16 Chennai 230 KV THIRUVALAM 230 230KV Thiruvalam – Mosur feeder entire.
KV
18 Chennai 230 KV THIRUVALAM 230 On 230KV Mosur feeder Breakers and its
KV CT’s and its Line Isolators
22 Chennai 230 KV ARNI 230 KV 110KV Arani-Singarpet –I # , CB, CT and Line
Side ISolators
23 Chennai 230 KV ARNI 230 KV 110KV Arani-Singarpet –II # CB, CT and Line
Side ISolators
26 Chennai 230 KV KADAPPERI 230 110KV KITS- Velachery # & 110KV Tharamani -
KV Velachery # (DC tower)
27 Chennai 400 KV Alamathy 400 KV 400/230KV ICT-4(315 MVA)
44 Chennai 230 KV THIRUVALAM 230 110 KV Thiruvalam – Vellore I feeder (In
KV between 230KV SS Thiruvalam and 110KV
Vellore SS).
45 Chennai 230 KV THIRUVALAM 230 110 KV Thiruvalam – Gudiyatham feeder entire.
KV
52 Chennai 230 KV MOSUR 230 KV Thiruvallur Feeder Breaker, CT'S & Line Isolater
54 Chennai 230 KV ARNI 230 KV 110KV Arani-Sirungattur# CB, CT and Line Side
ISolators
73 Chennai 230 KV ATHIPET 230 KV 230KV Bus-II entire and 230KV Bus Coupler
Switch-II
74 Chennai 230 KV MOSUR 230 KV Mosur Link-I&CT'S
75 Chennai 230 KV MOSUR 230 KV Mosur feeder
97 Chennai 230 KV MYLAPORE 230 230/110 kv, 100 MVA AUTO TRANSFORMER
KV -II
100 Chennai 400 KV Sunguvarchatram "400/ 230 KV, 315 MVA Auto-Transformer-1
400 KV entire
102 Chennai 230 KV MOSUR 230 KV 110KV pallur Feeder breaker , CT'S& Line
isolaters.
103 Chennai 230 KV MOSUR 230 KV Auto tr-IV, HV-IV& LV-IV breaker &CT'S
112 Chennai 110 KV CUDDALORE 230 110KV Aduthurai feeder in between Neyveli TS-I
KV and U.Mangalam110KV SS.
113 Chennai 230 KV NOKIA 230 KV 230 KV Nokia - Sunguvarchatram feeder breaker,
CTs and line isolator
114 Chennai 230 KV CUDDALORE 230 230KV Cuddalore- TAQA # breaker, CT’s line
KV side isolator& 230 KV Bus –A Isolator
115 Chennai 230 KV CUDDALORE 230 110 KV CUD-Chitharasur # breaker, CT’s & Line
KV side isolator.
116 Chennai 230 KV ATHIPET 230 KV 230KV Mosur # Breaker,CTs & Line isolator
120 Chennai 230 KV SPKOIL 230 KV 230 KV Kalpakkam -S.P.Koil -II feeder
129 Chennai 230 KV MOSUR 230 KV 110KV Itchipudur Feeder Breaker, CT'S& Line
isolaters.
130 Chennai 230 KV MOSUR 230 KV Itchipudur feeder
136 Chennai 230 KV GUMMIDIPOONDI 230 KV NCTPS Feeder, Breaker,230KV CTs Line
230 KV Isolator
138 Chennai 230 KV NOKIA 230 KV 110 KV Nokia feeder and 110 KV Nokia Spare
feeder
139 Chennai 230 KV SIRUSERI 230 KV 230KV Ottiyambakkam #
141 Chennai 230 KV CUDDALORE 230 230KV SC line in between Neyveli TS-I and
KV Eachangadu 230KV SS.
143 Chennai 230 KV CUDDALORE 230 110 kV PanrutiBahoor feeder section between
KV Chitarasur to Keelkavarapattu
153 Chennai 230 KV KADAPPERI 230 110KV SIruseri - TCS # from 230KV Siruseri SS
KV
154 Chennai 400 KV Thiruvalam 400 KV 400KV Thiruvalam - Palavadi I & II feeder
155 Chennai 230 KV MOSUR 230 KV 110KV Mosur – Sholinghur feeder in between
230KV Mosur SS and 110 KV Sholinghur SS.
156 Chennai 230 KV THIRUVALAM 230 110 KV Thiruvalam – M.V.Puram feeder entire
KV
157 Chennai 230 KV MOSUR 230 KV 110 KV Sholinghur – A.J.Pet feeder entire.
158 Chennai 230 KV THIRUVALAM 230 i)On Auto Tr. –IV, HV-IV, LV-IV Breaker and
KV CT’s. ii)On 110KV MV PURAM Feeder,
Breaker and CT’s
159 Chennai 230 KV CUDDALORE 230 110 KV Cuddalore – Kulanchavadi # breaker with
KV CT’s and line side isolator
160 Chennai 230 KV CUDDALORE 230 110 KV Cuddalore - Nathapattu # breaker with
KV CT’s and Line side isolator.
170 Chennai 230 KV THIRUVANNAMA 230 KV Bus Coupler and Transfer Bus CVT-I
LAI 230 KV
172 Chennai 230 KV KADAPPERI 230 110KV Kadapperi - Korattur # I between korattur
KV & Thirumudivakkam.
173 Chennai 230 KV NOKIA 230 KV 230 KV Nokia-Sriperumbudur feeder breaker, CTs
& line isolators
175 Chennai 230 KV CUDDALORE 230 230KV Cuddalore- Neyveli TS-1# , breaker,Ct’s
KV with line side isolator & 230 KV Bus –A Isolator.
176 Chennai 400 KV Sunguvarchatram "400/ 230 KV, 315 MVA Auto-Transformer-II 400
400 KV KV TIE-IV Breaker(Auto 1&2)"
177 Chennai 230 KV KITS 230 KV 230KV OTTIYAMBAKKAM-2 FEEDER
182 Chennai 230 KV ARNI 230 KV 230 KV Arani – Bhavini - II # CB, CT and
Isolators
185 Chennai 230 KV GUMMIDIPOONDI 230 KV ARS Feeder, Breaker,110KV CTs Line
230 KV Isolator
186 Chennai 110 KV Kanji 110 KV 110 KV Kanchipuram – Kaveripakkam feeder
(In between 110 KV Pallur SS and 110 KV Damal
SS).
187 Chennai 110 KV CUDDALORE 230 The 110KV Cuddalore – LANCO # breaker
KV with CT’s line side isolator
188 Chennai 230 KV ATHIPET 230 KV 1. 100MVA AutoTransformer , HV,LV CTs,
Breakers 2. 110KV CCTL # breaker , CTs 3.
25MVA Power Transformer
192 Chennai 230 KV CUDDALORE 230 110 KV Neyveli – Villupuram Feeder – I
KV (section between Neyveli TS I - Oraiyur SS )
193 Chennai 230 KV GUMMIDIPOONDI 230 KV Sulurpet Feeder, Breaker,230KV CTs
230 KV Line Isolator
195 Chennai 230 KV CUDDALORE 230 110 KV Neyveli – Villupuram Feeder – I
KV (section between Neyveli TS I - Oraiyur SS )
196 Chennai 400 KV MANALI 230 KV 400KV NCTPS feeder.
197 Chennai 230 KV ARNI 230 KV 110KV Arani link # CB, CT and ISolators
198 Chennai 230 KV ARNI 230 KV AutoTransformer –I CB, CT and ISolators
203 Chennai 230 KV CUDDALORE 230 Auto transformer III HV & LV breakers with CTs
KV & 230 KV Bus –A Isolator
205 Chennai 230 KV CUDDALORE 230 110 KV Neyveli – Villupuram Feeder – II
KV (section between Neyveli TS I – Arasur)
206 Chennai 230 KV CUDDALORE 230 110 KV CuddaloreLanco feeder section between
KV Chidambaram to LANCO
207 Chennai 230 KV TONDIARPET 230 230 KV NCTPS 1 FEEDER AND 100 MVA
KV AUTO TRANSFORMER 2 ONE BY ONE.
210 Chennai 230 KV KORATTUR 230 100 MVA 230/110 KV Auto Transformer No.II
KV
211 Chennai 230 KV KADAPPERI 230 230KV Kalivanthapattu - Tharamani # 230KV
KV KITS - Tharamani feeder.
212 Chennai 110 KV Villapuram 110 KV 110KV GC Breaker
213 Chennai 230 KV THIRUVALAM 230 110 KV Thiruvalam – Karnambut feeder entire.
KV
215 Chennai 230 KV THIRUVALAM 230 i)On Auto Transformer –III, HV-III, LV-III ,
KV Breakers and its Cts II) On 230KV LinkII #,
Breakers and its CT’s and its Line Isolators
ii)On 110KV Vellore –II# and Karnambut feeder
breaker and its CT’s,
216 Chennai 230 KV THIRUVALAM 230 i)On Auto Transformer –III, HV-III, LV-III ,
KV Breakers and its Cts II) On 230KV LinkII #,
Breakers and its CT’s and its Line Isolators
ii)On 110KV Vellore –II# and Karnambut feeder
breaker and its CT’s,
217 Chennai 230 KV OMEGA 230 KV 230 KV OMEGA-S.P.KOIL FDR
(Breakers,CT’s and Line Isolators)
221 Chennai 230 KV MOSUR 230 KV 110KV Thiruthani Feeder Breaker, CT'S& Line
isolaters.
222 Chennai 230 KV MOSUR 230 KV Tie Breaker, CT'S& (230 KV)
223 Chennai 230 KV MOSUR 230 KV Thiruttani feeder
231 Chennai 230 KV KOYAMBEDU 230 100 MVA Auto Transformer -II
KV
232 Chennai 230 KV BASIN 230 KV Tondiarpet Feeder
BRIDGE(GMRVAS
AVI) 230 KV
233 Chennai 230 KV KORATTUR 230 100 MVA 230/110 KV Auto Transformer No.III
KV
234 Chennai 230 KV KADAPPERI 230 230KV Sriperumbudur - Kadapperi # II
KV
235 Chennai 230 KV NOKIA 230 KV "110 KV GC feeder 110/ 11 KV 16 MVA Power -
Transformer-I & II"
236 Chennai 230 KV NOKIA 230 KV "110 KV GC feeder 110/ 11 KV 16 MVA Power -
Transformer-I & II"
237 Chennai 230 KV THIRUVALAM 230 110 KV Thiruvalam – Kaveripakkam feeder
KV entire
238 Chennai 230 KV THIRUVALAM 230 i)On Auto Tr. –I,HV-I,LV-I Breaker and
KV CT’s. ii)On 110KV Kaveripakkam Feeder,
Breaker and CT’s
243 Chennai 230 KV THIRUVALAM 230 i)On 110KV Capacitor Bank-I and 110KV
KV Capacitor Bank -II Breaker and CT’sone by
one ii)On Railway-I Feeder Breaker and CT’s
244 Chennai 230 KV ARNI 230 KV 230 KV Arani – Singarapet # ( Both end ) CB,
CT and ISolators
245 Chennai 230 KV ARNI 230 KV 110KV Arani-Kannamangalam# CB, CT and
ISolators
246 Chennai 230 KV ACHRAPAKKAM 110KV EASTERN BUS MAINTENANCE WITH
230 KV 100MVA AUTO TRANSFORMER-II WTH HV-II
& LV-II BREAKER WITH 110KV
ACHARAPAKKAM FEEDER BREAKER.
249 Chennai 230 KV CUDDALORE 230 110 KV Panruti - Bahoor feeder section between
KV Nallathur to Bahoor
250 Chennai 230 KV CUDDALORE 230 Monthly maintenance work 230KV Neyveli TS-II
KV feeder Breaker Programmed at 230 KV ULPT SS
253 Chennai 230 KV ARNI 230 KV 110 KV Arani - Kanamangalam feeder in between
110 KV Kilpalipet and 110 KV Thorapadi SS
254 Chennai 230 KV GUMMIDIPOONDI 110 KV sipcot I Feeder, Breaker,110KV CTs Line
230 KV Isolator
265 Chennai 230 KV CUDDALORE 230 1.For Checking of Jumper tightness in various
KV Locations .
272 Chennai 230 KV CUDDALORE 230 110 KV Cuddalore - Spic Pharma # breaker,
KV CT’s & Line side isolator.
273 Chennai 230 KV CUDDALORE 230 110 KV CuddaloreLanco feeder section between
KV Semmankuppam to B.mutlur
275 Chennai 400 KV Alamathy 400 KV 400KV sunguvar chathiram-2 feeder only
278 Chennai 230 KV THIRUVALAM 230 110 KV Sugar Mill feeder entire
KV
279 Chennai 230 KV THIRUVALAM 230 On Railway-II Feeder and Sugar mill feeder
KV Breaker and its CT’s
280 Chennai 230 KV ATHIPET 230 KV 110KV L & T # Breaker & CTs.
282 Chennai 230 KV MOSUR 230 KV 230KV Thiruvalam feeder breaker & CT'S
285 Chennai 230 KV CUDDALORE 230 110 KV Cuddalore - J.K. Pharma # breaker,
KV CT’s., Line side isolator.
286 Chennai 230 KV CUDDALORE 230 230 KV Neyveli-Bahoor SC line (LocNo.117 –
KV 118) Pondy government.
287 Chennai 230 KV CUDDALORE 230 230 KV Neyveli-Bahoor SC line (LocNo.117 –
KV 118) Pondy government.
288 Chennai 230 KV KORATTUR 230 110 KV Thiruverkadu feeder I&II one after
KV another
291 Chennai 230 KV THIRUVALAM 230 .230KV Thiruvalam – Chittoor feeder entire.
KV
292 Chennai 230 KV THIRUVALAM 230 On 230KV Chittoor interstate feeder Breakers and
KV its CT’s and Line Isolators
302 Chennai 230 KV NOKIA 230 KV 110 KV Nokia - Pillaipakkam - II feeder breaker,
CTs and line isolator
310 Chennai 230 KV NOKIA 230 KV 230/ 110 KV, 100 MVA Auto-Transformer
311 Chennai 230 KV KADAPPERI 230 230KV Sriperumbudur - Tharamani feeder
KV
316 Chennai 230 KV ACHRAPAKKAM 110KV ACK - S,P KOIL -II FEEDER BREAKER
230 KV & CT WITH LINE SIDE ISOLATOR
330 Chennai 230 KV MOSUR 230 KV 110KV Sriperumpudur feeder Breaker, CT'S
&Line isolaters.
331 Chennai 230 KV MOSUR 230 KV Sriperunmpudur feeder
336 Chennai 230 KV OMEGA SS 230 KV BUS-I & 230 KV BUS COUPLER
(Breakers,CT’s and Isolators)
For Maintenance Works. 1.315 MVA ICT-I HV and LV Breakers will be kept
in OFF Condition. 2.315 MVA ICT-II will be in
service. 3.All 400KV and 230KV feeders will be in
service.
LINE MAINTENANCE WORK ETL ss loads fed from 230KV Siruseri ss.
FOR MONTHELY MAINTENANCE 1.16 Mva pr Tr.II &III will be in service cater the
WORK entire 11 kv loads
FOR MONTHELY MAINTENANCE 1.16 Mva pr Tr.II &III will be in service cater the
WORK entire 11 kv loads
To carry out Breaker and CT’s Monthly 1. Both ends Breaker H/T and bus & Line side
Maintenance Work . Kept opened. 2. Hence No interruption of supply to
any SS.
Breaker , CT’s & Line Side isolator 1. Both ends Breaker H/T and bus & Line side
Maintenance Works. Kept opened. 2. Hence No interruption of supply to
any SS.
Line maintenance work. 110KV KITS- Perumbakkam feeder II will be in
service.
Routine Maintenance 230KV Mylapore feeder will be ketp hand tripped
at both the ends.
Routine Maintenance 230KV Mylapore feeder will be ketp hand tripped
at both the ends.
Routine maintenance work. 230KV Mylapore feeder will be kept hand tripped
at both the ends.
For erection of 1no MD+12M under the In FDR I-110 KV Pethasamuthram,Chinnasalem,
existing 110KV Deviyakurichi feeder I AdariM.Parur ,Railway Traction will be radially
& II (Loc.No.267-268)and to link the fed from Deviakurichi end. In FDR II-110 KV
proposed Neyveli 230/110 KVSS. Veppur ,Tholudur , will be radially fed from
(Approved vide TANTRANSCO Deviakurichi end radially. 110 KvVridhachalam
Proceedings No 65 dated 25.07.2015). will be fed from 230 KV Eachangadu SS Supply.Lc
Concurrence to be obtained from to be availed from Neyveli TSI uptoloc 260 after
EE/O/Deviakurichi. opening jumpers at 261 (LC has been requested
from 03.05.2018 to 08.05.2018)
For EHT line maintenance work During the period of LC i. 230KV Thiruvalam –
Mosur feeder Breakers both end will be in “
OFF†condition at 230KV Thiruvalam & 230KV
Mosur SS. ii. All other 230 KV feeders 230KV
Link I, Link II, Chittoor feeders are in service.
Hence there will be no interruption of supply
please.
For monthly maintenance works. During the period of shutdown the entire load of
230KV SIPCOT Mambakkam SS [Approximately:
50MW] will be fed from 400KV Sriperumbudur SS
through 230KV SIPCOT Mambakkam -
Sriperumbudur feeder without interruption.
Quarterly maintenance work During the above shutdown period the 230 KV
Sunguvachatram - Mambakkam feeder breaker,
CTs and line isolator will not be in service
For monthly maintenance work 110 KV Polur SS availing total shutdown and
110KV Arani - Singarapet II # Breaker is in hand
tripped condition.Hence no intruption of Supply.
For monthly maintenance work 110 KV Polur SS availing total shutdown and
110KV Arani - Singarapet II # Breaker is in hand
tripped condition.Hence no intruption of Supply.
Monthly maintenance work for HV/LV Ulundurpet 110/33-11 kv ss will be back fed from
Breakers , Isolators,Cheking of bolts, Villupuram 230. (24 MW). Ko-poovanur ss load
nuts and inspection of jumper joints and (11 MW) willl be fd from Deviakurichi feeder. 110
bus bar Thiagadurgam, Nagalur, and Pilliyarkuppam ss are
total shutdown for maintenance work. Dharani
sugars may be asked to go home load
FOR MONTHELY MAINTENANCE 1.110 kv s p koil # and korattur-I Radial from other
WORK end
For monthly maintenance work Auto Transformer I & II will be inservice to cater
the total SS loads.
Monthly Maintenance work carried in At the time of LC 1.110 KV Echur - Vandavsi # the
all Cts and isolators in 110 KV Echur - 110 KV Echur - Vandavasi # Bkr will be HT and
Vandavasi #. isolators are kept open, and at the time of LC
110KV Vandavasi in under shoudown as per
approved of SE/TEDC/T.V.malai. After completion
of Work, 110 KV Echur - Vandavasi # Bkr will be
charged and isolators are kept closed. Hence no
interruption to the substation
For Maintenance Works. 1.230KV S.P.Koil # Breaker kept in OFF
Condition. 2.All other 230KV & 400KV feeders
will be in service.
For Maintenance Works. 1.230KV TVLM Link-I Breaker kept in OFF
Condition. 2.All other 230KV & 400KV feeders
will be in service.
For Erection & Stringing of new 765KV 1.400KV TVLM-Alamathy-I&II # Breakers kept in
DC line with Hexa Zebra ACSR OFF Condition. 2.All other 400KV & 230KV
conductor from proposed Ariyalur feeders will be in service. 3.315 MVA ICT-I & II
765/400KV SS to Thiruvalam PGCIL will be in service.
765/400KV SS at Location no. AP-
276/0 to 276A/0
For providing repair sleeves for the 1.) The 110 KV line isolator towards E.V.Natham
strand cut in the panther conductor SS at Deviyakuruchi and towards Deviyakuruchi at
between location No. 94 & 95 E.V.Natham wiill be kept opened. 2.) The 110 KV
Thirukoilur - Deviyakurcihi feeder will be kept
radial from Villupuram Auto SS up to E.V.Natham
SS. 3.) 110 KV E.V.Natham, Pudhupattu ,
Kallakurichy SS availing total Shut down. 4.) No
interrruption of supply to any SS.
To carry out Breaker and CT’s Monthly 1. The 110 KV Villupuram - Madurapakkam I #
Maintenance Work. will be kept off between Villupuram 230 KV SS
and R2 Mundiyampakkam Sugar mill (LI Breaker
Kept off ). 2.The R2 Mundiyampakkam Sugar mill
& Madurapakkam SS will be backfed vide 110 KV
Madurapakkam II # by closing the bus coupler at
Madurapakkam SS. 3.Hence No interruption of
supply to any SS.
For line isolator maintenance and other During the period of S/D, Other 230 KV feeders
General maintenance works. will be in service
Breaker CTs & Line side isolator 1.110KV AB Switch at Tindivanam SS towards
maintenance works and Tightening of Villupuram 110KV SS side will be kept open.
Jumpers at various location between 2.110KV Tindivanam SS will be availing total shut
Tindivanam & Villupuram. down. 3. Hence no interruption of supply in any
SS.
For EHT Line maintenance work. During the period of LC i. 230KV Thiruvalam –
S.P.Koil feeder Breakers both end will be in “
OFF†condition at 400KV Thiruvalam & 230KV
S.P.Koil SS. ii. All other 230 KV feeders 230KV
Link I, Link II, Singarapet feeders are in service.
Hence there will be no interruption of supply
please
For Erection & Stringing of new 765KV During the period of LC i. 400KV Thiruvalam -
DC line with Hexa Zebra ACSR Alamathy I &II feeder breaker will be in “
conductor from proposed Ariyalur OFF†condition at both end. ii. And all other 400
765/400 KV SS to Thiruvalam PGCIL KV feeders will be in service. Hence there will be
765/400 KV SS at Loc AP-276/0 to AP no interruption of supply please.
276A/0.
For EHT line maintenance works. During the period of LC i. 110 KV Thiruvalam –
Vellore I feeder line LC in between 230KV
Thiruvalam SS and 110KV Vellore SS. ii. The
110KV Vellore SS load will be transferred to 110
KV Vellore II feeder. . iii. The 110KV Thorapadi
SS, Katpadi SS, 110 KV Sathuvachari SS & 110KV
Anaicut are availing total shutdown. Hence there
will be no interruption of supply please.
For EHT line maintenance work During the period of LC i. 110 KV Thiruvalam –
Gudiyatham feeder line LC in between from 230
KV Thiruvalam SS and 110 KV Pakkam SS. ii. 110
KV Vaduganthangal SS of VEDC/Vellore and
110KV Pakkam SS of TEDC/Thirupattur are
availing total Shutdown. Hence there will be no
interruption of supply please
For EHT Line Maintenance Works During the period of LC i. 110 KV Vellore
-Anaicut feeder line LC in between from 110 KV
Vellore and Anaicut SS. ii. The 110KV Thorapadi
SS, Katpadi SS, 110 KV Sathuvachari SS & 110KV
Anaicut are availing total shutdown. Hence there
will be no interruption of supply please
For EHT Line Maintenance Works During the period of LC i. 230KV Thiruvalam –
Link I feeder Breakers both end will be in “
OFF†condition at 400KV Thiruvalam & 230KV
Thiruvalam SS. ii. All other 230 KV feeders
230KV Link II, 230KV S.P.Koil & 230 KV
Singarapet feeders are in service. Hence there will
be no interruption of supply please
1. Replacement of flash over insulators Alternate source from Thiruvarur End
in loc no 374 (T) 2. Replacement of
weak jumpers at loc no 348 (T) Railway
crossing 3. To check jumper tightness at
various locations
For Monthly Maintenance work. Tie will be opened at 230KV Arani SS end.Hence
no intruption of Supply.
GRT Relay test work and Maintenance 1)230kv Thiruverkadu feeder will not be in service.
work
Overhauling of Pneumatic Drives of
HV breaker and maintenance work.
To carry out Breaker and CT’s Monthly 1. Chendur SS availing Total shutdown. 2. The will
Maintenance Work and replacement of be radial from Other end( Acharapakkam 230KV
flashed over insulator at location No. 17 SS ). 3. Hence No interruption of supply to any SS.
off Chendur LILO
Breaker CTs & Line side isolator 1. The 110KV AB Switch at Arasur SS towards
maintenance works. Villupuram 110KV SS will be kept open. 2. The
feeder will be kept radial from Neyveli TS I upto
Arasur SS. 3. Thirupachanur SS and Oraiyur SS in
Neyveli I feeder is availing total shutdown.
4.110KV Neyveli I #,T.V.Malai and Acharapakkam
I # will be in tied condition. 5. Hence no
interruption of supply in any SS.
Line maintenance work. 110KV ETL SS loads fed from 230KV Tharamani
SS and M/s ETA LTD there will be no supply.
Stringing of zebra conductor for 230KV 1.) The 230 KV Neyveli TS I - T.V.Malai feeder
Ulundurpet –Villupuram SC line over breaker will be hand tripped and line isolators kept
the existing 230KV Neyveli TS-I- opened at both ends. 2.) The 230 KV T.V.Malai-
Thiruvannamalai SC line between Singarapet and T.V.Malai - Villupuram feeders will
locaiton No. 118 and 119. be in service.
For stringing of the new 230 KV 1.) The 230 KV Neyveli TSI - T.V.Malai feeder
Villupuram - Ulundurpet feeder above will be kept off. 2.) The 230 KV T.V.Mali -
the existing 230 KV Neyveli TS I - Singarapet and 230 KV Villupuram - T.V.Malai
T.V.Malai feeder between location No. feeder will be in service. No interupption of supply
118 and 119 by EE / TLC / Cuddalore to any SS.
salai feeder line maintenance work 1. 110 kv salai ss and K.G.Kandigai SS are availing
total shutdown hence there will be no interruption.
For monthly maintenance works 230 KV TAQA#, 230 KV Neyveli #and 230 kv
villupuram # will be fed to Cuddalore 230KV SS
Quarterly maintenance work During the above shutdown period the 400KV SVC
- NCTPS stage-II feeder I & II with Tie breaker
will not be in service
To carry out Breaker and CT’s Monthly 1.Both ends will be H/T and kept opened . 2. Other
Maintenance Work. 230KV Cuddalore feeder & Acharapakam feeder
will be in service. 3. Hence No interruption of
supply to any SS.
Replacement of the flashed over 90 KN 1.) The 110 KV line isolator towards Manalurpet at
disc @ location No. 6 off Ariyalur LILO Ariyalur and towards Ariyalur at Manalurpet wiill
be kept opened. 2.) The 110 KV Thirukoilur -
Deviyakurcihi SS will be kept radial from both
ends up to Manalurpet and Ariyalur Sub-stations
respectively. 3.) The 110 KV Manalurpet SS
availing total Shutdown. 4.) No interrruption of
supply to any SS.
for Quarterly maintenance work during the LC Period the 230KV supply Will be fed
from 230 KV Nokia -SPR Feeder Without
interruption of power supply.
For monthly maintenance works& 1) All the loads will be transferred to 230 KV
loc. 48-49 conductor strand cut Cuddalore – Neyveli TS -1 # .,230 KV Upt –Cud
rectification work. 2) Jumper tightness and ,230 KV VPm –CUD. Hence no interruption of
checking in various locations. supply.
For monthly maintenance works The 110 KV Chitharasur SS will be availing total
shutdown. And EID Co – Generation, 110 KV
Keelkavaraqpattu SS, 110 KV Sornavoor SS &
110KV Nallathur SS, loads will be transferred to
the 110 KV Cuddalore – Nathapattu feeder. Hence,
no interruption of supply.
Routine Maintenance work The 230KV NCTPS feeder source will alone be in
service.
110KV-Mambakkam 110KV-Mambakkam SS, 110KV Nellikuppam SS
FDR(Breakers,CT’s and Isolators)& Load will be Transferred to 110KV Seruseri FDR
Bus coupler-I (Breakers,CT’s and of 230KV S.P.Koil SS and 110KV Omega SS
Isolators) Quarterly maintenance work &110KV Orchid Chemicals HT Service loads will
be transferred to 110 KV Thiruporur feeder of 230
KV Veerapuram ss
Quarterly maintenance work During the above shutdown period the 230KV SVC
- Nokia feeder entire will not be in service
Maintenance work 1) 230KV Kalivanthapattu # will not be inservice .
2) During 230KV Kalivanthapattu # LC period ,the
230KV Ottiyambakkam # will be inservice and
feed the entire 230KV Siruseri SS loads 3) 230KV
BHAVINI-I&II feeders Tie will be opened to
manage the 230KV Feeder overload.
i) For monthly Maintenance work ii) i) 11.05.2018 from 09.00 Hrs to 17.00 Hrs,110KV
For errection of 765 KV DC line For Thimiri SS availing Total Shutdown after that
errection of 765 KV DC line work with Timiri SS Loads (from 11.05.2018@ 17.00Hrs to
Hexa Zebrea ACSR conductor between 13.05.2018 @ 18.00Hrs, For errection of 765 KV
loc. No. 11 to 12 in 110KV Arani - DC line work with Hexa Zebrea ACSR conductor
Kaveripakkam feeder LILO line by between loc. No. 11 to 12 in 110KV Arani -
GCC II / Chennai wing Kaveripakkam feeder LILO line by GCC II /
Chennai wing) will be transferred to 230KV
Thiruvallam SS.
FOR MONTHELY MAINTENANCE 110 kv s p koil # and korattur-I Radial from other
WORK end
For Stringing of new 230 KV Cuddalore 1.) The 230 KV Villupuram - Acharpakkam feeder
- Veerapuram DC line above the existing will be kept off. 2.) The 230 KV Villupuram -
230 KV Villupuram - Acharapakkam Cuddalore and 230 KV Villupuram - T.V.Malai
feeder between location No. 260 and feeder will be in service. No interupption of supply
261. to any SS.
ROUTINE MAINTENANCE WORK DURING THE PERIOD OF SHUTDOWN
EXCEPT, 110 KV R.K.NAGAR FEEDER WILL
NOT BE IN SERVICE AND ALL OTHER
FEEDERS AND EQUIPMENTS WILL BE IN
SERVICE.
For mechanism box lubricating and During the period of S/D, the 110 KV Manali
other General maintenance works. feeder will be in Back charged condition.
Monthly Maintenance work, CT Clamp, concurance may be obtained from M/s.SRF
and Bolt Nuts replacement work.
For EHT line maintenance work During the period of LC i. 110 KV Arani -
Kaveripakkam line LC in between from 110 KV
Timiri SS and 110 KV Damal SS. ii. 110 KV Timiri
SS is availing total Shutdown. Hence there will be
no interruption of supply please.
itchipudur feeder line maintenance work 1. 110 kv itchipudur are availing total shutdown
hence there will be no interruption.
FOR MONTHLY MAINTENANCE DURING THE SHUTDOWN PERIOD 100MVA
WORK AUTO TR.I & III WILL BE IN SERVICE
for Quarterly maintenance work 1. 110 kv Loads of EHT Consumer M/S Nokia
india LTD , Will be transferred to 110 kv spr-
mosurII feeder being fed by 400 kv sv chatram ss
3. concurrence obtained from EHT consumer M/S
Nokia india LTD.
Maintenance work 1) 230KV Ottiyambakkam # will not be inservice .
2)During 230KV Ottiyambakkam # LC period ,the
230KV Kalivanthapattu # will be inservice and
feed the entire 230KV Siruseri SS loads . 3)
230KV BHAVINI-I&II feeders Tie will be opened
to manage the 230KV Feeder overload.
Monthly Maintenance work, CT Clamp, During the Period of Shut down the 110KV
and Bolt Nuts replacement work. Periyapalayam SS availing Total Shut down.
Concurance to be obtained from JR Metals EHT
Line maintenance and jumper tightness Alternate supply fed from 110KV Siruseri SS
checking work.
For Erection & Stringing of new 765KV During the period of LC i. 400KV Thiruvalam -
DC line with Hexa Zebra ACSR Palavadi I &II feeder breaker will be in “
conductor from proposed Ariyalur OFF†condition at both end. ii. And all other 400
765/400 KV SS to Thiruvalam PGCIL KV feeders will be in service. Hence there will be
765/400 KV SS at Loc AP-291/0 to AP no interruption of supply please.
292/0.
For EHT line maintenance works. During the period of LC iii. 110 KV Mosur–
Sholinghur feeder line LC in between from 230KV
Mosur SS and 110 KV Sholinghur SS. iv. The
110KV Sholinghur SS (33kv loads) is availing
Total Shutdown Hence there will be no interruption
of supply please
For EHT line maintenance works. During the period of LC i. 110 KV Thiruvalam –
M.V.Puram feeder line LC in between 230 KV
Thiruvalam SS and 110 KV Sholinghur SS. ii. The
110KV M.V.Puram SS, 110KV Mukundrayapuram
SS, 110KV Sholinghur SS (11kv loads), are
availing Total Shutdown Hence there will be no
interruption of supply please.
For EHT line maintenance work During the period of LC i.110 KV Sholinghur –
A.J.Pet feeder line LC in between from 110 KV
Sholinghur SS to 110 KV A.J. Pet SS. ii. 110 KV
AJ.Pet SS is availing shutdown. Hence there will
be no interruption of supply please.
For monthly maintenance work During the period of LC i)The 110KV M.V Puram
SS, 110KV M.RPuram SS ,110KV Sholinghur SS,
are availing Total shutdown on 15.05.18. ii) Auto-
Tr-I ,HV-I,LV-I Auto –Tr-II,HV-II,LV-II , Auto-
Tr-III ,HV-III,LV-III, will be in service and cater
the SS Loads. iii)Auto Tr –IV, HV-IV, LV-IV will
be in ‘OFF’ Condition. iv)The 110KV M.V
Puram feeder,will be in ‘OFF’ Condition v)
The 230KVLink I and II Feeder, 230KV Chittoor
interstate feeders,and 230KV Mosur feeders will be
in service and cater the SS Loads. Hence there will
be no interruption of supply please.
For monthly maintenance works The 110 KV Nathapattu SS, SS,110 KV Panruti
Urban SS will be availing total shutdown.
Semmandalam SS load will be transferred to the
110 KV Cuddalore – Chitrasur Feeder. Hence no
interruption of supply.
For monthly maintenance works. 1.The 100MVA Auto Transformer-II is feeding load
only to the 110KV GC of 230KV SIPCOT
Mambakkam SS. 2.The 110KV GC load of 230KV
SIPCOT Mambakkam SS will be 0 MW during the
above proposed L.C. period, since there is total
shutdown in the entire 11KV and 33KV side, for
monthly maintenance works.
For maintenance work Auto tr-2,3&4 are inservice and also Sholingur ss
Availing total shutdown. Hence no intruption of
supply.
sholinghur feeder line maintenance 1. 110 kv sholinghur , 110 kv A.J.Pet ss are
work availing total shutdown hence there will be no
interruption.
Line Maintenance work
For Monthly maintenance work 16 Mva pr Tr.I &II will be in service cater the
entire 11 kv loads
1.Auto Tfr – I Monthly maintenance 1. T.V.Nallur # & Villupuram Link # H/T at 230 Kv
work. 2.To carry out HV I, LV I & T.V Auto Ss. 2. T.V.Nallur SS , Ariyalur SS and Alathur
Nallur Breaker and CT’s Monthly SS availing Total shutdown. 3. Auto Tfr II will be
Maintenance Work. in service. 4.110Kv Acharapakkam II and Thayanur
# will be radial from other end. 5. Hence No
interruption of supply to any SS.
Monthly maintenance work During the period of L/C time, 230 KV Transfer
Bus will be OFF condition. There is no interruption
of supply please.
Routine maintenance work 1. 230/110 KV 100 MVA Auto Transformer I will
not be in service. 2. 230/110 KV 100 MVA Auto
Transformer II & III will be in service and load
may be maintained with 2 Nos Auto Transformers.
3. All other 110 KV & 230 KV Feeders will be in
service.
For monthly maintenance works & 1) All the loads will be transferred to 230 KV
Damaged insulator replacement in loc. Cuddalore – TAQA # ,230 KV UPT-CUD,230 KV
118 2) jumper tightness checking in VPM –CUD. Hence no interruption of supply.
various locations
Monthly maintenance work During the above shutdown period the 400/ 230
KV, 315 MVA Auto-Transformer-II will not be in
service and 400/ 230 KV, 315 MVA Auto-
Transformer-I will cater the load of 400/ 230 KV,
315 MVA Auto-Transformer-II without
interupption
FOR QUARTERLY MAINTENANCE DURING THE SHUTDOWN PERIOD 230KV
WORK OTTIYAMBAKKAM-2 FEEDER WILL BE IN
OFF CONDITION AND 230KV THARAMANI
FEEDER WILL BE IN SERVICE FEEDING THE
ENTIRE KITS SS LOADS
Monthly maintenance work "1.) 110KV Kanji SS availing Total shutdown. 2).
110KV Solar feeder, 110KV Admangalam SS loads
will be fed from 230KV Arani SS. Hence there is
no interruption supply Please. "
For monthly maintenance works & The 110 KV Semmankuppam SS, will be availing
1.For replacement of flash over total shutdown.110 KV Cuddalore – LANCO #
insulator in loc 10. 2. For Checking of tie will be opened at Cuddalore end .the 110 KV
Jumper tightness in railway crossing Chidambaram SS,110 KV B.Mutlur SS,& 110 KV
Location 21-22. Chemplast load will be radially feed from 110 KV
lanco IPP. Hence no interruption of supply
Routine Maintenance work and Annual 1. Alternate Supply to 110KV L&T # will be
Relay Testing work( AutoTransformer & arranged by back charging it from Manali 230KV
110KV CCTL #) SS. 2. Both 110KV CCTL # EHTSC, M/s.CCTL &
M/s.SICAL EHTSC will be under shutdown. 3.
Both the 230KV feeders will be in service.
Quarterly maintenance work During the above the shutdown period the 230 KV
Sunguvarchatram - Oragadam feeder breaker entire
will not be in service
For Checking of Jumper tightness in 110 KV Oraiyur SS will be availing TSD
various Locations.
Monthly Maintenance work, CT Clamp, During the Period of Shut down the 230KV
and Bolt Nuts replacement work. Sulurpet feeder Tie open at 230KV
Gummidipoondi SS end , Concurance to be
obtained from OD/230KV SS Sulurpet
For monthly Maintenance work. 110 KV Arani SS availing total shut down. Hence
no interruption of supply.
For monthly Maintenance work. 110 KV Arani SS availing total shut down. Hence
no interruption of supply. Auto Transformer II &
III will be in service and to cater the total SS loads.
For monthly maintenance work. 110 kv s p koil # and korattur-I Radial from other
end
For Maintenance Works. 1.230KV TVLM Link-II # Breaker kept in OFF
Condition. 2.All Other 230KV & 400KV feeders
will be in service.
Monthly Maintenance work carried in At the time of LC 1.230 KV Echur -Kalpakkam #
all Cts and isolators in 230 KV Echur - breaker will be HT, and Load transferred to other
Kalpakkam #. end SS no supply , the supply is fed from 230 KV
Arani SS, in case of over load to 230 KV Arani SS,
(The 110 KV mazhaiyur # Load transferred to 230
KV Villupuram SS and 110 KV, Vandavasi SS
Load transferred to 230 KV Acharapakkam SS).
There is no interruption of supply to any of the
Substation.
1.Auto Tfr –II Monthly maintenance 1.Thirukoilur # H/T at 230 Kv Auto Ss. 2.The
work. 2.To carry out HV II,LV II, feeder will be radial from other end( Deviyakurchi
Thirukoilur & Thayanur Breaker and 230Kv Ss). 3.110KV Karaniperchanur SS
CT’s Monthly Maintenance Work ,Thirukoilur SS and Sankarapuram SS availing
Total Shutdown. 4. Thayanur # H/T at Auto SS
VPM. The feeder will be radial from Echur Auto
SS. 5. 110Kv Acharapakkam II # will be radial
from Acharapakkam Auto SS. 6. Auto Tfr I will be
in service. 7. No interruption of supply to any SS.
For monthly maintenance works 110 KV Semmandalam panruti Urban –SS and
110 KV Chidambaram –Ss will be availing total
shutdown and 110 KV Cuddalore-Lanco feeder Tie
opened at 110 KV B.mutlur –SS hence No
interruption of supply.
For EHT Line Maintenance Works During the period of LC i. 230KV Thiruvalam –
Link II feeder Breakers both end will be in “
OFF†condition at 400KV Thiruvalam & 230KV
Thiruvalam SS. ii. All other 230 KV feeders
230KV Link I, Singarapet, S.P.Koil feeders are in
service. Hence there will be no interruption of
supply please.
Quarterly maintenance work During the above shutdown period the 110 KV
Sunguvarchatram - Vallam - Vadagal feeder breaker
will not be in servive
for maintenance work Auto Tr-1,3&4 are in servise and also
THIRUTHANI, tHIRUVALLUR&
pOONIMANGADU ss Availing Total shutdown.
Hence no intrupution of supply,
Line3 maintenance and jumper tightness 230KV Sriperumbudur -Tharamani feeder and
checking work. 230KV KITS- Tharamani feeder will be in service.
For Monthly maintenance work. The SS Load may be restricted within two Auto
Transformers I & III.
Monthly maintenance work 1. 230KV Tondiarpet Feeder will not be in service.
2. All other 110 KV & 230 KV Feeders , Auto
Transformers I, II, III will be in service.
For general maintenance work During the period of S/D, Other 2 Nos. 100 MVA
Auto Transformers will be in service.
