Simplifying Acquisition through bladesite solution
Blade Power DPU30D/ 30A
Traditional Macro Site Blade Site On-Pole Blade Battery DBU20B
Enclosure, Embedded Power
Urban Urban Sub-Urban
Rooftop Street

+ +
Blasé, AAU, 2-Sectors

Environmental Friendly

 “0” Footprint, Easy


Acquisition
 Fast installation, saving
80% deployment time

 Seamless Deployment,
Indoor => Outdoor => On-Pole
Easy Expansion
Simplified Distributed Pole-Site
3
Distributed Design Realize ‘0’ Site Footprint

3xDBU20B-N12A1 Blade Solution for Macro Site


Macro site Li Battery

RRU BBU Bat. DPU(D)  “0” Footprint

 Seamless
Installation, Easy
AC 220V Expansion
DC -48V
 Fast installation,
Load:1300W saving 90%
Configuration : deployment time
RRU×3+BBU+DPU(D) ×2 +Bat×3
Backup time:2h  All RATs, all bands
Weight:60kg (power+bat) 2xDPU30D-N06A1
with high capacity
Pole:60~114mm Power Module

4
Proposal for trial

Main materials involved


BBU 1
BBU 3910A 1
DPS Power System 1
DPU30D-N06A1-1500W Blade Power
Deliver time: 80~90 days by sea
2
Module
Battery 5
Proposal trial duration: 2 months
Telecom energy proximal intelligent
1
management software.

5
Contents

1 Bladesite proposal for trial

2 Easymacro proposal for trial

3 6 sectors proposal for trial

4 smallcell proposal for trial

6
Easy Macro, Densify Macro in Urban with Easy Deployment

Traditional Lamppost Site Innovative Easy Macro Site

Lamppost
Environment
friendly

Easy Site
Acquisition Rooftop Wall

Fast
•Multiple antenna on pole
Deployment
•Multiple RRUs on pole
7
Easy Macro : High Performance with High Integration
150mm
Ooredoo, Maldives
2015 2016 Future
 1.8~2.1GHz  AWS~PCS(2016Q2)  FDD+TDD
 2.1G+2.6G(TBD)  1.8G~2.6G

750mm High Performance Flexible Configuration

2T2R UMTS & LTE


Output Power: Multi Band Support:
• 2*30w (-40°~50°) • 1.8+2.1GHz

Small & Light • 2*40W(-40°~40°) • AWS+PCS

13L, 15KG Antenna : 14.5dBi UL: 4 Carriers+2*20MHz

8
Easy Macro Deployment proposal 1
With Remote BBU Suitable for Lamppost with Fiber Resource

1
Equipment Remark
AAU3940*3 On pole
(LTE only)
BBU3900/3910*1 Remote
indoor
Fiber
ODM*1 Power & fiber inside
splitter pole Cabling ODM
Mounting For different ODM 3 CPRI & 4 AC output
Accessories scenarios
ODF
1 ODM Fiber CPRI1
CPRI2
CPRI3

ACDB
Fiber AC input AC output 1
AC output 2
AC output 3
AC output 4
Lamppost

9
Easy Macro Simplify Site Acquisition

DC Easy Macro DPS Solution for Lamppost Site


2xDBU20B-
N12A1
Li Battery Easy Deployment
• Aesthetic design
DC • Easy for site acquisition
easy macro
• Less time for construction
DC
Bat
module

DC -48V

AC 220V
Load:800W
TCO Savings
• No Indoor Site Room
Configuration :
• No Tower
AAU3940×3+BBU+DPU(D) ×1
+Bat×2 • No External Antenna
Backup time:2h
DPU30D-N06A1 Business street • No BTS cabinet
Power Module
Weight:50kg
Outdoor public square
Pole:60~114mm
10
Easy Macro Installation Scenario

On Lamp Pole On Wall On Rooftop

Installation
Scenario

Mounting
Brackets

11
Proposal for trial

Main materials involved


RRU 3
AAU3940 3
BBU 1
BBU 39010A
DPS Power System
1
1
Deliver time: 80~90 days by sea
DPU30D-N06A1-1500W Blade Power
Module
2
Proposal trial duration: 2 months
Li Battery 3

Telecom energy proximal intelligent


1
management software.

