CCPP Operating Regime – Past & Present
24 hr 24 hr
LAM50
400 Asia
Russia CIS
MEA
300
Oceania
India
200 China
Europe
100
0
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
Source: Alstom 2011
© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Key Drivers of Product Development
© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Gas Turbine Product Portfolio
GT26 296 MW
>320
GT24 >230
193 MW
GT13E2 >200 MW
GT11N2 115 MW
GT gross electrical output at the generator terminals, including gearbox (where applicable) and generator losses but excluding duct and auxiliary losses.
Calculated with 100% methane at ISO conditions, GT cooling air cooler contribution included where applicable 50 Hz
60 Hz
60 & 50 Hz
CL = Shaft Centre-Line
SSS = Self-Shifting Synchronous
3PRH = Triple Pressure Reheat
GSU = Generator Step-Up
© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
KA26-2 MS “Reference Plant”
• 2-on-1 Multi-Shaft Power Train configuration
• 2 x Alstom GT26 Gas Turbines, each with TOPAIR (air-cooled) Generator
• 2 x Alstom drum-type HRSG as standard
• Alstom Steam Turbine with air-cooled (TOPAIR) or hydrogen-cooled (TOPGAS) Generator
• Alstom Plant Control System (ALSPA)
• 3PRH water-steam cycle (conventional water-steam conditions)
• 3 x GSU-Transformers
© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Nominal Performance – KA26(2011)
KA26-1 KA26-2
Plant performance data at ISO ambient conditions,
methane fuel with Indirect (WCT) Cooling Single Shaft Multi Shaft
1-on-1 2-on-1
Plant Net Output MW 467 935
% (LHV) 59.5 59.5
Plant Net Efficiency
kJ/kWh (LHV) 6055 6050
Plant Net Heat Rate Btu/kWh (LHV) 5739 5735
KA26-1 KA26-2
Plant performance data at ISO ambient conditions,
methane fuel with Direct Cooling Single Shaft Multi Shaft
1-on-1 2-on-1
Plant Net Output MW 473 947
% (LHV) >60 >60
Plant Net Efficiency
kJ/kWh (LHV) <6000 <6000
Plant Net Heat Rate Btu/kWh (LHV) <5688 <5688
2006
2002
1999
Compressor +
Turbine + Combustor Compressor +
Upgrade + SEV Burner +
FLEXIBILITY
SEV-combustor
EV-combustor
22-stage compressor
4-stage LP-turbine
Solid Rotor
1-stage HP-turbine
4 rows VGV‘s
KA26
2%-4% abs.
Single Combustor GT
single combustor engine
GT Ignition
~30 min ~100 min ~150 min
60%
ca. 40% less fuel consumed
50%
compared with operating
40% at 50% CCPP load
30%
20% 2 Shut-down
10%
0%
1 2 3 4 5 6 7 8 9 10 11
Time
C2+ varied by more than factor 10 in few hours! • Ready for changes in fuel
gas supply (i.e. LNG)
High airin
Inlet Air Cooling Fogging
Fogging Nozzles
High Fogging combustor
filter
Silencer
compressor
turbine
• Evaporative Cooling
- Cooling by water evaporation through cooling pads
• Fogging
- Cooling by water injection with GT inlet humidity close to saturation
• High Fogging
- Compressor inter-cooling by water injection with inlet humidity above saturation
80
70
Typical GT NOx Emission
60
50 EU Limit
40
30
LLOC
20
10
Actual NOx emissions depending on fuel composition
0
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
100 EU Limit
CO Emission (mg/Nm3)
Typical GT CO Emission
60
20
LLOC
0
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Capable of
Heat > 300 MWth
With bypass
& duct firing
(Option) Capable of
Condensing-Heating > 500 MW
Mode
Low Load
Operation
Boroscopic GT Inspection
(no burner/cans exchange foreseen,
Visual no combustor tuning)
Inspection
B
(incl. Control 18000 54000
14000 42000
System Insp.)
