COSTO MINA AÑO 1 AÑO 2 AÑO 3 AÑO 4 AÑO 5 AÑO 6 AÑO 7 AÑO 8 AÑO 9 AÑO 10 AÑO 11 AÑO 12 AÑO

AÑO 8 AÑO 9 AÑO 10 AÑO 11 AÑO 12 AÑO 13 AÑO 14 AÑO 15 AÑO 16 AÑO 17

COSTO DOTACIÓN (KUS$/AÑO) 3,347 5,578 7,513 10,705 10,705 10,705 10,705 10,705 10,705 10,705 10,705 10,705 10,705 10,705 10,705 10,705 5,578

COSTO DOTACIÓN (US$/TON) 2.45 2.07 1.64 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 2.15

COSTO PRODUCCIÓN MINA (KUS$/AÑO) 3,790 6,808 10,026 11,548 11,548 11,548 11,548 11,548 11,548 11,548 13,013 13,013 13,013 13,013 13,013 13,013 7,575

COSTO PRODUCCIÓN MINA (US$/TON) 2.77 2.52 2.18 1.83 1.83 1.83 1.83 1.83 1.83 1.83 2.07 2.07 2.07 2.07 2.07 2.07 2.92

COSTO PREPARACIÓN MINA (KUS$/AÑO) 13,138 19,512 22,409 22,602 22,625 23,926 24,088 24,636 24,339 23,634 24,773 20,261 24,875 20,597 17,479 8,426 1,017

COSTO PREPARACIÓN MINA (US$/TON) 9.60 7.23 4.88 3.59 3.59 3.80 3.82 3.91 3.86 3.75 3.93 3.22 3.95 3.27 2.77 1.34 0.39

COSTO PLANTA CHANCADO / PIQUE SKIP (KUS$/AÑO) 1,924 3,410 5,407 7,455 7,455 7,455 7,455 7,455 7,455 7,455 7,455 7,455 7,455 7,455 7,455 7,455 3,556

COSTO PLANTA CHANCADO / PIQUE SKIP (US$/TON) 1.41 1.26 1.18 1.18 1.18 1.18 1.18 1.18 1.18 1.18 1.18 1.18 1.18 1.18 1.18 1.18 1.37

CONTINGENCIAS (5%) (KUS$/AÑO) 1,110 1,765 2,268 2,615 2,617 2,682 2,690 2,717 2,702 2,667 2,797 2,572 2,802 2,588 2,433 1,980 886

CONTINGENCIAS (5%) (US$/TON) 0.81 0.65 0.49 0.42 0.42 0.43 0.43 0.43 0.43 0.42 0.44 0.41 0.44 0.41 0.39 0.31 0.34

COSTO TOTAL MINA (KUS$/AÑO) 23,307 37,072 47,623 54,925 54,949 56,315 56,485 57,060 56,748 56,009 58,743 54,005 58,850 54,358 51,084 41,578 18,613

