia 12mm (10-15cm) buah
31. Lapisan hot deep galvanis kg
MATERIAL PAVING
1. Paving block 6 cm abu-abu K-200 m²
2. Paving block 6 cm warna K-200 m²
3. Paving block 6 cm abu-abu K-300 m²
4. Paving block 6 cm warna K-300 m²
5. Paving block 8 cm abu-abu K-300 m²
6. Paving block 8 cm warna K-300 m²
7. Paving block 8 cm abu-abu K-400 m²
8. Paving block 8 cm warna K-400 m²
9. Paving block 10 cm abu-abu K-400 m²
10. Paving block 10 cm warna K-400 m²
11. Kanstin K-200, 10x20x50 cm buah
12. Kerb (13/16x30x50) K-200 tipe A buah
13. Kerb (18/21x30x50) K-200 tipe B buah
MATERIAL DRAINASE
1. Buis beton Ø 20 cm buah
2. Buis beton Ø 30 cm buah
halaman 45
URAIAN SATUAN
1 2 3
3. Buis beton Ø 40 cm buah
4. Buis beton Ø 50 cm buah
5. Buis beton Ø 60 cm buah
6. Buis beton Ø 70 cm buah
7. Buis beton Ø 80 cm buah
8. Buis beton Ø 100 cm buah
9. Got Normal U-20 buah
10. Got Normal U-30 buah
11. Got Normal U-40 buah
12. Got Normal U-60 buah
13. U - Ditch 60 x 60, panjang 120 cm, K-350, fabrikasi. unit
14. U - Ditch 60 x 80, panjang 120 cm, K-350, fabrikasi. unit
15. U - Ditch 80 x 80, panjang 120 cm, K-350, fabrikasi. unit
16. U - Ditch 80 x 100, panjang 120 cm, K-350, fabrikasi. unit
17. U - Ditch 100 x 100, panjang 120 cm, K-350, fabrikasi. unit
18. U - Ditch 120 x 120, panjang 120 cm, K-350, fabrikasi. unit
19. Penutup U - Ditch 20, panjang 60 cm, K-350, fabrikasi unit
20. Penutup U - Ditch 30, panjang 60 cm, K-350, fabrikasi unit
21. Tutup U-Ditch 60, t=10,0 cm,p=60 cm, beban ringan unit
22. Tutup U-Ditch 60, t=14,2 cm,p=60 cm, beban berat unit
23. Tutup U-Ditch 80, t=10,0 cm,p=60 cm, beban ringan unit
24. Tutup U-Ditch 80, t=15,2 cm,p=60 cm, beban berat unit
25. Tutup U-Ditch 100, t=12,0 cm,p=60 cm, beban ringan unit
26. Tutup U-Ditch 100, t=15,2 cm,p=60 cm, beban berat unit
27. Tutup U-Ditch 120, t=12,0 cm,p=60 cm, beban ringan unit
28. Tutup U-Ditch 120, t=15,2 cm,p=60 cm, beban berat. unit
29. Box Culvert 80 x 80, p=100 cm, K-350, beban ringan unit
30. Box Culvert 80 x 80, p=100 cm, K-350, beban berat unit
halaman 46
URAIAN SATUAN
1 2 3
31. Box Culvert 100 x 100, p=100 cm, K-350, beban ringan unit
32. Box Culvert 100 x 100, p=100 cm, K-350, beban berat unit
33. Box Culvert 120 x 120, p=100 cm, K-350, beban ringan unit
34. Box Culvert 120 x 120, p=100 cm, K-350, beban berat unit
35. Besi UNP Double 200x75x7 mm +siku+mb+pl strip m¹
36. Besi UNP Double 150x75x5 mm +siku+mb+pl strip m¹
37. Besi UNP Double 120x55x4 mm +siku+mb+pl strip m¹
38. Besi UNP Double 100x50x3 mm +siku+mb+pl strip m¹
39. Besi UNP Double 80x45x3 mm +siku+mb+pl strip m¹
40. Besi L Double 100x100x9 mm +pl simpul+mb m¹
41. Besi L Double 90x90x8 mm +pl simpul+mb m¹
42. Besi L Double 80x80x7,5 mm +pl simpul+mb m¹
43. Besi L Double 70x70x6,5 mm +pl simpul+mb m¹
44. Besi UNP Double 200x75x7 mm +plat 4mm+angker m¹
45. Besi UNP Double 150x75x5 mm +plat 4mm+angker m¹
46. Besi UNP Double 120x55x4 mm +plat 4mm+angker m¹
47. Besi UNP Double 100x50x3 mm +plat 4mm+angker m¹
48. Besi UNP Double 80x45x3 mm +plat 4mm+angker m¹
49. Besi L Double 100x100x9 mm +plat pengaku+angker m¹
50. Besi L Double 90x90x8 mm +plat pengaku+angker m¹
51. Besi L Double 80x80x7,5 mm +plat pengaku+angker m¹
52. Besi L Double 70x70x6,5 mm +plat pengaku+angker m¹
53. Plat pintu 10 mm + rangka besi kanal U120 m2
54. Plat pintu 10 mm + rangka besi kanal U100 m2
55. Plat pintu 8 mm + rangka besi kanal U80 m2
56. Plat pintu 8 mm + rangka besi L 50x50x5 m2
57. Mur baut SUS 304 stainless steel (penjepit karet) buah
58. Karet perapat m¹
59. Plat penjepit karet m¹
60. Plat peluncur SUS 304 stainless steel m¹
61. Plat peluncur kuningan m¹
62. Roda gigi piringan buah
63. Roda gigi nanasan buah
64. AS transmisi m¹
65. Mur kuningan Ø 4" buah
66. Mur kuningan Ø 3,5" buah
67. Mur besi Ø 4" buah
68. Lakher Ø 4" buah
69. Stang draft diameter 2,5" + mur baut m¹
70. Stang Pemutar Type A (bulat+dudukan+mb) m¹
halaman 47
URAIAN SATUAN
1 2 3
71. Stang Pemutar Type B m¹
72. Stel ring m¹
73. Cat kapal kg
74. Pelumas liter
75. Penyetelan dan Centering Pintu m¹
halaman 48
URAIAN SATUAN
1 2 3
22. Tiang pancang pratekan pracetak spun square piles 450x450 mm m¹
23. Sheetpile type FPC.220.500 m¹
24. Sheetpile type FPC.320.500 m¹
25. Sheetpile type CCSP W.325.1000 Kelas A m¹
26. Sheetpile type CCSP W.325.1000 Kelas B m¹
27. Sheetpile type CCSP W.350.1000 Kelas A m¹
28. Sheetpile type CCSP W.350.1000 Kelas B m¹
29. Sheetpile type CCSP W.400.1000 Kelas A m¹
30. Sheetpile type CCSP W.400.1000 Kelas B m¹
31. Sheetpile type CCSP W.450.1000 Kelas A m¹
32. Sheetpile type CCSP W.450.1000 Kelas B m¹
33. Sheetpile type CCSP W.500.1000 Kelas A m¹
34. Sheetpile type CCSP W.500.1000 Kelas B m¹
35. Sheetpile type CCSP W.600.1000 Kelas A m¹
36. Sheetpile type CCSP W.600.1000 Kelas B m¹
37. Triangle Pile 280 m¹
38. Triangle Pile 300 m¹
39. Triangle Pile 320 m¹
40. Voided slab CTC=97 cm, L=8,6 cm,H=57 cm, K-500 buah
41. Voided slab CTC=97 cm, L=10,6 cm,H=57 cm, K-500 buah
42. Voided slab CTC=97 cm, L=12,6 cm,H=57 cm, K-500 buah
43. Panel beton pracetak 5x50x213 cm buah
44. Kolom beton pracetak buah
halaman 49
URAIAN SATUAN
1 2 3
16. ATBL ( loko : AMP ) ton
17. ATB ( loko : AMP ) ton
18. AC-BC ( loko : AMP ) ton
19. AC-WC ( loko : AMP ) ton
20. HRS ( loko : AMP ) ton
21. Sand Sheet / LATASIR ) ( loko : AMP ) ton
22. AC-Base ( loko : AMP ) ton
23. HRS-Base ( loko : AMP ) ton
24. Inlet drain uk. 28 x 39 cm (tipe vertikal) Pabrikasi buah
halaman 50
URAIAN SATUAN
1 2 3
30. Asbes gelombang kecil 4mm (210x105) lembar
31. Asbes gelombang kecil 4mm (180x105) lembar
32. Asbes gelombang kecil 4mm (150x105) lembar
33. Asbes gelombang besar 6mm (300x102) lembar
34. Asbes gelombang besar 6mm (270x102) lembar
35. Asbes gelombang besar 6mm (240x102) lembar
36. Asbes gelombang besar 6mm (210x102) lembar
37. Asbes gelombang besar 6mm (180x102) lembar
38. Fibre glass (jabes) 180x92 cm lembar
39. Fibre glass (jabes) 200x92 cm lembar
40. Fibre glass (jabes) 180x105 cm lembar
41. Bubungan beton press buah
42. Bubungan asbes kecil buah
43. Bubungan asbes besar buah
44. Alumunium gelombang tebal 0,55 buah
45. Nok standar 40x18 buah
46. Genteng aspal lembar
47. Bitumen tekstur genting lembar
48. Listplang tekstur kayu buah
49. Listplang papan kalsiboard buah
MATERIAL PLAFOND
1. Akustik ukuran 30 x 30 cm lembar
2. Akustik ukuran 30 x 60 cm lembar
3. Asbes 1,00 x 1,00 m lembar
4. Gypsum Board (120 cm x 240 cm x 9 mm) lembar
5. Gypsum Board (120 cm x 240 cm x 12 mm) lembar
6. Pelat asbes tebal 3,5 mm lembar
7. Pelat asbes tebal 4 mm lembar
8. GRCboard (120 cm x 240 cm x 6 mm) m2
9. GRCboard (120 cm x 240 cm x 5 mm) m2
10. Listplank GRC (20 cm x 244 cm x 9 mm ) m2
11. List gypsum profil m'
halaman 51
URAIAN SATUAN
1 2 3
6. Keramik 40 x 40 cm buah
7. Granit tile 60 x 60 cm( double loading ) buah
8. Granit tile 40 x 40 cm ( double loading ) buah
9. Granit tile 30 x 30 cm ( double loading ) buah
10. Granit tile unpolish / anti skid m2
11. Guiding Block Warna t = 5 cm m2
12. Plint granit 10cm x 40cm buah
13. Plint granit 10cm x 30cm buah
14. Plint keramik 10 x 20 cm buah
15. Plint keramik 5 x 20 cm buah
16. Plint keramik 10 x 30 cm buah
17. Batako ukuran 20 x 40 x 10 cm buah
18. Marmer m2
19. Parquet jati m2
20. Carpet m2
halaman 52
URAIAN SATUAN
1 2 3
24. Compound gypsum kg
25. Compound hardboard kg
26. Paper tape hardboard m'
27. Kassa m'
28. Curing compound liter
29. Formtie/penjaga jarak bekesting/spacer buah
30. Additive liter
MATERIAL CAT
1. Cat dasar (cat kayu) kg
2. Cat penutup (cat kayu) kg
3. Cat dasar (cat besi) kg
4. Cat antara (cat besi) kg
5. Cat penutup (cat besi) kg
6. Cat besi kg
7. Cat anti karat kg
8. Cat dasar (cat tembok interior) kg
9. Cat penutup (cat tembok interior) kg
10. Cat dasar (cat tembok exterior) kg
11. Cat penutup (cat tembok exterior) kg
12. Cat tembok kg
13. Cat coating liter
14. Cat genteng kg
15. Cat kedap air ( water base) kg
16. Meni kayu kg
17. Meni besi kg
18. Dempul kg
19. Dempul jadi kg
20. Ampelas lembar
21. Kuas 4" buah
22. Kuas 3" buah
23. Kuas 2" buah
24. Kuas 1" buah
25. Plamir kayu kg
26. Plamir tembok kg
27. Politur liter
28. Politur jadi liter
29. Vernis liter
30. Pengencer cat kayu/besi kg
halaman 53
URAIAN SATUAN
1 2 3
MATERIAL KUNCI DAN ENGSEL
1. Door closer buah
2. Door holder buah
3. Door stop buah
4. Engsel angin buah
5. Engsel jendela buah
6. Engsel pintu (kw 2) buah
7. Engsel pintu (kw 1) buah
8. Engsel kupu-kupu buah
9. Engsel lengan jendela buah
halaman 54
URAIAN SATUAN
1 2 3
10. Kait angin buah
11. Kunci lemari buah
12. Kunci selot buah
13. Kunci silinder buah
14. Kunci tanam antik buah
15. Kunci tanam biasa buah
16. Kunci tanam kamar mandi buah
17. Spring knip buah
18. Grendel Tanam Luar Negeri buah
19. Grendel Biasa buah
20. Pull handle stainless jumbo (kw 1) buah
21. Pull handle (kw 1) buah
22. Handle pintu (kw 1) buah
23. Rel pintu sorong set
24. 1 set kunci pintu (kw 1) buah
25. 1 set kunci pintu (kw 2) buah
MATERIAL KACA
1. Jendela nako m2
2. Jendela nako (rangka + kaca 5 mm) m2
3. Kaca polos 3mm m2
4. Kaca polos 5mm m2
5. Kaca polos 8mm m2
6. Kaca buram 12 mm m2
7. Kaca cermin 5mm m2
8. Kaca cermin 6mm m2
9. Profil kaca m¹
10. Kaca patri 5mm m2
11. Kaca cermin 8mm m2
12. Kaca wireglass 5mm m2
13. Ray Band 3mm m2
14. Ray Band 5mm m2
15. Kaca gravire 5mm m2
16. Kaca gravire putih 5mm m2
17. Kaca lukis alur 5mm m2
18. Kaca triple 5mm m2
19. Kaca triple platinum 5mm m2
20. Kaca tanpa tripel 5mm m2
MATERIAL SANITAIR
halaman 55
URAIAN SATUAN
1 2 3
1. Bak cuci stainless steel buah
2. Bak fiberglass 70 x 70 x 66 cm buah
3. Bak reservoir fibreglass (kapasitas 1000 liter) buah
4. Floor drain stainles steel buah
5. Kloset duduk/monoblok buah
6. Kloset jongkok porselen buah
7. Kran air buah
8. Urinoir buah
9. Wastavel buah
10. Water drain + asesories set
11. Tempat sabun gantung buah
12. Tempat sabun tanam buah
MATERIAL MINYAK
1. Minyak cat kg
2. Residu liter
3. Teak oil liter
4. Thinner A liter
5. Solar (industri) liter
6. Solar liter
7. Bensin (industri) liter
