4 M 32 fights major fire 12
PM greetings cards
For three years now, the M 32 truck-
mounted concrete pump belonging to the
ready-mix company BERDING-BETON
support UNICEF projects
(Steinfeld) has been a firmly integrated
item in the resource planning of Vechta fire
Title Stor y brigade for the Osnabrück region. And only
just recently, the concrete boom was able
to demonstrate its valuable features in
4 Extensive concreting for a
complex bridge construction fighting a major fire in Dinklage.
7 Afghanistan:
Building a new university
3 4 9 4,000 m2 hall complex – the working area
of the two turntable ladders used was not
7 8 20 sufficient to cope with the situation alone. Photo: Police Oldenburg
10 Great Britain:
Service-directed for more than 30 years
The operation controllers therefore made a
quick decision to send for the additional
13
13 Italy:
No time for a coat of paint!
belonging to the BERDING-BETON
company. Within a mere 15 minutes, the
truck-mounted concrete pump was convert-
14 Poland: Warsaw pump service concreting
“Golden Terraces building complex”
ed into a highly flexible fire-fighting boom
as two firemen replaced a section of the
delivery line downstream of the pressure
20 France:
The land of the rotor fans
pipe of the truck-mounted concrete pump
with a delivery line bend fitted with an
adaptor to the fire brigade’s coupling
5 6 10 system. A collective connection to accom-
Domestic modate the two B-water hoses was also
10 14 18 added. The end hose was removed from the
tip of the boom and replaced with a so-
8 Compact 4-section boom features
numerous strong advantages called S8 foam pipe using a coupling.
Concrete pump operator, Franz-Heinrich
Photo: Holger Bokern
23 One-side support on
narrow Neckar weir
rations, foam was used to extinguish the
fire, instead of water. The foam was
BETON and fire chief of the Steinfeld fire
brigade involved in the operations: “The
provided from a tank fire truck which fed boom of a concrete pump is well suited for
up to 2,400 litres per minute to the delivery fire-fighting operations. It is easily convert-
Applications line of the truck-mounted concrete pump. ed for the job without having the firemen
As pump operator Ritterhof was controlling standing in the real danger areas!” By the
Universal pump for shotcrete job the boom from ground level and the view way – if a nozzle is connected to the boom
24 7
from above was restricted to the seat of the
fire, his mates from the fire brigade had to
tip instead of the S8 foam pipe and only
fire-fighting water is sprayed, then the
improvise. From two higher observation reach with this combination of fire truck
Practical Tip cards support partners but will be using UNICEF greet-
ings cards instead. UNICEF has been
selling the cards for many years and using
2
PM 3582 GB
3
PM 3582 GB
Title Stor y
The new, 820 m Yahagigawa Bridge has a three-lane carriageway in each direction of travel. Its impressive architecture is visible from afar. 14
15 16 18
Currently under construction in Japan is principals JAPAN HIGHWAY PUBLIC without a boom which PM has designed to
the so-called Second Tomei Expressway, CORPORATION to two well-reputed con- deliver concrete through long pipelines
struction companies KAJIMA KENSETSU (i.e. for high pump pressures). The MOLI,
urgently needed to deal with the high Co. Ltd. who is building the Western side which stands for mobile line pump is fre-
volume of traffic between Tokio and and ORIENTARU KENSETSU Co. Ltd. quently to be found in operation in coun-
Nagoya. The new motorway will take who is responsible for the Eastern side. tries in South-East Asia. Already in rod
Construction work commenced in October side operation, the machines in this series
some of the pressure off the present Tomei
2002 and work should be completed by the achieve concrete pressures of 150 bar and
Expressway which connects the two cities. end of 2004. pump flows of 68 m3/h, as does the “ordi-
The new motorway project also involves nary” stationary pump BSA 2110 HP-D
the construction of an 820 m long motor- Simultaneous concreting which, by the way, is designed for concrete
of separate towers pressures up to 150 bar and outputs of up
way bridge to span the Yahagigawa River A systematic diagram of the first phase of construction to 110 m3/h in rod side operation.