COSTO TOTAL MINA (US$/TON) 17.04 13.73 10.38 8.72 8.72 8.94 8.97 9.06 9.01 8.89 9.32 8.57 9.34 8.63 8.11 6.60 7.18
Turnos/Día 3
Turnos/Totales 4
Dotación Tarifas Tarifas
Dotación Mina
Dotación/Turno Dotación Total KUS$/Mes KUS$/Año
1.- Gerencia Mina 2 2
Gerente Mina 1 1 8.5 102.0
Secretaria 1 1 1.5 18.0
Sub-Total (1) 2 2
2.- Superintendencia Ingeniería, Geología y Geomecánica 18 19
Superintendente Mina 1 1 7.0 84.0
Ingenieros Planificación 3 3 5.0 60.0
Geólogos 2 2 5.0 60.0
Geomecánicos 1 1 5.0 60.0
Ayudantes Geologo 2 2 3.0 36.0
Proyectistas/Dibujantes 3 3 2.5 30.0
Topografos 2 2 2.5 30.0
Alarifes 2 2 1.5 18.0
Laboratoristas 1 1 2.5 30.0
Ayudante Laboratorio (Muestrero) 1 2 1.5 18.0
Sub-Total (2) 18 19
3.- Superintendencia Producción Mina 27 91
Superintendente Producción 1 1 7.0 84.0
Supervisor Producción 1 4 5.5 66.0
Supervisor Chancado y Skip 1 4 5.5 66.0
Supervisor Perforación y Tronadura Producción 1 4 5.5 66.0
Operadores Cargadores Frontales Sala Control 2 8 3.0 36.0
Operadores Camiones Sala Control 2 8 3.0 36.0
Operadores Perforadoras Radiales Sala Control 1 4 3.0 36.0
Operadores Chancador y Skip Sala Control 1 4 3.0 36.0
Operadores Perforadoras Radiales Terreno 3 12 3.0 36.0
Operador Equipo Tronadura 2 8 2.5 30.0
Operadores Equipos Apoyo 6 12 2.5 30.0
Operadores Ayudante Producción 3 12 2.0 24.0
Ayudantes Tronadura Producción 2 8 2.0 24.0
Control Producción 1 2 3.5 42.0
Sub-Total (3) 27 91
4.- Superintendencia Construcción y Preparación 18 67
Superintendente Construcción y Preparación 1 1 7.0 84.0
Supervisor Preparación 1 4 5.5 66.0
Operador Jumbo Avance 3 12 2.5 30.0
Operador LHD Preparación 3 12 2.5 30.0
Capataz Tronadura Avance 1 4 3.5 42.0
Mineros Tronadura 1 4 2.0 24.0
Operador Shotcretera 1 4 2.5 30.0
Operador Empernador 1 4 2.5 30.0
Mineros Fortificación 1 4 2.0 24.0
Operador Equipo Servicio 1 4 2.5 30.0
Mineros Servicios 1 4 2.0 24.0
Inspector Construcción ITO 1 4 3.0 36.0
Ayudante Inspector Construcción ITO 1 4 2.5 30.0
Geomecánicos Terreno 1 2 4.0 48.0
Sub-Total (4) 18 67
5.- Superintendencia Mantención Mina 19 73
Superintendencia Mantención 1 1 7.0 84.0
Supervisor Mecánico 1 4 5.5 66.0
Supervisor Eléctrico e Instrumentación 1 4 5.5 66.0
Mantenedores Mecánicos 6 24 2.5 30.0
Mantenedores Eléctricos 3 12 2.5 30.0
Mantenedores Instrumentación 2 8 2.5 30.0
Mantenedores Planta Chancado 2 8 2.5 30.0
Mantenedores Pique Skip y Correas 2 8 2.5 30.0
Pañolero 1 4 2.5 30.0
Sub-Total (5) 19 73
6.-Subgerencia Seguridad y Medio Ambiente 4 4
Subgerente Seguridad y Medio Ambiente 1 1 4.0 48.0
Prevencionista 2 2 3.5 42.0
Medio Ambientalista 1 1 3.5 42.0
Sub-Total (6) 4 4
7.- Unidad de Soporte y Mantención 5 11
Jefe Unidad 1 1 4.0 48.0
Ingeniero de Soporte 1 4 3.0 36.0
Ingeniero Mantención 2 2 3.0 36.0
Ingeniero Desarrollo 1 4 2.5 30.0
Sub-Total (7) 5 11

TOTAL DOTACIÓN MINA 93 267


Dotación Mina AÑO 1 AÑO 2 AÑO 3 AÑO 4 AÑO 5 AÑO 6 AÑO 7 AÑO 8 AÑO 9 AÑO 10 AÑO 11 AÑO 12 AÑO 13 AÑO 14 AÑO 15 AÑO 16 AÑO 17

