No Description OK N/A No Description OK


Ok
1 Work Permit 7 Man Basket

Work permit available & valid Have valid 3r° party certificate

Work permit relevant to the


Door latches are perfect
job
D Shackle/ Sling attached to
Work permit signed by all the basket are free from
defects.
Personnel are hooking the
Tool Box Talk Meeting harness to the overhaul ball
hook of crane.

Trial lift was done with man


Personal protective
2 basket with 110%of anticipated
equipment
load for each location.

PPE provided and its use is


Portable Generator
enforced
PPE properly maintained 8 ELCB ( 30mA rating) provided
PPE of approved make ELCB is functioning
Used for intended purpose Fuel tank covered
3 Excavation and Trenching Grounded properly

Shoring / Sloping / Stepping Pluck/receptacles good


Trench box Provided condition

Soil Clearance Maintained Safety Certificate validity


Barriers, Lights, Signs Fire Extinguisher with valid
Installed certificate

Safe Access /Egress Provided Guards are in position

Crossover Provided Condition of cable


Validity of Excavation
Cables are laid safely
authorization
Identification of existing
9 Gas/ Electric welding
facilities
4 Scaffolds Gauges / hoses condition
Scaffold tag system in place/ proper acetylene pressure
Valid maintained
Condition of welding / earth
Base and sole plates provided
returns cables.
Secured Proper earthling
Toe boards , guard rails
Operator's PPE
provided

Safe access ladder provided Fire extinguisher available


All ladders are secured
Combustibles protected/cleared
properly

workers are working in Spark Contained with approved


approved scaffold structure drapes

Power
5 ECLB is available /working
tool/machines/equipment

Free from defects/guarded Compressed Gas


Proper storage (shade /
Dead Man switch 10
separation)
Suitable for job Protective caps in place
Extension cords good Cylinders in upright position
condition &secured on trolley
Cables are laid neatly Flash back arrestors
Cable connectors good
Proper colour coding
condition
Cable connections properly
Regulators conditions
secured
Extension cables are armored
Crane & Lifting devices
type
11 Valid TP certificate/ safety
6 Temporary Electrical
certificate
Load Radius indicator & safe
ELCB/GFCI used
load charts
Condition of Receptacles / Condition of wire ropes and
plugs safety latches
Condition of cables Tag line used
Grounding Certified rigger in position
Warning signs Load drop area barricaded
Outriggers are placed safe
distance from the edges of
excavation.

Free from hydraulic oil leakage

Office Facilities
15
All electrical panels are covered
Electrical appliances are approved
12 Firefighting equipment
for use.
Fire extinguishers are available All ELCBs are functioning
Fire extinguishers with valid
Are the certificates are valid
certificate are available
Flammable material not stored
Gage pressure
inside office or under the cabins
13 House keeping Smoking prohibited
All plugs/ receptacles in good
Materials properly stacked
condition
Vehicle access ways are clear Good housekeeping maintained.
Walk ways are clear/ free from
First aid kit is available
obstructions.
Waste collection bins are
Office is properly earthed
available
Secured ladders are provided on Emergency telephone nos are
the slopes. displayed.
Trash bins are available and cleared
Overall condition
regularly.
14 Miscellaneous
Drinking water available
Fuel is stored in approved
containers
Fuel can keep closed / kept in
safe location.
Safe refueling practice is
followed.
All pipes are secured on the
supports
/foundations with wedges or
stoppers.
All erected pipes are secured
I