– a task which is worth several entries Sub-contractors TYUOU KENSETSU Co. showing the PM high-pressure pumps BSA 2110 HP-D
and BSF 2107 HP. Concrete placement in the towers
in the Guinness Book of Records! The Ltd. (formerly TAKASAGO KENSETSU was made using two RV 10 rotary distributors.
CHUO KENSETSU have connected the
Co. Ltd.) were commissioned to concrete concrete pumps at each of the two towers
most interesting aspect of the work is the
individual sections of the impressive to two type RV 10 mechanical concrete
methods of placing and distributing motorway bridge. The company’s fleet 17 rotary distributors via high pressure-proof
enormous quantities of mostly high- includes more than 20 Putzmeister concrete ZX delivery lines. The concrete distributors
pumps and is one of the largest concrete can be slewed horizontally over a working
strength concrete into the piers of the
pump service providers in Japan. radius of 10 m and in this phase of con-
bridge and on to the formwork for the According to estimations made by the site struction, one was installed to each of the
road surface using stationary and mobile management no locally-manufactured con- tower halves to enable the concrete to be
PM concrete pump units. crete pump would have been able to carry poured as rapidly as possible into the, in
out the concrete installation on this con- parts, very complex formwork sections.
struction site as almost all sections require As construction height increases, only one high-
pressure concrete pump and one concrete rotary
The bridge across the Yahagigawa River is concrete to be pumped to a height of about High-pressure pumps designed to distributor are required for concreting the towers
a cable-stayed bridge resting on two 120 m – and that demands a very high con- deal with 220 bar concrete pressure
towers, which have a drop-shaped cross- crete pressure. All in all, the amount of
section separating into two lattice-trussed concrete required for the towers and the When pressure rose to 130 bar in about
halves at a height of about 11 and 16 m carriageway deck of the Yahagigawa 80 m height, operational mode was switch-
through which a six-lane road is spanned in Bridge is estimated at about 24,000 m3. ed to piston side in both the MOLIs and
the centre of the carriageway. The two the BSA 2110 HP-D. All of the pumps areas of the towers was a concrete pump
structures meet in perfect harmony about Pump service providers CHUO KENSETSU were now able to deliver concrete up to a and a concrete rotary distributor type
84 m above the ground, reaching a height solved the problem by deploying two pressure of 220 bar. This of course, for RV 10. At the end of the placing oper-
of around 121 and 126 m above the found- Putzmeister concrete pumps type BSF physical reasons, reduced the output. ations, the delivery lines were cleaned
ations. The impressive construction height 2107 HP designed specially for high con- Nevertheless, around 170 m3 of concrete using a power-driven high-pressure water
of the Yahagigawa bridge represents a crete pressures and a stationary pump type was placed each day, tantamount to a daily pump which had to be hoisted each time
The MOLI (mobile line pump) is a boom-less truck-
record-breaking project for Japan. The BSA 2110 HP-D. The BSF 2107 HP mounted concrete pump designed by Putzmeister construction height of around 4.5 m. All by a crane up to the site of the concrete
contract for the works was awarded by the (MOLI) is a truck-mounted concrete pump especially for the delivery of high-pressure concrete that was then needed to concrete the upper placement.
through long delivery lines – the two operators are look-
4
PM 3582 GB
ing apparently well satisfied with its performance…
5
PM 3582 GB
Title Stor y International
24
19
1 x BSF 52.15 H
1 x BSS 52.15 H (semi-trailer)
6 x BSF 36.15 H
2 x MOLI BSF 2107 HP
1 x BSA 2110 HP-D
4 x RV 10
6
PM 3582 GB
A systematic diagram of the concreting of the bridge carriageway. As long as the horizontal reach of the two M 52 is long enough, the concrete is installed from
ground level exclusively by means of the long-reach boom pumps (top right), during later construction process supported by the BSA and MOLI high-pressure pumps.
Time-consuming concrete production using a positive-action mixer.
In the meantime, green concrete is brought to the construction site in truck mixers.
