Excavate Spoil Heaps to Transport, 0.6m3 bucket, Sand/Soil m3 hours 14.50 20.00
Excavate Spoil Heaps to Transport, 0.6m3 bucket, Gravel Beds m3 hours 15.20 20.40
Excavate Spoil Heaps to Transport, 0.6m3 bucket, Clay/Chalk m3 hours 12.30 18.50
Excavate Spoil Heaps to Transport, 0.6m3 bucket, Boulder Clay m3 hours 11.20 16.90
Excavate Spoil Heaps to Transport, 1.1m3 bucket, Sand/Soil m3 hours 25.40 30.30
Excavate Spoil Heaps to Transport, 1.1m3 bucket, Gravel Beds m3 hours 25.60 31.30
Excavate Spoil Heaps to Transport, 1.1m3 bucket, Clay/Chalk m3 hours 22.50 27.80
Excavate Spoil Heaps to Transport, 1.1m3 bucket, Boulder Clay m3 hours 18.90 24.40
Urban environment:
Rural environment:
Working Platforms
Metal KwikStage, House Scaffold with 3 lifts m run hours 2.80 3.20
Metal Tube and Fittings, 5-6 Boards wide m run hours 3.20 3.70
Tube and Fitting Platforms, 50-250m3 m3 hours 10.60 12.50
Waterproofing
Wallpapering
Strip Existing Wallpaper (3 layers) & Prepare Walls m2 hours - 5.00
Wall Finishes
Clay, quarry Tiles, Window Cills, setout and level m hours - 55.50
Clay, quarry Tiles, Window Cills, fix, grout and clean m2 hours - 1.50
Ceramic Tiles 150x150mm, Areas under 1.5m2 per room m2 hours 0.90 1.00
Ceramic Tiles 150x150mm, Areas of 1.5-2.5m2 per room m2 hours 1.40 1.60
Ceramic Tiles 150x150mm, Areas over 2.5m2 per room m2 hours 1.50 1.70
Ceramic Tiles 108x108mm, Areas under 1.5m2 per room m2 hours 1.00 1.30
Ceramic Tiles 108x108mm, Areas of 1.5-2.5m2 per room m2 hours 1.60 1.80
Ceramic Tiles 108x108mm, Areas over 2.5m2 per room m2 hours 1.70 1.90
Trench Excavation
Excavate and Board Trench, 0.5-1.5m deep, < 2.0m wide m2 hours 3.30 4.50
Excavate and Board Trench, 1.5-3.0m deep, < 2.0m wide m2 hours 3.00 4.20
Excavate and Board Trench, 3.0-4.5m deep, < 2.0m wide m2 hours 2.70 4.00
Excavate and Board Trench, 0.5-1.5m deep, > 2.0m wide m2 hours 6.60 7.10
Excavate and Board Trench, 1.5-3.0m deep, > 2.0m wide m2 hours 6.20 6.70
Excavate and Board Trench, 3.0-4.5m deep, > 2.0m wide m2 hours 5.80 6.20
Trackwork
PCBT - Pre-cast Concrete Block Track, in Bored Tunnels m days 17.10 41.00
PCBT - Pre-cast Concrete Block Track, in Cut and Cover Tunnels m days - 35.00
IST - Isolated Slab Track, in Cut and Cover Tunnels m days - 34.00
Tower Cranes
Lifting, Reinforcement Bins and Cages, 1st 15m lift lift mins - -
Lifting, Reinforcement Bins and Cages, above 1st 15m lift 15m mins - -
Timber Frames
Structural Steelwork
Simple Universal Beam Steel Bridge, erect support steel H frames no days - 0.8333
Simple Universal Beam Steel Bridge, erect 15m truss m days - 3.30
Stonework
Steel Strutting
Steel Frames
Wall Frame, Bow String Truss and Frame Tons days - 1.60
Roof Frame, Curved Truss and Frame Tons days - 5.20
Crawler Shovel, 0.8m3 bucket, Sand/Soil, pushed 5-50m to stockpile m3 hours 13.90 20.40
Crawler Shovel, 0.8m3 bucket, Sand/Soil, pushed 50-120m to stockpile m3 hours 7.60 9.50
Crawler Shovel, 0.8m3 bucket, Gravel, pushed 5-50m to stockpile m3 hours 14.20 20.40
Crawler Shovel, 0.8m3 bucket, Gravel, pushed 50-120m to stockpile m3 hours 7.60 10.20
Crawler Shovel, 0.8m3 bucket, Clay/Chalk, pushed 5-50m to stockpile m3 hours 12.70 18.40
Crawler Shovel, 0.8m3 bucket, Clay/Chalk, pushed 50-120m to stockpile m3 hours 6.90 8.90
Crawler Shovel, 0.8m3 bucket, Boulder Clay, pushed 5-50m to stockpile m3 hours 11.60 16.90
Crawler Shovel, 0.8m3 bucket, Boulder Clay, pushed 50-120m to stockpile m3 hours 6.30 8.20
Crawler Shovel, 1.2m3 bucket, Sand/Soil, pushed 5-50m to stockpile m3 hours 23.80 28.50
Crawler Shovel, 1.2m3 bucket, Sand/Soil, pushed 50-120m to stockpile m3 hours 16.70 18.50
Crawler Shovel, 1.2m3 bucket, Gravel, pushed 5-50m to stockpile m3 hours 25.00 32.00
Crawler Shovel, 1.2m3 bucket, Gravel, pushed 50-120m to stockpile m3 hours 17.20 19.30
Crawler Shovel, 1.2m3 bucket, Clay/Chalk, pushed 5-50m to stockpile m3 hours 21.70 27.50
Crawler Shovel, 1.2m3 bucket, Clay/Chalk, pushed 50-120m to stockpile m3 hours 15.10 16.90
Crawler Shovel, 1.2m3 bucket, Boulder Clay, pushed 5-50m to stockpile m3 hours 19.60 24.50
Crawler Shovel, 1.2m3 bucket, Boulder Clay, pushed 50-120m to stockpile m3 hours 13.70 15.90
Crawler Shovel, 0.6m3 bucket, 50-200m2, Sand/Soil m3 hours 18.60 28.50
Crawler Shovel, 0.6m3 bucket, over 200m2, Sand/Soil m3 hours 24.40 37.20
Crawler Shovel, 0.6m3 bucket, over 200m2, Gravel m3 hours 24.20 37.20
Crawler Shovel, 0.6m3 bucket, over 200m2, Hardcore m3 hours 19.20 29.60
Crawler Shovel, 0.6m3 bucket, 50-200m2, Boulder Clay m3 hours 17.20 26.40
Crawler Shovel, 0.6m3 bucket, over 200m2, Boulder Clay m3 hours 22.20 33.80
Crawler Shovel, 1.2m3 bucket, over 200m2, Sand/Soil m3 hours 55.50 61.10
Crawler Shovel, 1.2m3 bucket, over 200m2, Gravel m3 hours 55.50 61.10
Crawler Shovel, 1.2m3 bucket, over 200m2, Hardcore m3 hours 47.60 51.60
Crawler Shovel, 1.2m3 bucket, 50-200m2, Boulder Clay m3 hours 43.80 45.70
Crawler Shovel, 1.2m3 bucket, over 200m2, Boulder Clay m3 hours 55.60 59.10
Site Investigation
Pre Drilling, Wash Boring, grade V/IV rock m hours 2.50 3.20
Pre Drilling, Triple Tube Sampling, grade V/IV rock m hours 0.40 0.80
Pre Drilling, Triple Tube Sampling, grade III/II rock m hours 0.10 0.40
Site Clearance
Sheeted Roofs
Sheet Piling
Vibro/Drop Hammer, 10m deep Sand m days - 55.00
Secant Piling
Screeding
Rock Tunnels
Excavation, non explosive chemical method, cycle time mins - -
Excavation, non explosive chemical method, Class I Granite m3 cycle 0.30 0.90
Excavation, non explosive chemical method, Class II Granite m3 cycle 2.00 2.60
Excavation, non explosive chemical method, Class III Granite m3 cycle 1.20 1.40
Restoration Works
Rendering
Reinforcement Ratios
Reinforcement
Rainwater Works
Power Supply
Post Tensioning
Lag for Initial Stress Tensioning after 1st bay cast hrs - -
Browning (undercoat), Internal Walls under 2.5m high m2 hours 2.20 2.80
Browning (undercoat), Internal Walls over 2.5m high m2 hours 2.10 2.60
Browning (undercoat), Reveals and Columns less than 100mm wide m2 hours 9.90 10.00
Browning (undercoat), Reveals and Columns 100-200mm wide m2 hours 5.20 5.40
Browning (undercoat), Reveals and Columns 200-300mm wide m2 hours 3.30 3.60
Skimming (topcoat), Internal Walls under 2.5m high m2 hours 6.10 6.70
Skimming (topcoat), Internal Walls over 2.5m high m2 hours 5.50 6.10
Skimming (topcoat), Reveals and Columns less than 100mm wide m2 hours 12.60 13.80
Skimming (topcoat), Reveals and Columns 100-200mm wide m2 hours 7.70 8.30
Skimming (topcoat), Reveals and Columns 200-300mm wide m2 hours 4.50 5.00
Plasterboard
Partitioning
Tape, Joint Sand and Top Coat Plasterboard m2 hours 1.10 1.50
Fix Timber Studding and Hills Duraboard Partitions m2 hours 3.00 3.50
Fix Timber Studding and Gyproc Laminated Partitions m2 hours 2.20 2.60
Fix Toilet Partition System, Hand Door plugged to wall no hours - 1.67
Painting
Internal Timber, 1 coat primer before fixing, timber lengths m hours - 20.00
NATM Tunnels
Half Face Advance Method, used on tunnels with max diameter m - 10.00
Double side Drift Advance Method, used on tunnels with diameter over m - 10.00
Double side Drift Advance Method, used on tunnels with diameter over m - 10.00
Excavation, London Clay, internal diameter under 7.0m m days 2.50 2.90
Excavation, London Clay, internal diameter over 10.0m m days 1.00 1.30
Excavation, London Clay, Inclined Tunnels, diameter 2.0-7.0m m days 1.50 2.00
Excavation, London Clay, Inclined Tunnels, diameter 7.0-10.0m m days 0.50 1.00
Excavation, London Clay, Vertical Shafts, diameter 2.0-9.0m m days 1.00 1.50
Excavation, London Clay, Vertical Shafts, diameter 9.0-15.0m m days 0.50 1.00
Sprayed Secondary Lining, Tunnels, diameter under 6.5m m days 2.10 2.50
Sprayed Secondary Lining, Tunnels, diameter over 6.5m m days 1.50 2.00
Sprayed Secondary Lining, Inclined Tunnels, diameter under 6.5m m days 1.50 2.00
Sprayed Secondary Lining, Inclined Tunnels, diameter over 6.5m m days 1.00 1.50
Sprayed Secondary Lining, Vertical Shafts, diameter under 6.5m m days 1.80 2.00
Sprayed Secondary Lining, Vertical Shafts, diameter over 6.5m m days 2.20 2.50
Sprayed Secondary Lining, Circulation Halls, diameter under 11.0m m days - 2.00
Sprayed Secondary Lining, Intermediate Landing Tunnels with columns m days 1.70 2.00
Sprayed Secondary Lining, Intermediate Landing Tunnels without columns m days 1.60 2.10
Insitu Permanent Lining, 12m bays, 350-400mm reinforced with PCV backingm days - 8.40
Insitu Permanent Lining, extra over excavate/lining time to allow for permanent
% lining - 25.00
Excavate and Line Cycle Time , Running Tunnels m days 3.20 4.00
Excavate and Line Cycle Time, Station Access Adits m days 3.30 3.90
Excavate and Line Cycle Time, Concourse Tunnels m days 2.20 2.50
Excavate and Line Cycle Time, Escalator Tunnels m days 1.20 1.50
Metal Decking
Yard Gulleys, 75-150mm dia pipes, bed and level no hours - 2.20
Yard Gulleys, 150-225mm dia pipes, bed and level no hours - 1.80
Yard Gulleys, 225-300mm dia pipes, bed and level no hours - 1.50
Lift Installation
Landscaping
Top Soil, spread, level and prepare for turf or seeding m2 hours - 2.50
Land Drains, Concrete, butt jointed, under 150mm dia, 0-5m run m hours - 11.60
Land Drains, Concrete, butt jointed, under 150mm dia, 5-30m run m hours - 14.10
Land Drains, Concrete, butt jointed, under 150mm dia, over 30m run m hours - 18.80
Land Drains, Concrete, butt jointed, 150-225mm dia, 0-5m run m hours - 8.40
Land Drains, Concrete, butt jointed, 150-225mm dia, 5-30m run m hours - 10.20
Land Drains, Concrete, butt jointed, 150-225mm dia, over 30m run m hours - 11.90
Land Drains, Concrete, butt jointed, 225-300mm dia, 0-5m run m hours - 5.40
Land Drains, Concrete, butt jointed, 225-300mm dia, 5-30m run m hours - 6.50
Land Drains, Concrete, butt jointed, 225-300mm dia, over 30m run m hours - 7.90
Ground Compaction
Formwork
Columns, Construct Kickers, suspended from soffit slab no hours 1.20 2.80
Columns, Square Sides, Timber Clamp/Prop, csa < 0.1m2 m2 hours 1.30 1.60
Columns, Square Sides, Timber Clamp/Prop, csa 0.1-0.4m2 m2 hours 1.80 2.10
Columns, Square Sides, Timber Clamp/Prop, csa over 0.4m2 m2 hours 2.00 2.30
Columns, Square Sides, Steel Forms, 1.5 x 1.5 x 9.0m high m2 hours 7.90 9.50
Columns, Square Sides, Steel Forms, 2.0 x 2.0 x 9.0m high m2 hours 6.90 7.50
Columns, Square Sides, Steel Forms, 2.0 x 4.0 x 9.0m high m2 hours 8.50 10.20
Columns, Round Sides, Sacrificial Plastic Mould, 3.0-4.0m dia m2 hours 3.50 4.50
Columns, Round Sides, Steel Mould, 3.0-4.0m dia m2 hours 5.20 6.50
Table Form, H-Frame Steel Falsework, 400m2 bays m2 hours 1.90 3.00
Floor Finishes
Site Hoarding, timber posts, plywood nailed to horizontal rails m hours 1.00 1.20
Post Erection, Timber / Metal, dig, erect, fix no hours 3.30 4.50
Escalators
Electrical System
Cable Installation, 2 cable laid in trench and protect, 100mm dia m hours - 1.80
Cable Installation, 2 cable laid in trench and protect, 135mm dia m hours - 1.60
Cable Installation, 3 cable laid in trench and protect, 100mm dia m hours - 1.00
Cable Installation, 6 cable laid in trench and protect, 100mm dia m hours - 0.70
Cable Installation, 4 cable laid in trench and protect, 150mm dia m hours 0.70 1.20
Cable Installation, 36 cable laid in trench and protect, 100mm dia m hours - 0.20
Cable Installation, 10 cable laid in trench and protect, 100mm dia m hours - 0.50
Cable Installation, 1 cable laid in trench and protect, 300mm dia m hours - 1.30
Drainage
PVC Drainage, 1m pipes, 100-150mm dia, over 30m run m hours - 9.50
PVC Drainage, 3m pipes, 100-150mm dia, over 30m run m hours - 18.20
PVC Drainage, 6m pipes, 100-150mm dia, over 30m run m hours - 33.30
PVC Drainage, 3m pipes, 150-200mm dia, over 30m run m hours - 12.80
PVC Drainage, 6m pipes, 150-200mm dia, over 30m run m hours - 25.60
Stoneware Drainage, Cement/Sand Joints, 75mm dia, 0-5m run m hours - 4.70
Stoneware Drainage, Cement/Sand Joints, 75mm dia, 5-30m run m hours - 5.50
Stoneware Drainage, Cement/Sand Joints, 75mm dia, over 30m run m hours - 6.60
Stoneware Drainage, Cement/Sand Joints, 100mm dia, 0-5m run m hours - 4.40
Stoneware Drainage, Cement/Sand Joints, 100mm dia, 5-30m run m hours - 5.00
Stoneware Drainage, Cement/Sand Joints, 100mm dia, over 30m run m hours - 6.20
Stoneware Drainage, Cement/Sand Joints, 150mm dia, 0-5m run m hours - 3.20
Stoneware Drainage, Cement/Sand Joints, 150mm dia, 5-30m run m hours - 3.80
Stoneware Drainage, Cement/Sand Joints, 150mm dia, over 30m run m hours - 4.50
Stoneware Drainage, Cement/Sand Joints, 225mm dia, 0-5m run m hours - 2.10
Stoneware Drainage, Cement/Sand Joints, 225mm dia, 5-30m run m hours - 2.60
Stoneware Drainage, Cement/Sand Joints, 225mm dia, over 30m run m hours - 3.10
Stoneware Drainage, Cement/Sand Joints, 300mm dia, 0-5m run m hours - 1.40
Stoneware Drainage, Cement/Sand Joints, 300mm dia, 5-30m run m hours - 1.70
Stoneware Drainage, Cement/Sand Joints, 300mm dia, over 30m run m hours - 2.40
Stoneware Drainage, Cement/Sand Joints, over 375mm dia, 0-5m run m hours - 1.10
Stoneware Drainage, Cement/Sand Joints, over 375mm dia, 5-30m run m hours - 1.30
Stoneware Drainage, Cement/Sand Joints, over 375mm dia, over 30m run m hours - 1.60
Stoneware Drainage, Flexible Joints, 75mm dia, 0-5m run m hours - 8.30
Stoneware Drainage, Flexible Joints, 75mm dia, 5-30m run m hours - 10.00
Stoneware Drainage, Flexible Joints, 75mm dia, over 30m run m hours - 12.50
Stoneware Drainage, Flexible Joints, 100mm dia, 0-5m run m hours - 7.70
Stoneware Drainage, Flexible Joints, 100mm dia, 5-30m run m hours - 9.10
Stoneware Drainage, Flexible Joints, 100mm dia, over 30m run m hours - 10.00
Stoneware Drainage, Flexible Joints, 150mm dia, 0-5m run m hours - 5.20
Stoneware Drainage, Flexible Joints, 150mm dia, 5-30m run m hours - 6.20
