Академический Документы
Профессиональный Документы
Культура Документы
TCE TCE
Speed Laden Ballast Laden Ballast
7.0 26,287 23,768 431 326
7.5 27,131 24,683 496 375
8.0 27,761 25,437 566 428
8.5 28,163 26,019 642 485
9.0 28,322 26,417 722 546
9.5 28,225 26,621 807 610
10.0 27,857 26,620 897 678
10.5 27,204 26,403 992 751
11.0 26,251 25,960 1,093 827
11.5 24,985 25,280 1,198 906
12.0 23,390 24,351 1,309 990
12.5 21,454 23,164 1,425 1,078
13.0 19,161 21,707 1,547 1,170
13.5 16,497 19,969 1,673 1,266
14.0 13,448 17,941 1,805 1,366
14.5 10,000 15,610 1,943 1,470
15.0 6,138 12,967 2,086 1,578
15.5 1,849 9,794 2,235 1,690
16.0 -2,882 6,699 2,389 1,807
16.5 -8,070 3,052 2,549 1,928
17.0 -13,728 -950 2,715 2,053
17.5 -19,871 -5,319 2,886 2,183
18.0 -26,513 -10,065 3,063 2,317
18.5
32,000
24,000
16,000
CO2 emission
8,000
TCE Laden
TCE Ballast
Operation costs
TCE w. cap costs**
0
7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15
12,000
Net freight= Grossfreight -commision
9,000 x = speed
6,000
f(x) = Net freight/days(x)-Bunkercost(
3,000
0
0 14.0 15.0 16.0 17.0
Speed
Capital cost
Emission/Tonn
e miles
Emission/Tonn (Vx/Vbas
e miles Tonne miles Speed % is)^3 Laden
0.0013 584,618 48% 0.12 12,000 12236 310083.27
0.0015 506,669 52% 0.15 12,000 14128
0.0017 438,463 55% 0.18 12,000 15800
0.0019 378,282 59% 0.22 12,000 17236
0.0021 324,788 62% 0.26 12,000 18422
0.0024 276,924 66% 0.30 12,000 19345
0.0026 233,847 69% 0.35 12,000 19990
0.0029 194,873 72% 0.40 12,000 20343
0.0032 159,441 76% 0.45 12,000 20390
0.0035 127,091 79% 0.52 12,000 20117
0.0038 97,436 83% 0.58 12,000 19509
0.0042 70,154 86% 0.65 12,000 18552
0.0045 44,971 90% 0.73 12,000 17233
0.0049 21,653 93% 0.82 12,000 15536
0.0053 0 97% 0.90 12,000 13448
0.0057 -20,159 100% 1.00 12,000 10954 832,143
0.0061 -38,975 103% 1.10 12,000 8041
0.0066 -56,576 107% 1.21 12,000 4694
0.0070 -73,077 110% 1.33 12,000 899
0.0075 -88,578 114% 1.45 12,000 -3359
0.0080 -103,168 117% 1.58 12,000 -8093
0.0085 -116,924 121% 1.71 12,000 -13318
0.0090 -129,915 124% 1.86 12,000 -19048
s income is calculated based on WS taking into account cargo, volume, bunker cost, voyage cost , port cost, etc.
freight is a function of World scale points and based on a certain speed V0. At that speed the vessel has an est
et freight/days(x)-Bunkercost(x)-Voyage cost/day(x)
reight is based on a basis speed basis consumption and basis voyage cost and can be written as
where
The bunker consumption is varying as a function of the speed with a exponent of power of 3 and can b
Bunkercost(x)/day(x) = BP*BCbasis*(x/v0)^3
By setting this function to zero the theoretical economical speed will be found.
f(x)’= 0
x = SQRT( (TCbasis+BP*BCbasis)/(3* BP*BCbasis)*v0^2)
voyage cost , port cost, etc. Based on the WS for a specific voyage a net freight is calculated. The target with this
speed the vessel has an estimated bunker consumption BCbasis. The actual bunker consumption is will vary with
SQRT
e written as
lculated. The target with this exercise is to optimise the income per day as a function of speed.