AFGAHN TOOS has a good supply of the
most important wearing parts in stock
7
PM 3582 GB
Domestic
30
Compact 28
4-section boom
features numerous strong advantages
In the meantime, many pump service ing operations can really begin, operator The M 28-4 belonging to pump service
companies have supplemented their Roland Bänfer and his mate, Heinrich Gräb providers HÄBEL also has a wide range of
– who is on site today as a reserve man – accessories on board: 125 mm and 100 mm
machine fleet with the compact and uni- have calculated a 30 minute warm-up peri- delivery hoses and pipes for a total of
versally deployable Z-fold M 28-4. Our od to get their M 28-4 “Z-fold” ready for 60 m, 65 mm hoses with a reach of up to
brief report in issue 59 of the PM Post on operation. Then for this job for the Weber 50 m, reducers, a considerable number of
company (turning – drilling – milling), it’s couplings and rubber washers. Nothing is
some of the features might have contri-
not enough just to support the machine left lying around loose on the flatbed –
buted to such a decision being made. The quickly and unfold the boom, the boom everything has its place. Either in magazi-
following report describes the typical must be extended to reach far into the hall nes, in a storage space, on holders or in
advantages of this four-sectioned boom in order to place concrete for a high-load drawers.
bearing foundation for a new metal-work-
with its exemplary weight reserves and ing machine. In order to be able to reach into the further-
decidedly site-compatible support in daily most corners of the floor formwork in the
operations. Furthermore, the special The M 28 four-section boom stands with shop, the 28 m extended boom must be
its long side immediately in front of the lengthened by approximately a further
version of the machine is also equipped
entrance to the machine shop. The working 25 m. The two HÄBEL experienced em-
with the new fuel-saving EOC engine range of the Z-fold boom can be used with- ployees easily and quickly replace the end
speed control. out too great a loss in lateral reach. The hose on the boom tip with a reducer which
arm assembly is lifted, slewed sideways tapers the line diameter from 125 mm to
and placed a little to the rear. Now the 65 mm. In compliance with safety regulat-
The new BSF 28.14 H owned by the con- boom can be unfolded – like a pocket rule ions, the boom tip is placed on the ground
crete pump service company HÄBEL – and then driven to its end position in the and the reducer connected. In just a few
(Siegen) arrives punctually at nine in the shop. It’s really quite amazing to watch minutes, five 65 mm hoses have been con-
morning at the construction site in the how quickly a “Z-fold” boom is ready for nected – and pumping begins at 9.30, a.m..
Netphen industrial park. Before the pump- work! The working range of the M 28 Z-fold boom can be used without too great a loss in lateral reach
29
“With my M 28 pump, not only can I pump 31 32
large quantities of concrete for floor slabs makes it easier for the concreting team,
or floors, but I also frequently work on there’s less concrete residue and it’s easier
smaller construction sites where pumps to clean up afterwards.” According to his
with larger booms cause problems when observations, there are practically no natur-
setting up the machine. Not to mention al deposits of 16 grain size in the Siegerland
renovation sites which of course, are not – in contrast, for example, to the neighbour-
always at the roadside. That means in about ing Ruhr District. “The 16-grain chippings
every third job, it is necessary to extend the we send through the narrow lines should
boom delivery line by attaching additional contain ample fine particles, otherwise we
hoses”, estimates pump operator Bänfer. will quickly have too much wear and tear.”
“Here in the Siegerland, we are confronted In the meantime, most of the mix com-
by conditions that are either narrow, steep panies in his catchment area have changed
or confined. But I am always able to find a over to using fine-grain concrete with 0/8
space for our M 28; I can even set it up chippings for renovation work. “Before I
between the site trailer and the Dixi site begin to place any concrete, I send a few
toilets!” When he mentions needing less 65 mm hoses are easy to handle
buckets of grout through the line and then
space, he is referring to the front diagonal I start the job!” The retro-fitted high-press-
support (support width 6.2 m) and the ure water pump means that cleaning oper- further optimising fuel-saving concrete
almost vertical support legs at the rear ations are dealt with quickly and thorough- pump operations. As soon as the operator
(where the support width is just 2.6 m). ly, even in the big delivery lines. has set a desired output via radio remote
What he also likes is the manoeuvrability control, the EOC fuel management auto-
of the four-sectioned boom which is made The special version of the BSF 28.14 H matically regulates the required minimum
possible by its short wheel base. belonging to HÄBEL is also equipped with r.p.m.. Using EOC not only reduces diesel
the new fuel-saving EOC engine speed consumption in concrete pumps but also
Where smaller quantities of concrete are control. The EOC – or Ergonic Output noise level and, last but not least, wear and
required – although the delivery distance Control – is just one of the extras provided tear in the machines. When required, this
might still be extensive – operator Bänfer by PM in the “Power Kit”. Putzmeister has value can be manually “overridden” to set a
often deploys the 65 mm hoses. “That developed the Ergonic Output Control higher or lower r.p.m. However, fuel is also
(EOC) module as a control system for saved when in “normal operation” mode.