1.- Gerencia Mina


Gerente Mina 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Secretaria 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Sub-Total (1) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
2.- Superintendencia Ingeniería, Geología y Geomecánica 19
Superintendente Mina 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 7
Ingenieros Planificación 1 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 2 15
Geólogos 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 10
Geomecánicos 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 5
Ayudantes Geologo 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 1 6
Proyectistas/Dibujantes 1 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 2 7.5
Topografos 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 5
Alarifes 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 3
Laboratoristas 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2.5
Ayudante Laboratorio (Muestrero) 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 3
Sub-Total (2) 10 13 18 19 19 19 19 19 19 19 19 19 19 19 19 19 13
3.- Superintendencia Producción Mina 91
Superintendente Producción 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Supervisor Producción 1 2 2 4 4 4 4 4 4 4 4 4 4 4 4 4 2
Supervisor Chancado y Skip 1 2 2 4 4 4 4 4 4 4 4 4 4 4 4 4 2
Supervisor Perforación y Tronadura Producción 1 1 2 4 4 4 4 4 4 4 4 4 4 4 4 4 1
Operadores Cargadores Frontales Sala Control 2 4 6 8 8 8 8 8 8 8 8 8 8 8 8 8 4
Operadores Camiones Sala Control 2 4 6 8 8 8 8 8 8 8 8 8 8 8 8 8 4
Operadores Perforadoras Radiales Sala Control 1 2 3 4 4 4 4 4 4 4 4 4 4 4 4 4 2
Operadores Chancador y Skip Sala Control 1 2 3 4 4 4 4 4 4 4 4 4 4 4 4 4 2
Operadores Perforadoras Radiales Terreno 4 6 8 12 12 12 12 12 12 12 12 12 12 12 12 12 6
Operador Equipo Tronadura 2 3 4 8 8 8 8 8 8 8 8 8 8 8 8 8 3
Operadores Equipos Apoyo 1 6 8 12 12 12 12 12 12 12 12 12 12 12 12 12 6
Operadores Ayudante Producción 1 6 8 12 12 12 12 12 12 12 12 12 12 12 12 12 6
Ayudantes Tronadura Producción 2 3 4 8 8 8 8 8 8 8 8 8 8 8 8 8 3
Control Producción 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1
Sub-Total (3) 21 43 59 91 91 91 91 91 91 91 91 91 91 91 91 91 43
4.- Superintendencia Construcción y Preparación
Superintendente Construcción y Preparación 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Supervisor Preparación 1 1 3 4 4 4 4 4 4 4 4 4 4 4 4 4 1
Operador Jumbo Avance 3 6 9 12 12 12 12 12 12 12 12 12 12 12 12 12 6
Operador LHD Preparación 3 6 9 12 12 12 12 12 12 12 12 12 12 12 12 12 6
Capataz Tronadura Avance 1 2 3 4 4 4 4 4 4 4 4 4 4 4 4 4 2
Mineros Tronadura 1 2 3 4 4 4 4 4 4 4 4 4 4 4 4 4 2
Operador Shotcretera 1 2 3 4 4 4 4 4 4 4 4 4 4 4 4 4 2
Operador Empernador 1 2 3 4 4 4 4 4 4 4 4 4 4 4 4 4 2
Mineros Fortificación 1 2 3 4 4 4 4 4 4 4 4 4 4 4 4 4 2
Operador Equipo Servicio 1 2 3 4 4 4 4 4 4 4 4 4 4 4 4 4 2
Mineros Servicios 1 2 3 4 4 4 4 4 4 4 4 4 4 4 4 4 2
Inspector Construcción ITO 1 2 3 4 4 4 4 4 4 4 4 4 4 4 4 4 2
Ayudante Inspector Construcción ITO 1 2 3 4 4 4 4 4 4 4 4 4 4 4 4 4 2
Geomecánicos Terreno 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1
Sub-Total (4) 18 33 51 67 67 67 67 67 67 67 67 67 67 67 67 67 33
5.- Superintendencia Mantención Mina
Superintendencia Mantención 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Supervisor Mecánico 1 2 3 4 4 4 4 4 4 4 4 4 4 4 4 4 2
Supervisor Eléctrico e Instrumentación 1 2 3 4 4 4 4 4 4 4 4 4 4 4 4 4 2
Mantenedores Mecánicos 4 8 10 24 24 24 24 24 24 24 24 24 24 24 24 24 8
Mantenedores Eléctricos 4 8 10 12 12 12 12 12 12 12 12 12 12 12 12 12 8
Mantenedores Instrumentación 2 4 4 8 8 8 8 8 8 8 8 8 8 8 8 8 4
Mantenedores Planta Chancado 2 4 4 8 8 8 8 8 8 8 8 8 8 8 8 8 4
Mantenedores Pique Skip y Correas 2 4 4 8 8 8 8 8 8 8 8 8 8 8 8 8 4
Pañolero 1 2 3 4 4 4 4 4 4 4 4 4 4 4 4 4 2
Sub-Total (5) 18 35 42 73 73 73 73 73 73 73 73 73 73 73 73 73 35
6.-Subgerencia Seguridad y Medio Ambiente
Subgerente Seguridad y Medio Ambiente 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Prevencionista 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 1
Medio Ambientalista 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Sub-Total (6) 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 4 3
7.- Unidad de Soporte y Mantención
Jefe Unidad 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Ingeniero de Soporte 1 2 3 4 4 4 4 4 4 4 4 4 4 4 4 4 2
Ingeniero Mantención 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1
Ingeniero Desarrollo 1 2 3 4 4 4 4 4 4 4 4 4 4 4 4 4 2
Sub-Total (7) 4 6 9 11 11 11 11 11 11 11 11 11 11 11 11 11 6

TOTAL DOTACIÓN MINA 76 135 184 267 267 267 267 267 267 267 267 267 267 267 267 267 135
AÑO 1 AÑO 2 AÑO 3 AÑO 4 AÑO 5 AÑO 6 AÑO 7 AÑO 8 AÑO 9 AÑO 10 AÑO 11 AÑO 12 AÑO 13 AÑO 14 AÑO 15 AÑO 16 AÑO 17

Extracción Mina

Material (Tpd) 3,800 7,500 12,750 17,500 17,500 17,500 17,500 17,500 17,500 17,500 17,500 17,500 17,500 17,500 17,500 17,500 7,200

Equipos Producción
Camión Bajo Pefil (50 Toneladas) 1 2 3 4 4 4 4 4 4 4 6 6 6 6 6 6 2
Cargador LHD (12 Toneladas) 1 3 5 6 6 6 6 6 6 6 6 6 6 6 6 6 3

Perforadora Radial (3") 1 2 4 6 6 6 6 6 6 6 6 6 6 6 6 6 2


Camión Cargador de Explosivos 1 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 2

Martillo Móvil 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Camión Aljibe 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

Camión Petrolero 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

Camión Utilitario 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Total Equipos Producción 8 17 23 27 27 27 27 27 27 27 29 29 29 29 29 29 17
Equipos Preparaciones

Cargador Bajo Pefil (LHD) 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3


Perforadora Avance 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
Shotcretera 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