Line maintenance work. 230KV Sriperumbudur - Kadapperi feeder I &
230KV Kalivanthapattu - Tharamani feeder will be
in service.
for Monthly maintenance work 1. concurrence obtained from O&M Wing and HT
Consumer M/s Motherson Automotive LTD.
for Monthly maintenance work 1. concurrence obtained from O&M Wing and HT
Consumer M/s Motherson Automotive LTD.
For EHT Line Maintenance work and During the period of LC i The 110KV
Jumper tightness works. Kaveripakkam Feeder will be in ‘OFF’
Condition ii The 110 KV Sipcot SS & 110 KV
Kaveripakkam SS is availing total Shutdown.
Hence there will be no interruption of supply
please.
Line maintenance work. ETL SS loads fed from 230KV Tharamani ss and
M/s ETA Ltd there will be no supply.
Breaker CTs & Line side isolator 1.110KV AB Switch at Valavanur SS towards
maintenance works. Villupuram side will be kept open. 2.110KV
Valavanur SS& 110KV Kandamangalam SS will be
availing Total shutdown. 3.Hence no interruption
of supply in any SS.
For EHT Line Maintenance Works. During the period of LC I. 110 KV Railway I
feeder breaker will be in “ OFF†condition at
both end. II. 110 KV Railway II feeder will be in
service. Hence there will be no interruption of
supply please.
For monthly Maintenance work. All other 4 Nos 230KV feeders will be in service.
Hence no interruption of supply.
For monthly Maintenance work. 110 KV Kannamangalam SS & 110KV
Sathumadurai SS availing Total Shut Down.
TO CARRYOUT EASTERN BUS 1.100MVA AUTO TRANSFORMER - II WITH
MAINTENANCE WORK. HV-II & LV-II BREAKER WILL BE HAND
TRIPPED CONDITION. 2.100MVA AUTO
TRANSFORMER - I WILL BE IN SERVICE
CONDITION. 3.110KV ACK -S.P.KOLI- I & II
FEEDER WILL BE RADIALLY CHARGED
FROM OTHER END. 4.110KV ACK
-VANDHAVASI FEEDER WILL BE RADIALLY
CHARGED FROM OTHER END. 5.110KV
ACHARAPAKKAM FEEDER WILL BE HAND
TRIPPED CONDITION AND 110KV
ACHARAPAKKAM SS LOAD & TRACTION
LOAD WILL BE TRANSFERRED TO 110KV
ACK -S.P.KOIL - I FEEDER VIA. 5.HENCE NO
IN INTERRUPTION OF POWER SUPPLY.
Monthly Masintenance work in all CTs At the Time of LC 1. The 110 KV Echur -
and Isolators in 110 KV Echur - Kaliyampoondi # Bkr will be H/T Condition. After
Kaliyampoondi # and 110 KV Bus completion of maintnance work 110 KV Echur -
coupler. Kaliyampoondi # Bkr will be charge and bus
coupler Bkr maintnance work. (Hence it is ideally
charged) No interruption of supply.
For monthly maintenance works The 110 KV Capperhills SS and 110 KV Nallathur
SS will be availing total shutdown. Hence no
interruption of supply.
1) Flash over insulator replacement in 110 KV Nallathur SS to avail TSD
loc. 18 (DP) 2) Jumper tightness
checking checking at various locations
Routine maintenance work. 400KV Alamathy feeder will be kept hand tripped
at both the ends.
Monthly maintenance work 1). 110 KV vinnvanur SS availing total S/D, 2). 110
KV Chengam SS and 110 KV Bannari Sugars will
be radialy fed from 110 KV singarapet Grid SS.
Hence there is no interruption of supply please.
For EHT Line Maintenance work During the period of LC i. 110 KV Arani -
Kanamangalam feeder line LC in between from
110 KV Kilpalipet and 110 KV Thorapadi SS. ii.
The 110KV Kilpallipet SS & 10KV Sathumadurai
SS are availing total shutdown. Hence there will be
no interruption of supply please.
GRT & Monthly Maintenance work, CT concurance may be obtained from M/s.Tulsion and
Clamp, and Bolt Nuts replacement during the period of LC the 110KV SIPCOT I & IV
work. SS availing Total Shut down
QUARTERLY MAINTENANCE FEEDER WILL BE KEPT RADIAL FROM
OTHER END
For monthly Maintanace work 230KV Alamathy & 230KV Thiruvalamfeeder are
in service. Henae no intrupution of supply.
athipattu feeder line maintenance work 1. i.230 KV Alamathy and Thiruvalam Feeder in
service ii. All 110 KV Feeders in Service Hence
there will be no interruption please
Monthly maintenance work , checking All the load will be fed by Cuddalore 230 KV SS
bolt and nuts
For monthly Maintenance work. All other 4 Nos 230KV feeders will be in service.
Hence no interruption of supply.
To carry Breaker and CT’s Monthly 1. The feeder will be Kept OFF between
Maintenance Work. Villupuram – Acharapakkam SS. 2. The 230Kv
Villupuram – Cuddalore # & Villupuram - T.V
Malai # will be in tied Condition. 3. Hence No
interruption of supply to any SS.
GRT Relay test work and maintenance 1)230KV BUS COUPLER will not be in service
work
Routine maintenance work 1. 230/110 KV 100 MVA Auto Transformer II will
not be in service. 2. 230/110 KV 100 MVA Auto
Transformer I & III will be in service and load may
be maintained with 2 Nos Auto Transformers. 3.
All other 110 KV & 230 KV Feeders will be in
service.
For EHT Line Maintenance Works. During the period of LC 110 KV Sugar mill feeder
breaker will be in “ OFF†condition at both
end. Hence there will be no interruption of supply
please.
Routine Maintenance work and Annual Back feeding to 110KV L&T # will be arranged
Relay Testing work. from Manali 230KVSS.
110KV-Hitachi FDR (Breaker,CT’s No Supply to 110KV Hitachi HT Service-
and Isolators) Quarterly maintenance Concurrence obtained from M/S Hitachi
work
for monthly maintanance work 230KV Alamathy & 230KV Athipattu feeder are in
service. Henae no intrupution of supply.
Thiruvalam feeder line maintenance 1. i.230 KV Alamathy and Athipattu Feeder in
work service ii. All 110 KV Feeders in Service Hence
there will be no interruption please
Monthly & Line maintenance
work
For monthly maintenance works J.K. Pharma - Under D.C. from 25.06.2004
For stringing of Zebra conductor to link This line does not come under the scope of
the proposed Neyveli 230/110KV SS to TANTRANSCO as it is being maintained by M/s
the existing 230KV Eachangadu line PGCIL. Hence the LC in the line may be directly
(Loc.No.10-11) availed by TLC from M/s PGCIL.
For stringing of Zebra conductor to link This line does not come under the scope of
the proposed Neyveli 230/110KV SS to TANTRANSCO as it is being maintained by M/s
the existing 230KV Eachangadu line PGCIL. Hence the LC in the line may be directly
(Loc.No.10-11) availed by TLC from M/s PGCIL.
For General maintenance works. During the period of S/D, The 110 KV
Thiruverkadu I&II feeders will be in Back charged
condition
Line maintenance work. 230KV Sriperumbudur - Kadapperi # II and
230KV Kalivanthapttu - Kadapperi # will be in
service.
Breaker CTs & Line side isolator 1.The 110KV isolator switch at Vettavalam Ss
maintenance works. towards Villupuram 110 KV SS will be kept
opened. 2. The feeder will be kept radial from
T.V.Malai 230KV SS end upto Vettavalam. 3.
Vettavalam SS is availing total shutdown. 4. Hence
no interruption of supply in any SS.
For EHT Line maintenance work During the period of LC i. 230KV Thiruvalam –
Chittoor feeder Breakers both end will be in “
OFF†condition ii. All other 230 KV feeders
230KV Link I, Link II, Mosur feeders are in
service. Hence there will be no interruption of
supply please
For monthly maintenance works. During the period of shutdown the entire load of
230KV SIPCOT Mambakkam SS [Approximately:
50MW] will be fed from 400KV SV.Chatram SS
through 230KV SIPCOT Mambakkam -
SV.Chatram feeder without interruption.
Quarterly maintenance work 110KV Oragadam feeder radial from other end.
For monthly Maintenance work. All other 4 Nos 230KV feeders will be in service.
Hence no interruption of supply.
For Maintenance Works. 1.230KV TVLM-Singarapet # Breaker kept in OFF
Condition. 2.All other 230KV & 400KV feeders
will be in service.
for Quarterly maintenance work during the Lc period the 110 kv supply will be fed
from 110 kv nokia- pillaipakkam-I Feeder without
interruption of power supply
Line maintenance work. 230KV Kalivanthapattu - Siruseri feeder will be in
service.
For EHT Line maintenance work During the period of LC i. 230KV Thiruvalam –
Singarapet feeder Breakers both end will be in “
OFF†condition at 400KV Thiruvalam & 230KV
Singarapet SS. ii. All other 230 KV feeders 230KV
Link I, Link II, S. P.Koil feeders are in service.
Hence there will be no interruption of supply
please.
Quarterly maintenance work During the above shutdown period the 110 KV
Sunguvarchatram - Palayaseevaram feeder will not
be in service
Quarterly maintenance work During the above shutdown period the 110KV SVC
- Orrikkai feeder will not be in service
Maintenance works other 3 Auto Transformers will be in service
Maintenance work & Painting work 1) 100MVA Auto Transformer-II will not be
inservice. 2)110KV Sholinganallur SS load will be
transferred to 230KV KITS Park SS. 3)110KV ETL
SS load will be transferred to 230KV Tharamani
SS.
for Monthly maintenance work during the Lc period auto transformer-I, supply fed
from 110 KV Bus will be back charged from
Sriperumbudur SS through 110 KV SPR-I.G.Kottai
, 110 KV I.G.Kottai-Pillaipakkam -Nokia feeder.
Line maintenance work. 230KV Kalivanthapattu - Tharamani feeder and
230KV KITS - Tharamani feeder will be in service.
Replacement of Strung Bus and its 1.Bus Coupler Breaker is kept OFF Condition.
Corresponding droppers from Kundha to 2.230KV Bus I is not in service. 3.230KV Bus II is
Moose under KFW scheme as requested in service. 4.Hence no interruption of supply to any
by AEE / SSE / Cuddalore SS.
Monthly Maintenance work, CT Clamp, Back feeding may be arranged from 110 kv
and Bolt Nuts replacement work. panjetty feeder
for monthly maintenance work 230KV Athipattu & 230KV Thiruvalamfeeder are
in service. Henae no intrupution of supply.
Alamathy feeder line maintenance work 1. i.230 KV Thiruvalam and Athipattu Feeder in
service ii. All 110 KV Feeders in Service Hence
there will be no interruption please
FOR MONTHLY MAINTENANCE DURING THE SHUTDOWN PERIOD 100MVA
WORK AUTO TR. I & 80MVA AUTO TR. II WILL BE IN
SERVICE
Monthly & Line maintenance
work
Quraterly maintenance work. 110 kv korattur-I #Radial from other end
Sat, May 5, 2018 11:00 Sat, May 5, 2018 12:00 1 Inter SLDC
Tue, May 8, 2018 9:00 Tue, May 8, 2018 17:00 1 Inter SLDC
Thu, May 10, 2018 9:00 Thu, May 10, 2018 17:00 1 Possible
Thu, May 10, 2018 9:00 Thu, May 10, 2018 17:00 1 Possible
Thu, May 10, 2018 10:00 Thu, May 10, 2018 14:00 1 Inter SLDC
Thu, May 10, 2018 9:00 Thu, May 10, 2018 14:00 1 Possible
Thu, May 10, 2018 9:00 Thu, May 10, 2018 17:00 1 Possible
Thu, May 10, 2018 10:00 Thu, May 10, 2018 17:00 1 Possible
Thu, May 10, 2018 9:00 Sun, May 13, 2018 18:00 4 Inter SLDC
Thu, May 10, 2018 9:00 Thu, May 10, 2018 17:00 1 Possible
Thu, May 10, 2018 9:00 Thu, May 10, 2018 17:00 1 Possible
Thu, May 10, 2018 9:00 Thu, May 10, 2018 17:00 1 Possible
Thu, May 10, 2018 10:00 Thu, May 10, 2018 15:00 1 Possible
Thu, May 10, 2018 9:00 Thu, May 10, 2018 17:00 1 Possible
Thu, May 10, 2018 9:00 Thu, May 10, 2018 17:00 1 Possible
Thu, May 10, 2018 10:00 Thu, May 10, 2018 17:00 1 Possible
Thu, May 10, 2018 6:00 Thu, May 10, 2018 12:00 1 Possible
Fri, May 11, 2018 9:00 Fri, May 11, 2018 18:00 1 Possible
Fri, May 11, 2018 9:00 Sun, May 13, 2018 18:00 3 Possible
Fri, May 11, 2018 9:00 Fri, May 11, 2018 12:00 1 Possible
Fri, May 11, 2018 9:00 Fri, May 11, 2018 18:00 1 Possible
Fri, May 11, 2018 9:00 Fri, May 11, 2018 17:00 1 Possible
Fri, May 11, 2018 9:00 Fri, May 11, 2018 17:00 1 Possible
Fri, May 11, 2018 10:00 Fri, May 11, 2018 17:00 1 Possible
Fri, May 11, 2018 9:00 Fri, May 11, 2018 17:00 1 Possible
Fri, May 11, 2018 9:00 Fri, May 11, 2018 14:00 1 Possible
Fri, May 11, 2018 9:00 Fri, May 11, 2018 14:00 1 Possible
Fri, May 11, 2018 10:00 Fri, May 11, 2018 15:00 1 Possible
Fri, May 11, 2018 9:00 Fri, May 11, 2018 14:00 1 Possible
Sat, May 12, 2018 9:00 Sat, May 12, 2018 17:00 1 Possible
Sat, May 12, 2018 9:00 Sat, May 12, 2018 14:00 1 Possible
Sat, May 12, 2018 9:00 Sat, May 12, 2018 17:00 1 Possible
Sun, May 13, 2018 10:00 Sun, May 13, 2018 17:00 1 To be discuss
Sun, May 13, 2018 9:00 Sun, May 13, 2018 14:00 1 Possible
Sun, May 13, 2018 9:00 Sun, May 13, 2018 17:00 1 Possible
Sun, May 13, 2018 10:00 Sun, May 13, 2018 17:00 1 Possible
Sun, May 13, 2018 9:00 Sun, May 13, 2018 17:00 1 Possible
Mon, May 14, 2018 9:00 Mon, May 14, 2018 18:00 1 Possible
Mon, May 14, 2018 9:00 Mon, May 14, 2018 14:00 1 Possible
Mon, May 14, 2018 9:00 Mon, May 14, 2018 17:00 1 Possible
Mon, May 14, 2018 9:00 Mon, May 14, 2018 16:00 1 Possible
Mon, May 14, 2018 9:00 Mon, May 14, 2018 14:00 1 Possible
Mon, May 14, 2018 9:00 Mon, May 14, 2018 17:00 1 Possible
Tue, May 15, 2018 9:00 Tue, May 15, 2018 16:00 1 Possible
Wed, May 16, 2018 9:00 Fri, May 18, 2018 18:00 3 Subject to grid
condition
Tue, May 15, 2018 9:00 Tue, May 15, 2018 17:00 1 Possible
Tue, May 15, 2018 10:00 Tue, May 15, 2018 16:00 1 Possible
Tue, May 15, 2018 9:00 Tue, May 15, 2018 17:00 1 Possible
Tue, May 15, 2018 10:00 Tue, May 15, 2018 17:00 1 Possible
Tue, May 15, 2018 9:00 Tue, May 15, 2018 14:00 1 Possible
Wed, May 16, 2018 9:00 Wed, May 16, 2018 17:00 1 Subject to grid
condition
Tue, May 15, 2018 9:00 Tue, May 15, 2018 17:00 1 Possible
Tue, May 15, 2018 9:00 Tue, May 15, 2018 17:00 1 Possible
Tue, May 15, 2018 9:00 Tue, May 15, 2018 17:00 1 Possible
Tue, May 15, 2018 9:00 Tue, May 15, 2018 17:00 1 Possible
Tue, May 15, 2018 9:00 Tue, May 15, 2018 17:00 1 Possible
Tue, May 15, 2018 9:00 Tue, May 15, 2018 17:00 1 Possible
Tue, May 15, 2018 9:00 Tue, May 15, 2018 17:00 1 Possible
Tue, May 15, 2018 9:00 Tue, May 15, 2018 17:00 1 Possible
Tue, May 15, 2018 9:00 Tue, May 15, 2018 14:00 1 Possible
Tue, May 15, 2018 9:00 Tue, May 15, 2018 17:00 1 Possible
Tue, May 15, 2018 9:00 Tue, May 15, 2018 14:00 1 Possible
Tue, May 15, 2018 9:00 Tue, May 15, 2018 17:00 1 Possible
Wed, May 16, 2018 9:00 Wed, May 16, 2018 17:00 1 Possible
Wed, May 16, 2018 9:00 Wed, May 16, 2018 12:00 1 Possible
Wed, May 16, 2018 9:00 Wed, May 16, 2018 17:00 1 Possible
Wed, May 16, 2018 9:00 Wed, May 16, 2018 15:00 1 Possible
Wed, May 16, 2018 9:00 Wed, May 16, 2018 17:00 1 Possible
Wed, May 16, 2018 9:00 Wed, May 16, 2018 14:00 1 Possible
Wed, May 16, 2018 9:00 Wed, May 16, 2018 17:00 1 Possible
Wed, May 16, 2018 5:00 Wed, May 16, 2018 10:00 1 Possible
Wed, May 16, 2018 9:00 Wed, May 16, 2018 17:00 1 Possible
Wed, May 16, 2018 9:00 Wed, May 16, 2018 17:00 1 Possible
Wed, May 16, 2018 5:00 Wed, May 16, 2018 10:00 1 Possible
Wed, May 16, 2018 10:00 Wed, May 16, 2018 17:00 1 Possible
Wed, May 16, 2018 9:00 Wed, May 16, 2018 17:00 1 Possible
Wed, May 16, 2018 9:00 Wed, May 16, 2018 17:00 1 Possible
Wed, May 16, 2018 6:00 Wed, May 16, 2018 12:00 1 Possible
Thu, May 17, 2018 9:00 Thu, May 17, 2018 17:00 1 Possible
Thu, May 17, 2018 9:00 Thu, May 17, 2018 15:00 1 Possible
Thu, May 17, 2018 10:00 Thu, May 17, 2018 17:00 1 Possible
Thu, May 17, 2018 10:00 Thu, May 17, 2018 17:00 1 Possible
Thu, May 17, 2018 9:00 Thu, May 17, 2018 17:00 1 Possible
Thu, May 17, 2018 9:00 Thu, May 17, 2018 17:00 1 Inter SLDC
Thu, May 17, 2018 11:00 Thu, May 17, 2018 17:00 1 Possible
Thu, May 17, 2018 9:00 Thu, May 17, 2018 17:00 1 Possible
Thu, May 17, 2018 9:00 Thu, May 17, 2018 17:00 1 Possible
Thu, May 17, 2018 9:00 Thu, May 17, 2018 17:00 1 Possible
Fri, May 18, 2018 9:00 Fri, May 18, 2018 17:00 1 Possible
Fri, May 18, 2018 10:00 Fri, May 18, 2018 17:00 1 Possible
Fri, May 18, 2018 5:00 Fri, May 18, 2018 9:00 1 Possible
Fri, May 18, 2018 9:00 Fri, May 18, 2018 17:00 1 Possible
Sat, May 19, 2018 10:00 Sat, May 19, 2018 15:00 1 Possible
Sat, May 19, 2018 9:00 Sat, May 19, 2018 17:00 1 Possible
Sat, May 19, 2018 9:00 Sat, May 19, 2018 17:00 1 Possible
Sat, May 19, 2018 9:00 Sat, May 19, 2018 12:00 1 Possible
Sat, May 19, 2018 9:00 Sat, May 19, 2018 17:00 1 Possible
Sat, May 19, 2018 9:00 Sat, May 19, 2018 17:00 1 Possible
Sat, May 19, 2018 9:00 Sat, May 19, 2018 17:00 1 Inter SLDC
Sat, May 19, 2018 9:00 Sat, May 19, 2018 17:00 1 Possible
Sat, May 19, 2018 9:00 Sat, May 19, 2018 17:00 1 Possible
Sat, May 19, 2018 9:00 Sat, May 19, 2018 17:00 1 Possible
Sat, May 19, 2018 9:00 Sat, May 19, 2018 17:00 1 Possible
Sat, May 19, 2018 9:00 Sat, May 19, 2018 18:00 1 Possible
Sat, May 19, 2018 9:00 Sat, May 19, 2018 15:00 1 Possible
Sat, May 19, 2018 10:00 Sat, May 19, 2018 17:00 1 Possible
Sat, May 19, 2018 9:00 Sat, May 19, 2018 17:00 1 Possible
Sat, May 19, 2018 9:00 Sat, May 19, 2018 14:00 1 Possible
Sat, May 19, 2018 9:00 Sat, May 19, 2018 17:00 1 Possible
Sat, May 19, 2018 9:00 Sat, May 19, 2018 17:00 1 Possible
Sat, May 19, 2018 9:00 Sat, May 19, 2018 17:00 1 Possible
Sat, May 19, 2018 9:00 Sat, May 19, 2018 17:00 1 Possible
Sat, May 19, 2018 9:00 Sat, May 19, 2018 17:00 1 Possible
Sat, May 19, 2018 9:00 Sat, May 19, 2018 17:00 1 Possible
Sat, May 19, 2018 9:00 Sat, May 19, 2018 17:00 1 Possible
Sat, May 19, 2018 9:00 Sat, May 19, 2018 17:00 1 Possible
Sat, May 19, 2018 9:00 Sat, May 19, 2018 17:00 1 Possible
Sat, May 19, 2018 9:00 Sat, May 19, 2018 14:00 1 Possible
Sat, May 19, 2018 9:00 Sat, May 19, 2018 14:00 1 Possible
Sat, May 19, 2018 9:00 Sat, May 19, 2018 14:00 1 Possible
Sat, May 19, 2018 5:00 Sat, May 19, 2018 9:00 1 Possible
Sat, May 19, 2018 10:00 Sat, May 19, 2018 17:00 1 Possible
Sat, May 19, 2018 9:00 Sat, May 19, 2018 17:00 1 Possible
Sat, May 19, 2018 9:00 Sat, May 19, 2018 17:00 1 Possible
Sat, May 19, 2018 9:00 Sat, May 19, 2018 17:00 1 Possible
Sun, May 20, 2018 9:00 Sun, May 20, 2018 14:00 1 To be discuss
Sun, May 20, 2018 9:00 Sun, May 20, 2018 14:00 1 Possible
Sun, May 20, 2018 10:00 Sun, May 20, 2018 17:00 1 Possible
Sun, May 20, 2018 9:00 Sun, May 20, 2018 17:00 1 Possible
Sun, May 20, 2018 9:00 Sun, May 20, 2018 17:00 1 Possible
Sun, May 20, 2018 5:00 Sun, May 20, 2018 9:00 1 Possible
Sun, May 20, 2018 9:00 Sun, May 20, 2018 17:00 1 Possible
Sun, May 20, 2018 9:00 Sun, May 20, 2018 17:00 1 REPEAT LC
Sun, May 20, 2018 9:00 Sun, May 20, 2018 17:00 1 Possible
Sun, May 20, 2018 9:00 Sun, May 20, 2018 17:00 1 Possible
Mon, May 21, 2018 9:00 Mon, May 21, 2018 17:00 1 Possible
Mon, May 21, 2018 9:00 Mon, May 21, 2018 14:00 1 Possible
Mon, May 21, 2018 9:00 Mon, May 21, 2018 16:00 1 Possible
Mon, May 21, 2018 9:00 Mon, May 21, 2018 14:00 1 Possible
Mon, May 21, 2018 9:00 Mon, May 21, 2018 17:00 1 Possible
Tue, May 22, 2018 9:00 Tue, May 22, 2018 17:00 1 Possible
Tue, May 22, 2018 9:00 Tue, May 22, 2018 17:00 1 Possible
Tue, May 22, 2018 9:00 Tue, May 22, 2018 16:00 1 Possible
Tue, May 22, 2018 9:00 Tue, May 22, 2018 14:00 1 Possible
Tue, May 22, 2018 9:00 Tue, May 22, 2018 17:00 1 Possible
Tue, May 22, 2018 9:00 Tue, May 22, 2018 17:00 1 Possible
Tue, May 22, 2018 9:00 Tue, May 22, 2018 17:00 1 Possible
Tue, May 22, 2018 10:00 Tue, May 22, 2018 15:00 1 Possible
Tue, May 22, 2018 9:00 Tue, May 22, 2018 15:00 1 Possible
Tue, May 22, 2018 9:00 Tue, May 22, 2018 17:00 1 Possible
Tue, May 22, 2018 10:00 Tue, May 22, 2018 17:00 1 Possible
Tue, May 22, 2018 9:00 Tue, May 22, 2018 17:00 1 Possible
Tue, May 22, 2018 9:00 Tue, May 22, 2018 14:00 1 Possible
Tue, May 22, 2018 9:00 Tue, May 22, 2018 14:00 1 Possible
Tue, May 22, 2018 9:00 Tue, May 22, 2018 17:00 1 Possible
Tue, May 22, 2018 5:00 Tue, May 22, 2018 9:00 1 Possible
Wed, May 23, 2018 9:00 Wed, May 23, 2018 12:00 1 Possible
Wed, May 23, 2018 9:00 Wed, May 23, 2018 17:00 1 Possible
Wed, May 23, 2018 9:00 Wed, May 23, 2018 17:00 1 Possible
Wed, May 23, 2018 9:00 Wed, May 23, 2018 17:00 1 Possible
Wed, May 23, 2018 9:00 Wed, May 23, 2018 17:00 1 REPEAT LC
Wed, May 23, 2018 9:00 Wed, May 23, 2018 17:00 1 Wrong Entry
Wed, May 23, 2018 10:00 Wed, May 23, 2018 17:00 1 Possible
Wed, May 23, 2018 9:00 Wed, May 23, 2018 17:00 1 Possible
Wed, May 23, 2018 9:00 Wed, May 23, 2018 17:00 1 Possible
Wed, May 23, 2018 9:00 Wed, May 23, 2018 17:00 1 Pending
Wed, May 23, 2018 9:00 Wed, May 23, 2018 17:00 1 Possible
Thu, May 24, 2018 9:00 Thu, May 24, 2018 14:00 1 Possible
Thu, May 24, 2018 9:00 Thu, May 24, 2018 17:00 1 Possible
Thu, May 24, 2018 9:00 Thu, May 24, 2018 17:00 1 Possible
Thu, May 24, 2018 9:00 Thu, May 24, 2018 17:00 1 Possible
Thu, May 24, 2018 10:00 Thu, May 24, 2018 17:00 1 Possible
Thu, May 24, 2018 9:00 Thu, May 24, 2018 14:00 1 Possible
Thu, May 24, 2018 9:00 Thu, May 24, 2018 14:00 1 Possible
Thu, May 24, 2018 9:00 Thu, May 24, 2018 14:00 1 Possible
Thu, May 24, 2018 9:00 Thu, May 24, 2018 17:00 1 Possible
Thu, May 24, 2018 11:00 Thu, May 24, 2018 15:00 1 Possible
Thu, May 24, 2018 9:00 Thu, May 24, 2018 17:00 1 Possible
Thu, May 24, 2018 9:00 Thu, May 24, 2018 14:00 1 Possible
Thu, May 24, 2018 9:00 Thu, May 24, 2018 14:00 1 REPEAT LC
Thu, May 24, 2018 6:00 Thu, May 24, 2018 12:00 1 Possible
Fri, May 25, 2018 9:00 Fri, May 25, 2018 17:00 1 Possible
Fri, May 25, 2018 9:00 Sun, May 27, 2018 18:00 3 To be discuss
Fri, May 25, 2018 9:00 Fri, May 25, 2018 18:00 1 REPEAT LC
Fri, May 25, 2018 9:00 Fri, May 25, 2018 17:00 1 Possible
Fri, May 25, 2018 5:00 Fri, May 25, 2018 9:00 1 Possible
Fri, May 25, 2018 9:00 Fri, May 25, 2018 16:00 1 Possible
Fri, May 25, 2018 9:00 Fri, May 25, 2018 17:00 1 Possible
Fri, May 25, 2018 9:00 Fri, May 25, 2018 17:00 1 REPEAT LC
Fri, May 25, 2018 10:00 Fri, May 25, 2018 17:00 1 Possible
Fri, May 25, 2018 10:00 Fri, May 25, 2018 17:00 1 Possible
Fri, May 25, 2018 9:00 Fri, May 25, 2018 17:00 1 Possible
Fri, May 25, 2018 9:00 Fri, May 25, 2018 14:00 1 Possible
Fri, May 25, 2018 10:00 Fri, May 25, 2018 17:00 1 Possible
Fri, May 25, 2018 9:00 Fri, May 25, 2018 17:00 1 Pending
Sat, May 26, 2018 9:00 Sat, May 26, 2018 12:00 1 Possible
Sat, May 26, 2018 9:00 Sat, May 26, 2018 17:00 1 Possible
Sat, May 26, 2018 9:00 Sat, May 26, 2018 17:00 1 Possible
Sat, May 26, 2018 9:00 Sat, May 26, 2018 17:00 1 Possible
Sat, May 26, 2018 9:00 Sat, May 26, 2018 14:00 1 Possible
Sat, May 26, 2018 9:00 Sat, May 26, 2018 17:00 1 Possible
Sat, May 26, 2018 9:00 Sat, May 26, 2018 17:00 1 Possible
Sat, May 26, 2018 9:00 Sat, May 26, 2018 17:00 1 Possible
Sat, May 26, 2018 10:00 Sat, May 26, 2018 17:00 1 Possible
Sat, May 26, 2018 10:00 Sat, May 26, 2018 17:00 1 Possible
Sat, May 26, 2018 9:00 Sat, May 26, 2018 17:00 1 Possible
Sun, May 27, 2018 9:00 Sun, May 27, 2018 17:00 1 Possible
Sun, May 27, 2018 9:00 Sun, May 27, 2018 14:00 1 Possible
Sun, May 27, 2018 9:00 Sun, May 27, 2018 17:00 1 Possible
Sun, May 27, 2018 9:00 Sun, May 27, 2018 17:00 1 Possible
Sun, May 27, 2018 9:00 Sun, May 27, 2018 17:00 1 Possible
Mon, May 28, 2018 5:00 Mon, May 28, 2018 10:00 1 Possible
Tue, May 29, 2018 12:00 Tue, May 29, 2018 16:00 1 Possible
Tue, May 29, 2018 9:00 Thu, May 31, 2018 18:00 3 Possible
Tue, May 29, 2018 10:00 Tue, May 29, 2018 17:00 1 Possible
Tue, May 29, 2018 9:00 Tue, May 29, 2018 14:00 1 Possible
Tue, May 29, 2018 9:00 Tue, May 29, 2018 14:00 1 REPEAT LC
Tue, May 29, 2018 10:00 Tue, May 29, 2018 17:00 1 Possible
Tue, May 29, 2018 6:00 Tue, May 29, 2018 12:00 1 Possible
Wed, May 30, 2018 9:00 Wed, May 30, 2018 12:00 1 Possible
Wed, May 30, 2018 9:00 Wed, May 30, 2018 17:00 1 Possible
Sun, May 27, 2018 10:00 Sun, May 27, 2018 17:00 1 Possible
Wed, May 30, 2018 10:00 Wed, May 30, 2018 17:00 1 REPEAT LC
Wed, May 30, 2018 9:00 Wed, May 30, 2018 17:00 1 Possible
Wed, May 30, 2018 5:00 Thu, May 31, 2018 9:00 2 Possible
Wed, May 30, 2018 9:00 Wed, May 30, 2018 17:00 1 Possible
Wed, May 30, 2018 9:00 Wed, May 30, 2018 14:00 1 Possible
Wed, May 30, 2018 9:00 Wed, May 30, 2018 14:00 1 REPEAT LC
Wed, May 30, 2018 10:00 Wed, May 30, 2018 17:00 1 Possible
Wed, May 30, 2018 9:00 Wed, May 30, 2018 14:00 1 Possible
Thu, May 31, 2018 9:00 Thu, May 31, 2018 14:00 1 Possible
Thu, May 31, 2018 10:00 Thu, May 31, 2018 17:00 1 Possible
Thu, May 31, 2018 9:00 Thu, May 31, 2018 17:00 1 Possible
Thu, May 31, 2018 6:00 Thu, May 31, 2018 12:00 1 Possible
Remarks SE Approval
Subject to Concurrence Approved
from M/s.JK Tyres.
Approved
Addressed to
SRLDC for
approval
Approved
Approved
Approved
Approved
Approved
Repeat lc
Repeat lc
Postponed
Approved
Approved
Cancelled
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Addressed to
SRLDC for
approval
Postponed
Approved
Approved
Approved
Approved
Cancelled
Repeat lc
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Cancelled
Approved
Subject to
TAQA
Generation
Approved
Approved
Approved
Approved
Cancelled
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
OCC Appd. Addressed to
16.5.18/169 for line 1 SRLDC for
only. Addressed to approval
SRLDC for approval
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Addressed to
SRLDC for
approval
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Addressed to
SRLDC for
approval
Approved
Approved
Approved
Subject to load
condition
Subject to EHT Approved
Concurrence
Approved
Approved
Approved
Approved
Approved
Addressed to
SRLDC for
approval
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
OCC Appd. Approved
19.05.2018/184
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Cancelled
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Addressed to
SRLDC for
approval
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Cancelled
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Cancelled
Approved
Approved
Addressed to
SRLDC for
approval
Repeat lc
Approved
Approved
Approved
Cancelled
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Repeat lc
Approved
Approved
Approved
Repeat lc
Approved
Approved
Approved
Cancelled
Approved
Approved
Approved
Approved
Approved
C
Message
S. No SLDC UserName P_Id From Type of SS
No
1 Erode DEVIAKURIC 70234 31 EE/O/DEVIA 230 KV
HI230KV KURICHI
ARASUR 230 KV 230 /110 KV Auto Transformer-I, New 230KV Busbar protection panel
HV I, LV I BREAKERS, Its CTs commissioning works by P&C
and LAS wing/Thudialur.
MTPS MTPS-I to ANTHIYUR FEEDER Monthly Maintenance
Erode 110 KV 110KV Capacitor Bank 1 Annual relay testing & M.Mtce
THINGALUR 230 110KV Erode I feeder Breaker, For Monthly maintenance work and
KV CTs and line Isolator GRT Relay testing work
OTHAKKAL 110KV OKM-Udumalpet-2 feeder For line maintenance work by
MANDABAM 230 section between 110KV Lines/Udumalpet wing.
KV Kongalnagaram SS to 110KV
Negamam SS
Udumalpet 400 230 KV Myvadi - Kadamparai - 1 For Monthly maintenance and PMI by
KV # Breaker , CT Line entire lines wing
DEVIAKURICHI 110 KV Thammampatty jumper tightness work
230 KV -Koppampatty Feeder
UDUMALPET 110KV Udt link I # Breaker & For Monthly Maintenance works
230 KV Line entire
GURUPARAPALL 230KV Soolagiri # Monthly maintenance works
I 230 KV
KUNDAH PH1 Unit 3 Mtce
LOWER On Unit I & II complete with their To carryout Common Spell AOH
METTUR 3 internals along with their Power works.
Transformers, GC Breaker and
Barrage Gates & Trash rack.
Singarapet 110 KV 110KV Arni # II SF6 Bkr, CTs, Monthly maintenance Work
Line Isolator and Entire Line
ARASUR 230 KV 230/110 KV Auto Transformer-II, New 230 KV Busbar protection panel
HV II,LV II breakers,Its CTs and commissioning works by P&C
LAS wing/Thudialur
ARASUR 230 KV 230/110 KV Auto Transformer-II, New 230 KV Busbar protection panel
HV II,LV II breakers,Its CTs and commissioning works by P&C
LAS wing/Thudialur
ALIYAR 230 KV 230KV ALR-KDH FEEDER Tree cutting work by JE/Lines pollachi
CB,CT & LINE ENTIER & Monthly Maintence work
UDUMALPET 110KV Udt link II # Breaker & For Monthly Maintenance works
230 KV Line entire
GOBI 230 KV 110 KV Bhavani Sagar Feeder FOR THE REPLACEMENT OF
breaker, CTs with Entire line CONTROL VALVE IN BREAKER
AND FOR MANTHLY
MAINTENANCE WORK
UNJANAI 230 KV 230KV Pallakkapalayam – Gobi # 1) Multi ckt tower defective disc
Line Entire replacement work.
ARASUR 230 KV 230/110 KV Auto Transformer- New 230 KV Busbar protection panel
III,HV III,LV III breakers, Its CTs commissioning works by P&C wing
and LAS. /Thudialur.
ARASUR 230 KV 110 KV Arasur- Somanur feeder Monthly maintenance works
Breaker & CTs.
Erode 110 KV 110 KV Erode-Thingalur # 1 M.Mtce work
ALIYAR 230 KV 110KV ALR-UDT FEEDERII Tree cutting work by JE/Lines pollachi
CB,CT & LINE SECTION & CT Replacement work
BETTWEN ALIYAR SS & DEV
PUDHUR SS
KARUVALUR 230 Kv Karuvalur - PGCIL feeder "For Monthly maintenance work and
230 KV Breaker with Line switch Line maintenance by
AEE/Lines/Palladam
UNJANAI 230 KV 1.unjanai - paruthipally 110kv for monthly maintenance work
feeder breaker, cts and lineside
isolator only
KARUVALUR 230 KV Bus Coupler Breaker, CT For Monthly maintenance work of Bus
230 KV with Bus-A Coupler Breaker, CT and Bus-A
ANTHIYUR 230 110KV Anthiyur-Mettur entire For making LILO of 110KV Anthiyur-
KV feeder Mettur feeder at new Poonachi
110/22KVSS Nature of work:a)
Erection for one number QD+3m
tower b)Releasing and lowering of
existing 3 nos.panther conductor and 1
No earth wire of Anthiyur-Mettur
110KV feeder between location No 46
& 47. c) Re stinging of released 3 Nos
panther conductor and 1 No earth wire
between location 46-46A and 46A-47.
d) Stringing of 6 Nos panther
conductor between newly erected
QD+3m tower9at loc.No.46A) and
Loc. No.2 towards Poonachi
110/22KVSS.
KUNDAH PH2 UNIT-5 GENERATOR ,POWER Governor work and monthly
TRANSFORMER SF6 maintenance work
BREAKER AND ITS
ACCESSIORIES
ARASUR 230 KV 230 KV Arasur-Karamadai feeder New 230 KV Busbar protection panel
Breaker& CTs commissioning works by P&C
Wing/Thudialur.
Erode 110 KV 110 KV Erode-Thiruvachi # brkr M.Mtce work
& CT
Palavadi 400 KV PAALAVADI ICT - 1 (315 MVA, MONTHLY MAINTENANCE WORK
400/230 KV)
THINGALUR 230 Auto Transformer I,HV I & LV I For Monthly maintenance work and
KV Breakers with CTs GRT relay testing work
THINGALUR 230 110KV Arasur feeder Breaker, For Monthly maintenance work and
KV CTs and line Isolator with section GRT relay testing work
between 230KV Thingalur SS and
110KV perumanallur SS
THUDIALUR 230 110 CAPACITOR BANK I & II 110 CAPACITOR BANK WITH
KV BREAKER WITH CTs BREAKER AND CTs
MAINTENANCE WORKS
OTHAKKAL 110KV OKM-R.S.Puram-1 Feeder For PMI works by Lines/Thudiyalur
MANDABAM 230 section between 230KV OKM SS wing and monthly maintenance works.
KV and 110KV R.S.Puram SS
(Breaker, CT's, Line switch)
SALEM AUTO 110KV Capacitor Bank-I & II Monthly maintenance and hot spot
230 KV Breakers, CTs, Line Isolators and rectification work
Capacitors.
SINGAPURAM 1) 230 KV K.R.Thoppur, 2) 230 Monthly Maintenance
230 KV KV Deviakurichi Feeder/CT,
Breaker, Isolator.
SINGAPURAM 110 KV Northern Bus & Southern Monthly Maintenance Work
230 KV BUS During 110KV Southern Bus
LC Auto -II LV Breaker will be
kept in Hand Trip
condition/Jumpers and Isolators.
SINGARAPET 110 KV SSREL # Breaker, CTs & To carry monthly maintenance work by
230 KV line isolators AEE/Maintenance/230KV SS /
Singarapet
Anaikadavu 400 230 KV Bus I entire For monthly maintenance and testing
KV of Tandelta by P&C wing
VINNAMANGAL Auto Transformer-I, HV-I, LV-I For Replacing Strung bus dropper
AM 230 KV and 110KV Ambur Feeder conductor and routine monthly
Breaker and CT's maintenance works.
ARASUR 230 KV 230/110 KV Auto Transformer- New 230 KV Busbar protection panel
IV,HV IV, LV IV Breakers, Its CTs commissioning works by P&C
and LAS. wing/Thudialur.