8. Bensin liter
9. Minyak tanah liter
10. Thinner liter
11. Minyak bekisting liter
12. Minyak Pelumas liter
13. Oli mesin liter
14. Oli hidrolis liter
15. Steamvet liter
16. Bentonit liter
17. Premium (industri) liter
halaman 56
URAIAN SATUAN
1 2 3
MATERIAL PINTU ALUMINIUM DAN BESI
1. Pintu aluminium m¹
2. Profil aluminium m¹
3. Aluminium strip m¹
4. Skrup fixer buah
5. Pintu lipat (folding door) alumunium m2
6. Rolling door besi m2
7. Sliding pintu J4 buah
8. Pintu lipat besi m2
9. Kusen aluminium 4" putih m¹
10. Sunscreen aluminium m2
11. Rolling door aluminium m2
12. C channel galvanis lebar 40 mm m'
13. C channel galvanis lebar 75 mm m'
14. Hollow galvanis 20x40x0,4 mm m'
15. Hollow galvanis 40x40x0,4 mm m'
16. Talang galvalum lebar 50 cm tebal 0,4 mm m'
17. Pintu alluminium m'
18. Profil kaca m'
19. Rangka metal hollow 40.40.1,2 mm m'
20. Alluminium strip m'
halaman 57
URAIAN SATUAN
1 2 3
MATERIAL LISTRIK
1. Lampu HPSI 70 W / 220V buah
2. Lampu HPSI 150 W / 220V buah
3. Lampu HPSI 250 W / 220V buah
4. Lampu HPSI 400 W / 220V buah
5. Lampu HPSI 1000 W / 220V buah
6. Lampu SL 32 watt buah
7. Lampu SL 42 watt buah
8. Lampu SL 65 watt buah
9. Lampu LVD 40 watt buah
10. Lampu TL 40 W / 220 V buah
11. Lampu pijar 5 W / 220 V buah
12. Lampu HPL 125 W / 220 V buah
13. Lampu HPL 250 W / 220 V buah
14. Lampu HPI.T 250 W / 220 V buah
15. Lampu HPI.T 1000 W / 220 V buah
16. Lampu HPS.T 70 W / 220 V set
17. Lampu HPS.T 150 W / 220 V set
18. Lampu HPS.T 250 W / 220 V set
19. Lampu HPS.T 400 W / 220 V set
20. Lampu HPST 70 watt (komplit set) set
21. Lampu HPST 150 watt (komplit set) set
22. Lampu HPST 250 watt (komplit set) set
23. Lampu HPST 400 watt (komplit set) set
24. Lampu HPI.T 250 W / 220 VKomplit Set set
25. Lampu HPI.T 400 W / 220 V Komplit Set set
26. Lampu Flood Lighting 1000 W Komplit Set set
27. Lampu Non Neon m¹
28. Lampu Hias Lombok (5 m) m¹
29. Lampu Hias Selang m¹
halaman 58
URAIAN SATUAN
1 2 3
30. Tiang octagonal single ornament (T.Parabole) unit
31. Tiang beton tipe : 09 - 100 daN E unit
32. Traffo SON.T 70 W / 220V buah
33. Traffo SON.T 150 W / 220V buah
34. Traffo SON.T 250 W / 220V buah
35. Traffo SON.T 400 W / 220V buah
36. Traffo SON.T 1000 W / 220V buah
37. Traffo TL 40 W / 220 V buah
38. Traffo HPL 125 W buah
39. Traffo HPL 250 W buah
40. Traffo HPI.T 250 W buah
41. Dimming 250 W buah
42. Dimming 400 W buah
43. MCB 6 A buah
44. MCB 10 A buah
45. MCB 25 A buah
46. MCB 30 A buah
47. MCB 40 A buah
48. Kapasitor CP20CU29 buah
49. Kapasitor CP25ER28 buah
50. Kapasitor CP30ET28 buah
51. Kapasitor 12.5 uF buah
52. Kapasitor 8 mF buah
53. Kapasitor Metal Halide 70 W buah
54. Kapasitor Metal Halide 100 W buah
55. Kapasitor Metal Halide 150 W buah
56. Ignitor SI 51 buah
57. Ignitor SI 52 buah
58. Ignitor SN 56 buah
59. Ignitor SN 57 buah
60. Ignitor SN 58 buah
61. Ignitor SN 58 TI buah
62. Kontaktor SN.25 buah
63. Kontaktor SN.35 buah
64. Kontaktor SN.65 buah
65. Konektor buah
66. Konektor / terminal 6 mm buah
67. Konektor / terminal 10 mm buah
68. Konektor / terminal 16 mm buah
69. Konektor / terminal 25 mm buah
halaman 59
URAIAN SATUAN
1 2 3
70. Ballast 70 W / 220 V buah
71. Ballast 150 W / 220 V buah
72. Ballast 250 W / 220 V buah
73. Ballast 400 W / 220 V buah
74. Kabel NYM 2 x 1.5 mm2 m¹
75. Kabel NYM 2 x 2,5 mm2 m¹
76. Kabel NYM 2 x 4 mm2 m¹
77. Kabel NYM 3 x 1.5 mm2 m¹
78. Kabel NYM 3 x 2.5 mm2 m¹
79. Kabel NYM 3 x 4 mm2 m¹
80. Kabel NYM 3 x 6 mm2 m¹
81. Kabel NYM 3 x 10 mm2 m¹
82. Kabel NYY 3 x 1.5 mm2 m¹
83. Kabel NYY 3 x 2.5 mm2 m¹
84. Kabel NYY 3 x 4 mm2 m¹
85. Kabel NYY 3 x 6 mm2 m¹
86. Kabel NYY 3 x 10 mm2 m¹
87. Kabel NYY 4 x 4 mm2 m¹
88. Kabel NYY 4 x 6 mm2 m¹
89. Kabel NYY 4 x 10 mm2 m¹
90. Kabel LVTC 2 x 10 mm2 m¹
91. Kabel LVTC 2 x 25 mm2 m¹
92. Kabel LTVC 3 x 10 mm2 m¹
93. Kabel LVTC 3 x 16 mm2 m¹
94. Kabel LTVC 3 x 35 mm N 25 m¹
95. Kabel NYA 1.5 mm m¹
96. Kabel NYA 2.5 mm m¹
97. Kabel NYA F 6 mm m¹
98. Kabel NYA F 10 mm m¹
99. Kabel DX 2 x 10 mm m¹
100. Kabel DX 2 x 16 mm m¹
101. Kabel DX 2 x 25 mm m¹
halaman 60
URAIAN SATUAN
1 2 3
102. Kabel NYFGBY 3 x 10 mm m¹
103. Kabel NYFGBY 4 x 16 mm m¹
103. Senur roll
104. PTS 60 A buah
105. PTS 80 A buah
106. PTS 120 A buah
107. Fitting Gantung buah
108. Fitting DK E 27 / Keramik buah
109. Fitting DK E 40 buah
110. Box Panel 30 x 40 x 20 mm buah
111. Box Panel 20 x 40 x 50 mm buah
112. Box Panel 50 x 60 mm unit
113. Box panel 80x60x30 cm unit
114. Begel steel box panel buah
115. Begel steel infoor buah
116. Magnetic Contactor SN.65 buah
117. Pipa infoor galvanis Ø 2" batang
118. Pipa flexibel buah
119. Kawat BC - 6 mm m
120. Kanal C m
121. Kabel NYY 2 x 16 mm2 m
122. Mur baut buah
123. Ground rood 5/8" unit
124. T. infooring buah
125. Begel stang buah
126. Begel stang Ø 2",8" mm (medium A) buah
127. Stang Ø 1" x 2 m (caping) buah
128. Pipa Subduct HDPE 40 mm x 34 mm2 buah
129. Tang Listrik buah
130. Testpen buah
131. Toolset buah
132. Timer theben buah
133. Obeng min buah
134. Obeng kembang buah
135. Long Dead And buah
136. Ling buah
137. Strain clamp wedge alluminium Alloy batang
138. Stainless stell strap batang
139. Stopping batang
140. Fotocell 6 A buah
halaman 61
URAIAN SATUAN
1 2 3
141. SWC buah
142. Silicon buah
143. SJ.6 buah
144. Stainless m¹
145. Amperemeter buah
146. Bandead alcoa buah
147. Multimeter buah
148. Isolasi buah
149. Kawat Las UK.32 dos
150. Pisau gerindo buah
151. Kawat seng buah
152. Tutup panel 30 x 30 buah
153. Retur material eksisting unit
154. Tutup kaca buah
155. Pasang panel kontrol unit
156. Penyambungan beban unit
157. Pasang instalasi per titik titik
158. Pengetesan dan penyalaan titik
159. Biaya angkutan jam
160. Upah pasang stang 2" - 3" meter ls
161. Upah pasang stang 2" - 6" meter ls
162. Upah pasang lampu unit
163. Alat bantu listrik set
164. Assesoris panel r buah
165. Assesoris kabel buah
MATERIAL LAIN-LAIN
1. Air m³
2. Air, liter
3. Gebalan Rumput Jenis Lamuran m²
4. Ijuk m3
5. Karung plastik buah
halaman 62
URAIAN SATUAN
1 2 3
6. Sesek bambu (2x1,5m) m²
7. Tali ijuk kg
8. Formica lembar
9. Ramset/dina bolt buah
10. Rel pintu dorong buah
11. Roster/terawang buah
12. Sabun Kg
13. Seal tape buah
14. Aluminium foil m2
15. Soda api kg
16. Wallpaper m2
17. Sealant tube
18. Sealant kaca kg
19. Batu apung kg
20. Nako per daun buah
21. Kapur m3
22. Screen low carbon m¹
23. Screen stainless steel ø 4" m¹
24. Pipa screen pvc Ø 4" m¹
25. Sesek bambu lembar
26. Recorder paper set
27. Alat tulis buah
28. Bollard stainless steel (tinggi 1m ; Ø 4") buah
29. Bollard cast iron (tinggi 1,2m ; Ø bawah 5" ; Ø atas 4") buah
30. Batako (ukuran 40x20x10) buah
31. Batako (ukuran 40x20x12) buah
32. Batako (ukuran 40x20x15) buah
33. Batako (ukuran 40x20x20) buah
34. Hebel Block (ukuran 60x20x10 cm) buah
35. Hebel Block (ukuran 60x20x15 cm) buah
36. Hebel Block (ukuran 60x20x20 cm) buah
37. Joint Sealent kg
38. Pintu lipat (folding door) bahan plastik/PVC m2
39. Skrup fixer buah
40. Sealant tube
41. Plastic aerator buah
42. Venetions blinds dan vertical blinds (tirai) m2
43. Lem kayu kg
44. Lem vinyl kg
45. Lem Aibon kg
halaman 63
URAIAN SATUAN
1 2 3
46. Perekat untuk wallpaper kg
III. PERALATAN
1. Asphalt distributor 4000 ℓ jam
2. Asphalt finisher jam
3. Asphalt mixing plant jam
4. Asphalt sprayer 850 ℓ jam
5. Asphalt liquid mixer 1000 ℓ jam
6. Blending equipment jam
7. Bore pile machine jam
8. Bulldozer 100-150 HP jam
9. Chain saw jam
10. Cold milling machine jam
11. Compressor 4000-6500 ℓ\m jam
12. Concrete mixer 350 ℓ jam
13. Concrete mixer 500 ℓ jam
14. Concrete mixer truck 5 m³ jam
15. Concrete pan mixer jam
16. Concrete pump jam
17. Concrete slip form paver jam
18. Concrete vibrator jam
19. Crane on track 35 ton jam
20. Crane on wheel 10-15 ton jam
21. Cutting machine jam
22. Dump truck 40 ton jam
23. Dump truck 20 ton jam
24. Dump truck 7,5 ton jam
25. Dump truck 3,5 ton jam
26. Excavator 80-140 HP jam
27. Flat bed truck 3-4 m³ jam
28. Generator set 135 KVA jam
29. Jack hammer jam
halaman 64
URAIAN SATUAN
1 2 3
30. Motor grader >100 HP jam
31. Pedestrian Roller jam
32. Pile driver + hammer 2,5 ton jam
33. Pneumatic tire roller 8-10 ton jam
34. Stone crusher jam
35. Tandem roller 6-8 ton jam
36. Three wheel roller 6-8 ton jam
37. Trailer 20 ton jam
38. Vibratory plate tamper jam
39. Vibratory roller 1 ton jam
40. Vibratory roller 5-8 ton jam
41. Water pump 70-100 mm jam
42. Water tanker truck 3000-4000 ℓ jam
43. Wheel loader 1,0-1,6 m³ jam
44. Stamper jam
45. Mesin gilas 2 roda 6 - 10 ton jam
46. Mesin gilas 3 roda 6 - 10 ton jam
47. Mesin gilas roda karet 8 - 10 ton jam
48. Alat bantu set
49. Depresiasi mesin pompa uji hari
50. Depresiasi peralatan pemboran hari
51. Depresiasi alat compressor hari
52. Logging unit
53. Mesin kerek unit
54. Mesin bor unit
55. Transportasi peralatan drailler unit
56. Compressor bor unit
57. Pompa injeksi unit
58. Pompa tangan unit
59. Sewa bor horisontal hari
60. Sewa Crane hari
61. Sewa alat las jam
62. Sewa Scaffolding :
- Main frame T-190 bulan
- Main frame T-170 bulan
- Leader frame T-90 bulan
- Cross brass T-220 bulan
- Cross brass T-193 bulan
- Joint pin bulan
- Jack base T-40 bulan
halaman 65
URAIAN SATUAN
1 2 3
- Jack base T-60 bulan
- U head jack T-40 bulan
- U head jack T-60 bulan
- Pipe support bulan
- Horizontal frame bulan
- Cat walk bulan
- Pipe brancing 3 m bulan
- Pipe brancing 6 m bulan
- Swipel clamb bulan
- Roda custer (satu set) bulan
- Mesin molen (per hari) bulan
63. Tripod tinggi 5 m hari
64. Alat pancang Hammer 0.5 ton hari
65. Alat penyambung tiang pancang dolken hari
66. Sewa mobil crane hari
67. Pompa Air, diesel 5 KW hari
halaman 66
URAIAN SATUAN
1 2 3
68. Pompa Air, diesel 10 KW hari
69. Pompa Air, diesel 20 KW hari
70. Palu/Godam (Baja keras) buah
71. Gergaji Besi buah
72. Pahat Beton (Baja keras) buah
73. Linggis (Baja keras) buah
74. Sewa tangga 7 meter buah
75. Truck Crane 5 ton jam
halaman 67
LAMPIRAN II
PERATURAN WALIKOTA SE:
AR HARGA SATUAN
, BAHAN DAN ALAT
STER I TAHUN 2017
HARGA SATUAN
KODE
(Rp.)