Stoneware Drainage, Flexible Joints, 150mm dia, over 30m run m hours - 7.70
Stoneware Drainage, Flexible Joints, 225mm dia, 0-5m run m hours - 2.70
Stoneware Drainage, Flexible Joints, 225mm dia, 5-30m run m hours - 3.30
Stoneware Drainage, Flexible Joints, 225mm dia, over 30m run m hours - 4.00
Stoneware Drainage, Flexible Joints, 300mm dia, 0-5m run m hours - 1.70
Stoneware Drainage, Flexible Joints, 300mm dia, 5-30m run m hours - 2.10
Stoneware Drainage, Flexible Joints, 300mm dia, over 30m run m hours - 2.50
Stoneware Drainage, Flexible Joints, over 375mm dia, 0-5m run m hours - 1.40
Stoneware Drainage, Flexible Joints, over 375mm dia, 5-30m run m hours - 1.60
Stoneware Drainage, Flexible Joints, over 375mm dia, over 30m run m hours - 2.10
Pitch Fibre Pipes, 75mm dia, over 30m run m hours - 20.00
Pitch Fibre Pipes, 100mm dia, over 30m run m hours - 20.00
Pitch Fibre Pipes, 150mm dia, over 30m run m hours - 14.30
Pitch Fibre Pipes, 200mm dia, over 30m run m hours - 12.50
Pitch Fibre Pipes, 225mm dia, 0-5m run m hours - 5.80
Pitch Fibre Pipes, 225mm dia, over 30m run m hours - 12.10
Hepsleve Rubber Joint System, 75mm dia, 0-5m run m hours - 12.50
Hepsleve Rubber Joint System, 75mm dia, 5-30m run m hours - 14.30
Hepsleve Rubber Joint System, 75mm dia, over 30m run m hours 11.20 16.60
Hepsleve Rubber Joint System, 100mm dia, 0-5m run m hours - 10.00
Hepsleve Rubber Joint System, 100mm dia, 5-30m run m hours - 12.50
Hepsleve Rubber Joint System, 100mm dia, over 30m run m hours - 14.30
Hepsleve Rubber Joint System, 150mm dia, 0-5m run m hours - 7.10
Hepsleve Rubber Joint System, 150mm dia, 5-30m run m hours - 9.10
Hepsleve Rubber Joint System, 150mm dia, over 30m run m hours 8.30 10.00
Hepsleve Rubber Joint System, 225mm dia, 0-5m run m hours - 6.80
Hepsleve Rubber Joint System, 225mm dia, 5-30m run m hours - 4.50
Hepsleve Rubber Joint System, 225mm dia, over 30m run m hours - 5.50
Hepsleve Rubber Joint System, 300mm dia, 0-5m run m hours - 2.50
Hepsleve Rubber Joint System, 300mm dia, 5-30m run m hours - 2.90
Hepsleve Rubber Joint System, 300mm dia, over 30m run m hours - 3.70
Hepsleve Rubber Joint System, over 375mm dia, 0-5m run m hours - 1.90
Hepsleve Rubber Joint System, over 375mm dia, 5-30m run m hours - 2.30
Hepsleve Rubber Joint System, over 375mm dia, over 30m run m hours - 2.70
Concrete Pipes, 1.5m pipes, 375mm dia, 0-5m run m hours - 2.80
Concrete Pipes, 1.5m pipes, 375mm dia, 5-30m run m hours - 3.40
Concrete Pipes, 1.5m pipes, 375mm dia, over 30m run m hours - 3.80
Concrete Pipes, 1.5m pipes, 450mm dia, 0-5m run m hours - 2.70
Concrete Pipes, 1.5m pipes, 450mm dia, 5-30m run m hours - 3.20
Concrete Pipes, 1.5m pipes, 450mm dia, over 30m run m hours - 3.60
Concrete Pipes, 1.5m pipes, 525mm dia, 0-5m run m hours - 2.50
Concrete Pipes, 1.5m pipes, 525mm dia, 5-30m run m hours - 2.90
Concrete Pipes, 1.5m pipes, 525mm dia, over 30m run m hours - 3.40
Concrete Pipes, 1.5m pipes, 600mm dia, 0-5m run m hours - 2.40
Concrete Pipes, 1.5m pipes, 600mm dia, 5-30m run m hours - 2.70
Concrete Pipes, 1.5m pipes, 600mm dia, over 30m run m hours - 3.30
Concrete Pipes, 1.5m pipes, 675mm dia, 0-5m run m hours - 2.20
Concrete Pipes, 1.5m pipes, 675mm dia, 5-30m run m hours - 2.60
Concrete Pipes, 1.5m pipes, 675mm dia, over 30m run m hours - 2.90
Concrete Pipes, 1.5m pipes, 750mm dia, 0-5m run m hours - 1.10
Concrete Pipes, 1.5m pipes, 750mm dia, 5-30m run m hours - 2.40
Concrete Pipes, 1.5m pipes, 750mm dia, over 30m run m hours - 2.50
Concrete Pipes, 2.5m pipes, 375mm dia, 0-5m run m hours - 3.60
Concrete Pipes, 2.5m pipes, 375mm dia, 5-30m run m hours - 4.30
Concrete Pipes, 2.5m pipes, 375mm dia, over 30m run m hours - 5.00
Concrete Pipes, 2.5m pipes, 450mm dia, 0-5m run m hours - 3.40
Concrete Pipes, 2.5m pipes, 450mm dia, 5-30m run m hours - 4.10
Concrete Pipes, 2.5m pipes, 450mm dia, over 30m run m hours - 4.50
Concrete Pipes, 2.5m pipes, 525mm dia, 0-5m run m hours - 3.30
Concrete Pipes, 2.5m pipes, 525mm dia, 5-30m run m hours - 3.80
Concrete Pipes, 2.5m pipes, 525mm dia, over 30m run m hours - 4.10
Concrete Pipes, 2.5m pipes, 600mm dia, 0-5m run m hours - 3.00
Concrete Pipes, 2.5m pipes, 600mm dia, 5-30m run m hours - 3.50
Concrete Pipes, 2.5m pipes, 600mm dia, over 30m run m hours - 4.00
Concrete Pipes, 2.5m pipes, 675mm dia, 0-5m run m hours - 2.80
Concrete Pipes, 2.5m pipes, 675mm dia, 5-30m run m hours - 3.30
Concrete Pipes, 2.5m pipes, 675mm dia, over 30m run m hours - 3.70
Concrete Pipes, 2.5m pipes, 750mm dia, 0-5m run m hours - 2.60
Concrete Pipes, 2.5m pipes, 750mm dia, 5-30m run m hours - 3.10
Concrete Pipes, 2.5m pipes, 750mm dia, over 30m run m hours - 3.60
Lay Shingle Around Pipework, over 150mm dia m hours 4.00 5.50
Fix Metal and Timber Windows After Wall Complete m2 hours - 2.00
Blockwork
Dewatering
Demolition
Remove & Cart away, Ceramic Wall Tiles m2 hours 2.00 2.50
Remove & Cart away, Lathe and Plaster Ceilings m2 hours 3.20 4.60
Remove & Cart away, Brickwork Walls, 1.0 brick thick m2 hours - 1.30
Remove & Cart away, Brickwork Walls, 0.5 brick thick m2 hours - 2.60
Remove & Cart away, Brickwork Walls, Sand/Lime Mortar 100 hours - 0.5556
Remove & Cart away, Skirting, Architrave, Dado rail etc m hours - 16.50
Remove & Cart away, Staircase no hours - 0.1370
Remove & Cart away, Floor and Ceiling Joists m hours - 0.9091
Remove & Cart away, Pipework including brackets etc m hours - 6.10
Decking
Simple Universal Beam Steel Bridge, concrete bridge deck, grano cover m days - 7.10
Cutting Switchboxes
Cutting Chases
Light Blockwork, cutting by hand, < 25mm wide m hours 3.80 5.00
Light Blockwork, cutting by machine, < 25mm wide m hours 7.70 10.00
Heavy Blockwork, cutting by hand, < 25mm wide m hours 1.90 2.60
Heavy Blockwork, cutting by machine, < 25mm wide m hours 3.80 5.00
Cutting Back
Concrete Pile Caps, 50-300mm deep and 0.6m dia no hours 1.6667 -
Concrete Pile Caps, 300-750mm deep and 0.6m dia no hours 0.6667 -
Concrete Pile Caps, > 750mm deep and 0.6m dia no hours 0.5556 -
Concrete Pile Caps, 50-300mm deep and 1.1m dia no hours 0.5263 -
Concrete Pile Caps, 300-750mm deep and 1.1m dia no hours 0.4000 -
Concrete Pile Caps, > 750mm deep and 1.1m dia no hours 0.2381 -
Concrete Pile Caps, 50-300mm deep and 2.5m dia no hours 0.1087 -
Concrete Pile Caps, 300-750mm deep and 2.5m dia no hours 0.0990 -
Concrete Pile Caps, > 750mm deep and 2.5m dia no hours 0.0870 -
Curtain Walling
Concrete Placement
Placing Direct From Readymix Lorry, Mass Fill m3 hours 2.80 3.10
Placing Direct From Readymix Lorry, Pile Caps m3 hours 1.00 1.50
Placing Direct From Readymix Lorry, Ground Slab m3 hours 2.10 2.30
Placing Direct From Readymix Lorry,Drains Bed and Cover m3 hours - 0.90
Placing From Tower Crane, Slabs under 150mm thick m3 hours 0.90 1.30
Placing From Tower Crane, Slabs over 150mm thick m3 hours 1.20 1.50
Placing From Tower Crane, Trough/Coffered Slabs m3 hours 0.90 1.10
Placing From Tower Crane, Stairs and Landings m3 hours 0.60 0.70
Placing From Tower Crane, Beams under 150mm thick m3 hours 0.50 0.60
Placing From Tower Crane, Beams over 150mm thick m3 hours 0.60 0.80
Concrete Mixing
Making Good Bolt Holes, prepare, shutter, pour no/hr hours 14.80 16.80
Making Good Rubdown Precast Concrete, prepare, shutter, pour m2 hours - 18.00
Making Good Scabble 3 head brush hammer, prepare, shutter, pour m2 hours 30.70 59.50
Commercial Kitchen
Ceiling Finishes
Carpentry Carcassing
Windows, Drill, Screw & Plug extra over no hours 3.3333 10.0000
Bulk Excavation
Rail Mounted Grab, 2.0m3 bucket 2.4min lift cycle m3 hours 30.00 48.00
Crane Mounted Clamshell Grab, 2.0m3 bucket 2.9min lift cycle m3 hours 25.00 33.00
Crane Mounted Clamshell Grab, 2.5m3 bucket 2.9min lift cycle m3 hours 34.00 42.00
Breaking Out
Barrette Piles
Hydraulic Excavator, 0.3m3 bucket, Sand/Soil - Basement Works m3 hours 6.40 8.00
Hydraulic Excavator, 0.3m3 bucket, Gravel Beds - Basement Works m3 hours 5.50 6.90
Hydraulic Excavator, 0.3m3 bucket, Clay/Chalk - Basement Works m3 hours 5.20 6.50
Hydraulic Excavator, 0.3m3 bucket, Hard Ground - Basement Works m3 hours 4.70 5.90
Hydraulic Excavator, 0.4m3 bucket, Sand/Soil - Basement Works m3 hours 12.60 15.40
Hydraulic Excavator, 0.4m3 bucket, Gravel Beds - Basement Works m3 hours 11.70 14.30
Hydraulic Excavator, 0.4m3 bucket, Clay/Chalk - Basement Works m3 hours 10.90 13.30
Hydraulic Excavator, 0.4m3 bucket, Hard Ground - Basement Works m3 hours 9.70 11.80
Hydraulic Excavator, 0.5m3 bucket, Sand/Soil - Basement Works m3 hours 18.20 20.00
Hydraulic Excavator, 0.5m3 bucket, Gravel Beds - Basement Works m3 hours 16.50 18.10
Hydraulic Excavator, 0.5m3 bucket, Clay/Chalk - Basement Works m3 hours 15.40 16.70
Hydraulic Excavator, 0.5m3 bucket, Hard Ground - Basement Works m3 hours 13.30 15.40
earthworks
- - 0.1250 - earthworks
- - 0.1538 - earthworks
- - 0.1818 - earthworks
- - 0.0038 - earthworks
earthworks
earthworks
civil works
civil works
civil works
civil works
civil works
structural works
structural works
structural works
structural works
architectural works
architectural works
- - 0.2000 - architectural works
architectural works
architectural works
architectural works
architectural works
architectural works
architectural works
architectural works
architectural works
civil works
civil works
civil works
civil works
civil works
earthworks
earthworks
earthworks
earthworks
earthworks
structural works
structural works
structural works
structural works
structural works
civil works
civil works
civil works
civil works
civil works
Roofing System
Roofing System
Roofing System
Roofing System
Roofing System
structural works
structural works
structural works
structural works
structural works
structural works
architectural works
architectural works
architectural works
architectural works
architectural works
structural works
structural works
structural works
structural works
structural works
roofing system
roofing system
roofing system
roofing system
roofing system
earthworks
earthworks
earthworks
earthworks
earthworks
civil works
civil works
civil works
civil works
civil works
earthworks
earthworks
earthworks
earthworks
earthworks
civil works
civil works
civil works
civil works
civil works
Roofing System
Roofing System
Roofing System
Roofing System
Roofing System
Testing
Testing
14.00 0.1250 0.1000 0.0714 Testing
3.90 0.4000 0.3125 0.2564 Testing
0.90 2.5000 1.2500 1.1111 Testing
0.70 5.0000 2.0000 1.4286 Testing
0.70 10.0000 2.5000 1.4286 Testing
Testing
Testing
Testing
civil works
civil works
civil works
civil works
civil works
roofing system
roofing system
roofing system
roofing system
roofing system
civil works
civil works
60.00 - 0.0182 0.0167 civil works
10.50 0.2857 0.0313 0.0952 civil works
civil works
civil works
civil works
civil works
civil works
- - 12.00 - civil works
civil works
civil works
civil works
architectural works
architectural works
5.70 - 0.2083 0.1754 architectural works
5.50 - 0.2174 0.1818 architectural works
5.30 0.3125 0.2381 0.1887 architectural works
5.20 0.5000 0.2632 0.1923 architectural works
3.90 - 0.3030 0.2564 architectural works
3.60 - 0.3333 0.2778 architectural works
- - 0.1000 - architectural works
architectural works
architectural works
architectural works
civil works
civil works
0.3333 5.00 4.00 3.00 civil works
- - 0.0200 - civil works
0.1667 10.00 8.00 6.00 civil works
- - 0.0833 - civil works
- - 1.4286 - civil works
- - 0.0625 - civil works
- - 0.0071 - civil works
- - 0.1429 - civil works
- - 0.0833 - civil works
17.50 0.1429 0.0833 0.0571 civil works
- - 0.1961 - civil works
- - 0.6667 - civil works
- - 0.2222 - civil works
- - 0.2222 - civil works
- - 0.0167 - civil works
- - 0.6667 - civil works
civil works
civil works
civil works
earthworks
earthworks
- 8.00 6.00 5.50 earthworks
1.20 3.3333 1.1111 0.8333 earthworks
2.90 0.5000 0.3846 0.3448 earthworks
1.80 0.8333 0.7143 0.5556 earthworks
earthworks
earthworks
architectural works
architectural works
- - 0.0400 - architectural works
- - 0.1111 - architectural works
- - 0.0833 - architectural works
- - 0.1538 - architectural works
- - 0.0500 - architectural works
architectural works
architectural works
architectural works
architectural works
2.70 - 0.4545 0.3704 architectural works
1.70 - 0.6667 0.5882 architectural works
1.40 - 0.8333 0.7143 architectural works
1.70 - 0.6667 0.5882 architectural works
- - 0.7143 - architectural works
architectural works
architectural works
civil works
civil works
- - 7.00 - civil works
- - 6.00 - civil works
- - 2.00 - civil works
civil works
civil works
structural works
structural works
- - - - structural works
14.10 - - - structural works
25.60 - - - structural works
- - - - structural works
28.70 - - - structural works
- - - - structural works
structural works
structural works
structural works
structural works
0.0274 40.30 38.40 36.50 structural works
0.0388 28.20 26.90 25.80 structural works
0.0498 22.50 20.60 20.10 structural works
0.0649 16.90 16.30 15.40 structural works
0.0917 12.00 11.50 10.90 structural works
0.1220 9.20 8.60 8.20 structural works
0.1538 6.90 6.70 6.50 structural works
0.1923 5.70 5.50 5.20 structural works
0.2041 5.30 5.10 4.90 structural works
0.2174 5.20 4.90 4.60 structural works
0.0198 55.40 52.80 50.60 structural works
0.0285 38.80 37.00 35.10 structural works
0.0372 29.50 28.4 26.90 structural works
0.0457 23.40 22.40 21.90 structural works
0.0662 16.60 15.80 15.10 structural works
0.0885 12.40 11.90 11.30 structural works
0.1149 9.90 9.20 8.70 structural works
0.1613 6.80 6.60 6.20 structural works
0.1786 6.10 5.90 5.60 structural works
0.1786 6.10 5.90 5.60 structural works
0.0256 41.20 40.80 39.10 structural works
0.0365 29.20 28.60 27.40 structural works
0.0472 22.70 22.00 21.20 structural works
0.0592 17.60 17.30 16.90 structural works
0.0847 12.40 12.20 11.80 structural works
