Site Instructions
Others (Specify)
U - Under Review
Submitted by Returned by
ACTION
SI SWI RFI RFIA MIR RAS NCR OT Contrac. Consul.
Request for Inspection. Motor park Project sign board coordinates and elavation
2 SSH-K-CVL-002 0 Lagoona
prior to excavation. ü 20-Feb-18 21-Feb-18 B Approved As Noted
Request for Inspection. Setting Out points of perimeter fence around motor park
2 SSH-K-SUR-003 0 Lagoona
area, prior for foundation excavation ü 4-Mar-18 7-Mar-18 B Approved As Noted
2 SSH-K-SUR-004 0 Lagoona Request for Inspection. Top of sub-grade level prior to aggregate base course laying ü 4-Mar-18 7-Mar-18 B Approved As Noted
Request for Inspection: Top off Sub grade level prior to aggregate base course
SSH-K-CVL-005 0 Lagoona
laying track A Sta. 0+360 to Sta. 0+460 ü 6-Mar-18 8-Mar-18 B Approved As Noted
Request for Inspection: Top off Sub grade level prior to aggregate base course
SSH-K-CVL-006 0 Lagoona
laying track A Sta. 0+860 to Sta. 0+940 ü 6-Mar-18 8-Mar-18 B Approved As Noted
Request for Inspection: Top off Sub grade level prior to aggregate base course
SSH-K-CVL-007 0 Lagoona
laying track A Sta. 1+540 to Sta. 1+680 ü 6-Mar-18 8-Mar-18 B Approved As Noted
Request for Inspection: Top off Sub grade level prior to aggregate base course
SSH-K-CVL-008 0 Lagoona
laying track A Sta. 1+820 to Sta. 1+900 ü 6-Mar-18 8-Mar-18 B Approved As Noted
Request for Inspection: Top off Sub grade level prior to aggregate base course
SSH-K-CVL-009 0 Lagoona
laying track A Sta. 2+380 to Sta. 2+460 ü 6-Mar-18 8-Mar-18 B Approved As Noted
Request for Inspection: Top off Sub grade level prior to aggregate base course
SSH-K-CVL-010 0 Lagoona
laying track A Sta. 3+080 to Sta. 3+200 ü 6-Mar-18 8-Mar-18 B Approved As Noted
Request for Inspection: Top off Sub grade level prior to aggregate base course
SSH-K-CVL-011 0 Lagoona
laying Kart track A From Sta. 0+120.00 to 0+180.00 ü 8-Mar-18 11-Mar-18 B Approved As Noted
Request for Inspection: Top off Sub grade level prior to aggregate base course
SSH-K-CVL-012 0 Lagoona
laying Gradient TM3 Track Sta. 0+300.00 to 0+460.00 ü 8-Mar-18 11-Mar-18 B Approved As Noted
Request for Inspection: Top off Sub grade level prior to aggregate base course
SSH-K-CVL-013 0 Lagoona
laying Drift Track A Sta. 0+180.00 to 0+260.00 ü 8-Mar-18 11-Mar-18 B Approved As Noted
Request for Inspection. Setting Out points for location of storm water manholes
SSH-K-CVL-014 0 Lagoona
and pipe line from M1.9 TO M1.7 and from M1.7 to M1.8 for prior to excavation ü 11-Mar-18 13-Mar-18 B Approved As Noted
Request for Inspection. Setting Out points for location of storm water manholes
SSH-K-CVL-015 0 Lagoona
and pipe line from M1.7 TO M1.6 and from M1.6 to M1.5 for prior to excavation ü 11-Mar-18 13-Mar-18 B Approved As Noted
Request for Inspection. Setting Out points for location of storm water manholes
SSH-K-CVL-016 0 Lagoona
and pipe line from M1.5 TO M1.4 and from M1.4 to M1.3 for prior to excavation ü 11-Mar-18 13-Mar-18 B Approved As Noted
Request for Inspection. Setting Out points for location of storm water manholes
SSH-K-CVL-017 0 Lagoona
and pipe line from M1.3 TO M1.2 and from M1.2 to M1.1 for prior to excavation ü 11-Mar-18 13-Mar-18 B Approved As Noted
Request for Inspection. Setting Out points for location of storm water manholes
SSH-K-CVL-018 0 Lagoona
and pipe line from M1.1 TO M3.1 and from M3.1 to M3.2 for prior to excavation ü 11-Mar-18 13-Mar-18 B Approved As Noted
Request for Inspection. Setting Out points for location of storm water manholes
SSH-K-CVL-019 0 Lagoona
and pipe line from M3.2 TO M3.3 and from M1.3 to M2.1 for prior to excavation ü 11-Mar-18 13-Mar-18 B Approved As Noted
Site Instructions
Others (Specify)
U - Under Review
Submitted by Returned by
ACTION
SI SWI RFI RFIA MIR RAS NCR OT Contrac. Consul.