4 5
L.01 65,000.00
L.02 80,000.00
L.03 85,000.00
L.04 85,000.00
L.05 85,000.00
L.06 85,000.00
L.07 80,000.00
L.08 85,000.00
L.09 80,000.00
L.10 80,000.00
L.11 85,000.00
L.12 85,000.00
L.13 80,000.00
L.14 80,000.00
L.15 90,000.00
L.16 90,000.00
L.17 90,000.00
L.18 125,000.00
L.19 175,000.00
L.20 85,000.00
L.21 150,000.00
L.22 80,000.00
L.23 80,000.00
L.24 100,000.00
halaman 68
HARGA SATUAN
KODE
(Rp.)
4 5
L.25 80,000.00
L.26 75,000.00
L.27 65,000.00
L.28 325,000.00
L.29 80,000.00
L.30 150,000.00
L.31 125,000.00
L.32 100,000.00
M.1 105,000.00
M.2 154,000.00
M.3 150,000.00
M.4 221,600.00
M.5 321,400.00
M.6 335,200.00
M.7 85,416.00
M.8 268,100.00
M.9 313,500.00
M.10 373,500.00
M.11 220.00
M.12 50,000.00
M.13 101,400.00
M.14 196,600.00
M.15 218,000.00
M.16 71,458.00
M.17 141,700.00
M.18 225,800.00
M.19 254,500.00
M.20 35,000.00
M.21 147,000.00
M.22 62,500.00
M.23 188,900.00
M.24 66,666.00
M.25 125,000.00
M.26 275,000.00
M.27 500.00
M.28 413,000.00
M.29 181.48
halaman 69
HARGA SATUAN
KODE
(Rp.)
4 5
M.30 245,000.00
M.31 245,000.00
M.32 245,000.00
M.33 245,000.00
M.34 125,000.00
M.35 100,000.00
M.36 179,000.00
M.37 155,000.00
M.38 165,000.00
M.39 130,000.00
M.40 101,500.00
M.41 101,500.00
M.59 4,250.00
M.60 28,090,000.00
M.61 30,899,000.00
M.62 8,125,000.00
M.63 6,770,833.00
M.64 12,500,000.00
M.65 11,500,000.00
M.66 6,687,500.00
M.67 6,545,000.00
M.68 3,575,000.00
M.69 1,962,500.00
M.70 2,530,000.00
M.74 30,000.00
M.75 27,000.00
M.76 12,500.00
M.77 14,750.00
M.77 26,000.00
M.78 40,000.00
M.79 1,785,714.00
M.80 2,642,857.00
M.81 8,214,285.00
M.82 7,500,000.00
M.83 7,916,666.00
M.84 7,285,714.00
M.85 7,083,333.00
M.86 7,083,333.00
M.87 1,050,000.00
halaman 70
HARGA SATUAN
KODE
(Rp.)
4 5
M.88 1,146,250.00
M.89 4,317,857.00
M.90 4,687,500.00
M.91 1,062,500.00
M.92 12,500.00
M.93 66,000.00
M.94 95,000.00
M.95 155,000.00
M.96 125,000.00
M.97 170,000.00
M.98 177,500.00
M.99 200,000.00
M.99 135,000.00
M.100 97,000.00
M.101 70,000.00
M.102 61,500.00
M.103 62,500.00
halaman 71
HARGA SATUAN
KODE
(Rp.)
4 5
M.104 21,200.00
M.105 27,250.00
M.106 34,350.00
M.107 59,500.00
M.108 85,300.00
M.109 118,300.00
M.110 166,500.00
M.111 235,950.00
M.112 33,950.00
M.113 37,850.00
M.114 47,450.00
M.115 64,300.00
M.116 91,950.00
M.117 126,250.00
M.118 205,500.00
M.119 257,250.00
M.120 483,750.00
M.121 696,000.00
M.122 977,100.00
M.123 11,850.00
M.124 15,000.00
M.125 25,400.00
M.126 37,200.00
M.127 86,000.00
M.128 113,400.00
M.129 231,300.00
M.130 341,800.00
M.131 728,800.00
M.132 1,124,600.00
M.133 11,862.50
M.134 4,650.00
M.135 9,000.00
M.136 72,000.00
M.137 89,500.00
M.138 112,000.00
M.139 164,000.00
M.140 210,000.00
halaman 72
HARGA SATUAN
KODE
(Rp.)
4 5
M.141 368,000.00
M.142 496,000.00
M.143 775,000.00
M.144 925,000.00
M.145 2,250,000.00
M.146 91,000.00
M.147 117,000.00
M.148 179,500.00
M.149 273,000.00
M.150 371,500.00
M.151 610,000.00
M.152 885,000.00
M.153 1,200,000.00
M.154 1,440,000.00
M.155 2,095,000.00
M.156 5,000.00
M.157 10,350.00
M.158 10,350.00
M.159 10,350.00
M.160 11,100.00
M.161 8,900.00
M.162 7,250.00
M.163 14,250.00
M.164 14,250.00
M.165 16,250.00
M.166 12,000.00
halaman 73
HARGA SATUAN
KODE
(Rp.)
4 5
M.167 14,500.00
M.168 78,000.00
M.169 13,000.00
M.170 13,500.00
M.171 15,250.00
M.172 14,500.00
M.173 15,750.00
M.174 22,000.00
M.175 22,500.00
M.176 24,500.00
M.177 23,500.00
M.178 72,500.00
M.179 20,000.00
M.180 16,000.00
M.181 650.00
M.182 5,750.00
M.183 13,750.00
M.184 15,500.00
M.185 25,000.00
M.186 10,000.00
M.187 8,000.00
M.188 70,000.00
M.189 77,000.00
M.190 84,200.00
M.191 119,200.00
M.192 115,200.00
M.193 150,200.00
M.194 123,200.00
M.195 158,200.00
M.196 163,500.00
M.197 198,500.00
M.198 17,500.00
M.199 43,500.00
M.200 52,500.00
M.201 47,000.00
M.202 62,500.00
halaman 74
HARGA SATUAN
KODE
(Rp.)
4 5
M.203 90,000.00
M.204 103,333.00
M.205 135,000.00
M.206 195,666.00
M.207 262,500.00
M.208 415,000.00
M.209 42,666.00
M.210 61,833.00
M.211 83,000.00
M.212 123,333.00
M.217 725,300.00
M.218 906,600.00
M.219 1,079,300.00
M.220 1,288,500.00
M.221 1,857,300.00
M.222 2,809,400.00
M.223 45,400.00
M.224 118,100.00
M.225 179,000.00
M.226 254,500.00
M.227 231,600.00
M.228 263,700.00
M.229 301,200.00
M.230 399,000.00
M.231 431,000.00
M.232 551,400.00
M.233 1,590,700.00
M.234 2,698,700.00
halaman 75
HARGA SATUAN
KODE
(Rp.)
4 5
M.235 2,454,300.00
M.236 3,373,700.00
M.237 3,550,100.00
M.238 4,387,100.00
M.239 4,000,000.00
M.240 3,750,000.00
M.241 3,500,000.00
M.242 3,250,000.00
M.243 3,000,000.00
M.244 3,750,000.00
M.245 3,750,000.00
M.246 2,750,000.00
M.247 2,750,000.00
M.248 4,500,000.00
M.249 4,000,000.00
M.250 3,750,000.00
M.251 3,500,000.00
M.252 3,250,000.00
M.253 4,000,000.00
M.254 3,750,000.00
M.255 2,750,000.00
M.256 2,500,000.00
M.257 6,250,000.00
M.258 6,000,000.00
M.259 5,000,000.00
M.260 4,750,000.00
M.261 50,000.00
M.262 725,000.00
M.263 425,000.00
M.264 525,000.00
M.265 425,000.00
M.266 2,750,000.00
M.267 1,600,000.00
M.268 2,750,000.00
M.269 4,000,000.00
M.270 3,750,000.00
M.271 3,000,000.00
M.272 450,000.00
M.273 3,750,000.00
M.274 2,000,000.00
halaman 76
HARGA SATUAN
KODE
(Rp.)
4 5
M.275 1,500,000.00
M.276 375,000.00
M.277 475,000.00
M.278 250,000.00
M.279 3,000,000.00
M.280 83,982,000.00
M.281 118,121,000.00
M.282 127,526,000.00
M.283 187,179,000.00
M.284 273,085,000.00
M.285 283,927,000.00
M.286 334,083,000.00
M.287 394,822,000.00
M.288 242,000.00
M.289 308,000.00
M.290 400,000.00
M.291 471,000.00
M.292 599,000.00
M.293 786,000.00
M.294 261,000.00
M.295 351,000.00
M.296 474,000.00
M.297 594,000.00
M.298 757,000.00
M.299 915,000.00
M.300 545,000.00
halaman 77
HARGA SATUAN
KODE
(Rp.)
4 5
M.301 643,000.00
M.302 420,000.00
M.303 465,000.00
M.304 741,000.00
M.305 777,000.00
M.306 862,000.00
M.307 897,000.00
M.308 914,000.00
M.309 1,002,000.00
M.310 1,066,000.00
M.311 1,142,000.00
M.312 1,143,000.00
M.313 1,253,000.00
M.314 1,295,000.00
M.315 1,488,000.00
M.316 184,000.00
M.317 200,000.00
M.318 233,000.00
M.319 39,039,000.00
M.320 48,856,000.00
M.321 58,212,000.00
M.322 120,000.00
M.323 202,500.00
M.324 125,000.00
M.325 575,000.00
M.326 825,000.00
M.327 1,255,500.00
M.328 155,000.00
M.329 510,000.00
M.330 1,050,000.00
M.331 42,500.00
M.332 38,000.00
M.333 12,500.00
M.334 75,000.00
M.335 500,000.00
M.336 57,500.00
M.337 10,900.00
M.338 11,600.00
halaman 78
HARGA SATUAN
KODE
(Rp.)
4 5
M.339 1,167,500.00
M.340 1,167,500.00
M.341 1,140,900.00
M.342 1,167,800.00
M.343 1,278,400.00
M.344 1,680,100.00
M.345 1,108,600.00
M.346 1,189,200.00
M.347 113,295.00
M.347 4,500.00
M.348 4,500.00
M.349 2,675.00
M.350 4,500.00
M.351 100,000.00
M.352 2,625.00
M.353 4,000.00
M.354 6,100.00
M.355 10,000.00
M.356 7,500.00
M.357 50,000.00
M.358 50,000.00
M.359 85,000.00
M.360 105,000.00
M.361 74,000.00
M.362 65,000.00
M.363 97,000.00
M.364 95,000.00
M.365 65,000.00
M.366 63,000.00
M.367 67,000.00
M.368 1,750.00
M.369 106,000.00
M.370 95,000.00
M.371 85,500.00
M.372 76,000.00
M.373 75,250.00
M.374 70,250.00
M.375 62,000.00
halaman 79
HARGA SATUAN
KODE
(Rp.)
4 5
M.376 52,500.00
M.377 44,000.00
M.378 40,500.00
M.379 118,850.00
M.380 107,000.00
M.381 98,750.00
M.382 88,500.00
M.383 83,600.00
M.384 49,500.00
M.385 68,000.00
M.386 69,666.00
M.387 5,033.00
M.388 37,500.00
M.389 8,633.00
M.390 179,000.00
M.391 66,750.00
M.392 137,500.00
M.393 56,375.00
M.394 47,500.00
M.395 53,333.00
M.396 5,500.00
M.397 9,000.00
M.398 15,166.00
M.399 60,333.00
M.400 80,000.00
M.401 54,500.00
M.402 29,333.00
M.403 135,000.00
M.404 105,000.00
M.405 62,500.00
M.406 13,250.00
M.407 8,350.00
M.408 2,200.00
M.409 2,000.00
M.410 3,200.00
M.411 5,300.00
halaman 80
HARGA SATUAN
KODE
(Rp.)