0.1149 9.40 9.20 8.70 structural works
0.1429 7.40 7.20 7.00 structural works
0.1563 7.00 6.80 6.40 structural works
0.1695 6.40 6.10 5.90 structural works
0.2083 5.30 5.10 4.80 structural works
0.0220 48.90 48.00 45.50 structural works
0.0313 34.40 33.60 31.90 structural works
0.0412 26.60 25.80 24.30 structural works
0.0513 20.90 20.40 19.50 structural works
0.0725 14.60 14.40 13.80 structural works
0.0952 11.30 10.80 10.50 structural works
0.1220 8.60 8.40 8.20 structural works
structural works
structural works
mechanical works
mechanical works
- - 0.3030 - mechanical works
- - 0.3226 - mechanical works
- - 0.3226 - mechanical works
- - 0.4762 - mechanical works
- - 0.4000 - mechanical works
- - 0.4545 - mechanical works
- - 0.4000 - mechanical works
- - 0.3448 - mechanical works
- - 0.5263 - mechanical works
mechanical works
mechanical works
electrical works
electrical works
- - 12.00 - electrical works
- - 12.00 - electrical works
- 11.00 5.00 - electrical works
- 12.00 6.00 - electrical works
- - 5.00 - electrical works
- - 1.00 - electrical works
- - 10.00 - electrical works
- 12.0 9.00 - electrical works
- 12.0 6.00 - electrical works
- 0.0005 - - electrical works
- - 1.0 - electrical works
electrical works
electrical works
structural works
structural works
- - 48.00 - structural works
- - 120.00 - structural works
structural works
structural works
architectural works
architectural works
3.10 0.4545 0.3571 0.3226 architectural works
2.80 0.4762 0.3846 0.3571 architectural works
10.10 0.1010 0.1000 0.0990 architectural works
6.40 0.1923 0.1852 0.1563 architectural works
3.90 0.3030 0.2778 0.2564 architectural works
- - 0.2000 - architectural works
7.30 0.1639 0.1493 0.1370 architectural works
6.70 0.1818 0.1639 0.1493 architectural works
15.40 0.0794 0.0725 0.0649 architectural works
9.80 0.1299 0.1205 0.1020 architectural works
5.50 0.2222 0.2000 0.1818 architectural works
5.50 0.3125 0.2222 0.1818 architectural works
2.40 0.9091 0.5882 0.4167 architectural works
5.40 0.3704 0.3125 0.1852 architectural works
architectural works
architectural works
architectural works
architectural works
5.50 0.2778 0.2500 0.1818 architectural works
6.70 0.2500 0.2000 0.1493 architectural works
- - 0.0800 - architectural works
- - 0.0606 - architectural works
- - 0.10 - architectural works
architectural works
architectural works
architectural works
architectural works
6.80 0.1695 0.1613 0.1471 architectural works
2.50 0.6250 0.5000 0.4000 architectural works
2.10 0.9091 0.6667 0.4762 architectural works
6.70 0.1818 0.1639 0.1493 architectural works
3.60 - 0.3125 0.2778 architectural works
1.40 1.2500 0.9091 0.7143 architectural works
0.60 3.3333 2.0000 1.6667 architectural works
20.20 - 0.0562 0.0495 architectural works
3.40 0.3846 0.3333 0.2941 architectural works
1.60 1.2500 0.9091 0.6250 architectural works
3.90 0.3333 0.2857 0.2564 architectural works
2.90 0.4545 0.3846 0.3448 architectural works
9.10 0.1695 0.1370 0.1099 architectural works
5.80 0.2857 0.2174 0.1724 architectural works
4.80 0.3448 0.2778 0.2083 architectural works
3.70 0.4762 0.3571 0.2703 architectural works
- - 0.0901 - architectural works
- - 0.0602 - architectural works
- - 0.0351 - architectural works
- - 0.80 - architectural works
- - 0.70 - architectural works
- - 0.60 - architectural works
- - 0.60 - architectural works
- - 0.40 - architectural works
- - 0.60 - architectural works
- - 0.10 - architectural works
architectural works
architectural works
architectural works
architectural works
- - 0.0704 - architectural works
- - 0.0800 - architectural works
- - 0.0400 - architectural works
- - 0.9091 - architectural works
- - 0.1493 - architectural works
- - 0.0500 - architectural works
2.10 - 0.5882 0.4762 architectural works
3.80 - 0.3226 0.2632 architectural works
- - 0.3030 - architectural works
- - 0.4545 - architectural works
- - 0.2778 - architectural works
- - 0.4167 - architectural works
- - 0.6667 - architectural works
- - 0.5000 - architectural works
- - 0.2500 - architectural works
- - 0.5000 - architectural works
- - 0.1250 - architectural works
- - 0.1667 - architectural works
- - 0.1667 - architectural works
- - 0.2222 - architectural works
- - 0.4348 - architectural works
- - 0.0500 - architectural works
- - 0.0606 - architectural works
- - 0.1408 - architectural works
- - 0.1613 - architectural works
- - 0.4000 - architectural works
- - 0.5000 - architectural works
- - 0.5000 - architectural works
- - 0.5882 - architectural works
- - 0.3448 - architectural works
- - 0.1639 - architectural works
- - 0.2000 - architectural works
- - 0.2381 - architectural works
- - 0.2439 - architectural works
- 0.7692 0.4167 - architectural works
- 1.1111 0.5882 - architectural works
- - 0.4000 - architectural works
architectural works
architectural works
architectural works
civil works
civil works
- - - - civil works
- - - - civil works
- - - - civil works
- - - - civil works
3.20 0.4000 0.3448 0.3125 civil works
2.50 0.6667 0.5000 0.4000 civil works
1.5 1.0000 0.7692 - civil works
2.0 0.6667 0.5556 - civil works
- - 0.6667 - civil works
1.5 - 1.0000 - civil works
3.2 0.6667 0.5000 - civil works
2.2 2.0000 1.0000 - civil works
2.2 1.0000 0.6667 - civil works
2.6 2.0000 1.0000 - civil works
1.2 1.2500 1.0000 - civil works
- - 5.0000 - civil works
279.0 0.0053 0.0044 - civil works
366.0 0.0039 0.0033 - civil works
549.0 0.0026 0.0022 - civil works
2.8 0.4762 0.4000 - civil works
2.4 0.6667 0.5000 - civil works
2.3 0.6667 0.5000 - civil works
1.9 1.0000 0.6667 - civil works
2.5 0.5556 0.5000 - civil works
3.1 0.4545 0.4000 - civil works
2.3 - 0.5000 - civil works
2.1 0.5882 0.5000 - civil works
2.3 0.6250 0.4762 - civil works
0.3 - 5.0000 - civil works
12.0 - 0.1190 - civil works
- - - - civil works
4.9 0.3125 0.2500 - civil works
4.2 0.3030 0.2564 - civil works
2.7 0.4545 0.4000 - civil works
1.7 0.8333 0.6667 - civil works
civil works
civil works
structural works
structural works
- - 0.0143 - structural works
- - 0.0357 - structural works
- - 0.1053 - structural works
- - 0.3333 - structural works
- - 0.3704 - structural works
- - 0.4167 - structural works
- - 0.4762 - structural works
- - 0.3571 - structural works
- - 0.5263 - structural works
- - 0.4000 - structural works
- - 0.4762 - structural works
- - 0.7692 - structural works
- - 0.0114 - structural works
- - 0.0132 - structural works
- - 0.2857 - structural works
- - 0.3030 - structural works
- - 0.3125 - structural works
- - 1.2500 - structural works
- - 1.4286 - structural works
structural works
structural works
mechanical works
mechanical works
- - 1.20 - mechanical works
- - 1.60 - mechanical works
- - 3.3333 - mechanical works
- - 5.0000 - mechanical works
- - 5.0000 - mechanical works
- - 0.90 - mechanical works
- - 1.20 - mechanical works
- - 1.80 - mechanical works
- - 0.10 - mechanical works
- - 0.20 - mechanical works
- - 0.30 - mechanical works
0.83 0.30 0.60 1.20 mechanical works
- - 0.4545 - mechanical works
- - 0.5556 - mechanical works
- - 0.6667 - mechanical works
- - 0.8333 - mechanical works
- - 1.2500 - mechanical works
- - 2.5000 - mechanical works
- - 3.3333 - mechanical works
- - 0.2000 - mechanical works
- - 15.00 - mechanical works
mechanical works
mechanical works
mechanical works
mechanical works
- - 3.00 - mechanical works
- - 2.00 - mechanical works
- - 1.00 - mechanical works
- - 12.00 - mechanical works
- 75.00 65.00 52.00 mechanical works
mechanical works
mechanical works
architectural works
architectural works
- - 0.4000 - architectural works
- - 0.0400 - architectural works
- - 0.2500 - architectural works
- - 0.6667 - architectural works
- - 0.5882 - architectural works
- - 0.0595 - architectural works
architectural works
architectural works
structural works
structural works
- - 0.0862 - structural works
- - 0.0709 - structural works
- - 0.0532 - structural works
- - 0.1190 - structural works
- - 0.0980 - structural works
- - 0.0840 - structural works
- - 0.1852 - structural works
- - 0.1538 - structural works
- - 0.1266 - structural works
structural works
structural works
architectural works
architectural works
4.20 0.3704 - 0.2381 architectural works
2.70 0.4348 - 0.3704 architectural works
2.30 0.6667 - 0.4348 architectural works
1.50 0.9091 - 0.6667 architectural works
2.80 0.5882 - 0.3571 architectural works
1.90 0.6250 - 0.5263 architectural works
- - 3.3333 - architectural works
- - 5.0000 - architectural works
- - 0.4000 - architectural works
1.90 1.1111 0.7692 0.5263 architectural works
1.20 - 1.0000 0.8333 architectural works
- - 0.0952 - architectural works
- - 0.4000 - architectural works
- - 0.1613 - architectural works
- - 0.2222 - architectural works
- - 0.2000 - architectural works
- - 0.1818 - architectural works
- - 0.2857 - architectural works
- - 0.1299 - architectural works
- - 0.1724 - architectural works
- - 0.1613 - architectural works
- - 0.1408 - architectural works
- - 0.1515 - architectural works
- - 0.1724 - architectural works
- - 0.1205 - architectural works
architectural works
architectural works
structural works
structural works
2.00 1.1111 0.6250 0.5000 structural works
2.30 0.6250 0.5000 0.4348 structural works
2.50 0.5000 0.4348 0.4000 structural works
3.10 0.4348 0.4000 0.3226 structural works
1.80 0.9091 0.5882 0.5556 structural works
2.50 0.5882 0.5556 0.4000 structural works
2.60 0.5556 0.4000 0.3846 structural works
3.50 0.4000 0.3846 0.2857 structural works
1.20 1.6667 1.2500 0.8333 structural works
1.10 1.1111 1.0000 0.9091 structural works
1.30 1.0000 0.9091 0.7692 structural works
1.50 0.8333 0.7692 0.6667 structural works
1.80 0.6667 0.6250 0.5556 structural works
1.70 0.7143 0.6667 0.5882 structural works
10.00 0.1887 0.1408 0.1000 structural works
1.90 1.1111 0.5556 0.5263 structural works
2.50 1.0000 0.4545 0.4000 structural works
2.90 0.8333 0.4000 0.3448 structural works
2.00 1.0000 0.7143 0.5000 structural works
3.30 0.5263 0.4348 0.3030 structural works
3.50 0.4348 0.3571 0.2857 structural works
4.00 0.3125 0.2222 0.2500 structural works
5.40 0.2632 0.2083 0.1852 structural works
1.80 1.0000 0.6667 0.5556 structural works
5.40 0.3125 0.2439 0.1852 structural works
3.20 0.8333 0.3571 0.3125 structural works
1.80 0.7692 0.6250 0.5556 structural works
2.40 0.5556 0.4762 0.4167 structural works
2.50 0.5000 0.4348 0.4000 structural works
10.30 0.1266 0.1053 0.0971 structural works
8.30 0.1449 0.1333 0.1205 structural works
12.00 0.1176 0.0980 0.0833 structural works
6.00 0.2857 0.2222 0.1667 structural works
7.50 0.1923 0.1538 0.1333 structural works
0.29 - 2.50 3.50 structural works
1.00 1.4286 1.2500 1.0000 structural works
1.20 1.2500 1.1111 0.8333 structural works
- 2.5000 1.6667 - structural works
- 1.4286 1.2500 - structural works
2.80 - 0.4000 0.3571 structural works
2.60 - 0.4348 0.3846 structural works
1.80 0.9091 0.7143 0.5556 structural works
500.00 - 0.0033 0.0020 structural works
3.80 0.4762 0.3125 0.2632 structural works
3.50 0.5263 0.3333 0.2857 structural works
17.50 - 0.0641 0.0571 structural works
47.50 - 0.0230 0.0211 structural works
31.20 - 0.0341 0.0321 structural works
4.20 0.3571 0.2857 0.2381 structural works
1.90 0.8333 0.6667 0.5263 structural works
1.40 1.1111 0.9091 0.7143 structural works
9.10 0.1316 0.1220 0.1099 structural works
4.50 0.3226 0.2564 0.2222 structural works
7.10 0.2222 0.1613 0.1408 structural works
4.50 0.3226 0.2703 0.2222 structural works
structural works
structural works
architectural works
architectural works
- - 0.3226 - architectural works
- - 0.2778 - architectural works
5.10 - 0.2174 0.1961 architectural works
2.20 - 0.6667 0.4545 architectural works
1.10 - 1.2500 0.9091 architectural works
2.80 - 0.4545 0.3571 architectural works
- - 0.3846 - architectural works
5.00 - 0.3226 0.2000 architectural works
5.60 - 0.3030 0.1786 architectural works
2.10 - 0.6667 0.4762 architectural works
- - 0.3226 - architectural works
6.10 - 0.1786 0.1639 architectural works
4.20 - 0.2857 0.2381 architectural works
2.80 - 0.5000 0.3571 architectural works
4.10 - 0.2703 0.2439 architectural works
7.20 - 0.1515 0.1389 architectural works
10.50 - 0.1053 0.0952 architectural works
architectural works
architectural works
roofing system
roofing system
- - 0.0222 - roofing system
- - 0.0256 - roofing system
- - 0.0192 - roofing system
- - 0.0286 - roofing system
- - 0.7143 - roofing system
roofing system
roofing system
civil works
civil works
- 1.0000 0.8333 - civil works
- 0.3030 0.2222 - civil works
- 0.3125 0.2500 - civil works
- - 0.2381 - civil works
- - 0.2273 - civil works
- - 0.1818 - civil works
- - 0.0420 - civil works
- - 0.0300 - civil works
- - 0.0240 - civil works
- - 0.0140 - civil works
- - 0.0100 - civil works
- - 0.0080 - civil works
- - 0.2439 - civil works
civil works
civil works
mechanical works
mechanical works
- 14.00 12.00 11.00 mechanical works
- - 60.00 48.00 mechanical works
- - 1.00 - mechanical works
- 8.00 6.00 4.00 mechanical works
- - 5.00 - mechanical works
- - 2.00 - mechanical works
- - 2.00 - mechanical works
- - 2.00 - mechanical works
mechanical works
mechanical works
electrical works
electrical works
- - 38.0 - electrical works
- - 16.0 - electrical works
- - 8.0 - electrical works
- - 0.1613 - electrical works
- - 0.1786 - electrical works
- - 0.2326 - electrical works
- - 0.2703 - electrical works
- - 0.2857 - electrical works
- - 0.5556 - electrical works
- - 0.6250 - electrical works
1.50 - 1.0000 0.6667 electrical works
1.20 - 1.4286 0.8333 electrical works
3.10 1.4286 0.8333 0.3226 electrical works
- - 5.0000 - electrical works
- - 2.0000 - electrical works
- - 0.7692 - electrical works
electrical works
electrical works
mechanical works
mechanical works
- - 0.1754 - mechanical works
