2016 LAYOUT GROUND FLOOR: 3,960
BUILT SQ. METERS: 5,949
1B1 Ice surface Concrete base 60x30 with plumbing 1,791.50 245 438,918 0 0
1B2 Ice rink painting 1,757.80 3.25 5,713 0 0
TOTAL 4,848,802
Contractor Profit 6% 290,928
Contractor General Expenses 13% 630,344
TOTAL 6,667,209
(VAT not included)
Indoor Sq m 5,949 1,061.97 €/m2
Outdoor Sq m 3,766 92.90 €/m2
B - AREAS
IIHF 1 ICE PAD BLUEPRINT BUDGET
Facilities Committee 2012-1016
M2 A PLAYER BENCH
PLOT 7,725.25 B MEDIA ZONE
ARENA 3,959.75 C PENALTY BENCH
LANDSCAPE 3,765.50 D JUDGES & CONTROL TABLE
E SEATS ( 22X4) 88
BUILT 5,948.74 F RETRACTABLE SEATS (4x10x7) + (4x10x6) 520.00
G SHOOTING PRACTICE ZONE
H VENDING ZONE
GROUND FLOOR 3,959.75 I LOCKERS (25x80x40 cm = 134 un / 40X80X40 = 68 un)
J BUS PARKING LOT
0-01 ICE PAD 1,791.50 K CARS PARKING LOT
0-02 MAIN HALL 795.80 L BIKE PARKING LOT
0-03 ICE RESURFER 47.00 M EMERGENCY STAIRS
0-04 MECHANICAL ROOM (COMPRESSORS) 45.50 N MEDIA & TV ZONE
0-05 STORAGE ( GOALS AND SHORT TRACK) 36.30 O AUTHORITIES SEAT ZONE 33.00
0-06 ENTRANCE 64.80 P TRUCKS ENTRY DOOR
0-07 TICKETING, ARENA OFFICE & CONTROL AREA 23.60 Q SPECTATORS SEATS 958.00
0-08 RENTAL SKATES COUNTER 26.90
0-09 PUBLIC SKATING DRESSING ROOM 71.00
0-10 LOBBY 95.00
0-11 SHOP 26.60
0-12 STAIRS 20.20
0-13 LIFT 4.10
0-14 LAVATORY (HANDICAP) 5.60
0-15 PUBLIC SKATING LAVATORY FEMALE 13.00
0-16 PUBLIC SKATING LAVATORY MALE 10.80
0-17 CLUB OFFICE 40.60
0-18 STAFF LOCKER ROOM 14.70
0-19 CORRIDOR 171.65
0-20 MEDICAL / FIRST AID ROOM 16.35
0-21 SKATES AND MAINTENANCE ROOM 15.90
0-22 ELECTRICAL CONTROL ROOM 4.15
0-23 FIRE EXTINGUISH ROOM 12.10
0-24 PLUMBING ROOM 10.80
0-25 DRYING ROOMS (11 un) 102.55
0-26 FIGURE SKATING STORAGE ROOM 12.85
0-27 FIGURE SKATING COACHES ROOM 17.60
0-28 LAUNDRY & CLEANING ROOM 6.20
0-29 INNER STAIRS 13.55
0-30 ICE HOCKEY EQUIPMENT ROOM 15.05
0-31 DRESSING ROOM HOCKEY 1 43.50
0-32 SHOWERS & LAVATORY HOCKEY 1 19.30
0-33 SHOWERS & LAVATORY HOCKEY 2 19.30
0-34 DRESSING ROOM HOCKEY 2 42.00
0-35 DRESSING ROOM HOCKEY HOME TEAM 48.45
0-36 SHOWERS & LAVATORY HOCKEY HOME TEAM 20.90
0-37 DRESSING ROOM REFEREES 20.80
0-38 DRESSING ROOM HOCKEY COACHES 20.80
0-39 SHOWERS & LAVATORY HOCKEY VISITOR TEAM 20.95
0-40 DRESSING ROOM HOCKEY VISITOR TEAM 49.00
0-41 DRESSING ROOM FIGURE SKATING MALE 42.10
0-42 SHOWERS & LAVATORY FIGURE SKATING MALE 19.30
0-43 SHOWERS & LAVATORY FIGURE SKATING FEMALE 19.30
0-44 DRESSING ROOM FEMALE FIGURE SKATING 42.30
N L W H S TOTAL
1C1 Rental Skates Pairs 8 2.5 4 8 640.00 640.00
SUM 6,962
SUM 7,422
SUM 6,185
SUM 1,519
2A33 Public Common areas (Stairs & Lift) 74.50 218.00 n cost n cost
STAIRS 20.20
LIFT D 57.4 1,894 T 4.37 589.95
INNER STAIRS E 54.2 325
STAIRS F 54.2 434
LIFT L 54.2 271
INNER STAIRS M 10.11 607
J 10.11 283
SUM 4,404
SUM 28,676
SUM 1,878
2A39 Coaches, Staff & Referees Rooms 73.90 610.86 n cost n cost
STAFF LOCKER ROOM A 1 350 N 15.05 677.25
FIGURE SKATING COACHES ROOM B 1 150 P 1 265
DRESSING ROOM REFEREES C 13.92 334 Q 2 300
DRESSING ROOM HOCKEY COACHES 20.80 D 35.37 1,167 R 2 450
E 69.02 414 X 1.2 66
G 60.06 2,703 Y 3.96 336.6
H 14.56 728 Z 2 260
J 17 4,505
SUM 12,706
SUM 7,675
SUM 2,689
2A43 Under seats zone low height 279.15 21.38 n cost n cost
L 351 1,755 B 2 300
C 175.5 4212
SUM 5,967
UNDER SEATS ZONE (HEIGHT MINUS 2,50)
E CEMENT COATING M2 6
F GYPSUM COATING M2 8
G VINYL COATING M2 24
H TILE COATING M2 50
I METAL.LIC CEILING M2 42
J PLASTERBOARD CEILING -PAINTED M2 28
K VINYL CEILING M2 32
L PAINT M2 5
M TILE FLOORING M2 60
N RUBBER FLOORING M2 45
O CARPET FLOORING M2 42
P WC UNIT UN 265
Q SHOWER UNIT UN 150
R SINK UNIT WITH FAWCET UN 225
S URINARY UNIT UN 135
T RAILING ML 80