4 5
M.412 8,800.00
M.413 64,800.00
M.414 32,000.00
M.415 20,000.00
M.416 255,000.00
M.417 306,800.00
M.418 37,500.00
M.419 25,000.00
M.420 5,375.00
M.421 3,000.00
M.422 17,500.00
M.423 2,875.00
M.424 475,000.00
M.425 200,000.00
M.426 13,750.00
M.427 5,500.00
M.428 5,000.00
M.429 13,125.00
M.430 23,000.00
M.431 13,000.00
M.432 12,750.00
M.433 8,500.00
M.434 1,575.00
M.435 54,000.00
M.436 67,500.00
M.437 77,500.00
M.438 89,000.00
M.439 739,000.00
M.440 786,000.00
M.441 814,500.00
M.442 838,000.00
M.443 869,500.00
M.444 903,000.00
M.445 933,500.00
M.446 977,500.00
M.447 1,022,500.00
M.448 1,077,500.00
M.449 45,000.00
halaman 81
HARGA SATUAN
KODE
(Rp.)
4 5
M.450 11,750.00
M.451 69,000.00
M.452 500.00
M.453 400.00
M.454 41,500.00
M.455 6,650.00
M.456 60,000.00
M.457 42,500.00
M.458 41,500.00
M.459 50,000.00
M.460 41,333.00
M.461 41,333.00
M.462 46,655.00
M.463 36,500.00
M.464 24,926.00
M.465 37,000.00
M.464-a 40,000.00
M.465-a 60,000.00
M.466 14,333.00
M.467 55,000.00
M.468 32,500.00
M.468-a 55,000.00
M.469 20,166.00
M.470 21,333.00
M.471 14,750.00
M.472 26,250.00
M.473 3,500.00
M.474 11,000.00
M.475 7,500.00
M.476 6,000.00
M.477 4,000.00
M.478 30,000.00
M.479 40,000.00
M.480 38,500.00
M.481 33,333.00
M.482 23,500.00
M.483 27,000.00
halaman 82
HARGA SATUAN
KODE
(Rp.)
4 5
M.484 187,500.00
M.485 91,000.00
M.486 37,250.00
M.487 21,875.00
M.488 22,600.00
M.489 24,200.00
M.490 43,500.00
M.491 39,750.00
M.492 8,000.00
halaman 83
HARGA SATUAN
KODE
(Rp.)
4 5
M.493 13,433.00
M.494 11,125.00
M.495 104,875.00
M.496 89,375.00
M.497 99,000.00
M.498 40,833.00
M.499 52,666.00
M.500 15,625.00
M.501 40,750.00
M.502 5,750.00
M.503 484,000.00
M.504 237,033.00
M.505 124,666.00
M.506 250,000.00
M.507 176,566.00
M.508 137,666.00
M.509 300,000.00
M.510 225,000.00
M.511 75,000.00
M.512 90,000.00
M.513 187,500.00
M.514 300,000.00
M.515 185,000.00
M.516 250,000.00
M.517 12,500.00
M.518 2,000,000.00
M.519 750,000.00
M.520 135,000.00
M.521 80,000.00
M.522 110,000.00
M.523 750,000.00
M.524 700,000.00
M.525 650,000.00
M.526 3,000,000.00
M.527 3,500,000.00
M.528 3,250,000.00
halaman 84
HARGA SATUAN
KODE
(Rp.)
4 5
M.529 248,333.00
M.530 275,000.00
M.531 205,000.00
M.532 75,000.00
M.533 1,500,000.00
M.534 145,000.00
M.535 36,750.00
M.536 612,500.00
M.537 286,250.00
M.538 350,000.00
M.539 47,750.00
M.540 60,250.00
M.541 25,000.00
M.542 25,000.00
M.543 27,500.00
M.544 31,500.00
M.545 12,894.00
M.546 7,500.00
M.547 11,783.00
M.548 8,500.00
M.549 13,346.00
M.550 22,000.00
M.551 16,000.00
M.552 26,000.00
M.553 25,000.00
M.554 27,500.00
M.555 47,500.00
M.556 20,000.00
M.557 9,115.00
halaman 85
HARGA SATUAN
KODE
(Rp.)
4 5
M.558 108,333.00
M.559 85,000.00
M.560 38,500.00
M.561 550.00
M.562 400,000.00
M.563 450,000.00
M.564 400,000.00
M.565 450,000.00
M.566 80,000.00
M.567 350,000.00
M.568 550,000.00
M.569 10,000.00
M.570 12,500.00
M.571 5,000.00
M.572 8,000.00
M.573 75,000.00
M.574 70,000.00
M.575 5,000.00
M.576 15,000.00
M.577 70,000.00
M.578 600,000.00
M.579 655,000.00
M.580 810,000.00
M.581 910,000.00
M.582 155,000.00
M.583 205,000.00
M.584 225,000.00
M.585 255,000.00
M.586 675,000.00
M.587 755,000.00
M.588 835,000.00
M.589 1,005,000.00
M.590 1,100,000.00
M.591 1,050,000.00
M.592 1,128,000.00
M.593 1,250,000.00
halaman 86
HARGA SATUAN
KODE
(Rp.)
4 5
M.594 78,500.00
M.595 83,750.00
M.596 107,250.00
M.597 117,416.00
M.598 566,250.00
M.599 49,750.00
M.600 115,083.00
M.601 149,750.00
M.602 45,625.00
M.603 16,916.00
M.604 5,004.00
M.605 35,000.00
M.606 71,883.00
M.607 225,416.00
M.608 568,333.00
M.609 342,806.00
M.610 357,200.00
M.611 445,875.00
M.612 479,800.00
M.613 1,318,636.00
M.614 1,671,818.00
M.615 2,669,090.00
M.616 3,454,545.00
M.617 3,197,250.00
M.618 5,500,000.00
M.619 9,300,000.00
M.620 59,375.00
M.621 105,000.00
M.622 64,250.00
halaman 87
HARGA SATUAN
KODE
(Rp.)
4 5
M.623 4,521,000.00
M.624 2,080,000.00
M.625 131,250.00
M.626 186,250.00
M.627 258,000.00
M.628 428,000.00
M.629 2,250,000.00
M.630 42,200.00
M.631 129,600.00
M.632 313,000.00
M.633 238,750.00
M.634 406,250.00
M.635 515,000.00
M.636 43,625.00
M.637 43,875.00
M.638 51,100.00
M.639 55,375.00
M.640 60,700.00
M.641 55,833.00
M.642 53,583.00
M.643 63,333.00
M.644 26,833.00
M.645 21,500.00
M.646 60,875.00
M.647 102,500.00
M.648 67,625.00
M.649 81,000.00
M.650 59,250.00
M.651 56,000.00
M.652 60,000.00
M.653 61,750.00
M.654 56,900.00
M.655 327,500.00
M.656 396,250.00
M.657 742,500.00
M.658 10,000.00
M.659 26,625.00
M.660 27,500.00
M.661 43,250.00
M.662 59,250.00
halaman 88
HARGA SATUAN
KODE
(Rp.)
4 5
M.663 153,250.00
M.664 247,625.00
M.665 305,937.00
M.666 537,500.00
M.667 6,025.00
M.668 8,387.00
M.669 14,100.00
M.670 9,076.00
M.671 10,575.00
M.672 17,125.00
M.673 31,750.00
M.674 43,100.00
M.675 11,616.00
M.676 16,200.00
M.677 21,883.00
M.678 30,508.00
M.679 46,050.00
M.680 27,340.00
M.681 41,900.00
M.682 60,100.00
M.683 5,650.00
M.684 17,500.00
M.685 8,687.00
M.686 14,500.00
M.687 32,283.00
M.688 2,400.00
M.689 3,480.00
M.690 12,558.00
M.691 19,750.00
M.692 5,058.00
M.693 7,350.00
M.694 15,312.00
halaman 89
HARGA SATUAN
KODE
(Rp.)
4 5
M.695 81,075.00
M.696 99,100.00
M.697 133,250.00
M.698 1,330,000.00
M.699 1,750,000.00
M.700 2,175,000.00
M.701 5,550.00
M.702 13,875.00
M.703 25,166.00
M.704 172,250.00
M.705 264,875.00
M.706 513,750.00
M.707 840,000.00
M.708 45,000.00
M.709 48,300.00
M.710 835,000.00
M.711 262,350.00
M.712 14,500.00
M.713 14,370.00
M.714 29,750.00
M.715 44,550.00
M.716 28,750.00
M.717 128,350.00
M.718 34,500.00
M.719 47,750.00
M.720 67,833.00
M.721 358,200.00
M.722 13,500.00
M.723 70,333.00
M.724 24,875.00
M.725 476,500.00
M.726 398,333.00
M.727 31,666.00
M.728 32,500.00
M.729 21,750.00
M.730 1,000.00
M.731 12,425.00
M.732 12,125.00
M.733 3,000.00
M.734 89,000.00
halaman 90
HARGA SATUAN
KODE
(Rp.)
4 5
M.735 11,000.00
M.736 46,000.00
M.737 25,500.00
M.738 9,750.00
M.739 606,666.00
M.740 7,500.00
M.741 177,500.00
M.742 8,200.00
M.743 80,000.00
M.744 57,750.00
M.745 26,250.00
M.746 30,375.00
M.747 100,000.00
M.748 155,000.00
M.749 87,500.00
M.750 19,000.00
M.751 125,000.00
M.752 7,750.00
M.753 7,500.00
M.754 27,500.00
M.755 45,000.00
M.756 93,500.00
M.757 85,625.00
M.758 59,300.00
M.759 1,200.00
M.760 15,833.00
M.761 157.00
M.762 10,000.00
M.763 67,500.00
M.764 2,500.00
halaman 91
HARGA SATUAN
KODE
(Rp.)
4 5
M.765 11,000.00
M.766 8,000.00
M.767 48,000.00
M.768 3,000.00
M.769 222,500.00
M.770 5,750.00
M.771 19,500.00
M.772 2,500.00
M.773 7,500.00
M.774 17,500.00
M.775 28,500.00
M.776 33,000.00
M.777 36,300.00
M.778 5,500.00
M.779 8,200.00
M.780 250,000.00
M.781 522,500.00
M.782 1,083,500.00
M.783 90,000.00
M.784 17,500.00
M.785 165,000.00
M.786 65,000.00
M.787 525,000.00
M.788 2,500,000.00
M.789 4,000.00
M.790 4,800.00
M.791 6,000.00
M.792 8,000.00
M.793 16,607.00
M.794 25,714.00
M.795 46,904.00
M.796 42,000.00
M.797 200,000.00
M.798 500.00
M.799 27,500.00
M.800 15,000.00
M.801 7,000.00
M.802 14,500.00
M.803 24,333.00
M.804 35,000.00
halaman 92
HARGA SATUAN
KODE
(Rp.)
4 5
M.805 43,600.00
E.1 7,875.00
E.2 625,390.00
E.3 8,844,240.00
E.4 77,731.00
E.5 53,452.00
E.6 247,719.00
E.7 552,281.00
E.8 972,888.00
E.9 52,273.00
E.10 632,726.00
E.11 202,750.00
E.12 93,682.00
E.13 102,553.00
E.14 665,933.00
E.15 859,832.00
E.16 332,227.00
E.17 612,909.00
E.18 54,269.00
E.19 487,571.00
E.20 408,795.00
E.21 46,522.00
E.22 784,494.00
E.23 645,949.00
E.24 384,386.00
E.25 340,196.00
E.26 749,012.00
E.27 541,332.00
E.28 481,928.00
E.29 40,359.00
halaman 93
HARGA SATUAN
KODE
(Rp.)
4 5
E.30 599,910.00
E.31 103,698.00
E.32 249,900.00
E.33 526,670.00
E.34 885,808.00
E.35 496,797.00
E.36 277,343.00
E.37 610,189.00
E.38 50,982.00
E.39 94,139.00
E.40 419,459.00
E.41 58,560.00
E.42 290,642.00
E.43 506,005.00
E.44 33,200.00
E.45 496,797.00
E.46 277,343.00
E.47 526,670.00
E.48 50,000.00
E.49 42,000.00
E.50 265,000.00
E.51 425,000.00
E.52 280,000.00
E.53 50,000.00
E.54 450,000.00
E.55 500,000.00
E.56 700,000.00
E.57 300,000.00
E.58 160,000.00
E.59 150,000.00
E.60 3,412,997.00
E.61 25,000.00
E.62
E.62.1 8,500.00
E.62.2 8,000.00
E.62.3 5,250.00
E.62.4 4,000.00
E.62.5 3,800.00
E.62.6 1,500.00
E.62.7 4,000.00
halaman 94
HARGA SATUAN
KODE
(Rp.)
4 5
E.62.8 4,200.00
E.62.9 4,000.00
E.62.10 4,250.00
E.62.11 8,250.00
E.62.12 7,500.00
E.62.13 26,000.00
E.62.14 8,500.00
E.62.15 17,000.00
E.62.16 5,000.00
E.62.17 62,000.00
E.62.18 160,000.00
E.63 250,000.00
E.64 350,000.00
E.65 350,000.00
E.66 1,450,000.00
E.67 250,000.00
halaman 95
HARGA SATUAN
KODE
(Rp.)