MOYAR Unit I Generator & its Pr Tr Monthly maintenance
ALIYAR 230 KV 230KV ALR-UDT FEEDER Tree cutting work by JE/Lines pollachi
CB,CT & LINE ENTIER & Quarterly Maintence work
METTUR DPH 110 KV DPH - AUTO SS1 Feeder Monthly Maintenance and Energy
meter replacement work by GRT
GURUPARAPALL 1. 230KV Palavadi, Soolagiri, Monthly maintenance works in
I 230 KV Singarapet feeder Breakers, 230KV/110KV/33KV/11KV SS
230KV BC, 2) Auto I and II, equipments. 110KV LILO works by SS
110KV Hosur, Karimangalam Erection wing.
feeder Breakers, LV I and II,
110KV BC, GC I and II Breakers.
ALIYAR 230 KV 110KV ALR-SKPY# CB,CT & Tree cutting work by JE/Lines pollachi
LINE ENTIRE & CT Replacement work
OTHAKKAL 110KV OKM-Udumalpet 2 Feeder For monthly maintenance works.
MANDABAM 230 (Breaker, CT's)
KV
Udumalpet 400 230 KV Myvadi - Kadamparai - 2 For Monthly maintenance and PMI by
KV # Breaker , CT Line entire lines wing
SALEM AUTO 110KV Salem –Rasipuram feeder jumper tightness work
230 KV (Section between Salem SS to
Mallur SS)
KUNDAH PH3 230KV PH3 to PH2 Feeder For monthly maintenance work
KUNDAH PH3 230KV PH3 to PH2 Feeder For monthly maintenance work
HOSUR 230 KV 230KV Mettur feeder,110KV 1)Monthly maintenance work and Line
Uddanapally #,110KV Kempatty Maintenance work.
#,100MVA Auto transformer-II
PUDHANCHANT 230KV Pugalur feeder CB, CTs, For attending Hot Spots, twist & turn
HAI 230 KV CVTs, Waver Traps, and Switches. problem in 230KV Bus Switch and
230KV idle Bus side Switch in regular maintenance works in
Pugalur feeder. equipments and Bus side Switch.
PALLAKAPALAY 230 KV MAIN BUS-I & 230 KV For attending Monthly Maintenance
AM 230 KV BUS COUPLER - CTs,Breakers work
and PTs
METTUR AUTO 110KV K.R.Thoppur- Nangavally For checking of Jumpercone Tightness
230 KV feeder section between at Railway crossing Towers
Nangavally SS o/g Isolator and LOC.NO.19 & 20 in 110KV
DPloc.no. 28 only Nangavalli EHT spurline
METTUR AUTO 230KV Mettur -Tunnel power Arching Rod Tightness checking at
230 KV house feeder entire LOC.NO. 46 in 230 KV Mettur-Tunnel
Power house feeder entire
INGUR 230 KV 230KV Thingalur # Breaker, CT’s MONTHLY MAINTENANCE
and Line side Isolator WORKS
Sandinallah 110 110kv Sandynallah-PH-5 Annunal Relay Testing work
KV
ARASUR 230 KV 230 KV/ 110 KV Auto New 230 KV Busbar protection panel
Transformer-IV, HV IV,LV IV commissioning works by P&C wing
Breakers, Its CTs and LAS /Thudialur.
METTUR TPH 230KV Common Bus Bar on daily Common Bus Annual Maintenance
basis (Breakers, CTs, PTs, LAs works and Testing and Commissioning
and earth pits. of New Bus Bar Protection panel.
INGUR 230 KV 230KV Ingur – Thingalur # LINE MAINTENANCE WORKS
THINGALUR 230 230KV Ingur feeder Breaker and For monthly maintenance work and
KV CTs with line Isolator GRT relay testing work
KUNDAH PH3 230KV KPH3-KARAMADAI # For Pre-Monsoon Inspection Work
SINGARAPET 230KV Salem # Breaker, CTs & To carry monthly maintenance work by
230 KV line isolators AEE/Maintenance/230KV SS /
Singarapet
Palavadi 400 KV 230 KV Paalavadi- Karimangalam Monthly maintenance work.
feeder
Udumalpet 400 230 KV Myvadi - Anikadavu # For Monthly maintenance and PMI by
KV Breaker , CT Line entire lines wing
Salem 400 KV 400 / 230 KV ICT II HV & LV Monthly Maintenance Work and ABT
SIDE TRANSFORMER, LAS, meter replacement work on HV and LV
CTs, BREAKERS, JUMPERS & side by GRT wing / K.R.Thoppur
SWITCHES and ABT meter
replacement work on HV and LV
side by GRT wing / K.R.Thoppur
Anaikadavu 400 230 KV Anikadavu - Myvadi For Monthly Maintenance and PMI by
KV feeder Breaker, CT line entire lines wing
GOBI 230 KV Capacitor Bank I Breaker and CTs FOR MANTHLY MAINTENANCE
only WORK
KUNDAH PH1 110 KV Kundah PH 1 - Kundah Mtce
PH 2 #1 breaker & CT
METTUR AUTO 230 KV K.R.Thoppur-Thingalur For Jumper Cone Tightness checking
230 KV Feeder entire work at River crossing Tower Loc
No:198 & 199
THINGALUR 230 230KV KR Thoppur feeder for Montly Maintenance work
KV Breaker and CTs with line
Isolator.
Salem 400 KV 230 KV THINGALUR # Monthly Monthly Maintenance Work
maintenance of CT, Breaker, Bus
& Line switches; Relay and ABT
meter replacement work by GRT
wing / K.R.Thoppur
METTUR AUTO 230KV MTPS I- Salem 230KVSS For checking of Jumpercone tightness
230 KV feeder entire at Tension Towers between
TLOC.NO.42 to 82
MTPS 230KV MTPS-I to Salem 230KV Monthly Maintenance
FEEDER
UNJANAI 230 KV 110KV Unjanai- BKB- II # line 1) Jumper Tightness Checking
portion between BKB-II
&Pallipalayam
B"Sagar MHPH Bhavanisagar MHPH Units 3&4 ANNUAL RELAY TEST BY GRT
METTUR TPH 230KV Common Bus Bar on daily Common Bus Annual Maintenance
basis (Breakers, CTs, PTs, LAs works and Testing and Commissioning
and earth pits. of New Bus Bar Protection panel.
ALIYAR 230 KV 110KV ALR-UDT #I CB,CT & Tree cutting work by JE/Lines pollachi
LINE SECTION BETTWEN & Monthly mtce work
ALIYAR SS &
POOLANKINARU SS
METTUR TPH 230KV Common Bus (Breakers, Common Bus Annual Maintenance
CTs, PTs, LAs and earth pits. Works and Testing and Commissioning
of New Bus Bar Protection Panel.
PALLADAM 230 230 KV Palladam - PGCIL feeder For making LILO arrangements for
KV Line Entire Gobi - Arasur 230 KV feeder at PGCIL
campus erection of 2 Nos towers at
PGCIL Arasur end work to be carried
out by EE/TLC/Coimbatore. LC
required due to crossing of 230 KV
Palladam - PGCIL feeder
ARASUR 230 KV Both 230 KV PGCIL- Arasur Link Rearranging the 230 KV PGCIL-
I & II feeders entire. Karuvalur and 230 KV PGCIL-
Palladam feeders between LOC Nos 1
& 2 for making LILO arrangements for
230 KV Arasur-GOBI feeder at PGCIL
-Arasur SS premises.
Salem 400 KV 230 kv BUS Coupler Breaker for Monthly Maintenance Work
ABT meter replacement work by
GRT wing / K.R.Thoppur
KUNDAH PH3 230KV PH3 to PH4 Feeder For monthly maintenance work
METTUR DPH 110 KV DPH - Mettur town SS Monthly Maintenance and Energy
meter replacement work by GRT
PALLAKAPALAY Auto Transfomer II - Entire HV & For attending monthly maintenance
AM 230 KV LV Side,LAS,CTs,Breakers and work & REPLACEMENT OF 3 Nos
Switches LV CT's
METTUR AUTO 110KV K.R.Thoppur- Nangavally For checking of Jumper cone Tightness
230 KV fee section between K.R.Thoppur at Tension towers between
SS and110KV Tharamangalam TLOC.NO.1-20 110KV Nangavally
incoming Isolator only EHT spurline
Singarapet 110 KV 110KV LINK # I SF6 Bkr, CTs, Monthly Maintenance work
Line Isolator and Entire Line
METTUR TPH 230KV Common Bus (Breakers, Common Bus Annual Maintenance
CTs, PTs, LAs and earth pits. Works and Testing and Commissioning
of New Bus Bar Protection Panel.
230 Kv Kurukathi 110 KV Ingur I # Breaker with For Monthly maintenance work.
Ss Cts, Switches.
230 Kv Kurukathi 110 KV Ingur II # Breaker with For Monthly maintenance work.
Ss Cts, Switches.
230 Kv Kurukathi 110 KV Rasi Palayam # Breaker For Monthly maintenance work.
Ss with Cts, Switches
Rasipalayam 400 i) 110KV Kurukathi # breaker & For Monthly maintenance works
KV CTs ii) 110KV Ponnapuram #
breaker & CTs one by one
THINGALUR 230 110KV Erode II feeder Breaker, For monthly maintenance work
KV CTs and line Isolator with section
between 230KV Thingalur SS and
110KV Ganthi nagar SS.
Negamam 110 KV 110KV Negamam - Pollachi For monthly maintenance works and
feeder breaker and CTs Annual relay test by AEE/P&C/Aliyar
Negamam 110 KV 110KV Negamam - Pollachi For monthly maintenance works and
feeder breaker and CTs Annual relay test by AEE/P&C/Aliyar
UNJANAI 230 KV 110KV Pudhansanthai – K.N.Patty 1) Jungle clearance & Broken disc
# line portion between replacement work.
K.N.Patty& Rasipuram SS
Erode 110 KV 110 KV Capacitor Bank 2 M.Mtce work & Annual relay testing
METTUR TPH 230KV Common Bus (Breakers, Common Bus Annual Maintenance
CTs, PTs, LAs and earth pits. works and Testing and Commissioning
of New Protection Panel.
THINGALUR 230 110KV Kavundapadi feeder for monthly maintenance work and
KV Breaker, CTs and line Isolator GRT relay testing work
with section between 230KV
Thingalur SS and 110KV
Kavundapadi SS
ANTHIYUR 230 110KV Bus coupler breaker & CT. Monthly Maintenance work.
KV
SINGARAPET 110KV Link I # Breaker and CTs To carry monthly maintenance work by
230 KV & line isolators and 110KV Link AEE/Maintenance/230KV SS /
II # Breaker and CTs & line Singarapet
isolators (ONE BY ONE)
Udumalpet 400 230 KV Myvadi - Udumalpet Link For Monthly maintenance and PMI by
KV - 1 # Breaker , CT Line entire lines wing
KARAMADAI 315 MVA, 400/230 KV, ICT II For Monthly maintenance of HV & LV
230 KV breaker's, CTs
PUDHANCHANT Auto-I, HV&LV-I CBs, CTs, For attending hot spots, fix ABT
HAI 230 KV LASs, 230KV Switches. 230KV meters in HV & LV Side and regular
Auto-I idle Bus Side Switch. maintenance works.
Negamam 110 KV 110KV Negamam - Anthiyur For monthly maintenance works and
feeder breaker and CTs Annual relay test by AEE/P&C/Aliyar
Negamam 110 KV 110KV Neganmam - Anthiyur For monthly maintenance and Annual
feeder breaker and CTs relay test by AEE/P&C/Aliyar
METTUR TPH 230KV Common Bus (Breakers, Common Bus Annual Maintenance
CTs, PTs, LAs and earth pits. Works and Testing and Commissioning
of New Bus Bar Protection Panel.
SALEM AUTO 230 KV Link - I feeder Breaker & Monthly Maintenance works
230 KV CT’s
ALIYAR 230 KV 110KV NEGAMAM FEEDER Tree cutting Work by JE Lines Pollachi
CB,CT &LINE SECTION & Half yearly Mtce work
BETWEEN ALR & MUTHUR SS
Udumalpet 400 230 KV Myvadi - Udumalpet Link For Monthly maintenance and PMI by
KV - 2 # Breaker , CT Line entire lines wing
SADAYAMPALA 230 KV Bus coupler breaker and Monthly maintenance and P&C check.
YAM 230 KV Isolators.
KARUVALUR 230/110 KV Auto transformer "For Monthly maintenance work
230 KV II ,HV,LV BKR,CTs and LAS
METTUR TPH 230KV Common Bus (Breakers, Common Bus Annual Maintenance
CTs, PTs, LAs and earth pits. Works and Testing and commissioning
of New Bus Bar Protection Panel.
VINNAMANGAL Auto Transformer-II, HV-II, LV-II, For replacing the defective surge
AM 230 KV 110KV V.Patty feeder breaker, monitors in 230/110 KV LAS, for
110KV Thirupattur feeder breaker carrying out routine monthly
and its CT's maintenance works.
KUNDAH PH3 230KV PH3 to Karamadai Feeder For monthly maintenance work
KUNDAH PH2 UNIT 1 TO 5 ALL 110KV FOR 110KV TOP AND BOTTOM
FEEDERS. BUS PT SELECTOR SWITCH
ERECTION WORK
ANTHIYUR 230 230KV Bus Coupler Breaker and Monthly Maintenance work
KV CT.
DEVIAKURICHI 110 KV Krishnapuram Feeder Monthly Maintenance
230 KV Breaker ,CTs
METTUR TPH 230KV Common Bus (Breakers, Common Bus Annual Maintenance
CTs, PTs, LAs and earth pits. Works and Testing and Commissioning
of New Bus Bar Protection Panel.
PALLADAM 230 110 KV BUS COUPLER Breaker To carry out Monthly Maintenance
KV & CT's Only work on 110 KV Bus coupler breaker
and CTs by
AEE/maintenance/Palladam
METTUR DPH 110 KV DPH - Auto ss 2 Feeder Monthly Maintenance and Energy
meter replacement work by GRT
VALAYAPATTY2 110KV Valayapatty# CB,CTs and For attending monthly maintenance
30KV Line Isolators. work.
VALAYAPATTY2 230/110KV Auto-II HV,LV For attending monthly and yearly
30KV Breaker and 110KV Bus entire. maintenance work.
METTUR AUTO 230KV MTPS II- Gobi feeder For checking of Jumpercone tightness
230 KV entire DC line at River crossing Towers
T.LOC.NO.143 and other Tension
Towers between T.LOC.NO. 87-143
SINGARAPET 230KV Arani # Breaker and CTs To carry monthly maintenance work by
230 KV & line isolators AEE/Maintenance/230KV SS /
Singarapet
Udumalpet 400 230 KV Myvadi - Ponnapuram - 1 For Monthly maintenance and PMI by
KV # Breaker , CT Line entire lines wing
PONNAPURAM 230kV Myvadi 1# Monthly maintenance work
230 KV
METTUR DPH 110 KV DPH - Barriage 1 Feeder Monthly Maintenance and Energy
meter replacement work by GRT
METTUR AUTO 110KV RC Plant -Singarapet Jumper cone Tightness checking at
230 KV feeder II portion between 110KV Railway crossing Tower LOC.NO.106
Mechari SS -singarapetSS B-107 is RC Plant- singarapet feeder-II
INGUR 230 KV 230 kv bus coupler , breaker , CT, monthly maintenance works
Isolator and also Auxillary bus
THINGALUR 230 110KV Ingur feeder Breaker, CTs for monthly maintenance work and
KV and line Isolator with section GRT relay testing work
between 230KV Thingalur SS and
110KV P.G.Palayam SS
ALIYAR 230 KV 110KV ANGALAKURICHY Tree cutting Work by JE Lines Pollachi
FEEDER CB,CT &LINE & Quarterly Mtce work
SECTION BETWEEN ALR &
AKY SS
PUDHANCHANT 230KV Unjanai feeder CB, CTs, For attending Broken Worm wheel in
HAI 230 KV CVTs, WAve Traps and 230KV MoM Box-189 Switch, to replace
Switches. 230KV idle Bus side defective PDR and regular
Switch of 230KV Unajani feeder. maintenance works.
KUNDAH PH2 230KV PH3 FEEDER ,SF6 FOR CVT ERECTION WORK PH2-
BREAKER AND ITS PH3 FEEDER
ACCESSIORIES
DEVIAKURICHI 110 KV TASPL Feeder( Neyveli Monthly Maintenance
230 KV Feeder- II) Breaker and CTs.
PUDHANCHANT Auto-II, HV&LV-II CBs, CTs, For attending hot spots, fix ABT
HAI 230 KV LASs, 230KV Switches. 230KV meters in HV&LV Side and regular
Auto-II idle Bus Side Switch. maintenance works.
Udumalpet 400 230 KV Myvadi - Ponnapuram - 2 For Monthly maintenance and PMI by
KV # Breaker , CT Line entire lines wing
SALEM AUTO 110KV Salem – Singapuram II jumper tightness work
230 KV feeder (Section between Salem-
Singapuram)
METTUR AUTO 230KV MTPS II- Thingalur For checking of Jumpercone tightness
230 KV feeder entire DC line at River crossing Towers
T.LOC.NO.143 and other Tension
Towers between T.LOC.NO. 87-143
MOYAR 110 KV Moyar Pykara feeder 1 GRT relay test and monthly
breaker maintenance
OTHAKKAL 230KV OKM-Anikadavu Feeder For Monthly maintenance works.
MANDABAM 230 Entire (Breaker, CT's, 89M1,
KV 89M2 & 89L Isolators)
THINGALUR 230 230KV MTPS II feeder Breaker for Monthly maintenance work
KV and CTs with line Isolator.
During the LC period the remaining 3*100 MVA Auto TRs Wed, May 2, 2018 9:00
will be in service. 110 KV Sulur SS AND 110 KV
Neelambur SS are under total shutdown.
Programmed LC Wed, May 2, 2018 9:00
During the LC period, (1)Idle charged from 110KV Wed, May 2, 2018 9:00
Kongalnagaram SS upto 110KV Negamam SS Breaker
under Cut-OFF condition Hence, No SS will be affected.
During the LC period 230KV Gobi feeder will be in service. Wed, May 2, 2018 9:00
230KV MTPS 1 feeders other end also programmed to avail
LC . No SS will be affected.
Both end Wed, May 2, 2018 9:00
110 KV Udt Link II # and Link III # will cater the load of Wed, May 2, 2018 9:00
110 KV Udt Link I #
Other #s will be in service Wed, May 2, 2018 8:00
During the LC period 1. 110KV PolurSS load fed from Thu, May 3, 2018 9:00
110KV Arni # I. Hence there is no interuption of supply
During the LC period,the remaining 3*100 MVA Auto TRs Thu, May 3, 2018 9:00
will be in service.110 KV Saravanampatty SS, 110 KV
Kaduvetty palayam SS and MGC Palayam SS are under
total shutdown.
During the LC period,the remaining 3*100 MVA Auto TRs Thu, May 3, 2018 9:00
will be in service.110 KV Saravanampatty SS, 110 KV
Kaduvetty palayam SS and MGC Palayam SS are under
total shutdown.
110 KV Kodumudi SS availing TSD, Kaspapettai 110 & Thu, May 3, 2018 9:00
Kasipalayam 110will be fed from Pugalur 230
110KV K.R.Thoppur-I feeder will be radially fed from other Thu, May 3, 2018 9:00
end or Railway traction SS will be fed from 110KV
K.R.Thoppur-II feeder There will be no interruption to any
SS or Feeder
During the LC period, the other 230 KV feeders are in Thu, May 3, 2018 9:00
service to cater the SS loads with support of wind
generation.
1. Schedule total Shutdown 110KV Peelamedu SS. Thu, May 3, 2018 9:00
1. No interruption of supply. 2. Load fed through 230 KV Thu, May 3, 2018 9:00
SS Karimangalam.
1.Both End Breaker Open Condition. 2.Both End Bus & Thu, May 3, 2018 9:00
Line Mods Open Condition. 3.Both End Earth Switch
Closed Condition.
Both end Thu, May 3, 2018 9:00
1)Salem 230KV SS KR Thoppur I feeder monthely Thu, May 3, 2018 9:00
maintenances work Breaker,CT ‘s. 2) Railway traction
supply change to KR Thoppur II feeder. 3) KR Thoppur
400KV SS radially fed from upto Kandampatty 110KV SS
End. 4) There will be no interruption of supply any other
SS.
During 400/230 KV Auto Transformer I LC Period, 400/230 Thu, May 3, 2018 9:00
KV Auto Transformer II will be in Service Condition.
Hence there will be no interruption of supply.
During The Lc Period 230KV Udt # Will Caters The load Thu, May 3, 2018 9:00
110 KV Udt Link I and Link III Feeder will cater the load of Thu, May 3, 2018 9:00
110 KV Udt Link II #
1.110 KV THOPPAMPALAYAM SS,110 KV NAMBIYUR Thu, May 3, 2018 9:00
SS,110 KV THAVAVADY SS,110 KV BHAVANISAGAR
SS AND 110 KV KARATTUPALAYAM SS MAY AVAIL
TOTAL SHUTDOWN ON THE SAME DAY 2.NO OTHER
SS WILL AFFECTED
During LC period other end also programmed to avail Thu, May 3, 2018 9:00
Maintenance work.No SS will be affected.
Mettur Town & Kolathur fed from MDPH Thu, May 3, 2018 9:00
1. The AOH schedule has been approved vide Lr. No: CE / Wed, May 2, 2018 9:00
H / SE / H(E) / EE / HP / AEE-9 / F. AOH-2018 / D. 16 / 18,
dt. 10.01.2018. 2. During LC period, RBCPH demand will
be only 5 cusecs. Hence generation loss will not arise.
OTHER FEEDER WILL CATER THE LOAD Wed, May 2, 2018 9:00
Erumapatty 110KV SS loads will be transferred to 230kv Fri, May 4, 2018 9:00
Jambunathapuram SS.
Other end also availing LC on that day. Fri, May 4, 2018 9:00
OTHER END ALSO AVAILED LC ON THAT DAY Fri, May 4, 2018 9:00
OTHER END ALSO AVAIL LC ON THAT DAY Fri, May 4, 2018 9:00
During the LC period the remaining 3*100 MVA Auto TRs Fri, May 4, 2018 9:00
will be in service. 110 KV Somanur SS under total
shutdown.
110 KV Somanur SS under total shutdown. Fri, May 4, 2018 9:00
No SS will be affected, # will be radial from Thingalur 230 Fri, May 4, 2018 9:00
During The Lc Period 110KV UDT # I Will Caters The load Fri, May 4, 2018 9:00
During the LC period, 110KV OKM-Udumalpet I feeder Fri, May 4, 2018 9:00
will be kept radial from 110KV Udumalpet SS. Hence, No
SS will be affected.
LC already applied at BKB PH 3 end also. Fri, May 4, 2018 9:00
Power transformer IV in service. LC will be taken subject to Fri, May 4, 2018 10:00
the wind generation condition.
Now the paruthipally 110kvss laods already fed from Salem Fri, May 4, 2018 9:00
230KVSS through Salem - sankiri feeder
During LC period Unit 1 & 2 Under Non standby, 110 KV Fri, May 4, 2018 9:00
Nallur feeder is in service & PWD demand will be
regulated from BKB PH 2 / Vendipalayam.
OTHER FEEDER CATER THE LOAD Fri, May 4, 2018 9:00
110 KV Pochampally and Uthangarai SS availing total Shut Fri, May 4, 2018 9:00
down, Expected Load relief: 40 MW. The station loads will
be managed by keeping Auto Transformer - II & III and 230
KV Shoolagiri and Palavadi feeder are in service.
110 KV Renganathapuram # will be supplied radially from Fri, May 4, 2018 9:00
230 KV Renganathapuram SS
During LC period 110KV West & East Bus loads will be fed Fri, May 4, 2018 9:00
by Auto-I & II separately/respectively. If necessary load
sharing will be equalised by transfering Rasipuram 110KV
SS to 110KV KN Patty feeder or 110KV Namagiripet SS to
110KV DVK-Thammampatty feeder. No supply
interruption.
During LC period 1) 110 KV Uthukuli SS availing total Fri, May 4, 2018 9:00
shutdown. 2) Mudalipalayam SS will be fed from
Palladam230 and Periandipalayam SS will be fed from
Sipcot II.
230 KV Deviakurichy- Valayapatty & Singapuram Feeders Sat, May 5, 2018 9:00
will be in service
During the LC period 1. Blink Issued at 110KV Singarapet Sat, May 5, 2018 9:00
and 110KV Vinnavanur SS and LILO Switch towards
110KV Singarapet SS kept open at 110KV Chengam SS
Hence there is no interruption of supply
During the LC period , the remaining 5 nos 230 KV feeders Sat, May 5, 2018 9:00
are in service.
110 KV Mettukadai SS will be availing TSD, No SS will be Sat, May 5, 2018 9:00
affected
1. NO INTERRUPTION OF POWER SUPPLY. 2. LOAD Sat, May 5, 2018 9:00
FED THROUGH ICT - 2 (315 MVA, 400/230 KV).
On 29th March 2018, Blackout occurred at Pykara Power Sat, May 5, 2018 8:00
House, Singara. AE/GRT/Msg. and AEE/P&C/Msg.
informed that fault occurred on 110 Pyk-S.Nallah #. But,
just because of the old statistical type relay on the above
feeder, it was not tripped at Pykara(Singara) end. Instead of
that all other 110kV feeders of Pykara PH got tripped. So, it
is necessary to replace the relay to avoid future blackouts.
110KV Capacitor Bank I & II will be in hand trip condition. Sat, May 5, 2018 9:00
There will be no interruption to any SS or feeder
Monthly Maintenance Both ends. (TANDELTA Value Sat, May 5, 2018 9:00
Measurement by P&C Gobi).
Monthly Maintenance. Only one Auto Transformer is Sat, May 5, 2018 9:00
available and intermediate 110KV SS Loads will be fed
radially from the respective other ends & 230KV
Deviakurichi and KR Thoppur feeders will be in service.
(ATTUR 110KV SS TSD is on 05.05.2018).
During the above LC there will be no supply to 110KV Sat, May 5, 2018 9:00
Minnagar SS, 110KV Zuzuvadi SS, TVS EHT service. All
other Hosur 230KV SS load will be fed through 230KV
Mettur feeder.The Yerrandahally SS load will be transferred
to Somanahally end. The Concurrence of
CE/D/Vellore,SE/O/TVLM and SE/KEDC/Krishnagiri has
been obtained.
During the shutdown period, 1) 110KV SSREL # Breaker Sat, May 5, 2018 9:00
already in hand trip condition at Singarapet end and radial
from Karimangalam 230KV SS. 2) Line Isolator towards
Singarapet SS will be kept opened at Uthangharai 110KV
SS by availing blink in 110KV SSREL feeder from SSREL
end and hence no interruption of supply.
1)The singapuram & K.R.Thoppur both 230KV SS availing Sat, May 5, 2018 9:00
Breaker, CT’s maintenances work . 2)There will be no
interruption any other SS.
1)The singapuram & K.R.Thoppur both 230KV SS availing Sat, May 5, 2018 9:00
Breaker, CT’s maintenances work . 2)There will be no
interruption any other SS.
{ 110kv Avinashi SS and 110KV Thekalur ss total shut Sat, May 5, 2018 9:00
down } 110KV KVLR-Nambiyur loads will be fed from
230KV Gobi SS
110KV Thekalur SS total shutdown and KPR EHT will be Sat, May 5, 2018 9:00
transferred to karuvalur-Arasur # II."
110kv Avinashi SS total shut down and 110kv Eripalayam Sat, May 5, 2018 9:00
SS and TCS EHT of KVLR- ASR I feeder are kept radial
from 230kV ASR SS.
Both end Monthly Maintenance Work Sat, May 5, 2018 9:00
1. Isolators 201- 89 M1 and 201 - 89 M2 are closed. 2. Bus Sat, May 5, 2018 11:00
coupler circuit breaker 201 - 52 is charged. 3. Isolator 206 -
89 - M2 is closed and Isolator 206 - 89 - M1 is opened 4.
Bus coupler circuit breaker 201 - 52 is hand tripped. 5.
Isolators 201- 89 M1 and 201 - 89 M2 are opened.
1. Isolators 201 - 89 - M1 and 201 - 89 - M2 are closed. 2. Sat, May 5, 2018 13:00
Buscoupler circuit breaker 201 - 52 is charged. 3. Isolators
206 - 89 - M1, 207 - 89 - M1, 209 - 89 - M1 and 210 - 89 -
M1 are closed. 4. Isolators 206 - 89 - M2, 207 - 89 - M2,
209 - 89 - M2 and 210 - 89 - M2 are opened. 5. Buscoupler
circuit breaker 201 - 52 is hand tripped.
110 KV Pallapampatty SS Availing total shutdown. 110 KV Sat, May 5, 2018 9:00
Renganathapuram # will be radially fed from 230 KV
Renganathapuram SS 110 KV Sembatty #will be radially
fed from 230 KV Sembatty SS 110 KV Polavady # will be
fed from 230 KV Ponnapuram with GC I and II of Thungavi
1. 230/110 KV Auto Transformer - I will be in off condition. Sat, May 5, 2018 9:00
2. 230KV HV-I, 110KV LV-I and 110 KV Ambur feeder
breaker will be in off condition. 3. 110KV Valathur traction
loads to be fed by 110 KV V.Patty feeder. 4. 110KV Ambur
SS, Somalapuram SS, and 110KV V.Patty SS are availing
total shut down.
1.SUPPLY TO ALL OTHER INTER SS MAY FED FROM Sat, May 5, 2018 9:00
MOYAR END 2.110 KV N G PALAYAM SS AND 110 KV
SHENBAGAPUDUR SS MAY AVAIL TOTAL
SHUTDOWN.
1.110 KV N G PALAYAM SS AND 110 KV Sat, May 5, 2018 9:00
SHENBAGAPUDUR SS MAY AVAIL TOTAL
SHUTDOWN. 2.SUBJECT TO THE LOAD CONDITION
IN 110 KV BHAVANISAGAR FEEDER AND 110 KV
PERIYAKODIVERY FEEDER
1.Both End Breaker Open Condition. 2.Both End Bus & Sun, May 6, 2018 8:00
Line Mods Open Condition. 3.Both End Earth Switch
Closed Condition.
Unit under shutdown condition; SF6 breaker open Sun, May 6, 2018 8:00
condition; Bus MODS open condition
During the LC period, the remaining 3*100 MVA Auto TRs Sun, May 6, 2018 9:00
will be in service.
SF6 BREAKER OFF IN CONDITION TOP AND Sun, May 6, 2018 9:00
BOTTOM BUS OPEN IN CONDITION
During the LC period 110KV Gobi feeder supply will be Mon, May 7, 2018 9:00
Radial up to 110/11KV T.N.Palayam SS. No SS will be
affected.
230 KV Deviakurichy- STCMS & Singapuram Feeders will Mon, May 7, 2018 9:00
be in service
Valayapatty 230KV SS Availing LC on the same feeder Mon, May 7, 2018 0:00
feeder is radially available Mon, May 7, 2018 9:00
During the LC period the remaining 5 Nos 230KV feeders Mon, May 7, 2018 9:00
are in service. LC programmed at other end also.
During The Lc Period 230KV KDH # Will Caters The load Mon, May 7, 2018 9:00
1.Both End Breaker Open Condition. 2.Both End Bus & Mon, May 7, 2018 8:00
Line Mods Open Condition. 3.Both End Earth Switch
Closed Condition.
Both end Monthly Maintenance Work Mon, May 7, 2018 9:00
During the lc period other 230KV feeders and other Auto Mon, May 7, 2018 9:00
transformer will be in service
Auto I, II, III are in parallel Auto III load will be catered by Mon, May 7, 2018 9:00
Auto I and II
During LC period 230KV Bus-B is idly charged through Mon, May 7, 2018 9:00
Bus Coupler CB & CTs will be hand tripped. No supply
interruption.
1.SUPPLY TO 110 KV GOBI SS MAY FED FROM 110 Mon, May 7, 2018 9:00
KV ANTHIYUR FEEDER BY CLOSING THE SWITCH
IN 110 KV GOBI SS. 2. NO OTHER SS WILL
AFFECTED
During the LC period 110KV Anthiyur-Gobi feeder will be Mon, May 7, 2018 10:00
in radial condition from Gobi 230KVSS end.Hence no SS
will be affected.
1. 110KV Hosur and Karimangalam feeder Breakers, Tue, May 8, 2018 8:00
110KV GC I, II, LV I, II and BC Breakers to be Hand
tripped. 230KV Palavadi, Soolagiri and Singarapet feeder
Breakers, 230KV HV I, II and BC to be Hand tripped. LS /
BS isolators of feeder breakers to be opened. Total shut
down will be availed in 230KV SS Gurubarapally. 2.
Monthly maintenance works will be carried out in 230KV
Breakers, 230KV Bus, Auto I & II, 110KV Breakers,
110KV Bus and 110/33-11KV Gurubarapally SS. 110KV
Soolagiri, Kaman doddy, Sipcot Phase II, Bagalur,
Nariganapuram, Gurubarapally SSs and EHT service M/s
Venkraft will avail total shutdown. LC will be issued to SS
erection wing in 110KV Bus (entire) for LILO works 3.
Concurrence obtained from Superintending
Engineer/O/Thiruvalam, Superintending Engineer / KEDC /
Krishnagiri.
Other end also availing LC on that day. Tue, May 8, 2018 9:00
During the LC period 110 KV Gandhinagar SS will be Tue, May 8, 2018 9:00
under TSD condition
NO SS WILL BE AFFECTED DURING LC PERIOD Tue, May 8, 2018 9:00
110KV Getticheviyur SS availing Total Shutdown and other Tue, May 8, 2018 9:00
end also availing LC
During The Lc Period Sarkarpathy Machine AOH Work Tue, May 8, 2018 9:00
During the LC period, 110KV OKM-Udumalpet II feeder Tue, May 8, 2018 9:00
will be kept radial from 110KV Udumalpet SS. Hence, No
SS will be affected.
OTHER 230 KV FEEDERS WILL SHARE THE LOADS Tue, May 8, 2018 9:00
110 KV Rasipuram feeder will radially fed at other end. Tue, May 8, 2018 9:00
There will be no interruption to any SS or feeder
1 No interruption of supply. 2.LC availed at both end. Tue, May 8, 2018 9:00
1.Both End Breaker Open Condition. 2.Both End Bus & Tue, May 8, 2018 8:00
Line Mods Open Condition. 3.Both End Earth Switch
Closed Condition.
Both end Tue, May 8, 2018 9:00
DURING THE L.C PERIOD, AUTO TR NO :I LOADS Tue, May 8, 2018 9:00
WILL BE FED BY SALEM 230KV FEEDER AUTO TR
NO :II LOADS WILL BE FED BY PUDANCHANDAI
230KV FEEDER
During the lc period other 230KV feeders and other Auto Tue, May 8, 2018 9:00
transformer will be in service
110 KV Sembatty # will be radially fed from 230 KV Tue, May 8, 2018 9:00
Sembatty SS
During The LC peroid ALR Power House Machine Tue, May 8, 2018 9:00
shutdown condition
1. During LC period, it is expected that PWD demand in Wed, May 9, 2018 9:00
river will be below 200 cusecs. Hence, generation loss may
not arise at MHPH. 2. During Lc period, RBCPH PWD
demand will be only 5 c/s, hence generation loss will not
arise at RBCPH. 3. During LC period, only 110 KV GC and
11 KV common LV breakers will be hand tripped. 110 KV
feeders will not be affected. Hence no SS will be affected.
Both end SF6 breaker open condition; Both end Bus& Line Wed, May 9, 2018 8:00
MODS open condition ; Both end Earth switch closed
condition
Both end SF6 breaker open condition; Both end Bus& Line Wed, May 9, 2018 8:00
MODS open condition ; Both end Earth switch closed
condition
Radial from 230KV SS PSI Wed, May 9, 2018 9:00
(i) Both K.R.Thoppur and MTPS-I have programmed for Wed, May 9, 2018 9:00
Maintenance work (ii) K.R.Thoppur and MTPS-I will be in
service .
1) On the same day, 110 KV Koneripatti ss will be Wed, May 9, 2018 8:00
programmed for availing total shutdown. 2) 110 KV
Chennampatty SS will radially fed from Anthiyur 230
KVSS on 09.05.2018 3) During the LC period, the Unit I
and II at BPH 3 will be in shutdown Condition for AOH
Common spell.
Tendative LC Programmed at MTPS 2 is above the feeder Wed, May 9, 2018 9:00
During the LC Period 1. 110KV Samalpatti Railway Wed, May 9, 2018 9:00
traction loads will be fed from Bommidi traction SS 2.
110KV Pochampalli SIPCOT SS availing Total Shut Down
3. 110KV Singarapet Grid SS availing Total Shut Down on
33KV and 11KV #s Hence there is no interruption of supply
During the LC period, (1) 110KV R.S.Puram SS will be Wed, May 9, 2018 9:00
under Total Shut down. (2) 110KV Sidco SS loads will be
transferred to 110KV OKM-R.S.Puram I feeder. Hence, No
SS will be affected.
110 KV MARUTHUR SS UNDER TOTAL SHUT DOWN. Wed, May 9, 2018 10:00
110 KV JAGADHALA,KOTHAGIRI, KATTTAPETTU SS
WILL BE RADIALLY FED FROM SANDINALLAH
END.
During the above LC period there will be no supply to Wed, May 9, 2018 9:00
110KV Kempatty SS,110KV Uddanapally SS and Auto-II.
All other Hosur SS Loads will be fed through 230KV
Shoolagiri Hosur feeder. The concurrence of
CE/D/Vellore,SE/O/TVLM and SE/KEDC/Krishnagiri has
been obtained.
1. No interruption of supply. 2. Load fed through 230 KV Wed, May 9, 2018 9:00
Karimangalam SS
During the LC period both ends breaker will be in Handtrip Wed, May 9, 2018 9:00
condition, other 6 no’s 230KV feeders will be in service
and hence no interruption of supply
During the period of LC, 1) Auto transformer II and LV II Wed, May 9, 2018 9:00
breaker will be in off condition 2) The Auto transformer I
and III will be in service, 3) All the 110KV feeders will be
in service 4) 110KV Singarapet Grid SS and 110KV
Pochampally SIPCOT SS total shutdown approved and
hence no interruption of supply.
During the lc period other 230 kv feeders &other auto Wed, May 9, 2018 9:00
transformer will be inservice
No interruption of supply. 110 KV Pennagaram SS fed from Wed, May 9, 2018 9:00
400 KV Palavadi SS.
1. 230KV Singarapet Feeder Breaker will be in Off Wed, May 9, 2018 9:00
Condition. 2. 230KV Shoolagiri feeder to be fed the entire
load of Vinnamangalam 230 KV Substation.
During LC period 230KV Bus Coupler CB will be hand Wed, May 9, 2018 9:00
tripped for idle Bus side switch works in 230KV Pugalur
feeder. 230KV Unjanai and Valayapatty feeders will be kept
tied with grid. 230KV Pugalur SS also availing LC in the
same feeder at opposite end. No supply interruption.
Auto Transformer I & II will cater the load. Thu, May 10, 2018 9:00
(i) 110 KV Tharamangalam SS and 110KV Nangavalli SS Thu, May 10, 2018 10:00
will be fed radially from K.R.Thoppur SS ii) The EHT
consumer,M/S JSW ltd,Potteneri has given concurrence for
the above Mentioned time to avail LC as there will be no
supply to this EHT consumer during that period
Tentative LC for bus Maintenance from 10.05.2018 10days Thu, May 10, 2018 9:00
at Mettur Tunnel power house
OTHER END ALSO AVAIL LC ON THAT DAY Thu, May 10, 2018 9:00
a) During the LC period the above feeder fed Radially from Thu, May 10, 2018 10:00
other end b) No SS will be affected.
During the LC period the remaining 3*100 MVA Auto TRs Thu, May 10, 2018 9:00
will be in service.110 KV Kalapatty SS & 110 KV
Poomalur SS under total shutdown.110 KV Arasur-
Karamadai II feeder to be radial from Karamadai 230 KV
SS.
During the above LC Period all the 4 Machines will be Thu, May 10, 2018 7:00
Common spell AOH and PWD Demand Meet out by PWD
Gate.
NO SS WILL BE AFFECTED DURING LC PERIOD Thu, May 10, 2018 9:00
During the LC period, (1) 110KV Madhampatty SS, 110KV Thu, May 10, 2018 9:00
Devarayapuram SS, 110KV Anthiyur SS and 110KV
Peedampally SS will be under Total Shut down. (2) 110KV
Madukkarai SS will be fed from 230KV OKM SS. (2)
110KV OKM-Thudiyalur II feeder loads will be transferred
to 230KV Thudiyalur SS. Hence, No SS will be affected.
During the LC period, (1) 110KV Madhampatty SS, 110KV Thu, May 10, 2018 9:00
Devarayapuram SS will be under Total Shut down. (2)
110KV Madukkarai SS will be fed from 230KV OKM SS.
Hence, No SS will be affected.
230KV Singarapet feeder LC will be availed at both end. Thu, May 10, 2018 9:00
3Nos. 230KV feeders will be in service. There will be no
interruption to any SS or feeder
Other end also availing LC Thu, May 10, 2018 9:00
1.Both End Breaker Open Condition. 2.Both End Bus & Thu, May 10, 2018 8:00
Line Mods Open Condition. 3.Both End Earth Switch
Closed Condition.