- - 0.1235 - mechanical works
- - 0.1053 - mechanical works
- - 0.0820 - mechanical works
- - 0.0658 - mechanical works
- - 0.0549 - mechanical works
- - 0.0450 - mechanical works
- - 0.0361 - mechanical works
- - 0.0300 - mechanical works
- - 0.0943 - mechanical works
- - 0.0781 - mechanical works
- - 0.0472 - mechanical works
- - 0.0391 - mechanical works
- - 0.2128 - mechanical works
- - 0.1818 - mechanical works
- - 0.1515 - mechanical works
- - 0.2273 - mechanical works
- - 0.2000 - mechanical works
- - 0.1613 - mechanical works
- - 0.3125 - mechanical works
- - 0.2632 - mechanical works
- - 0.2222 - mechanical works
- - 0.4762 - mechanical works
- - 0.3846 - mechanical works
- - 0.3226 - mechanical works
- - 0.7143 - mechanical works
- - 0.5882 - mechanical works
- - 0.4167 - mechanical works
- - 0.9091 - mechanical works
- - 0.7692 - mechanical works
- - 0.6250 - mechanical works
- - 0.1205 - mechanical works
- - 0.1000 - mechanical works
- - 0.0800 - mechanical works
- - 0.1299 - mechanical works
- - 0.1099 - mechanical works
- - 0.1000 - mechanical works
- - 0.1923 - mechanical works
- - 0.1613 - mechanical works
- - 0.1299 - mechanical works
- - 0.3704 - mechanical works
- - 0.3030 - mechanical works
- - 0.2500 - mechanical works
- - 0.5882 - mechanical works
- - 0.4762 - mechanical works
- - 0.4000 - mechanical works
- - 0.7143 - mechanical works
- - 0.6250 - mechanical works
- - 0.4762 - mechanical works
- - 2.40 - mechanical works
- - 0.1099 - mechanical works
- - 0.0602 - mechanical works
- - 0.0500 - mechanical works
- - 0.1099 - mechanical works
- - 0.0602 - mechanical works
- - 0.0500 - mechanical works
- - 0.1515 - mechanical works
- - 0.0800 - mechanical works
- - 0.0699 - mechanical works
- - 0.1613 - mechanical works
- - 0.0901 - mechanical works
- - 0.0800 - mechanical works
- - 0.1724 - mechanical works
- - 0.1000 - mechanical works
- - 0.0826 - mechanical works
- - 0.0800 - mechanical works
- - 0.0699 - mechanical works
30.10 0.0893 0.0602 0.0332 mechanical works
- - 0.1000 - mechanical works
- - 0.0800 - mechanical works
- - 0.0699 - mechanical works
- - 0.1408 - mechanical works
- - 0.1099 - mechanical works
13.80 0.1205 0.1000 0.0725 mechanical works
- - 0.1471 - mechanical works
- - 0.2222 - mechanical works
- - 0.1818 - mechanical works
- - 0.4000 - mechanical works
- - 0.3448 - mechanical works
- - 0.2703 - mechanical works
- - 0.5263 - mechanical works
- - 0.4348 - mechanical works
- - 0.3704 - mechanical works
- - 0.3571 - mechanical works
- - 0.2941 - mechanical works
- - 0.2632 - mechanical works
- - 0.3704 - mechanical works
- - 0.3125 - mechanical works
- - 0.2778 - mechanical works
- - 0.4000 - mechanical works
- - 0.3448 - mechanical works
- - 0.2941 - mechanical works
- - 0.4167 - mechanical works
- - 0.3704 - mechanical works
- - 0.3030 - mechanical works
- - 0.4545 - mechanical works
- - 0.3846 - mechanical works
- - 0.3448 - mechanical works
- - 0.9091 - mechanical works
- - 0.4167 - mechanical works
- - 0.4000 - mechanical works
4.20 - 0.3448 0.2381 mechanical works
3.80 - 0.4000 0.2632 mechanical works
2.60 - 0.4762 0.3846 mechanical works
- - 0.2778 - mechanical works
- - 0.2326 - mechanical works
8.00 - 0.2000 0.1250 mechanical works
- - 0.2941 - mechanical works
- - 0.2439 - mechanical works
9.00 - 0.2222 0.1111 mechanical works
- - 0.3030 - mechanical works
- - 0.2632 - mechanical works
- - 0.2439 - mechanical works
- - 0.3333 - mechanical works
- - 0.2857 - mechanical works
- - 0.2500 - mechanical works
- - 0.3571 - mechanical works
- - 0.3030 - mechanical works
- - 0.2703 - mechanical works
- - 0.3846 - mechanical works
- - 0.3226 - mechanical works
- - 0.2778 - mechanical works
- - 0.1429 - mechanical works
9.00 0.2500 0.1818 0.1111 mechanical works
mechanical works
mechanical works
architectural works
architectural works
- - 0.1053 - architectural works
- - 0.5000 - architectural works
- - 0.7692 - architectural works
- - 0.5000 - architectural works
- - 0.7692 - architectural works
architectural works
architectural works
architectural works
architectural works
3.20 0.5556 0.4000 0.3125 architectural works
2.50 0.7143 0.5263 0.4000 architectural works
2.10 0.8333 0.6250 0.4762 architectural works
2.90 0.6667 0.4545 0.3448 architectural works
2.10 0.7143 0.5263 0.4762 architectural works
2.00 0.8333 0.6250 0.5000 architectural works
2.90 0.7143 0.4762 0.3448 architectural works
2.10 0.8333 0.6250 0.4762 architectural works
1.80 0.9091 0.7143 0.5556 architectural works
- - 0.0140 - architectural works
- - 0.0340 - architectural works
- - 0.0568 - architectural works
architectural works
architectural works
civil works
civil works
- 10.00 8.00 6.00 civil works
- - 21.00 - civil works
- - 2.50 - civil works
- - 3.50 - civil works
civil works
civil works
civil works
civil works
- - 0.4000 - civil works
3.40 0.5000 0.4000 0.2941 civil works
- - 0.1149 - civil works
- - 0.1408 - civil works
- - 0.1754 - civil works
5.00 0.3125 0.2174 0.2000 civil works
5.90 0.4762 0.3226 0.1695 civil works
- - 0.2564 - civil works
- - 0.3125 - civil works
- - 0.2500 - civil works
- - 0.7692 - civil works
- - 0.3846 - civil works
- - 1.80 - civil works
- - 1.90 - civil works
- - 0.1613 - civil works
- - 0.0606 - civil works
- - 7.30 - civil works
- - 0.60 - civil works
- - 0.80 - civil works
- - 0.90 - civil works
- - 0.30 - civil works
- - 0.10 - civil works
- - 1.10 - civil works
- - 3.90 - civil works
- - 1.40 - civil works
- - 0.80 - civil works
- - 0.1639 - civil works
civil works
civil works
structural works
structural works
- - 0.1408 - structural works
structural works
structural works
structural works
structural works
12.50 0.1408 0.1053 0.0800 structural works
5.60 0.2778 0.2222 0.1786 structural works
12.50 0.1515 0.1053 0.0800 structural works
6.30 0.2381 0.1887 0.1587 structural works
25.00 0.0500 0.0435 0.0400 structural works
14.30 0.1000 0.0800 0.0699 structural works
12.50 0.1299 0.1000 0.0800 structural works
5.90 0.2632 0.2083 0.1695 structural works
structural works
structural works
structural works
structural works
3.10 0.6667 0.4762 0.3226 structural works
2.50 0.8333 0.6250 0.4000 structural works
2.10 1.0000 0.7143 0.4762 structural works
1.80 1.1111 0.8333 0.5556 structural works
5.80 0.3226 0.2500 0.1724 structural works
5.00 0.4000 0.3030 0.2000 structural works
4.20 0.4762 0.3448 0.2381 structural works
3.70 0.5556 0.4167 0.2703 structural works
4.10 0.4762 0.3704 0.2439 structural works
3.50 0.6250 0.4348 0.2857 structural works
2.80 0.7143 0.5263 0.3571 structural works
2.50 0.8333 0.6250 0.4000 structural works
11.10 0.2381 0.1818 0.0901 structural works
6.70 0.3030 0.2222 0.1493 structural works
6.70 0.3030 0.2222 0.1493 structural works
5.00 0.4000 0.3030 0.2000 structural works
7.70 0.2632 0.2000 0.1299 structural works
6.30 0.3125 0.2381 0.1587 structural works
5.30 0.3846 0.2941 0.1887 structural works
4.50 0.4348 0.3226 0.2222 structural works
14.20 0.1299 0.1000 0.0704 structural works
11.10 0.1695 0.1299 0.0901 structural works
10.00 0.1923 0.1389 0.1000 structural works
9.10 0.2128 0.1587 0.1099 structural works
3.80 0.5263 0.3846 0.2632 structural works
3.20 0.6250 0.4762 0.3125 structural works
2.70 0.7692 0.5556 0.3704 structural works
2.30 0.8333 0.6667 0.4348 structural works
7.70 0.2632 0.2000 0.1299 structural works
6.20 0.3125 0.2381 0.1613 structural works
5.20 0.3704 0.2778 0.1923 structural works
4.50 0.4348 0.3226 0.2222 structural works
structural works
structural works
structural works
structural works
3.3333 0.60 - 0.30 structural works
2.5000 1.50 - 0.40 structural works
1.2500 1.80 - 0.80 structural works
1.2500 1.90 - 0.80 structural works
0.9091 2.50 - 1.10 structural works
0.4348 4.20 - 2.30 structural works
0.1220 9.20 - 8.20 structural works
0.1053 10.10 - 9.50 structural works
0.0980 11.50 - 10.20 structural works
- - 0.0658 - structural works
- - 0.0870 - structural works
- - 0.1493 - structural works
- - 5.0000 - structural works
- - 0.4000 - structural works
structural works
structural works
architectural works
architectural works
- - 0.0690 - architectural works
- - 0.0143 - architectural works
- - 0.0357 - architectural works
- - 0.0286 - architectural works
- - 0.8333 - architectural works
- - 0.9091 - architectural works
- - 0.0400 - architectural works
architectural works
architectural works
structural works
Placing Placement
structural wor Concrete
concrete,
Task /
50.00 0.0333 0.0250 0.0200 Hollorib
structural wor lorry
Description Slow Ave Fast
Decking,
Hollorib
based
120.00 0.0118 0.0100 0.0083 structural wor concrete
Decking,
pump 30.0 40.0 50.0
Placing
topping,
concrete
70.00 0.0250 0.0200 0.0143 structural wor Concrete,
incl
topping 85.0 100.0 120.0
ByPlacing
PowerFloa
2.50 0.4762 0.4348 0.4000 structural wor Concrete,
Wheelbarr
t 40.0 50.0 70.0
By
owPlacing
over 1-
2.10 0.6667 0.5556 0.4762 structural wor Concrete,
Wheelbarr
10m 2.1 2.3 2.5
By
owPlacing
over
1.50 1.2500 0.9091 0.6667 Placing
structural wor Direct
Wheelbarr
10-20m 1.5 1.8 2.1
Direct
From
ow over
3.30 0.3571 0.3226 0.3030 Placing
structural wor From
Readymix
20-50m 0.8 1.1 1.5
Direct
Readymix
Lorry,
1.60 - 0.7692 0.6250 structural wor From
Lorry,
Mass Fill 2.8 3.1 3.3
Placing
Readymix
50mm
1.70 0.6667 - 0.5882 structural wor Direct
Lorry,
Blinding - 1.3 1.6
Placing
From
Ground
2.30 1.0000 0.6667 0.4348 Placing
structural wor Direct
Readymix
Beams 1.5 - 1.7
Direct
From
Lorry, Pile
1.10 - 1.2500 0.9091 Placing
structural wor From
Readymix
Caps 1.0 1.5 2.3
Direct
Readymix
Lorry, Duct
0.60 - 2.5000 1.6667 Placing
structural wor From
Lorry,
Walls - 0.8 1.1
Direct
Readymix
Stub
2.60 0.4762 0.4348 0.3846 structural wor From
Lorry,
Columns - 0.4 0.6
Readymix
Ground
1.00 - 1.1111 1.0000 Placing
structural wor Lorry,Drai
Slab 2.1 2.3 2.6
nsPlacing
FromBed
1.60 0.8333 0.7143 0.6250 structural wor From
Placing
Tower
and Cover - 0.9 1.0
Tower
From
Crane,
5.50 0.2500 0.2222 0.1818 structural wor Crane,
Tower
Pile Caps 1.2 1.4 1.6
Slabs
Crane,
1.70 1.1111 0.7692 0.5882 structural wor under
Mass Fill 4.0 4.5 5.5
150mm
1.80 0.8333 0.6667 0.5556 structural wor thick 0.9 1.3 1.7
Placing
From
Placing
Tower
From
Crane,
Tower
Slabs over
Placing
Crane,
150mm
1.20 1.1111 0.9091 0.8333 structural wor From
Trough/Co
thick 1.2 1.5 1.8
Placing
Tower
ffered
0.90 1.6667 1.4286 1.1111 structural wor From
Placing
Crane,
Slabs 0.9 1.1 1.2
Placing
Tower
From
Stairs and
1.10 1.2500 1.0000 0.9091 From
Crane,
Tower
structural wor Landings 0.6 0.7 0.9
Tower
Beams
Crane,
0.80 2.0000 1.6667 1.2500 structural wor Crane,
under
Blinding 0.8 1.0 1.1
Beams
150mm
1.00 1.6667 1.2500 1.0000 Placing
structural wor over
thick 0.5 0.6 0.8
From
150mm
1.50 1.6667 0.9091 0.6667 Placing
structural wor Tower
thick 0.6 0.8 1.0
From
Crane,
0.60 2.5000 2.0000 1.6667 structural wor Tower
Walls 0.6 1.1 1.5
Crane,
structural wor Columns 0.4 0.5 0.6
structural works
structural works
structural works
- - - - structural works
- - - - structural works
- - - - structural works
- - - - structural works
- - - - structural works
- - - - structural works
20.00 - - - structural works
- - 3.3333 - structural works
210.00 0.0063 0.0056 0.0048 structural works
420.00 0.0032 0.0027 0.0024 structural works
- - 0.0083 - structural works
- - 0.0111 - structural works
structural works
structural works
architectural works
architectural works
25.00 0.1087 0.0719 0.0400 architectural works
29.40 0.0855 0.0581 0.0340 architectural works
37.00 0.0719 0.0481 0.0270 architectural works
170.00 0.0179 0.0111 0.0059 architectural works
85.00 0.0347 0.0206 0.0118 architectural works
145.00 0.0154 0.0105 0.0069 architectural works
30.00 0.0667 0.0400 0.0333 architectural works
8.60 - 0.1818 0.1163 architectural works
6.90 - 0.3571 0.1449 architectural works
7.00 - 0.3571 0.1429 architectural works
5.50 - 0.2381 0.1818 architectural works
25.80 0.0676 0.0595 0.0388 architectural works
- - 0.0556 - architectural works
73.80 0.0326 0.0168 0.0136 architectural works
architectural works
architectural works
architectural works
architectural works
- - 3.00 - architectural works
- - 5.00 - architectural works
- - 8.00 - architectural works
- - 1.00 - architectural works
- - 2.00 - architectural works
architectural works
architectural works
architectural works
architectural works
3.50 - 0.3846 0.2857 architectural works
- - 1.4286 - architectural works
- - 0.8333 - architectural works
architectural works
architectural works
architectural works
architectural works
3.3333 0.60 0.40 0.30 architectural works
1.6667 1.30 0.90 0.60 architectural works
- 0.40 0.30 - architectural works
2.5000 0.70 0.50 0.40 architectural works
1.4286 1.60 1.20 0.70 architectural works
- 0.20 0.30 - architectural works
3.3333 0.50 0.40 0.30 architectural works
2.0000 1.20 0.80 0.50 architectural works
5.0000 0.40 0.30 0.20 architectural works
2.0000 1.20 0.60 0.50 architectural works
1.0000 1.40 1.20 1.00 architectural works
5.0000 - 0.30 0.20 architectural works
3.3333 - 0.40 0.30 architectural works
8.50 - 0.1587 0.1176 architectural works
5.60 - 0.2174 0.1786 architectural works
11.10 - 0.1220 0.0901 architectural works
5.50 - 0.3030 0.1818 architectural works
3.70 - 0.4167 0.2703 architectural works
11.30 - 0.1176 0.0885 architectural works
- - 0.1316 - architectural works
- - 0.2222 - architectural works
- - 0.1163 - architectural works
18.20 0.1053 0.0820 0.0549 architectural works
- - 1.20 - architectural works
25.00 0.0990 0.0592 0.0400 architectural works
20.40 0.0645 0.0538 0.0490 architectural works
1.6667 1.30 0.90 0.60 architectural works
1.1111 1.90 1.20 0.90 architectural works
- - 0.20 - architectural works
- - 0.60 - architectural works
- - 0.40 - architectural works
1.6667 - 0.80 0.60 architectural works
2.0000 - 0.70 0.50 architectural works