4 5
E.68 500,000.00
E.69 1,000,000.00
E.70 25,000.00
E.71 3,500.00
E.72 15,000.00
E.73 30,000.00
E.74 50,000.00
E.75 525,000.00
WALIKOTA SEMARANG
HENDRAR PRIHADI
halaman 96
JAM
ANALISA BIAYA SEWA PERALATAN PER JAM
KERJA
BIAYA PASTI PER JAM BIAY
UMUR FAKTOR BAHAN BAKAR & PELUMAS
TENAGA KAPASITAS NILAI
PENGEMB BIAYA TOTAL
ALAT HARGA ALAT SISA
ALAT ALIAN PENGEMBALIAN ASURANSI BUAYA MINYAK
ALAT ALAT ALAT & LAIN2 BAHAN
1 MODAL MODAL PASTI / JAM BAKAR PELU-
MAS
HP Cp A W B C D e1 e2 E f1 f2
0. Alat bantu alat 0. 0 0- 0 0 0 0 0.0000 0 0.00 0 0.00 0.000
1. Aggregat/chip spreader alat 1. 115 3.5 m³ 4 1000 420,000,000 42,000,000 0.3503 132,400 840.00 133,240 0.15 0.030
2. Asphalt distributor 4000 ℓ alat 2. 115 4000 liter 5 2000 126,000,000 12,600,000 0.2983 16,914 126.00 17,040 0.12 0.025
3. Asphalt finisher alat 3. 72.4 10 ton 6 2000 1,900,800,000 190,080,000 0.2642 226,018 1,900.80 227,918 0.12 0.025
4. Asphalt liquid mixer 1000 ℓ alat 4. 5 1000 liter 5 2000 25,000,000 2,500,000 0.2983 3,356 25.00 3,381 0.12 0.025
5. Asphalt liquid mixer 20000 ℓ alat 5. 40 20000 liter 5 2000 183,750,000 18,375,000 0.2983 24,667 183.75 24,851 0.12 0.025
6. Asphalt mixing plant alat 6. 294 60 ton/Jam 10 1500 3,600,000,000 360,000,000 0.1993 430,384 4,800.00 435,184 0.15 0.030
7. Asphalt sprayer 850 ℓ alat 7. 4 850 liter 5 2000 89,250,000 8,925,000 0.2983 11,981 89.25 12,070 0.12 0.025
8. Asphalt Tanker alat 8. 190 4000 liter 6 2000 45,675,000 4,567,500 0.2642 5,431 45.68 5,477 0.12 0.025
9. Blending equipment alat 9. 50 30 ton/jam 5 2000 420,000,000 42,000,000 0.2983 56,382 420.00 56,802 0.12 0.025
10. Bore pile machine alat 10. 150 2000 m 10 1500 367,500,000 36,750,000 0.1993 43,935 490.00 44,425 0.15 0.030
11. Bore pile machine Ø 60 alat 11. 125 60 CM 10 1500 262,500,000 26,250,000 0.1993 31,382 350.00 31,732 0.15 0.030
12. Bulldozer 100-150 HP alat 12. 155 - - 5 2000 2,467,500,000 246,750,000 0.2983 331,242 2,467.50 333,710 0.12 0.025
13. Cement tanker alat 13. 190 4000 liter 5 2000 45,675,000 4,567,500 0.2983 6,132 45.68 6,177 0.12 0.025
14. Chain saw alat 14. 3.5 0 2 1000 8,000,000 800,000 0.6151 4,429 16.00 4,445 0.15 0.030
15. Cold milling machine alat 15. 3 1000 m 5 2000 2,347,275,000 234,727,500 0.2983 315,103 2,347.28 317,450 0.12 0.025
16. Cold recycler alat 16. 900 2.2 M 5 2000 12,405,750,000 1,240,575,000 0.2983 1,665,373 12,405.75 1,677,778 0.12 0.025
17. Compressor 4000-6500 ℓ\m alat 17. 60 5000 CPM/(ℓ/m) 5 2000 142,800,000 14,280,000 0.2983 19,170 142.80 19,313 0.12 0.025
18. Concrete pan mixer alat 18. 134 600 liter 4 1000 787,500,000 78,750,000 0.3503 248,251 1,575.00 249,826 0.15 0.030
19. Concrete breaker alat 19. 290 20 m3/jam 5 2000 23,625,000 2,362,500 0.2983 3,171 23.63 3,195 0.12 0.025
20. Concrete mixer 350 ℓ alat 20. 20 350 liter 2 2000 34,650,000 3,465,000 0.6151 9,591 34.65 9,626 0.12 0.025
21. Concrete mixer 500 ℓ alat 21. 20 500 liter 2 2000 57,750,000 5,775,000 0.6151 15,985 57.75 16,043 0.12 0.025
JAM
KERJA
BIAYA PASTI PER JAM BIAY
UMUR FAKTOR BAHAN BAKAR & PELUMAS
TENAGA KAPASITAS NILAI
PENGEMB BIAYA TOTAL
ALAT HARGA ALAT SISA
ALAT ALIAN PENGEMBALIAN ASURANSI BUAYA MINYAK
ALAT ALAT ALAT & LAIN2 BAHAN
1 MODAL MODAL PASTI / JAM BAKAR PELU-
MAS
HP Cp A W B C D e1 e2 E f1 f2
0. Alat bantu alat 0. 0 0- 0 0 0 0 0.0000 0 0.00 0 0.00 0.000
22. Concrete mixer truck 5 m³ alat 22. 220 5 m³ 5 2000 605,000,000 60,500,000 0.2983 81,216 605.00 81,821 0.12 0.025
23. Concrete pump alat 23. 100 8 m³ 5 2000 315,000,000 31,500,000 0.2983 42,286 315.00 42,601 0.12 0.025
24. Concrete slip form paver alat 24. 105 3m 5 2000 1,337,142,000 133,714,200 0.2983 179,501 1,337.14 180,838 0.12 0.025
25. Concrete vibrator alat 25. 5.5 25 25 4 1000 5,250,000 525,000 0.3503 1,655 10.50 1,666 0.15 0.030
26. Crane on wheel 10-15 Ton alat 26. 130 15 ton 5 2000 359,100,000 35,910,000 0.2983 48,206 359.10 48,565 0.12 0.025
27. Crane on track 35 ton alat 27. 125 35 ton 5 2000 730,800,000 73,080,000 0.2983 98,104 730.80 98,835 0.12 0.025
28. Crane on track 75-100 ton alat 28. 200 75 ton 5 2000 5,943,525,000 594,352,500 0.2983 797,871 5,943.53 803,814 0.12 0.025
29. Cutting machine alat 29. 3 32 mm 5 2000 14,500,000 1,450,000 0.2983 1,947 14.50 1,961 0.12 0.025
30. Dump truck 40 ton alat 30. 260 40 ton 5 2000 732,000,000 73,200,000 0.2983 98,265 732.00 98,997 0.12 0.025
31. Dump truck 20 ton alat 31. 220 20 ton 5 2000 522,250,000 52,225,000 0.2983 70,108 522.25 70,630 0.12 0.025
32. Dump truck 7,5 ton alat 32. 110 7.5 ton 5 2000 440,000,000 44,000,000 0.2983 59,066 440.00 59,506 0.12 0.025
33. Dump truck 3,5 ton alat 33. 100 3.5 ton 5 2000 348,000,000 34,800,000 0.2983 46,716 348.00 47,064 0.12 0.025
34. Excavator 80-140 HP alat 34. 200 0.8 m³ 5 2000 1,131,000,000 113,100,000 0.2983 151,828 1,131.00 152,959 0.12 0.025
35. Flat bed truck 3-4 m³ alat 35. 190 10 ton 5 2000 362,000,000 36,200,000 0.2983 48,596 362.00 48,958 0.12 0.025
36. Fulvi mixer alat 36. 345 2005 5 2000 761,250,000 76,125,000 0.2983 102,192 761.25 102,953 0.12 0.025
37. Generator set 135 KVA alat 37. 180 135 KVA 5 2000 207,000,000 20,700,000 0.2983 27,788 207.00 27,995 0.12 0.025
38. Hot recycler alat 38. 400 3m 5 2000 2,646,000,000 264,600,000 0.2983 355,204 2,646.00 357,850 0.12 0.025
JAM
KERJA
BIAYA PASTI PER JAM BIAY
UMUR FAKTOR BAHAN BAKAR & PELUMAS
TENAGA KAPASITAS NILAI
PENGEMB BIAYA TOTAL
ALAT HARGA ALAT SISA
ALAT ALIAN PENGEMBALIAN ASURANSI BUAYA MINYAK
ALAT ALAT ALAT & LAIN2 BAHAN
1 MODAL MODAL PASTI / JAM BAKAR PELU-
MAS
HP Cp A W B C D e1 e2 E f1 f2
0. Alat bantu alat 0. 0 0- 0 0 0 0 0.0000 0 0.00 0 0.00 0.000
39. Jack hammer alat 39. 0 1330 5 2000 16,275,000 1,627,500 0.2983 2,185 16.28 2,201 0.12 0.025
40. Motor grader >100 HP alat 40. 135 10800 - 5 2000 1,105,000,000 110,500,000 0.2983 148,337 1,105.00 149,442 0.12 0.025
41. Pedestrian roller alat 41. 8.8 835 ton 3 2000 157,500,000 15,750,000 0.4380 31,042 157.50 31,199 0.12 0.025
42. Pile driver + hammer 2,5 ton alat 42. 25 2.5 ton 4 1000 262,500,000 26,250,000 0.3503 82,750 525.00 83,275 0.15 0.030
43. Pneumatic tire roller 8-10 ton alat 43. 100.5 9 ton 5 2000 1,115,625,000 111,562,500 0.2983 149,764 1,115.63 150,879 0.12 0.025
44. Rock drill breaker alat 44. 248 1000 m 5 2000 21,000,000 2,100,000 0.2983 2,819 21.00 2,840 0.12 0.025
45. Stone crusher alat 45. 220 50 ton/Jam 5 2000 1,468,162,500 146,816,250 0.2983 197,089 1,468.16 198,557 0.12 0.025
46. Tandem roller 6-8 ton alat 46. 82 8.1 ton 5 2000 1,160,250,000 116,025,000 0.2983 155,754 1,160.25 156,915 0.12 0.025
47. Three wheel roller 6-8 ton alat 47. 55 8 ton 5 2000 497,175,000 49,717,500 0.2983 66,742 497.18 67,239 0.12 0.025
48. Track loader 75-100 HP alat 48. 70 0.8 m³ 5 2000 210,000,000 21,000,000 0.2983 28,191 210.00 28,401 0.12 0.025
49. Trailer 20 ton alat 49. 175 20 ton 5 2000 783,615,000 78,361,500 0.2983 105,194 783.62 105,978 0.12 0.025
50. Trailer 15 ton alat 50. 150 15 ton 5 2000 315,000,000 31,500,000 0.2983 42,286 315.00 42,601 0.12 0.025
51. Truck bak 5 ton alat 51. 100 5 ton 5 2000 120,000,000 12,000,000 0.2983 16,109 120.00 16,229 0.12 0.025
52. Vibratory roller 5-8 ton alat 52. 82 7.05 ton 5 2000 840,000,000 84,000,000 0.2983 112,763 840.00 113,603 0.12 0.025
53. Vibratory roller 1 ton alat 53. 20 1 ton 5 2000 57,000,000 5,700,000 0.2983 7,652 57.00 7,709 0.12 0.025
54. Vibratory plate tamper alat 54. 4.7 121 kg 5 2000 17,500,000 1,750,000 0.2983 2,349 17.50 2,367 0.12 0.025
55. Vibro rammer 80 kg. alat 55. 4.2 80 kg 5 2000 10,000,000 1,000,000 0.2983 1,342 10.00 1,352 0.12 0.025
56. Water pump 70-100 mm alat 56. 6 - - 3 2000 29,400,000 2,940,000 0.4380 5,794 29.40 5,824 0.12 0.025
57. Water tanker truck 3000-4000 ℓ alat 57. 100 4 m³ 5 2000 142,800,000 14,280,000 0.2983 19,170 142.80 19,313 0.12 0.025
58. Welding set alat 58. 40 250 Amp 5 2000 28,350,000 2,835,000 0.2983 3,806 28.35 3,834 0.12 0.025
59. Wheel loader 1,0-1,6 m³ alat 59. 96 1.5 m³ 5 2000 1,071,000,000 107,100,000 0.2983 143,773 1,071.00 144,844 0.12 0.025
JAM
KERJA
BIAYA PASTI PER JAM BIAY
UMUR FAKTOR BAHAN BAKAR & PELUMAS
TENAGA KAPASITAS NILAI
PENGEMB BIAYA TOTAL
ALAT HARGA ALAT SISA
ALAT ALIAN PENGEMBALIAN ASURANSI BUAYA MINYAK
ALAT ALAT ALAT & LAIN2 BAHAN
1 MODAL MODAL PASTI / JAM BAKAR PELU-
MAS
HP Cp A W B C D e1 e2 E f1 f2
0. Alat bantu alat 0. 0 0- 0 0 0 0 0.0000 0 0.00 0 0.00 0.000
HALAMAN
BAHAN BAKAR & PELUMAS WORKSHOP PERBAIKAN & PERAWATAN UPAH
TOTAL TOTAL BIAYA
F g1 G g1 G H I J K
HALAMAN
BAHAN BAKAR & PELUMAS WORKSHOP PERBAIKAN & PERAWATAN UPAH
TOTAL TOTAL BIAYA
F g1 G g1 G H I J K
HALAMAN
BAHAN BAKAR & PELUMAS WORKSHOP PERBAIKAN & PERAWATAN UPAH
TOTAL TOTAL BIAYA
F g1 G g1 G H I J K
HALAMAN
BAHAN BAKAR & PELUMAS WORKSHOP PERBAIKAN & PERAWATAN UPAH
TOTAL TOTAL BIAYA
F g1 G g1 G H I J K
apasitas AMP Riil = 0.7 x Kapasitas AMP/Jam) x Harga BBM Solar , (kolom 16)
x Kapasitas tangki aspal x harga bahan bakar solar ( lihat E 01 , E 03, E 41)
URAIAN ANALISA ALAT
1. Aggregat/chip spreader
A. URAIAN PERALATAN
1. Jenis Peralatan Aggregat/c
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C
2. Faktor Angsuran Modal = i x (1 + i)^A D
(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E
W
b. Asuransi, dll = 0.002 x B F
W
Biaya Pasti per Jam = (E+F) G
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (12%-15%) x Pw x Ms H
2. Pelumas = (2.5%-3%) x Pw x Mp I
Biaya bengkel (6.25% dan 8.75%) x B J
W
3. Perawatan dan = (12,5 % - 17,5 %) x B K
perbaikan W
4. Operator alat berat = ( 1 Orang / Jam ) x U1 L
5. Pembantu Operator = ( 3 Orang / Jam ) x U2 M
Biaya Operasi per Jam = (H+I+K+L+M) P
A. URAIAN PERALATAN
1. Jenis Peralatan Asphalt distr
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
B. BIAYA PASTI PER JAM KERJA
halaman 49
1. Nilai Sisa Alat = 10 % x B C
2. Faktor Angsuran Modal = i x (1 + i)^A D
(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E
W
b. Asuransi, dll = 0.002 x B F
W
Biaya Pasti per Jam = (E+F) G
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (12%-15%) x Pw x Ms H
2. Pelumas = (2.5%-3%) x Pw x Mp I
Biaya bengkel (6.25% dan 8.75%) x B J
W
3. Perawatan dan = (12,5 % - 17,5 %) x B K
perbaikan W
4. Operator = ( 1 Orang / Jam ) x U1 L
5. Pembantu Operator = ( 3 Orang / Jam ) x U2 M
Biaya Operasi per Jam = (H+I+K+L+M) P
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
halaman 49
3. Asphalt Finisher
A. URAIAN PERALATAN
1. Jenis Peralatan Asphalt
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan Asphalt liquid
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
halaman 49
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C
2. Faktor Angsuran Modal = i x (1 + i)^A D
(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E
W
b. Asuransi, dll = 0.002 x B F
W
Biaya Pasti per Jam = (E+F) G
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
halaman 49
5. Asphalt liquid mixer 20000 ℓ
A. URAIAN PERALATAN
1. Jenis Peralatan Asphalt liquid
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan Asphalt M
2. Tenaga Pw
3. Kapasitas Cp
4. Alat a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
5. Kapastas tangki aspal Ca
halaman 49
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C
2. Faktor Angsuran Modal = i x (1 + i)^A D
(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E
W
b. Asuransi, dll = 0.002 x B F
W
Biaya Pasti per Jam = (E+F) G
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
halaman 49
7. Asphalt sprayer 850 ℓ
A. URAIAN PERALATAN
1. Jenis Peralatan Asphalt sp
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
8. Asphalt Tanker
A. URAIAN PERALATAN
1. Jenis Peralatan Asphal
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
halaman 49
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C
2. Faktor Angsuran Modal = i x (1 + i)^A D
(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E
W
b. Asuransi, dll = 0.002 x B F
W
Biaya Pasti per Jam = (E+F) G
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
halaman 49
9. Blending Equipment
A. URAIAN PERALATAN
1. Jenis Peralatan Blending
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan Bore pile
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
halaman 49
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C
2. Faktor Angsuran Modal = i x (1 + i)^A D
(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E
W
b. Asuransi, dll = 0.002 x B F
W
Biaya Pasti per Jam = (E+F) G
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
halaman 49
11. Bore pile machine Ø 60
A. URAIAN PERALATAN
1. Jenis Peralatan Bore pile m
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan Bulldozer 1
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
halaman 49
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C
2. Faktor Angsuran Modal = i x (1 + i)^A D
(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E
W
b. Asuransi, dll = 0.002 x B F
W
Biaya Pasti per Jam = (E+F) G
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
halaman 49
13. Cement Tanker
A. URAIAN PERALATAN
1. Jenis Peralatan Cemen
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan Chai
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
halaman 49
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C