During the LC period both ends breaker will be in Handtrip Thu, May 10, 2018 9:00
condition, other 6 no’s 230KV feeders will be in service
and hence no interruption of supply
1. No interruption of supply. 2. LC availed at both ends Thu, May 10, 2018 9:00
1) The Salem and Singarapet both 230KV SS availing Thu, May 10, 2018 9:00
Breaker, CT’s maintenances work . 2) There will be no
interruption any other SS.
During 400/230 KV Auto Transformer II LC Period, Thu, May 10, 2018 8:00
400/230 KV Auto Transformer I will be in Service
Condition. Hence there will be no interruption of supply.
1. Circuit breaker 207 - 52 is hand tripped. 2. Isolators 207 - Thu, May 10, 2018 9:00
89 - B, 207 - 89 - L, 207 - 89 - M2 are opened. 3. Earth
switch 207 - 89 - LE is closed.
The station loads will be managed by keeping Auto Thu, May 10, 2018 9:00
Transformer - I, II & III and 230 KV Shoolagiri feeder are
in service and also 2 No's Grid feeder in service.
Auto I, II, III are in parallel. Auto I load will be catered by Thu, May 10, 2018 9:00
Auto II and III
During LC period 110KV Pudhansandai along with Thu, May 10, 2018 9:00
Rasipuram SS will be trasferred to 110KV PSI-KN Patty
feeder. If necessary 110KV Namagiripet SS will be
transferred to 110KV DVK-Thammampatty feeder. 110KV
Namakkal SS will be back fed from 110KV Unjanai-Nallur
or 110KV Valayapatty-Namakkal feeders. Other 110KV
Sub-Stations normally fed by this station will be fed by
Auto-II. No supply interruption
1.Capacitor Bank II is in service and also subject to the Thu, May 10, 2018 9:00
voltage condition.
# 2 will cater the load Thu, May 10, 2018 9:00
Both K.R.Thoppur and Thingalur SS have Programmed for Fri, May 11, 2018 9:00
Maintenance work on that day
Both end Monthly Maintenance Work Fri, May 11, 2018 9:00
1. No interruption of supply 2. LC availed at both end 3. Fri, May 11, 2018 9:00
Providing arcking rod at various location by lines wing.
110KV Deviakurichy - Singipuram feeder- II will be kept Fri, May 11, 2018 9:00
radial from Singipuram 230KV SS end.
Both MTPS I and Salem 230KVSS have programmed for Fri, May 11, 2018 9:00
Maintenance work
Pallipalayam 110 KV SS will be fed from Unjanai 230 KV Fri, May 11, 2018 9:00
SS.
PWD DEMAND IS SHARE BY UNITS 1&2 Fri, May 11, 2018 9:00
During the above LC Period All the 4 Machines will be in Fri, May 11, 2018 7:00
Common Spell AOH and PWD Demand Meet Out by PWD
Gate.
During The Lc Period 110KV UDT # II Will Caters The Fri, May 11, 2018 9:00
load
During the LC period, the other 230 KV feeders are in Fri, May 11, 2018 9:00
service to cater the SS loads.
LC already applied in 110KV Unjanai To BKB PH 2 feeder Fri, May 11, 2018 9:00
Line Portion between BKB 2 To Pallipalayam SS by
EE/O/Unjanai.Pallipalayam SS will be fed from 230 KV
Unjanai SS.
230KV MTPS feeder LC will be availed at both ends. 3Nos Fri, May 11, 2018 9:00
230KV feeder will be in service. There will be no
interruption to any SS or feeder
1. Scheduled Total shutdown at 110/11KV Irugur SS. 2. The Fri, May 11, 2018 9:00
110KV Kallimadai SS , KPR Mills , Sulur Railway traction
& M.G.Pudur SS will be fed from 230KV Arasur SS.
During the above LC period there will be no supply to 33 Fri, May 11, 2018 9:00
and 11KV feeders and Gc's. The concurrence of
CE/D/Vellore,SE/O/TVLM and SE/KEDC/Krishnagiri has
been obtained.
Power transformer I in service. LC will be taken subject to Fri, May 11, 2018 10:00
the wind generation condition.
During the LC period Auto Transformer II will be in Fri, May 11, 2018 9:00
service. No SS will be affected.
1) The Salem and MTPS both 230KV SS availing Breaker, Fri, May 11, 2018 9:00
CT’s maintenances work . 2) There will be no interruption
any other SS.
DURING THE L.C PERIOD,STATION WAR LOADS Fri, May 11, 2018 9:00
WILL BE CATER BY THE CAPACITOR BANK NO II
1. Circuit breaker 210 - 52 is handtripped. 2. Isolators 210 - Fri, May 11, 2018 9:00
89 - L, 210 - 89 - B and 210 - 89 - M2 are opened. 3. Earth
switch 210 - 89 - LE is closed.
During the lc period other 110 kv feeders will be in Fri, May 11, 2018 9:00
service.110kv rs ss FED FROM Mettur DAM Power house
end
Auto I, II, III are in parallel. Auto II load will be catered by Fri, May 11, 2018 9:00
Auto I and III
During LC period 110KV Namakkal SS will be back fed Fri, May 11, 2018 9:00
through 110KV Valayapatty-Namakkal feeder. If necessary
110KV Sendamangalam SS loads will be fed by 110KV
PSI-Valayapatty feeder radially. No supply interruption.
OTHER END ALSO LC APPLIED ON SAME DAY Fri, May 11, 2018 10:00
230KV Karuvalur - Shenbagapudur# idly charged upto loc Fri, May 11, 2018 9:00
2 from Shenbagapudur SS"
During the above LC Period all the 4 Machines will be in Sat, May 12, 2018 7:00
Common Spell AOH and PWD Demand Meet out by PWD
Gate.
During LC period 1). Other 3 Nos 230 KV feeders will be Thu, May 10, 2018 8:00
in service 2). 230 KV PGCIL feeder load of 120 MW will
be shared with 230 KV Sadayapalayam feeder and 230 KV
O.K.M feeder 3). The loading of 230 KV Sadayapalayam
feeder will be about 200 MW and 230 KV O.K.M feeder
will be about 140 MW 4). OCC approval to be obtained
(230KV Karamadai will be in service)" Subject to OCC Thu, May 10, 2018 8:00
approval
During the LC period the remaining 4 nos 230 kv feeders Sun, May 13, 2018 8:00
will be in service.
During the above LC Period all the 4 Machines Will be in Mon, May 14, 2018 7:00
Common Spell AOH and Pwd Demand Meet Out by PWD
Gate.
During LC period 1).110 KV Alagumalai SS availing Mon, May 14, 2018 9:00
TotalShutdown and Mudalipalayam SS will be fed from 230
KV ingur SS 2). No other SS will be affected
During the LC period, the 110KV OKM-Negamam II feeder Mon, May 14, 2018 9:00
will be kept radial from 110KV Negamam SS. Hence, No
SS will be affected.
1.Both End Breaker Open Condition. 2.Both End Bus & Mon, May 14, 2018 8:00
Line Mods Open Condition. 3.Both End Earth Switch
Closed Condition.
During the LC period both ends breaker will be in Handtrip Mon, May 14, 2018 9:00
condition, other 6 no’s 230KV feeders will be in service
and hence no interruption of supply
Tentative LC Programmed by MTPS 1 on 14.05.2018 Mon, May 14, 2018 9:00
STATION WAR LOADS WILL BE CATER BY THE CB-I Mon, May 14, 2018 9:00
FEEDING CAN BE ARRANGED FROM 230KV Mon, May 14, 2018 10:00
UDUMALPET SS FROM 110 KV PONNAPURAM #
230 KV STCMS & Valayapatty Feeders will be in service. Mon, May 14, 2018 9:00
In Singapuram#, new 230KV CVT to be commissioned and
testing by P&C wings/salem
1)The singapuram & Deviyakurichy both 230KV SS Mon, May 14, 2018 9:00
availing Breaker, CT’s maintenances work . 2)There will be
no interruption any other SS.
OTHER FEEDER CATER THE LOAD Tue, May 15, 2018 9:00
Both end Monthly Maintenance Work Tue, May 15, 2018 9:00
Both end SF6 breaker open condition; Both end Bus& Line Tue, May 15, 2018 8:00
MODS open condition ; Both end Earth switch closed
condition
Load is proposed to shift to anthiyur feeder Tue, May 15, 2018 9:00
Auto Transfomer-I will cater the load. Tue, May 15, 2018 9:00
i) K.R.Thoppur SS – have programmed for Maintenance Tue, May 15, 2018 9:00
work (ii) 110 KV Tharamangalam SS – have programmed
for Total shout down (iii) 110KV Nangavally SS and M/S
JSW Ltd. Potnari loads will be fed radially through 110 KV
Mettur AutoSS – Singarapet feeder I by closing D.P.
TLOC.NO 28 (iv) Necessary concurrence from the EHT
consumer M/S JSW Ltd Potnari has to be obtained obtained
.
During the LC Period 1. 110KV Singarapet Grid SS will be Tue, May 15, 2018 9:00
availing Supply from 110KV LINK # II Hence there is no
interruption of Supply
Veppadai 110KV SS availing total shutdown Tue, May 15, 2018 9:00
During the LC period the 110 KV Arasur- Thingalur feeder Tue, May 15, 2018 9:00
loads eill be fed via the 110 KV Arasur - Karuvalur I feeder.
110 KV Thekkalur SS under total shutdown.
During the above LC Period all the 4 Machines will be in Tue, May 15, 2018 7:00
AOH and PWD Demand Meet Out by PWD Gate.
During the LC period, 1.Both units are in Non standby Tue, May 15, 2018 9:00
condition, since low lake level and 500 C/S PWD demand.
2.Erode,Pallakapalayam,BKB-2 feeder breakers tripped
condition. 3.The PWD demand of 500 C/S will br regulated
through barrage gate.
Load will be Maintained with Auto Transformer and other Tue, May 15, 2018 9:00
110 Kv Feeders.
Load will be Maintained with Auto Transformer and other Tue, May 15, 2018 11:00
110 Kv Feeders
Load will be Maintained with Auto Transformer and other Tue, May 15, 2018 13:00
110 Kv Feeders
110KV Kundadam SS & Uthiur SS will be under total Tue, May 15, 2018 9:00
shutdown. During the LC period feeder load will be radial
from other end.
OTHER TWO AUTO TRANSFORMER WILL SHARE Tue, May 15, 2018 10:00
THE LOADS
2Nos. 100MVA Auto Transformer-II and III will be in Tue, May 15, 2018 9:00
service. 110KV Veerapandi SS Availing total shutdown. 110
KV Rasipuram feeder will radially fed at other end. There
will be no interruption to any SS or Feeder
During the Lc period Auto-II Will Caters Load Tue, May 15, 2018 9:00
1.Both End Breaker Open Condition. 2.Both End Bus & Tue, May 15, 2018 8:00
Line Mods Open Condition. 3.Both End Earth Switch
Closed Condition.
During the shutdown period, 1) 110KV Ramiyanahally Tue, May 15, 2018 9:00
feeder breaker will be in handtrip condition at Singarapet
end and radially charged condition from 110KV
Ramiyanahally SS upto 110KV Harur SS. 2) 110 KV
Ramiyanahalli SS total shutdown approved. 3) 110KV
Harur SS and 110KV Pappireddipatti SS loads will fed from
230 KV SS Karimangalam through 110 KV Karimangalam
- Ramiyanahalli # hence no interruption of supply.
During the period of LC, 1) Auto transformer III and LV III Tue, May 15, 2018 9:00
breaker will be in off condition 2) The Auto transformer I
and II will be in service, 3) All the 110KV feeders will be in
service, except 110KV SSREL which will be radial
condition from other end. 4) 110KV Ramiyanahalli SS total
shutdown approved 5) 110KV Pappireddipatty SS and
110KV Harur SS loads will be fed from 230KV SS
Karimangalam if necessary and hence no interruption of
supply.
Both end Tue, May 15, 2018 9:00
1)Concurrence Already obtained from M/s. JSW Ltd., 2) the Tue, May 15, 2018 0:00
110 KV Nangavally SS & M/S.JSW Ltd., fed from Mettur
230 KVSS. 3) the 110 kv tharamangalam ss will be in total
shutdown on 15-05-2018 Hence, the maintenance only will
be taken CT, Breaker & Bus Switch at Salem 400 KVSS /
K.R.Thoppur end.
DURING THE L.C PERIOD, PALLIPALAYAM 110KVSS Tue, May 15, 2018 9:00
LOADS WILL BE RADIALLY FED FROM OTHER END.
PARUTHIPALLY 110KVSS LOADS WILL BE FED
FROM SALEM 230KVSS ( FOR CLEARANCE)
During the LC period any one malco feeder (I / II)will be in Tue, May 15, 2018 9:00
service
It is a Ideal charged feeder hence no interruption of power Tue, May 15, 2018 9:00
supply.
110 KV Udt I, II # will cater the load of 110 KV Udt Link Tue, May 15, 2018 9:00
III #
AS WE PLANNED FOR A MONTHLY MAINTENANCE Tue, May 15, 2018 9:00
ON UNIT 1 AT POWER HOUSE 5, I KINDLY REQUEST
YOU TO APPROVE ONE DAY LC FOR UNIT 1 AND
THE MACHINE WILL NOT BE IN STAND BY DURING
THE PARTICULAR DATE AND TIME MENTIONED
ABOVE.
UNIT IN SERVICE. ALL 400KV FEEDERS ARE IN Tue, May 15, 2018 9:00
SERVICE, EXCEPT PALAVADI-II FEEDER RADIALLY
CHARGED. ALL 230KV METTUR AUTO SS, GOBI,
THINGALUR ARE IN SERVICE.
During LC period 110KV Namagiripet SS will be back Tue, May 15, 2018 9:00
fed/transferred to 110KV DVK-Thammampatty feeder. No
supply interruption.
During the LC period, Negamam - Pollachi 110KV feeder is Tue, May 15, 2018 10:00
radial from Negamam end(existing condition) and no SS
will be affected.
During the LC period, Negamam - Pollachi 110KV feeder is Tue, May 15, 2018 10:00
radial from Negamam end(existing condition) and no SS
will be affected.
Programmed LC Tue, May 15, 2018 9:00
Other ICT's will be in service Tue, May 15, 2018 9:00
110 KV Ponnapuram # will be fed radially from 230 KV Wed, May 16, 2018 9:00
Ponnapuram SS
Auto Transformer II will be in service. 110 KV Wed, May 16, 2018 9:00
Deviakurichy-Singipuram feeder I and II will be kept radial
from Singipuram 230kV SS end
Feeder will be radially avaialable Wed, May 16, 2018 9:00
During the LC Period 1. 110KV Singarapet Grid SS will be Wed, May 16, 2018 9:00
availing supply from 110KV LINK # I Hence there is no
interruption of supply
DEPENDING UPON LOAD CONDITION Wed, May 16, 2018 9:00
During the LC period the feeder will be radial from 230 KV Wed, May 16, 2018 9:00
Karuvalur SS. 110 kv Vanjipalayam SS under total
shutdown.
110 KV Capacitor Bank 1 will be in service Wed, May 16, 2018 9:00
During the LC Period the feeder will be radial from 230 KV Wed, May 16, 2018 9:00
Karuvalur SS UPTO 110 KV Avinashi SS. 110 KV
Vavjipalayam SS under total shutdown.
During the above LC Period all the 4 Machines will be Wed, May 16, 2018 7:00
Common Spell AOH and PWD Demand Meet out by PWD
Gate.
110KV Sankari feeder will be radially fed from other end. Wed, May 16, 2018 9:00
Vembadithalam 110 KV SS availing total shutdown. There
is no interruption to any SS or feeder
during the LC period Auto Transformer I will feed 110KV Wed, May 16, 2018 9:00
Malco , 110KV Barrage III and 110KV Anthiyur feeders.
Auto Transformer II will feed 110KV Thalavaipet and
110KV Gobi feeders. No SS will be affected.
During the LC period both ends breaker will be in Handtrip Wed, May 16, 2018 9:00
condition other 3 no’s 110KV feeders will be in service
except 110KV SSREL feeder which is radial from
Karimangalam 230KV SS and hence no interruption of
supply
1) The Salem 230KV SS Sankari feeder availing Breaker, Wed, May 16, 2018 9:00
CT’s maintenances work . 2) Sankari 110KV SS radially fed
upto Veerapondy 110KV SS End. 2) There will be no
interruption of supply any other SS.
During LC Period, 110 KV Vembadithalam SS will avail Wed, May 16, 2018 9:00
total shut down on 16-05-2018.
1) During LC Period, 110 KV Edappady SS will be avail Wed, May 16, 2018 9:00
total shut down on 16-05-2018. 2) During LC Period, The
110 kv polampatty ss,110 kv jalakandapuram ss, 110 kv
ettikuttaimedu ss loads will be fed from 110 kv barrage -II
End
FEEDING CAN BE ARRANGED FROM 400 KV Wed, May 16, 2018 10:00
RASIPALAYAM SS
During the LC period 100 MVA auto transformer II will be Wed, May 16, 2018 9:00
in service
230 KV Myvady Link II # will cater the load of 230 KV Wed, May 16, 2018 9:00
Myvady Link I #
Feeder in hand tripped condition. Wed, May 16, 2018 9:00
OCC Aprroval (Other two ICTs will be in service). Wed, May 16, 2018 10:00
SF6 BREAKER OFF IN CONDITION TOP AND Wed, May 16, 2018 9:00
BOTTOM BUS OPEN IN CONDITION
1.AUTO TRANSFORMER I AND III ARE IN Wed, May 16, 2018 9:00
SERVICE,IT MAY CATER THE LOAD AND ALSO
SUBJECT TO THE LOAD CONDITION
During LC period 230KV idle Bus will be hand tripped for Wed, May 16, 2018 9:00
maintenance works in 230KV idle Bus side Switch of HV-I
Bay. 110KV Rasipuram SS availing Total along with
110KV Mallur SS. 110KV Namakkal SS will be back fed
from 110KV Valayapatty-Namakkal feeder, other wise
110KV Valayapatty feeder will be hand tripped if export to
contain Station load within one Auto. Other 110KV Sub-
Stations normally fed by this station will be fed by Auto-II.
No supply interruption.
During the LC period, Negamam - Anthiyur 110KV feeder Wed, May 16, 2018 10:00
breaker is kept in Hand trip(already existing condition) and
no SS will be affected.
During LC period, Negamam - Anthiyur 110KV feeder Wed, May 16, 2018 10:00
breaker is kept in Hand trip(already existing condition) and
no SS will be affected.
Other units will be inservice Wed, May 16, 2018 9:00
OTHER END ALSO AVAILED LC ON THAT DAY Thu, May 17, 2018 9:00
During the above LC Period all the 4 Machines will be in Thu, May 17, 2018 7:00
Common Spell AOH and PWD Demand Meet out By PWD
Gate.
230KV Link-I feeder LC will be availed at both ends. 3Nos Thu, May 17, 2018 9:00
230KV feeder will be in service. There will be no
interruption to any SS or feeder
During the Lc period Pollachi ss Shutdown Thu, May 17, 2018 9:00
1.Both End Breaker Open Condition. 2.Both End Bus & Thu, May 17, 2018 8:00
Line Mods Open Condition. 3.Both End Earth Switch
Closed Condition.
Both end Thu, May 17, 2018 9:00
1) The Salem and KR Thoppur Link I both 230KV SS Thu, May 17, 2018 9:00
availing Breaker, CT’s maintenances work . 2) There will be
no interruption any other SS.
Both end Monthly Maintenance Work Thu, May 17, 2018 9:00
FEEDING CAN BE ARRANGED FROM 230 KV INGUR Thu, May 17, 2018 10:00
SS &GC1 PNP FED FROM 110 PONNAPURAM#
During the LC period 110 Kv MDPH feeder II radially fed Thu, May 17, 2018 9:00
from mettur dam power house end
230 KV Myvady Link I # will cater the load of 230 KV Thu, May 17, 2018 9:00
Myvady Link II #
LC programmed at other end also. Thu, May 17, 2018 9:00
Pudhansanthai 230KV SS Availing LC on the same feeder Thu, May 17, 2018 9:00
During LC period 230KV Bus Coupler CB will be hand Thu, May 17, 2018 9:00
tripped for idle Bus side Switch works in 230KV
Valayapatty feeder. 230KV Unjanai and Pugalur feeder will
be kept tied with grid. 230KV Valayapatty SS also availing
LC in the same feeder at opposite end. No supply
interruption.
During the Lc period NO ss Will be affected Thu, May 17, 2018 9:00
(i) During Common spell AOH, Both units will be under Wed, May 16, 2018 8:00
shutdown and all the 110k Feeders Will be in service except
one day (Common Bus LC). (ii)(a)During the LC Period the
PWD demand will be met through barrage gates. (b)
LMBPH-2 pondage water will be depleted and impounded
the pondage of LMBPH -3/KKMedu.
110KV Deviakurichy - Singipuram feeder- I will be kept Fri, May 18, 2018 9:00
radial from Singipuram 230KV SS end.
110 KV SS Pallakkapalayam,Thevur and Sankari availing Fri, May 18, 2018 9:00
Total shutdown on that day.
During the above LC Period all the 4 Machines will be in Fri, May 18, 2018 7:00
Common Spell AOH and PWD Demand Meet Out by PWD
Gate.
OTHER TWO AUTO TRANSFORMER WILL SHARE Fri, May 18, 2018 10:00
THE LOADS
During the LC period, 110KV Panapatty SS will be under Fri, May 18, 2018 9:00
Total Shut down. Hence, No SS will be affected.
110KV Thingalur SS availing total shutdown. Fri, May 18, 2018 9:00
2Nos. 100MVA Auto Transformer-I and III will be in Fri, May 18, 2018 9:00
service. 110KV Sankari SS availing total shutdown. There
will be no interruption to any SS or Feeder
2Nos. 100MVA Auto Transformer-I and III will be in Fri, May 18, 2018 9:00
service. 110KV Sankari SS availing total shutdown. There
will be no interruption to any SS or Feeder
During the LC perode no SS will be affected. Fri, May 18, 2018 10:00
110KV Annur SS, Eripalayam SS , Karuvalur SS 110KV Fri, May 18, 2018 9:00
Padhuvampalli SS and 110KV Sellapampalayam SS total
shutdown 110KV KVLR-Nambiyur loads to be fed by
230KV Gobi SS
110KV Annur SS, Karuvalur SS, 110KV Padhuvampalli SS Fri, May 18, 2018 9:00
and 110KV Sellapapalayam SS total shutdown
During LC period Unit 1&2 Non standby,110 KV BKB 2 Fri, May 18, 2018 9:00
Feeder is in service and PWD demand Will be regulated
from BKB 2/ Vendipalayam.
Both end Monthly Maintenance Work Fri, May 18, 2018 9:00
DURING THE L.C PERIOD, 1.SALEM 400KVSS ALSO Fri, May 18, 2018 9:00
AVAILING L.C ON SAME FEEDER. 2. SANKARI
110KVSS AVAILING APPROVED TOTAL SHOUTDOWN
3. ELANAGAR & MUSIRI 110KVSS LOADS WILL BE
FED FROM PUDANCHANTHAI 230KVSS. 4.AUTO TR
NO :II WILL CATER THE STATION LOADS, IF
NECESSARY NALLUR FEEDER TIE WILL BE OPENED
AT THIS END
1. Circuit breaker 209 - 52 is handtripped. 2. Isolators 209 - Fri, May 18, 2018 9:00
89 - L, 209 - 89 - B and 209 - 89 - M2 are opened. 3. Earth
switch 209 - 89 - LE is closed.
FEEDING CAN BE ARRANGED OTHER TWO AUTOS Fri, May 18, 2018 10:00
Capacitor Bank I is in service and also subject to the Fri, May 18, 2018 9:00
voltage condition.
230 KV Sadayapalayam-Palladam feeder in service. Fri, May 18, 2018 10:00
OTHER END ALSO LC APPLIED ON SAME DAY Fri, May 18, 2018 10:00
KANGEYAM TOTAL SHUTDOWN ON THAT DAY Sat, May 19, 2018 9:00
NO SS WILL BE AFFECTED DURING LC PERIOD Sat, May 19, 2018 9:00
During the above LC Period all the 4 Machines Will be in Sat, May 19, 2018 7:00
Common Spell AOH and PWD Demand Meet Out by PWD
Gate.
During the LC period, 110KV OKM-Thudiyalur I feeder Sat, May 19, 2018 8:00
will be kept radial from 230KV Thudiyalur SS. Hence, No
SS will be affected.
During LC period 1). 110 KV Santhaipet SS and Arulpuram Sat, May 19, 2018 9:00
SS availing Total shutdown 2). No other SS will be affected
During LC period 1). 110 KV Santhaipet SS,Arulpuram SS Sat, May 19, 2018 9:00
and Kumarnagar SS availing Total shutdown 2). other 3 Nos
230 KV feeders will be in service 3). OCC approved 4). No
other SS will be affected
Scheduled total shutdown at 110/11KV CBE SS. Sat, May 19, 2018 9:00
1.Both End Breaker Open Condition. 2.Both End Bus & Sat, May 19, 2018 8:00
Line Mods Open Condition. 3.Both End Earth Switch
Closed Condition.
1) Hasthampatty 110KV SS availing Total Shutdown on that Sat, May 19, 2018 9:00
day. 2) There will be no interruption of supply any other SS.
110 KV Unjanai , Thiruchenkode feeders will be fed by Sat, May 19, 2018 9:00
other end of 230 KV Unjanai SS and BKB PH 3 will be fed
by other end of Nallur SS . Ponni Sugar feeder will be
under shut down condition . Concurrence also obtained .
230KV Suzlon will be under shutdown Sat, May 19, 2018 9:00
During LC Period, 110 KV Thumbipady SS will be avail Sat, May 19, 2018 9:00
total shut down on 19-05-2018.
During 400/110 KV Auto Transformer III LC Period, Sat, May 19, 2018 9:00
400/110 KV Auto Transformer IV will be in Service
Condition. 110 KV Salem # I will be kept radial from
K.R.Thoppur end , 110 KV Salem # II will be kept radial
from Salem end, 110 KV Thumbipady # will be Total
shutdown on 19-05-2018. 110 KV HASTHAMPATTY #
will be Total shutdown on 19-05-2018.Hence there will be
no interruption of supply.
FEEDING CAN BE ARRANGED OTHER TWO AUTOS Sat, May 19, 2018 10:00
During the LC period 110 KV Auxiliary bus portion and 110 Sat, May 19, 2018 9:00
KV main bus MBS I to Eastern side will be in service
110 KV Krishnagiri SS availing total Shut down, Expected Sat, May 19, 2018 9:00
Load relief: 45 MW.Hence no interruption of power supply
1. Auto Transformer-II Will be in off condition. 2. 230KV Sat, May 19, 2018 9:00
HV-II, 110KV LV-II, 110KV V.Patty feeder breaker and
110KV Tirupattur feeder breaker will be in off condition. 3.
110KV Chinnavarigam, Pernambut, Paravakkal,
Vinnamangalam, Vaniyambadi and Alangayam substations
availing total shut down.
1.AUTO TRANSFORMER II AND III ARE IN Sat, May 19, 2018 9:00
SERVICE,IT MAY CATER THE LOAD AND ALSO
SUBJECT TO THE LOAD CONDITION
( i) 110 KV Thumbipady SS – have programmed for total Sat, May 19, 2018 9:00
shutdown on that day (ii) K.R.Thoppur SS have
programmed for Maintenance work
During LC period 110KV Rasipuram SS will be back fed Sat, May 19, 2018 9:00
through 110KV PSI-KN Patty feeder. No supply
interruption.
LC programmed at other end also. Sat, May 19, 2018 9:00
Both end SF6 breaker open condition; Both end Bus& Line Sat, May 19, 2018 8:00
MODS open condition ; Both end Earth switch closed
condition
#1 will be in service Sat, May 19, 2018 9:00
During the above LC period, Unit-I will be in service / Thu, May 17, 2018 8:00
standby to meet out the PWD Demand. All the 110KV
Feeders will be in service. From 17.05.2018/08.00 hrs to
05.06.2018/17.00 hrs (20 days) Lc Approved by CE/
Hydro /Chennai
During the LC period, 110KV OKM-Thudiyalur I feeder Sat, May 19, 2018 8:00
will be kept radial from 230KV Thudiyalur SS. Hence, No
SS will be affected.
Unit under shutdown condition; SF6 breaker open Sun, May 20, 2018 8:00
condition; Bus MODS open condition
Other two unit will be service Sun, May 20, 2018 9:00
During LC period 1).Sun day holiday load relief expected Sun, May 20, 2018 9:00
2). Other 3 Nos Auto transformers will be in service 3). No
other SS will be affected
Standby Sun, May 20, 2018 8:00
ALL UNITS SF6 BREAKER OFF CONDITION TOP AND Sun, May 20, 2018 9:00
BOTTOM BUS OPEN CONDITION LINE SIDE
ISOLATOR AND BUS SIDE ISOLATOR OPEN
CONDITION
SF6 BREAKER OFF IN CONDITION TOP AND Sat, May 19, 2018 9:00
BOTTOM BUS OPEN IN CONDITION
During the LC period Auto transformer I will avail 230KV Mon, May 21, 2018 9:00
Gobi feeder and Auto transformer II will avail 230KV
MTPS feeder supply.No SS will be affected.
110 KV Krishnapuram Feeder radial from 230KV SS Mon, May 21, 2018 9:00
Perambalur end
Mon, May 21, 2018 9:00
Auto Transformer-II will cater the load. Mon, May 21, 2018 9:00
PWD DEMAND IS SHARE BY UNITS 3&4 Mon, May 21, 2018 9:00
During the LC period Ingur 110 KV SS will be fed from Mon, May 21, 2018 9:00
Ingur 230 KV SS.
During the above LC Period all the 4 Machines will be in Mon, May 21, 2018 7:00
Common Spell AOH and PWD Demand Meet Out by PWD
Gate.
All 4 SS's namely Athipalli SS, Gudalur SS, Cherambady Mon, May 21, 2018 8:00
SS, Uppatti SS will avail total shutdown on that day.
During the LC period, (1) 110KV OKM SS & 110KV Mon, May 21, 2018 9:00
Edayarpalayam SS will be under Total Shut down. (2)
110KV OKM-TDLR 1 feeder loads will be transferred to
230KV TDLR SS. Hence, No SS will be affected.
OTHER 230 KV FEEDERS WILL SHARE THE LOADS Mon, May 21, 2018 10:00
Monthly Maintenance 110KV Salem I&II feeder will be fed Mon, May 21, 2018 9:00
radially from Salem end, 110KV Deviakurichi I&II feeder
will be fed radially from Deviakurichi end. (TANDELTA
Value Measurement by P&C Gobi) (SALEM 110KV SS
TSD is on 21.05.2018).
During LC period 1).Auto Transformer I will be separated Mon, May 21, 2018 9:00
from common 110 KV Bus and fed to 110 KV Elavanthy #
and 110 KV Palladam # seperatly 2). Other 4 Nos 110 KV
feeders load can be managed with Auto transformer II,III
and IV 3). No other SS will be affected
During the LC period 230KV MTPS feeder will be in Mon, May 21, 2018 9:00
service. 230KV Gobi end also programmed to avail LC . No
SS will be affected.
1.230KV CBE SS fed from 230KV CBE- OKM # of 230KV Mon, May 21, 2018 9:00
OKM SS
1.Both End Breaker Open Condition. 2.Both End Bus & Mon, May 21, 2018 8:00
Line Mods Open Condition. 3.Both End Earth Switch
Closed Condition.
During 110 KV Salem I # LC period, 110 KV Salem II # Mon, May 21, 2018 9:00
will be service condition. Hence, there will be no
interruption of supply.
FEEDING CAN BE ARRANGED FROM PONNAPURAM Mon, May 21, 2018 10:00
-INGUR 2 #
1.230 KV ARASUR FEEDER,230 KV Mon, May 21, 2018 9:00
PALLAKAPALAYAM FEEDER AND 230 KV MTPS II
FEEDER ARE IN SERVICE,IT MAY CATER THE LOAD.
2.OTHER END MAY ALSO AVAIL LC
During the LC period the remaining 5 Nos 230 KV feeders Tue, May 22, 2018 9:00
will be in service.
1. During LC period, it is expected that PWD demand in Tue, May 22, 2018 9:00
river will be below 200 cusecs. Hence, generation loss may
not arise at MHPH. 2. During Lc period, RBCPH PWD
demand will be only 5 c/s, hence generation loss will not
arise at RBCPH. 3. During LC period, only 110 KV GC and
11 KV common LV breakers will be hand tripped. 110 KV
feeders will not be affected. Hence no SS will be affected.
Valayapatty 110KV SS under total shutdown. Tue, May 22, 2018 9:00
1. Valayapatty 110KVSS under total shutdown. 2. Tue, May 22, 2018 9:00
Erumapatty 110KVSS loads will be transferred to 230KV
Jambunathapuram, SS. 3. 110KV Valavanthi # Radial from
110KV Kabilarmalai of 230KV Pugalur SS. 4. 110KV
Puthansanthai # Radial from 230KV Puthansanthai. 5. No
SS will be Affected.
Both MTPS II and Gobi 230KVSS have programmed for Tue, May 22, 2018 9:00
Maintenance work on that day
1.During the LC period the above feeder will be fed radially Tue, May 22, 2018 10:00
from other end. 2. No SS will be affected.
DEPENDING UPON LOAD CONDITION Tue, May 22, 2018 9:00
During the LC period, 110KV OKM-Thudiyalur II feeder Tue, May 22, 2018 9:00
will be kept radial from 230KV Thudiyalur SS. Hence, No
SS will be affected.
110 KV MADAMPALAYAM SS UNDER TOTAL SHUT Tue, May 22, 2018 10:00
DOWN
1. No interruption of supply. 2. Load fed through 230 KV Tue, May 22, 2018 9:00
Karimangalam SS
During LC period 1).110 KV Tiruppur SS and 110 KV Tue, May 22, 2018 9:00
Mudalipalayam SS will be availing TSD and Kumar Nagar
SS will be fed through 110 KV SIPCOT II # 2). No other SS
will be affected
During LC period 1). 110 KV Tirupur SS and Tue, May 22, 2018 9:00
Mudalipalayam SS availing Total Shutdown 2). Other 3 Nos
Auto Transformers will be in service 3). no other SS will be
affected
1.Both End Breaker Open Condition. 2.Both End Bus & Tue, May 22, 2018 8:00
Line Mods Open Condition. 3.Both End Earth Switch
Closed Condition.
During the LC period both ends breaker will be in Handtrip Tue, May 22, 2018 9:00
condition, other 6 no’s 230KV feeders will be in service
and hence no interruption of supply
Both end Tue, May 22, 2018 9:00
Other end also need LC onsame day Tue, May 22, 2018 10:00
OTHER END ALSO LC APPLIED ON SAME DAY Tue, May 22, 2018 10:00
HV Breaker I & II will be in service condition, Hence there Tue, May 22, 2018 9:00
will be no interruption of supply to 400 / 230 KV Auto
transformers I & II.
DURING THE L.C PERIOD, 1&2 - T.GODE& NALLUR Tue, May 22, 2018 9:00
110KVSS AVAILING APPROVED TOTAL SHOUTDOWN
3.STATION LOADS WILL BE CATER BY AUTO TR
NO :I
During the LC Period 100 MVA Auto transformer I will be Tue, May 22, 2018 9:00
in Service
110 KV Kariamangalam SS availing total shut down. Tue, May 22, 2018 9:00
Expected load relief : 50 MW. The station loads will be
managed by keeping Auto Transformer - I & III and 230
KV Palavadi (Already Mettur #) and 230 KV Shoolagiri
feeder in service and also 2 No's Grid feeder in service.
Radially fed from 230 KV Thudiyalur SS Tue, May 22, 2018 14:00
Tentative LC Programmed by 110 KV Singarpet SS for Tue, May 22, 2018 9:00
Maintenance Work on 22.05.2018
UNIT IN SERVICE. ALL 400KV FEEDERS ARE IN Tue, May 22, 2018 9:00
SERVICE,EXCEPT PALAVADI -II RADIALLY
CHARGED. ALL 230KV FEEDERS MTPS-I,METTUR
AUTO SS,THINGALUR FEEDERS ARE IN SERVICE.
During LC period 110KV Valayapatty SS & Tue, May 22, 2018 9:00
Sendamangalam SS availing Total Shut down. No supply
interruption.
Other ICT's will be in service Tue, May 22, 2018 9:00
Other end also proposed to take LC on the same date Wed, May 23, 2018 9:00
(i)Tentative LC programed by 110kv Singarapet ss for Wed, May 23, 2018 9:00
Maintenance work on 23.05.2018 (ii)During LC Period 110
KV Thumbipady SS to be availed supply from Salem 400
KV/110KVSS (K.R.Thoppur)
1.Main bus is inservice 2.Depending upon load condition Wed, May 23, 2018 9:00
Tentative LC programmed at MTPS 2 in above the feeder Wed, May 23, 2018 9:00
on 23.05.2018
PWD DEMAND IS SHARE BY UNITS 1&2 Wed, May 23, 2018 9:00
During the LC Period No SS will be affected Wed, May 23, 2018 9:00
During the LC period 1. Blink issued at 110KV Singarapet Wed, May 23, 2018 9:00
SS and 110KV RC Plant end and LILO Switch towards
Singarapet end will be kept open at 110KV Mecheri SS 2.
Bommidi Traction supply will be availed from 110KV
Mettur # I Hence there is no interruption of supply
OTHER TWO AUTO TRANSFORMER WILL SHARE Wed, May 23, 2018 10:00
THE LOADS
During the LC period, the other 230KV feeders are in Wed, May 23, 2018 9:00
service to cater the SS loads.
Monthly Maintenance. Only one Auto Transformer is Wed, May 23, 2018 9:00
available and Auto transformer will not be in Service and
230KV Main Bus & 110KV Bus will be in Service & there
will be no interruption to the Intermediate SS. (SFRA and
TANDELTA Value Measurement by P&C Gobi).
(UDAYAPATTY 110KV SS TSD is on 23.05.2018).
2Nos. 100MVA Auto Transformer-I and II will be in Wed, May 23, 2018 9:00
service. Singapuram – I feeder will radially fed from
other end. 110 KV Udayapatty SS availing total shutdown.
There will be no interruption to any SS or feeder
During LC period 1).Other 3 Nos 230 KV feeders will be in Wed, May 23, 2018 9:00
service 2). Other end availing LC 3). No other SS will be
affected
During the LC period Auto Transformer I will be in service. Wed, May 23, 2018 9:00
No SS will be affected.
1) The Salem 230KV SS, Singapuram I feeder availing Wed, May 23, 2018 9:00
Breaker, CT’s maintenances work . 2) Udayapatty 110KV
SS availing Total Shutdown on that day. 3) Singapuram 230
SS radially fed from upto Kitchipalayam 110KV SS End. 4)
There will be no interruption of supply any other SS.
During LC Period, 110 KV Karuppur SS will be avail total Wed, May 23, 2018 9:00
shut down on 23-05-2018.
DURING THE L.C PERIOD, OTHER END ALSO Wed, May 23, 2018 9:00
AVAILING LINE CLEAR
During the LC period 110 KV thoppur SS radially fed from Wed, May 23, 2018 9:00
110 KV singarapet SS end
1. 230KV Shoolagiri feeder breaker will be in off condition. Wed, May 23, 2018 9:00
2. 230 KV Singarapet feeder to be fed the entire load of
230KV Vinnamangalam Substation during shut down
period.
OCC Aprroval (MTPS-I feeder will be in service). Wed, May 23, 2018 10:00
SF6 BREAKER OFF CONDITION LINE SIDE AND BUS Wed, May 23, 2018 9:00
SIDE ISOLATOR OPEN CONDITION
During LC period 230KV Bus Coupler CB will be hand Wed, May 23, 2018 9:00
tripped for idle Bus side Switch works in 230KV Unjanai
feeder. 230KV Valayapatty and Pugalur feeders will be kept
tied with grid. 230KV Unjanai SS also availing LC in the
same feeder at opposite end. No supply interruption.
1.Both End Breaker Open Condition. 2.Both End Bus & Wed, May 23, 2018 8:00
Line Mods Open Condition. 3.Both End Earth Switch
Closed Condition.
1.110 KV SANKARI-I & BKB-I # will be fed from AUTO- Thu, May 24, 2018 9:00
I. 2.110 KV SANKARI-II,BARRAGE-IV & THEVUR will
be fed from AUTO-II.
1.During the LC period the above feeder will be fed radially Thu, May 24, 2018 10:00
from other end. 2.No SS will be affected.
DEPENDING UPON LOAD CONDITION Thu, May 24, 2018 9:00
Load will be Maintained with other110 Kv Feeders Thu, May 24, 2018 9:00
1.Both End Breaker Open Condition. 2.Both End Bus & Thu, May 24, 2018 8:00
Line Mods Open Condition. 3.Both End Earth Switch
Closed Condition.
During the LC period both ends breaker will be in Handtrip Thu, May 24, 2018 9:00
condition, other 6 no’s 230KV feeders will be in service
and hence no interruption of supply
During LC period 1). 110 KV source for 230 KV Kurukathi Thu, May 24, 2018 9:00
SS will be availed through 110 KV Rasipalayam -
Kurukathi Feeder 2). Other 3 Nos 230 KV feeders will be in
service 3). No other SS will be affected 4). Other end
availing LC
During 230 KV Bus B LC Period, 230 KV Bus A will be in Thu, May 24, 2018 9:00
service condition. Hence there will be no interruption of
supply.
