You are reading Thumb rule of formwork quantity for High rise buildings.
Posted in Construction
Add
Comment
Like 4
Share
« Back
Comments
Showing 20 recent comments
[View more comments]
Ilias Mahammad : Concrete:0.5A Cum for Commercial Bldg. 0.2A Cum for Residential
Bldg. Where, A= Total Built Up Area.(i.e. Plinth Area xNo. of Floor) Steel: 4.5-4.75 kg
per Sqft of Built up Area for Residential Building. 5.0-5.5 kg per Sqft of Built up area
for Commercial Building. Formwork: (1). Shuttering = 6 times the quantity of
concreting.(or2.4 times the plinth area) (a) No of12 mm Ply(2.44mx1.22m)=0.22 times
of shuttering ( or, 0.4A) (b)Batten(75mmx40mm)=19.82X No. of Ply Sheets(it gives
batten in RM) (c)... more Posted: 1569 days ago
Rate It
Raj Kumar Shrivastava : Practically, 75 gm nails and 75 gm binding wire + nut-bolts are
consumed per sqm of shuttering Posted: 1565 days ago
Rate It
Sundeep Contractor : Some expert should comment on this. everybodys views are
different. Posted: 1560 days ago
Rate It
Ahmad Khan : it also depends on the target time. if you want to cast the next floor
before curing period of the 1st one, then the material required will be x2 specially the
shuttering formworks. Posted: 1310 days ago
Rate It
http://www.brijj.com/group/construction-management-construction-materials--discussionboard--Thumb-Rule-Of-Formwork-Quantity-For-High-Rise-… 1/4
5/20/2018 Construction
5 /51 Vote
Rate It
Sriharsha Md : I am working on Villa project. As per the data the calulation goes like for
1 Cum Concrete the requirement of shuttering is 11.71813333 Sqm On concretable area
for 1 Cum Concrete the requirement of shuttering is 3.767038414 Sqm On floor plate
area Shuttering required for 1 Sqm on BUA 3.110701842 Sqm On BUA Concrete
Coefficient / Sqm 3.767038414 Posted: 1046 days ago
Rate It
Hemant Kedare : by thumb rule, in ordinary building how many aggregate (fine as well
as coarse) is using per sft of total plan area( app.) Posted: 1001 days ago
Rate It
Rate It
Harshad Patel : We need to collect data from completed projects and work out quantity
of components like Formwork /steel/Aggregate/Manpower etc,,, the person who worked
in planning and billing have details of same in the project.....This details may very by
type of construction and Load bearing capacity of area ( where designer change
components accordingly )
Posted: 750 days ago
Rate It
Sri Charan : How can we calculate the shuttering qty for making a cast of beam for
Bridges?? Posted: 573 days ago
Rate It
Robin Rastogi : Pls tell me steel consuption per sq ft for ground plus twelve floor
Posted: 487 days ago
Rate It
Bhavesh Verma : I need to calculate the shuttering required for foundation work. How it
is calculated? Posted: 455 days ago
Rate It
Vvinayak Our Name : Please provide the Thumb rule for construction time line If you
want to connect 15 floor building...please provide time analysis for
tendering;Excavation ; PCC ; Typical construction.etc Posted: 398 days ago
http://www.brijj.com/group/construction-management-construction-materials--discussionboard--Thumb-Rule-Of-Formwork-Quantity-For-High-Rise-… 2/4
5/20/2018 Construction
Rate It
Suresh P Seeri : please tell me how to calculate the Rate for Beam Shuttering. I have
heard that, first three side to be calculated,, please tell me in details Posted: 395 days
ago
Rate It
Bhushan Ghogare : can you provide information of thumb rules for manpower required
in high rise buildings for centering work ( no of fitters, carpenters, helpers) required per
square feet area. Posted: 363 days ago
Rate It
Shivani B : Can any body tell me which is the most preferable shuttering material and
why? Posted: 338 days ago
Rate It
Uday Bhaskar : 1Cum of earth works 3-4 time of concrete on earth work Steel to be
considered 100-120 KG Shuttering area 4-6 Times of the volume Individual houses -2-4
kg steel to be considered per Sft, high towers upto 5Kg/Sft Posted: 330 days ago
Rate It
Ashok Reddy : Can you provide manpower of mivan aluminium shuttering .I want
skilled labour 20 members, un skilled labour 40 members,2years of work Posted: 249
days ago
Rate It
Shivam Arya : : praticaly suttering matarial 1 cum concrete used 1 ply (3 sqm ) . Posted:
191 days ago
Rate It
Maaruf Multani : Wht is Oil qun for 1 sq m shuttering? Posted: 64 days ago
Rate It
Comment
http://www.brijj.com/group/construction-management-construction-materials--discussionboard--Thumb-Rule-Of-Formwork-Quantity-For-High-Rise-… 3/4
5/20/2018 Construction
Login Here
Technology
Forgot Password?
Sales
Domains
Marketing
Banking
SEARCH
Strategyfor your profes
Find domains
Construction
Health Care
Finance
More »
Construction (32818)
To comment and start your own discussions Follow Domain
Share Link
Content (1987) Questions (294)
Jobs (9)
Ask Question Questions in Construction
Vipin Mathur , Project Manager, Stl Investments Ltd. A Big population is suffering without roo
(House) almost in every state of India what to do ? Views: 690
View all 13 Answers
Audhesh Kumar Tiwari : Who ever are remitting dollar , are not effected persons. Posted:
1487 days ago
Rate It
Abdul Azim Mohammad : The expats may not be effected,but their dollars are helping Ind
by reducing gap in balance of payment.They may also be effected once they return to India
unforeseen circumstances.Let us not devi... more Posted: 1487 days ago
http://www.brijj.com/group/construction-management-construction-materials--discussionboard--Thumb-Rule-Of-Formwork-Quantity-For-High-Rise-… 4/4