2. Faktor Angsuran Modal = i x (1 + i)^A D
(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E
W
b. Asuransi, dll = 0.002 x B F
W
Biaya Pasti per Jam = (E+F) G
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
halaman 49
15. Cold milling machine
A. URAIAN PERALATAN
1. Jenis Peralatan Cold millin
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan Cold r
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
halaman 49
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C
2. Faktor Angsuran Modal = i x (1 + i)^A D
(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E
W
b. Asuransi, dll = 0.002 x B F
W
Biaya Pasti per Jam = (E+F) G
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
halaman 49
17. Compressor 4000-6500 ℓ\m
A. URAIAN PERALATAN
1. Jenis Peralatan Compressor 4
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan Concrete
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
halaman 49
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C
2. Faktor Angsuran Modal = i x (1 + i)^A D
(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E
W
b. Asuransi, dll = 0.002 x B F
W
Biaya Pasti per Jam = (E+F) G
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
halaman 49
19. Concrete Breaker
A. URAIAN PERALATAN
1. Jenis Peralatan Concrete
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan Concrete m
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
halaman 49
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C
2. Faktor Angsuran Modal = i x (1 + i)^A D
(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E
W
b. Asuransi, dll = 0.002 x B F
W
Biaya Pasti per Jam = (E+F) G
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
halaman 49
21. Concrete mixer 500 ℓ
A. URAIAN PERALATAN
1. Jenis Peralatan Concrete m
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan Concrete mix
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
halaman 49
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C
2. Faktor Angsuran Modal = i x (1 + i)^A D
(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E
W
b. Asuransi, dll = 0.002 x B F
W
Biaya Pasti per Jam = (E+F) G
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
halaman 49
23. Concrete Pump
A. URAIAN PERALATAN
1. Jenis Peralatan Concre
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan Concrete sli
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
halaman 49
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C
2. Faktor Angsuran Modal = i x (1 + i)^A D
(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E
W
b. Asuransi, dll = 0.002 x B F
W
Biaya Pasti per Jam = (E+F) G
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
halaman 49
25. Concrete vibrator
A. URAIAN PERALATAN
1. Jenis Peralatan Concrete
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan Crane on wh
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
halaman 49
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C
2. Faktor Angsuran Modal = i x (1 + i)^A D
(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E
W
b. Asuransi, dll = 0.002 x B F
W
Biaya Pasti per Jam = (E+F) G
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
halaman 49
27. Crane on track 35 ton
A. URAIAN PERALATAN
1. Jenis Peralatan Crane on t
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan Crane on tra
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
halaman 49
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C
2. Faktor Angsuran Modal = i x (1 + i)^A D
(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E
W
b. Asuransi, dll = 0.002 x B F
W
Biaya Pasti per Jam = (E+F) G
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
halaman 49
29. Cutting machine
A. URAIAN PERALATAN
1. Jenis Peralatan Cutting
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan Dump tru
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
halaman 49
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C
2. Faktor Angsuran Modal = i x (1 + i)^A D
(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E
W
b. Asuransi, dll = 0.002 x B F
W
Biaya Pasti per Jam = (E+F) G
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
halaman 49
31. Dump truck 20 ton
A. URAIAN PERALATAN
1. Jenis Peralatan Dump tru
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan Dump tru
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
halaman 49
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C
2. Faktor Angsuran Modal = i x (1 + i)^A D
(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E
W
b. Asuransi, dll = 0.002 x B F
W
Biaya Pasti per Jam = (E+F) G
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
halaman 49
34. Excavator 80-140 HP
A. URAIAN PERALATAN
1. Jenis Peralatan Excavator
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan Flat bed tr
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
halaman 49
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C
2. Faktor Angsuran Modal = i x (1 + i)^A D
(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E
W
b. Asuransi, dll = 0.002 x B F
W
Biaya Pasti per Jam = (E+F) G
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
halaman 49
36. Fulvi mixer
A. URAIAN PERALATAN
1. Jenis Peralatan Fulvi
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan Generator
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
halaman 49
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C
2. Faktor Angsuran Modal = i x (1 + i)^A D
(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E
W
b. Asuransi, dll = 0.002 x B F
W
Biaya Pasti per Jam = (E+F) G
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
halaman 49
38. Hot recycler
A. URAIAN PERALATAN
1. Jenis Peralatan Hot re
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan Jack h
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
halaman 49
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C
2. Faktor Angsuran Modal = i x (1 + i)^A D
(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E
W
b. Asuransi, dll = 0.002 x B F
W
Biaya Pasti per Jam = (E+F) G
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
halaman 49
40. Motor grader >100 HP
A. URAIAN PERALATAN
1. Jenis Peralatan Motor grad
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan Pedestr
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
halaman 49
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C
2. Faktor Angsuran Modal = i x (1 + i)^A D
(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E
W
b. Asuransi, dll = 0.002 x B F
W
Biaya Pasti per Jam = (E+F) G
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
halaman 49
42. Pile driver + hammer 2,5 ton
A. URAIAN PERALATAN
1. Jenis Peralatan Pile driver + h
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan Pneumatic tire
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
halaman 49
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C
2. Faktor Angsuran Modal = i x (1 + i)^A D
(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E
W
b. Asuransi, dll = 0.002 x B F
W
Biaya Pasti per Jam = (E+F) G
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
halaman 49
44. Rock drill breaker
A. URAIAN PERALATAN
1. Jenis Peralatan Rock dri
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan Stone
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
halaman 49
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C
2. Faktor Angsuran Modal = i x (1 + i)^A D
(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E
W
b. Asuransi, dll = 0.002 x B F
W
Biaya Pasti per Jam = (E+F) G
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
halaman 49
46. Tandem roller 6-8 ton
A. URAIAN PERALATAN
1. Jenis Peralatan Tandem ro
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan Three wheel
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
halaman 49
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C
2. Faktor Angsuran Modal = i x (1 + i)^A D
(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E
W
b. Asuransi, dll = 0.002 x B F
W
Biaya Pasti per Jam = (E+F) G
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
halaman 49
48. Track loader 75-100 HP
A. URAIAN PERALATAN
1. Jenis Peralatan Track loade
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan Trailer
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
halaman 49
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C
2. Faktor Angsuran Modal = i x (1 + i)^A D
(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E
W
b. Asuransi, dll = 0.002 x B F
W
Biaya Pasti per Jam = (E+F) G
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
halaman 49
50. Trailer 15 ton
A. URAIAN PERALATAN
1. Jenis Peralatan Trailer
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan Truck b
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
halaman 49
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C
2. Faktor Angsuran Modal = i x (1 + i)^A D
(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E
W
b. Asuransi, dll = 0.002 x B F
W
Biaya Pasti per Jam = (E+F) G
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
halaman 49
52. Vibratory roller 5-8 ton
A. URAIAN PERALATAN
1. Jenis Peralatan Vibratory r
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan Vibratory
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
halaman 49
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C
2. Faktor Angsuran Modal = i x (1 + i)^A D
(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E
W
b. Asuransi, dll = 0.002 x B F
W
Biaya Pasti per Jam = (E+F) G
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
halaman 49
54. Vibratory plate tamper
A. URAIAN PERALATAN
1. Jenis Peralatan Vibratory p
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan Vibro Ram
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
halaman 49
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C
2. Faktor Angsuran Modal = i x (1 + i)^A D
(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E
W
b. Asuransi, dll = 0.002 x B F
W
Biaya Pasti per Jam = (E+F) G
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
halaman 49
56. Water pump 70-100 mm
A. URAIAN PERALATAN
1. Jenis Peralatan Water pump
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan Water tanker tr
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
halaman 49
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C
2. Faktor Angsuran Modal = i x (1 + i)^A D
(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E
W
b. Asuransi, dll = 0.002 x B F
W
Biaya Pasti per Jam = (E+F) G
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
halaman 49
58. Welding set
A. URAIAN PERALATAN
1. Jenis Peralatan Weld
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan Wheel loade
2. Tenaga Pw
3. Kapasitas Cp
4. Alat Baru : a. Umur Ekonomis A
b. Jam Kerja Dalam 1 Tahun W
c. Harga Alat B
halaman 49
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C
2. Faktor Angsuran Modal = i x (1 + i)^A D
(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E
W
b. Asuransi, dll = 0.002 x B F
W
Biaya Pasti per Jam = (E+F) G
E. LAIN - LAIN
1. Tingkat Suku Bunga i
2. Operator alat berat U1
3. Pembantu operator alat berat U2
4. Bensin (industri) Mb
5. Solar (industri) Ms
6. Minyak pelumas Mp
7. PPN diperhitungkan pada lembar rekapitulasi biaya pekerjaan
halaman 49
ALAT
Aggregat/chip spreader
115.00 HP
3.50 M
4.00 Tahun
1,000.00 Jam
420,000,000.00 Rupiah
42,000,000 Rupiah
0.35027 -
132,400.30 Rupiah
840.00 Rupiah
133,240.30 Rupiah
197,570,053,545.14 Rupiah
89,700.00 Rupiah
26,250 Rupiah
73,500.00 Rupiah
25,000.00 Rupiah
34,285.71 Rupiah
197,570,302,280.86 Rupiah
197,570,435,521.16 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
12,600,000 Rupiah
0.29832 -
16,914.49 Rupiah
126.00 Rupiah
17,040.49 Rupiah
177,937.20 Rupiah
74,750.00 Rupiah
5,513 Rupiah
7,875.00 Rupiah
25,000.00 Rupiah
34,285.71 Rupiah
325,360.41 Rupiah
342,400.91 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
KOEF. SATUAN KET.
Asphalt Finisher
72.40 HP
10.00 Ton
6.00 Tahun
2,000.00 Jam
1,900,800,000.00 Rupiah
190,080,000 Rupiah
0.26424 -
226,017.68 Rupiah
1,900.80 Rupiah
227,918.48 Rupiah
112,023.07 Rupiah
47,060.00 Rupiah
83,160
118,800.00 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
397,471.64 Rupiah
625,390.12 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
2,500,000 Rupiah
0.29832 -
3,356.05 Rupiah
25.00 Rupiah
3,381.05 Rupiah
7,736.40 Rupiah
3,250.00 Rupiah
1,094 Rupiah
1,562.50 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
50,071.22 Rupiah
53,452.27 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
KOEF. SATUAN KET.
18,375,000 Rupiah
0.29832 -
24,666.97 Rupiah
183.75 Rupiah
24,850.72 Rupiah
61,891.20 Rupiah
26,000.00 Rupiah
8,039 Rupiah
11,484.38 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
143,843.21 Rupiah
168,693.93 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
360,000,000 Rupiah
0.19925 -
430,384.46 Rupiah
4,800.00 Rupiah
435,184.46 Rupiah
568,625.40 Rupiah
6,498,576.00 Rupiah Khusus
386,820.00 AMP
229,320.00 Rupiah
210,000
420,000.00 Rupiah
25,000.00 Rupiah
34,285.71 Rupiah
8,372,627.11 Rupiah
8,807,811.57 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
KOEF. SATUAN KET.
