Академический Документы
Профессиональный Документы
Культура Документы
Category: Civil
Report generated based on inspections conducted by TCM and Service Providers
Page 1
TCM Comments
SL NO Pictures Priority Remarks
5 Location: DIAC Fire & Irrigation Pump Station Routine Estimated repair cost: AED 8,000.00
Problem: Pump room floor is full of cracks which requires repair
Page 2
SL NO TCM Comments Pictures Priority Remarks
Page 3
SL NO TCM Comments Pictures Priority Remarks
Location: DIAC Fire & Irrigation Pump Station Estimated repair cost: AED 15000.00
10 Routine
Problem: LV room has cracks on wall structure
B. Site A (Dubai Internet City, Dubai Media City, Dubai Knowledge Park)
Page 4
SL NO TCM Comments Pictures Priority Remarks
Page 5
SL NO TCM Comments Pictures Priority Remarks
Location: Site A
20 High Estimated repair cost:
Problem: Speed hump pedestrian lane crossing road marking
Page 6
SL NO TCM Comments Pictures Priority Remarks
Page 7
SL NO TCM Comments Pictures Priority Remarks
Location: DIC
25 Routine Estimated repair cost:
Problem: All road markings are faded
Location: DIC
26 Routine Estimated repair cost: AED 1,742.00
Problem: Metal bollards paint faded (10 no.)
Location: DIC
27 Routine Estimated repair cost: AED 1,045.00
Problem: Missing metal bollards (3 no.)
Page 8
SL NO TCM Comments Pictures Priority Remarks
Page 9
SL NO TCM Comments Pictures Priority Remarks
Page 10
SL NO TCM Comments Pictures Priority Remarks
Page 11
SL NO TCM Comments Pictures Priority Remarks
Location: DMC
41 Routine Estimated repair cost:
Problem: Car parking area asphalt damage
Location: DMC
42 Routine Estimated repair cost:
Problem: Car parking area asphalt damage
Location: DMC
43 Routine Estimated repair cost: AED 27,300.00
Problem: Interlocks stones are not laid properly in various areas (200 sq.m)
Page 12
SL NO TCM Comments Pictures Priority Remarks
Location: DMC
45 Routine Estimated repair cost: AED 34,000.00
Problem: manhole concrete frame is cracked (60 no.)
Location: DMC
46 Routine Estimated repair cost: AED 58,500.00
Problem: Wooden benches require repair and repainting (60 no.)
Location: DMC
47 Routine Estimated repair cost: AED 7,332.00
Problem: Wooden benches not bolted to ground (60 no.)
Location: DMC
48 Routine Estimated repair cost: AED 19,500.00
Problem: Damaged kerb stones at many locations (100 l.m)
Page 13
SL NO TCM Comments Pictures Priority Remarks
Location: DMC
49 Routine Estimated repair cost: AED 6,825.00
Problem: Interlock tiles not fixed properly at many locations (50 sq.m)
Location: DMC
50 Routine Estimated repair cost: AED 6,825.00
Problem: Interlock tiles not fixed properly at many locations (50 sq.m)
Location: DKP
52 Routine Estimated repair cost: AED 27,300.00
Problem: car parking interlock tiles damaged (200 sq.m)
Page 14
SL NO TCM Comments Pictures Priority Remarks
Location: DKP
53 Routine Estimated repair cost:
Problem: Speed hump road marking required
Location: DKP
55 Routine Estimated repair cost: AED 4,368.00
Problem: Interlock tiles not fixed properly (20 sq.m)
Location: DKP
56 Routine Estimated repair cost:
Problem: Road marking is faded across the site
Page 15
SL NO TCM Comments Pictures Priority Remarks
Page 16