8
PM 3582 GB
The pipelines and connected delivery hoses are
“lubricated” at first using a few buckets of grout
Radio remote control allows pump operator Roland
Bänfer to remain close to the placement site
9
PM 3582 GB
International
33
average length of service over twelve 36
years, but without losing any of the enthu-
siasm. Mick Ferguson the Service Manager
has been with Putzmeister from the begin-
ning, and still finds new challenges, still
gets excited by talking a customer through
a problem, still looks for ways to improve
the service his team provides and how it
isdelivered. PMUK invest in training and
forward planning to ensure this fund of
knowledge and practical experience of the
machines, applications and operations is
secured for the future.
By Austin Quier,
managing director Putzmeister Ltd., How PMUK performs is dependant on the
Chesterfield entire team, and those behind the scenes
are every bit as important in delivering
quality to the customers. This culture has
been reinforced in the systems and
Thirty
structure already developed to achieve
certification for BS EN9001-2000.
Thirty years ago, PMUK consisted of just one office and one storeroom – the company moved into this new building
in 1981 Strengths built on differences
2004 marks thirty years of Putzmeister’s The beginnings were certainly humble, just Chesterfield, where the current premises This has helped to make PMUK more
direct presence in the UK and Ireland, two small rented buildings one in which were built in 1981. responsive to market requirements, and has
the first pumps were assembled, the other resulted in a number of successes over the
and it is a good moment to reflect on used as stores and offices. People matter years. The City Pump concept of a small
the record of Putzmeister Ltd, known mobile concrete pump was conceived in
within the Putzmeister Group as PMUK. Over a period of six years more buildings Whilst the buildings are important PMUK 1986, and in 1987 the first units were
were rented to accommodate the growing is about commitment to supplying quality assembled in Chesterfield with 16 m boom
To assess how they have arrived where
demand. This may not have been a glamor- products, and about people with a commit- and 1005 pump mounted on a 13 t chassis.
they are today, and how the company ous start, but it established the culture of ment to providing the best for their cus- Initially this model attracted a number of
can continue to develop in the future. financial strength and self-sufficiency that tomers, not always succeeding, but willing new operators into the pumping market,
has become a hallmark of PMUK, and pro- to learn, and come back stronger for the and has evolved over the years until small
vided the resources to acquire the site in experience. PMUK can take pride in an concrete pumps now feature in most UK
In compliance with the requirements of the British market, Putzmeister developed the City concrete pump series
10
PM 3582 GB
This stationary pump BSA 1005 D “Primera” differs in a few details from the series produced in Aichtal
11
PM 3582 GB
International International
38 40
37 39
12
PM 3582 GB
two HSP high-density solids pumps in an Irish mine.
13
PM 3582 GB
International International
42 44
On completion, the underground car park
the “Golden Terraces” a hotel with 450 beds. The upper storeys
will be rented out as office premises and
residential apartments.
