Вы находитесь на странице: 1из 1

Contractor

EARTHING SYSTEM CHECKING Rep. No.

REPORT Proj, Int. ID.

Form – IQ Form E001


Company Contract No.: Project
Yard (Location):

Eni Iraq bv 5000008489 ZUBAIR OIL FIELD DEVELOPMENT

CHECK PERFORMED P N N/A


1. Buried conductors and earth rods are located in accordance with the design.
2. Conductors installed without protection are sheathed (yellow/green).
3. The continuity of the protective conductors (PE), equipotential conductors and other
conductors which form part of the earthing system has been verified.
4. Conductors rising from the floor or ground are protected by means of a conduit section.
5. Buried joints of conductors are protected against damp with a bitumen or similar
compound.
6. Earthing of equipotential connections are provided for machines, panels, equipment,
components and structures, including those outside the electrical installation, as anticipated
in the design and in accordance with reference codes.
7. Air terminations and down conductors for lightning protection comply with the design.
8. Transformer neutrals are correctly earthed.
9. Earthing of concrete reinforcing bars has been carried out, if required by the design.
10. Terminals and earth bus-bars are correctly installed.
11. Protective conductors (PE) and earthing conductors are correctly fixed and protected.
12. Metal sheaths and cable armouring are earthed.
13. Bus-bar joints or conductor fixing bolts are well tightened.
14. Protection against corrosion has been provided and is complete or made good where
necessary.
REMARKS: P=POSITIVE N =NEGATIVE N/A =NOT APPLICABLE

MEASUREMENT OF SOIL ELECTRIC RESISTIVITY FOR CATHODIC PROTECTION – WENNER METHOD

Ambient Temperature =
Measured Resistance Value (Ohms) with Spacing 5 Meter =
Measured Resistance Value (Ohms) with Spacing 7.5 Meter =
Measured Resistance Value (Ohms) with Spacing 10 Meter =

Test Equipment – Earth Resistivity Meter


Make – Megger, Model – DET4TCR2
Serial number – 101247729
Calibration Date – 19-06-2017
Next Calibration Due – 18-06-2018
Calibration Certificate number – 1170628-25

FOREMAN - CONTRACTOR QC - CONTRACTOR QC - ENI QC - ZFOD

NAME NAME NAME NAME

SIGNATURE SIGNATURE SIGNATURE SIGNATURE

Date Date Date Date

This document is property of Eni Iraq B.V.


It shall neither be shown to Third Parties not used for purposes other than those f or which it has been sent.