1.4286 - 0.8 0.70 architectural works
0.9091 1.90 1.50 1.10 architectural works
0.3846 3.70 2.90 2.60 architectural works
- - 6.30 - architectural works
10.0000 1.20 0.60 0.10 architectural works
3.3333 0.90 0.50 0.30 architectural works
5.0000 0.90 - 0.20 architectural works
- 0.30 0.20 - architectural works
- - 2.0000 - architectural works
architectural works
architectural works
architectural works
architectural works
10.0000 1.10 0.50 0.10 architectural works
- 0.30 0.10 - architectural works
- - 0.20 - architectural works
- 0.50 0.40 - architectural works
- 1.20 0.80 - architectural works
- - 0.30 - architectural works
- 0.60 0.30 - architectural works
- 1.40 1.00 - architectural works
- - 0.4348 - architectural works
- - 0.10 - architectural works
- - 3.3333 - architectural works
11.60 0.1111 0.1042 0.0862 architectural works
9.70 0.1471 0.1389 0.1031 architectural works
7.30 0.1818 0.1724 0.1370 architectural works
14.70 0.0781 0.0714 0.0680 architectural works
12.60 0.0926 0.0826 0.0794 architectural works
11.10 0.1042 0.0926 0.0901 architectural works
28.50 0.0500 0.0400 0.0351 architectural works
26.30 0.0498 0.0420 0.0380 architectural works
- - 0.0435 - architectural works
- - 0.0794 - architectural works
- - 0.5882 - architectural works
- - 0.2941 - architectural works
- - 0.2632 - architectural works
- - 0.2381 - architectural works
- - 0.1818 - architectural works
10.20 - 0.1099 0.0980 architectural works
4.80 - 0.2439 0.2083 architectural works
9.10 - 0.1205 0.1099 architectural works
4.60 - 0.2500 0.2174 architectural works
11.50 - 0.1000 0.0870 architectural works
5.80 - 0.1961 0.1724 architectural works
9.10 - 0.1075 0.1099 architectural works
5.90 - 0.1818 0.1695 architectural works
architectural works
architectural works
architectural works
architectural works
- - 0.5556 - architectural works
20.20 0.0893 0.0704 0.0495 architectural works
- - 0.1299 - architectural works
- - 0.1613 - architectural works
architectural works
architectural works
earthworks
earthworks
20.00 - - - earthworks
- - - - earthworks
- - - - earthworks
- - - - earthworks
- - - - earthworks
- - - - earthworks
- - - - earthworks
- - - - earthworks
- - - - earthworks
59.00 0.0333 0.0208 0.0169 earthworks
41.00 0.0400 0.0303 0.0244 earthworks
52.00 0.0294 0.0238 0.0192 earthworks
10.20 0.1449 0.1149 0.0980 earthworks
33.40 0.0427 0.0350 0.0299 earthworks
58.00 0.0220 0.0200 0.0172 earthworks
8.20 0.1786 0.1408 0.1220 earthworks
29.00 0.0488 0.0400 0.0345 earthworks
46.00 0.0272 0.0250 0.0217 earthworks
8.30 0.1786 0.1408 0.1205 earthworks
28.70 0.0488 0.0400 0.0348 earthworks
46.00 0.0270 0.0250 0.0217 earthworks
7.20 0.2222 0.1639 0.1389 earthworks
25.00 0.0559 0.0450 0.0400 earthworks
32.90 0.0389 0.0350 0.0304 earthworks
earthworks
earthworks
civil works
civil works
0.5263 3.20 - 1.90 civil works
0.2703 5.50 4.10 3.70 civil works
0.2564 5.20 - 3.90 civil works
0.2128 9.10 6.20 4.70 civil works
0.3226 4.70 3.90 3.10 civil works
0.2564 5.60 4.70 3.90 civil works
0.3333 3.60 3.30 3.00 civil works
0.2083 5.40 5.10 4.80 civil works
0.1786 7.50 6.50 5.60 civil works
0.1370 9.20 8.20 7.30 civil works
0.6667 1.90 1.70 1.50 civil works
0.6250 2.10 - 1.60 civil works
0.5882 2.10 - 1.70 civil works
- - 3.60 - civil works
0.7692 2.40 1.80 1.30 civil works
0.6667 2.70 2.10 1.50 civil works
civil works
civil works
structural works
structural works
0.8333 0.50 1.10 1.20 structural works
- - 4.00 - structural works
55.00 0.0250 0.0200 0.0182 structural works
- - 2.40 - structural works
0.5000 4.00 3.50 2.00 structural works
- - 0.70 - structural works
structural works
structural works
earthworks
earthworks
9.40 0.1563 0.1250 0.1064 earthworks
8.10 0.1818 0.1449 0.1235 earthworks
7.90 0.1923 0.1538 0.1266 earthworks
8.20 0.2128 0.1695 0.1220 earthworks
18.90 0.0794 0.0649 0.0529 earthworks
16.70 0.0855 0.0699 0.0599 earthworks
15.60 0.0917 0.0752 0.0641 earthworks
14.00 0.1031 0.0847 0.0714 earthworks
23.00 0.0549 0.0500 0.0435 earthworks
20.00 0.0606 0.0552 0.0500 earthworks
19.30 0.0649 0.0599 0.0518 earthworks
17.70 0.0752 0.0649 0.0565 earthworks
earthworks
earthworks
structural works
structural works
- - 0.5000 - structural works
- - 1.0000 - structural works
- - 0.4545 - structural works
structural works
structural works
structural works
structural works
0.2500 8.00 4.00 4.00 structural works
- 10.00 8.00 - structural works
- 25.00 10.00 - structural works
- 45.00 25.00 - structural works
- 60.00 45.00 - structural works
- 2.00 - structural works
- - 0.2857 - structural works
- - 0.4762 - structural works
- - 0.4000 - structural works
- - 2.0000 - structural works
- - 0.6667 - structural works
- - 1.0000 - structural works
- - 2.0000 - structural works
- - 2.0000 - structural works
0.30 - 5.0000 3.3333 structural works
0.20 - 10.0000 5.0000 structural works
- - 10.0000 - structural works
- - 2.00 - structural works
- - 5.00 - structural works
- - 1.2500 - structural works
- - 2.0000 - structural works
- 60.00 53.00 50.00 structural works
- - 5.00 - structural works
- - 2.50 - structural works
- - 2.00 - structural works
- - 8.0 - structural works
- - 2.0 - structural works
- - 12.0 - structural works
- - 14.0 - structural works
- - 48.0 - structural works
- - 72.0 - structural works
2.20 - 0.3125 0.4545 structural works
- - 2.50 - structural works
- - 6.50 - structural works
structural works
structural works
structural works
Units
m3/hr
m2/hr
m2/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
Introduction to Costing
1.1 Introduction
Cost is important to all industry. Costs can be divided into two general classes; absolute costs and relative costs.
Absolute cost measures the loss in value of assets. Relative cost involves a comparison between the chosen course of
action and the course of action that was rejected. This cost of the alternative action - the action not taken - is often
called the "opportunity cost".
The accountant is primarily concerned with the absolute cost. However, the forest engineer, the planner, the
manager needs to be concerned with the alternative cost - the cost of the lost opportunity. Management has to be
able to make comparisons between the policy that should be chosen and the policy that should be rejected. Such
comparisons require the ability to predict costs, rather than merely record costs.
Cost data are, of course, essential to the technique of cost prediction. However, the form in which much cost data
are recorded limits accurate cost prediction to the field of comparable situations only. This limitation of accurate cost
prediction may not be serious in industries where the production environment changes little from month to month or
year to year. In harvesting, however, identical production situations are the exception rather than the rule. Unless
the cost data are broken down and recorded as unit costs, and correlated with the factors that control their values,
they are of little use in deciding between alternative procedures. Here, the approach to the problem of useful cost
data is that of identification, isolation, and control of the factors affecting cost.
1.2 Basic Classification of Costs
Costs are divided into two types: variable costs, and fixed costs. Variable costs vary per unit of production. For
example, they may be the cost per cubic meter of wood yarded, per cubic meter of dirt excavated, etc. Fixed costs,
on the other hand, are incurred only once and as additional units of production are produced, the unit costs fall.
Examples of fixed costs would be equipment move-in costs and road access costs.
In symbols using the first letters of the cost elements and N for the output or number of units of production, these
simple formulas are
C = F + NV
UC = F/N + V
A breakeven analysis determines the point at which one method becomes superior to another method of
accomplishing some task or objective. Breakeven analysis is a common and important part of cost control.
One illustration of a breakeven analysis would be to compare two methods of road construction for a road that
involves a limited amount of cut-and-fill earthwork. It would be possible to do the earthwork by hand or by bulldozer.
If the manual method were adopted, the fixed costs would be low or non-existent. Payment would be done on a
daily basis and would call for direct supervision by a foreman. The cost would be calculated by estimating the time
required and multiplying this time by the average wages of the men employed. The men could also be paid on a
piece-work basis. Alternatively, this work could be done by a bulldozer which would have to be moved in from
another site. Let us assume that Figure
the cost1.1
of the hand labor
Breakeven would befor
Example $0.60 per cubic meter and the bulldozer would
Excavation.
cost $0.40 per cubic meter and would require $100 to move in from another site. The move-in cost for the bulldozer
is a fixed cost, and is independent of the quantity of the earthwork handled. If the bulldozer is used, no economy will
result unless the amount of earthwork is sufficient to carry the fixed cost plus the direct cost of the bulldozer
operation.
If, on a set of coordinates, cost in dollars is plotted on the vertical axis and units of production on the horizontal axis,
we can indicate fixed cost for any process by a horizontal line parallel to the x-axis. If variable cost per unit output is
constant, then the total cost for any number of units of production will be the sum of the fixed cost and the variable
cost multiplied by the number of units of production, or F + NV. If the cost data for two processes or methods, one
of which has a higher variable cost, but lower fixed cost than the other are plotted on the same graph, the total cost
lines will intersect at some point. At this point the levels of production and total cost are the same. This point is
known as the "breakeven" point, since at this level one method is as economical as the other. Referring to Figure 1.1
the breakeven point at which quantity the bulldozer alternative and the manual labor alternative become equal is at
500 cubic meters. We could have found this same result algebraically by writing F + NV = F' + NV' where F and V
are the fixed and variable costs for the manual method, and F' and V' are the corresponding values for the bulldozer
method. Since all values are known except N, we can solve for N using the formula N = (F' - F) / (V - V')
A similar, but different problem is the determination of the point of minimum total cost. Instead of balancing two
methods with different fixed and variable costs, the aim is to bring the sum of two costs to a minimum. We will
assume a clearing crew of 20 men is clearing road right-of-way and the following facts are available:
1. Men are paid at the rate of $0.40 per hour.
2. Time is measured from the time of leaving camp to the time of return.
3. Total walking time per man is increasing at the rate of 15 minutes per day.
If the camp is moved each day, no time is lost walking, but the camp cost is $50 per day. If the camp is not moved,
on the second day 15 crew-minutes are lost or $2.00. On the third day, the total walking time has increased 30
minutes, the fourth day, 45 minutes, and so on. How often should the camp be moved assuming all other things are
equal? We could derive an algebraic expression using the sum of an arithmetic series if we wanted to solve this
problem a number of times, but for demonstration purposes we can simply calculate the average total camp cost.
The average total camp cost is the sum of the average daily cost of walking time plus the average daily cost of
moving
TABLE 1.1camp. If we moved
Average daily camp
total each
campday,
costthen average
as the sumdaily cost
of the of walking
cost time would
of walking be zero
time plus theand
costthe
ofcost of
moving
moving camp would be $50.00. If we moved the camp every other day, the cost of walking time is $2.00 lost the
camp.
second day, or an average of $1.00 per day. The average daily cost of moving camp is $50 divided by 2 or $25.00.
The average total camp cost is then $26.00. If we continued this process for various numbers of days the camp
remains in location, we would obtain the results in Table 1.1.
Days camp remained in location Average daily Average daily Average total
cost of cost of camp cost
walking time moving camp
1 0 50 50
2 1 25 26
3 2 16.67 18.67
4 3 12.5 15.5
5 4 10 14
6 5 8.33 13.33
7 6 7.14 13.14
8 7 6.25 13.25
9 8 5.56 13.56
10 9 5 14
We see the average daily cost of walking time increasing linearly and the average cost of moving camp decreasing as
the number of days the camp remains in one location increases. The minimum cost is obtained for leaving the camp
in location 7 days (Figure 1.2). This minimum cost point should only be used as a guideline as all other things are
rarely equal. An important output of the analysis is the sensitivity of the total cost to deviations from the minimum
cost point. In this example, the total cost changes slowly between 5 and 10 days. Often, other considerations which
may be difficult to quantify will affect the decision. In Section 2, we discuss balancing road costs against skidding
costs. Sometimes roads are spaced more 1.2
Figure closely together
Costs than that
for Camp indicated
Location by the point of minimum total cost if
Example.
excess road construction capacity is available. In this case the goal may be to reduce the risk of disrupting skidding
production because of poor weather or equipment availability. Alternatively, we may choose to space roads farther
apart to reduce environmental impacts. Due to the usually flat nature of the total cost curve, the increase in total
cost is often small over a wide range of road spacings.