FEEDING CAN BE ARRANGED FROM 230KV Thu, May 24, 2018 10:00
PALLADAM SS FROM 110 KV PALLADAM #
During the Lc period 230 KV Auxiliary bus will be in Thu, May 24, 2018 9:00
service
110 KV Bargur SS and 110/33 KV Penneswaramadam SS Thu, May 24, 2018 9:00
are availing total shut down. Expected load relief : 40 MW.
The station loads will be managed by keeping Auto
Transformer - I, II & III and 230 KV Palavadi (Already
Mettur #) feeder in service and also 2 No's Grid feeder in
service.
Radially fed from 230 KV Thudiyalur SS and 110 KV Thu, May 24, 2018 9:00
Keeranatham SS will be under Total S/D
1.AUTO TRANSFORMER I AND II ARE IN SERVICE,IT Thu, May 24, 2018 9:00
MAY CATER THE LOAD AND ALSO SUBJECT TO THE
LOAD CONDITION
SF6 BREAKER OFF CONDITION LINE SIDE AND BUS Thu, May 24, 2018 9:00
SIDE ISOLATOR OPEN CONDITION
110 KV Neyveli # II will be kept radial from TS -I end. Fri, May 25, 2018 9:00
During LC period 230KV idle Bus will be hand tripped for Fri, May 25, 2018 9:00
maintenance works in 230KV idle Bus side Switch of HV-II
Bay. 110KV Rasipuram SS will be transferred to 110KV
Salem-Mallur feeder. 110KV Namagiripet SS will be back
fed from 110KV DVK-Thammampatty feeder, other wise
110KV Valayapatty feeder will be hand tripped if export to
contain Station load within one Auto. Other 110KV Sub-
Stations normally fed by this station will be fed by Auto-I.
No supply interruption.
110 KV Kaniyur SS under total shutdown. Fri, May 25, 2018 9:00
During the LC period the 110 KV Arasur- Palladam feeder Fri, May 25, 2018 11:00
loads will be transferred to 110 KV Arasur-Kaniyur feeder.
During the LC period, the other 230KV feeders are in Fri, May 25, 2018 8:00
service to cater the SS loads.
110 KV singapuram-II feeder will radially fed from other Fri, May 25, 2018 9:00
end. There will be no interruption to any SS or feeder
1) The Salem 230KV SS, Singapuram II feeder availing Fri, May 25, 2018 9:00
Breaker, CT’s maintenances work . 2) ) 110KV Mettupatty
SS supply change to Singapuram I feeder 3) There will be
no interruption of supply any other SS.
OTHER END ALSO LC APPLIED ON SAME DAY Fri, May 25, 2018 10:00
During LC period 1).110 KV Palladam SS and Itchipatty SS Fri, May 25, 2018 9:00
will be availing Total Shutdown and Kalivelampatty SS will
be fed through Veerapandy # 2). No other SS will be
affected
During LC period 1).110 KV Pongalur SS and Elavanthi SS Fri, May 25, 2018 9:00
will be availing Total Shutdown 2). No other SS will be
affected
During LC period 1).110 KV Pongalur SS, 110 KV Fri, May 25, 2018 9:00
Elavanthy SS, 110 KV Palladam SS and Itchipatty SS
availing Total Shutdown 2). Other 3 Nos 230 KV feeders
will be in service 3). other end availing LC 4).No other SS
will be affected
During LC period Unit 1&2 Non standby,110 KV BKB 2 & Fri, May 25, 2018 9:00
NALLUR Feeders are in back charged condition and PWD
demand Will be regulated from BKB 2 / Vendipalayam.
HV Breaker III & IV will be in service condition, Hence Fri, May 25, 2018 9:00
there will be no interruption of supply to 400 / 110 KV Auto
transformers III & IV.
During the LC period radially fed from singarapet SS upto Fri, May 25, 2018 9:00
M/S RC Plant end
Dedicated feeder and LC requested by M/S.KGDL Fri, May 25, 2018 9:00
ALL 230 KV FEEDERS AND AUTO TRANSFORMER Fri, May 25, 2018 9:00
I,II, AND III ARE CONNECTED IN 230 KV BUS I,230
KV BUS II IDLY CHARGED THROUGH 230 KV BUS
COUPLER BREAKER.
During the LC period, the other 230KV feeders are in Sat, May 26, 2018 8:00
service to cater the SS loads.
During the LC period both ends breaker will be in Handtrip Sat, May 26, 2018 9:00
condition, other 6 no’s 230KV feeders will be in service
and hence no interruption of supply
During the period of LC 110 KV Tirupattur SS & 110KV Sat, May 26, 2018 9:00
Koratty SS are programmed to avail Total shutdown and
110 KV Tirupattur Railway traction SS load will be fed to
Vinnamangalam 230 KV SS through 110 KV
Vinnamangalam Tirupattur #. hence no interruption of
supply.
During the LC period, 1) 110 KV LV 1 breaker will be in Sat, May 26, 2018 9:00
handtrip condition and Auto transformer I will be in off
condition 2) The Auto transformer II, III and all 110 KV
feeders will be in service except 110KV Tirupattur Feeder,
hence no interruption of supply 3) The 110KV Tirupattur SS
total shutdown approved. 4) The 110KV Tirupattur Railway
Traction SS loads will be fed from Vinnamangalam 230KV
SS and hence no interruption of Supply.
During the LC period 1. 230KV GC breaker, 110KV LV Sat, May 26, 2018 9:00
Breaker I, II & III will be in hand trip condition & 3 no's
Auto transformer will be in off condition. 2. 230KV
Thiruvalam # Breaker will be in hand trip condition at both
ends. 3. 110KV Tirupattur # Breaker will be in hand trip
condition at both ends & Tirupattur SS and Koratty SS are
availing total shutdown 4. 110KV Tirupattur Railway
traction loads will be fed from Vinnamangalam 230KV SS
5. 110KV Ramiyanahally SS loads will be from
Karimangalam 230KV SS 6. 110KV Harur SS and 110KV
Pappireddipatty SS total shutdown approved 7. 110KV
Singarapet Grid SS loads will be managed by 110KV
Mettur I & II feeders and 110KV Vinnavanur # 8. 110KV
Link I, Link II, Ramiayanhally feeders will be in service at
Singarapet 230KV SS end 9. Other 6 numbers 230KV
Feeders will be in service hence no interruption of supply.
During 400/110 KV Auto Transformer IV LC Period, Sat, May 26, 2018 9:00
400/110 KV Auto Transformer III will be in Service
Condition,110 KV Salem # I will be kept radial from
K.R.Thoppur end. 110 KV Salem #II will be kept radial
from Salem 230 KVSS end & 110 KV Thumbipady # will
be fed from Mettur 230 KVSS. Hence there will be no
interruption of supply.
110 KV Ramiyanahally SS will be fed from 230 KV Sat, May 26, 2018 9:00
Singarapet SS and 110 KV Vellichandai SS fed from 400
KV Palavadi SS. No interruption of supply.
During the LC period, the other 230KV feeders are in Fri, May 25, 2018 8:00
service to cater the SS loads. Note: Approval for the above
LC also requested in Long LC format vide Lr.No:
EE/O/OKM/F.LC/D.No.162/2018 Dt 21.04.2018.
1. 230KV CBE SS fed from 230KV CBE- Thudiyalur # of Fri, May 25, 2018 8:00
230KV Thudiyalur SS .
Unit under shutdown condition; SF6 breaker open Sun, May 27, 2018 8:00
condition; Bus MODS open condition
LC WILL BE TAKEN ONE BY ONE Sun, May 27, 2018 10:00
During LC period 1).Sun day holiday load relief expected Sun, May 27, 2018 9:00
2). other 3 Nos Auto transformers will be in service 3). No
other SS will be affected
During the LC period, the other 230KV feeders are in Thu, May 24, 2018 8:00
service to cater the SS loads with support of wind
generation. Note: Approval for the above LC also requested
in Long LC format vide Lr.No:
EE/O/OKM/F.LC/D.No.161/2018 Dt 21.04.2018.
DEPENDS UPON WIND GENERATION Sat, May 26, 2018 8:00
During the LC period both ends breaker will be in Handtrip Mon, May 28, 2018 9:00
condition, other 6 no’s 230KV feeders will be in service
and hence no interruption of supply
110 KV Neyveli # I will be kept Radial from TS-I end Mon, May 28, 2018 9:00
110 KV Ettikuttaimedu SS ,110 KV Jalakandapuram SS & Mon, May 28, 2018 9:00
110 KV Edapady SS supplywill be fed redially from
K.R.Thoppur 400 KVSS and Poolampatty SS
1.During the LC period the above feeder will be fed radially Mon, May 28, 2018 10:00
from other end. 2.No SS will be affected.
DEPENDING UPON LOAD CONDITION Mon, May 28, 2018 9:00
During the LC period, (a) Units 1&2 will be in non standby Mon, May 28, 2018 8:00
condition pondage will be depleted. (b) 110KV KRT # will
be feed radial upto poolampatty ss from KRT SS end. (c)
LMBPH – 1 and LMBPH – 3 will be both ends hand
tripped.
230KV Link-II feeder LC will be availed at both ends. 3Nos Mon, May 28, 2018 9:00
230KV feeder will be in service. There will be no
interruption to any SS or feeder
1.Both End Breaker Open Condition. 2.Both End Bus & Mon, May 28, 2018 8:00
Line Mods Open Condition. 3.Both End Earth Switch
Closed Condition.
1) The Salem and KR Thoppur Link II both 230KV SS Mon, May 28, 2018 9:00
availing Breaker, CT’s maintenances work . 2) There will be
no interruption any other SS.
110KV KVLR-Nambiyur loads will be fed from 230KV Mon, May 28, 2018 9:00
Gobi SS
Both end Monthly Maintenance Work Mon, May 28, 2018 9:00
110 KV Poolavady SS availing total shutdown. 110 KV Mon, May 28, 2018 9:00
Thungavi SS will be fed from 230 KV Ponnapuram SS.
UNIT IN SERVICE. ALL 400KV FEEDERS Mon, May 28, 2018 9:00
KARAMADAI-I&II,PALAVADI-I,ICT-I ARE IN SERVICE
,PALAVADI-II ARE IN RADIALLY CHARGED .ALL
230KV FEEDERS ARE IN SERVICE.
SUPPLY TO THE 110 kv KUGALUR SS AND 110 KV TH Mon, May 28, 2018 9:00
PALAYAM SS MAY FED FROM 230 KV ANTHIYUR SS
AND NO OTHER SS WILL AFFECTED
During LC period 110KV Namagiripet SS will be back fed Tue, May 29, 2018 9:00
through 110KV DVK-Thammampatty feeder. 110KV KN
Patty SS will be transferred to 110KV PSI-Rasipuram
feeder. 110KV Sendamangalam SS now fed by 110KV PSI-
Valayapatty feeder will back fed from 110KV Vlpty-
Pudhansandai feeder. Other 110KV Sub-Stations normally
fed by this station will be fed by Auto-I. No supply
interruption
Both MTPS II and Thingalur 230KVSS have programmed Tue, May 29, 2018 9:00
for Maintenance work on that day
Radially fed from other end. Tue, May 29, 2018 9:00
During the LC period, the other 230KV feeders are in Tue, May 29, 2018 9:00
service to cater the SS loads.
1.Both End Breaker Open Condition. 2.Both End Bus & Tue, May 29, 2018 8:00
Line Mods Open Condition. 3.Both End Earth Switch
Closed Condition.
During the shutdown period 110 KV Capacitor bank II Tue, May 29, 2018 9:00
breaker will be in off condition
During LC period 1). All the 4 Nos Auto tranformers and 4 Tue, May 29, 2018 9:00
Nos 230 KV feeders will be in service 2). No other SS will
be affected
During 230 KV Bus A LC Period, 230 KV Bus B will be in Tue, May 29, 2018 9:00
service condition. Hence there will be no interruption of
supply.
1. Circuit breaker 206 - 52 is handtripped. 2. Isolators 206 - Tue, May 29, 2018 9:00
89 - L, 206 - 89 - B and 206 - 89 - M1 are opened. 3. Earth
switch 206 - 89 - LE is closed
FEEDING CAN BE ARRANGED FROM 230KV Tue, May 29, 2018 10:00
UDUMALPET SS
During the LC period 230 KV main bus will be in service Tue, May 29, 2018 8:00
UNIT IN SERVICE. ALL 400KV FEEDERS ARE IN Tue, May 29, 2018 9:00
SERVICE EXCEPT PALAVADI-II RADIALLY
CHARGED . ALL 230KV FEEDERS MTPS-I, METTUR
AUTO SS, GOBI ARE IN SERVICE.
SUPPLY TO THE 110 kv KAVUNDAPADY SS MAY FED Tue, May 29, 2018 9:00
FROM 230 KV THINGALUR SS AND NO OTHER SS
WILL AFFECTED
1.No SS will be affected during the above LC Mon, May 7, 2018 11:00
period . Hrs.
2.110 KV Kodumudi SS,110 KV Nadupalayam
SS ,110 KV Sivagiri SS & 110 KV
Elumathur SS supply will be fed from
pugalur 230 KV SS
During the LC period, 230KV OKM-Palladam feeder Wed, May 30, 2018 9:00
substitute with TBC breaker to retain its original condition.
110 KV K.R.Thoppur II feeder radially fed from other end. Wed, May 30, 2018 9:00
There is no interruption to any SS or feeder
1. 110/11KV Kallimadai SS will be fed from 230KV CBE Wed, May 30, 2018 9:00
SS. 2. 110/11KV Irugur SS, KPR Mills , Sulur Railway
Traction & M.G.Pudur SS will be fed from 230KV Arasur
SS.
During the LC period 110/22KV Chennampatty SS Will Wed, May 30, 2018 9:00
avail supply from other end.No SS will be affected.
Myvadi end only Wed, May 30, 2018 9:00
FEEDING CAN BE ARRANGED OTHER TWO AUTOS Wed, May 30, 2018 10:00
During the LC period 230 KV main bus will be in service Wed, May 30, 2018 8:00
110KV GC TOP AND BOTTOM BUS OPEN CONDTION Wed, May 30, 2018 8:00
230KV FEEDERS TRIP CONDITION FEEDERS LINE
SIDE AND BUS SIDE ISOLATOR OPEN CONDITION
SUPPLY TO THE INTER SS MAY FED FROM 230 KV Thu, May 31, 2018 9:00
THINGALUR SS AND NO OTHER SS WILL AFFECTED
To No. of
To date Recomendation Remarks SE Approval
time Days
Wed, May 2, 2018 17:00 1 Approved Sub to Grid Voltage Approved
Wed, May 2, 2018 17:00 1 Possible Sub to Auto load after Approved
TSD Relief
Wed, May 2, 2018 14:00 1 Possible Other # will cater the Approved
load
Wed, May 2, 2018 17:00 1 Possible Idle section Approved
Thu, May 3, 2018 17:00 1 Possible Sub to TSD relief and Approved
load condition
Thu, May 3, 2018 15:00 1 Possible Other #s will cater the Approved
load
Thu, May 3, 2018 17:00 1 Possible Sub to transfer of Approved
Mettur Town &
Kolathur to MDPH
Fri, May 4, 2018 23:00 3 Possible Approved by Dir/ Approved
Op/Chi for 30 Days
Fri, May 4, 2018 17:00 1 Possible Other # will cater the Approved
load
Fri, May 4, 2018 14:00 1 Possible Other # will cater the Approved
load
Fri, May 4, 2018 17:00 1 Possible Other # will cater the Approved
load
Fri, May 4, 2018 17:00 1 Possible Other # will cater the Approved
load
Fri, May 4, 2018 17:00 1 Possible Sub to TSD relief and Approved
other Autos load
condition
Fri, May 4, 2018 17:00 1 Possible Sub to Somanue TSD Approved
Fri, May 4, 2018 17:00 1 Possible Other #s will cater the Approved
load
Fri, May 4, 2018 14:00 1 Repeat Cancelled
Fri, May 4, 2018 14:00 1 Possible Other # will cater the Approved
load
Fri, May 4, 2018 17:00 1 Possible Other #s will cater the Approved
load
Fri, May 4, 2018 17:00 1 Postponed Sub to normalisation Postponed
of ICT 4 at KR
Thoppur
Fri, May 4, 2018 17:00 1 1,2) Possible Sub to TSD relief and Approved
other Autos load
condition
Fri, May 4, 2018 17:00 1 Possible Other # will cater the Approved
load
Fri, May 4, 2018 17:00 1 Possible Sub to TSD and load Approved
transfer
Sat, May 5, 2018 18:00 3 Possible Other #s will cater the Approved
load
Sat, May 5, 2018 17:00 1 Possible Approved
Sat, May 5, 2018 17:00 1 Possible Other #s will cater the Approved
load
Sat, May 5, 2018 17:00 1 Possible Sub to TSD relief and Approved
other Auto load
condition
Sat, May 5, 2018 14:00 1 Postponed Load transfer to Subject to
ASR230 not feasible EE/SLDC
due to Karuvalur Auto concurrence
LC
Sat, May 5, 2018 17:00 1 Possible Other #s will cater the Approved
load
Sat, May 5, 2018 17:00 1 Possible Other #s will cater the Approved
load
Sat, May 5, 2018 16:00 1 Possible Sub to TSD relief and Approved
other Autos load
condition
Sat, May 5, 2018 17:00 1 Possible Sub to TSD relief and Approved
other Auto load
condition
Sun, May 6, 2018 17:00 1 Possible Other #s will cater the Approved
load
Mon, May 7, 2018 17:00 1 Possible #2 will cater the load Approved
Mon, May 7, 2018 17:00 1 Possible Other #s will cater the Approved
load
Mon, May 7, 2018 17:00 1 Possible Sub to grid condition Approved
Tue, May 8, 2018 13:00 1 Possible Other #s will cater the Approved
load
Wed, May 9, 2018 17:00 1 Possible #1 will cater the load Approved
Wed, May 9, 2018 18:00 1 Possible Sub to TSD relief and Approved
load condition
Wed, May 9, 2018 12:00 1 Possible Sub to TSD relief and Approved
other autoload
condition
Wed, May 9, 2018 17:00 1 Possible Other # will cater the Approved
load
Thu, May 10, 2018 17:00 1 Possible Bus 2 will cater the Approved
load
Thu, May 10, 2018 17:00 1 Possible Sub to load condition Approved
Thu, May 10, 2018 14:00 1 Possible Other #s will cater the Approved
load
Thu, May 10, 2018 17:00 1 Possible Sub to load condition Approved
Thu, May 10, 2018 17:00 1 Possible Sub to TSD relief and Approved
other Autos load
condition
Thu, May 10, 2018 17:00 1 Possible Sub to load condition Approved
Thu, May 10, 2018 14:00 1 Possible Other #s will cater the Approved
load
Thu, May 10, 2018 14:00 1 Possible Sub to TSD relief and Approved
load transfer
Thu, May 10, 2018 14:00 1 Possible Sub to TSD relief and Approved
load transfer
Thu, May 10, 2018 16:00 1 Possible Other #s will cater the Approved
load
Thu, May 10, 2018 14:00 1 Possible Other #s will cater the Approved
load
Thu, May 10, 2018 17:00 1 Possible Other #s will cater the Approved
load
Thu, May 10, 2018 14:00 1 Possible Other #s will cater the Approved
load
Thu, May 10, 2018 17:00 1 Possible Other #s will cater the Approved
load
Thu, May 10, 2018 17:00 1 Postponed 230KV OKM - Postponed
Anaikadavu will
overload
Thu, May 10, 2018 17:00 1 Possible Other #s will cater the Approved
load
Thu, May 10, 2018 17:00 1 Approved Sub to Grid Voltage Approved
Thu, May 10, 2018 17:00 1 Possible # 2 will cater the load Approved
Fri, May 11, 2018 17:00 1 Possible Sub to load condition Approved
Fri, May 11, 2018 17:00 1 Possible Sub to load condition Approved
Fri, May 11, 2018 17:00 1 Possible Sub to load condition Approved
Fri, May 11, 2018 17:00 1 Possible Sub to load condition Approved
Fri, May 11, 2018 17:00 1 Possible Sub to # kept radial Approved
from Other end
Fri, May 11, 2018 17:00 1 Possible Other #s will cater the Approved
load
Fri, May 11, 2018 17:00 1 Possible Other #s will cater the Approved
load
Fri, May 11, 2018 17:00 1 Possible Sub to T'Code # Approved
loading
Fri, May 11, 2018 18:00 1 Possible Sub to PWD demand Approved
Fri, May 11, 2018 17:00 1 Possible Sub to load condition Approved
Fri, May 11, 2018 14:00 1 Possible #2 will be in service Approved
Fri, May 11, 2018 17:00 1 Possible Sub to other #s load Approved
condition
Fri, May 11, 2018 13:00 1 Possible Sub to interload TSD Approved
Fri, May 11, 2018 16:00 1 Possible Other #s will cater the Approved
load
Fri, May 11, 2018 16:00 1 Possible Other #s will cater the Approved
load
Fri, May 11, 2018 18:00 1 Possible Sub to 11KV & 33KV Approved
GC TSD
Fri, May 11, 2018 15:00 1 Possible Sub to load codition Approved
Fri, May 11, 2018 17:00 1 Possible Other #s will cater the Approved
load
Fri, May 11, 2018 14:00 1 Possible Sub to Grid Voltage Approved
Fri, May 11, 2018 17:00 1 Possible Sub to Wind & Approved
REGEN concurrence
Fri, May 11, 2018 17:00 1 Possible Sub to load condition Approved
Fri, May 11, 2018 16:00 1 Possible Sub to other Autos Approved
load condition
Fri, May 11, 2018 14:00 1 Possible Sub to load transfer Approved
Fri, May 11, 2018 17:00 1 Possible Sub to other #s load Approved
condition
Sat, May 12, 2018 17:00 1 Possible Sub to load condition Approved
Sun, May 13, 2018 17:00 1 Possible Sub to grid condition Approved
Sun, May 13, 2018 17:00 1 Possible Sub to grid condition Approved
Sun, May 13, 2018 18:00 1 Possible Sub to grid condition Approved
Mon, May 14, 2018 14:00 1 Approved Sub to Grid Voltage Approved
Mon, May 14, 2018 17:00 1 Possible Sub to grid condition Approved
Mon, May 14, 2018 17:00 1 Possible Sub to grid condition Approved
Mon, May 14, 2018 16:00 1 Possible Sub to Ingur auto load Approved
Mon, May 14, 2018 17:00 1 Possible Sub to load condition Approved
Mon, May 14, 2018 14:00 1 Possible Sub to grid condition Approved
Mon, May 14, 2018 17:00 1 Possible Sub to grid condition Approved
Mon, May 14, 2018 14:00 1 Approved Sub to Grid Voltage Approved
Mon, May 14, 2018 17:00 1 Possible Sub to load transfer Approved
Mon, May 14, 2018 17:00 1 Possible Sub to load condition Approved
Mon, May 14, 2018 17:00 1 Possible Sub to load condition Approved
Tue, May 15, 2018 17:00 1 Possible Sub to load condition Approved
Tue, May 15, 2018 17:00 1 Possible Sub to load condition Approved
Tue, May 15, 2018 17:00 1 Possible Sub to load condition. Approved
Tue, May 15, 2018 15:00 1 Possible Sub to load transfer Approved
Tue, May 15, 2018 17:00 1 Possible Sub to TSD relief and Approved
load transfer
Tue, May 15, 2018 15:00 1 Possible #2 will cater the load Approved
Tue, May 15, 2018 17:00 1 Possible Sub to TSD relief Approved
Tue, May 15, 2018 12:00 1 Possible Sub to TSD relief and Approved
load transfer
Tue, May 15, 2018 17:00 1 Possible Sub to load condition Approved
Tue, May 15, 2018 17:00 1 Possible #2 will cater the load Approved
and sub to grid
condition
Tue, May 15, 2018 17:00 1 Possible Sub to load condition Approved
Tue, May 15, 2018 11:00 1 Possible Sub to load condition Approved
Tue, May 15, 2018 13:00 1 Postponed NoTSD relief Subject to
EE/SLDC
concurrence
Tue, May 15, 2018 15:00 1 Possible Sub to load condition Approved
Tue, May 15, 2018 15:00 1 Possible Sub to other Autos Approved
load condition
Tue, May 15, 2018 14:00 1 Possible Sub to # kept radial Approved
from Other end
Tue, May 15, 2018 16:00 1 Possible Sub to other Auto Approved
load condition
Tue, May 15, 2018 17:00 1 Postponed 230KV KPH2 - KPH3 Postponed
# lc recommended
Tue, May 15, 2018 15:00 1 Possible Sub to TSD relief and Approved
load transfer
Tue, May 15, 2018 12:00 1 Possible Sub to TSD relief and Approved
other Autos load
condition
Tue, May 15, 2018 17:00 1 Possible Sub to load condition Approved
Tue, May 15, 2018 17:00 1 Possible Sub to load condition Approved
Tue, May 15, 2018 17:00 1 Possible Sub to # kept radial Approved
from Other end
Tue, May 15, 2018 17:00 1 Possible Idly charged line Approved
Tue, May 15, 2018 16:00 1 Possible Sub to link # 1 & 2 Approved
load condition
Tue, May 15, 2018 17:00 1 Possible Sub to grid condition Approved
Tue, May 15, 2018 15:00 1 Possible Sub to transfer of load Approved
Tue, May 15, 2018 16:00 1 Possible Idly charged line Approved
Wed, May 16, 2018 16:00 1 Possible Sub to load transfer Approved
Wed, May 16, 2018 17:00 1 Possible Sub to load condition Approved
Wed, May 16, 2018 17:00 1 Possible Sub to load condition Approved
Wed, May 16, 2018 15:00 1 Possible Sub to link #1 load Approved
condition
Wed, May 16, 2018 17:00 1 Approved Sub to Grid Voltage Approved
Wed, May 16, 2018 17:00 1 Possible Sub to grid condition Approved
Wed, May 16, 2018 16:00 1 Possible Sub to TSD Relief Approved
and # kept radial from
other end
Wed, May 16, 2018 14:00 1 Possible Sub to # kept radial Approved
from Other end
Wed, May 16, 2018 16:00 1 Possible Sub to load condition Approved
Wed, May 16, 2018 13:00 1 Possible Sub to equal division Approved
of loads.
Wed, May 16, 2018 17:00 1 Possible Sub to wind and load Approved
condition
Wed, May 16, 2018 17:00 1 Possible Sub to load condition Approved
Wed, May 16, 2018 17:00 1 Possible Sub to TSD relief Approved
Wed, May 16, 2018 17:00 1 Possible Sub to TSD relief and Approved
load transfer
Wed, May 16, 2018 17:00 1 Possible Sub to other Auto Approved
load condition
Wed, May 16, 2018 16:00 1 Possible Sub to wind and load Approved
condition
Wed, May 16, 2018 17:00 1 Possible Sub to PUSHEP Approved
generation
Wed, May 16, 2018 16:00 1 Possible Approved in 142nd Approved
OCC Slno.192
Wed, May 16, 2018 17:00 1 Possible Sub to grid condition Approved
Wed, May 16, 2018 17:00 1 Possible Sub to other Autos Approved
load condition
Wed, May 16, 2018 17:00 1 Possible Sub to TSD relief and Approved
load transfer
Wed, May 16, 2018 16:00 1 Possible Idly charged line Approved
Wed, May 16, 2018 17:00 1 Possible Sub to grid condition Approved
Thu, May 17, 2018 14:00 1 Possible Other #s will cater the Approved
load
Thu, May 17, 2018 17:00 1 Possible Approved in 142nd Approved
OCC Sl no.200
Thu, May 17, 2018 17:00 1 Possible Sub to load condition Approved
Thu, May 17, 2018 14:00 1 Possible Other #s will cater the Approved
load
Thu, May 17, 2018 17:00 1 Possible #1 will be in service Approved
Thu, May 17, 2018 14:00 1 Possible Sub to TSD relief and Approved
other autos load
condition
Thu, May 17, 2018 17:00 1 Possible Other #s will cater the Approved
load
Thu, May 17, 2018 14:00 1 Possible Sub to Pollachi TSD Approved
Thu, May 17, 2018 17:00 1 Possible Sub to grid condition Approved
Thu, May 17, 2018 17:00 1 Possible Other #s will cater the Approved
load
Thu, May 17, 2018 17:00 1 Possible Other #s will cater the Approved
load
Thu, May 17, 2018 17:00 1 Possible Sub to Ingur Auto Approved
load condition and
wind condition
Thu, May 17, 2018 17:00 1 Possible Sub to load condition Approved
Thu, May 17, 2018 17:00 1 Possible Other #s will cater the Approved
load
Thu, May 17, 2018 17:00 1 Possible Other #s will cater the Approved
load
Thu, May 17, 2018 17:00 1 Possible Other #s will cater the Approved
load
Thu, May 17, 2018 14:00 1 Possible Sub to Pollachi TSD Approved
Fri, May 18, 2018 17:00 1 Possible Sub to # kept radial Approved
from Other end
Fri, May 18, 2018 17:00 1 Possible Sub to TSD relief Approved
Fri, May 18, 2018 16:00 1 Possible Sub to other Autos Approved
load condition
Fri, May 18, 2018 14:00 1 Possible Sub to TSD relief Approved
Fri, May 18, 2018 14:00 1 Possible Sub to TSD relief Approved
Fri, May 18, 2018 17:00 1 Possible Sub to other Autos Approved
load condition and
TSD relief
Fri, May 18, 2018 17:00 1 Possible Sub to grid condition Approved
Fri, May 18, 2018 14:00 1 Possible Sub to TSD relief and Approved
load transfer
Fri, May 18, 2018 17:00 1 Possible Sub to TSD relief Approved
Fri, May 18, 2018 14:00 1 Possible Sub to TSD relief Approved
Fri, May 18, 2018 17:00 1 Possible Sub to grid condition Approved
Fri, May 18, 2018 17:00 1 Possible Sub to load condition Approved
Fri, May 18, 2018 17:00 1 1,2,3,4) Possible Sub to load condition Approved
and TSD relief
Fri, May 18, 2018 17:00 1 Possible Sub to other autos Approved
load condition
Fri, May 18, 2018 17:00 1 Approved Sub to Grid Voltage Approved
Fri, May 18, 2018 17:00 1 Possible Sub to load condition Approved
Fri, May 18, 2018 17:00 1 Possible Sub to load condition Approved
Sat, May 19, 2018 14:00 1 Possible # kept radial from Approved
TDLR230
Sat, May 19, 2018 16:00 1 Possible Sub to TSD relief and Approved
other Auto load
condition
Sat, May 19, 2018 17:00 1 Possible Sub to Grid condition Approved
Sat, May 19, 2018 17:00 1 Possible Sub to other autos Approved
load condition
Sat, May 19, 2018 17:00 1 Possible Sub to transfer of Approved
loads to Auxillary bus
Sat, May 19, 2018 17:00 1 Possible Sub to TSD relief Approved
Sat, May 19, 2018 17:00 1 Possible Sub to TSD relief and Approved
other Auto load
condition
Sat, May 19, 2018 17:00 1 Possible Sub to load condition Approved
Sat, May 19, 2018 17:00 1 Possible Sub to TSD relief Approved
Sat, May 19, 2018 15:00 1 Possible Sub toload transfer Approved
Sat, May 19, 2018 14:00 1 Possible Sub to load condition Approved
Sat, May 19, 2018 17:00 1 Possible Sub to load condition Approved
Sun, May 20, 2018 17:00 2 Possible # kept radial from Approved
TDLR230
Sun, May 20, 2018 17:00 1 Possible Sub to grid condition Approved
Sun, May 20, 2018 17:00 1 Possible Sub to grid condition Approved
Sun, May 20, 2018 16:00 1 Possible Sub to load condition Approved
Sun, May 20, 2018 17:00 1 Possible Sub to grid condition Approved
Sun, May 20, 2018 17:00 1 Possible Sub to grid condition Approved
Mon, May 21, 2018 13:00 1 Possible Sub to grid condition Approved
Mon, May 21, 2018 17:00 1 Possible Sub to # kept radial Approved
from Other end
Mon, May 21, 2018 17:00 1 Wrong entry Cancelled
Mon, May 21, 2018 17:00 1 Possible Sub to load condition Approved
Mon, May 21, 2018 14:00 1 Approved Sub to Grid Voltage Approved
Mon, May 21, 2018 18:00 1 Possible Sub to PWD demand Approved
Mon, May 21, 2018 14:00 1 Possible Sub to TSD and Approved
transfer of loads
Mon, May 21, 2018 13:00 1 Possible Sub to load condition Approved
Mon, May 21, 2018 17:00 1 Possible Sub to # kept radial Approved
from Other end
Mon, May 21, 2018 15:00 1 Possible Sub to load condition Approved
Tue, May 22, 2018 15:00 1 Possible Sub to load condition Approved
Tue, May 22, 2018 17:00 1 Possible Sub to TSD and Approved
transfer of loads to
other end
Tue, May 22, 2018 17:00 1 Possible Interloads fed from Approved
TDLR230
Tue, May 22, 2018 14:00 1 Possible Sob to # kept radial Approved
from other end
Tue, May 22, 2018 14:00 1 Possible Line lc sub to EHT Approved
concurrence
Tue, May 22, 2018 15:00 1 Possible Sub to # kept radial Approved
from Other end and
transfer of traction
loads.
Tue, May 22, 2018 14:00 1 Possible Sub to # kept radial Approved
from Other end
Tue, May 22, 2018 16:00 1 Possible Sub to TSD and other Approved
autos load condition
Tue, May 22, 2018 17:00 1 Possible Sub to grid condition Approved
Tue, May 22, 2018 14:00 1 Possible Other #s will cater the Approved
load
Tue, May 22, 2018 17:00 1 Possible Sub to load condition Approved
Tue, May 22, 2018 17:00 1 1,2) Possible 1,2) Sub to TSD and Approved
other Autos load
condition
Tue, May 22, 2018 17:00 1 Possible Sub to # kept radial Approved
from other end
Tue, May 22, 2018 15:00 1 Possible sub to # kept radial Approved
form Mettue end
Wed, May 23, 2018 15:00 1 Possible Sub to load condition Approved
Wed, May 23, 2018 15:00 1 Possible Sub to transfer of Approved
Thumbipadi110 to
KRT
Wed, May 23, 2018 17:00 1 Possible Sub to load condition Approved
Wed, May 23, 2018 17:00 1 Possible Sub to # kept radial Approved
from Gobi end
Wed, May 23, 2018 17:00 1 Possible Standby unit Approved
Wed, May 23, 2018 16:00 1 Possible Sub to other autos Approved
load condition
Wed, May 23, 2018 17:00 1 Possible Other #s will cater the Approved
load
Wed, May 23, 2018 14:00 1 Possible Sub to # kept radial Approved
from other end
Wed, May 23, 2018 16:00 1 Postponed TSD relief Subject to
insufficient EE/SLDC
concurrence
Wed, May 23, 2018 17:00 1 1,2) Possible Sub to TSD and other Approved
Auto load condition
Wed, May 23, 2018 16:00 1 Possible Other #s will cater the Approved
load
Wed, May 23, 2018 15:00 1 Possible Sub to load condition Approved
Wed, May 23, 2018 17:00 1 Possible Sub to TSD and # Approved
kept radial from other
end
Wed, May 23, 2018 17:00 1 Possible Sub to Karuppur TSD Approved
and transfer of
Hasthampatty to
SLM 230 After
availing Autolc
Wed, May 23, 2018 17:00 1 Possible Sub to load condition Approved
Wed, May 23, 2018 17:00 1 Possible Sub to load condition Approved
Wed, May 23, 2018 17:00 1 Possible Sub to load condition Approved
Thu, May 24, 2018 17:00 1 Possible Sub to grid condition Approved
Thu, May 24, 2018 14:00 1 Possible Sub to # kept radial Approved
from other end
Thu, May 24, 2018 14:00 1 Possible Sub toLoad condition Approved
Thu, May 24, 2018 17:00 1 Possible Sub to load condition Approved
Thu, May 24, 2018 17:00 1 1,2) Possible 1) Sub to TSD 2) Approved
Approved in 142nd
OCC Slno.196
Thu, May 24, 2018 14:00 1 Possible Sub to TSD and # Approved
kept radial from other
end
Thu, May 24, 2018 17:00 1 Possible Sub to other autos Approved
load condition
Thu, May 24, 2018 17:00 1 Possible Sub to load condition Approved
Fri, May 25, 2018 17:00 1 Possible Sub to # kept radial Approved
fofrom other end
Fri, May 25, 2018 17:00 1 Possible Sub to load transfer Approved
Fri, May 25, 2018 17:00 1 Possible Sub to wind and load Approved
condition
Fri, May 25, 2018 16:00 1 Possible Sub to # kept radial Approved
from other end
Fri, May 25, 2018 16:00 1 Possible Sub to wind and load Approved
condition
Fri, May 25, 2018 17:00 1 Possible Sub to grid condition Approved
Fri, May 25, 2018 17:00 1 Possible Sub to # kept radial Approved
from other end
Sat, May 26, 2018 17:00 1 Possible Sub to TSD and Approved
Transfer of traction
loads
Sat, May 26, 2018 17:00 1 Possible Sub to TSD relief and Approved
load transfer
Sat, May 26, 2018 17:00 1 Possible Approved in 142nd Approved
OCC Slno.229
Sun, May 27, 2018 17:00 1 Possible Sub to grid condition Approved
Sun, May 27, 2018 16:00 1 Possible Sub to load condition Approved
Mon, May 28, 2018 14:00 1 Possible Sub to load condition Approved
Mon, May 28, 2018 17:00 1 Possible Sub to # kept radial Approved
from other end
Mon, May 28, 2018 17:00 1 Possible Sub to normalisation Approved
of ICT 4 at KRT
Mon, May 28, 2018 17:00 1 Possible Sub to load condition Approved
Mon, May 28, 2018 17:00 1 Possible Sub to Ingur110 TSD Approved
Mon, May 28, 2018 14:00 1 Possible Sub to load condition Approved
Mon, May 28, 2018 17:00 1 Possible Sub to grid condition Approved
Mon, May 28, 2018 17:00 1 Possible Sub to # kept radial Approved
from other end
Tue, May 29, 2018 17:00 1 Possible Sub to Load transfer Approved
Tue, May 29, 2018 17:00 1 Possible Sub to load condition Approved
Tue, May 29, 2018 17:00 1 Possible Sub to load condition Approved
Tue, May 29, 2018 17:00 1 Possible Sub to load condition Approved
Tue, May 29, 2018 17:00 1 Possible Sub to grid condition Approved
Tue, May 29, 2018 15:00 1 Approved Sub to Grid Voltage Approved
Tue, May 29, 2018 16:00 1 Possible Sub to load condition Approved
Tue, May 29, 2018 17:00 1 Possible All loads will be in Approved
Bus B
Tue, May 29, 2018 17:00 1 Possible Sub to load condition Approved
Tue, May 29, 2018 17:00 1 Possible Sub to # kept radial Approved
form other end
Wed, May 30, 2018 14:00 1 Possible # 1 will feed the Approved
traction loads
Wed, May 30, 2018 14:00 1 Possible # 1 will feed the Approved
traction loads
Wed, May 30, 2018 17:00 1 Possible Standby unit Approved
Wed, May 30, 2018 17:00 1 Possible Sub to load condition Approved
Wed, May 30, 2018 16:00 1 Postponed Load transfer not Subject to
feasible EE/SLDC
concurrence
Wed, May 30, 2018 16:00 1 Possible Sub to load transfer Approved
Wed, May 30, 2018 17:00 1 Possible Sub to other Autos Approved
load condition
Wed, May 30, 2018 17:00 1 Possible All loads in main bus Approved
Wed, May 30, 2018 17:00 1 Possible Sub to load condition Approved
Wed, May 30, 2018 17:00 1 Possible Sub to grid condition Approved
Thu, May 31, 2018 17:00 2 Possible 2 days continuous lc. Approved
Sub to Kundah
generation
Thu, May 31, 2018 17:00 1 Possible Sub to # kept radial Approved
from other end
Conso
2 Madurai 230 KV SEMBATTY 230 110KV Capacitor bank I & II Bkr and CTs one by
KV one
4 Madurai 400 KV kanarpatti 400 400kv Abishekapatti feeder entire with Bay no
KV 401 &402
5 Madurai 230 KV THIRUVARUR Capacitor Bank - II
230 KV
25 Madurai 230 KV KARAIKUDI 230 230KV KKDI- KVNR-‘1’ # Bkr & Ct’s
KV and Entire line
26 Madurai 230 KV SEMBATTY 230 230KV Auto III, HV III and LV III
KV
27 Madurai 230 KV SEMBATTY 230 110KV SBT - AKL II # sec. bet. Kosavapatti and
KV V.K.Patti SS
33 Madurai 230 KV KAYATHAR 230 on 110 KV Kayathar GC Breaker with CT & 66Kv
KV Kovilpatti breaker
37 Madurai 230 KV ALUNDUR 230 230KV Alundur -Trichy I feeder breaker, CT'S,
KV CVT'S and line isolators.
44 Madurai 230 KV PASUMALAI 230 230 KV Pasumalai - Alagarkoil # BKR & CT, LI
KV only
45 Madurai 230 KV then I 230 KV 230 KV Auto Transformer II , HV & LV Breaker
with CT only.