8,925,000 Rupiah
0.29832 -
11,981.10 Rupiah
89.25 Rupiah
12,070.35 Rupiah
6,189.12 Rupiah
10,959.90 Rupiah
2,600.00 Rupiah
3,904.69 Rupiah
5,578.13 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
65,660.40 Rupiah
77,730.75 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
Asphalt Tanker
190.00 HP
4,000.00 liter
6.00 Tahun
2,000.00 Jam
45,675,000.00 Rupiah
halaman 49
4,567,500 Rupiah
0.26424 -
5,431.06 Rupiah
45.68 Rupiah
5,476.73 Rupiah
268,652.40 Rupiah
51,576.00 Rupiah
123,500.00 Rupiah
1,998 Rupiah
2,854.69 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
485,009.94 Rupiah
490,486.67 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
KOEF. SATUAN KET.
Blending Equipment
50.00 HP
30.00 Ton
5.00 Tahun
2,000.00 Jam
420,000,000.00 Rupiah
42,000,000 Rupiah
0.29832 -
56,381.64 Rupiah
420.00 Rupiah
56,801.64 Rupiah
77,364.00 Rupiah
32,500.00 Rupiah
18,375 Rupiah
26,250.00 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
190,917.57 Rupiah
247,719.21 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
36,750,000 Rupiah
0.19925 -
43,935.08 Rupiah
490.00 Rupiah
44,425.08 Rupiah
290,115.00 Rupiah
117,000.00 Rupiah
21,438 Rupiah
42,875.00 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
507,856.07 Rupiah
552,281.15 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
KOEF. SATUAN KET.
26,250,000 Rupiah
0.19925 -
31,382.20 Rupiah
350.00 Rupiah
31,732.20 Rupiah
241,762.50 Rupiah
97,500.00 Rupiah
15,313 Rupiah
30,625.00 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
421,628.57 Rupiah
453,360.77 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
Bulldozer 100-150 HP
155.00 HP
- -
5.00 Tahun
2,000.00 Jam
2,467,500,000.00 Rupiah
halaman 49
246,750,000 Rupiah
0.29832 -
331,242.13 Rupiah
2,467.50 Rupiah
333,709.63 Rupiah
239,828.40 Rupiah
100,750.00 Rupiah
107,953
154,218.75 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
639,178.85 Rupiah
972,888.48 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
KOEF. SATUAN KET.
Cement Tanker
190.00 HP
4,000.00 liter
5.00 Tahun
2,000.00 Jam
45,675,000.00 Rupiah
4,567,500 Rupiah
0.29832 -
6,131.50 Rupiah
45.68 Rupiah
6,177.18 Rupiah
293,983.20 Rupiah
123,500.00 Rupiah
1,998 Rupiah
2,854.69 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
458,764.74 Rupiah
464,941.92 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
Chain saw
3.50 HP
0.00
2.00 Tahun
1,000.00 Jam
8,000,000.00 Rupiah
halaman 49
800,000 Rupiah
0.61512 -
4,428.84 Rupiah
16.00 Rupiah
4,444.84 Rupiah
6,769.35 Rupiah
2,730.00 Rupiah
500.00 Rupiah
1,400.00 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
47,827.92 Rupiah
52,272.76 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
KOEF. SATUAN KET.
234,727,500 Rupiah
0.29832 -
315,102.89 Rupiah
2,347.28 Rupiah
317,450.16 Rupiah
4,641.84 Rupiah
1,950.00 Rupiah
102,693.28 Rupiah
146,704.69 Rupiah
25,000.00 Rupiah
34,285.71 Rupiah
315,275.52 Rupiah
632,725.69 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
Cold recycler
900.00 HP
2.20 M
5.00 Tahun
2,000.00 Jam
12,405,750,000.00 Rupiah
halaman 49
1,240,575,000 Rupiah
0.29832 -
1,665,372.67 Rupiah
12,405.75 Rupiah
1,677,778.42 Rupiah
1,392,552.00 Rupiah
585,000.00 Rupiah
542,752 Rupiah
775,359.38 Rupiah
25,000.00 Rupiah
34,285.71 Rupiah
3,354,948.65 Rupiah
5,032,727.08 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
KOEF. SATUAN KET.
14,280,000 Rupiah
0.29832 -
19,169.76 Rupiah
142.80 Rupiah
19,312.56 Rupiah
92,836.80 Rupiah
39,000.00 Rupiah
6,248
8,925.00 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
183,437.87 Rupiah
202,750.43 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
78,750,000 Rupiah
0.35027 -
248,250.57 Rupiah
1,575.00 Rupiah
249,825.57 Rupiah
259,169.40 Rupiah
104,520.00 Rupiah
49,219 Rupiah
137,812.50 Rupiah
25,000.00 Rupiah
34,285.71 Rupiah
610,006.36 Rupiah
859,831.93 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
KOEF. SATUAN KET.
Concrete Breaker
290.00 HP
20.00 m3/jam
5.00 Tahun
2,000.00 Jam
23,625,000.00 Rupiah
2,362,500 Rupiah
0.29832 -
3,171.47 Rupiah
23.63 Rupiah
3,195.09 Rupiah
448,711.20 Rupiah
188,500.00 Rupiah
1,034 Rupiah
1,476.56 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
676,149.93 Rupiah
679,345.02 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
3,465,000 Rupiah
0.61512 -
9,591.20 Rupiah
34.65 Rupiah
9,625.85 Rupiah
30,945.60 Rupiah
13,000.00 Rupiah
1,516 Rupiah
2,165.63 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
84,055.73 Rupiah
93,681.58 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
KOEF. SATUAN KET.
5,775,000 Rupiah
0.61512 -
15,985.33 Rupiah
57.75 Rupiah
16,043.08 Rupiah
30,945.60 Rupiah
13,000.00 Rupiah
2,527 Rupiah
3,609.38 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
86,510.11 Rupiah
102,553.19 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
60,500,000 Rupiah
0.29832 -
81,216.41 Rupiah
605.00 Rupiah
81,821.41 Rupiah
340,401.60 Rupiah
143,000.00 Rupiah
26,469 Rupiah
37,812.50 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
584,111.42 Rupiah
665,932.83 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
KOEF. SATUAN KET.
Concrete Pump
100.00 HP
8.00 M3
5.00 Tahun
2,000.00 Jam
315,000,000.00 Rupiah
31,500,000 Rupiah
0.29832 -
42,286.23 Rupiah
315.00 Rupiah
42,601.23 Rupiah
154,728.00 Rupiah
65,000.00 Rupiah
13,781 Rupiah
19,687.50 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
289,625.32 Rupiah
332,226.55 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
133,714,200 Rupiah
0.29832 -
179,500.61 Rupiah
1,337.14 Rupiah
180,837.76 Rupiah
162,464.40 Rupiah
68,250.00 Rupiah
58,500 Rupiah
83,571.38 Rupiah
25,000.00 Rupiah
34,285.71 Rupiah
432,071.45 Rupiah
612,909.21 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
KOEF. SATUAN KET.
Concrete vibrator
5.50 HP
25.00 -
4.00 Tahun
1,000.00 Jam
5,250,000.00 Rupiah
525,000 Rupiah
0.35027 -
1,655.00 Rupiah
10.50 Rupiah
1,665.50 Rupiah
10,637.55 Rupiah
4,290.00 Rupiah
328 Rupiah
918.75 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
52,603.00 Rupiah
54,268.50 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
35,910,000 Rupiah
0.29832 -
48,206.30 Rupiah
359.10 Rupiah
48,565.40 Rupiah
201,146.40 Rupiah
84,500.00 Rupiah
15,711 Rupiah
22,443.75 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
360,229.35 Rupiah
408,794.75 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
KOEF. SATUAN KET.
73,080,000 Rupiah
0.29832 -
98,104.05 Rupiah
730.80 Rupiah
98,834.85 Rupiah
193,410.00 Rupiah
81,250.00 Rupiah
31,973 Rupiah
45,675.00 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
388,736.07 Rupiah
487,570.92 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
594,352,500 Rupiah
0.29832 -
797,870.67 Rupiah
5,943.53 Rupiah
803,814.20 Rupiah
309,456.00 Rupiah
130,000.00 Rupiah
260,029 Rupiah
371,470.31 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
1,107,384.10 Rupiah
1,911,198.30 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
KOEF. SATUAN KET.
Cutting machine
3.00 HP
32.00 Ton
5.00 Tahun
2,000.00 Jam
14,500,000.00 Rupiah
1,450,000 Rupiah
0.29832 -
1,946.51 Rupiah
14.50 Rupiah
1,961.01 Rupiah
4,641.84 Rupiah
1,950.00 Rupiah
634 Rupiah
906.25 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
44,561.04 Rupiah
46,522.05 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
73,200,000 Rupiah
0.29832 -
98,265.14 Rupiah
732.00 Rupiah
98,997.14 Rupiah
402,292.80 Rupiah
169,000.00 Rupiah
32,025 Rupiah
45,750.00 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
685,496.37 Rupiah
784,493.51 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
KOEF. SATUAN KET.
52,225,000 Rupiah
0.29832 -
70,107.88 Rupiah
522.25 Rupiah
70,630.13 Rupiah
340,401.60 Rupiah
143,000.00 Rupiah
22,848 Rupiah
32,640.63 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
575,319.23 Rupiah
645,949.37 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
44,000,000 Rupiah
0.29832 -
59,066.48 Rupiah
440.00 Rupiah
59,506.48 Rupiah
170,200.80 Rupiah
71,500.00 Rupiah
19,250
27,500.00 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
324,879.37 Rupiah
384,385.85 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
KOEF. SATUAN KET.
Excavator 80-140 HP
200.00 HP
0.80 M3
5.00 Tahun
2,000.00 Jam
1,131,000,000.00 Rupiah
113,100,000 Rupiah
0.29832 -
151,827.70 Rupiah
1,131.00 Rupiah
152,958.70 Rupiah
309,456.00 Rupiah
130,000.00 Rupiah
49,481 Rupiah
70,687.50 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
596,053.32 Rupiah
749,012.02 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
36,200,000 Rupiah
0.29832 -
48,595.60 Rupiah
362.00 Rupiah
48,957.60 Rupiah
293,983.20 Rupiah
123,500.00 Rupiah
15,838 Rupiah
22,625.00 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
492,374.27 Rupiah
541,331.87 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
KOEF. SATUAN KET.
Fulvi mixer
345.00 HP
2,005.00 -
5.00 Tahun
2,000.00 Jam
761,250,000.00 Rupiah
76,125,000 Rupiah
0.29832 -
102,191.72 Rupiah
761.25 Rupiah
102,952.97 Rupiah
533,811.60 Rupiah
224,250.00 Rupiah
33,305 Rupiah
47,578.13 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
875,372.98 Rupiah
978,325.96 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
20,700,000 Rupiah
0.29832 -
27,788.09 Rupiah
207.00 Rupiah
27,995.09 Rupiah
278,510.40 Rupiah
117,000.00 Rupiah
9,056 Rupiah
12,937.50 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
453,932.72 Rupiah
481,927.82 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
KOEF. SATUAN KET.
Hot recycler
400.00 HP
3.00 M
5.00 Tahun
2,000.00 Jam
2,646,000,000.00 Rupiah
264,600,000 Rupiah
0.29832 -
355,204.33 Rupiah
2,646.00 Rupiah
357,850.33 Rupiah
618,912.00 Rupiah
260,000.00 Rupiah
115,763 Rupiah
165,375.00 Rupiah
25,000.00 Rupiah
34,285.71 Rupiah
1,219,335.21 Rupiah
1,577,185.54 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
Jack hammer
0.00 HP
1,330.00 -
5.00 Tahun
2,000.00 Jam
16,275,000.00 Rupiah
halaman 49
1,627,500 Rupiah
0.29832 -
2,184.79 Rupiah
16.28 Rupiah
2,201.06 Rupiah
0.00 Rupiah
0.00 Rupiah
712 Rupiah
1,017.19 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
38,157.79 Rupiah
40,358.85 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
KOEF. SATUAN KET.
110,500,000 Rupiah
0.29832 -
148,337.41 Rupiah
1,105.00 Rupiah
149,442.41 Rupiah
208,882.80 Rupiah
87,750.00 Rupiah
48,344 Rupiah
69,062.50 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
450,467.62 Rupiah
599,910.03 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
Pedestrian roller
8.80 HP
835.00 Ton
3.00 Tahun
2,000.00 Jam
157,500,000.00 Rupiah
halaman 49
15,750,000 Rupiah
0.43798 -
31,041.62 Rupiah
157.50 Rupiah
31,199.12 Rupiah
13,616.06 Rupiah
5,720.00 Rupiah
6,891 Rupiah
9,843.75 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
72,499.01 Rupiah
103,698.13 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
KOEF. SATUAN KET.
26,250,000 Rupiah
0.35027 -
82,750.19 Rupiah
525.00 Rupiah
83,275.19 Rupiah
48,352.50 Rupiah
19,500.00 Rupiah
16,406 Rupiah
45,937.50 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
166,624.82 Rupiah
249,900.01 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
111,562,500 Rupiah
0.29832 -
149,763.73 Rupiah
1,115.63 Rupiah
150,879.35 Rupiah
155,501.64 Rupiah
65,325.00 Rupiah
48,809 Rupiah
69,726.56 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
375,790.37 Rupiah
526,669.72 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
KOEF. SATUAN KET.
2,100,000 Rupiah
0.29832 -
2,819.08 Rupiah
21.00 Rupiah
2,840.08 Rupiah
383,725.44 Rupiah
161,200.00 Rupiah
919 Rupiah
1,312.50 Rupiah
25,000.00 Rupiah
34,285.71 Rupiah
606,442.40 Rupiah
609,282.49 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
Stone crusher
220.00 HP
50.00 T/Jam
5.00 Tahun
2,000.00 Jam
1,468,162,500.00 Rupiah
halaman 49
146,816,250 Rupiah
0.29832 -
197,089.07 Rupiah
1,468.16 Rupiah
198,557.23 Rupiah
340,401.60 Rupiah
143,000.00 Rupiah
64,232 Rupiah
91,760.16 Rupiah
25,000.00 Rupiah
22,857.14 Rupiah
687,251.01 Rupiah
885,808.24 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
KOEF. SATUAN KET.