Building industry
booms in Poland
According to enquiries carried out by the
Frankfurter Allgemeine Zeitung, Poland’s
building industry is on a definite road to
recovery; this can be attributed to the
improved economic situation and result-
ing investments. In addition to privately
financed construction projects, the future
will see more and more funding from the
EU funds to benefit especially civil
engineering and road construction as well
as special environmental construction
projects. The increasing number of ten-
ders for major projects has contributed to
an improved climate in the building in-
dustry: alone in the first quarter of 2004,
there was an increase of 20 % compared
with the figures for the same period in
the previous year. (FAZ, 7 June 2004)
14
PM 3582 GB
15
PM 3582 GB
International
46
50 they are wrapped in an insulating foil for at cleaning process and the BSA pump and
48
least 72 hours to ensure the slow release of gate valve are carefully serviced. Whereby
hydration heat. The result is high-strength operator Zdzieszynski is very particular:
building components which have a basic “Lubrication is on the agenda, at least once
area of 150 x 150 cm on the “Golden a day!”
Terraces” site and a very fine, smooth sur-
face already prepared for painting.
52
Maintenance jobs are taken seriously
53
during the climb, supplementary tubes are transfers the concrete to the pumps, is emptied using a gate valve, which steers PM representative – a strong partner
installed as length adjustments. each batch is tested in their own mobile the concrete residue still in the line via a
laboratory. pipe bridge - a so-called „gallows“- into a Not only BOSTA and WARBUD but also
In the winter months, the two pump ser- truck mixer. The valve is connected to the many other Polish concrete pump compa-
vices can carry out pours using pre-heated hydraulic circle of the concrete pump agi- nies and building contractors are provided
49 aggregates up to a temperature of -12°C. tator and can be controlled by means of with support from the PM representative
The concrete is pumped up to the eighth 51 remote control push button. As soon as the ALLTECH, both on the purchase of a
storey whereby the delivery line is now pipe line is empty, the whole of the con- machine and its servicing. Already in the
The climbing process in detail: almost 200 m long. crete delivery system undergoes a thorough “Golden Terraces“ planning phase,
ALLTECH specialists were able therefore
■ Attaching the climbing In addition to WARBUD’s graduate to give the main contractor SKANSKA
A construction piece wrapped around
cylinders and bolt 1 engineer Adam Wleklak, the company with foil releases hydration heat only slowly practical tips regarding optimum concrete
54
has three other employees constantly on pours for this complex construction site.
■ Extending the climbing
site for concrete jobs in zones 3 and 4.
formcylinder (30 mm), “Cooperation with our customer ALLTECH, registered in Warsaw and
extracting bolt 2 and HYDROBUDOWA is simply excellent. Sopot (near Gdansk) has been representing
complete extension Our colleagues from HB 6 give us every Putzmeister AG in Poland since 1992. The
■ Placing bolt 2 on floor support when things begin to get tight and 15 employees at ALLTECH – four of them
frames, removal of bolt 1 we understand when sometimes a piece exclusively responsible for service and
and retracting climbing of formwork isn’t ready according to maintenance – deal with consultation,
cylinder schedule!” Diplom-Ingenieur Adam Wleklak sales, spares supply and customer service
for the PM machines in Poland. The most
■ The process is repeated
In general, the concrete used for the Self-compacting concrete means less important wearing parts are kept in stock in
project is of strength class C50/60 and formwork all three locations, or can be ordered at
C35/45. Furthermore, different components short notice. When required, the service
are made of self-compacting concrete Self-compacting concrete is used for exam- team can be quickly on the spot to tend the
The MX boom is situated on a 20 m high building. With the help of an hydraulic (SCC) of the same strength. Of the total ple in sections where a vibrator cannot machines. Trained ALLTECH employees
tubular column led through small openings climbing device, the height of the concrete quantity of concrete (156,000 m3 for the reach. Or because the high degree of early also carried out the required customer
in the floor and supported in the storeys by boom can be adjusted to building progress. building and 56,000 m3 for the foundation), strength of SCC means the formwork can service jobs at the “Golden Terraces“ site –
three frames. The floor frames fulfil two The climbing process is easily and quickly about 4,800 m3 is SCC material. The be removed sooner, for example, from the to the total satisfaction of both the pump
functions: On the one hand, they clamp the carried out by using two lift cylinders degree of slump is about 17 cm. The supporting piles where formwork may be service companies and the responsible
tubular column taut and on the other hand, which are connected with the hydraulic concrete is supplied by two mixer plants removed in most cases already after 12 contractor.