46 Madurai 230 KV then I 230 KV 110 KV Theni -Periyar # III (section between
Theni SS to SR Puram WF SS)
57 Madurai 230 KV SANKANERI 230 230kv Sankaneri - Kayathar # breaker CTs and
KV Line Swiches.
58 Madurai 230 KV KAYATHAR 230 on 110 KV Kayathar - N.S.Puram breaker with
KV CT, lines section between kayathar and
vijayapuri
59 Madurai 400 KV kamuthi 400 KV 400KV Future and Tie Breaker with CT Bay
No:402 & 403
60 Madurai 230 KV TUTICORIN TTPS- II FEEDER
-AUTO 230 KV
61 Madurai 230 KV TUTICORIN On 230KV Auto - TTPS -II feeder Entire.
-AUTO 230 KV
65 Madurai 230 KV ALUNDUR 230 230KV Alundur -Trichy II feeder breaker, CT'S,
KV CVT'S and line isolators.
69 Madurai 230 KV PUGALUR 230 110KV Pugalur - Puliyur Feeder Breaker, CTs
KV only.
74 Madurai 230 KV PASUMALAI 230 230 KV Pasumalai - Checkanurani # BKR & CT,LI
KV only
75 Madurai 230 KV PASUMALAI 230 110 KV Pasumalai - (Tirumangalam)
KV -Kinnimangalam 3 # BKR & CT,LI only. section
between Pasumalai and Kappalur SS
82 Madurai 230 KV KARAIKUDI 230 110KV KKDI-link #Bkr & Ct’s and # entire
KV
83 Madurai 230 KV KARAIKUDI 230 230KV KKDI-NT.Kudi feeder entire
KV
91 Madurai 400 KV kamuthi 400 KV 110KV Uthumalai Feeder Breaker & CT Bay No
108
100 Madurai 230 KV ALUNDUR 230 110KV Alundur - Thanjavur Feeder breaker,CT's,
KV and Isolators Line section between 110 KV
Ambigapuram SS.
107 Madurai 230 KV kumbakonam 110 KV Sakkottai - I feeder Breaker, CT's, CVT
230 KV and 110 KV line side isolator
119 Madurai 230 KV KAYATHAR 230 110 KV Kayathar - Suruliyar # breaker with CT,
KV Lines section between Kayathar and
sankarankovil
120 Madurai 400 KV kamuthi 400 KV 400KV Bus I
123 Madurai 230 KV ANUPPANKULAM 230 KV Anuppankulam - Madurai feeder Br., CT.,
230 KV and Line switch only.
124 Madurai 230 KV KAYATHAR 230 110 KV Kayathar - Suruliyar # breaker with CT,
KV Lines section between Kayathar and
sankarankovil
125 Madurai 230 KV ALUNDUR 230 110KV Alundur - Trichy-I Feeder breaker,CT's,
KV and Line Isolators.
131 Madurai 230 KV EACHANGADU 230 KV Bus Coupler Breaker & B'Bus CVT Only
230 KV
132 Madurai 230 KV TRICHY 230 KV 110KV TRICHY - ALUNDUR I Feeder breaker,
CTs and line isolators and line entire
133 Madurai 230 KV TRICHY 230 KV 110KV TRICHY - ALUNDUR I Feeder breaker,
CTs and line isolators and line entire
134 Madurai 230 KV RENGANATHAPU 110KV RNPM - Kovilur # Breaker & CT's and
RAM 230 KV section between RNPM & Kovilur SS
141 Madurai 230 KV SEMBATTY 230 1. 110KV Theni I # Bkr, CTs and sec. bet. SBT
KV and Ayyampalayam SS. 2. 110KV Theni II # Bkr,
CTs and sec. bet. SBT and Nilakottai SS
144 Madurai 230 KV SANKANERI 230 230/110 K.V. AUTO TRANSFORMER -I H.V and
KV L.V Breakers.
146 Madurai 230 KV TUTICORIN On 230/110 KV Auto-I, HV-I and LV-I breakers
-SIPCOT 230 KV with CTs and LAS ,
152 Madurai 230 KV ANUPPANKULAM 100 MVA AUTO TR. II, HV-II and LV-II Breaker
230 KV with CT only.
153 Madurai 230 KV NALLAPPANAYA 110KV Kodikuruchi # Breaker with CT
KANPATTY 230
KV
155 Madurai 230 KV KAYATHAR 230 On 230 KV Kayathar - TTN AUTO #, breaker
KV with CT and entire line
161 Madurai 230 KV PUGALUR 230 110 KV Pugalur - Karur feeder Breaker, CTs
KV only.
164 Madurai 230 KV THANJAVUR 230 230 KV Thanjavur - Thiruvarur feeder, Breaker,
KV CT, CVT & Line Isolator.
168 Madurai 230 KV PASUMALAI 230 100 MVA AUTO - 2, HVB - II, LVB - II, CT only.
KV
169 Madurai 230 KV PASUMALAI 230 1)110KV Pasumalai - Alagarkoil -1 # BKR & CT,
KV LI . 2) Lines LC section between Pasumalai
-Vandiyur SS.
170 Madurai 230 KV PASUMALAI 230 1)110KV Pasumalai - Sakthi Sugars # BKR & CT,
KV LI . 2)Line LC section between Pasumalai and
Uranganpatty
171 Madurai 230 KV CHECKANURANI 230 KV Checkanurani-Kinnimanglam feeder
SW STATION entire
230 KV
172 Madurai 230 KV then I 230 KV 110 KV Theni- Kinnimangalam I &II # Breaker
with CT only ( One by one )
179 Madurai 230 KV KAYATHAR 230 110 KV Kayathar - Anupankulam # breaker with
KV CT, Lines section between Kayathar and
duraisamypuram SS
180 Madurai 400 KV kamuthi 400 KV 400KV Kayathar I Feeder Main Breaker 407(52)
181 Madurai 230 KV SRPUDUR 230 110 KV SRP-NGL # Br,CT,Line Switch and Line
KV entire
187 Madurai 230 KV PUGALUR 230 230 KV Pugalur - Paramathy I feeder Breaker,
KV CT & line switch& entire line only.
188 Madurai 230 KV PUGALUR 230 230 KV Pugalur - Pudansanthai feeder Breaker,
KV CT, Line switch
197 Madurai 230 KV then I 230 KV 230 KV Auto Transformer III , HV & LV Breaker
with CT only.
198 Madurai 230 KV kinnimangalam 110KV KNMLM PASUMALAI III #
230 KV
207 Madurai 230 KV SRPUDUR 230 110 KV KDR PH I and KDR PH II Link feeder
KV
210 Madurai 230 KV ANUPPANKULAM 110 KV Capacitor Bank - II Br., CT. and line
230 KV switch only.
216 Madurai 110 KV Uthumalai 110 110KV Uthumalai - Vannikonendal Breaker with
KV CTs
217 Madurai 230 KV SAMAYAPURAM 1.230 KV Samayapuram-Trichy feeder CT’s,
230 KV 2.230 KV Samayapuram-Poyyur feeder CT’s,
3.Auto-I HV & LV CT’s, (One after one)
218 Madurai 230 KV ALUNDUR 230 L.C. on 230KV Alundur - Mondipatty Feeder
KV Breaker CT'S,CVT's and Line isolators.
222 Madurai 230 KV THIRUVARUR 230KV BUS II LC and Transfer of Main Bus
230 KV I to II
225 Madurai 230 KV PUDUKOTTAI 110 KV Alangudi breaker, CT, Isolator and
230 KV 110KV Alangudi feeder Line portion between
110KV Alangudi - Malaiyur SS
226 Madurai 230 KV THANJAVUR 230 110 KV Thanjavur - NTKudi feeder, breaker, CT
KV & LI (Line portion between Thanjavur 230
KV SS and Eachankottai 110 KV SS)
231 Madurai 230 KV PASUMALAI 230 100 MVA AUTO - 1, HVB - I, LVB - I, CT only.
KV
243 Madurai 230 KV UDAYATHUR 230/33kv Power Tr1,HV & LV breaker and 33kv
230 KV SIL fdr 1to 4 and 33kv BUs 1.
244 Madurai 230 KV SANKANERI 230 110K.V Sankaneri Melakallur # Breaker, CTs and
KV Line Switches.
246 Madurai GENERATING PAPANASAM 110KV Papanasam - KYTR feeder breaker with
STATIONS CT.
247 Madurai 400 KV kamuthi 400 KV 400KV Kayathar II feeder Main Breaker 409(52)
256 Madurai 230 KV THIRUVARUR Auto Transformer II, HV, LV and CTs
230 KV
261 Madurai 230 KV PASUMALAI 230 1)110 KV Alagarkoil - Sembatty Feeder Bkr, CT
KV & LI only 2)Line LC section between
Samayanallur SS and Ammaiyanaickanur
SS
262 Madurai 230 KV then I 230 KV 230 KV Theni-Sempatty # Br., C.T and line
isolator
263 Madurai 230 KV CHECKANURANI 110 KVAlagarkoil -Sempattti feeder section
SW STATION between sholavanthan to Amainaikanur
230 KV
264 Madurai 230 KV kinnimangalam 1. 230 KV KNMLM – TTPS # Breaker 2. 230 KV
230 KV KNMLM – CKNI # Breaker 3. 230 KV KNMLM –
KAYATHAR # Breaker 4. 230KV KNMLM – PSQ #
Breaker 5. 230KV BUS SECTION 1 Breaker 6.
230KV BUS SECTION 2 Breaker 7. 230KV BUS
COUPLER (one by one)
265 Madurai 230 KV SEMBATTY 230 230KV Theni # Bkr, CTs and line entire
KV
266 Madurai 230 KV KODIKURICHY Auto Transformer - I
230 KV
267 Madurai 230 KV VEERANAM 230 Power Transformer-I,HV-I,LV-I and 33KV
KV Feeders Micon 3,4&5.
268 Madurai 230 KV SANKANERI 230 230/33K.V. Powertransformer-III H.V and L.V
KV Breakers.
269 Madurai 230 KV KAYATHAR 230 110 KV kayathar - Kodikurichi #, breaker with
KV CT and Lines section between Kayathar and
Therkupatty
272 Madurai 230 KV ANUPPANKULAM 100 MVA AUTO TR. III, HV-III and LV-III
230 KV Breaker and C.T. only.
273 Madurai 230 KV THIRUVARUR 110KV Thiruvarur - Mannargudy Feeder LC
230 KV
276 Madurai 230 KV TRICHY 230 KV 100MVA Auto Transformer I, LV I BR, HV & LV
LAS, LV CTs and Isolators.
283 Madurai 230 KV RENGANATHAPU 1) Auto Transformer - I Breaker , CT's & Relays
RAM 230 KV 2) 110KV RNPM -SBT I # Breaker , CT's &
Relays. 3)Section b/w RNPM and Minukkampatty
284 Madurai 230 KV KARAIKUDI 230 230KV G.C Breaker & Ct’s
KV
285 Madurai 230 KV SEMBATTY 230 230KV Myvadi # Bkr, CTs and line entire
KV
287 Madurai 230 KV STERILITE SW On 230 KV Sipcot- CKNRI feeder breaker with
STATION 230 KV CTs and line isolators only. (Th’ Bus Transfer
Breaker)
288 Madurai 230 KV SRPUDUR 230 100 MVA AUTO TR I HV I & LV I Br
KV
289 Madurai 230 KV ANUPPANKULAM 110 KV NNPT - Reddiapatty feeder section
230 KV between 110 KV Reddiapatti SS and 110 Kv
SIVAKASI ESI SS
294 Madurai 230 KV NALLAPPANAYA 110KV Rajapalayam feeder breaker with C.T
KANPATTY 230
KV
295 Madurai 230 KV KODIKURICHY 110 KV Kodikuruchi-Tenkasi-Papanasam Feeder
230 KV section between 110 KV Kadayam SS
-Rastha-Papanasam PH
297 Madurai 230 KV KAYATHAR 230 110 KV Melakkallur - Thalayuthu # breaker with
KV CT and lines section between Talayuthu and
Palayapettai
298 Madurai 230 KV SAMAYAPURAM 230KV Samayapuram - Poyyur # Breeaker CT's
230 KV and Line Isolator and entire line
299 Madurai 230 KV ALUNDUR 230 110KV Capacitar Bank- I & II breaker,CT's, and
KV Isolators.
300 Madurai 230 KV ALUNDUR 230 100 MVA Auto Transformer - I ,HV-I,LV-I
KV Breaker's, CT's and Isolators.
301 Madurai 110 KV Thanjavur 110 110 kv TJR-Thiruvarur feeder Br and its line
KV isolator
315 Madurai 230 KV KARAIKUDI 230 230KV KKDI- KVNR-‘2’ # Bkr &
KV Ct’s - entire #
316 Madurai 230 KV KAVANOOR 230 230KV KAVANOOR-KARAIKUDI #2
KV
317 Madurai 230 KV VEERANAM 230 230kv veeranam - kodikurichi - I feeder
KV breaker,current transformer with lineswitch
322 Madurai 400 KV kamuthi 400 KV 400/230KV ICT I Main,Tie Breakers with CT &
Transformer Bay NO 404 , 405.
323 Madurai 230 KV TUTICORIN 110kv arumuganeri- II feeder
-AUTO 230 KV
325 Madurai 230 KV ANUPPANKULAM 110 KV APKM - RJPM - I feeder Br., CT. and Line
230 KV switch only.
326 Madurai 230 KV KAYATHAR 230 On 230/110 KV Auto Transformer III, HV III and
KV LV III, breaker with CT
327 Madurai 230 KV ALUNDUR 230 230KV Alundur - Thanjavur-I Feeder Breaker,
KV CT's, CVT's, Line Isolators and 230 KV "B" Bus
entire at Alundur end.
331 Madurai 230 KV EACHANGADU 110KV ICL-II & ICL-I ( Radial feeders) feeder
230 KV Breaker and CT's only One by one.
332 Madurai 230 KV THANJAVUR 230 230 KV Thanjavur - Alundur-1 feeder, Breaker,
KV CT, CVT & LI
333 Madurai 230 KV TRICHY 230 KV 100MVA Auto Transformer III, LV III BREAKER,
LAS, CTs and ,LV III I/C Isolator.
335 Madurai 230 KV PASUMALAI 230 1)110 KV Pasumalai - Alagarkoil-II # BKR &
KV CT,LI only. 2)Line LC section between Pasumalai
- Anaiyur
336 Madurai 230 KV then I 230 KV 110 KV Theni – Rasingapuram # Breaker with
CT & line
340 Madurai 230 KV RENGANATHAPU 1.110KV RNPM - SBT II #Breaker & CT's.
RAM 230 KV
350 Madurai 230 KV KAYATHAR 230 On 230 KV Kayathar - TTPS I #, breaker with CT
KV and entire line
351 Madurai 230 KV KAYATHAR 230 110 KV Kayathar- Talayuthu Express feeder
KV breaker CT entire
352 Madurai 230 KV KAYATHAR 230 110 KV Melakkallur- Sankanery feeder breaker,
KV CT and Line section between Melakkallr and
Karisal patti
353 Madurai 230 KV ALUNDUR 230 230KV Alundur - Thanjavur-II Feeder Breaker,
KV CT's, CVT's and Line Isolators.
359 Madurai 230 KV TRICHY 230 KV 1. 110KV Trichy - Kovilur feeder breaker, CTs,
line isolator and Line portion between 230KV SS
Trichy and 110KV Kavalkaranpatti SS.
362 Madurai 230 KV PASUMALAI 230 110 KV Pasumalai - Kinnimangalam - 2 # BKR &
KV CT,LI only.
363 Madurai 230 KV CHECKANURANI 230 KV Checkanurani -Sembatty feeder entire
SW STATION
230 KV
364 Madurai 230 KV then I 230 KV 110 KV Theni -Periyar # II (section between
Cumbum & C.O.Puram Thevaram spur line )
366 Madurai 230 KV SEMBATTY 230 230KV CKNI # Bkr, CTs and line entire
KV
367 Madurai 230 KV SEMBATTY 230 110KV RNPM III # BHkr and CTs only
KV
368 Madurai 230 KV RENGANATHAPU 230KV RNPM - PGLR # Breaker and CT's
RAM 230 KV
372 Madurai 230 KV UDAYATHUR 230/33kv Power Tr.2 HV & LV breaker and 33kv
230 KV SRSPL , SRL, Sapthagiri& red phonix fdrs & 33kv
Bus 2
375 Madurai 230 KV KAYATHAR 230 110 KV Main Bus beyond switch no.52
KV
376 Madurai 400 KV kamuthi 400 KV 400/230KV ICT II Main,Tie Breakers with CT &
Transformer Bay No 405 , 406.
377 Madurai 230 KV ANUPPANKULAM 230 KV Anuppankulam - Sterlite feeder Br., CT.,
230 KV and Line Entire.
379 Madurai 110 KV ANUPPANKULAM a)110KV GC OMCB AT 110KV APK SS. b)110kv
230 KV TKPT-APK # section between 110kv MRPM &
APK SS
380 Madurai 230 KV KAYATHAR 230 On 230 KV Kayathar - TTPS II #, breaker with
KV CT, Lines Inspection
381 Madurai 230 KV THIRUVARUR 110KV Thiruvarur - Narimanam - II feeder LC
230 KV
384 Madurai 230 KV TRICHY 230 KV 100MVA Auto Transformer II, HV II & LV II BRs,
HV II & LV II and their LAS,CTs and isolators.
386 Madurai 110 KV SIVAGANGA 110 (a)110KV Sivaganga - Karaikudi breaker with CT
KV and Relay test. (b)110KV Sivaganga - Kavanoor
breaker with CT and Relay test.
388 Madurai 230 KV PASUMALAI 230 1)110 KV Pasumalai - Anupankulam # BKR &
KV CT, LI only. 2)Line Entire
391 Madurai 230 KV SEMBATTY 230 1. 110KV RNPM II # Sec. bet. Gandhigramam
KV SS and RNPM 230KV SS 2. 110KV Mondipatti #
Bkr, CTs and sec. bet SBT and Sengurichi SS
392 Madurai 230 KV VALUTHUR 230 110 KV Valuthur - ARKAY II feeder entire
KV
393 Madurai 230 KV RENGANATHAPU 110KV RNPM -SBT III # Breaker , CT's, Relays
RAM 230 KV and line switch.
397 Madurai 230 KV UDAYATHUR 230kv Auto Tr, HV & LV br, 11okv Bus,
230 KV 110kv Radapuram fdr, Br, 110kv
Sankaneri Fdr Br & 110kv
Samugarengapuram Fdr Br
400 Madurai 230 KV KAYATHAR 230 110 KV Kayathar - Papanasam # breaker with
KV CT only
406 Madurai 230 KV ANUPPANKULAM 110 KV APKM - MADURAI # Br., CT., and line
230 KV Entire.
407 Madurai 230 KV ANUPPANKULAM 110 KV APKM - PPTY # Br., CT., and line entire.
230 KV
410 Madurai 230 KV KODIKURICHY 110 KV Papanasam -Servalar Feeder 1&2 entire
230 KV line
414 Madurai 230 KV SAMAYAPURAM 230KV Bus Coupler Breaker & isolotors (idle)
230 KV
415 Madurai 230 KV ALUNDUR 230 "LC On 110KV Vadugapatty Radial Feeder with
KV solar generation."
417 Madurai 230 KV KADALANGUDI 230/110KV Auto Transformer I; HV-I; LV-I &
230 KV LAS
418 Madurai 230 KV PERAMBALUR 1)230/110KV Auto-III,HV-III,LV-III Breakers
230 KV CT'S & Isolaters only.
421 Madurai 230 KV THANJAVUR 230 110 KV Thanjavur - Alundur feeder, breaker, CT
KV & LI (Line portion between Thanjavur 230
KV SS & Thuvakudi 110 KV SS)
422 Madurai 230 KV THANJAVUR 230 1) 230 KV Eastern Bus entire, 2) 110 KV
KV Eastern Bus entire
424 Madurai 230 KV then I 230 KV " 100MVA/ TELK :MAKE 230/110 KV Auto
Transformer I , HV & LV Breakers . "
426 Madurai 230 KV PASUMALAI 230 1)110 KV Pasumalai - Sembatty Feeder BKR &
KV CT,LI only 2)Line LC section between
Achampathu and Sithargalnatham SS
432 Madurai 230 KV SANKANERI 230 110KV Sankaner- koodankulam feeder Breaker
KV CTs & Lineswitches.
436 Madurai 230 KV SAMAYAPURAM 110KV Samayapuram - Trichy Grid feeder line
230 KV portion between 110KV Valady SS and 110KV
Thiruvanaikoil SS.
448 Madurai 230 KV RENGANATHAPU 230KV RNPM - CKNI # Breaker , CT's & Relays
RAM 230 KV
453 Madurai 230 KV KODIKURICHY 230 KV Veeranam # -II Breaker with CT & Line
230 KV Isolators
454 Madurai 400 KV Kayathar 400kv 400 KV Main Breaker for ICT2 (410-52) 400KV
Tie Breaker for ICT2 & ICT3 (411-52) & 230 KV
LV Breaker for ICT2 (206-52), 400/230KV ICT2
455 Madurai 230 KV SAMAYAPURAM 110 KV SMPM- Srirangam # Breaker and CT's
230 KV only (Tied feeder)
456 Madurai 400 KV kamuthi 400 KV 110KV Manur feeder Breaker with CT and Line
isolator Bay No 102.
461 Madurai 230 KV ANUPPANKULAM 100 MVA AUTO TR. I, HV-I and LV-I Breaker and
230 KV C.T. only.
469 Madurai 230 KV kumbakonam 110 KV Sakottai -II feeder, CT's, CVT and line
230 KV side Isolators.
470 Madurai 230 KV KADALANGUDI 110KV Kadalangudy- Mayiladuthurai feeder
230 KV entire
471 Madurai 230 KV KADALANGUDI 230/110KV Auto Tranformer II; HV-II; LV-II &
230 KV LAS
474 Madurai 230 KV PUGALUR 230 Auto transformer III, HV III and LV III
KV Breaker,CT's and LAS only.
475 Madurai 230 KV EACHANGADU 230 KV Eachangadu-Poyyur #, BREAKER, CT's,
230 KV &LINE CVT
476 Madurai 230 KV THANJAVUR 230 110KV Punnalkulam - Trichy feeder (Line
KV portion between 110KV Punnalkulam Grid
SS & 110KV Veeramarasenpettai SS)
478 Madurai 230 KV TRICHY 230 KV 110 KV Trichy – Punalkulam feeder Breaker,
CTs & line isolator and line portion between
230KV SS Trichy and 110KV Mathur SS
only.
483 Madurai 230 KV SEMBATTY 230 230KV Karaikudi # Bkr and CTs
KV
484 Madurai 230 KV KODIKURICHY 110 KV Kadayanallur # Breaker with CT & Line
230 KV Isolators
489 Madurai 230 KV KAYATHAR 230 110 KV Kayathar - Kodayar # breaker with CT
KV and lines section between kayathar and
veeravanallur
490 Madurai 400 KV kamuthi 400 KV 400/110KV ICT III Main,Tie & LV Breakers with
CT & Transformer Bay NO 410 , 411 & 101.
493 Madurai 230 KV ANUPPANKULAM 110 KV K.G. Patti - Kayathar feeder section
230 KV between 110 KV Perumal patti SS and 110 KV
Mudangiar SS.
494 Madurai 110 KV Uthumalai 110 110KV Uthumalai - Veerasigamani breaker with
KV CTs
495 Madurai 230 KV ALUNDUR 230 110KV Alundur - Trichy-II Feeder breaker,CT's,
KV and Line Isolators.
496 Madurai 230 KV Mondipatti 110KV Mondipatty - Sembatty feeder Breaker,
230KV CT's., Line isolator and line section between
110 KV Vaiyampatty SS and 230 KV
Mondipatty SS
501 Madurai 230 KV PUGALUR 230 230 KV Pugalur - Paramathy II feeder Breaker,
KV CT & line switch & entire line only.
503 Madurai 230 KV PUDUKOTTAI Auto I, HVI, LVI, Breaker, CT, Isolator
230 KV
504 Madurai 230 KV THANJAVUR 230 110 KV & 230 KV Bus-Coupler breakers (one by
KV one)
505 Madurai 230 KV TRICHY 230 KV 110KV Trichy – Srirangam feeder Breaker,
CTs, line isolator and line portion between
230KV Trichy SS and 110KV Kambarasampettai
SS only.
506 Madurai 230 KV TRICHY 230 KV 110KV TRICHY - ALUNDUR II breaker, CTs &
Line Isolator and line entire.
507 Madurai 230 KV PASUMALAI 230 230 KV Pasumalai - Kayathar #, BKR & CT,LI
KV only.
508 Madurai 230 KV CHECKANURANI 230 KV Checkanurani-TTPS #
SW STATION
230 KV
509 Madurai 230 KV VALUTHUR 230 Auto Transformer III
KV
511 Madurai 230 KV KARAIKUDI 230 110KV KKDI-DVKT BKR & CT’s & Line S/B
KV KKDI-DVKT
515 Madurai 230 KV UDAYATHUR 230kv Kayathar feeder Br., CT , CVT & Line Sw.
230 KV
520 Madurai 230 KV NALLAPPANAYA 230/110 KV Auto II, 230KV HV Breaker II with
KANPATTY 230 CT, 110KV LV Breaker II with CT
KV
521 Madurai 230 KV NALLAPPANAYA 110KV Thottiapatti feeder breaker with C.T
KANPATTY 230
KV
526 Madurai 230 KV KAYATHAR 230 110 KV Melakkallur - Thalayuthu # breaker with
KV CT and lines section between Melakkallur and
Palayapettai
527 Madurai 230 KV KADALANGUDI 110KV Vaitheeswarankoil- Manalmedu- LTPCL
230 KV feeder entire
531 Madurai 230 KV THANJAVUR 230 110 KV Thanjavur - Punalkulam feeder, breaker,
KV CT & LI (Line portion between Thanjavur 230 KV
SS and Punalkulam 110 KV Grid SS)
533 Madurai 230 KV PASUMALAI 230 230 KV Pasumalai - TTPS #, BKR & CT,LI only.
KV
534 Madurai 230 KV CHECKANURANI 230 KV Checkanurani - Nallamanaikanpatty
SW STATION feeder entire
230 KV
535 Madurai 230 KV then I 230 KV 230 KV Theni – Moozhiyar # Breaker with
CT.& Line
536 Madurai 230 KV SEMBATTY 230 110KV Bus section III Bkr, Capacitor bank
KV PT and Bus section III
537 Madurai 230 KV VALUTHUR 230 110 KV Valuthur - ARKAY I feeder entire
KV
538 Madurai 230 KV KARAIKUDI 230 110KV KKDI –SVGA# S/B MPTY- SVGA
KV
539 Madurai 230 KV KODIKURICHY 110 KV Kodikurichi WF # Breaker with CT & Line
230 KV Isolators
541 Madurai 400 KV Kayathar 400kv 400 KV Main Breaker for ICT3 (412-52), 400 KV
Tie Breaker for ICT2 & ICT3 (411-52), 230KV LV
Breaker for ICT3 (203-52). 400/230KV ICT3
545 Madurai 230 KV KAYATHAR 230 110 KV Kayathar - O.T.Patty # breaker with CT,
KV Lines section between kayathar and
seethaparpanallur
546 Madurai 400 KV kamuthi 400 KV 400/110KV ICT IV Main,Tie & LV Breakers with
CT & Transformer Bay No 411 , 412 & 106.
552 Madurai 230 KV ALUNDUR 230 230KV Alundur - Paramathy Feeder Breaker,
KV CT's, CVT's and Line Isolators.
553 Madurai 230 KV ALUNDUR 230 100 MVA Auto Transformer - II ,HV-II,LV-II
KV Breaker's, CT's and Isolators.
560 Madurai 230 KV TRICHY 230 KV 110KV Trichy – Srirangam feeder Breaker,
CTs, line isolator and line portion between
230KV Trichy SS and 110KV Kambarasampettai
SS only.
561 Madurai 230 KV TRICHY 230 KV 1) 110KV Northern BUS ENTIRE
563 Madurai 230 KV SRPUDUR 230 110 KV SRP-PZR feeder Br,CT,Line Switch and
KV line entire.
564 Madurai 230 KV TRICHY 230 KV 110 KV Trichy Link I & II feeder breaker , CTs &
Line Isolator and line entire one by one.
573 Madurai 230 KV KAYATHAR 230 on 110 KV Kayathar - K.G.Patti feeder breaker
KV with CT, section between Kayathar and
kalugumalai
574 Madurai 400 KV kamuthi 400 KV 400KV Bus II.
575 Madurai 230 KV TUTICORIN On 110KV Arumuganeri - SR Pudur - II Feeder.
-AUTO 230 KV (section between 110 KV Arumuganeri SS and
110 KV Koodenkulam SS)
576 Madurai 230 KV SRPUDUR 230 110 KV SRP-MPL # Br ,CT & Line switch and
KV Line section between SRP to MPL
582 Madurai 230 KV PUDUKOTTAI 230KV PDKT - Karaikudi PG Breaker, CT, Isolator
230 KV and 230KV PDKT - Karaikudi PG feeder EHT
LINE
594 Madurai 400 KV kamuthi 400 KV 110KV Alangulam feeder Breaker with CT Bay
No 111
602 Madurai 230 KV KAYATHAR 230 110 KV Melakkallur - Kodayar feeder breaker CT
KV and line entire
603 Madurai 230 KV PUGALUR 230 230 KV Paruthiyur feeder breaker, CT & Line
KV switch only
604 Madurai 230 KV PUGALUR 230 110 KV TNPL feeder breaker, CT & Line switch
KV only
612 Madurai 230 KV RENGANATHAPU 1) Auto Transformer - II Breaker , CT's & Relays.
RAM 230 KV
613 Madurai 230 KV KARAIKUDI 230 110KV G.C & 110/22 KV Power Transformer at
KV Karaikudi 230 KV Auto SS – 110/22 KV SS
614 Madurai 230 KV KARAIKUDI 230 110KV G.C & 110/22 KV Power Transformer at
KV Karaikudi 230 KV Auto SS – 110/22 KV SS
618 Madurai 400 KV kamuthi 400 KV 110KV Keelaveeranam Feeder Breaker with CT
Bay No 105
630 Madurai 110 KV RENGANATHAPU 110KV RNPM - UDPT # Breaker & CT's and
RAM 230 KV section between RNPM and Oddanchatram .
631 Madurai 230 KV KODIKURICHY 110 KV Bus section II Breaker with CT &
230 KV Isolators
632 Madurai 230 KV UDAYATHUR 230/33kv Power Tr.3 , HV &LV br., and 33kv
230 KV SRF 1 to 4 fdrs and 33kv Bus 3
633 Madurai 400 KV kamuthi 400 KV 400/110KV ICT V Main & LV Breakers with CT &
Transformer Bay NO 413 & 109.
634 Madurai 230 KV SRPUDUR 230 110 KV SRP - KDR I # section between TKY &
KV VNR
635 Madurai 230 KV KAYATHAR 230 110 KV kayathar - Vanchi Maniyachi #, Braeker
KV with CT only
636 Madurai 230 KV THIRUVARUR 230KV PPN - Thanajvur feeder LC
230 KV
637 Madurai 230 KV THANJAVUR 230 230 KV Thanjavur - PPN feeder, Breaker, CT,
KV CVT & LI
TAMIL NADU TRANSMISSION CORPORATION LIMIT
Consolidation of LC for the month of May 2018 at 16th TNS
Transmission Lines / Elements Details
Purpose From date From time To date
Monthly Maintenance works Wed, May 2, 2018 9:00 Wed, May 2, 2018
Monthly maintenance work Wed, May 2, 2018 10:00 Wed, May 2, 2018
For Monthly Maintenance Work. Wed, May 2, 2018 9:00 Wed, May 2, 2018
For Monthly maintenance and Abishekapatti Wed, May 2, 2018 10:00 Wed, May 2, 2018
feeder Relay checking work
Capacitor Bank - II maintenance work, Wed, May 2, 2018 9:00 Wed, May 2, 2018
Breaker, CT's and Isolator maintenance
work and GRT Relay testing work.
Maintenance Works of BKR & CT,LI Wed, May 2, 2018 9:00 Wed, May 2, 2018
Monthly Maintenance work, Tree clearance Wed, May 2, 2018 9:00 Wed, May 2, 2018
work,Breaker testing work.
For Monthly Mtc work. Wed, May 2, 2018 9:00 Wed, May 2, 2018
For Line Maintenance Work Wed, May 2, 2018 9:00 Wed, May 2, 2018
Monthly Mtce work Wed, May 2, 2018 9:00 Wed, May 2, 2018
Monthly maintenance works for breaker , Wed, May 2, 2018 9:00 Wed, May 2, 2018
CT and Line Isolator
For Attending Oil leak in Auto Transformer Wed, May 2, 2018 9:00 Wed, May 2, 2018
I HV and LV breakers and it's CT's and
isolators Monthly Maintenance work.
For monthly maintenance work. Wed, May 2, 2018 9:00 Wed, May 2, 2018
Tower to Tower Inspection Wed, May 2, 2018 9:00 Wed, May 2, 2018
Monthly Maintenance Work Wed, May 2, 2018 9:00 Wed, May 2, 2018
For monthly maintenance work. Wed, May 2, 2018 9:00 Wed, May 2, 2018
a) Monthly Maintenance work Wed, May 2, 2018 9:00 Wed, May 2, 2018
Line maintenance work Wed, May 2, 2018 9:00 Wed, May 2, 2018
To carry out monthly maintenance works Wed, May 2, 2018 10:00 Wed, May 2, 2018
Monthly Maintenance work. Wed, May 2, 2018 9:00 Wed, May 2, 2018
1)Tree cutting works and T-T Inspection Thu, May 3, 2018 9:00 Thu, May 3, 2018
works 2)Replacement of leopard conductor
by Panther conductor in the LILO portion to
Kappalur SS.
Monthly Maintenance of Breaker, CT 'S& Thu, May 3, 2018 9:00 Thu, May 3, 2018
GRT Relay Testing work
For Monthly Mtc work Thu, May 3, 2018 9:00 Thu, May 3, 2018
For line mtc works & attending premonsoon Thu, May 3, 2018 9:00 Thu, May 3, 2018
inspection.
Bay Monthly Maintenance work and Thu, May 3, 2018 9:00 Thu, May 3, 2018
Disc replacement work & Tower to
Tower inspection work
1. Monthly maintenance work2. Exg. Thu, May 3, 2018 10:00 Thu, May 3, 2018
differential relay replaced by new numerical
differential relay
Tree cutting work Thu, May 3, 2018 9:00 Thu, May 3, 2018
Monthly maintenance work Thu, May 3, 2018 10:00 Thu, May 3, 2018
For Monthly Maintenance Work. Thu, May 3, 2018 9:00 Thu, May 3, 2018
For Monthly Maintenance Work. Thu, May 3, 2018 9:00 Thu, May 3, 2018
For maintenance work Thu, May 3, 2018 10:00 Thu, May 3, 2018
For monthly maintenance work. Thu, May 3, 2018 9:00 Thu, May 3, 2018
For Monthly Maintenance work Thu, May 3, 2018 9:00 Thu, May 3, 2018
Monthly Maintanace work,Tree clearance Thu, May 3, 2018 9:00 Thu, May 3, 2018
work,Annual relay testing work
for replacement of defective disc at location Thu, May 3, 2018 9:00 Thu, May 3, 2018
No.38,47,52,55 and tree clearance work
a) Monthly Maintenance work Thu, May 3, 2018 9:00 Thu, May 3, 2018
a)3 Nos CTs erection work under PSDF Thu, May 3, 2018 9:00 Thu, May 3, 2018
b)Preventive Monthly maintenance work.
c)premonsoon inspection and tree cutting
work. d) Relay Testing Work.
For monthly maintenance work Thu, May 3, 2018 9:00 Thu, May 3, 2018
For monthly maintenance works . Thu, May 3, 2018 9:00 Thu, May 3, 2018
Line premonsoon inspection and Thu, May 3, 2018 9:00 Thu, May 3, 2018
rectification work, Breaker, CT's and
isolator maintenance work.
Monthly maintenance work. Thu, May 3, 2018 9:00 Thu, May 3, 2018
1) For monthly maintenance works by the Thu, May 3, 2018 9:00 Thu, May 3, 2018
AEE/Mtce/Thanjavur,2) For premonsoon
inspection works by the
AEE/Lines/Thanjavur
1. For monthly maintenance works, 2. Thu, May 3, 2018 9:00 Thu, May 3, 2018
Premonsoon inspection 3.Relay Testing
Maintenance Works of BKR & CT,LI Fri, May 4, 2018 9:00 Fri, May 4, 2018
For Monthly Mtc work Fri, May 4, 2018 9:00 Fri, May 4, 2018
TOWER TO TOWER INSPECTION AND Fri, May 4, 2018 9:00 Fri, May 4, 2018
ANNUAL RELAY TEST AT S.R.PURAM
For Tower to Tower inspection work Fri, May 4, 2018 9:00 Fri, May 4, 2018
Monthly Mtce, line patrol work. Fri, May 4, 2018 9:00 Fri, May 4, 2018
Monthly Maintenance works. Fri, May 4, 2018 9:00 Fri, May 4, 2018
1) Monthly Maintenance of Bay Fri, May 4, 2018 6:00 Fri, May 4, 2018
equipments, GRT Test. 2) Dismantling
the conductors in 1. Kayathar –
KKDI-II to Kamudhi – KKDI-II
400KV Line in b/w Loc: 532 & 317. 2.
Kayathar – KKDI-II to Kamudhi –
KKDI-I 400KV Line in b/w Loc: 533 &
317 3. Dismantling of earth wire and
OPGW cable in Kayathar – KKDI I
and II feeders in b/w loc 532 -533
Restringing the Conductors in. 1.
Kayathar – KKDI-II 400KV Line in
b/w Loc: 532 & 533 2. Kamudhi
–KKDI I and II 400 KV line in b/w
loc 317 to 318. Stringing of Earth wire
and OPGW cable by diamond crossing
in b/w loc 532 – 318-533-317-532
of Kayathar – Karaikudi I and II and
Kamudhi – Karaikudi I and II
feeders. The work should be
completed on the end of the 2nd day.
2) 230KV KKDI-KVNR III & IV New
Line stringing works b/w 323-324
1) Bay equipments Monthly maintenance Fri, May 4, 2018 8:00 Fri, May 4, 2018
works, GRT test.2) 230KV KKDI-KVNR
III & IV New line stringing works loc
b/w 324-325
230kv kkdi-kvnr III & IV # New line Fri, May 4, 2018 8:00 Fri, May 4, 2018
stringing works at loc b/w 324 –
325
Dismantling the conductors in 1. Fri, May 4, 2018 6:00 Sun, May 6, 2018
Kayathar – KKDI-II to Kamudhi –
KKDI-II 400KV Line in b/w Loc: 532 &
317. 2. Kayathar – KKDI-II to
Kamudhi – KKDI-I 400KV Line in
b/w Loc: 533 & 317 3. Dismantling of
earth wire and OPGW cable in
Kayathar – KKDI I and II feeders in
b/w loc 532 -533 Restringing the
Conductors in. 1. Kayathar – KKDI-
II 400KV Line in b/w Loc: 532 & 533
2. Kamudhi –KKDI I and II 400 KV
line in b/w loc 317 to 318. Stringing
of Earth wire and OPGW cable by
diamond crossing in b/w loc 532 –
318-533-317-532 of Kayathar –
Karaikudi I and II and Kamudhi –
Karaikudi I and II feeders. The work
should be completed on the end of the
2nd day.
Dismantling the conductors in 1. Fri, May 4, 2018 6:00 Sun, May 6, 2018
Kayathar – KKDI-II to Kamudhi –
KKDI-II 400KV Line in b/w Loc: 532 &
317. 2. Kayathar – KKDI-II to
Kamudhi – KKDI-I 400KV Line in
b/w Loc: 533 & 317 3. Dismantling of
earth wire and OPGW cable in
Kayathar – KKDI I and II feeders in
b/w loc 532 -533 Restringing the
Conductors in. 1. Kayathar – KKDI-
II 400KV Line in b/w Loc: 532 & 533
2. Kamudhi –KKDI I and II 400 KV
line in b/w loc 317 to 318. Stringing
of Earth wire and OPGW cable by
diamond crossing in b/w loc 532 –
318-533-317-532 of Kayathar –
Karaikudi I and II and Kamudhi –
Karaikudi I and II feeders. The work
should be completed on the end of the
2nd day.
Monthly maintenance work Fri, May 4, 2018 10:00 Fri, May 4, 2018
For Monthly Maintenance Work. Fri, May 4, 2018 9:00 Fri, May 4, 2018
For monthly maintenance. Fri, May 4, 2018 9:00 Fri, May 4, 2018
For monthly maintenance work Line switch Fri, May 4, 2018 9:00 Fri, May 4, 2018
Maintenance work
For Monthly Maintanance Work Fri, May 4, 2018 10:00 Fri, May 4, 2018
For monthly maintenance work. Fri, May 4, 2018 9:00 Fri, May 4, 2018
Tower to Tower Inspection Fri, May 4, 2018 9:00 Fri, May 4, 2018
(a) For Monthly Maintenance Work. (b) For Fri, May 4, 2018 12:00 Fri, May 4, 2018
Monthly Maintenance Work at
Thulukkapatti SS.
