Академический Документы
Профессиональный Документы
Культура Документы
05/05/18 Ethiopian Patriots day. Ethiopian Patriots day. Ethiopian Patriots Ethiopian Patriots Ethiopian Patriots
day. day. day.
07/05/18 Burned 450 Tool cable test Jumpering No CP data 50 pair is not
pair MDF book connected to the cp
frame 50 pair is fixed on since we troubled
Burned over the new frame to identify the
head cable proper cable.
08/05/18 Burned 450 Tool cable test Jumpering No CP data We used one
pair MDF book daily laborer
frame 100 pair is fixed
Burned over on the new frame
head cable
Conclusion-
-The burned MDF frame is replaced by new frame and proper jumpering is made for the active customers
-the burned over head cable closure can be maintained only if the electric power near to the closure is off.