PRODUCTION RATES
PRODUCTION RATES (Qty per Time)
UNIT FOR UNIT FOR
ITEM NO. DESCRIPTION
QUANTITY TIME Slow Average Fast
Excavate Spoil Heaps to Transport, 0.6m3 bucket, Sand/Soil m3 hours 14.50 20.00 25.60
Excavate Spoil Heaps to Transport, 0.6m3 bucket, Gravel Beds m3 hours 15.20 20.40 25.60
Excavate Spoil Heaps to Transport, 0.6m3 bucket, Clay/Chalk m3 hours 12.30 18.50 23.20
Excavate Spoil Heaps to Transport, 0.6m3 bucket, Boulder Clay m3 hours 11.20 16.90 21.30
Excavate Spoil Heaps to Transport, 1.1m3 bucket, Sand/Soil m3 hours 25.40 30.30 35.70
Excavate Spoil Heaps to Transport, 1.1m3 bucket, Gravel Beds m3 hours 25.60 31.30 37.00
Excavate Spoil Heaps to Transport, 1.1m3 bucket, Clay/Chalk m3 hours 22.50 27.80 33.30
Excavate Spoil Heaps to Transport, 1.1m3 bucket, Boulder Clay m3 hours 18.90 24.40 30.30
Trench Excavation
137
Hydraulic Excavator, 0.3m3 bucket, Sand/Soil m3 hours 5.60 7.10 8.20
Hydraulic Excavator, 0.3m3 bucket, Gravel Beds m3 hours 4.80 6.10 7.30
Hydraulic Excavator, 0.3m3 bucket, Hard Ground m3 hours 9.70 5.40 6.40
Hydraulic Excavator, 0.4m3 bucket, Gravel Beds m3 hours 18.20 22.20 26.00
Hydraulic Excavator, 0.4m3 bucket, Hard Ground m3 hours 17.00 20.00 23.40
Hydraulic Excavator, 0.5m3 bucket, Gravel Beds m3 hours 26.30 28.60 33.20
Hydraulic Excavator, 0.5m3 bucket, Hard Ground m3 hours 22.70 25.00 28.80
Excavate and Board Trench, 0.5-1.5m deep, < 2.0m wide m2 hours 3.30 4.50 6.80
Excavate and Board Trench, 1.5-3.0m deep, < 2.0m wide m2 hours 3.00 4.20 6.50
Excavate and Board Trench, 3.0-4.5m deep, < 2.0m wide m2 hours 2.70 4.00 6.00
Excavate and Board Trench, 0.5-1.5m deep, > 2.0m wide m2 hours 6.60 7.10 8.80
Excavate and Board Trench, 1.5-3.0m deep, > 2.0m wide m2 hours 6.20 6.70 9.20
Excavate and Board Trench, 3.0-4.5m deep, > 2.0m wide m2 hours 5.80 6.20 10.50
138
Crawler Shovel, 0.8m3 bucket, Sand/Soil, pushed 5-50m to stockpile m3 hours 13.90 20.40 25.00
Crawler Shovel, 0.8m3 bucket, Sand/Soil, pushed 50-120m to stockpile m3 hours 7.60 9.50 12.60
Crawler Shovel, 0.8m3 bucket, Gravel, pushed 5-50m to stockpile m3 hours 14.20 20.40 25.60
Crawler Shovel, 0.8m3 bucket, Gravel, pushed 50-120m to stockpile m3 hours 7.60 10.20 12.80
Crawler Shovel, 0.8m3 bucket, Clay/Chalk, pushed 5-50m to stockpile m3 hours 12.70 18.40 23.20
Crawler Shovel, 0.8m3 bucket, Clay/Chalk, pushed 50-120m to stockpile m3 hours 6.90 8.90 11.60
Crawler Shovel, 0.8m3 bucket, Boulder Clay, pushed 5-50m to stockpile m3 hours 11.60 16.90 21.30
Crawler Shovel, 0.8m3 bucket, Boulder Clay, pushed 50-120m to stockpile m3 hours 6.30 8.20 10.40
Crawler Shovel, 1.2m3 bucket, Sand/Soil, pushed 5-50m to stockpile m3 hours 23.80 28.50 35.70
Crawler Shovel, 1.2m3 bucket, Sand/Soil, pushed 50-120m to stockpile m3 hours 16.70 18.50 20.40
Crawler Shovel, 1.2m3 bucket, Gravel, pushed 5-50m to stockpile m3 hours 25.00 32.00 37.00
Crawler Shovel, 1.2m3 bucket, Gravel, pushed 50-120m to stockpile m3 hours 17.20 19.30 21.20
Crawler Shovel, 1.2m3 bucket, Clay/Chalk, pushed 5-50m to stockpile m3 hours 21.70 27.50 33.30
Crawler Shovel, 1.2m3 bucket, Clay/Chalk, pushed 50-120m to stockpile m3 hours 15.10 16.90 18.80
Crawler Shovel, 1.2m3 bucket, Boulder Clay, pushed 5-50m to stockpile m3 hours 19.60 24.50 30.30
Crawler Shovel, 1.2m3 bucket, Boulder Clay, pushed 50-120m to stockpile m3 hours 13.70 15.90 17.50
Crawler Shovel, 0.6m3 bucket, 50-200m2, Sand/Soil m3 hours 18.60 28.50 38.50
Crawler Shovel, 0.6m3 bucket, over 200m2, Sand/Soil m3 hours 24.40 37.20 50.00
Crawler Shovel, 0.6m3 bucket, 50-200m2, Gravel m3 hours 18.90 28.60 38.40
Crawler Shovel, 0.6m3 bucket, over 200m2, Gravel m3 hours 24.20 37.20 50.00
Crawler Shovel, 0.6m3 bucket, 50-200m2, Hardcore m3 hours 15.80 23.50 31.20
Crawler Shovel, 0.6m3 bucket, over 200m2, Hardcore m3 hours 19.20 29.60 40.00
Crawler Shovel, 0.6m3 bucket, 50-200m2, Boulder Clay m3 hours 17.20 26.40 35.70
139
Crawler Shovel, 0.6m3 bucket, over 200m2, Boulder Clay m3 hours 22.20 33.80 45.40
Crawler Shovel, 1.2m3 bucket, 50-200m2, Sand/Soil m3 hours 43.50 48.00 52.60
Crawler Shovel, 1.2m3 bucket, over 200m2, Sand/Soil m3 hours 55.50 61.10 66.70
Crawler Shovel, 1.2m3 bucket, 50-200m2, Gravel m3 hours 43.80 48.30 52.90
Crawler Shovel, 1.2m3 bucket, over 200m2, Gravel m3 hours 55.50 61.10 66.70
Crawler Shovel, 1.2m3 bucket, 50-200m2, Hardcore m3 hours 37.10 40.30 43.50
Crawler Shovel, 1.2m3 bucket, over 200m2, Hardcore m3 hours 47.60 51.60 55.60
Crawler Shovel, 1.2m3 bucket, 50-200m2, Boulder Clay m3 hours 43.80 45.70 47.60
Crawler Shovel, 1.2m3 bucket, over 200m2, Boulder Clay m3 hours 55.60 59.10 62.50
Hydraulic Excavator, 0.3m3 bucket, Gravel Beds m3 hours 3.20 4.50 5.00
Hydraulic Excavator, 0.3m3 bucket, Hard Ground m3 hours 3.30 4.10 5.20
Hydraulic Excavator, 0.4m3 bucket, Gravel Beds m3 hours 7.10 8.70 10.20
Hydraulic Excavator, 0.4m3 bucket, Hard Ground m3 hours 6.30 7.70 9.10
140
Hydraulic Excavator, 0.5m3 bucket, Gravel Beds m3 hours 10.20 11.10 12.90
Hydraulic Excavator, 0.5m3 bucket, Hard Ground m3 hours 6.10 6.70 7.70
Rock Tunnels
Excavation, non explosive chemical method, Class I Granite m3 cycle 0.30 0.90 1.20
Excavation, non explosive chemical method, Class II Granite m3 cycle 2.00 2.60 2.90
Excavation, non explosive chemical method, Class III Granite m3 cycle 1.20 1.40 1.80
Bulk Excavation
141
Spoil Weight, Landfill/CDG Tonnes/m3 - 1.90 -
Rail Mounted Grab, 2.0m3 bucket 2.4min lift cycle m3 hours 30.00 48.00 59.00
Crane Mounted Clamshell Grab, 2.0m3 bucket 2.9min lift cycle m3 hours 25.00 33.00 41.00
Crane Mounted Clamshell Grab, 2.5m3 bucket 2.9min lift cycle m3 hours 34.00 42.00 52.00
Hydraulic Excavator, 0.3m3 bucket, Gravel Beds m3 hours 5.60 7.10 8.20
Hydraulic Excavator, 0.4m3 bucket, Gravel Beds m3 hours 20.50 25.00 29.00
Hydraulic Excavator, 0.5m3 bucket, Gravel Beds m3 hours 36.80 40.00 46.00
Hydraulic Excavator, 0.3m3 bucket, Hard Ground m3 hours 4.50 6.10 7.20
Hydraulic Excavator, 0.4m3 bucket, Hard Ground m3 hours 17.90 22.20 25.00
Hydraulic Excavator, 0.5m3 bucket, Hard Ground m3 hours 25.70 28.60 32.90
Basement Excavation
Hydraulic Excavator, 0.3m3 bucket, Sand/Soil - Basement Works m3 hours 6.40 8.00 9.40
Hydraulic Excavator, 0.3m3 bucket, Gravel Beds - Basement Works m3 hours 5.50 6.90 8.10
142
Hydraulic Excavator, 0.3m3 bucket, Clay/Chalk - Basement Works m3 hours 5.20 6.50 7.90
Hydraulic Excavator, 0.3m3 bucket, Hard Ground - Basement Works m3 hours 4.70 5.90 8.20
Hydraulic Excavator, 0.4m3 bucket, Sand/Soil - Basement Works m3 hours 12.60 15.40 18.90
Hydraulic Excavator, 0.4m3 bucket, Gravel Beds - Basement Works m3 hours 11.70 14.30 16.70
Hydraulic Excavator, 0.4m3 bucket, Clay/Chalk - Basement Works m3 hours 10.90 13.30 15.60
Hydraulic Excavator, 0.4m3 bucket, Hard Ground - Basement Works m3 hours 9.70 11.80 14.00
Hydraulic Excavator, 0.5m3 bucket, Sand/Soil - Basement Works m3 hours 18.20 20.00 23.00
Hydraulic Excavator, 0.5m3 bucket, Gravel Beds - Basement Works m3 hours 16.50 18.10 20.00
Hydraulic Excavator, 0.5m3 bucket, Clay/Chalk - Basement Works m3 hours 15.40 16.70 19.30
Hydraulic Excavator, 0.5m3 bucket, Hard Ground - Basement Works m3 hours 13.30 15.40 17.70
Working Platforms
Metal KwikStage, 5 Boards with 2m lifts m run hours 11.10 11.90 12.50
Metal KwikStage, 5 Boards with 3m lifts m run hours 9.10 10.00 10.50
Metal KwikStage, House Scaffold with 3 lifts m run hours 2.80 3.20 3.80
Metal Tube and Fittings, 5-6 Boards wide m run hours 3.20 3.70 4.60
Tube and Fitting Platforms, over 1000m3 m3 hours 24.50 30.00 33.50
143
Underpinning
Tower Cranes
Lifting, Reinforcement Bins and Cages, 1st 15m lift lift mins - - -
Lifting, Reinforcement Bins and Cages, above 1st 15m lift 15m mins - - -
144
Soil Mix Walls
Three Auger Drill, cement and cure m days 3.80 4.50 6.40
Crane grab, cement/bentonite and sheet piles m days 1.80 2.50 3.40
Site Clearance
145
Hedges and Roots, 1.5-2.0m high m hours - 0.60 -
Sheet Piling
Secant Piling
Rule of Thumb
146
Reinforcement Fixing Tonnes days - 0.70 -
Removable Anchors
147
NATM Tunnels
Half Face Advance Method, used on tunnels with max diameter m - 10.00 -
Double side Drift Advance Method, used on tunnels with diameter over m - 10.00 -
Double side Drift Advance Method, used on tunnels with diameter over m - 10.00 -
Excavation, London Clay, internal diameter under 7.0m m days 2.50 2.90 3.20
Excavation, London Clay, internal diameter 7.0-10.0m m days 1.50 2.00 2.50
Excavation, London Clay, internal diameter over 10.0m m days 1.00 1.30 1.5
Excavation, Woolwich/Reading Beds, internal diameter 2.0-7.0m m days 1.50 1.80 2.0
Excavation, Woolwich/Reading Beds, internal diameter over 10.0m m days - 1.00 1.5
Excavation, London Clay, Inclined Tunnels, diameter 2.0-7.0m m days 1.50 2.00 3.2
Excavation, London Clay, Inclined Tunnels, diameter 7.0-10.0m m days 0.50 1.00 2.2
Excavation, London Clay, Vertical Shafts, diameter 2.0-9.0m m days 1.00 1.50 2.2
Excavation, London Clay, Vertical Shafts, diameter 9.0-15.0m m days 0.50 1.00 2.6
Excavation, London Clay, Circulation Halls m of circumf days 0.80 1.00 1.2
Sprayed Secondary Lining, Tunnels, diameter under 6.5m m days 2.10 2.50 2.8
Sprayed Secondary Lining, Tunnels, diameter over 6.5m m days 1.50 2.00 2.4
Sprayed Secondary Lining, Inclined Tunnels, diameter under 6.5m m days 1.50 2.00 2.3
148
Sprayed Secondary Lining, Inclined Tunnels, diameter over 6.5m m days 1.00 1.50 1.9
Sprayed Secondary Lining, Vertical Shafts, diameter under 6.5m m days 1.80 2.00 2.5
Sprayed Secondary Lining, Vertical Shafts, diameter over 6.5m m days 2.20 2.50 3.1
Sprayed Secondary Lining, Circulation Halls, diameter under 11.0m m days - 2.00 2.3
Sprayed Secondary Lining, Intermediate Landing Tunnels with columns m days 1.70 2.00 2.1
Sprayed Secondary Lining, Intermediate Landing Tunnels without columns m days 1.60 2.10 2.3
Insitu Permanent Lining, 12m bays, 350-400mm reinforced with PCV backingm days - 8.40 12.0
Insitu Permanent Lining, extra over excavate/lining time to allow for permanent
% lining - 25.00 -
Excavate and Line Cycle Time , Running Tunnels m days 3.20 4.00 4.9
Excavate and Line Cycle Time, Station Access Adits m days 3.30 3.90 4.2
Excavate and Line Cycle Time, Concourse Tunnels m days 2.20 2.50 2.7
Excavate and Line Cycle Time, Escalator Tunnels m days 1.20 1.50 1.7
Fencing Works
Site Hoarding, timber posts, plywood nailed to horizontal rails m hours 1.00 1.20 -
Post Erection, Timber / Metal, dig, erect, fix no hours 3.30 4.50 -
149
Fence Erection, Chestnut Pailings, posts at 1.5m m hours - 23.80 -
Dewatering
Demolition
Remove & Cart away, Ceramic Wall Tiles m2 hours 2.00 2.50 3.40
150
Remove & Cart away, Wallpaper, 3 layers m2 hours - 5.70 -
Remove & Cart away, Lathe and Plaster Ceilings m2 hours 3.20 4.60 5.00
Remove & Cart away, Plaster to Walls m2 hours 2.10 3.10 5.90
Remove & Cart away, Brickwork Walls, 1.0 brick thick m2 hours - 1.30 -
Remove & Cart away, Brickwork Walls, 0.5 brick thick m2 hours - 2.60 -
Remove & Cart away, Brickwork Walls, Sand/Lime Mortar 100 hours - 0.5556 -
Remove & Cart away, Skirting, Architrave, Dado rail etc m hours - 16.50 -
Remove & Cart away, Floor and Ceiling Joists m hours - 0.9091 -
Remove & Cart away, Pipework including brackets etc m hours - 6.10 -
151
Breaking Out
152
Site Investigation
Pre Drilling, Rercussive or Rotary, soft deposits m hours 8.00 10.00 14.00
Pre Drilling, Wash Boring, grade V/IV rock m hours 2.50 3.20 3.90
Pre Drilling, Triple Tube Sampling, grade V/IV rock m hours 0.40 0.80 0.90
