Академический Документы
Профессиональный Документы
Культура Документы
FEBRUARY, 2018
NO DESCRIPTION
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
A Powerhouse
Inner Wall 8th 9th
Staging Spiral Casing
Filling Conc EL.209.34-210.70
Filling Conc EL.210.70-211.90
Filling Conc EL.211.90-212.85
B Penstock
Wall Left 3rd
Wall Right 2nd 3rd
Inner Wall 1st left 1st right 2nd right 2nd left 3rd
C Tailrace
Foundation 2nd 3rd 4th
Wall Left 1st
Wall Right 1st
Inner Wall 1st left 1st right
SCHEDULE
FEBRUARY, 2018
27 28
4th
2nd
MONTHLY SCHEDULE OF POWER HOUSE
Project : Rajamandala (Hydro Electric Power Plant 1 x 47 MW)
Company : PT. Multi Karya Engineering
Facility : Power House (Civil)
JUNE, 2017
22 23 24 25 26 27 28 29 30
L
E
B
A
R
A
N