Equipos Empernador 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

Acuñador 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Total Equipos Preparación 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14
PERFORACIÓN RADIAL 3" TRONADURA RADIAL 3"
Perforación Requerida/Año 528,517 mb/año Perforación Requerida/Año 528,517 mb/año
Diámetro Perforación (3") 7.62 cm
EQUIPOS CANTIDAD COSTO COSTO EQUIPOS Rend. COSTO COSTO
mb/hr US$/hr US$/mb mb/hr US$/hr US$/mb
JUMBO RADIAL 3" 21.70 50.32 2.32 CARGADOR EXPLOSIVO 50.00 34.17 0.68
TOTAL EQUIPOS 2.32 TOTAL EQUIPOS 0.68

MATERIALES VIDA ÚTIL VALOR COSTO EXPLOSIVOS CONSUMO VALOR COSTO


mb US$/un US$/mb un/mb US$/un US$/mb
BARRAS 6' 800 150 2.63 ANFO (kg) 1.8 1.00 1.80
BITS 3" 450 700 1.56 TRONEX (un) 0.4 0.75 0.30
CULATIN 1,100 200 0.18 FULMINANTE (un) 0.6 1.00 0.60
COPLAS 200 150 9.75 NONEL (m) 0.4 0.50 0.20
TOTAL MATERIALES 14.11 CORDON DETONANTE (m) 2.0 0.35 0.70
TOTAL MATERIALES 3.60
COSTO DIRECTO (US$/mb) 16.43
COSTO DIRECTO (US$/mb) 4.28
CAMIÓN 50 TON
ITEM CANTIDAD UNIDAD