Request for Inspection. Setting out points for location of irrigation pipe lines and
SSH-K-CVL-020 0 Lagoona
water obstacle for prior to excavation. ü 13-Mar-18 15-Mar-18 B Approved As Noted
Request for Inspection. Setting out point location and level of TM-1 (KICK PLATE)
SSH-K-CVL-022 0 Lagoona
Concrete road area ü 18-Mar-18 on hold
Request for Inspection. Setting out point for location of run off behind track A from
SSH-K-CVL-023 0 Lagoona
Sta. 2+060 to 2+370 (East Side) ü 19-Mar-18 21-Mar-18 B Approved As Noted
Request for Inspection. Setting out point for location of run off behind track A from
SSH-K-CVL-024 0 Lagoona
Sta. 0+030 to 0+070 (North Side) ü 19-Mar-18 21-Mar-18 B Approved As Noted
Request for Inspection. Setting out point for location of run off behind track A from
SSH-K-CVL-025 0 Lagoona
Sta. 0+060 to 0+140 (West Side) ü 19-Mar-18 21-Mar-18 B Approved As Noted
Request for Inspection. Setting out point for location of run off behind track A from
SSH-K-CVL-026 0 Lagoona
Sta. 2+190 to 2+370 (West Side) ü 19-Mar-18 21-Mar-18 B Approved As Noted
Request for Inspection. Setting out point for location of run off behind track A from
SSH-K-CVL-027 0 Lagoona
Sta. 2+840 to 3+080 (East Side) ü 19-Mar-18 21-Mar-18 B Approved As Noted
Request for Inspection. Setting out point for location of run off behind track A from
SSH-K-CVL-029 0 Lagoona
Sta. 1+450 to 1+750 (West Side) ü 24-Mar-18 25-Mar-18 B Approved As Noted
Request for Inspection. Setting out point for location of run off behind track A from
SSH-K-CVL-030 0 Lagoona
Sta. 1+530 to 1+610 (North Side) ü 24-Mar-18 25-Mar-18 B Approved As Noted
Request for Inspection. Setting out point for location of run off behind track A from
SSH-K-CVL-031 0 Lagoona
Sta. 0+310 to 0+530 ü 27-Mar-18 29-Mar-18 B Approved As Noted
Request for Inspection. Setting out point for location of run off behind track A from
SSH-K-CVL-032 0 Lagoona
Sta. 0+700 to 0+840 (west Side) ü 27-Mar-18 29-Mar-18 B Approved As Noted
Request for Inspection. Setting out point for location of run off behind track A from
SSH-K-CVL-033 0 Lagoona
Sta. 1+620 to 1+720 (east Side) ü 27-Mar-18 29-Mar-18 B Approved As Noted
Request for Inspection. Setting out point for location of run off behind track A from
SSH-K-CVL-034 0 Lagoona
Sta. 2+700 to 2+760 (west Side) ü 27-Mar-18 29-Mar-18 B Approved As Noted
Request for Inspection. Setting out point for location of run off behind track A from
SSH-K-CVL-035 0 Lagoona
Sta. 2+770 to 2+850 (west Side) ü 27-Mar-18 29-Mar-18 B Approved As Noted
Request for Inspection. Setting out point for location of run off behind track A from
SSH-K-CVL-036 0 Lagoona
Sta. 1+800 to 2+040 (west & south Side) ü 28-Mar-18 2-Apr-18 B Approved As Noted
Request for Inspection. Setting out point for location of run off behind track A from
SSH-K-CVL-037 0 Lagoona
Sta. 2+810 to 2+840 (east Side) ü 28-Mar-18 2-Apr-18 B Approved As Noted
Request for Inspection. Setting out point for location of run off behind track A from
SSH-K-CVL-038 0 Lagoona
Sta. 3+200 to 3+280 (south Side) ü 28-Mar-18 2-Apr-18 B Approved As Noted
Site Instructions
Others (Specify)
U - Under Review
Submitted by Returned by
ACTION
SI SWI RFI RFIA MIR RAS NCR OT Contrac. Consul.