Pre Drilling, Rotary, grade III/II rock m hours 0.20 0.50 0.70
Pre Drilling, Triple Tube Sampling, grade III/II rock m hours 0.10 0.40 0.70
Waterproofing
153
Trackwork
PCBT - Pre-cast Concrete Block Track, in Bored Tunnels m days 17.10 41.00 -
PCBT - Pre-cast Concrete Block Track, in Cut and Cover Tunnels m days - 35.00 -
IST - Isolated Slab Track, in Cut and Cover Tunnels m days - 34.00 -
154
Structural Steelwork
Simple Universal Beam Steel Bridge, erect support steel H frames no days - 0.8333 -
Simple Universal Beam Steel Bridge, erect 15m truss m days - 3.30 -
Steel Strutting
Reinforcement Ratios
155
Walls, Concrete m3 x Ratio = Rebar Tonnes % ratio 14.70 15.00 -
Reinforcement
156
Beams/Columns, steelfixing, 40mm tonne hours 0.1639 0.1695 0.1786
Post Tensioning
157
Lag for Initial Stress Tensioning after 1st bay cast hrs - - -
Metal Decking
158
Lead Roofs, rooflight flashings no days - 0.80 -
Land Drains
Land Drains, Concrete, butt jointed, under 150mm dia, 0-5m run m hours - 11.60 -
Land Drains, Concrete, butt jointed, under 150mm dia, 5-30m run m hours - 14.10 -
Land Drains, Concrete, butt jointed, under 150mm dia, over 30m run m hours - 18.80 -
Land Drains, Concrete, butt jointed, 150-225mm dia, 0-5m run m hours - 8.40 -
Land Drains, Concrete, butt jointed, 150-225mm dia, 5-30m run m hours - 10.20 -
Land Drains, Concrete, butt jointed, 150-225mm dia, over 30m run m hours - 11.90 -
Land Drains, Concrete, butt jointed, 225-300mm dia, 0-5m run m hours - 5.40 -
Land Drains, Concrete, butt jointed, 225-300mm dia, 5-30m run m hours - 6.50 -
Land Drains, Concrete, butt jointed, 225-300mm dia, over 30m run m hours - 7.90 -
Formwork
159
Ground Beams, < 0.7m2 m2 hours 1.10 1.70 1.80
Beams, on erected falsework, width over 750mm m2 hours 1.40 1.50 1.70
Walls, Fully Framed Formwork/Struts, over 5.0m2 m2 hours 1.20 2.50 2.90
Columns, Construct Kickers, suspended from soffit slab no hours 1.20 2.80 3.20
Columns, Square Sides, Timber Clamp/Prop, csa < 0.1m2 m2 hours 1.30 1.60 1.80
160
Columns, Square Sides, Timber Clamp/Prop, csa 0.1-0.4m2 m2 hours 1.80 2.10 2.40
Columns, Square Sides, Timber Clamp/Prop, csa over 0.4m2 m2 hours 2.00 2.30 2.50
Columns, Square Sides, Steel Forms, 1.5 x 1.5 x 9.0m high m2 hours 7.90 9.50 10.30
Columns, Square Sides, Steel Forms, 2.0 x 2.0 x 9.0m high m2 hours 6.90 7.50 8.30
Columns, Square Sides, Steel Forms, 2.0 x 4.0 x 9.0m high m2 hours 8.50 10.20 12.00
Columns, Round Sides, Sacrificial Plastic Mould, 3.0-4.0m dia m2 hours 3.50 4.50 6.00
Columns, Round Sides, Steel Mould, 3.0-4.0m dia m2 hours 5.20 6.50 7.50
Columns, Sloping Column Heads, extra over rate no hours - 0.40 0.29
Table Form, Aluminum System, 400m2 bays m2 hours 2.10 3.20 3.80
Table Form, H-Frame Steel Falsework, 400m2 bays m2 hours 1.90 3.00 3.50
Tunnel Forms, Wall and Slab poured as one m2 hours - 15.60 17.50
161
Stop Ends, dense perforations m2 hours 0.90 1.10 1.40
Decking
Simple Universal Beam Steel Bridge, concrete bridge deck, grano cover m days - 7.10 -
Cutting Switchboxes
162
Cutting Chases
Concrete, cutting by hand, < 25mm wide m hours 1.50 2.10 3.10
Concrete, cutting by machine, < 25mm wide m hours 3.10 4.00 5.80
Brickwork, cutting by hand, < 25mm wide m hours 2.10 2.70 4.10
Brickwork, cutting by machine, < 25mm wide m hours 4.20 5.50 11.10
Light Blockwork, cutting by hand, < 25mm wide m hours 3.80 5.00 7.70
Light Blockwork, cutting by hand, 25-50mm wide m hours 3.20 4.20 6.30
Light Blockwork, cutting by hand, 50-75mm wide m hours 2.60 3.40 5.30
Light Blockwork, cutting by hand, 75-100mm wide m hours 2.30 3.10 4.50
163
Light Blockwork, cutting by machine, < 25mm wide m hours 7.70 10.00 14.20
Light Blockwork, cutting by machine, 25-50mm wide m hours 5.90 7.70 11.10
Light Blockwork, cutting by machine, 50-75mm wide m hours 5.20 7.20 10.00
Light Blockwork, cutting by machine, 75-100mm wide m hours 4.70 6.30 9.10
Heavy Blockwork, cutting by hand, < 25mm wide m hours 1.90 2.60 3.80
Heavy Blockwork, cutting by hand, 25-50mm wide m hours 1.60 2.10 3.20
Heavy Blockwork, cutting by hand, 50-75mm wide m hours 1.30 1.80 2.70
Heavy Blockwork, cutting by hand, 75-100mm wide m hours 1.20 1.50 2.30
Heavy Blockwork, cutting by machine, < 25mm wide m hours 3.80 5.00 7.70
Heavy Blockwork, cutting by machine, 25-50mm wide m hours 3.20 4.20 6.20
Heavy Blockwork, cutting by machine, 50-75mm wide m hours 2.70 3.60 5.20
Heavy Blockwork, cutting by machine, 75-100mm wide m hours 2.30 3.10 4.50
Cutting Back
Concrete Pile Caps, 50-300mm deep and 0.6m dia no hours 1.6667 - 3.3333
Concrete Pile Caps, 300-750mm deep and 0.6m dia no hours 0.6667 - 2.5000
Concrete Pile Caps, > 750mm deep and 0.6m dia no hours 0.5556 - 1.2500
Concrete Pile Caps, 50-300mm deep and 1.1m dia no hours 0.5263 - 1.2500
Concrete Pile Caps, 300-750mm deep and 1.1m dia no hours 0.4000 - 0.9091
Concrete Pile Caps, > 750mm deep and 1.1m dia no hours 0.2381 - 0.4348
Concrete Pile Caps, 50-300mm deep and 2.5m dia no hours 0.1087 - 0.1220
164
Concrete Pile Caps, 300-750mm deep and 2.5m dia no hours 0.0990 - 0.1053
Concrete Pile Caps, > 750mm deep and 2.5m dia no hours 0.0870 - 0.0980
Concrete Placement
Hollorib Decking, concrete topping, incl PowerFloat m2 hours 40.00 50.00 70.00
Placing Direct From Readymix Lorry, Mass Fill m3 hours 2.80 3.10 3.30
Placing Direct From Readymix Lorry, 50mm Blinding m3 hours - 1.30 1.60
Placing Direct From Readymix Lorry, Ground Beams m3 hours 1.50 - 1.70
Placing Direct From Readymix Lorry, Pile Caps m3 hours 1.00 1.50 2.30
Placing Direct From Readymix Lorry, Duct Walls m3 hours - 0.80 1.10
Placing Direct From Readymix Lorry, Stub Columns m3 hours - 0.40 0.60
165
Placing Direct From Readymix Lorry, Ground Slab m3 hours 2.10 2.30 2.60
Placing Direct From Readymix Lorry,Drains Bed and Cover m3 hours - 0.90 1.00
Placing From Tower Crane, Pile Caps m3 hours 1.20 1.40 1.60
Placing From Tower Crane, Mass Fill m3 hours 4.00 4.50 5.50
Placing From Tower Crane, Slabs under 150mm thick m3 hours 0.90 1.30 1.70
Placing From Tower Crane, Slabs over 150mm thick m3 hours 1.20 1.50 1.80
Placing From Tower Crane, Trough/Coffered Slabs m3 hours 0.90 1.10 1.20
Placing From Tower Crane, Stairs and Landings m3 hours 0.60 0.70 0.90
Placing From Tower Crane, Beams under 150mm thick m3 hours 0.50 0.60 0.80
Placing From Tower Crane, Beams over 150mm thick m3 hours 0.60 0.80 1.00
Concrete Mixing
166
Readymix Lorry, Allowable Access Ramp Gradient degrees - 17.00 20.00
Mixing Concrete, Single Drum Paddle Mixer m3 hours 158.00 180.00 210.00
Mixing Concrete, Double Drum Paddle Mixer m3 hours 315.00 370.00 420.00
Barrette Piles
167
Bored Piling
Excave Rock Socket by RCD, grade IV/V rock m hours - 0.20 0.30
Excave Rock Socket by RCD, grade II/III rock m hours - 0.10 0.20
168
Remove Obstruction, above water hand hammers m hours - 0.80 -
Timber Frames
169
Ceiling Joists m hours - 32.10 -
Roof Carcass, Cut Rafter Feet to line no hours 142.00 166.00 175.00
170
Roof Facia Panels, Softwood m hours 5.10 7.20 9.30
Roof Facia Panel Studding, bolted to beams m hours 5.40 5.90 6.60
Steel Frames
Wall Frame, Bow String Truss and Frame Tons days - 1.60 -
171
Slate Roofs, Cumbrian Slate 8-11mm m2 days - 8.50 -
Sheeted Roofs
172
Wallpapering
Wall Finishes
Clay, quarry Tiles, Window Cills, setout and level m hours - 55.50 -
Clay, quarry Tiles, Window Cills, fix, grout and clean m2 hours - 1.50 -
Ceramic Tiles 150x150mm, Areas under 1.5m2 per room m2 hours 0.90 1.00 1.20
Ceramic Tiles 150x150mm, Areas of 1.5-2.5m2 per room m2 hours 1.40 1.60 1.90
Ceramic Tiles 150x150mm, Areas over 2.5m2 per room m2 hours 1.50 1.70 2.10
Ceramic Tiles 108x108mm, Areas under 1.5m2 per room m2 hours 1.00 1.30 1.50
Ceramic Tiles 108x108mm, Areas of 1.5-2.5m2 per room m2 hours 1.60 1.80 2.10
Ceramic Tiles 108x108mm, Areas over 2.5m2 per room m2 hours 1.70 1.90 2.20
173
Ceramic Tiles 108x108mm, Extra Over for Cutting no hours - 125.00 -
Stonework
Fix 0.5m2 Stones to Metal Support Frame m2 days 5.60 7.00 7.80
Fix 0.5-0.75m2 Stones to Metal Support Frame m2 days 7.20 9.00 10.10
Fix 0.75-1.0m2 Stones to Metal Support Frame m2 days 6.90 8.70 9.70
Screeding
174
Sand/Cement Floor Screed, 30-40mm thick m2 hours 3.20 4.20 5.30
Restoration Works
Rendering
175
Plastering
Browning (undercoat), Internal Walls under 2.5m high m2 hours 2.20 2.80 3.10
Browning (undercoat), Internal Walls over 2.5m high m2 hours 2.10 2.60 2.80
Browning (undercoat), Reveals and Columns less than 100mm wide m2 hours 9.90 10.00 10.10
Browning (undercoat), Reveals and Columns 100-200mm wide m2 hours 5.20 5.40 6.40
Browning (undercoat), Reveals and Columns 200-300mm wide m2 hours 3.30 3.60 3.90
Skimming (topcoat), Internal Walls under 2.5m high m2 hours 6.10 6.70 7.30
Skimming (topcoat), Internal Walls over 2.5m high m2 hours 5.50 6.10 6.70
Skimming (topcoat), Reveals and Columns less than 100mm wide m2 hours 12.60 13.80 15.40
Skimming (topcoat), Reveals and Columns 100-200mm wide m2 hours 7.70 8.30 9.80
Skimming (topcoat), Reveals and Columns 200-300mm wide m2 hours 4.50 5.00 5.50
Plasterboard
176
Boarding 12mm nailed to studding m2 hours - 12.50 -
Partitioning
Tape, Joint Sand and Top Coat Plasterboard m2 hours 1.10 1.50 2.10
100mm Pine Paneling, excluding studding time m2 hours 0.80 1.10 1.40
Quality Hardwood Paneling, excluding studding time m2 hours 0.30 0.50 0.60
Fix Timber Studding and Paramount Partitions m2 hours 2.60 3.00 3.40
Fix Timber Studding and Demountable Partitions m2 hours 0.80 1.10 1.60
Fix Timber Studding and Hills Duraboard Partitions m2 hours 3.00 3.50 3.90
Fix Timber Studding and Gyproc Laminated Partitions m2 hours 2.20 2.60 2.90
177
Stud Partitions, Fix Noggins m hours - 16.60 -
Fix Toilet Partition System, Hand Door plugged to wall no hours - 1.67 -
Painting
Internal Timber, 1 coat primer before fixing, timber lengths m hours - 20.00 -
Internal Timber, knot, 1 primer, stop, 1 undercoat, 1 gloss m2 hours - 1.70 2.10
Internal Timber, touchup primer, 1 undercoat, 1 coat gloss m2 hours - 3.10 3.80
178
External Timber, windows and frames m2 hours - 2.40 -
179
External Steelwork, 1 primer, 2 undercoats, 1 gloss m2 hours 0.90 1.70 -
Landscaping
Top Soil, spread, level and prepare for turf or seeding m2 hours - 2.50 -
180
Cobble Stones, laid in mortar, no patterns m2 hours - 0.30 -
Floor Finishes
181
Granolithic Flooring m2 hours - 3.10 -
Clay, quarry Tiles, small areas, much cutting m2 hours - 0.80 1.10
Clay, quarry Tiles, large areas, little cutting m2 hours - 2.20 2.80
Fix Metal and Timber Windows After Wall Complete m2 hours - 2.00 -
182
Window Glazing m2 hours - 1.30 -
Blockwork
Lightweight Concrete Blockwork, under 100mm thick m2 hours 1.50 2.20 2.90
Lightweight Concrete Blockwork, under 100-150mm thick m2 hours 1.40 1.90 2.10
Lightweight Concrete Blockwork, over 150mm thick m2 hours 1.20 1.60 2.00
Heavyweight Concrete Blockwork, under 100mm thick m2 hours 1.40 2.10 2.90
Heavyweight Concrete Blockwork, under 100-150mm thick m2 hours 1.20 1.60 2.10
Heavyweight Concrete Blockwork, over 150mm thick m2 hours 1.10 1.40 1.80
Curtain Walling
183
Vertical Glazed Lights, 6m x 2.5m m2 days - 14.50 -
Concrete Finishing
Surface Finishing, Sprayed By Pump, expose aggregate m2 hours 65.00 95.00 145.00
Surface Finishing, Wire Brush, expose aggregate m2 hours 15.00 25.00 30.00
Making Good Sides of Beams, prepare, shutter, pour m2 hours - 2.80 7.00
Making Good Slab Soffits, prepare, shutter, pour m2 hours - 4.20 5.50
Making Good Bolt Holes, prepare, shutter, pour no/hr hours 14.80 16.80 25.80