12
Contents

1 Bladesite proposal for trial

2 Easymacro proposal for trial

3 6 sectors proposal for trial

4 smallcell proposal for trial

13
6-sector Boost Network Capacity without New Site
& New Spectrum
3 Antenna,3 Sector 3 Antenna,6 Sector

Split-sector
Capacity Coverage TCO

Value Points
>70% 2dB
>50% Saved

3 sector

6 sector

3 sector 6 sector External Wall Interior Wall

14 6 sector solution is also one way to solve current capacity issue


6-sector Boost Network Capacity without New Site
& New Spectrum
65° Antenna
Hardware change
B C
A
B E
A D C F
Split Antenna Replaced with
33°+33° split antenna
65° 65°
UL 6 sectors

Add one RRU


2T2R
2T2R

Add a new
Baseband baseband board
BBU
BBU board

The proposed solution for site “Estadio Nacional”

15
Proposal for trial
Dual Band

Bottom Panel
Main materials involved
Antenna 1 Huawei Model AMB4520R0
AMB4520R0 1

Frequency (MHz) 2x1710-2690 (Split)

Bandwidth 2x33

Deliver time: 30 days


Proposal trial duration: 2 months Gain (dBi) 1710-2690: 20.5

<=-153dBc
IM3
(2*20w)
Dimensions
1468 x 349 x 166
(H x W x D) (mm)

Electric Tilt Type Integrated RET

16
Contents

1 Bladesite proposal for trial

2 Easymacro proposal for trial

4 6 sectors proposal for trial

4 smallcell proposal for trial

17
Huawei Microcell Solution BTS3911E
Frequency band AWS UMTS+LTE mode
Output power
2*2*5W
(multimode)
IBW 40M
Uo: 4UMTS
Carrier Lo: 2x20MHz LTE/per band
UL: 4UMTS+1x20MHz LTE
Uo: 512CE
Baseband Capacity Lo: 600 RRC-connected users per cell
UL: 256CE+600 RRC-connected users per site
UMTS+LTE: 84Mbps DL/ 23Mbps UL (UMTS 2 cells)
Throughput Capacity built-in antenna external antenna
150Mbps DL/ 75Mbps UL (LTE 1 carrier)
Antenna Internal/External
(11dbi) (11dbi)
10L(external antenna)
Dimensions
14L(built-in antenna)
11Kg(external antenna)
Weight
13Kg(built-in antenna)
Power AC Status: Current Available
Transmission Port 2x Optical FE/GE, 2x Electrical FE/GE

18
Proposal for trial

Main materials involved

BTS 3
BTS3911E 1800M+2100M Deliver time: 30 days
built-in Antenna 3 Proposal trial duration: 2 months

19
Service Responsibility Matrix for Trial
Item Huawei WOM
Trial Site location Selection S R

TSSR ( technical site survey report ) of Trial Site R

Site acquisition, power electricity access (PEA), transmission R


resource and permission acquisition

Transport and install the Trial equipments to site R

Commissioning the Trial equipments R S

Single Site Verification and RF optimization S R

Output the SSV report and performance comparison report S R

20
Thank you
Copyright©2015 Huawei Technologies Co., Ltd. All Rights Reserved.
The information in this document may contain predictive statements including, without limitation, statements regarding the future financial
and operating results, future product portfolio, new technology, etc. There are a number of factors that could cause actual results and
developments to differ materially from those expressed or implied in the predictive statements. Therefore, such information is provided for
reference purpose only and constitutes neither an offer nor an acceptance. Huawei may change the information at any time without notice.

Вам также может понравиться