Request for Inspection. NGL from parking lot (50 cars) to connecting road circle
SSH-K-CVL-039 0 Lagoona
area (Easting, Northing and Elevation) ü 28-Mar-18 2-Apr-18 B Approved As Noted
Request for Inspection. Setting out point for location of run off behind track A from
SSH-K-CVL-040 0 Lagoona
Sta. 0+540 to 0+590 and from Sta. 0+010 to 0+050 ü 1-Apr-18 8-Apr-18 B Approved As Noted
Request for Inspection. Setting out points for location of Sand Trap 1 for Prior to
SSH-K-CVL-041 0 Lagoona
Excavation. ü 1-Apr-18 8-Apr-18 B Approved As Noted
Request for Inspection. Setting out points for location of Fence for Prior to
SSH-K-CVL-042 0 Lagoona
Excavation. ü 1-Apr-18 8-Apr-18 B Approved As Noted
Request for Inspection: Sand bedding level of drainage Manholes M1.9, M1.7,
SSH-K-CVL-043 0 Lagoona
M1.8 and drainage line ü 2-Apr-18 12-Apr-18 C Revise and Resubmit
Request for Inspection: Sand bedding level of drainage Manholes M1.7, M1.6,
SSH-K-CVL-044 0 Lagoona
M1.5 and drainage lines ü 2-Apr-18 12-Apr-18 C Revise and Resubmit
Request for Inspection: Sand bedding level of drainage Manholes M1.5, M1.4,
SSH-K-CVL-045 0 Lagoona
M1.3 and drainage lines ü 2-Apr-18 12-Apr-18 C Revise and Resubmit
Request for Inspection: Sand bedding level of drainage Manholes M1.3, M2.1 and
SSH-K-CVL-046 0 Lagoona
drainage lines ü 2-Apr-18 12-Apr-18 C Revise and Resubmit
Request for Inspection: Sand bedding level of drainage Manholes M3.1, M3.2,
SSH-K-CVL-047 0 Lagoona
M3.3 and drainage lines ü 2-Apr-18 12-Apr-18 C Revise and Resubmit
Request for Inspection. Setting out points for location of internal Fence TM 1 and
SSH-K-CVL-048 0 Lagoona
TM2 area for Prior to Excavation. ü 4-Apr-18 8-Apr-18 B Approved As Noted
Request for Inspection. Setting out location centre line of conduit for electrical
SSH-K-CVL-049 0 Lagoona
cables from MH2 to MH3 for Prior to Excavation. ü 1-Apr-18 8-Apr-18 B Approved As Noted
Request for Inspection. Compaction testing for drainage manholes of MH 1.9 and
SSH-K-CVL-050 0 Lagoona
MH 1.7 ü 8-Apr-18 11-Apr-18 C Revise and Resubmit
SSH-K-CVL-051 0 Lagoona Request for Inspection. Compaction testing for drainage line from MH 1.9 to MH 1.7 ü 8-Apr-18 11-Apr-18 C Revise and Resubmit
SSH-K-CVL-051 R1 1 Lagoona Request for Inspection. Compaction testing for drainage line from MH 1.9 to MH 1.7 ü 16-Apr-18 21-Apr-18 B Approved As Noted
Request for Inspection. Compaction testing for drainage manholes of MH 1.8 and
SSH-K-CVL-052 0 Lagoona
MH 1.6 ü 8-Apr-18 11-Apr-18 C Revise and Resubmit
SSH-K-CVL-053 0 Lagoona Request for Inspection. Compaction testing for drainage line from MH 1.7 to MH 1.6 ü 8-Apr-18 11-Apr-18 C Revise and Resubmit
SSH-K-CVL-053 R1 1 Lagoona Request for Inspection. Compaction testing for drainage line from MH 1.7 to MH 1.6 ü 16-Apr-18 21-Apr-18 B Approved As Noted
Request for Inspection. Compaction testing for drainage manholes of MH 1.5 and
SSH-K-CVL-054 0 Lagoona
MH 1.4 ü 8-Apr-18 11-Apr-18 C Revise and Resubmit
Site Instructions
Others (Specify)
U - Under Review
Submitted by Returned by
ACTION
SI SWI RFI RFIA MIR RAS NCR OT Contrac. Consul.