(a) For Monthly Maintenance Work. ( b) For Fri, May 4, 2018 9:00 Fri, May 4, 2018
Monthly Maintenance Work at NSPM SS.
a) Monthly Maintenance work Fri, May 4, 2018 9:00 Fri, May 4, 2018
a)Preventive Monthly maintenance work. Fri, May 4, 2018 9:00 Fri, May 4, 2018
b)premonsoon inspection and tree cutting
work. c)Relay Testing work.
230KV Bus Coupler breaker, CT's and Fri, May 4, 2018 9:00 Fri, May 4, 2018
Isolator maintenance work.
For monthly maintenance works . Fri, May 4, 2018 10:00 Fri, May 4, 2018
To carry out monthly maintenance works. Fri, May 4, 2018 10:00 Fri, May 4, 2018
For Monthly Maintenance Work. Fri, May 4, 2018 9:00 Fri, May 4, 2018
For Monthly Maintenance work and Fri, May 4, 2018 9:00 Fri, May 4, 2018
Annual Relay Test work carried out by
P&C wing,Erode.
A) MONTHLY PREVENTIVE Fri, May 4, 2018 9:00 Fri, May 4, 2018
MAINTENANCE WORK BY AEE/MTC/
NEMMELI THIPPIYAKUDI. B)
PREMONSOON INSPECTION WORK BY
AE/LINES/PATTUKKOTTAI.C) FOR
MONTHLY MAINTENANCE WORK BY
AEE/MTC/N T KUDI.
1. For monthly maintenance works, 2. Fri, May 4, 2018 9:00 Fri, May 4, 2018
Premonsoon inspection 3.Relay Testing
110 KV Line portion between Karambakudi Fri, May 4, 2018 9:00 Fri, May 4, 2018
- Ooranipuram for tree cutting and
premonsoon inspection and Kambakudi ss
under shutdown
Maintenance Works of BKR & CT,LI Sat, May 5, 2018 9:00 Sat, May 5, 2018
Maintenance Works of BKR & CT,LI Sat, May 5, 2018 9:00 Sat, May 5, 2018
For Monthly Maintenance Work, Line Sat, May 5, 2018 9:00 Sat, May 5, 2018
Maintenance Work and P&C Work
For Monthly Mtc work Sat, May 5, 2018 9:00 Sat, May 5, 2018
Monthly Mtce work & Annual relay testing Sat, May 5, 2018 9:00 Sat, May 5, 2018
Monthly Mtce work & Annual relay testing Sat, May 5, 2018 9:00 Sat, May 5, 2018
For attending Tower to Tower Inspection Sat, May 5, 2018 9:00 Sat, May 5, 2018
and Tree cutting work
1) tower to tower inspection and disc Sat, May 5, 2018 9:00 Sat, May 5, 2018
replacement works2) Bay equipments
Maintenance works
Dismantling the conductors in 1. Sat, May 5, 2018 6:00 Sat, May 5, 2018
Kayathar – KKDI-II to Kamudhi –
KKDI-II 400KV Line in b/w Loc: 532 &
317. 2. Kayathar – KKDI-II to
Kamudhi – KKDI-I 400KV Line in
b/w Loc: 533 & 317 3. Dismantling of
earth wire and OPGW cable in
Kayathar – KKDI I and II feeders in
b/w loc 532 -533 Restringing the
Conductors in. 1. Kayathar – KKDI-
II 400KV Line in b/w Loc: 532 & 533
2. Kamudhi –KKDI I and II 400 KV
line in b/w loc 317 to 318. Stringing
of Earth wire and OPGW cable by
diamond crossing in b/w loc 532 –
318-533-317-532 of Kayathar –
Karaikudi I and II and Kamudhi –
Karaikudi I and II feeders. The work
should be completed on the end of the
2nd day.
230KV KKDI-KVNR III & IV New line Sat, May 5, 2018 8:00 Sat, May 5, 2018
stringing works loc b/w 324-325
230kv kkdi-kvnr III & IV # New line Sat, May 5, 2018 8:00 Sat, May 5, 2018
stringing works at loc b/w 324 –
325
MONTHLY MAINTENANCE WORKS AND Sat, May 5, 2018 9:00 Sat, May 5, 2018
LINE MAINTENANCE WORKS
MONTHLY MAINTENANCE WORKS AND Sat, May 5, 2018 9:00 Sat, May 5, 2018
LINE MAINTENANCE WORKS
1. Monthly maintenance work 2. Tree Sat, May 5, 2018 9:00 Sat, May 5, 2018
cutting work
For Monthly Maintenance Works. Sat, May 5, 2018 9:00 Sat, May 5, 2018
For Monthly maintenance work Sat, May 5, 2018 10:00 Sat, May 5, 2018
For Monthly maintenance work Sat, May 5, 2018 10:00 Sat, May 5, 2018
IN MAIN BUS SELECTOR SWITH NO Sat, May 5, 2018 9:00 Sat, May 5, 2018
69 FEMALE CONDACT CHANAGE
WORK
Monthly Maintenance work, Tree clearance Sat, May 5, 2018 9:00 Sat, May 5, 2018
work,
For replacement of defective disc at Sat, May 5, 2018 9:00 Sat, May 5, 2018
location 6,7,9,47,&50 and tree clearance
work
(a) For Monthly Maintenance Works (b) For Sat, May 5, 2018 9:00 Sat, May 5, 2018
Monthly Maintenance Works at
Thulukkapatti SS © For flash over disk
replacement work at Loc No.
10,13,38,41,159,161, 164, 168, 182.
For replacement of defective disc at Sat, May 5, 2018 9:00 Sat, May 5, 2018
location No.7,9,11 & 14 and tree cutting
works
1)For attending LBB wiring and testing Sat, May 5, 2018 10:00 Sat, May 5, 2018
work2)Fro maintenance work
Annual relay test and contact resistance Sat, May 5, 2018 10:00 Sat, May 5, 2018
test conducted by wind farm MRT /
Tirunelveli.
1. For monthly maintenance works . 2. EHT Sat, May 5, 2018 9:00 Sat, May 5, 2018
Lines inspection Work.
a) Preventive Monthly maintenance work. Sat, May 5, 2018 9:00 Sat, May 5, 2018
b)Premonsoon inspection and Tree cutting
work by AEE/Lines/Trichy. c)Relay testing
work.
Line maintenance work Sat, May 5, 2018 9:00 Sat, May 5, 2018
A) FOR MONTHLY MAINTENANCE Sat, May 5, 2018 9:00 Sat, May 5, 2018
WORK BY AEE/MTC/N T KUDI. AND
ANNUAL RELAY TESTING BY P&C
WING THANJAVUR B) FOR MONTHLY
MAINTENANCE WORK BY AEE/MTC/N
T KUDI.C) PREMONSOON
INSPECTION WORK BY
AE/LINES/PATTUKKOTTAI.
To carry out line maintenance and tree Sat, May 5, 2018 10:00 Sat, May 5, 2018
clearance works.
1)Line maintenance work 2)Maintenance Sat, May 5, 2018 9:00 Sat, May 5, 2018
work.
Line premonsoon inspection and Sat, May 5, 2018 9:00 Sat, May 5, 2018
rectification work, Breaker, CT's and
Insolator maintenance work.
110KV Bus section III maintenance Sat, May 5, 2018 9:00 Sat, May 5, 2018
work and Bus side isolators
maintenance work
For monthly maintenance works. Sat, May 5, 2018 10:00 Sat, May 5, 2018
MONTHLY MAINTENANCE WORK. Sat, May 5, 2018 10:00 Sat, May 5, 2018
For MONTHLY MAINTENANCE WORK Sat, May 5, 2018 10:00 Sat, May 5, 2018
1. For monthly maintenance works, 2. Sat, May 5, 2018 9:00 Sat, May 5, 2018
Premonsoon inspection 3.Relay Testing
REGULAR AND ROUTINE BREAKER Sat, May 5, 2018 9:00 Sat, May 5, 2018
MAINTENANCE AND TESTING WORKS.
230kv kkdi-kvnr III & IV # New line Sun, May 6, 2018 8:00 Mon, May 7, 2018
stringing works at loc b/w 323 –
324
Mon, May 7, 2018 9:00 Mon, May 7, 2018
MONTHLY MAINTENANCE WORKS AND Mon, May 7, 2018 9:00 Mon, May 7, 2018
LINE MAINTENANCE WORKS
Maintenance Works of BKR & CT,LI Mon, May 7, 2018 9:00 Mon, May 7, 2018
Monthly Mtce work & Annual relay testing Mon, May 7, 2018 9:00 Mon, May 7, 2018
MONTHLY MAINTENANCE WORK Mon, May 7, 2018 10:00 Mon, May 7, 2018
For monthly maintenance and GRT Relay Mon, May 7, 2018 9:00 Mon, May 7, 2018
test.
For monthly maintenance work Line switch Mon, May 7, 2018 9:00 Mon, May 7, 2018
Maintenance work
For Monthly Maintenance Work. Mon, May 7, 2018 10:00 Mon, May 7, 2018
Monthly maintenance work Mon, May 7, 2018 9:00 Mon, May 7, 2018
Monthly Maintenance Works of BKR & CT, Mon, May 7, 2018 9:00 Mon, May 7, 2018
Line switch only.
a) For monthly maintenance work b)For Mon, May 7, 2018 9:00 Mon, May 7, 2018
flash over disk replacement at LOC.218
For replacing defective disc at various Mon, May 7, 2018 9:00 Mon, May 7, 2018
location
a) Preventive Monthly maintenance work. Mon, May 7, 2018 9:00 Mon, May 7, 2018
b) Premonsoon inspection and Tree cutting
work. c)Relay testing work.
1)Monthly Maintenance work 2)Annual Mon, May 7, 2018 10:00 Mon, May 7, 2018
Relay testing work
To carry out 230 KV line maintenance and Mon, May 7, 2018 10:00 Mon, May 7, 2018
Tree clearance works.
Line premonsoon inspection and Mon, May 7, 2018 9:00 Mon, May 7, 2018
rectification work.
Auto Transformer-I, HV Breaker & LV Mon, May 7, 2018 9:00 Mon, May 7, 2018
Breaker, CT's and isolator maintenance
work.
To carry out monthly maintenance works. Mon, May 7, 2018 10:00 Mon, May 7, 2018
MONTHLY MAINTENANCE WORK Mon, May 7, 2018 10:00 Mon, May 7, 2018
1. For monthly maintenance works . 2. Mon, May 7, 2018 9:00 Mon, May 7, 2018
Premonsoon inspection. 3. Relay Testing 4.
Line switch alignment work towards
Alundur SS at 110KV Ammappettai SS.
1. For monthly maintenance works . 2. Mon, May 7, 2018 9:00 Mon, May 7, 2018
Premonsoon inspection. 3. Relay Testing 4.
Line switch alignment work towards
Alundur SS at 110KV Ammappettai SS.
Monthly Maintenance of Breaker and CT's & Tue, May 8, 2018 9:00 Tue, May 8, 2018
GRT Relay Testing work,Tree Cutting Work
For Monthly Maintenance Work and Tue, May 8, 2018 9:00 Tue, May 8, 2018
P&C Work
"Tower to Tower inspection and Tue, May 8, 2018 9:00 Tue, May 8, 2018
defect Rectification of Tapping switch
location."
Monthly Mtce work & Annual relay testing Tue, May 8, 2018 9:00 Tue, May 8, 2018
For Attending Oil leak in Auto Tue, May 8, 2018 9:00 Tue, May 8, 2018
Transformer II HV and LV breakers
and it's CT's and isolators Monthly
Maintenance work.
MONTHLY MAINTENANCE WORKS AND Tue, May 8, 2018 9:00 Tue, May 8, 2018
LINE MAINTENANCE WORKS
LINE MAINTENANCE WORKS Tue, May 8, 2018 9:00 Tue, May 8, 2018
1. Monthly maintenance work 2. Tree Tue, May 8, 2018 9:00 Tue, May 8, 2018
cutting work
For Monthly Maintenance Work. Tue, May 8, 2018 9:00 Tue, May 8, 2018
For Monthly Maintenance Work. Tue, May 8, 2018 9:00 Tue, May 8, 2018
For monthly maintenance and GRT Relay Tue, May 8, 2018 9:00 Tue, May 8, 2018
test.
For monthly maintenance work Tue, May 8, 2018 9:00 Tue, May 8, 2018
For monthly maintenance work Tue, May 8, 2018 9:00 Tue, May 8, 2018
For monthly maintenance work. Tue, May 8, 2018 9:00 Tue, May 8, 2018
Monthly Maintenance work Tue, May 8, 2018 9:00 Tue, May 8, 2018
Monthly maintenance work Tue, May 8, 2018 9:00 Tue, May 8, 2018
Line strenthaning with tower Tue, May 8, 2018 9:00 Tue, May 15, 2018
replacement between Loc
No.225&232
(a & b ) Earth wire cut rectification Tue, May 8, 2018 9:00 Tue, May 8, 2018
work between Loc No. 40 & 46
For Monthly Maintenance Work. Tue, May 8, 2018 9:00 Tue, May 8, 2018
For Monthly maintenance work Tue, May 8, 2018 10:00 Tue, May 8, 2018
For replacement of defective disc at Tue, May 8, 2018 9:00 Tue, May 8, 2018
location No,35,36,46 & 49 and tree cutting
works
a) For monthly maintenance work b) Relay Tue, May 8, 2018 9:00 Tue, May 8, 2018
test by GRT
1. For monthly maintenance works . 2. Tue, May 8, 2018 9:00 Tue, May 8, 2018
EHT Lines inspection Work.
Line maintenance work. Tue, May 8, 2018 9:00 Tue, May 8, 2018
To carry out line maintenance and tree Tue, May 8, 2018 10:00 Tue, May 8, 2018
clearance works.
Line premonsoon inspection and Tue, May 8, 2018 9:00 Tue, May 8, 2018
rectification work, Breaker, CTs and Line
side isoaltor maintenance work
For monthly maintenance works . Tue, May 8, 2018 10:00 Tue, May 8, 2018
Monthly Maintenance work. Tue, May 8, 2018 9:00 Tue, May 8, 2018
To carry out monthly maintenance works. Tue, May 8, 2018 9:00 Tue, May 8, 2018
monthly maintenance Tue, May 8, 2018 10:00 Tue, May 8, 2018
1) For monthly maintenance works by the Tue, May 8, 2018 9:00 Tue, May 8, 2018
AEE/Mtce/Thanjavur, 2) For premonsoon
inspection works by the
AEE/Lines/Thanjavur
A) FOR MONTHLY PREVENTIVE Tue, May 8, 2018 9:00 Tue, May 8, 2018
MAINTENANCE WORK BY AEE/MTC/
N.T.KUDI. B) FOR TREE CUTTING
WORK BY AE/LINES/ PATTUKKOTTAI.
1.Monthly maintenance works, Breaker, CT, Tue, May 8, 2018 9:00 Tue, May 8, 2018
Isolator and EHT Line tree cutting and
premonsoon inspection on 08.05.2018, 2.
Tower insertion work to be carried out by
AEE/TLC/PUDUKKOTTAI On 08.05.2018,
09.05.2018 and 10.05.2018
Breaker with CT and 110KV Line side AB Wed, May 9, 2018 9:00 Wed, May 9, 2018
Switch monthly maintenance work.
Monthly Maintenance Works Wed, May 9, 2018 9:00 Wed, May 9, 2018
1) Maintenance Works of BKR & CT, LI 2) Wed, May 9, 2018 9:00 Wed, May 9, 2018
Tree cutting works and T-T Inspection
works
1) Maintenance Works of BKR & CT, LI 2) Wed, May 9, 2018 9:00 Wed, May 9, 2018
Tree cutting works and T-T Inspection
works
For Monthly Maintenance Work, Line Wed, May 9, 2018 9:00 Wed, May 9, 2018
Maintenance Work and P&C Work
For Monthly Mtc work Wed, May 9, 2018 9:00 Wed, May 9, 2018
premonsoon inspection &Tree cutting Wed, May 9, 2018 9:00 Wed, May 9, 2018
works.
Maintenance works of Breaker , CT and Wed, May 9, 2018 9:00 Wed, May 9, 2018
Line Isolator
For attending tower to tower Inspection Wed, May 9, 2018 9:00 Wed, May 9, 2018
and Tree cutting work
Monthly Maintenance work. Wed, May 9, 2018 9:00 Wed, May 9, 2018
Monthly maintenance work Wed, May 9, 2018 10:00 Wed, May 9, 2018
Tree cutting work Wed, May 9, 2018 9:00 Wed, May 9, 2018
For monthly maintenance work Line switch Wed, May 9, 2018 9:00 Wed, May 9, 2018
Maintenance work
For Monthly Maintenance Work. Wed, May 9, 2018 10:00 Wed, May 9, 2018
Monthly Maintenance work, Tree clearance Wed, May 9, 2018 9:00 Wed, May 9, 2018
work,Breaker testing work.
Monthly Maintenance Work Wed, May 9, 2018 9:00 Wed, May 9, 2018
a) Monthly Maintenance work Wed, May 9, 2018 9:00 Wed, May 9, 2018
1. For monthly maintenance works . 2. Wed, May 9, 2018 9:00 Wed, May 9, 2018
EHT Lines inspection Work.
1)Line maintenance work 2)Maintenance Wed, May 9, 2018 9:00 Wed, May 9, 2018
work
Line premonsoon inspection and Wed, May 9, 2018 9:00 Wed, May 9, 2018
rectification work, Breaker, CTs and Line
side isolator maintenance work.
1)For Monthly Maintenance work. 2)Tree Wed, May 9, 2018 9:00 Wed, May 9, 2018
cutting work
For Monthly Maintenance work. Wed, May 9, 2018 9:00 Wed, May 9, 2018
Monthly maintenance work. Wed, May 9, 2018 9:00 Wed, May 9, 2018
1. Monthly maintenance works. 2. Wed, May 9, 2018 9:00 Wed, May 9, 2018
Premonsoon maintenance, 3. Relay Testing
Monthly Maintenance work , Wed, May 9, 2018 9:00 Wed, May 9, 2018
Monthly maintenance work Thu, May 10, 2018 10:00 Thu, May 10, 2018
110 KV BOTTOM AND TOP BUS AB Thu, May 10, 2018 8:00 Thu, May 10, 2018
SWITCH Annual maintenance work &
all insulator cleaning work.
For Line Maintenance Work Thu, May 10, 2018 9:00 Thu, May 10, 2018
premonsoon inspection &Tree cutting Thu, May 10, 2018 9:00 Thu, May 10, 2018
works.
For Monthly Mtc work Thu, May 10, 2018 9:00 Thu, May 10, 2018
Monthly maintenance works for breaker, CT Thu, May 10, 2018 9:00 Thu, May 10, 2018
and Line Isolator
LINE MAINTENANCE AND MONTHLY MTCE Thu, May 10, 2018 9:00 Thu, May 10, 2018
WORKS
Monthly maintenance work Thu, May 10, 2018 10:00 Thu, May 10, 2018
1.For Monthly Maintenance Work. 2. 3 Nos Thu, May 10, 2018 9:00 Thu, May 10, 2018
CVT Dropper erection work.
For Monthly Maintenance Work. Thu, May 10, 2018 9:00 Thu, May 10, 2018
1)Contact resistance test by GRT WING Thu, May 10, 2018 10:00 Thu, May 10, 2018
2.MONTHLY MAINTENANCE WORK
For monthly maintenance. Thu, May 10, 2018 9:00 Thu, May 10, 2018
For monthly maintenance works Thu, May 10, 2018 9:00 Thu, May 10, 2018
For monthly maintenance work. Thu, May 10, 2018 9:00 Thu, May 10, 2018
Tree clearance work and line maintenance Thu, May 10, 2018 9:00 Thu, May 10, 2018
work
Monthly maintenance of breaker, CT & LS Thu, May 10, 2018 9:00 Thu, May 10, 2018
Monthly Maintenance Work and Annual Thu, May 10, 2018 9:00 Thu, May 10, 2018
Relay Testing Work
For monthly maintenance work. Thu, May 10, 2018 9:00 Thu, May 10, 2018
Monthly maintenance work Thu, May 10, 2018 8:00 Thu, May 10, 2018
For replacement of defective disc at Thu, May 10, 2018 9:00 Thu, May 10, 2018
location No.83,95,102 and rectification of
defective jumper
A) Monthly Maintenance work Thu, May 10, 2018 9:00 Thu, May 10, 2018
Maintenance work and MRT Annual testing Thu, May 10, 2018 9:00 Thu, May 10, 2018
work
Annual routine testing maintenance of Thu, May 10, 2018 9:00 Thu, May 10, 2018
Numerical Distance Protection relays Main
-I & II in 230kV TTPS - SIPCOT Feeder.
To carry out the monthly maintenance Thu, May 10, 2018 10:00 Thu, May 10, 2018
works.
1. For monthly maintenance works on Thu, May 10, 2018 9:00 Thu, May 10, 2018
Auto I. 2.Tan Delta Testing by P&C,
Madurai
a) Preventive Monthly Maintenance Work. Thu, May 10, 2018 9:00 Thu, May 10, 2018
b) Relay testing Work c) Premonsoon
Inspection and Tree cutting Work.
For monthly maintenance works . Thu, May 10, 2018 9:00 Thu, May 10, 2018
Line maintenance work Thu, May 10, 2018 9:00 Thu, May 10, 2018
Line premonsoon Inspection and Thu, May 10, 2018 9:00 Thu, May 10, 2018
rectification work.
230KV BUS II maintenance work Thu, May 10, 2018 9:00 Thu, May 10, 2018
For monthly maintenance work . Thu, May 10, 2018 10:00 Thu, May 10, 2018
To carry out monthly maintenance works. Thu, May 10, 2018 10:00 Thu, May 10, 2018
For monthly maintenance work of breaker, Thu, May 10, 2018 9:00 Thu, May 10, 2018
CT Isolators and 110 KV EHT line tree
cutting and premonsoon inspection.
1) For monthly maintenance works by Thu, May 10, 2018 9:00 Thu, May 10, 2018
the AEE/Mtce/Thanjavur, 2) For
premonsoon inspection works by the
AEE/Lines/Thanjavur 3) For annual
relay testing works by the
AEE/P&C/Thanjavur
FOR TREE CUTTING WORK BY Thu, May 10, 2018 9:00 Thu, May 10, 2018
AE/LINES/PATTUKKOTTAI.
1. Premonsoon inspection and tree cutting Thu, May 10, 2018 9:00 Thu, May 10, 2018
works.
REGULAR AND ROUTINE BREAKER Thu, May 10, 2018 9:00 Thu, May 10, 2018
MAINTENANCE AND TESTING WORKS.
monthly maintenance Thu, May 10, 2018 10:00 Thu, May 10, 2018
Monthly Maintenance Works Fri, May 11, 2018 9:00 Fri, May 11, 2018
Strengthening of SC line on SC towers Fri, May 11, 2018 9:00 Fri, May 25, 2018
with Leopard conductor into 110 KV
SC line on DC towers with Panther
conductor from Loc 1 to 39A
( Kappalur SS Tapping Loc ) and in the
Line in portion to Kappalur 110KV SS
to be executed by TLC wing
Tree Cutting Work Fri, May 11, 2018 9:00 Fri, May 11, 2018
For Monthly Maintenance Work, Line Fri, May 11, 2018 9:00 Fri, May 11, 2018
Maintenance Work and P&C Work
For Monthly Mtc work Fri, May 11, 2018 9:00 Fri, May 11, 2018
For Line Maintenance Work Fri, May 11, 2018 9:00 Fri, May 11, 2018
Maintenance works of Breaker, CT and Line Fri, May 11, 2018 9:00 Fri, May 11, 2018
Isolator
Tower to Tower inspection Fri, May 11, 2018 9:00 Fri, May 11, 2018
For attending tower to tower Inspection Fri, May 11, 2018 9:00 Fri, May 11, 2018
and Tree cutting work
Monthly maintenance work Fri, May 11, 2018 10:00 Fri, May 11, 2018
For Monthly Maintenance Work. Fri, May 11, 2018 9:00 Fri, May 11, 2018
For Monthly Maintenance Work. Fri, May 11, 2018 9:00 Fri, May 11, 2018
1.Annual Relay Test by GRT/ Wing 2. Fri, May 11, 2018 10:00 Fri, May 11, 2018
Monthly Maintenance work
For monthly maintenance. Fri, May 11, 2018 9:00 Fri, May 11, 2018
For monthly maintenance works Fri, May 11, 2018 9:00 Fri, May 11, 2018
For monthly maintenance work Fri, May 11, 2018 10:00 Fri, May 11, 2018
For Monthly Maintenance Work. Fri, May 11, 2018 10:00 Fri, May 11, 2018
Tower to Tower Inspection and Fri, May 11, 2018 9:00 Fri, May 11, 2018
Rectification Work
For monthly maintenance work. Fri, May 11, 2018 9:00 Fri, May 11, 2018
a) For Monthly maintenance work Fri, May 11, 2018 9:00 Fri, May 11, 2018
Maintenance work and MRT Annual testing Fri, May 11, 2018 9:00 Fri, May 11, 2018
work
Maintenance work and MRT Annual testing Fri, May 11, 2018 9:00 Fri, May 11, 2018
work
1. For monthly maintenance works on Fri, May 11, 2018 8:00 Fri, May 11, 2018
Siruganur #. 2.Tan Delta Testing by
P&C, Madurai
1)Line maintenance work 2)Maintenance Fri, May 11, 2018 9:00 Fri, May 11, 2018
work
Line premonsoon Inspection and Fri, May 11, 2018 9:00 Fri, May 11, 2018
rectification work.
HV II, LV II Breakers and CTs maintenance Fri, May 11, 2018 9:00 Fri, May 11, 2018
work
For Monthly Maintenance work and Fri, May 11, 2018 9:00 Fri, May 11, 2018
Annual Relay Test work carried out by
P&C wing,Erode.
Monthly Mtce work. Sat, May 12, 2018 9:00 Sat, May 12, 2018
Monthly Mtce work Sat, May 12, 2018 9:00 Sat, May 12, 2018
Manintenance of damaged DC tower Sat, May 12, 2018 9:00 Sat, May 12, 2018
at Loc No 41,42,43 at ISRO .
Tree cutting works Mon, May 14, 2018 9:00 Mon, May 14, 2018
For line mtc works & premonsoon Mon, May 14, 2018 9:00 Mon, May 14, 2018
inspection work.
For Line Maintenance Work Mon, May 14, 2018 9:00 Mon, May 14, 2018
For conducting Tan & Delta Test by Mon, May 14, 2018 9:00 Mon, May 14, 2018
GRT/MDU
1. Monthly maintenance work 2. Tree Mon, May 14, 2018 9:00 Mon, May 14, 2018
cutting work
For Monthly Maintenance Work. Mon, May 14, 2018 9:00 Mon, May 14, 2018
For Monthly Maintenance work. Mon, May 14, 2018 10:00 Mon, May 14, 2018
For monthly maintenance. Mon, May 14, 2018 9:00 Mon, May 14, 2018
a) For monthly maintenance work line Mon, May 14, 2018 9:00 Mon, May 14, 2018
section between Kayathar and
Therkupatty
For monthly maintenance works. Mon, May 14, 2018 9:00 Mon, May 14, 2018
Monthly Maintenance Work . Mon, May 14, 2018 9:00 Mon, May 14, 2018
For Monthly Maintanance work. Mon, May 14, 2018 9:00 Mon, May 14, 2018
Line premonsoon inspection and Mon, May 14, 2018 9:00 Mon, May 14, 2018
rectification work, Breaker, CTs and Line
side isolator maintenance work
For monthly maintenance works and Mon, May 14, 2018 10:00 Mon, May 14, 2018
R phase CVTErection and
commissioning works.
For monthly maintenance works and R Mon, May 14, 2018 10:00 Mon, May 14, 2018
phase CVTErection and commissioning
works.
1. Monthly maintenance works. 2) Relay Mon, May 14, 2018 9:00 Mon, May 14, 2018
Testing.
1) Maintenance Works of BKR & CT,LI Tue, May 15, 2018 9:00 Tue, May 15, 2018
2)Tree cutting works and T-T Inspection
works
For Monthly Maintenance Work, Line Tue, May 15, 2018 9:00 Tue, May 15, 2018
Maintenance Work and P&C Work
premonsoon inspection &Tree cutting Tue, May 15, 2018 9:00 Tue, May 15, 2018
works.
For conducting Tan & Delta Test by Tue, May 15, 2018 9:00 Tue, May 15, 2018
GRT/MDU
Monthly maintenance works for breaker , Tue, May 15, 2018 9:00 Tue, May 15, 2018
CT and Line Isolator
For ensuring system stability at Tue, May 15, 2018 9:00 Wed, May 16, 2018
VGTPS. To keep 110KV VALUTHUR -
VGTPS Ph II LINE 3 # & 110KV
VALUTHUR - VGTPS Ph I Line 4# in
different buses in VALUTHUR SS.
(Presently the above 2 Nos feeders
are in 110KV Bus II, at VALUTHUR
230/110KV SS). [110KV SAI 2# Will
be shifted from Bus 1 (BAY3) to Bus
II(BAY4).110KV CORAMANDAL will be
shifted from Bus II(BAY4) to
BUSII(BAY5). 110KV VGTPS PH II
LINE 3# will be shifted from Bus
II(BAY5) to Bus I (BAY3)]
Monthly Maintenance of Breaker,CT 's GRT Tue, May 15, 2018 9:00 Tue, May 15, 2018
Relay Testing work,Tree Cutting Work
Monthly maintenance work. Tue, May 15, 2018 9:00 Tue, May 15, 2018
1. Monthly maintenance work 2. Tree Tue, May 15, 2018 9:00 Tue, May 15, 2018
cutting work
For Monthly Maintenance Work. Tue, May 15, 2018 9:00 Tue, May 15, 2018
For monthly maintenance works Tue, May 15, 2018 9:00 Tue, May 15, 2018
Monthly Mainteanace work, Tue, May 15, 2018 9:00 Tue, May 15, 2018
Earth wire cut rectification work between Tue, May 15, 2018 9:00 Tue, May 15, 2018
Loc. No. 4 to 6 of 110 KV R.RPT LILO line.
For monthly maintenance work. Tue, May 15, 2018 9:00 Tue, May 15, 2018
For monthly maintenance work Tue, May 15, 2018 10:00 Tue, May 15, 2018
For Monthly maintenance work Tue, May 15, 2018 10:00 Tue, May 15, 2018
For monthly maintenance work Tue, May 15, 2018 9:00 Tue, May 15, 2018
For monthly maintenance work Tue, May 15, 2018 10:00 Tue, May 15, 2018
For replacement of defective disc at Tue, May 15, 2018 9:00 Tue, May 15, 2018
location No.19,21,22,24,32,36(Kadayam
spur line)Main line location
NO.36,37,41,83,92&93
a) For Monthly maintenance work b) Relay Tue, May 15, 2018 9:00 Tue, May 15, 2018
replacement and breaker testing by GRT
For Monthly maintenance work, defective Tue, May 15, 2018 9:00 Tue, May 15, 2018
disc replacement work
1. For monthly maintenance works . 2. EHT Tue, May 15, 2018 9:00 Tue, May 15, 2018
Lines inspection Work.
a) Preventive Monthly maintenance Tue, May 15, 2018 9:00 Tue, May 15, 2018
work. b) Tan delta Test by the
EE/P&C/Madurai c) Relay testing
work.
a) Monthly maintenance work. b) Tan Tue, May 15, 2018 9:00 Tue, May 15, 2018
delta test by the EE/P&C/Madurai. c)
Relay testing work.
FOR Monthly maintenance work Tue, May 15, 2018 9:00 Tue, May 15, 2018
To carry out 230 KV Kumbakonam - Tue, May 15, 2018 10:00 Tue, May 15, 2018
Thiruvarur feeder line maintenance and
tree clearance works.
Line premonsoon inspection and Tue, May 15, 2018 0:00 Tue, May 15, 2018
rectification work, Breaker, CTs and Line
side isolator maintenance work
Line premonsoon inspection and Tue, May 15, 2018 9:00 Tue, May 15, 2018
rectification work, Breaker, CTs and Line
side isolator maintenance work
230 KV Kumbakonam -Thiruvarur breaker Tue, May 15, 2018 10:00 Tue, May 15, 2018
monthly maintenance work.
Monthly maintenance works, Breaker, CT, Tue, May 15, 2018 9:00 Tue, May 15, 2018
Isolator and EHT Line tree cutting and
premonsoon inspection
Monthly maintenance works by the Tue, May 15, 2018 9:00 Tue, May 15, 2018
AEE/Mtce/Thanjavur
FOR TREE CUTTING WORK BY Tue, May 15, 2018 9:00 Tue, May 15, 2018
AE/LINES/PATTUKKOTTAI.
1. Premonsoon inspection and tree cutting Tue, May 15, 2018 9:00 Tue, May 15, 2018
works.
1) Monthly Maintenance Works of BKR & Wed, May 16, 2018 9:00 Wed, May 16, 2018
CT,LI 2) Tree cutting works and T-T
Inspection works
For Monthly Maintenance Work, Line Wed, May 16, 2018 9:00 Wed, May 16, 2018
Maintenance Work and P&C Work
Annual relay test by GRT wing .Line CVT Wed, May 16, 2018 9:00 Wed, May 16, 2018
erection work .For line mtc works &
premonsoon inspection work.
For conducting Tan & Delta Test by Wed, May 16, 2018 9:00 Wed, May 16, 2018
GRT/MDU
230kv kkdi-kvnr III & IV # New line Wed, May 16, 2018 8:00 Thu, May 17, 2018
stringing works at loc b/w 310 –
311
Kavanur- 3 & 4 New proposed line Wed, May 16, 2018 8:00 Wed, May 16, 2018
stringing work b/w 310-311
MONTHLY MAINTENANCE WORKS Wed, May 16, 2018 9:00 Thu, May 17, 2018
AND LINE MAINTENANCE WORKS
AND TLC WING KKDI WORK
Monthly maintenance work Wed, May 16, 2018 10:00 Wed, May 16, 2018
For Monthly Maintenance Work. Wed, May 16, 2018 9:00 Wed, May 16, 2018
For Monthly Maintenance Work Wed, May 16, 2018 9:00 Wed, May 16, 2018
For monthly maintenance. Wed, May 16, 2018 9:00 Wed, May 16, 2018
For monthly maintenance work. Wed, May 16, 2018 9:00 Wed, May 16, 2018
For Monthly Maintenance Work. Wed, May 16, 2018 10:00 Wed, May 16, 2018
For monthly maintenance work. Wed, May 16, 2018 9:00 Wed, May 16, 2018
Monthly Maintenance Work . Wed, May 16, 2018 9:00 Wed, May 16, 2018
For Monthly Maintenance Work. Wed, May 16, 2018 9:00 Wed, May 16, 2018
For Monthly Maintenance work Wed, May 16, 2018 0:00 Wed, May 16, 2018
a)Monthly Preventive Maintenance work. Wed, May 16, 2018 9:00 Wed, May 16, 2018
b)Premonsoon Inspection and tree cutting
work. c)Relay Testing Work.
110 KV Kovilvenni - Kudavasal feeder Wed, May 16, 2018 10:00 Wed, May 16, 2018
monthly maintenance work.
For monthly maintenance works . Wed, May 16, 2018 9:00 Wed, May 16, 2018
For monthly maintenance work Wed, May 16, 2018 10:00 Wed, May 16, 2018
For Monthly Maintenance work Wed, May 16, 2018 10:00 Wed, May 16, 2018
1) For monthly maintenance works by the Wed, May 16, 2018 9:00 Wed, May 16, 2018
AEE/Mtce/Thanjavur, 2) For premonsoon
inspection works by the
AEE/Lines/Thanjavur
1. Monthly maintenance works. 2) Relay Wed, May 16, 2018 9:00 Wed, May 16, 2018
Testing
monthly maintenance Wed, May 16, 2018 10:00 Wed, May 16, 2018
1) Maintenance Works of BKR & CT, LI Thu, May 17, 2018 9:00 Thu, May 17, 2018
only. 2)Tree cutting works and T-T
Inspection works
For line mtc works & premonsoon Thu, May 17, 2018 9:00 Thu, May 17, 2018
inspection work.
Tree clearance work in Valayapatty LILO Thu, May 17, 2018 9:00 Thu, May 17, 2018
1. Monthly maintenance work 2. Tree Thu, May 17, 2018 9:00 Thu, May 17, 2018
cutting work
"1. For attending breaker and it's CT's and Thu, May 17, 2018 9:00 Thu, May 17, 2018
isolators Monthly Maintenance work. 2. For
attending tower to tower inspection work. "
Monthly Maintenance of Breaker, CT 'S & Thu, May 17, 2018 9:00 Thu, May 17, 2018
GRT Relay Testing work
Kavanur- 3 & 4 New proposed line Thu, May 17, 2018 8:00 Thu, May 17, 2018
stringing work b/w 310-311.
Disc replacement work Thu, May 17, 2018 9:00 Thu, May 17, 2018
LINE MAINTENANCE WORKS Thu, May 17, 2018 9:00 Thu, May 17, 2018
For Monthly Maintenance Work. Thu, May 17, 2018 9:00 Thu, May 17, 2018
For Monthly Maintenance Work Thu, May 17, 2018 9:00 Thu, May 17, 2018
1.Contact resistance test of HV breaker &LV Thu, May 17, 2018 10:00 Thu, May 17, 2018
breaker by GRT Wing 2. Maintenance work
QUARTERLY MAINTENANCE WORKS & Thu, May 17, 2018 9:00 Thu, May 17, 2018
BREAKER TESTING WORK
Monthly Maintenance work,,Breaker testing Thu, May 17, 2018 9:00 Thu, May 17, 2018
work.
For replacement of defective disc at Thu, May 17, 2018 9:00 Thu, May 17, 2018
location No.4,24,21 and tree cutting works
a) For Monthly Maintenance work b) Tower Thu, May 17, 2018 9:00 Thu, May 17, 2018
to Tower inspection work
a) For Monthly Maintenance work Thu, May 17, 2018 9:00 Thu, May 17, 2018
a) For monthly maintenance work, Thu, May 17, 2018 9:00 Thu, May 17, 2018
a)Monthly Preventive Maintenance work. Thu, May 17, 2018 9:00 Thu, May 17, 2018
b)Premonsoon Inspection and tree cutting
work. c)Relay Testing Work.
Line maintenance work Thu, May 17, 2018 9:00 Thu, May 17, 2018
Line premonsoon inspection and Thu, May 17, 2018 9:00 Thu, May 17, 2018
rectification work, Breaker, CTs and Line
side isolator maintenance work
For 110KV Karambakudi SS loop Thu, May 17, 2018 9:00 Thu, May 17, 2018
jumper removing work
1) For monthly maintenance works by the Thu, May 17, 2018 9:00 Thu, May 17, 2018
AEE/Mtce/Thanjavur, 2) For premonsoon
inspection works by the
AEE/Lines/Thanjavur
A) FOR MONTHLY MAINTENANCE Thu, May 17, 2018 9:00 Thu, May 17, 2018
WORK BY AEE/MTC/N T KUDI. B) FOR
TREE CUTTING WORK BY
AE/LINES/PATTUKKOTTAI.
1. Monthly maintenance works. 2. Thu, May 17, 2018 9:00 Thu, May 17, 2018
Premonsoon inspection. 3.Relay test
For extension of 110 KV strung bus Thu, May 17, 2018 9:00 Thu, May 17, 2018
from LILO at Pettavaithalai 110 KV
SS.
onthly maintenance Thu, May 17, 2018 10:00 Thu, May 17, 2018
Maintenance Works of BKR & CT,LI Fri, May 18, 2018 9:00 Fri, May 18, 2018
For Monthly Maintenance Work, Line Fri, May 18, 2018 9:00 Fri, May 18, 2018
Maintenance Work and P&C Work
premonsoon inspection &Tree cutting Fri, May 18, 2018 9:00 Fri, May 18, 2018
works.
Monthly maintenance works for breaker , Fri, May 18, 2018 9:00 Fri, May 18, 2018
CT and Line Isolator
1. Monthly maintenance work 2. Tree Fri, May 18, 2018 9:00 Fri, May 18, 2018
cutting work
To attend oil leak on Y and B phase Fri, May 18, 2018 10:00 Fri, May 18, 2018
primary bushing CT
Monthly Maintenance of Breaker and CT's. Fri, May 18, 2018 9:00 Fri, May 18, 2018
& GRT Relay Testing work,Tree Cutting
work
Monthly maintenance works Fri, May 18, 2018 9:00 Fri, May 18, 2018
For Monthly Maintenance work. Fri, May 18, 2018 10:00 Fri, May 18, 2018
For Monthly Maintenance Work. Fri, May 18, 2018 9:00 Fri, May 18, 2018
1.Annual Relay Test by GRT/ Wing 2. Fri, May 18, 2018 10:00 Fri, May 18, 2018
Monthly Maintenance work
For monthly maintenance. Fri, May 18, 2018 9:00 Fri, May 18, 2018
For monthly maintenance works Fri, May 18, 2018 9:00 Fri, May 18, 2018
For Monthly Maintenance work Fri, May 18, 2018 9:00 Fri, May 18, 2018
For Monthly Maintenance Work. Fri, May 18, 2018 10:00 Fri, May 18, 2018
(a) For monthly maintenance work. (b) Fri, May 18, 2018 9:00 Fri, May 18, 2018
Earth wire cut rectification work at Loc No.