COMBUSTIBLE
CONSUMO 40 lt/hr
PRECIO 1.2 US$/lt
COSTO 48.00 US$/hr

LUBRICANTES
CONSUMO (30% COMBUSTIBLE) 12 lt/hr
PRECIO 1.20 US$/lt
COSTO 14.40 US$/hr

NEUMATICOS
VIDA UTIL 5,500 hr/set
PRECIO 30,000 US$/set
COSTO 5.45 US$/hr

TOLVA
VIDA UTIL 2,500 hr/un
PRECIO 9,000 US$/un
COSTO 3.60 US$/hr

OTROS COSTOS
(20% ANTERIORES) 14.29 US$/hr

COSTOS OPERACIÓN EQUIPO 85.75 US$/hr

COSTO MANTENCION/REPARACION
(50% COSTOS ADQUISICION) 26.97 US$/hr

COSTO OVERHAUL
(40% COSTOS ADQUISICION) 21.58 US$/hr

RESUMEN
COSTO OPERACIÓN 85.75 US$/hr
COSTO MANTENCION/REPARACION 26.97 US$/hr
COSTO OVERHAUL 21.58 US$/hr

TOTAL COSTO OPERACIÓN 134.29 US$/hr


LHD 12 Ton
ITEM CANTIDAD UNIDAD

COMBUSTIBLE
CONSUMO 30 lt/hr
PRECIO 1.2 US$/lt
COSTO 36.00 US$/hr

LUBRICANTES
CONSUMO (30% COMBUSTIBLE) 9 lt/hr
PRECIO 1.2 US$/lt
COSTO 10.80 US$/hr

NEUMATICOS
CONSUMO 1,250 hr/set
PRECIO 7,000 US$/set
COSTO 5.6 US$/hr

BALDE
VIDA UTIL 1,750 hr/un
PRECIO 3,200 US$/un
COSTO 1.8 US$/hr

OTROS COSTOS
(20% ANTERIORES) 10.85 US$/hr

COSTOS OPERACIÓN EQUIPO 65.07 US$/hr

COSTO MANTENCION/REPARACION
(50% COSTOS ADQUISICION) 27.33 US$/hr

COSTO OVERHAUL
(40% COSTOS ADQUISICION) 21.86 US$/hr

RESUMEN
COSTO OPERACIÓN 65.07 US$/hr
COSTO MANTENCION/REPARACION 27.33 US$/hr
COSTO OVERHAUL 21.86 US$/hr

TOTAL COSTO OPERACIÓN 114.26 US$/hr


JUMBO RADIAL 3"
ITEM CANTIDAD UNIDAD

ENERGÍA ELÉCTRICA
CONSUMO 80 kwh
PRECIO 0.092 US$/kwh
COSTO 7.36 US$/hr

COMBUSTIBLE
CONSUMO 1 lt/hr
PRECIO 1.20 US$/lt
COSTO 1.20 US$/hr

LUBRICANTES
CONSUMO (8% COMBUSTIBLE) 0.08 lt/hr
PRECIO 1.20 US$/lt
COSTO 0.10 US$/hr

NEUMATICOS
CONSUMO 4,000 hr/set
PRECIO 4,000 US$/set
COSTO 1.0 US$/hr

AGUA INDUSTRIAL
CONSUMO 0.05 m3/hr
PRECIO 1.0 US$/m3
COSTO 0.05 US$/hr

OTROS COSTOS
(20% ANTERIORES) 1.94 US$/hr

COSTOS OPERACIÓN EQUIPO 11.64 US$/hr

COSTO MANTENCION/REPARACION
(50% COSTOS ADQUISICION) 21.49 US$/hr

COSTO OVERHAUL
(40% COSTOS ADQUISICION) 17.19 US$/hr

RESUMEN
COSTO OPERACIÓN 11.64 US$/hr
COSTO MANTENCION/REPARACION 21.49 US$/hr
COSTO OVERHAUL 17.19 US$/hr

TOTAL COSTO OPERACIÓN 50.32 US$/hr


MARTILLO MÓVIL
ITEM CANTIDAD UNIDAD

COMBUSTIBLE
CONSUMO 10 lt/hr
PRECIO 1.2 US$/lt
COSTO 12.00 US$/hr

LUBRICANTES
CONSUMO (30% COMBUSTIBLE) 3 lt/hr
PRECIO 1.20 US$/lt
COSTO 3.60 US$/hr

NEUMATICOS
VIDA UTIL 3,000 hr/set
PRECIO 5,000 US$/set
COSTO 1.7 US$/hr

CABEZAL
VIDA UTIL 5,000 hr/un
PRECIO 8,000 US$/un
COSTO 1.6 US$/hr

OTROS COSTOS
(15% ANTERIORES) 2.83 US$/hr

COSTOS OPERACIÓN EQUIPO 21.70 US$/hr

COSTO MANTENCION/REPARACION
(50% COSTOS ADQUISICION) 6.25 US$/hr

COSTO OVERHAUL
(40% COSTOS ADQUISICION) 5.00 US$/hr

RESUMEN
COSTO OPERACIÓN 21.70 US$/hr
