6000
190 190
200
600
Examples on how to Calculate Material 3.49 x 5.5 = 19.195 bags cement (round off to
20 bags)
Quantities: 3.49 x 0.75 = 2.6175m3 riversand (round off to
3m3)
Wall Height : 2.4m 3.49 x 0.75 = 2.6175m3 stone (round off to 3m3)
To calculate the volume of concrete required, the overall Volume = Length x Width x Thickness
dimensions of the concrete strip foundations need to be = 7.360m x 5.560m x 0.075m
determined. Also, refer to guidelines of cement manufacturer. = 3.069m3
Overall length + outside wall dimension + 380 Requirements: Medium Strength Concrete
Therefore : 7800 + 380 = 8180m To produce medium strength concrete as per the calculation,
6000 + 380 = 6380m
CHAPTER 20
82 www.claybrick.org
= Length x Height 10 bags of cement
= (2X7800 + 2X6000) x 2.4 2.0m3 plaster sand
= 15.600 + 12.000 x 2.4
= 27.600 x 2.4 62 x 0.10 = 6.2 bags of cement (round off to 7)
= 66.24m2 walling 62 x 0.02 = 1.24m³ plaster sand
i NOTE
4. Topping (Screed)
To produce 100m2 of screed, that is 25mm thick you will need:
23 bags of cement
3.0m3 riversand sand
Internal
Formula = Length x Height
= (14.72 + 11.12) x 2.4
= 25.84 x 2.4
= 62.016m2
www.claybrick.org 83
Clay Bricklaying Made Easy
NOTES
CHAPTER 20
84 www.claybrick.org