they absorb the introduction of vertical system of the MX boom. The delivery line outside of Warsaw, which together have a hours. Immediately after the removal of
load moments in the structure of the remains attached to the tubular column capacity of 140 m3/h. Before WARBUD formwork from these building components,
16
PM 3582 GB
17
PM 3582 GB
Tunnel Construction Practical Tip
®
Sika -PM wet spraying systems
55
Mess-free formwork 60
One of three Sika®-PM 500 P seen here placing concrete for the upper arches of a tunnel portal of ARGE “LA HERRADURA“ (Photo: José Luis Rivas, Sika®) 57 61
59
18
PM 3582 GB
19
PM 3582 GB
International International
64 67
France – the
62
land of
the rotor fans
For years now, the demand for is part of the large fleet of vehicles belong- foundations in the garden of a 300 year-old
Putzmeister rotor PUMI s among our
® ing to BETON DE FRANCE, a pump ser- farmhouse, 20 m3 normal concrete, boom The large hopper on the rotor pump is easy to charge
vice company operating all over France. tip extended with a 15 m hose, lots of time
neighbours in France has been considera- Operator Alain Meroy has been working on spent just waiting – the usual situation. 65
bly higher than that for PUMI®s with a the rotor pump for three years delivering a
piston pump. The rotor system – in whole range of different materials. In the Waiting for concrete
evening, he does not go back to his depot,
France it is also known as “ROMIX” – is
but takes his ROMIX home with him! At 7.15 a.m., the rotor pump arrives at the
so well-known and successful that some “That’s better for me because I save myself construction site. In half an hour, the pump
customers would like to install the rotor the trip to the depot and in the morning, I is ready for operation. The boom has been
onto a “normal” truck-mounted concrete can drive straight to the construction site. placed over the wall in position and the
All the many traffic jams in and out of 100 mm pipe and delivery line have been
pump with boom. Putzmeister is only too Paris mean you need to calculate extra time connected with a reducer. It’s late – and
pleased to put this request into practice. to get to the site punctually”, he explained. around 9.00 a.m. the first of three truck
We came across one of these truck-mount- As the operator and the machine are prac- mixers turns up. So there is enough time
tically left to their own devices, the BQF is for a chat at the vehicle and then for an
ed concrete pumps from the BQF series
equipped with all the accessories needed espresso with the PM visitor in the café
on a typical construction site south of for “an emergency”. next door. Along the way, we are told that
Paris. Alain Meroy pumps using a 4,000 m3 rotor
This morning, Alain Morey is on his way hose, a wearing part, which is replaced
The machine is a BQF 24.08, built in 1999. to his first job in the what used to be rural about 3 or 4 times a year. “No – we don’t The hose is placed around the side of the building The 24 m boom serves as a “pipe bridge” taking the garden wall in its stride
The rotor pump with a 24 m Z-fold boom landscape around Paris to place concrete just turn the hose around in order to length-
63 en its service life”, states operator Meroy 66
clearly, and he goes on to tell us all about
the different materials his rotor delivers, Even a pump hose
with never a word of complaint! “I pump
everything the pinch valve can cope with –
has only one life
whatever happens to come along: lean con-
crete, lean mortar, steel fibre reinforced
concrete, light-weight concrete, that means It doesn’t happen too often but
materials which would not be so suitable occasionally it has been observed that
for a piston pump. So, I am never at a loss after the rotor hose has dealt with a
for work!“ certain quantity it is not replaced, but
simply turned around. This attempt
No need to dispose of concrete residues – assumes saving costs and extending
saving detours and time the service life of the wearing part.
