Академический Документы
Профессиональный Документы
Культура Документы
The STA should be completed daily for each Procedures/Programs Required Yes No
task. Post this STA in a conspicuous location Yes No After scaffolds/ladders were
throughout the length of the task. Each Hot Work inspected, was the inspection
crewmember involved with the task should sign Lock, Tag, Try tag signed?
this STA. At the end of the task, give this STA Trenching/Excavation Has a hazard assessment
to the Project Management. If deviation from Signs/Barricades been completed with
known safe work practice/procedure occurs, Confined Space chemicals/materials
work must be stopped. Crane Lift identified?
Line Breaking
Supervisor: Hot Tapping
Has a fire watch or vessel
attendant been trained and
Job #: Date: Scaffolds assigned?
Location of Task: Other (Specify)
Task Description: Are flammable/ combustible
Employee Certification Required materials stored, separated,
Yes No
inspected, and secured per
Crane Operator procedure?
Does task require special training? Yes No Forklift Operator
If yes, what type? Mobile Equipment Operator Have areas been identified
Power-Actuated Tool User that require fall protective
Personal Protective Equipment Required Competent Person (Lead, systems (i.e. barricades,
Yes No Type Asbestos, Excavations, confined static lines, hole covers,
Fall Protection space, Hazardous Materials, etc.)?
Body harness; lifelines; barricades scaffolds) Have they been installed?
Eye/Face
Other (specify)
Location of the nearest safety shower:
Mono goggles; face shield; hood General Information
Yes No
Respirator Was Safety involved in the Where are trash receptacles available?
SCBA; hoseline; HEPA; dust planning of this job?
Foot Protection Have the weather conditions Evacuation staging area:
Safety shoes; rubber hip boots been considered for the task?
Hand User inspection is required on all
Leather; chemical resistant; gauntlets tools, ladders, electrical cords,
rigging, and safety equipment.
Clothing Has this been completed?
Coveralls; welding shield; sleeves; rain
suit; FRC; disposable; life vest
CONTRACTOR
SAFETY PROGRAM
POST SAFETY TASK
ASSIGNMENT
List all hazards associated with this task! Involved Crew Members 1. Was anyone injured or did an
unplanned incident occur today?
Name Badge # Post STA If yes, explain.
Initial YES NO
5. Miscellaneous concerns:
Supervisor’s Signature