298 to 302
(a) For providing GI Metal spike on Fri, May 18, 2018 9:00 Fri, May 18, 2018
tower cross arm .(b ) For monthly
maintenance work
a) For removing jumpers,releasing of Fri, May 18, 2018 13:00 Wed, May 23, 2018
cables from the existing 110KVGC OMCB
for dismantling. b) For dismanling and
releasing of 110KV GC OMCB and erection
of 1No New 110KV SF6 Breaker in place of
110KV GC OMCBwith the help of crane to
lift the Breakers.
a) For monthly maintenance work, Fri, May 18, 2018 9:00 Fri, May 18, 2018
Line premonsoon inspection and Fri, May 18, 2018 9:00 Fri, May 18, 2018
rectification work, Breaker, CTs and Line
side isolator maintenance work
For monthly maintenance work Fri, May 18, 2018 10:00 Fri, May 18, 2018
MONTHLY MAINTENANCE WORK Fri, May 18, 2018 10:00 Fri, May 18, 2018
1. Monthly maintenance works . 2) Relay Fri, May 18, 2018 9:00 Fri, May 18, 2018
test
monthly maintenance Fri, May 18, 2018 10:00 Fri, May 18, 2018
Relay test by P&C -II /Madurai & Sat, May 19, 2018 9:00 Sat, May 19, 2018
Maintenance works by
AEE/Maintenance/110 KV Sivaganga
Grid SS.
Checking of all earth Resistance value Sat, May 19, 2018 8:00 Sat, May 19, 2018
and station Battery commissioning
work. BOTTOM & TOP BUS PT
Maintenance work.Lightening arrestor
maintenance work. Supporting
insulator cleaning work.
1)Maintenance Works of BKr & CT,LI Sat, May 19, 2018 9:00 Sat, May 19, 2018
2)Tree cutting works and T-T Inspection
works
For Monthly Maintenance Work, Line Sat, May 19, 2018 9:00 Sat, May 19, 2018
Maintenance Work and P&C Work
premonsoon inspection &Tree cutting Sat, May 19, 2018 9:00 Sat, May 19, 2018
works.
1. Monthly maintenance work 2. Tree Sat, May 19, 2018 9:00 Sat, May 19, 2018
cutting work
"1. For attending breaker and it's CT's and Sat, May 19, 2018 9:00 Sat, May 19, 2018
isolators Monthly Maintenance work. 2. For
attending tower to tower inspection work. "
Monthly Maintenance of Breaker,CT 's GRT Sat, May 19, 2018 9:00 Sat, May 19, 2018
Relay Testing work
MONTHLY MAINTENANCE WORKS AND Sat, May 19, 2018 9:00 Sat, May 19, 2018
LINE MAINTENANCE WORKS
Monthly maintenance work Sat, May 19, 2018 9:00 Sat, May 19, 2018
For Monthly Maintenance Work. Sat, May 19, 2018 9:00 Sat, May 19, 2018
1)LBB Protection testing and Sat, May 19, 2018 10:00 Sat, May 19, 2018
Commissioning for all 110kv fdr Brs
by GRT /Wing / SRpudur. 2)110kv
Bus mainteance Work and
Replacement of Strandcut vertical
Dropper of 110kv Radhapuram fdr.R
ph Bus side
For monthly maintenance work. b)For Sat, May 19, 2018 9:00 Sat, May 19, 2018
annual relay tests.
For monthly maintenance work. b)For Sat, May 19, 2018 9:00 Sat, May 19, 2018
annual relay tests.
For monthly maintenance work, Sat, May 19, 2018 9:00 Sat, May 19, 2018
For monthly maintenance work Sat, May 19, 2018 10:00 Sat, May 19, 2018
Tower to Tower Inspection and Sat, May 19, 2018 9:00 Sat, May 19, 2018
Rectification Work
SWITH NO 94 ALLIMENT WORK Sat, May 19, 2018 9:00 Sat, May 19, 2018
Monthly Maintenance work, Tree clearance Sat, May 19, 2018 9:00 Sat, May 19, 2018
work,Breaker testing work.
Monthly maintenance of breaker, CT & LS Sat, May 19, 2018 9:00 Sat, May 19, 2018
(a) For monthly maintenance work. Sat, May 19, 2018 13:00 Sat, May 19, 2018
(b) Flash over disk replacement work
at Loc No. 159,161,163 & 164
For monthly maintenance work. Sat, May 19, 2018 9:00 Sat, May 19, 2018
a) For monthly maintenance work .b) Disk Sat, May 19, 2018 9:00 Sat, May 19, 2018
replacement work at Location No4 in
Thiruthankal spurline & Loc No. 98
For monthly maintenance work (B) For Sat, May 19, 2018 9:00 Sat, May 19, 2018
flash over disk replacement work at Loc No.
225, 243, 245
for replacement of defective disc and Sat, May 19, 2018 10:00 Sat, May 19, 2018
rectification of jumper and tree cutting
works in both feeder in thick forest area
a) For Monthly maintenance work Sat, May 19, 2018 9:00 Sat, May 19, 2018
For rectificatiion of earth wire Sat, May 19, 2018 9:00 Sat, May 19, 2018
snapping
11\110 KV SERVALAR POWER HOUSE Sat, May 19, 2018 10:00 Sat, May 19, 2018
SWITCH YARD ENTIRE MONTHLY
MAINTENANCE WORK
1. For monthly maintenance works Sat, May 19, 2018 9:00 Sat, May 19, 2018
a)Preventive Monthly Maintenance work Sat, May 19, 2018 9:00 Sat, May 19, 2018
b)Premonsoon inspection work and tree
cutting work.
1)Line Maintenance work 2)Maintenance Sat, May 19, 2018 9:00 Sat, May 19, 2018
work
Maintenance work. Sat, May 19, 2018 9:00 Sat, May 19, 2018
For monthly maintenance works Sat, May 19, 2018 10:00 Sat, May 19, 2018
Line premonsoon inspection and Sat, May 19, 2018 9:00 Sat, May 19, 2018
rectification work, Breaker, CTs and Line
side isolator maintenance work.
"Brief Description of the work programmed: Sat, May 19, 2018 8:00 Sat, May 19, 2018
To replace the 110Kv Isolator in the
Auto II-III common bus before the
Existing Bus coupler Isolator. To
strengthen the existing Strung Bus
structure near Thirumayam 110Kv
feeder and monthly maintenance
work of breaker, CT Isolators and 110
KV EHT line,"
1) For monthly maintenance works by the Sat, May 19, 2018 9:00 Sat, May 19, 2018
AEE/Mtce/Thanjavur, 2) For premonsoon
inspection works by the
AEE/Lines/Thanjavur
1) To attend the hotspot temperature Sat, May 19, 2018 9:00 Sat, May 19, 2018
idetified by the thermal imaging camera at
Bus Isolator-1 (Y-Phase) top clamp dropper
at 230 KV Eastern Bus by the
AEE/Mtce/Thanjavur, 2) To attend the
hotspot temperature idetified by the
thermal imaging camera at Bus Isolator's
fixed contact towards bus side (B-Phase) at
110 KV Thanjavur - NTKudi feeder by the
AEE/Mtce/Thanjavur, 3) To attend the bus-
isolator's (located in 230 KV Eastern Bus)
mechanism problem of 230 KV Thanjavur -
PPN feeder breaker by the
AEE/Mtce/Thanjavur, since it is very hard
to close the isolator, 4) To carry out
premonsoon inspection works in 230 KV
Thanjavur - PPN feeder by the
AEE/Lines/Thanjavur.
monthly maintenance Sat, May 19, 2018 10:00 Sat, May 19, 2018
"Replacement of Damaged gasket and Sun, May 20, 2018 10:00 Tue, May 22, 2018
Hot oil circulation work."
110 KV Breaker with CT and Line side AB Mon, May 21, 2018 9:00 Mon, May 21, 2018
Switch monthly maintenance work.
1)Maintenance Works of BKr & CT,LI Mon, May 21, 2018 9:00 Mon, May 21, 2018
2)Tree cutting works and T-T Inspection
works
For Line Maintenance Work Mon, May 21, 2018 9:00 Mon, May 21, 2018
premonsoon inspection &Tree cutting Mon, May 21, 2018 9:00 Mon, May 21, 2018
works.
Monthly maintenance work Mon, May 21, 2018 9:00 Mon, May 21, 2018
Monthly maintenance works Mon, May 21, 2018 9:00 Mon, May 21, 2018
Monthly maintenance work Mon, May 21, 2018 9:00 Mon, May 21, 2018
For monthly maintenance and GRT Relay Mon, May 21, 2018 9:00 Mon, May 21, 2018
test.
For Monthly maintenance work and Mon, May 21, 2018 9:00 Mon, May 21, 2018
line switch maintenance work
Tower to Tower Inspection & Mon, May 21, 2018 9:00 Mon, May 21, 2018
Rectification Work
For replacement of defective disc at Mon, May 21, 2018 9:00 Mon, May 21, 2018
location No.
1.For EHT Line Inspection Work Mon, May 21, 2018 9:00 Mon, May 21, 2018
a)Monthly preventive maintenance work. Mon, May 21, 2018 9:00 Mon, May 21, 2018
b)Premonsoon inspection and tree cutting
work. c)Relay Testing Work.
HV III, LV III and CTs maintenance work. Mon, May 21, 2018 9:00 Mon, May 21, 2018
FOR MONTHLY MAINTENANCE OF Mon, May 21, 2018 9:00 Mon, May 21, 2018
BREAKER, CT, CVT, ISOLATORS AND 230
KV EHT LINE
Monthly maintenance work Tue, May 22, 2018 10:00 Tue, May 22, 2018
110 KV Breaker with CT and Line side AB Tue, May 22, 2018 9:00 Tue, May 22, 2018
Switch monthly maintenance work.
1)Monthly Maintenance Works of BKR & Tue, May 22, 2018 9:00 Tue, May 22, 2018
CT,LI 2)Tree cutting works in EHT and HT
Line crossing areas
For Monthly Maintenance Work, Line Tue, May 22, 2018 9:00 Tue, May 22, 2018
Maintenance Work and P&C Work
For line mtc works & premonsoon Tue, May 22, 2018 9:00 Tue, May 22, 2018
inspection work.
Monthly Mtce work & Tree clearance work, Tue, May 22, 2018 9:00 Tue, May 22, 2018
Monthly maintenance work Tue, May 22, 2018 10:00 Tue, May 22, 2018
"1. For attending breaker and it's CT's and Tue, May 22, 2018 9:00 Tue, May 22, 2018
isolators Monthly Maintenance work. 2. For
attending tower to tower inspection work. "
Monthly Maintenance of Breaker,CT 's GRT Tue, May 22, 2018 9:00 Tue, May 22, 2018
Relay Testing work,Tree cutting work
Disc replacement work Tue, May 22, 2018 9:00 Tue, May 22, 2018
MONTHLY MAINTENANCE WORKS AND Tue, May 22, 2018 9:00 Tue, May 22, 2018
LINE MAINTENANCE WORKS
MONTHLY MAINTENANCE WORK Tue, May 22, 2018 10:00 Tue, May 22, 2018
Monthly maintenance work Tue, May 22, 2018 10:00 Tue, May 22, 2018
For Monthly Maintenance Work. Tue, May 22, 2018 9:00 Tue, May 22, 2018
For Monthly Maintenance Work Tue, May 22, 2018 9:00 Tue, May 22, 2018
1. For monthly maintenance works . Tue, May 22, 2018 9:00 Tue, May 22, 2018
For monthly maintenance work. Tue, May 22, 2018 10:00 Tue, May 22, 2018
For monthly maintenance work. Tue, May 22, 2018 9:00 Tue, May 22, 2018
Monthly Maintenance work ,Breaker testing Tue, May 22, 2018 9:00 Tue, May 22, 2018
work.
Thrust cooler cleaning Tue, May 22, 2018 9:00 Tue, May 22, 2018
Monthly Maintenance Work Tue, May 22, 2018 9:00 Tue, May 22, 2018
For Monthly Maintanance work. Tue, May 22, 2018 9:00 Tue, May 22, 2018
For replacement of flash over disc at Loc. Tue, May 22, 2018 9:00 Sun, Apr 22, 2018
No. 3
For monthly maintenance work. Tue, May 22, 2018 10:00 Tue, May 22, 2018
For rectification of defective jumper at Tue, May 22, 2018 9:00 Tue, May 22, 2018
location No.350,369,389 and 384
For Monthly maintenance work Tue, May 22, 2018 9:00 Tue, May 22, 2018
A) Monthly Maintenance work, B) Earth Tue, May 22, 2018 9:00 Tue, May 22, 2018
wire resagging , defective disc replacement
To carry out the monthly maintenance Tue, May 22, 2018 10:00 Tue, May 22, 2018
works.
a)Monthly Maintenance work. b) Relay Tue, May 22, 2018 9:00 Tue, May 22, 2018
Testing Work.
110 KV Sakottai -II feeder monthly Tue, May 22, 2018 10:00 Tue, May 22, 2018
maintenance work.
1)Line maintenance work 2)Maintenance Tue, May 22, 2018 9:00 Tue, May 22, 2018
work 3)Annual relay testing work at Myld
end.
Maintenance work Tue, May 22, 2018 9:00 Tue, May 22, 2018
Maintenance work Tue, May 22, 2018 9:00 Tue, May 22, 2018
Line premonsoon Inspection and Tue, May 22, 2018 9:00 Tue, May 22, 2018
Rectification work, Breaker, CTs and Line
side Isolator maintenance work
For Monthly Maintenance work . Tue, May 22, 2018 9:00 Tue, May 22, 2018
FOR MONTHLY MAINTENANCE WORK & Tue, May 22, 2018 10:00 Tue, May 22, 2018
CVT Erection and commissioning
1) For Flash over disc rectification works by Tue, May 22, 2018 8:00 Tue, May 22, 2018
AEE/ Lines/ Thanjavur 2) For monthly
maintenance works by the
AEE/Mtce/Punalkulam Grid SS
A)FOR MONTHLY PREVENTIVE Tue, May 22, 2018 9:00 Tue, May 22, 2018
MAINTENANCE WORK BY AEE/MTC/
NEMMELI THIPPIYAKUDI AND
ANNUAL RELAY TESTING BY P&C
WING THANJAVUR B)FOR TREE
CUTTING WORK BY AE/LINES
/PATTUKKOTTAI.
a) For monthly maintenance works. 2. Tue, May 22, 2018 9:00 Tue, May 22, 2018
Premonsoon inspection. 3. Relay Testing
1. 110KV bus isolator maintenance Tue, May 22, 2018 9:00 Tue, May 22, 2018
work, 2. 110KV bus PT maintenance
work.
For Monthly Maintenance Work, Line Wed, May 23, 2018 9:00 Wed, May 23, 2018
Maintenance Work and P&C Work
premonsoon inspection &Tree cutting Wed, May 23, 2018 9:00 Wed, May 23, 2018
works.
Monthly maintenance works for breaker, CT Wed, May 23, 2018 9:00 Wed, May 23, 2018
and Line Isolator
Monthly maintenance work Wed, May 23, 2018 10:00 Wed, May 23, 2018
For monthly maintenance work Wed, May 23, 2018 9:00 Wed, May 23, 2018
For Monthly Maintenance work. Wed, May 23, 2018 10:00 Wed, May 23, 2018
For Monthly Maintenance Work. Wed, May 23, 2018 9:00 Wed, May 23, 2018
For monthly maintenance . Wed, May 23, 2018 9:00 Wed, May 23, 2018
For monthly maintenance work Wed, May 23, 2018 9:00 Wed, May 23, 2018
For Monthly maintenance work, Line switch Wed, May 23, 2018 9:00 Wed, May 23, 2018
maintenance work
For Monthly Maintenance Work. Wed, May 23, 2018 10:00 Wed, May 23, 2018
QUARTERLY MAINTENANCE WORKS Wed, May 23, 2018 9:00 Wed, May 23, 2018
Monthly Maintenance Work and Annual Wed, May 23, 2018 9:00 Wed, May 23, 2018
Relay Testing Work
For replacement of flash over disc at Loc. Wed, May 23, 2018 9:00 Wed, May 23, 2018
No. 7 & 21 of Seithur (LILO)
To carry out the monthly maintenance Wed, May 23, 2018 10:00 Wed, May 23, 2018
works.
a)Monthly maintenance work. b)Relay Wed, May 23, 2018 9:00 Wed, May 23, 2018
testing work.
For monthly maintenance works . Wed, May 23, 2018 9:00 Wed, May 23, 2018
Line maintenance work Wed, May 23, 2018 9:00 Wed, May 23, 2018
For monthly maintenance work Wed, May 23, 2018 10:00 Wed, May 23, 2018
Line premonsoon Inspection and Wed, May 23, 2018 9:00 Wed, May 23, 2018
rectification work.
Monthly Maintenance work. Wed, May 23, 2018 9:00 Wed, May 23, 2018
1) For Monthly Maintenance work. 2) Tree Wed, May 23, 2018 9:00 Wed, May 23, 2018
cutting work
For Monthly Maintenance work. Wed, May 23, 2018 9:00 Wed, May 23, 2018
Monthly maintenance works, Auto I, HVI, Wed, May 23, 2018 9:00 Wed, May 23, 2018
LVI, Breaker, CT, Isolator
For monthly maintenance works by the Wed, May 23, 2018 9:00 Wed, May 23, 2018
AEE/Mtce/Thanjavur
For a) Monthly Maintenance works b) Wed, May 23, 2018 9:00 Wed, May 23, 2018
Premonsoon inspection. C) Relay test
a) For monthly maintenance works. b) Pre Wed, May 23, 2018 9:00 Wed, May 23, 2018
monsoon inspection, c) Relay test
Maintenance Works of BKR & CT,LI Thu, May 24, 2018 9:00 Thu, May 24, 2018
For Monthly Maintenance Work, Line Thu, May 24, 2018 9:00 Thu, May 24, 2018
Maintenance Work and P&C Work
For Attending Oil leak in Auto Thu, May 24, 2018 9:00 Thu, May 24, 2018
Transformer III, HV and LV breakers
and it's CT's and isolators Monthly
Maintenance work.
For Circuit breaker, CT and Line isolator Thu, May 24, 2018 9:00 Thu, May 24, 2018
maintenance works.
Tower to Tower Inspection work & Bay Thu, May 24, 2018 9:00 Thu, May 24, 2018
equipment maintenance works
LINE MAINTENANCE WORKS Thu, May 24, 2018 9:00 Thu, May 24, 2018
LINE MAINTENANCE WORKS Thu, May 24, 2018 9:00 Thu, May 24, 2018
For Monthly Maintenance Work. Thu, May 24, 2018 9:00 Thu, May 24, 2018
1)Annual Relay Test & Contact Resistance Thu, May 24, 2018 10:00 Thu, May 24, 2018
Test By GRT wing /SR pudur, 2) Monthly
Maintenance work
Tower to Tower Inspection and Thu, May 24, 2018 9:00 Thu, May 24, 2018
Rectification Work
For monthly maintenance work. Thu, May 24, 2018 9:00 Thu, May 24, 2018
Monthly Maintenance work ,Line Thu, May 24, 2018 9:00 Thu, May 24, 2018
maintanance work.
Monthly maintenance of Exciter Thu, May 24, 2018 9:00 Thu, May 24, 2018
cleaning, 55MVA Generator Power
Transformer
For monthly maintenance work Thu, May 24, 2018 9:00 Thu, May 24, 2018
For monthly maintenance work Thu, May 24, 2018 10:00 Thu, May 24, 2018
For Monthly maintenance work Thu, May 24, 2018 10:00 Thu, May 24, 2018
a) For monthly maintenance work b) Relay Thu, May 24, 2018 9:00 Thu, May 24, 2018
and breaker testing by GRT
Maintenance work and MRT Annual testing Thu, May 24, 2018 9:00 Thu, May 24, 2018
work
For replacement of defective disc at Thu, May 24, 2018 9:00 Thu, May 24, 2018
location No.11,12,36 and tree cutting works
For Monthly maintenance work, defective Thu, May 24, 2018 10:00 Thu, May 24, 2018
disc replacement work
Line maintenance work Thu, May 24, 2018 9:00 Thu, May 24, 2018
For monthly maintenance work Thu, May 24, 2018 10:00 Thu, May 24, 2018
Line premonsoon Inspection and Thu, May 24, 2018 9:00 Thu, May 24, 2018
rectification work, Breaker, CTs & isolator
maintenance work and GRT Relay tesing
work.
EHT Line tree cutting and premonsoon Thu, May 24, 2018 9:00 Thu, May 24, 2018
inspection
1) For monthly maintenance works by the Thu, May 24, 2018 9:00 Thu, May 24, 2018
AEE/Mtce/Thanjavur, 2) For premonsoon
inspection works by the
AEE/Lines/Thanjavur
FOR PREMONSOON INSPECTION Thu, May 24, 2018 9:00 Thu, May 24, 2018
RECTIFICATION WORK BY AE/LINES/
PATTUKKOTTAI.
Maintenance Works of BKR & CT,LI Fri, May 25, 2018 9:00 Fri, May 25, 2018
For Monthly Maintenance Work, Line Fri, May 25, 2018 9:00 Fri, May 25, 2018
Maintenance Work and P&C Work
Line Monthly Mtc and premonsoon Fri, May 25, 2018 9:00 Fri, May 25, 2018
inspection
1. Erection of 1200-600-300/1A ratio Fri, May 25, 2018 9:00 Fri, May 25, 2018
CT in R,Y and B phase of Bus section
breaker 2. Shifting of PT III
"1. For attending breaker and it's CT's and Fri, May 25, 2018 9:00 Fri, May 25, 2018
isolators Monthly Maintenance work. 2. For
attending tower to tower inspection work. "
Disc replacement & Disc Replacement Fri, May 25, 2018 9:00 Fri, May 25, 2018
work.
For Monthly Maintenance Work. Fri, May 25, 2018 9:00 Fri, May 25, 2018
For Monthly Maintenance work. Fri, May 25, 2018 10:00 Fri, May 25, 2018
For Monthly Maintenance Work Fri, May 25, 2018 9:00 Fri, May 25, 2018
Monthly Maintenance Work Fri, May 25, 2018 10:00 Fri, May 25, 2018
For monthly maintenance and GRT Fri, May 25, 2018 9:00 Fri, May 25, 2018
BREAKER test.
For monthly maintenance work Fri, May 25, 2018 9:00 Fri, May 25, 2018
For monthly maintenance work, Line switch Fri, May 25, 2018 9:00 Fri, May 25, 2018
maintenance work
For Monthly Maintenance Work. Fri, May 25, 2018 10:00 Fri, May 25, 2018
For replacement of flash over disc at Loc. Fri, May 25, 2018 9:00 Fri, May 25, 2018
No. 30,228 & 278
For monthly maintenance work. Fri, May 25, 2018 10:00 Fri, May 25, 2018
For the erection of 110 KV isolator at Fri, May 25, 2018 9:00 Fri, May 25, 2018
location 53 to preliminary work for
blackstart operation
Maintenance work and MRT Annual testing Fri, May 25, 2018 9:00 Fri, May 25, 2018
work
a) Monthly maintenance work. Fri, May 25, 2018 9:00 Fri, May 25, 2018
b)premonsoon inspection and tree cutting
work. c)Relay testing work.
a)Monthly Preventive Maintenance Fri, May 25, 2018 9:00 Fri, May 25, 2018
work. b) Premonsoon inspection and
tree cutting work by
AEE/Lines/Trichy. c) Tan Delta Test
by the EE/P&C/Madurai. d) Relay
Testing Work.
a)Monthly maintenance work. b) Tan Fri, May 25, 2018 9:00 Fri, May 25, 2018
delta Test by the EE/P&C/Madurai. c)
Relay Testing work.
For monthly maintenance works . Fri, May 25, 2018 9:00 Fri, May 25, 2018
Line maintenance work Fri, May 25, 2018 9:00 Fri, May 25, 2018
Line premonsoon inspection and Fri, May 25, 2018 9:00 Fri, May 25, 2018
rectification work, Breaker, CTs and Line
side isolator maintenance work
FOR MONTHLY MAINTENANCE WORK. Fri, May 25, 2018 10:00 Fri, May 25, 2018
For Monthly maintenance works & Annual Fri, May 25, 2018 10:00 Fri, May 25, 2018
Relay test by GRT/VPM.
FOR PREMONSOON INSPECTION Fri, May 25, 2018 9:00 Fri, May 25, 2018
RECTIFICATION WORK BY AE/LINES/
PATTUKKOTTAI.
For a) Monthly Maintenance works b) Fri, May 25, 2018 9:00 Fri, May 25, 2018
Premonsoon inspection. C) Relay test
1. 110KV bus isolator maintenance work, 2. Fri, May 25, 2018 9:00 Fri, May 25, 2018
110KV bus PT maintenance work and
replacement of 110KV bus PT by new one.
For monthly maintenance work Sat, May 26, 2018 10:00 Sat, May 26, 2018
Monthly Maintenance work ,Line Sat, May 26, 2018 9:00 Sat, May 26, 2018
maintanance work.
a) For monthly maintenance works. b) Pre Sat, May 26, 2018 9:00 Sat, May 26, 2018
monsoon inspection c) Relay Testing work.
Monthly maintenance work Mon, May 28, 2018 9:00 Mon, May 28, 2018
Monthly Mtce work ,Auxiliary contact Mon, May 28, 2018 9:00 Mon, May 28, 2018
replacement work
Monthly maintenance work Mon, May 28, 2018 10:00 Mon, May 28, 2018
Monthly Maintenance of Breaker Mon, May 28, 2018 9:00 Mon, May 28, 2018
MONTHLY MAINTENANCE WORKS AND Mon, May 28, 2018 9:00 Mon, May 28, 2018
LINE MAINTENANCE WORKS
MONTHLY MAINTENANCE WORK Mon, May 28, 2018 10:00 Mon, May 28, 2018
Monthly Maintenance work Mon, May 28, 2018 10:00 Mon, May 28, 2018
For monthly maintenance and GRT Mon, May 28, 2018 9:00 Mon, May 28, 2018
BREAKER test.
For monthly maintenance work Line switch Mon, May 28, 2018 9:00 Mon, May 28, 2018
Maintenance work
For Monthly Maintenance Work. Mon, May 28, 2018 10:00 Mon, May 28, 2018
Tower to Tower Inspection and Mon, May 28, 2018 9:00 Mon, May 28, 2018
Rectification Work
Monthly Maintenance work ,Line Mon, May 28, 2018 9:00 Mon, May 28, 2018
maintanance work.
For replacement of flash over disc at Loc. Mon, May 28, 2018 9:00 Mon, May 28, 2018
No. 51 & 81
1. For monthly maintenance works . 2. Mon, May 28, 2018 9:00 Mon, May 28, 2018
EHT Lines inspection Work.
For monthly maintenance works . Mon, May 28, 2018 9:00 Mon, May 28, 2018
Line premonsoon inspection and Mon, May 28, 2018 9:00 Mon, May 28, 2018
rectification work
monthly maintenance Mon, May 28, 2018 10:00 Mon, May 28, 2018
Monthly maintenance works, Breaker, CT, Mon, May 28, 2018 9:00 Mon, May 28, 2018
Isolator and EHT Line tree cutting and
premonsoon inspection
1. All 230KV bus isolator maintenance Mon, May 28, 2018 9:00 Mon, May 28, 2018
work, 2) 230KV Bus PT & CVT maintenance
work.
For Monthly Maintenance Work, Line Tue, May 29, 2018 9:00 Tue, May 29, 2018
Maintenance Work and P&C Work
premonsoon inspection &Tree cutting Tue, May 29, 2018 9:00 Tue, May 29, 2018
works.
Monthly maintenance works for breaker, CT Tue, May 29, 2018 9:00 Tue, May 29, 2018
and Line Isolator
Monthly Mtce work Tue, May 29, 2018 9:00 Tue, May 29, 2018
Monthly Mtce work & Annual relay testing Tue, May 29, 2018 9:00 Tue, May 29, 2018
For attending tower to tower Inspection Tue, May 29, 2018 9:00 Sun, Apr 29, 2018
and Tree cutting work
MONTHLY MAINTENANCE WORKS AND Tue, May 29, 2018 9:00 Tue, May 29, 2018
LINE MAINTENANCE WORKS
For Monthly Maintenance Works. Tue, May 29, 2018 9:00 Tue, May 29, 2018
For Monthly Maintenance Work. Tue, May 29, 2018 9:00 Tue, May 29, 2018
For monthly maintenance work Tue, May 29, 2018 9:00 Tue, May 29, 2018
For Monthly Maintenance Work. Tue, May 29, 2018 10:00 Tue, May 29, 2018
To Replace the defective disk Insulators by Tue, May 29, 2018 9:00 Tue, May 29, 2018
new one at location No.102, 116.
For monthly maintenance work. Tue, May 29, 2018 9:00 Tue, May 29, 2018
Tree clearance work Tue, May 29, 2018 9:00 Tue, May 29, 2018
Exciter cleaning, Back washing of UGB, LGB Tue, May 29, 2018 9:00 Tue, May 29, 2018
oil coolers & Governor oil circulation
Monthly maintenanec of breaker, CT & LS Tue, May 29, 2018 9:00 Tue, May 29, 2018
a) For monthly maintenance work Tue, May 29, 2018 9:00 Tue, May 29, 2018
For replacement of defective disc at Tue, May 29, 2018 9:00 Tue, May 29, 2018
location NO.36,3,15 and tree cutting works
For monthly maintenance workTree Tue, May 29, 2018 9:00 Tue, May 29, 2018
clearance witnin KMTR Forest area
For Monthly Maintenance work. Tue, May 29, 2018 9:00 Tue, May 29, 2018
Monthly Maintenance work. Tue, May 29, 2018 9:00 Tue, May 29, 2018
FOR PREMONSOON INSPECTION Tue, May 29, 2018 9:00 Tue, May 29, 2018
RECTIFICATION WORK BY AE/LINES/
PATTUKKOTTAI.
monthly maintenance Tue, May 29, 2018 10:00 Tue, May 29, 2018
Strengthening of SC line on SC towers Wed, May 30, 2018 9:00 Wed, Jun 13, 2018
with Leopard conductor into 110 KV
SC line on DC towers with Panther
conductor from Loc 1 to 39A
( Kappalur SS Tapping Loc ) and in the
Line in portion to Kappalur 110KV SS
to be executed by TLC wing
For Monthly Maintenance Work, P&C Wed, May 30, 2018 9:00 Wed, May 30, 2018
Work
For Tower toTower inspection and Line Wed, May 30, 2018 9:00 Wed, May 30, 2018
maintenance Work
Maintenance works of Breaker ,CT and Line Wed, May 30, 2018 9:00 Wed, May 30, 2018
Isolator
Tree cutting work Wed, May 30, 2018 9:00 Wed, May 30, 2018
Monthly Maintenance of Breaker, CT 'S& Wed, May 30, 2018 0:00 Wed, May 30, 2018
GRT Relay Testing work
Monthly maintenance works Wed, May 30, 2018 9:00 Wed, May 30, 2018
Monthly maintenance works Wed, May 30, 2018 9:00 Wed, May 30, 2018
For Monthly Maintenance work. Wed, May 30, 2018 10:00 Wed, May 30, 2018
230KV Kayathar 2 # Main Breaker (205-52) Wed, May 30, 2018 9:00 Wed, May 30, 2018
& CT,CVT
For monthly maintenance and GRT Wed, May 30, 2018 9:00 Wed, May 30, 2018
BREAKER test.
For Monthly Maintenance Work. Wed, May 30, 2018 10:00 Wed, May 30, 2018
To Replace the defective disk Insulators by Wed, May 30, 2018 9:00 Wed, May 30, 2018
new one at location No.155.
QUARTERLY MAINTENANCE WORKS & Wed, May 30, 2018 9:00 Wed, May 30, 2018
BREAKER TESTING WORK
Monthly maintenance of breaker CT & LS Wed, May 30, 2018 9:00 Wed, May 30, 2018
For monthly maintenance work Wed, May 30, 2018 9:00 Wed, May 30, 2018
a) For monthly maintenance work Wed, May 30, 2018 9:00 Wed, May 30, 2018
1. For monthly maintenance works . 2. EHT Wed, May 30, 2018 9:00 Wed, May 30, 2018
Lines inspection Work.
For monthly maintenance work Wed, May 30, 2018 10:00 Wed, May 30, 2018
Line premonsoon Inspection and Wed, May 30, 2018 9:00 Wed, May 30, 2018
Rectification work, Breaker, CTs and Line
side Isolator maintenance work
110KV Bus section II maintenance work, Wed, May 30, 2018 9:00 Wed, May 30, 2018
Auto II LV Breaker, CT's and bus side
isolators maintenace work.
Monthly Mtce work Thu, May 31, 2018 9:00 Thu, May 31, 2018
"1. For attending breaker and it's CT's and Thu, May 31, 2018 9:00 Thu, May 31, 2018
isolators Monthly Maintenance work. 2. For
attending tower to tower inspection work. "
Monthly Maintenance of Breaker, CT 'S & Thu, May 31, 2018 9:00 Thu, May 31, 2018
GRT Relay Testing work,Tree Cutting
For monthly maintenance work. Thu, May 31, 2018 9:00 Thu, May 31, 2018
1.Annual Relay Test by GRT Wing 2. Thu, May 31, 2018 10:00 Thu, May 31, 2018
Maintenance work
For Monthly Maintenance Work. Thu, May 31, 2018 10:00 Thu, May 31, 2018
tree clearance work,Premonsoon Thu, May 31, 2018 9:00 Thu, May 31, 2018
inspection.
For monthly maintenance work Thu, May 31, 2018 9:00 Thu, May 31, 2018
Line premonsoon inspection and Thu, May 31, 2018 9:00 Thu, May 31, 2018
rectification work
1) For monthly maintenance works by the Thu, May 31, 2018 9:00 Thu, May 31, 2018
AEE/Mtce/Thanjavur, 2) For premonsoon
inspection works by the
AEE/Lines/Thanjavur 3) The Shift
Manager/PPN Power Plant has requested
LC in 230 KV Thanjavur - PPN feeder for
maintenance works in bus isolators nos. 5
& 18.
RPORATION LIMITED
2018 at 16th TNSOCC Meeting
ments Details
to time No. of Recomendation Remarks SE Approval OPERATION
Days CIRCLE
17:00 1 RESCHEDULE SINCE VLTHR AUTO Subject to MDU
TR.LC EE/SLDC
concurrence
17:00 1 SE/O/APPROVAL Subject to SE/O TIN
concurrence
GCC
GCC
GCC
SLDC
CHENNAI
CONCURRENC
E
EE/SLDC/MDU
DISCRETION
GCC
GCC
GCC
EE/SLDC/MDU
DISCRETION
EE/SLDC/MDU
DISCRETION
GCC
SR OCC
APPROVAL NO.
EE/SLDC/MDU
DISCRETION
LONG LC
CHENNAI
SLDC
CONCURRENC
E
EE/SLDC/MDU
DISCRETION
EE/SLDC/MDU
DISCRETION
EE/SLDC/MDU
DISCRETION
EE/SLDC/MDU
DISCRETION
ERODE SLDC
CONCURRENC
E
ERODE SLDC
CONCURRENC
E
CHENNAI
SLDC
CONCURRENC
E
GCC LONG LC
ERODE SLDC
CONC.
ERODE SLDC
CONC.
ERODE SLDC
CONCURRENC
E
TAMIL NADU TRANSMISSION CORPORATION LIMITED
Consolidation of LC for the month of May 2018 at 16th TNSOCC
Transmission Lines / Elements Details
S. No SLDC Name of SS Feeder Equipment
Purpose Condition
Enhancement of Auto transformer capacity from 100 MVA During the LC period 1. 110KV SBT – Theni I, Theni
to 160 MVA II, Alagarkovil I, Alagarkovil II, Udumalpet,
Mondipatti, RNPM I, II and Shriram feeders will be
kept in tie condition.
2. 110KV Pasumalai Fr will be kept radial from Other
end. 3. 110 KV Sembatty – RNPM III Feeder will be
kept radial from both ends upto Lakshmanampatty
SS. 4. If Auto transformers found overload at
Sembatti SS, RNPM II &Mondipatty feeder will be
kept radial from other end depending on the
respective SS conditions.Hence no interruption to any
SS.
Strengthening of SC line on SC towers with 1) The feeder will be kept radial from Kinnimangalam
Leopard conductor into 110 KV SC line on DC SS upto Kappalur SS feeding 110KV Tirumangalam SS
towers with Panther conductor from Loc 1 to 39A ( and 110KV Kappalur SS 2) At Kappalur SS the switch
Kappalur SS Tapping Loc ) and in the Line in towards Pasumalai SS will be kept opened. 3)The
portion to Kappalur 110KV SS to be executed by feeder Line isolator at 230KV Pasumalai SS will be
TLC wing kept opned Hence No interruption of Supply to any SS
4)LC could be Entered only for 3 days whereas the
actual LC Required is from 11.05.2018 to
25.05.2018
Maintenance work in switch yard at M/s TNPL end& During the LC period, there will be no supply on the
Pugalur end above feeder. M/s TNPL has requested that the LC for
Maintenance work to be carried out in switch yard at
M/s TNPL end. Request letter is herewith enclosed.
The EE/TLC/Thanjavur has requested LC to carry out During the entire LC period,1) this feeder will be
strengthening work in the existing 110 KV Thanjavur – radial from Thanjavur 110 KV Grid SS upto Poondi
Thiruvarur SC line from Leopard conductor to Panther 110 KV SS,2) this feeder will be radial from Thiruvarur
conductor from Poondi 110 KV SS to Kovilvenni 110 KV 230 KV SS upto Kovilvenni 110 KV SS,3)
SS (i.e. location between 75 and 100) as per (Per) CH concurrence has been obtained from the
TANTRANSCO Proceedings No. 19, Dt. 22.01.2014. SE/Thanjavur EDC/ Thanjavur, SE/Operation/Trichy
and EE/Operation/Thiruvarur, 4) a special gang will
be readily available for attending breakdown, if
occurs, in this feeder (radial portions), 5)
backfeeding supply will be given to important 11 KV
feeders (during the breakdown period of 110 KV
feeder, if any) by EDC wing
and concurrence has been obtained for the same,
6) no supply interruption to any SS.
STRENGTHNING OF LINE
(a) For providing GI Metal spike on tower cross During the LC period 110 KV MRPM SS,
arm .(b ) For monthly maintenance work Velayuthapuram SS, 110 KV EHT Ramalinga mills and
Thulukkapatti SS under total shut down.110 KV APK
SS loads will be transfer to 110 KV Kavanoor-Kamuthi
#, along with all solar generation. Hence No SS
affected.
a) For removing jumpers,releasing of cables from the a) During the LC period 110KVAPK SS load will be fed
existing 110KVGC OMCB for dismantling. b) For from110KV Kavanoor-Kamuthi #. B) During the LC
dismanling and releasing of 110KV GC OMCB and erection period 110kv APK SS will be under total shutdown.
of 1No New 110KV SF6 Breaker in place of 110KV GC Concurrence obtained from SE/VREDC/VDRand EHT
OMCBwith the help of crane to lift the Breakers. Ramalinga mills.Hence no ss will be affected. General
remarks: After completion of erection work,wiring&
testingwill be completed before 23.05.2018 and new
SF6 breaker will be commissioned on
23.05.2018.Hence APK SS loads will be transferred to
110kv Kavanoor-Kamuthi # from14.00hrs on 18.5.18
to 23.5.18 up to 12.00hrs.(except on 19.05.2018
from 9hrs to 17.00hrs)
Strengthening of SC line on SC towers with 1)The feeder will be kept radial from Kinnimangalam
Leopard conductor into 110 KV SC line on DC SS upto Tirumangalam SS 2) The feeder will be kept
towers with Panther conductor from Loc 1 to 39A ( radial from 230KV Pasumalai SS upto Kappalur SS
Kappalur SS Tapping Loc ) and in the Line in 2)110KV Isolator towards Pasumalai at Tirumangalam
portion to Kappalur 110KV SS to be executed by SS and towards Kinnimangalam at Kappalur SS will be
TLC wing kept opened. 3)Hence No interruption of Supply to
any SS 4)LC could be Entered only for 3 days
whereas the actual LC Required is from
30.05.2018 to 13.06.2018
No. of Recomenda
From date From time To date to time
Days tion
Mon, May 7, 2018 09:00 Hrs. Wed, Jun 20, 2018 17:00 Hrs. 45 POSSIBLE
Tue, May 8, 2018 9:00 Tue, May 15, 2018 15:00 8 LONG LC
Fri, May 11, 2018 9:00 Fri, May 25, 2018 17:00 15 LONG LC
Tue, May 15, 2018 09:30 Hrs. Sun, May 20, 2018 18:00 Hrs. 6 LONG LC
Thu, May 17, 2018 09.00 Hrs. Tue, May 29, 2018 17.00 Hrs. 13 LONG LC
Thu, May 17, 2018 Tue, May 29, 2018 13
Fri, May 18, 2018 9:00 Fri, May 18, 2018 12:00 1 LONG LC
Fri, May 18, 2018 13:00 Wed, May 23, 2018 17:00 6 LONG LC
Wed, May 30, 2018 9:00 Wed, Jun 13, 2018 17:00 15 LONG LC
OPERATION GCC/P& LONG INTER
Remarks SE Approval REMARKS
CIRCLE C LC LD
LONG LC NOTE TO BE
PUT UP
NOTE TO BE NOTE TO BE
PUT UP PUT UP