Вы находитесь на странице: 1из 6
} No, “ah 227 eee Hondquarters aE (te Canerat Border Reade (Dee of Brges & Tunating) Sccrsn Sadek Bhawan | Ring oad, De Cant, ew Doth 110 010 sossn-arsseyocens WU por om ef _pet 2003 We fo 59/7 99 AO (an poets) ‘AND “BRIDGE SSR FOR ESTIMATE PURPOSE” 1. Ths. Bridge SR-1990 was lsued and made effective n BRO wer 03 Ap. 2001, This Sits Component wea tam wie. In such ena, the datoded designs should be mad aval in hard fer prepivation of estimate. In most of ta cases, the dataled designs ara rot avalble ding ‘Sstnate stage: Hence, nead was fel to have a Bridge SSR on per m shan bal, eomponent wise (substructure and supersb eter 2. In view ofthe above, analysis of cos of construction of several Brides in BRO was caried ‘st basad on the iam-wee quantities and a per metro span SSR for Ins! state purposa ha [Seon valved. Thiz SSRs Extge component wee and per metre coercion ree ies bean given Fee span ranging from 30m to 70m. Some ofthe worked ct Brkige cost estineta samples Nave [sour etclsad st Appa & to the SSR, Ti crfind thatthe per mire rate Sit Is en aoplcae for sialy supported span Brisges on bearing. Th SSR is het applesble for balswed cartiever| Drilgee, contmunus brtiges, Med Frame fridges of cable stayed bridges. I also cirfed that In Sha flevieed Approxrite Estimates and Wier Done Estates, Rem wise Bridge SSK 1998 has tebe adonted, 2. Pov antee rate bin SCH mn effective wel DI Apr 2003. Thess SSA ra wl subact e veew eA 3 yo or inate rate bridge SSK Yor wit eset purpose eae afte bana cen fram 16 (BA) vide thar Nake Wo TD No TF/W/1SO/AA NHN. RIL-220(22 7) che a 5. Phase acknowledge rece. (oY ne) See Specs a ee canta rab Sem Sedke Bhawan Naw pei 130 010 SBR WP Ota oseniFr ote sna Das ounfy e8 verget SOST PER M SPAN (FOR ESTIMATE PURPOSE) SUDSIRUCTURE AND FOUNDATION COST CIN Rs LACS) PER m SPAN (FOR OPEL FOUNDATION) Wier Hotes 1. the substructure overall ght has baen talon as 10 m for cest perm substructure. For vaca eit ctr than 40 tm, the Ct por m wl be worked out proper tonite ceestey AENDIXB [beA_ cot a brkiga wth 35 s gpm and having bots aah ns on open Feu wt 13.0) Sha thw erage issued ) UBB, sotation (o)Sunenstiustare Frm ttle St) for 35 m span 1.20 as er ms the cos Hence cst = 35x4.20= Re 42.00 es, (b) Substructure : From Table 5(2) for 35 m spon Re 4.15 lace par mt the cast for substuctize helt tte tom. “Therefore for 13 m height rata = 1.15 x 19/10 = Rs 1.495 lae/m. Herc cost = 35 » 1.495 = Re 52.325 ns bal enat © 42,00 + 52.325 ~ Re 84.325 lcs. Dia cost « bine wih 50m span, Goh the strats, are on wa eur High of Bz Com 2 MMT nd dap of wall 14m, The bridge i ated in () Deak ettion sesrenuctune rom Tabla 5(b for 50 m epan Re 4.40 las parm is the cot Hones cost = 50 X40 « Rs 70,00 acs ‘Subatucture ‘om table 5 (e) for $0 my cpan F135 lcs perm te cost For suberuclrs halght wei Aoeeie nals teeberecmem= 040 ist) = = feos ee ear seven afr wal foundation upto 10m cet) = 3.00% 1.25 e135 Jae pe 10 cunt of an = 4/10 X 0.84 X50 = 21,60 bes sat cf wall = 14/10 x 1.35 x 50 « R5 0450 ace Fetal wat = 70.004723,60494.50 = Rs 186.10 es. c lie sgeretusture overot with has bes taken 9g 11un for enat per of suerstuctire "oe vowed ets then 13m, thn tpt wl a watlnd Out propor onstah ‘Substiucture-on wall foundation (0). Sgetusucer the cost of substructure sbove we cap opto deck eve. taking overall Helgi Itt wil be taken as 4095 ef tha valuae given in Table Aa) te. thooe for ope (euro Fer overal ght ether thar 10 m tha cost pr ml be worked ext Eroporthnatahy ell foundation: For wel foundation upto 19 depth from top ef wall ap wil be taken {Un fer subst uct on open foundation |e valves given in Tae 4a). For well dog ole {ig lity the cost parm of span wl be worked aut preprtonately. 4 Baidaa estimates ln the bridga shame dawngs provargd_n rorpect of each bras the type of suysestuctre, substructure and foundator are shown lati. Based on tose eels! ‘linavetons the bidge aetnatas can be prepared 9oLOEE a Headquarters ei wt Lbrectorate General Border Roses (Bte of Bridgas & Tunnate) Seurna Sadak Bhawan, Ring Road Bathi Cantt ~ 110 010) PEN 21s ps cartier 2003 99 ADS DER METRE RATE SSR FOR BI 1 Furthe to this Dte latter No 40520-4/SSR/DGBR/14/Br Dte dated 08” Cet 2002. ]ough the subject SSR incorporates rales for Project Deapal, Vartak and Udayal aes could be rotiied by ether projects for thelr usa by mulkipiying 3 factor which | vavrived fer your Project ag under:= 1+ {Adm Ovethead Charges in 9» + Supervision Charges in % + Miscellaneatis active Project ‘CRIPTION OF ee Sek? | See eed vk head agers 15.38 Supervision Charges +. 2.50% - Miscellaneous CCharges)/109} for Project Daepak ULSI TTF Wis Tse Aas Ove | FoR) | Deepa i | fe se {2245211 + (10.34% - Ram Overhead Charges + FT bam | 1 FOR (P) | Supervision Charges + 2.50% = Miscellaneous | UDAYAK | Charges)/100} for Project Udayak t Dieetlons may plaaca be mada in the subjact SSR issued vide our letter Ls vn unl the heading "SUBSTRUCTURE ANO FOUNDATION COST (Re 1M Fo SPAN FOR OPEN FOUNDATION” at Appendix ~ A” to be considered \ st tho heading “SUPERSTRUCTURE COST (Rs IN LACS) PER m the considered as "TABLE ~ 72", five ~ 1 gxample 2 ated in Appendix as ‘Tobie s(t) read “TARLE ~ gy, for “Table 5(0)" Mpalipieces... eee) soa Le ie me yey (us chaunan) 5e (civil Director (Bridges) for 0GBR

Вам также может понравиться