Jörg Herrmann, head of the Central
This job also reveals other strengths of the Service Station at PM AG in Aichtal
rotor system. The whole of the concrete doesn’t think much of such reputedly
can be pumped forward into the formwork economizing measures: “It takes more
- an important feature - as otherwise there time to turn the pump hose around
would be no way of cleaning the pump than it does to replace it with a new
system and the delivery line on the con- one because the hose spout must be
struction site. This speciality is also an removed from the ends and then push-
important reason that the M 24 rotor con- ed on again after the hose has been
crete pump earns its keep on average at two turned. And afterwards, the operator
sites each day in spite of frequent traffic still has a worn rotor hose, in which
congestions. It would have cost operator the fabric lining has been subjected to
Meroy a lot of time in those traffic conditi- great stress. The risk of the hose burst-
ons to drive off to the next disposal site. ing is therefore very high, And all
that just to save A 840 for a new rotor
hose? There is nothing to be gained
from it, you only lose out!”
20
PM 3582 GB
When the truck gets stuck in a jam, there’s time for a chat for the operators Without holding up the flow of traffic, the BFQ 24.08 can be set up along the road
21
PM 3582 GB
Domestic Domestic
69
of high-strength concrete on Neckar weir only sure instincts when setting up the
machine but also OSS – one-sided supports
as only a very narrow pedestrian or cycle
path – in former times a towpath – could
be considered as a possible location which
Well-conceived site logistics, modern stationary PM concrete pump type BSA The walls of the Neckar weir in The wall runs from the Cloister Mill about could also be reached by the truck mixers.
formwork methods and a reliable fleet of 1408 E took over the delivery of concrete 200 m upstream, separating the Neckar Achim Baierl is a fully qualified, trained
Mittelstadt were renovated in the summer
via a high-pressure pipeline to the station- from its old natural river bed. The surface and tested concrete pump operator and was
machines are today’s essentials when it ary boom MX 32 T. months using a Putzmeister BSF 42.16 H. of the sloping shoulder of the weir had therefore very much aware of the risks of
comes to saving time and money on high- The narrow banks provided very little been increasingly washed away over the setting up the machine so close to the river
rise projects. The latest example of rapid The RWE tower is built on a lens-shaped space for setting up the machine. years. The work immediately next to and in banks and of the need to comply with
foundation in the middle of which is the the Neckar had been planned to take place safety regulations.
project completion are the 91 m high
central core of the building. Whilst at low water.
RWE towers in Dortmund where a OEVERMANN installed MEVA formwork
stationary Putzmeister concrete pump for the ceilings, the stationary concrete
and a concrete boom climbing up with the boom was anchored to a DOKA formwork 70 71
platform which was supported in the ele-
formwork platform played a decisive role. vator shaft. Half of the ceiling area and the
walls of the building’s core were to be rein- The BSA 1408 E being charged from a truck mixer
In the early stages the construction com- forced and simultaneously concreted wet
pany responsible for carrying out the work on wet in a five-day rhythm. Using hy-
OEVERMANN GmbH & Co. KG draulic cylinders, the formwork platform Delivering concrete through
(Münster, branch in Dortmund) rented climbed upwards together with the MX high-pressure line
truck-mounted concrete pumps with long- boom. One storey every five days (3.45 m).
reach booms from local pump service com- The concrete used was of strength class Concrete was delivered from the BSA
panies for placing concrete for the floor C 50/60 of which 120 m3 went into the two stationary pump as far as the boom through
slab, the ceilings in the ground floor and ceiling sections in each storey and around a high-pressure pump line, totalling 120 m
the first four upper storeys. Afterwards, a 49 m3 into each half of the shaft. in length. It comprised for the most part
ZX pipes which were supplemented on two
short sections by high-pressure SK lines
Half of the ceiling area and the walls of the building’s core were to be reinforced and simultaneously concreted wet on wet (130 bar operational pressure). At the inter-
68 face between riser pipe and stationary
boom pipework, a delivery hose – likewise
able to withstand 130 bar – ensures flexible
transition. Concrete was installed up to a
maximum of 30 m3/h.
Concrete pump and end hose in view – operator Achim Baierl can control concrete placement using the EBC radio remote controls down to the last millimetre
22
PM 3582 GB
23
PM 3582 GB
Applications
72
PM 3582 GB All rights reserved. Subject to technical amendments without notice. The illustrations in some cases show special-purpose machine designs and snapshots of site
practice which do not always comply with the regulations determined by professional bodies.© 2004 by Putzmeister Printed in Germany (2.50412 RR)