COSTO MANTENCION/REPARACION 6.25 US$/hr
COSTO OVERHAUL 5.00 US$/hr

TOTAL COSTO OPERACIÓN 32.95 US$/hr


CAMIÓN EXPLOSIVOS
ITEM CANTIDAD UNIDAD

COMBUSTIBLE
CONSUMO 14 lt/hr
PRECIO 1.2 US$/lt
COSTO 16.80 US$/hr

LUBRICANTES
CONSUMO (30% COMBUSTIBLE) 4 lt/hr
PRECIO 1.20 US$/lt
COSTO 5.04 US$/hr

NEUMATICOS
VIDA UTIL 100,000 hr/set
PRECIO 5,000 US$/set
COSTO 0.05 US$/hr

OTROS COSTOS
(15% ANTERIORES) 3.28 US$/hr

COSTOS OPERACIÓN EQUIPO 25.17 US$/hr

COSTO MANTENCION/REPARACION
(50% COSTOS ADQUISICION) 5.00 US$/hr

COSTO OVERHAUL
(40% COSTOS ADQUISICION) 4.00 US$/hr

RESUMEN
COSTO OPERACIÓN 25.17 US$/hr
COSTO MANTENCION/REPARACION 5.00 US$/hr
COSTO OVERHAUL 4.00 US$/hr

TOTAL COSTO OPERACIÓN 34.17 US$/hr


CAMIÓN PETROLERO
ITEM CANTIDAD UNIDAD

COMBUSTIBLE
CONSUMO 12 lt/hr
PRECIO 1.2 US$/lt
COSTO 14.40 US$/hr

LUBRICANTES
CONSUMO (30% COMBUSTIBLE) 4 lt/hr
PRECIO 1.20 US$/lt
COSTO 4.32 US$/hr

NEUMATICOS
VIDA UTIL 100,000 hr/set
PRECIO 5,000 US$/set
COSTO 0.05 US$/hr

OTROS COSTOS
(15% ANTERIORES) 2.82 US$/hr

COSTOS OPERACIÓN EQUIPO 21.59 US$/hr

COSTO MANTENCION/REPARACION
(50% COSTOS ADQUISICION) 2.40 US$/hr

COSTO OVERHAUL
(40% COSTOS ADQUISICION) 1.92 US$/hr

RESUMEN
COSTO OPERACIÓN 21.59 US$/hr
COSTO MANTENCION/REPARACION 2.40 US$/hr
COSTO OVERHAUL 1.92 US$/hr

TOTAL COSTO OPERACIÓN 25.91 US$/hr


CAMIÓN ALJIBE
ITEM CANTIDAD UNIDAD

COMBUSTIBLE
CONSUMO 12 lt/hr
PRECIO 1.2 US$/lt
COSTO 14.40 US$/hr

LUBRICANTES
CONSUMO (30% COMBUSTIBLE) 4 lt/hr
PRECIO 1.20 US$/lt
COSTO 4.32 US$/hr

NEUMATICOS
VIDA UTIL 100,000 hr/set
PRECIO 5,000 US$/set
COSTO 0.05 US$/hr

OTROS COSTOS
(15% ANTERIORES) 2.82 US$/hr

COSTOS OPERACIÓN EQUIPO 21.59 US$/hr

COSTO MANTENCION/REPARACION
(50% COSTOS ADQUISICION) 3.00 US$/hr

COSTO OVERHAUL
(40% COSTOS ADQUISICION) 2.40 US$/hr

RESUMEN
COSTO OPERACIÓN 21.59 US$/hr
COSTO MANTENCION/REPARACION 3.00 US$/hr
COSTO OVERHAUL 2.40 US$/hr

TOTAL COSTO OPERACIÓN 26.99 US$/hr


CAMIÓN UTILITARIO
ITEM CANTIDAD UNIDAD

COMBUSTIBLE
CONSUMO 8 lt/hr
PRECIO 1.2 US$/lt
COSTO 9.60 US$/hr

LUBRICANTES
CONSUMO (30% COMBUSTIBLE) 2 lt/hr
PRECIO 1.20 US$/lt
COSTO 2.88 US$/hr

NEUMATICOS
VIDA UTIL 50,000 hr/set
PRECIO 3,000 US$/set
COSTO 0.1 US$/hr

OTROS COSTOS
(15% ANTERIORES) 1.88 US$/hr

COSTOS OPERACIÓN EQUIPO 14.42 US$/hr

COSTO MANTENCION/REPARACION
(50% COSTOS ADQUISICION) 1.00 US$/hr

COSTO OVERHAUL
(40% COSTOS ADQUISICION) 0.80 US$/hr

RESUMEN
COSTO OPERACIÓN 14.42 US$/hr
COSTO MANTENCION/REPARACION 1.00 US$/hr
COSTO OVERHAUL 0.80 US$/hr

TOTAL COSTO OPERACIÓN 16.22 US$/hr


VENTILADOR 450 KCFM
ITEM CANTIDAD UNIDAD

ENERGÍA ELÉCTRICA
CONSUMO 470 kwh
PRECIO 0.092 US$/kw
