NEW DEALERSHIP READINESS PLAN - DHARMANA, SRIKAKULAM

Slno Area of Work Target Date


A SHOWROOM
1 Erection of Shed & Completion of Basic structure
2 Interior Civil work, Painitngs / Electricals 20-Oct
3 Showroom false Sealing & Flooring- tiles as per RIP 15-Oct
4 Showroom Glass fittment
5 Cabins / Meeting room / Partitions work as per Layout 20-Oct
6 Furniture - Chair, Tables & Storage cabinets to RIP 25-Oct
7 Fron facia - Clading & Main Signage Installation 30-Oct
8 Branding - Pillars/Shutters & Internal - Posters/Signages 31-Oct
9 Reception table & Backdrop installation 30-Oct
10 Order for Marketing & POP kits as required 12-Oct
11 CDMS Installation - Systems, Printer & Broadband 15-Oct
12 Recruitment of Sales Manager & Team Leaders
13 Recruitment of Counter/Field sales Executives & CDMS
14 Training to Fiels Sales Team 11-Oct
15 Uniforms to Sales & Showroom Staf 20-Oct

B WORKSHOP
1 Erection of Shed & Completion of Basic structure 10-Nov
2 Interior Civil work, Kota Floor & Electricals 25-Nov
3 Cabins / Partitions work & false sealing as per Layout 10-Dec
4 Wall Paintings- External & Internal wall/Floor as per RIP 12-Dec
5 Furniture - Chair, Tables & Storage cabinets to RIP 14-Dec
6 Workshop Tables-Engine table, Tech lockers, Dining etc 14-Dec
7 Branding - Main Signage & Internal - Posters/Signages 15-Dec
8 Reception table & Backdrop installation 14-Dec
9 General Tools & Equipment as per Check list 5-Dec
10 Order of 2 post lift, Wash Jack, Air compressor 1-Dec
11 Special Tools order - 1 tonner & Porter, Engine Stand 25-Nov
12 Installtion of 2 post lift, Air Complressor/Pnuematics 10-Dec
13 Readiness of Wash Bay with Hoist & Floor/wall to RIP 10-Dec
14 Spares - Racks, Bins Arrangement and Counter with POP display 10-Dec
15 Customer Lounge - Seating, LCD TV & Water cooler 12-Dec
16 Toilets - for Customers & Staf 10-Dec
17 CDMS Installation - Systems, Printer & Broadband 10-Dec
18 Recruitment & Training of Staf - WM,SPM, CRM & SA/SUP 1-Dec
19 Recruitment & Training Technicians 10-Dec
20 Uniforms to Staf & Technicians 15-Dec
C NETWORK - READINESS
1.1 Site Identification & Proposal for LOA 25-Nov
1.2 Completion of Setup-to norms 15-Dec
PALASA
1.3 LOA proposal- with required manpower 15-Dec
1.4 Setup into operation 15-Dec
2.1 Site Identification & Proposal for LOA 25-Nov
2.2 Completion of Setup-to norms 15-Dec
RANASTALAM
2.3 LOA proposal- with required manpower 15-Dec
2.4 Setup into operation 15-Dec
3.1 Site Identification & Proposal for LOA 25-Nov
3.2 Completion of Setup-to norms 15-Dec
RAJAM
3.3 LOA proposal- with required manpower 15-Dec
3.4 Setup into operation 15-Dec
Review Date
A, SRIKAKULAM
10/7/2015

Expected
Present Status / Remarks Completion date

done
20-Oct
15-Oct
done
20-Oct
25-Oct
30-Oct
31-Oct
30-Oct
12-Oct
15-Oct
done
done
11-Oct
order placed 20-Oct

10-Nov
25-Nov
10-Dec
12-Dec
14-Dec
14-Dec
15-Dec
14-Dec
General tolls bought 5-Dec
1-Dec
25-Nov
10-Dec
10-Dec
10-Dec
12-Dec
10-Dec
10-Dec
1-Dec
4 mechnics recruited already 10-Dec
order placed 15-Dec
25-Nov
15-Dec
15-Dec
15-Dec
25-Nov
15-Dec
15-Dec
15-Dec
25-Nov
15-Dec
15-Dec
15-Dec