SSH-K-CVL-055 0 Lagoona Request for Inspection. Compaction testing for drainage line from MH 1.6 to MH 1.5 ü 8-Apr-18 11-Apr-18 C Revise and Resubmit
SSH-K-CVL-055 R1 1 Lagoona Request for Inspection. Compaction testing for drainage line from MH 1.6 to MH 1.5 ü 16-Apr-18 21-Apr-18 B Approved As Noted
SSH-K-CVL-056 0 Lagoona Request for Inspection. Compaction testing for drainage line from MH 1.5 to MH 1.4 ü 8-Apr-18 11-Apr-18 C Revise and Resubmit
SSH-K-CVL-056 R1 1 Lagoona Request for Inspection. Compaction testing for drainage line from MH 1.5 to MH 1.4 ü 16-Apr-18 21-Apr-18 B Approved As Noted
Request for Inspection. Setting out location centre line of conduit for electrical
SSH-K-CVL-057 0 Lagoona
cables from MH3 to MH4 and MH4 TO MH5 for Prior to Excavation. ü 16-Apr-18 22-Apr-18 B Approved As Noted
Site Instructions
Others (Specify)
U - Under Review
Submitted Returned
SI SWI RFI RFIA MIR RAS NCR OT by Contrac. by Consul.
1 KAEC/LMSP/SSH/DS-06 0 LAGOONA Company Profile: SAFCO for civil works third party ü 11-Feb-18 10-Mar-18
BASE COURSE MATERIAL RESULT: CBR, SIEVE ANALYSIS & PROCTOR (BOQ
3 KAEC/LMSP/SSH/DS-08 0 LAGOONA
# 5 ITEM 5.01001 ü 4-Jan-18 23-Jan-18
4 KAEC/LMSP/SSH/DS-08 R1 1 LAGOONA BASE COURSE MATERIAL RESULT: CBR, SIEVE ANALYSIS & PROCTOR ü 25-Jan-18 29-Jan-18
4 KAEC/LMSP/SSH/DS-08 R2 2 LAGOONA BASE COURSE MATERIAL RESULT: CBR, SIEVE ANALYSIS & PROCTOR ü 3-Mar-18 5-Mar-18
5 KAEC/LMSP/SSH/DS-09 0 LAGOONA PROJECT PERCENTAGE WEIGHT DISTRIBUTION ü 4-Jan-18 21-Jan-18
Triple Guard Rail (One Side & Double Side) Manufacturer/Vendor : Guardian Ind.
9 KAEC/LMSP/SSH/MS-07 R2 2 LAGOONA
Ltd. ü 8-Mar-18 14-Mar-18
Triple Guard Rail (One Side & Double Side) Manufacturer/Vendor : Guardian Ind.