COSTO 43.3 US$/hr

LUBRICANTES
COSTO (30% EE) 12.98 US$/hr

OTROS COSTOS
(20% ANTERIORES) 11.2 US$/hr

COSTOS OPERACIÓN EQUIPO 67.49 US$/hr

COSTO MANTENCION/REPARACION
(85% COSTOS ADQUISICION) 11.13 US$/hr

COSTO OVERHAUL
(40% COSTOS ADQUISICION) 5.24 US$/hr

RESUMEN
COSTO OPERACIÓN 67.49 US$/hr
COSTO MANTENCION/REPARACION 11.13 US$/hr
COSTO OVERHAUL 5.24 US$/hr

TOTAL COSTO OPERACIÓN 83.85 US$/hr


VENTILADOR 370 KCFM
ITEM CANTIDAD UNIDAD

ENERGÍA ELÉCTRICA
CONSUMO 455 kwh
PRECIO 0.092 US$/kw
COSTO 41.9 US$/hr

LUBRICANTES
COSTO (30% EE) 12.56 US$/hr

OTROS COSTOS
(20% ANTERIORES) 10.9 US$/hr

COSTOS OPERACIÓN EQUIPO 65.34 US$/hr

COSTO MANTENCION/REPARACION
(85% COSTOS ADQUISICION) 10.94 US$/hr

COSTO OVERHAUL
(40% COSTOS ADQUISICION) 5.15 US$/hr

RESUMEN
COSTO OPERACIÓN 65.34 US$/hr
COSTO MANTENCION/REPARACION 10.94 US$/hr
COSTO OVERHAUL 5.15 US$/hr

TOTAL COSTO OPERACIÓN 81.42 US$/hr


VENTILADOR 200 KCFM
ITEM CANTIDAD UNIDAD

ENERGÍA ELÉCTRICA
CONSUMO 101 kwh
PRECIO 0.092 US$/kw
COSTO 9.3 US$/hr

LUBRICANTES
COSTO (30% EE) 2.79 US$/hr

OTROS COSTOS
(20% ANTERIORES) 2.4 US$/hr

COSTOS OPERACIÓN EQUIPO 14.53 US$/hr

COSTO MANTENCION/REPARACION
(85% COSTOS ADQUISICION) 1.43 US$/hr

COSTO OVERHAUL
(40% COSTOS ADQUISICION) 0.67 US$/hr

RESUMEN
COSTO OPERACIÓN 14.53 US$/hr
COSTO MANTENCION/REPARACION 1.43 US$/hr
COSTO OVERHAUL 0.67 US$/hr

TOTAL COSTO OPERACIÓN 16.63 US$/hr


VENTILADOR 75 KCFM
ITEM CANTIDAD UNIDAD

ENERGÍA ELÉCTRICA
CONSUMO 47 kwh
PRECIO 0.092 US$/kw
COSTO 4.3 US$/hr

LUBRICANTES
COSTO (30% EE) 1.29 US$/hr

OTROS COSTOS
(20% ANTERIORES) 1.1 US$/hr

COSTOS OPERACIÓN EQUIPO 6.72 US$/hr

COSTO MANTENCION/REPARACION
(85% COSTOS ADQUISICION) 1.04 US$/hr

COSTO OVERHAUL
(40% COSTOS ADQUISICION) 0.49 US$/hr

RESUMEN
COSTO OPERACIÓN 6.72 US$/hr
COSTO MANTENCION/REPARACION 1.04 US$/hr
COSTO OVERHAUL 0.49 US$/hr

TOTAL COSTO OPERACIÓN 8.24 US$/hr


VENTILADOR 25 KCFM
ITEM CANTIDAD UNIDAD

ENERGÍA ELÉCTRICA
CONSUMO 21 kwh
PRECIO 0.092 US$/kw
COSTO 1.9 US$/hr

LUBRICANTES
COSTO (30% EE) 0.58 US$/hr

OTROS COSTOS
(20% ANTERIORES) 0.5 US$/hr

COSTOS OPERACIÓN EQUIPO 3.01 US$/hr

COSTO MANTENCION/REPARACION
(85% COSTOS ADQUISICION) 0.24 US$/hr

COSTO OVERHAUL
(40% COSTOS ADQUISICION) 0.11 US$/hr

RESUMEN
COSTO OPERACIÓN 3.01 US$/hr
COSTO MANTENCION/REPARACION 0.24 US$/hr
COSTO OVERHAUL 0.11 US$/hr

TOTAL COSTO OPERACIÓN 3.37 US$/hr


Tipo Cantidad US$/hr US$/hr
VENTILADOR 450 KCFM 2 83.85 167.70278
VENTILADOR 370 KCFM 2 81.42 162.84163
VENTILADOR 200 KCFM 1 16.63 16.634178
VENTILADOR 75 KCFM 1 8.24 8.2389582
Total Costos ventilación principal 355.41754
MARTILLO FIJO
ITEM CANTIDAD UNIDAD

