Академический Документы
Профессиональный Документы
Культура Документы
SP-A8GA-006-FLR-CS-PL-5010 RC
C 07/08/2017 AB VA PSR
B 17/07/2017 AB VA PSR
Revision History
A 22/05/2017 AB VA PSR
Prepared Checked
Rev Date Approved by
by by
BAUXITE EXPORT PROJECT, GUINEA - CC - 006
SP-A8GA-006-FLR-CS-PL-5010 RC
TABLE OF CONTENTS
1. PURPOSE.....................................................................................................................................................3
2. SCOPE..........................................................................................................................................................3
3. DEFINITIONS .............................................................................................................................................3
4. RESPONSIBILITIES OF KEY PERSONAL ..............................................................................................3
5. METHODOLOGY –TASK STATEMENT .................................................................................................4
5.1. Drawing and specifications ......................................................................................................................4
6. PILE TESTING ............................................................................................................................................4
6.1. Lateral load test ........................................................................................................................................5
6.2. PRESENTATION OF RESULTS ............................................................................................................7
7. LOGISTICS AND MATERIALS FOR CONSTRUCTION ........................................................................7
8. RISK ASSESSMENT ..................................................................................................................................7
9. HEALTH SAFETY AND ENVIRONMENTAL PLAN .............................................................................8
10. ATTACHMENT: .......................................................................................................................................10
BAUXITE EXPORT PROJECT, GUINEA - CC - 006
SP-A8GA-006-FLR-CS-PL-5010 RC
1. PURPOSE
The purpose of this method statement is to identify the tasks involved in this work and to explain all
the involved parties step by step procedures adapted to ensure the works are carried out in a Safe,
efficient and environmental friendly manner.
2. SCOPE
This method statement covers the Lateral Load Testing for Piles.
3. DEFINITIONS
HSE – Health, Safety & Environment
JSA – Job Safety Analysis
QC – Quality Control
DPM – Deputy project Manager
BBS – Bar Bending Schedule
IFC – Issued for Construction
SP-A8GA-006-FLR-CS-PL-5010 RC
d) Quality Manager
The QAQC manager is responsible for reviewing this procedure and has the overall responsibility to
ensure that works in the field are performed in compliance with all applicable quality standards,
stipulations and procedures and to take corrective actions in cases where the work is not performed
correctly.
Responsible for ensuring quality standards as per project requirements at Site.
Responsible to carry out the water sample tests, trail mix design and observe results.
Coordinate with site team and sub-contractors for compliance to Quality aspects.
Maintaining the quality records as per specifications.
e) Safety Officer
Conduct necessary induction training for workers.
Conducting daily Tool box meetings and work briefing to workers.
Ensuring that all equipment is in good condition, meeting safety requirement by checking and
submitting equipment checklist.
Responsible for ensuring that all applicable safety and environmental measures are implemented
during the period of construction.
Ensure that recipients understand Job safety analysis (JSA) and risk assessments.
Attends Weekly site walkthrough for HSE inspections with client.
f) Supervisor
Responsible for material handling, loading and unloading of equipment, observe safety and quality
standards, materials, tools safekeeping, monitor labor workforce.
Responsible for quality, progress and safety.
Executing the work as per specification and schedule.
Performing risk assessments to ensure that the job remains safely executed.
Maintaining good housekeeping and safety standards at site location.
6. PILE TESTING
Testing of piles shall be carried out in accordance with drawings & specification.
Install Ø600mm / Ø 500mm Piles for testing
BAUXITE EXPORT PROJECT, GUINEA - CC - 006
SP-A8GA-006-FLR-CS-PL-5010 RC
SP-A8GA-006-FLR-CS-PL-5010 RC
Following each application of an increment of load the load shall be held for not less than the
period shown in the above table. For any period when the load is constant, time and settlement
shall be recorded immediately on reaching the load and prior to the next step of load.
BAUXITE EXPORT PROJECT, GUINEA - CC - 006
SP-A8GA-006-FLR-CS-PL-5010 RC
Contract identification
Site location
Main contractor’s name
Client
Date, Time, weather conditions.
Control Staff (Contractor’s / Client’s Representatives)
Date of pile installation and concreting
Type, size and length of pile (as pitched and as driven)
Reinforcement details
Date of pile load test
Load settlement curves, time vs settlement curves,
Time vs load curves
Pile identification number
Photographic record of the tests
Calibration certificates
Cube Test result (Trail Mix design report)
8. RISK ASSESSMENT
a) Broad Risk assessment – Guidelines for JSA
Loading and unloading
Use of cranes, Lifting and rigging practice
Transportation
Manual handling
Material handling
Traffic management
Slip trip and fall
BAUXITE EXPORT PROJECT, GUINEA - CC - 006
SP-A8GA-006-FLR-CS-PL-5010 RC
b) Task Specific JSA to address the above broad risk areas. In addition the following generic
risk assessment* and new assessment ** will be used
Traffic management *
Manual handling*
Loading and unloading *
Use of cranes, Lifting and rigging practice *
c) Safe work Procedure for :-
Crane operation
Forklift Operation
d) TASC card guidelines
Availability of proper access and egress
Crane operation, vehicle and equipment movement
Loading and offloading
Manual handling
Health and hygiene
PPE compliance
e) Risk –based main HSE focus area
Use of cranes, lifting and rigging practices
House keeping
Traffic control
SP-A8GA-006-FLR-CS-PL-5010 RC
Fire Service
Fire Service Kamsar
Security
Afcons site: -
Kamsar 24 hrs Security: -
GAC Project Security:
Emergency contact numbers will be displayed in the site area and the office area/ rest area
c) First Aid
Company first aiders will respond to work site as required.
Assigned safety agents will also serve as first responders.
Emergency First Aid box will be available on site.
Company clinic facilities will provide for the medical care of injuries.
First Aider will be identified by white hard hat with Red Cross and first responders will
be wearing green hard hat.
d) Fire prevention & Fire fighting
All the waste materials will be removed or properly disposed on daily basis.
Fire point with 3x DCP (5 kg), 2x Co2 (5 kg) with good condition will be made available
at the butt fusion area.
In case of emergency ref Para 8(b) for telephone number
e) HSE Training requirement as per training schedule
Everybody will be given job specific induction prior to deploy on job.
Training will take place in accordance to identified training needs and training schedules.
f) HSE communication topics
Daily Tool box meetings will be conducted by the Engineer/supervisor prior to work and
the records will be maintained.
TASC will be conducted by the supervisor prior to work and he will brief about the work,
hazards associated with the work and prevention method to overcome the hazards and the
records will be maintained.
Tool Box meeting will be conducted on the following topics
Trip & fall hazards PPE
Manual handling Pinch points
Hand tools Fire prevention and extinguishing
Power tools Traffic control
Lifting operations Health & hygiene
Crane safety Access/egress
Rigging safety Housekeeping
BAUXITE EXPORT PROJECT, GUINEA - CC - 006
SP-A8GA-006-FLR-CS-PL-5010 RC
10. ATTACHMENT:
1. Pile Load Test Observation Sheet