116,025,000 Rupiah
0.29832 -
155,754.28 Rupiah
1,160.25 Rupiah
156,914.53 Rupiah
126,876.96 Rupiah
53,300.00 Rupiah
50,761 Rupiah
72,515.63 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
339,882.09 Rupiah
496,796.62 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
49,717,500 Rupiah
0.29832 -
66,741.77 Rupiah
497.18 Rupiah
67,238.94 Rupiah
85,100.40 Rupiah
35,750.00 Rupiah
21,751 Rupiah
31,073.44 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
210,103.82 Rupiah
277,342.76 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
KOEF. SATUAN KET.
21,000,000 Rupiah
0.29832 -
28,190.82 Rupiah
210.00 Rupiah
28,400.82 Rupiah
108,309.60 Rupiah
45,500.00 Rupiah
9,188 Rupiah
13,125.00 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
212,550.67 Rupiah
240,951.49 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
Trailer 20 ton
175.00 HP
20.00 Ton
5.00 Tahun
2,000.00 Jam
783,615,000.00 Rupiah
halaman 49
78,361,500 Rupiah
0.29832 -
105,194.04 Rupiah
783.62 Rupiah
105,977.66 Rupiah
270,774.00 Rupiah
113,750.00 Rupiah
34,283 Rupiah
48,975.94 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
504,211.67 Rupiah
610,189.32 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
KOEF. SATUAN KET.
Trailer 15 ton
150.00 HP
15.00 Ton
5.00 Tahun
2,000.00 Jam
315,000,000.00 Rupiah
31,500,000 Rupiah
0.29832 -
42,286.23 Rupiah
315.00 Rupiah
42,601.23 Rupiah
232,092.00 Rupiah
97,500.00 Rupiah
13,781 Rupiah
19,687.50 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
399,489.32 Rupiah
442,090.55 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
12,000,000 Rupiah
0.29832 -
16,109.04 Rupiah
120.00 Rupiah
16,229.04 Rupiah
154,728.00 Rupiah
65,000.00 Rupiah
5,250 Rupiah
7,500.00 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
268,906.57 Rupiah
285,135.61 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
KOEF. SATUAN KET.
Rupiah
84,000,000 Rupiah
0.29832 -
112,763.28 Rupiah
840.00 Rupiah
113,603.28 Rupiah
126,876.96 Rupiah
53,300.00 Rupiah
36,750 Rupiah
52,500.00 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
305,855.53 Rupiah
419,458.81 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
5,700,000 Rupiah
0.29832 -
7,651.79 Rupiah
57.00 Rupiah
7,708.79 Rupiah
30,945.60 Rupiah
13,000.00 Rupiah
2,494 Rupiah
3,562.50 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
86,430.42 Rupiah
94,139.22 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
KOEF. SATUAN KET.
1,750,000 Rupiah
0.29832 -
2,349.23 Rupiah
17.50 Rupiah
2,366.73 Rupiah
7,272.22 Rupiah
3,055.00 Rupiah
766 Rupiah
1,093.75 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
48,615.16 Rupiah
50,981.90 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
1,000,000 Rupiah
0.29832 -
1,342.42 Rupiah
10.00 Rupiah
1,352.42 Rupiah
6,498.58 Rupiah
2,730.00 Rupiah
438 Rupiah
625.00 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
46,719.65 Rupiah
48,072.07 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
KOEF. SATUAN KET.
2,940,000 Rupiah
0.43798 -
5,794.44 Rupiah
29.40 Rupiah
5,823.84 Rupiah
9,283.68 Rupiah
3,900.00 Rupiah
1,286 Rupiah
1,837.50 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
52,736.00 Rupiah
58,559.84 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
14,280,000 Rupiah
0.29832 -
19,169.76 Rupiah
142.80 Rupiah
19,312.56 Rupiah
154,728.00 Rupiah
65,000.00 Rupiah
6,248 Rupiah
8,925.00 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
271,329.07 Rupiah
290,641.63 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
KOEF. SATUAN KET.
Welding set
40.00 HP
250.00 Amp
5.00 Tahun
2,000.00 Jam
28,350,000.00 Rupiah
2,835,000 Rupiah
0.29832 -
3,805.76 Rupiah
28.35 Rupiah
3,834.11 Rupiah
61,891.20 Rupiah
26,000.00 Rupiah
1,240 Rupiah
1,771.88 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
127,331.96 Rupiah
131,166.07 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
107,100,000 Rupiah
0.29832 -
143,773.18 Rupiah
1,071.00 Rupiah
144,844.18 Rupiah
148,538.88 Rupiah
62,400.00 Rupiah
46,856 Rupiah
66,937.50 Rupiah
25,000.00 Rupiah
11,428.57 Rupiah
361,161.20 Rupiah
506,005.38 Rupiah
15.00 % / Tahun
25,000.00 Rp./Jam
11,428.57 Rp./Jam
11,783.00 -
12,894.00 -
26,000.00 -
halaman 49
URAIAN ANALISA BM SPLIT
Uraian Satuan
A. B a h a n
1. Batu kali (quarry - base camp) m³
B. Peralatan
1. Harga satuan dasar wheel loader 1,0-1,6 m³ jam
2. Stone crusher jam
C. Jumlah (termasuk biaya umum dan keuntungan di luar PPN) per m³ :
A. B a h a n
1. Batu kali (quarry - base camp) m³
B. Peralatan
1. Harga satuan dasar wheel loader 1,0-1,6 m³ jam
2. Stone crusher jam
C. Jumlah (termasuk biaya umum dan keuntungan di luar PPN) per m³ :
A. B a h a n
1. Batu kali (quarry - base camp) m³
B. Peralatan
1. Harga satuan dasar wheel loader 1,0-1,6 m³ jam
2. Stone crusher jam
C. Jumlah (termasuk biaya umum dan keuntungan di luar PPN) per m³ :
Uraian Satuan
A. B a h a n
1. Batu kali (quarry - base camp) m³
B. Peralatan
1. Harga satuan dasar wheel loader 1,0-1,6 m³ jam
2. Stone crusher jam
C. Jumlah (termasuk biaya umum dan keuntungan di luar PPN) per m³ :
halaman 48
Uraian Satuan
A. B a h a n
1. Batu kali (quarry - base camp) m³
B. Peralatan
1. Harga satuan dasar wheel loader 1,0-1,6 m³ jam
2. Stone crusher jam
C. Jumlah (termasuk biaya umum dan keuntungan di luar PPN) per m³ :
A. B a h a n
1. Batu kali (quarry - base camp) m³
B. Peralatan
1. Harga satuan dasar wheel loader 1,0-1,6 m³ jam
2. Stone crusher jam
C. Jumlah (termasuk biaya umum dan keuntungan di luar PPN) per m³ :
Uraian Satuan
A. B a h a n
1. Batu kali (quarry - base camp) m³
B. Peralatan
1. Stone crusher jam
2. Harga satuan dasar wheel loader 1,0-1,6 m³ jam
3. Harga satuan dasar dump truck 7,5 ton jam
C. Jumlah (termasuk biaya umum dan keuntungan di luar PPN) per m³ :
halaman 48
ISA BM SPLIT
239,997.94
239,997.94
239,997.94
239,997.94
halaman 48
Perkiraan Harga Satuan Jumlah
kuantitas (Rp.) (Rp.)
239,997.94
239,997.94
ke lokasi proyek
389,293.46
halaman 48
INFORMASI UMUM
halaman 50
ℓ q-BC = 83.33 km
halaman 50
15. Perkiraan jarak quarry pasir beton ke lokasi pekerjaan
L4 = { (ℓ d-o+χ/2)*χ + (ℓ d-o+y/2)*y } / (χ+y)
= 106.59 km
16. Perkiraan jarak base camp beton precast ke titik tengah kota
ℓ BCbp-o = 90.00 km
17. Perkiraan jarak base camp beton precast ke lokasi pekerjaan
L5 = { (ℓ BCbp-o+χ/2)*χ + (ℓ BCbp-o+y/2)*y } / (χ+y)
= 106.59 km
18. Jam kerja efektif dalam 1 hari 7.0 jam
19. Asuransi, Pajak, dsb. untuk Peralatan 0.002 x Harga Pokok Alat
20. Tingkat Suku Bunga Investasi Alat 15.00 %
21. Biaya Umum dan Keuntungan 10.00 % x Biaya Langsung
Quarry
pasir beton
WALIKOTA SEMARANG
HENDRAR PRIHADI
halaman 50
INFORMASI UMUM
halaman 50
x Harga Pokok Alat
% x Biaya Langsung
Quarry tanah
biasa
Radius wilayah
lokasi pekerjaan
12 km
Quarry tanah
padas
Quarry
pasir beton
WALIKOTA SEMARANG
HENDRAR PRIHADI
halaman 50
DAFTAR HARGA SATUAN
HARGA SURVEY
SEMESTER I TAHUN 2014
URAIAN SATUAN
1 2 3
1. Jendela nako m2
2. Kaca polos 3mm m2
3. Kaca polos 5mm m2
5. Kaca polos 8mm m2
6. Kaca cermin 5mm m2
7. Kaca cermin 6mm m2
8. Profil kaca m¹
9. Kaca patri 5mm m2
10. Kaca cermin 8mm m2
11. Kaca wireglass 5mm m2
12. Ray Band 3mm m2
13. Ray Band 5mm m2
14. Kaca gravire 5mm m2
15. Kaca gravire putih 5mm m2
16. Kaca lukis alur 5mm m2
17. Kaca triple 5mm m2
18. Kaca triple platinum 5mm m2
19. Kaca tanpa tripel 5mm m2
Daftar Harga Satuan Bahan dan Upah Semester I 2014 - halaman 230
HARGA SATUAN
(Rp.)
4
Daftar Harga Satuan Bahan dan Upah Semester I 2014 - halaman 231
HARGA PEROLEHAN ALAT
Harga
No. Jenis Alat yang Harga
digunakan
1 2 3 4
1 Aggregat/chip spreader 24,000,000 24,000,000
2 Asphalt distributor 4000 ℓ 395,000,000 395,000,000
3 Asphalt finisher ### 2,205,000,000
4 Asphalt liquid mixer 1000 ℓ 15,000,000 15,000,000
5 Asphalt liquid mixer 20000 ℓ 150,000,000 150,000,000
6 Asphalt mixing plant ### 3,500,000,000
7 Asphalt sprayer 850 ℓ 87,000,000 87,000,000
8 Asphalt Tanker 500,000,000 500,000,000
9 Blending equipment 500,000,000 500,000,000
10 Bore pile machine ### 2,250,000,000
11 Bore pile machine Ø 60 ### 1,170,000,000
12 Bulldozer 100-150 HP 900,000,000 900,000,000
13 Cement tanker 500,000,000 500,000,000
14 Chain saw 8,000,000 8,000,000
15 Cold milling machine ### 4,945,000,000
16 Cold recycler ### 19,500,000,000
17 Compressor 4000-6500 ℓ\m 110,000,000 110,000,000
18 Concrete pan mixer 632,333,000 632,333,000
19 Concrete breaker 900,000,000 900,000,000
20 Concrete mixer 350 ℓ 35,000,000 35,000,000
21 Concrete mixer 500 ℓ 66,000,000 66,000,000
22 Concrete mixer truck 5 m³ 405,000,000 405,000,000
23 Concrete pump 112,500,000 112,500,000
24 Concrete slip form paver ### 1,337,142,857
25 Concrete vibrator 4,000,000 4,000,000
26 Crane on wheel 10-15 Ton 342,000,000 342,000,000
27 Crane on track 35 ton 850,000,000 850,000,000
28 Crane on track 75-100 ton 900,000,000 900,000,000
29 Cutting machine 14,500,000 14,500,000
30 Dump truck 40 ton 680,000,000 680,000,000
31 Dump truck 20 ton 444,600,000 494,000,000
32 Dump truck 7,5 ton 162,350,000 191,000,000
33 Excavator 80-140 HP 850,000,000 850,000,000
34 Flat bed truck 3-4 m³ 330,800,000 330,800,000
35 Fulvi mixer 900,000,000 900,000,000
36 Generator set 135 KVA 207,000,000 207,000,000
37 Hot recycler ### 29,250,000,000
38 Jack hammer 35,000,000 35,000,000
39 Motor grader >100 HP 676,000,000 676,000,000
40 Pedestrian roller 150,000,000 150,000,000
41 Pile driver + hammer 2,5 ton 156,000,000 156,000,000
42 Pneumatic tire roller 8-10 ton 900,000,000 900,000,000
43 Rock drill breaker 900,000,000 900,000,000
44 Stone crusher ### 1,010,989,671
45 Tandem roller 6-8 ton ### 1,195,425,000
46 Three wheel roller 6-8 ton 350,000,000 350,000,000
47 Track loader 75-100 HP 542,000,000 542,000,000
48 Trailer 20 ton 600,000,000 600,000,000
49 Trailer 15 ton 450,000,000 450,000,000
50 Truck bak 5 ton 120,000,000 120,000,000
51 Vibratory roller 5-8 ton 918,787,500 918,787,500
52 Vibratory roller 1 ton 57,000,000 57,000,000
53 Vibratory plate tamper 17,500,000 17,500,000
54 Vibro rammer 80 kg. 14,000,000 14,000,000
55 Water pump 70-100 mm 5,000,000 5,000,000
56 Water tanker truck 3000-4000 ℓ 105,000,000 105,000,000
57 Welding set 17,500,000 17,500,000
58 Wheel loader 1,0-1,6 m³ 564,000,000 564,000,000
ROLEHAN ALAT
Sumber
Data
5
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004
PERMEN PU N0 15/KTPS/M/2004