(4-5 days**)
© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
KA26 Capture Ready
Concept of KA26 with CCS
© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Alstom activity on demonstrations
1st and 2nd Generation CCS
Tests complete Operating Large-scale projects-under development
NER300 NER300
© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Gas Power Plants
KA26 & KA24 References
BESOS 1x KA26-1 RINGSEND 1xKA26-1 ROCKSAVAGE 1xKA26-2 FLEVO 2xKA26-1
BESOS 1x KA26-1 AGHADA 1xKA26-1 ENFIELD 1xKA26-1 CLAUS C 1xKA26-3**
SAN ROQUE 1x KA26-1 SHOREHAM 1xKA26-1
SAN ROQUE 1x KA26-1 CORYTON 1xKA26-2 CYCOFOS 1xKA26-1
CASTEJON 1x KA26-1 LANGAGE 1xKA26-2 FOS SUR MER 1xKA26-1
CARTAGENA 3x KA26-1 GRAIN 3xKA26-1*
CASTEJON 2 1x KA26-1 STAYTHORPE 4xKA26-1 RDK 1xKA26-1**
MALAGA 1x KA26-1 PEMBROKE 5xKA26-1 KW EMSLAND 1xKA26-2
SOTO DE RIBERA 2x KA26-1
TPP26 1x KA26-1*
GILBERT 1x GT24
BURGIN 2x GT24 Alstom Test Power Plant
AGAWAM 1x KA24-1 1x KA26-1
MIDLOTHIAN 4x KA24-1
ALIVERI 1x KA26-1
ISLAND COGEN 1x KA24-1*
LAKE ROAD 3x KA24-1 Tzafit 2x KA26-1
MILFORD 2x KA24-1
BLACKSTONE 2x KA24-1 CHIBA 1x KA26-1
BAYSIDE 1x KA24-1**
HAYS 4x KA24-1 PORYONG 4x KA24-2
MIDLOTHIAN II 2x KA24-1
BELLINGHAM 2x KA24-1 HAI FU 2x KA24-2
LA PALOMA 4x KA24-1
BOWIN 2x KA26-1
MONTERREY 2x KA24-1 BANG BO 1x KA26-1
ROSARITO 2x KA24-1 KHANG KHOI 2x KA26-2
HERMOSILLO 1x KA24-1
SWANBANK 1x KA26-1
MONTERREY III 4x KA24-1
TALLAWARRA 1x KA26-1
EL SAUZ 1x KA24-1**
TARANAKI 1x KA26-1
TERMOBAHIA 1x KA24-1*
SENOKO 1x KA26-1**
TOCOPILLA 1x KA26-1 SCANDALE 2x KA26-1(*) SENOKO II 2x KA26-1**
GISSI 2x KA26-1 UTRAN 1x KA26-1 TUAS CCP5 1x KA26-1
DOCK SUD 1x KA26-2 TERGA 3x KA26-1 MODUGNO 1x KA26-2 JEGURUPADU III 2x KA26-1 KEPPEL II 2x KA26-1
Banyan 1x KA26-1
* CoGen Projects GHANNOUCH 1xKA26-1 FUJAIRAH 2xKA26-2; 1xKA26-1* red & italic = SC
** Repowering Projects blue = CC single-shaft
(Status: Jan 2012) blue underlined = CC multi-shaft
© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Overall RAM status of KA26 Plants
Capacity Factor progress - 12 monthly rolling average
© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Overall RAM status of KA24/ KA26 Plants
KA24/26 Fleet Operations regime in 2006-2010
© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Overall RAM status of KA24/ KA26 Plants
KA24/26 Fleet Operations regime 2011
© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Overall RAM status of one specific KA26 Plant in EU
12 monthly rolling average
© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any
particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without
express written authority, is strictly prohibited.
Key KA26 Features / Customer Benefits
• Superior operational flexibility
High full-load performance (capable of >59% efficiency with ACC)
Superior part-load performance (virtually constant efficiency from 100% down to 80% load)
High reliability and availability
Turndown capability down to below 50% load
Fast starting options including <30 minutes hot start capability
Emission compliant parking of entire plant at ~20% CCPP load
offering spinning reserve of more than 350 MW per block in 15 minutes
Superior fuel gas composition flexibility (±15% WI tolerance)
Proven GT Inlet Cooling options for power augmentation
On-line choice between Performance Optimised (PO) and
Maintenance Cost Optimised (MCO) operation modes
• Reduced emissions
NOx emissions well below EU limits (50 mg/Nm3)
CO capability well below EU limits (100 mg/Nm3)
Low overall CO2 emissions due to high efficiency over full load-range
CO2 Capture Ready solutions already available