9 KAEC/LMSP/SSH/MS-07 R3 3 LAGOONA
Ltd. ü 5-Apr-18
9 KAEC/LMSP/SSH/MS-09 1 LAGOONA ROAD MARKING TRACK, MANUFACTURER/VENDOR : REDA NATIONAL CO. ü 25-Jan-18 29-Jan-18
10 KAEC/LMSP/SSH/MS-09 R2 2 LAGOONA ROAD MARKING TRACK, MANUFACTURER/VENDOR : REDA NATIONAL CO. ü 13-Feb-18 20-Feb-18
27 KAEC/LMSP/SSH/DS-17 0 LAGOONA Method Statement for Drainage System Gravity Testing ü 13-Feb-18 18-Feb-18
28 KAEC/LMSP/SSH/DS-18 0 LAGOONA Method Statement for the Construction of Pump Station ü 13-Feb-18 15-Feb-18
29 KAEC/LMSP/SSH/DS-18 R1 1 LAGOONA Method Statement for the Construction of Pump Station ü 20-Feb-18 21-Feb-18
30 KAEC/LMSP/SSH/DS-19 0 LAGOONA Method Statement for Hydro Testing of Waterlines ü 13-Feb-18 18-Feb-18
30 KAEC/LMSP/SSH/DS-19 R1 1 LAGOONA Method Statement for Hydro Testing of Waterlines ü 7-Mar-18 12-Mar-18
31 KAEC/LMSP/SSH/DS-24 0 LAGOONA Proposed detailed drawing of thirteen nos. GRP Manholes for drainage network ü 8-Mar-18 13-Mar-18
31 KAEC/LMSP/SSH/DS-27 0 LAGOONA Warning Letter for Safety Non Compliance ü 27-Mar-18 29-Mar-18
31 KAEC/LMSP/SSH/DS-27 R1 1 LAGOONA Warning Letter for Safety Non Compliance ü 31-Mar-18 2-Apr-18
31 KAEC/LMSP/SSH/DS-28 0 LAGOONA Water Chemical Analysis Report - Vendor : Soil & Foundation Co. Ltd. ü 27-Mar-18 1-Apr-18
31 KAEC/LMSP/SSH/DS-29 0 LAGOONA Engineer Abdullah Nasser Bin Jaman Office - For Civil Works Third Party ü 27-Mar-18 29-Mar-18
31 KAEC/LMSP/SSH/DS-29 R1 1 LAGOONA Engineer Abdullah Nasser Bin Jaman Office - For Civil Works Third Party ü 17-Apr-18 18-Apr-18
31 KAEC/LMSP/SSH/DS-30 0 LAGOONA BASE COURSE MATERIAL RESULT CBR, SIEVE ANALYSIS & PROCTOR ü 29-Mar-18 1-Apr-18
31 KAEC/LMSP/SSH/DS-30 R1 1 LAGOONA BASE COURSE MATERIAL RESULT CBR, SIEVE ANALYSIS & PROCTOR ü 9-Apr-18 11-Apr-18
31 KAEC/LMSP/SSH/DS-32 0 LAGOONA Proposed concrete Drainage Network Substitue to Hipcap ü 3-Apr-18 15-Apr-18
31 KAEC/LMSP/SSH/DS-32 R1 1 LAGOONA Proposed concrete Drainage Network Substitue to Hipcap ü 25-Apr-18 25-Apr-18
KAEC/LMSP/SSH/DS-35 0 LAGOONA Concrete Mix Design for 5000 PSI OPC + PP FIBER ü 17-Apr-18 23-Apr-18
KAEC/LMSP/SSH/DS-39 0 LAGOONA Proposed Butterfly Valve & Telescopic Valve ü 23-Apr-18 24-Apr-18
KAEC/LMSP/SSH/DS-40 0 LAGOONA Sea Water chemical Analysis report. Vendor: Soil & Foundation Co. Ltd. ü 23-Apr-18 23-Apr-18
KAEC/LMSP/SSH/DS-45 0 LAGOONA Contract Agreement - AL HEIZM UPSCALE EST. for Asphalt ü 28-Apr-18 29-Apr-18
Proposed Sum Pit Location 50.00 m x 30.00 m x 4.00 m (For Dewatering Sub-
KAEC/LMSP/SSH/DS-47 0 LAGOONA
Station) ü 28-Apr-18 29-Apr-18
