POWER PLANT TRAINING SIMULATOR

Bakreswar Thermal Power Project/WBPDCL

GOVERNING SYSTEM LINE DIAGRAM


I

,
1.1 Main Oil Pump 6.1.1 Main Steam Control Valve-1
1.2 Governor Irnpeller 6.1.2 Main Steam Control Valve-2
1.3.1 Emergency Governor (1) 6.1.3 Main Steam Control Valve-3
1.3.2 Emergency Governor (2) 6.1.4 Main Steam Control Valve-4
1.3.4 Releasing Device for 1.3 6.2 Servomotor
1.4 Thrust Failure Protection Device 6.3 Pilot Valve
1.5 Releasing Device for 1.4 6.4 Piston
1.6 Oil Trip Test Device 7.1.1 Reheat Stop Valve- L
1.6.2 Reset Device 7.1.2 Reheat Stop Valve- R
1.6.3 Lock out Device 7.2 Test Valve
1.7 Control Oil 7.3 Plunger
1.9 Electrical Speed Transmitter 7.4 Piston
1.18 Control Oil Filter 8.1.1 Intercept Valve- L
2.1 Emergency Trip device
2.2 Emergency Trip Lever 8.1.2 Intercept Valve- R
2.3 Vacuum Trip Device. 8.2 Servomotor
2.5 Change over valve fot.A TT 8.3 Pilot Valve
3.1 Speed Governor 8.4 Piston
3.2 Governor Bellows 17.1 Reheat Check Valve
3.3 Speeder Spring 17.3 Air Cylinder
3.4 Lever 18.5 Extraction Check Valve
3.5 Sleeve 18.10 Air Cylinder
3.6 Piston 20.1 Condenser
3.7 Spring 40 Pressure Switch
3.8 Speed Setter 41 Solenoid Valve
3.9 Changeover Valve 41.1 Solenoid Valve for Control Oil
3.10 Starting and Load Limiting Device Supply
3.11 Over speed Test Device during Test·
-r
3.20 Auxiliary Follow-up Piston . 41.3.1 Solenoid Trip Device-1
3.21 Follow-up Piston for MCV 41.3.2 Solenoid Trip Device-2
3.22 Follow-up Piston for ICV 41.20 Solenoid Valve for Load
3.25 Follow-up Piston Shedding
3.50 Electro-hydraulic Converter Relay
3.51 Moving Coil 42 Limit Switch
43 Pressure Gauge. [)
3.52 Differential Transformer
3.53 Proportional Band adjustment 44 Electric Position Transmitter
5.l.1 Main Stop Valve -L 45 Motor
5.1.2 Main Stop Valve-R 50.1 Boiler
5.2 Test Valve 50.4 Reheater
5.3 Plunger 50.5 Turbine
5.4 Piston 50.8 Generator
5.5 Steam Strainer