Fig. 2. SCCC Configuration. The AGC is the one that is in charge of automatically
adjust the generation of the units of the Power Plant, with the
1) Data Processing Server: intention of fulfilling the requirements of generation of CVG
They are the servers who are in charge to process all the EDELCA. The AVC makes a real time dispatch of the reactive
information coming from distributed control, that is to say, power of the Power Plant and maintains the voltage in the
from all the control boards that contain all the information of generators and in the switchyard, its objective will be to
the generation units, the switchyard and the Caruachi spill maintain the voltage in the 400 kV bars in the required level
gates. Besides in these servers, the on line application while the balance of the load of reactive power of each unit is
programs such as: the Automatic Generation Control (AGC), maintain. Finally, the SGC is in charge to maintain the
Automatic Voltage Control (AVC) and Automatic Spill gates volume of the river and the level the dam by means of
Control (SGC), run in real time. adjustments of the Spill gates.
EDELCA. The adjustment of the generation can be received 4) Active Power and Frequency:
from the System Operations Center, obtained from forecast In this mode of control the AGC calculates the
values or manually introduced by the operator of the power requirements of generation of the power plant, or GCE, taking
plant. into account for it the variation of active power (programmed
minus actual) and the variation of frequency (programmed
2) To maintain the system frequency as close as possible to minus actual) and the respective frequency polarization
the reference frequency. constant.
2) Dispatch:
The generation of active power of the power plant is
controlled from the System Operations Center .
F. Processing Modes
1) Active Power:
The requirements of generation of the power plant that will
be used by the AGC for the control of the active power of the
power plant, are assigned manually by the operator of the
power plant as a base value which previously is coordinated
with the System Operations Center, additionally, they can be
received from the System Operations Center through the ICCP
link between control centers or be obtained from a table of
forecast values. In this mode the GCE is calculated as the
difference between the actual generation minus the desired
Fig. 3. Operation of the AGC.
generation.
H .Control Modes of the Generation Units
2) Frequency:
In this case the requirements of generation of the power 1) Automatic:
plant are calculated by the AGC, but taking into account only The Unit participates completely to satisfy the variations of
the component from the frequency of the system (programmed active power generation of the power plant.
minus actual) and the respective frequency polarization
constant for the calculation of the GCE. 2) Base load without regulation:
The unit does not participate within the regulation of the
3) Time Error Correction: system, to satisfy the variations of the power plant generation,
The requirements of generation of the power plant are remaining with a fixed generation established by the operator.
calculated taking into account the time deviation.
3) Base load with regulation:
4
The unit participates to satisfy the variations of power It is equal to the maximum active power of a unit minus a
generation of the power plant, in a limited form within a rank of regulation determined by the operator, also due to
regulation rank. restrictions of operations or temporary conditions of the unit.
5) Manual:
The unit does not participate to satisfy the variations of Maximum Active Power
power generation of the power plant, that is to say, the AGC Reserved Regulation Rank (Upper)
does not send setpoint control to the unit.
Maximum Regulation
Minimum Regulation
Reserved Regulation Rank (Lower)
Minimum Active Power
1) Spinning Reserve:
It is sum of the spinning reserve of all the units. ACUMULATED TIME
ERROR ACTUAL FREQUENCY ACTUAL ACTIVE ACTIVE POWER
MANUAL ENTRY
It is the sum of the raise regulation margin of all the units BIAS
that are out of line and available, that is to say, that is not in
maintenance. Fig. 6. Active Power Setpoint Distribution.