32 KAEC/LMSP/SSH/MS-12 0 LAGOONA POLYMER CRUMB RUBBER - VENDOR : ALHEIZM UPSCALE EST. ü 31-Dec-17 6-Feb-18
34 KAEC/LMSP/SSH/MS-15 0 LAGOONA Water proofing for Pump Station - 1 (Manufacturer/Vendor : Master Builders) ü 1-Mar-18 5-Mar-18
34 KAEC/LMSP/SSH/MS-15 R1 1 LAGOONA Water proofing for Pump Station - 1 (Manufacturer/Vendor : Master Builders) ü 1-Apr-18 8-Apr-18
34 KAEC/LMSP/SSH/MS-15 R2 2 LAGOONA Water proofing for Pump Station - 1 (Manufacturer/Vendor : Master Builders) ü 8-Apr-18 14-Apr-18
34 KAEC/LMSP/SSH/MS-16 0 LAGOONA Concrete Mix Design for under water (Manufacturer/Vendor : ABNI) ü 1-Mar-18 10-Mar-18
34 KAEC/LMSP/SSH/MS-17 0 LAGOONA Material Submittal for jointfix PVC Water stop (CFIX 150) ü 1-Mar-18 5-Mar-18
34 KAEC/LMSP/SSH/MS-19 0 LAGOONA EMPTY CONDUIT - Manufacturer/Vendor : Saudi Industrires for Pipe Co. Ltd. ü 17-Mar-18 18-Mar-18
34 KAEC/LMSP/SSH/MS-22 0 LAGOONA DUCTILE IRON FLANGE PIPE. MANUFACTURER / VENDOR: RVK ü 27-Mar-18 27-Mar-18
34 KAEC/LMSP/SSH/MS-23 0 LAGOONA GATE VALVE, BUTTERFLY VALVE. MANUFACTURER / VENDOR: RVK ü 27-Mar-18 27-Mar-18
Ladder Rung/Steps for Pump Station 1 & Sand Trap 1 Concrete Chamber -
34 KAEC/LMSP/SSH/MS-26 0 LAGOONA
MANUFACTURER / VENDOR: Linktech Engineering Pvt. Ltd. ü 14-Apr-18 15-Apr-18
SSH-MIR-02 0 LAGOONA Six Packs consisting of used tyres belt with all accessories, screws etc. ü 27-Mar-18 29-Mar-18
SSH-MIR-03 0 LAGOONA Six Packs consisting of used tyres with dimension as per drawings ü 11-Apr-18 16-Apr-18
RF 2.4
103418
0100991 / 10200001
ACTION
B Approved As Noted
B Approved As Noted
B Approved As Noted
R Rejected
C Revised & Resubmit
A Approved as submitted
B Approved As Noted
B Approved As Noted
B Approved As Noted
R Rejected
R Rejected
A Approved as submitted
C Revised & Resubmit
B Approved As Noted
B Approved As Noted
B Approved As Noted
A Approved as submitted
B Approved As Noted
R Rejected
A Approved
R Rejected
R Rejected
R Rejected
B Approved As Noted
I Information
R Rejected
A Approved as submitted
R Rejected
R Rejected
B Approved As Noted
B Approved As Noted
R Rejected
C Revised & Resubmit
R Rejected
B Approved As Noted
B Approved As Noted
A Approved as submitted
B Approved As Noted
B Approved As Noted
B Approved As Noted
B Approved As Noted
B Approved As Noted
B Approved As Noted
B Approved As Noted
B Approved As Noted
B Approved As Noted
Please Discuss
By Mr. Rodney
B Approved As Noted
B Approved As Noted
R Rejected
R Rejected
KING ABDULLAH ECONOMIC CITY
Site Instructions
Others (Specify)
U - Under Review
Submitted by Returned by
ACTION
SI SWI RFI RFIA MIR RAS NCR OT Contrac. Consul.