ENERGÍA ELÉCTRICA
CONSUMO 30 kwh
PRECIO 0.092 US$/kwh
COSTO 2.76 US$/hr

LUBRICANTES
COSTO (30% EE) 0.83 US$/hr

CABEZAL
VIDA UTIL 5,000 hr/un
PRECIO 8,000 US$/un
COSTO 1.6 US$/hr

OTROS COSTOS
(20% ANTERIORES) 1.04 US$/hr

COSTOS OPERACIÓN EQUIPO 6.23 US$/hr

COSTO MANTENCION/REPARACION
(50% COSTOS ADQUISICION) 5.00 US$/hr

COSTO OVERHAUL
(40% COSTOS ADQUISICION) 4.00 US$/hr

RESUMEN
COSTO OPERACIÓN 6.23 US$/hr
COSTO MANTENCION/REPARACION 5.00 US$/hr
COSTO OVERHAUL 4.00 US$/hr

TOTAL COSTO OPERACIÓN 15.23 US$/hr


APRON/GRIZZLY
ITEM CANTIDAD UNIDAD

ENERGÍA ELÉCTRICA
CONSUMO 78 kwh
PRECIO 0.092 US$/kw
COSTO 7.2 US$/hr

LUBRICANTES
COSTO (30% EE) 2.15 US$/hr

OTROS COSTOS
(20% ANTERIORES) 1.9 US$/hr

COSTOS OPERACIÓN EQUIPO 11.19 US$/hr

COSTO MANTENCION/REPARACION
(85% COSTOS OPERACIÓN) 9.52 US$/hr

RESUMEN
COSTO OPERACIÓN 11.19 US$/hr
COSTO MANTENCION/REPARACION 9.52 US$/hr

TOTAL COSTO OPERACIÓN 20.71 US$/hr


CHANCADOR
ITEM CANTIDAD UNIDAD

ENERGÍA ELÉCTRICA
CONSUMO 216 kwh
PRECIO 0.092 US$/kw
COSTO 19.9 US$/hr

LUBRICANTES
COSTO (30% EE) 5.97 US$/hr

OTROS COSTOS
(20% ANTERIORES) 5.2 US$/hr

COSTOS OPERACIÓN EQUIPO 31.04 US$/hr

COSTO MANTENCION/REPARACION
(85% COSTOS OPERACIÓN) 26.39 US$/hr

RESUMEN
COSTO OPERACIÓN 31.04 US$/hr
COSTO MANTENCION/REPARACION 26.39 US$/hr

TOTAL COSTO OPERACIÓN 57.43 US$/hr


CORREA TRANSPORTADORA 48"
ITEM CANTIDAD UNIDAD

ENERGÍA ELÉCTRICA
CONSUMO 93 kwh
PRECIO 0.092 US$/kw
COSTO 8.6 US$/hr

LUBRICANTES
COSTO (30% EE) 2.57 US$/hr

OTROS COSTOS
(20% ANTERIORES) 2.2 US$/hr

COSTOS OPERACIÓN EQUIPO 13.36 US$/hr

COSTO MANTENCION/REPARACION
(85% COSTOS OPERACIÓN) 11.36 US$/hr

RESUMEN
COSTO OPERACIÓN 13.36 US$/hr
COSTO MANTENCION/REPARACION 11.36 US$/hr

TOTAL COSTO OPERACIÓN 24.72 US$/hr


SISTEMA SKIP
ITEM CANTIDAD UNIDAD

ENERGÍA ELÉCTRICA
CONSUMO 2,310 kwh
PRECIO 0.092 US$/kw
COSTO 212.6 US$/hr

LUBRICANTES
COSTO (30% EE) 63.77 US$/hr

OTROS COSTOS
(20% ANTERIORES) 55.3 US$/hr

COSTOS OPERACIÓN EQUIPO 331.59 US$/hr

COSTO MANTENCION/REPARACION
(85% COSTOS OPERACIÓN) 281.85 US$/hr

RESUMEN
COSTO OPERACIÓN 331.59 US$/hr
COSTO MANTENCION/REPARACION 281.85 US$/hr

TOTAL COSTO OPERACIÓN 613.43 US$/hr


HUINCHE TAMBOR
ITEM CANTIDAD UNIDAD

ENERGÍA ELÉCTRICA
CONSUMO 638 kwh
PRECIO 0.092 US$/kw
COSTO 58.7 US$/hr

LUBRICANTES
COSTO (30% EE) 17.60 US$/hr

OTROS COSTOS
(20% ANTERIORES) 15.2 US$/hr

COSTOS OPERACIÓN EQUIPO 91.49 US$/hr

COSTO MANTENCION/REPARACION
(85% COSTOS OPERACIÓN) 77.77 US$/hr

RESUMEN
COSTO OPERACIÓN 91.49 US$/hr
COSTO MANTENCION/REPARACION 77.77 US$/hr

TOTAL COSTO OPERACIÓN 169.26 US$/hr


ALIMENTADOR
ITEM CANTIDAD UNIDAD

ENERGÍA ELÉCTRICA
CONSUMO 33 kwh
PRECIO 0.092 US$/kw
COSTO 3.0 US$/hr

LUBRICANTES
COSTO (30% EE) 0.91 US$/hr

OTROS COSTOS
(20% ANTERIORES) 0.8 US$/hr

COSTOS OPERACIÓN EQUIPO 4.74 US$/hr

COSTO MANTENCION/REPARACION
(85% COSTOS OPERACIÓN) 4.03 US$/hr

RESUMEN
COSTO OPERACIÓN 4.74 US$/hr
COSTO MANTENCION/REPARACION 4.03 US$/hr

TOTAL COSTO OPERACIÓN 8.76 US$/hr


CORREA TRANSPORTADORA 48" SUPERFICIE
ITEM CANTIDAD UNIDAD

ENERGÍA ELÉCTRICA
CONSUMO 111 kwh
PRECIO 0.092 US$/kw
COSTO 10.2 US$/hr

LUBRICANTES
COSTO (30% EE) 3.06 US$/hr

OTROS COSTOS
(20% ANTERIORES) 2.7 US$/hr

COSTOS OPERACIÓN EQUIPO 15.93 US$/hr

COSTO MANTENCION/REPARACION
(85% COSTOS OPERACIÓN) 13.54 US$/hr

RESUMEN
COSTO OPERACIÓN 15.93 US$/hr
COSTO MANTENCION/REPARACION 13.54 US$/hr

TOTAL COSTO OPERACIÓN 29.47 US$/hr


EQUIPOS AUXILIARES
ITEM CANTIDAD UNIDAD

ENERGÍA ELÉCTRICA
CONSUMO 126 kwh
PRECIO 0.092 US$/kw
COSTO 11.6 US$/hr

LUBRICANTES
COSTO (30% EE) 3.47 US$/hr

OTROS COSTOS
(20% ANTERIORES) 3.0 US$/hr

COSTOS OPERACIÓN EQUIPO 18.04 US$/hr

COSTO MANTENCION/REPARACION
(85% COSTOS OPERACIÓN) 15.33 US$/hr

RESUMEN
COSTO OPERACIÓN 18.04 US$/hr
COSTO MANTENCION/REPARACION 15.33 US$/hr

TOTAL COSTO OPERACIÓN 33.37 US$/hr


BOMBAS
ITEM CANTIDAD UNIDAD

ENERGÍA ELÉCTRICA
CONSUMO 336 kwh
PRECIO 0.092 US$/kw
COSTO 30.9 US$/hr

LUBRICANTES
COSTO (30% EE) 9.27 US$/hr

OTROS COSTOS
(20% ANTERIORES) 8.0 US$/hr

COSTOS OPERACIÓN EQUIPO 48.22 US$/hr

COSTO MANTENCION/REPARACION
(85% COSTOS OPERACIÓN) 40.99 US$/hr
RESUMEN
COSTO OPERACIÓN 48.22 US$/hr
COSTO MANTENCION/REPARACION 40.99 US$/hr

TOTAL COSTO OPERACIÓN 89.21 US$/hr