Provide copy of
4 SSH-RFI-04 0 Lagoona Temporary Asphalt Batching Plant ü 11-Feb-18 15-Feb-18 I Information - Replied SSH Letter sent to
Client for follow up.
5 SSH-RFI-05 0 Lagoona Epoxy coated Deformed Round Bars and Fence Fabric ü 21-Feb-18 22-Feb-18 I Information - Replied
Contractor to
submit product
data for review and
approval, RFV for
5 SSH-RFI-05.A 0 Lagoona SSH RESPONSE : Epoxy coated Deformed Round Bars and Fence Fabric ü 26-Feb-18 10-Mar-18 I Information - Replied additional costs.
Employer
confirmed normal
galvanized fence
fabric.
IFC drawings
issued, No
notice to proceed already issued to SSH on Feb, 18. Need a copy for revised Instruction
6 SSH-RFI-06 0 Lagoona
Construction IFC Drawing ü 25-Feb-18 6-Mar-18 I Information - Replied
regarding Revised
Dwgs.No variations
have been issued
Contractor to
follow the
7 SSH-RFI-07 0 Lagoona Official Bench Mark ü 4-Mar-18 10-Mar-18 I Information - Replied benchmark used in
Phase 2 of this
project.
7 SSH-RFI-07.A 0 Lagoona Official Bench Mark - EEC Confirm by Email attached ü 14-Mar-18 21-Mar-18 I Information - Replied
Contractor to
follow the existing
7 SSH-RFI-08 0 Lagoona FGL of Run OFF, Perimeter Fence & Service Road ü 4-Mar-18 10-Mar-18 I Information - Replied
ground profile and
runoff to drain
7 SSH-RFI-08.A 0 Lagoona SSH RESPONSE FGL of Run OFF, Perimeter Fence & Service Road ü 14-Mar-18 11-Apr-18 I Information - Replied
see attached email
7 SSH-RFI-09 0 Lagoona Finish Ground Elevation ü 15-Mar-18 21-Mar-18 I Information - Replied from Designer on
20 March, 2018
Use PN 10 Pipes &
7 SSH-RFI-10 0 Lagoona Irrigation Network (Bill No. 4) ü 15-Mar-18 21-Mar-18 I Information - Replied
Fittings
7 SSH-RFI-11 0 Lagoona Emergency Overflow Pipe at Pump Station ü 15-Mar-18 15-Mar-18 I Information - Replied
SSH to Submit 3
7 SSH-RFI-12 0 Lagoona Concrete Mixed Design specification with fiber Reinforcement ü 21-Mar-18 27-Mar-18 I Information - Replied
Different options
7 SSH-RFI-13 0 Lagoona Property Fence area is not included to LMSP Phase 1 ü 25-Mar-18 28-Mar-18 I Information - Replied
7 SSH-RFI-17 0 Lagoona Technical Equipment procurement log update ü 26-Mar-18 26-Mar-18 I Information - Replied
7 SSH-RFI-19 0 Lagoona SSH, HDR, EMAAR Minutes of Meeting March 21, 2018 ü 28-Mar-18 Maher
7 SSH-RFI-20 0 Lagoona Shortage of bitumen for Asphalt ü 29-Mar-18 14-Apr-18 I Information - Replied
7 SSH-RFI-21 0 Lagoona Finish Grade Level (FGL) Of TM-1 and TM-2 ü 29-Mar-18 28-Apr-18 I Information - Replied
7 SSH-RFI-23 0 Lagoona Pump Station 1 and Sand Trap 1 Distance ü 1-Apr-18 17-Apr-18 I Information - Replied
Control Forms - Sec 2
RF2.4 Rev. 2 - 24 Jan 16
KING ABDULLAH ECONOMIC CITY
Site Instructions
Others (Specify)
U - Under Review
Submitted by Returned by
ACTION
SI SWI RFI RFIA MIR RAS NCR OT Contrac. Consul.
7 SSH-RFI-29 0 Lagoona Service Road and Run Off Profile Discrepancy ü 17-Apr-18 24-Apr-18 I Information - Replied