184
Making Good Rubdown Precast Concrete, prepare, shutter, pour m2 hours - 18.00 -
Making Good Scabble 3 head brush hammer, prepare, shutter, pour m2 hours 30.70 59.50 73.80
Commercial Kitchen
Ceiling Finishes
185
Windows, Softwood, 7.0-10.0m2 no hours 0.7692 1.1111 1.6667
186
Door Stop Mouldings m hours 10.10 16.90 25.00
Hanging Doors, Softwood, Single Pair Butts no hours 0.7692 1.1111 1.6667
Hanging Doors, Hardwood, Single Pair Butts no hours 0.5263 0.8333 1.1111
Carpentry Carcassing
187
Windows, Drill, Screw & Plug extra over no hours 3.3333 10.0000 -
188
Floor Boards, T&G Boards, 100-125mm wide m2 hours - 4.20 -
Power Supply
189
AC Install 2 no Switchgear, 7 men days - - -
Electrical System
Cable Installation, 2 cable laid in trench and protect, 100mm dia m hours - 1.80 -
190
Cable Installation, 2 cable laid in trench and protect, 135mm dia m hours - 1.60 -
Cable Installation, 3 cable laid in trench and protect, 100mm dia m hours - 1.00 1.50
Cable Installation, 6 cable laid in trench and protect, 100mm dia m hours - 0.70 1.20
Cable Installation, 4 cable laid in trench and protect, 150mm dia m hours 0.70 1.20 3.10
Cable Installation, 36 cable laid in trench and protect, 100mm dia m hours - 0.20 -
Cable Installation, 10 cable laid in trench and protect, 100mm dia m hours - 0.50 -
Cable Installation, 1 cable laid in trench and protect, 300mm dia m hours - 1.30 -
Rainwater Works
191
Manholes and Gulleys
Brickwork Manhole, build in cast iron covers no hours 3.33 1.6667 0.83
Yard Gulleys, 75-150mm dia pipes, bed and level no hours - 2.20 -
Yard Gulleys, 150-225mm dia pipes, bed and level no hours - 1.80 -
Yard Gulleys, 225-300mm dia pipes, bed and level no hours - 1.50 -
192
Lift Installation
Escalators
193
Drainage
PVC Drainage, 1m pipes, 100-150mm dia, over 30m run m hours - 9.50 -
PVC Drainage, 3m pipes, 100-150mm dia, over 30m run m hours - 18.20 -
PVC Drainage, 6m pipes, 100-150mm dia, over 30m run m hours - 33.30 -
PVC Drainage, 3m pipes, 150-200mm dia, over 30m run m hours - 12.80 -
PVC Drainage, 6m pipes, 150-200mm dia, over 30m run m hours - 25.60 -
Stoneware Drainage, Cement/Sand Joints, 75mm dia, 0-5m run m hours - 4.70 -
Stoneware Drainage, Cement/Sand Joints, 75mm dia, 5-30m run m hours - 5.50 -
Stoneware Drainage, Cement/Sand Joints, 75mm dia, over 30m run m hours - 6.60 -
Stoneware Drainage, Cement/Sand Joints, 100mm dia, 0-5m run m hours - 4.40 -
Stoneware Drainage, Cement/Sand Joints, 100mm dia, 5-30m run m hours - 5.00 -
Stoneware Drainage, Cement/Sand Joints, 100mm dia, over 30m run m hours - 6.20 -
Stoneware Drainage, Cement/Sand Joints, 150mm dia, 0-5m run m hours - 3.20 -
Stoneware Drainage, Cement/Sand Joints, 150mm dia, 5-30m run m hours - 3.80 -
Stoneware Drainage, Cement/Sand Joints, 150mm dia, over 30m run m hours - 4.50 -
194
Stoneware Drainage, Cement/Sand Joints, 225mm dia, 0-5m run m hours - 2.10 -
Stoneware Drainage, Cement/Sand Joints, 225mm dia, 5-30m run m hours - 2.60 -
Stoneware Drainage, Cement/Sand Joints, 225mm dia, over 30m run m hours - 3.10 -
Stoneware Drainage, Cement/Sand Joints, 300mm dia, 0-5m run m hours - 1.40 -
Stoneware Drainage, Cement/Sand Joints, 300mm dia, 5-30m run m hours - 1.70 -
Stoneware Drainage, Cement/Sand Joints, 300mm dia, over 30m run m hours - 2.40 -
Stoneware Drainage, Cement/Sand Joints, over 375mm dia, 0-5m run m hours - 1.10 -
Stoneware Drainage, Cement/Sand Joints, over 375mm dia, 5-30m run m hours - 1.30 -
Stoneware Drainage, Cement/Sand Joints, over 375mm dia, over 30m run m hours - 1.60 -
Stoneware Drainage, Flexible Joints, 75mm dia, 0-5m run m hours - 8.30 -
Stoneware Drainage, Flexible Joints, 75mm dia, 5-30m run m hours - 10.00 -
Stoneware Drainage, Flexible Joints, 75mm dia, over 30m run m hours - 12.50 -
Stoneware Drainage, Flexible Joints, 100mm dia, 0-5m run m hours - 7.70 -
Stoneware Drainage, Flexible Joints, 100mm dia, 5-30m run m hours - 9.10 -
Stoneware Drainage, Flexible Joints, 100mm dia, over 30m run m hours - 10.00 -
Stoneware Drainage, Flexible Joints, 150mm dia, 0-5m run m hours - 5.20 -
Stoneware Drainage, Flexible Joints, 150mm dia, 5-30m run m hours - 6.20 -
Stoneware Drainage, Flexible Joints, 150mm dia, over 30m run m hours - 7.70 -
Stoneware Drainage, Flexible Joints, 225mm dia, 0-5m run m hours - 2.70 -
Stoneware Drainage, Flexible Joints, 225mm dia, 5-30m run m hours - 3.30 -
Stoneware Drainage, Flexible Joints, 225mm dia, over 30m run m hours - 4.00 -
Stoneware Drainage, Flexible Joints, 300mm dia, 0-5m run m hours - 1.70 -
Stoneware Drainage, Flexible Joints, 300mm dia, 5-30m run m hours - 2.10 -
195
Stoneware Drainage, Flexible Joints, 300mm dia, over 30m run m hours - 2.50 -
Stoneware Drainage, Flexible Joints, over 375mm dia, 0-5m run m hours - 1.40 -
Stoneware Drainage, Flexible Joints, over 375mm dia, 5-30m run m hours - 1.60 -
Stoneware Drainage, Flexible Joints, over 375mm dia, over 30m run m hours - 2.10 -
Pitch Fibre Pipes, 75mm dia, over 30m run m hours - 20.00 -
Pitch Fibre Pipes, 100mm dia, over 30m run m hours - 20.00 -
Pitch Fibre Pipes, 150mm dia, over 30m run m hours - 14.30 -
Pitch Fibre Pipes, 200mm dia, over 30m run m hours - 12.50 -
Pitch Fibre Pipes, 225mm dia, over 30m run m hours - 12.10 -
Hepsleve Rubber Joint System, 75mm dia, 0-5m run m hours - 12.50 -
Hepsleve Rubber Joint System, 75mm dia, 5-30m run m hours - 14.30 -
Hepsleve Rubber Joint System, 75mm dia, over 30m run m hours 11.20 16.60 30.10
196
Hepsleve Rubber Joint System, 100mm dia, 0-5m run m hours - 10.00 -
Hepsleve Rubber Joint System, 100mm dia, 5-30m run m hours - 12.50 -
Hepsleve Rubber Joint System, 100mm dia, over 30m run m hours - 14.30 -
Hepsleve Rubber Joint System, 150mm dia, 0-5m run m hours - 7.10 -
Hepsleve Rubber Joint System, 150mm dia, 5-30m run m hours - 9.10 -
Hepsleve Rubber Joint System, 150mm dia, over 30m run m hours 8.30 10.00 13.80
Hepsleve Rubber Joint System, 225mm dia, 0-5m run m hours - 6.80 -
Hepsleve Rubber Joint System, 225mm dia, 5-30m run m hours - 4.50 -
Hepsleve Rubber Joint System, 225mm dia, over 30m run m hours - 5.50 -
Hepsleve Rubber Joint System, 300mm dia, 0-5m run m hours - 2.50 -
Hepsleve Rubber Joint System, 300mm dia, 5-30m run m hours - 2.90 -
Hepsleve Rubber Joint System, 300mm dia, over 30m run m hours - 3.70 -
Hepsleve Rubber Joint System, over 375mm dia, 0-5m run m hours - 1.90 -
Hepsleve Rubber Joint System, over 375mm dia, 5-30m run m hours - 2.30 -
Hepsleve Rubber Joint System, over 375mm dia, over 30m run m hours - 2.70 -
Concrete Pipes, 1.5m pipes, 375mm dia, 0-5m run m hours - 2.80 -
Concrete Pipes, 1.5m pipes, 375mm dia, 5-30m run m hours - 3.40 -
Concrete Pipes, 1.5m pipes, 375mm dia, over 30m run m hours - 3.80 -
Concrete Pipes, 1.5m pipes, 450mm dia, 0-5m run m hours - 2.70 -
Concrete Pipes, 1.5m pipes, 450mm dia, 5-30m run m hours - 3.20 -
Concrete Pipes, 1.5m pipes, 450mm dia, over 30m run m hours - 3.60 -
Concrete Pipes, 1.5m pipes, 525mm dia, 0-5m run m hours - 2.50 -
Concrete Pipes, 1.5m pipes, 525mm dia, 5-30m run m hours - 2.90 -
197
Concrete Pipes, 1.5m pipes, 525mm dia, over 30m run m hours - 3.40 -
Concrete Pipes, 1.5m pipes, 600mm dia, 0-5m run m hours - 2.40 -
Concrete Pipes, 1.5m pipes, 600mm dia, 5-30m run m hours - 2.70 -
Concrete Pipes, 1.5m pipes, 600mm dia, over 30m run m hours - 3.30 -
Concrete Pipes, 1.5m pipes, 675mm dia, 0-5m run m hours - 2.20 -
Concrete Pipes, 1.5m pipes, 675mm dia, 5-30m run m hours - 2.60 -
Concrete Pipes, 1.5m pipes, 675mm dia, over 30m run m hours - 2.90 -
Concrete Pipes, 1.5m pipes, 750mm dia, 0-5m run m hours - 1.10 -
Concrete Pipes, 1.5m pipes, 750mm dia, 5-30m run m hours - 2.40 -
Concrete Pipes, 1.5m pipes, 750mm dia, over 30m run m hours - 2.50 -
Concrete Pipes, 2.5m pipes, 375mm dia, 0-5m run m hours - 3.60 -
Concrete Pipes, 2.5m pipes, 375mm dia, 5-30m run m hours - 4.30 -
Concrete Pipes, 2.5m pipes, 375mm dia, over 30m run m hours - 5.00 8.00
Concrete Pipes, 2.5m pipes, 450mm dia, 0-5m run m hours - 3.40 -
Concrete Pipes, 2.5m pipes, 450mm dia, 5-30m run m hours - 4.10 -
Concrete Pipes, 2.5m pipes, 450mm dia, over 30m run m hours - 4.50 9.00
Concrete Pipes, 2.5m pipes, 525mm dia, 0-5m run m hours - 3.30 -
Concrete Pipes, 2.5m pipes, 525mm dia, 5-30m run m hours - 3.80 -
Concrete Pipes, 2.5m pipes, 525mm dia, over 30m run m hours - 4.10 -
Concrete Pipes, 2.5m pipes, 600mm dia, 0-5m run m hours - 3.00 -
198
Concrete Pipes, 2.5m pipes, 600mm dia, 5-30m run m hours - 3.50 -
Concrete Pipes, 2.5m pipes, 600mm dia, over 30m run m hours - 4.00 -
Concrete Pipes, 2.5m pipes, 675mm dia, 0-5m run m hours - 2.80 -
Concrete Pipes, 2.5m pipes, 675mm dia, 5-30m run m hours - 3.30 -
Concrete Pipes, 2.5m pipes, 675mm dia, over 30m run m hours - 3.70 -
Concrete Pipes, 2.5m pipes, 750mm dia, 0-5m run m hours - 2.60 -
Concrete Pipes, 2.5m pipes, 750mm dia, 5-30m run m hours - 3.10 -
Concrete Pipes, 2.5m pipes, 750mm dia, over 30m run m hours - 3.60 -
Lay Shingle Around Pipework, over 150mm dia m hours 4.00 5.50 9.00
Urban environment:
199
Spread & Compact Production = 30m3/hr m3 hours 30.00
Rural environment:
Ground Compaction
200
PRODUCTION RATES (Time per Quantity)
REMARKS
Slow Average Fast
earthworks 1
0.0690 0.0500 0.0391 earthworks 1
0.0658 0.0490 0.0391 earthworks 1
0.0813 0.0541 0.0431 earthworks 1
0.0893 0.0592 0.0469 earthworks 1
0.0394 0.0330 0.0280 earthworks 1
0.0391 0.0319 0.0270 earthworks 1
0.0444 0.0360 0.0300 earthworks 1
0.0529 0.0410 0.0330 earthworks 1
- 8.00 - earthworks 1
- 6.50 - earthworks 1
- 5.50 - earthworks 1
- 0.0038 - earthworks 1
earthworks 1
earthworks 1
earthworks 1
earthworks 1
201
0.1786 0.1408 0.1220 earthworks 1
0.2083 0.1639 0.1370 earthworks 1
0.2083 0.1639 0.1408 earthworks 1
0.1031 0.1852 0.1563 earthworks 1
0.0488 0.0400 0.0342 earthworks 1
0.0549 0.0450 0.0385 earthworks 1
0.0549 0.0450 0.0385 earthworks 1
0.0588 0.0500 0.0427 earthworks 1
0.0385 0.0350 0.0302 earthworks 1
0.0380 0.0350 0.0301 earthworks 1
0.0380 0.0350 0.0301 earthworks 1
0.0441 0.0400 0.0347 earthworks 1
0.3030 0.2222 0.1471 earthworks 1
0.3333 0.2381 0.1538 earthworks 1
0.3704 0.2500 0.1667 earthworks 1
0.1515 0.1408 0.1136 earthworks 1
0.1613 0.1493 0.1087 earthworks 1
0.1724 0.1613 0.0952 earthworks 1
earthworks 1
earthworks 1
earthworks 1
earthworks 1
earthworks 1
202
0.0719 0.0490 0.0400 earthworks 1
0.1316 0.1053 0.0794 earthworks 1
0.0704 0.0490 0.0391 earthworks 1
0.1316 0.0980 0.0781 earthworks 1
0.0787 0.0543 0.0431 earthworks 1
0.1449 0.1124 0.0862 earthworks 1
0.0862 0.0592 0.0469 earthworks 1
0.1587 0.1220 0.0962 earthworks 1
0.0420 0.0351 0.0280 earthworks 1
0.0599 0.0541 0.0490 earthworks 1
0.0400 0.0313 0.0270 earthworks 1
0.0581 0.0518 0.0472 earthworks 1
0.0461 0.0364 0.0300 earthworks 1
0.0662 0.0592 0.0532 earthworks 1
0.0510 0.0408 0.0330 earthworks 1
0.0730 0.0629 0.0571 earthworks 1
0.0538 0.0351 0.0260 earthworks 1
0.0410 0.0269 0.0200 earthworks 1
0.0529 0.0350 0.0260 earthworks 1
0.0413 0.0269 0.0200 earthworks 1
0.0633 0.0426 0.0321 earthworks 1
0.0521 0.0338 0.0250 earthworks 1
0.0581 0.0379 0.0280 earthworks 1
203
0.0450 0.0296 0.0220 earthworks 1
0.0230 0.0208 0.0190 earthworks 1
0.0180 0.0164 0.0150 earthworks 1
0.0228 0.0207 0.0189 earthworks 1
0.0180 0.0164 0.0150 earthworks 1
0.0270 0.0248 0.0230 earthworks 1
0.0210 0.0194 0.0180 earthworks 1
0.0228 0.0219 0.0210 earthworks 1
0.0180 0.0169 0.0160 earthworks 1
earthworks 1
earthworks 1
earthworks 1
earthworks 1
earthworks 1
0.1493 0.1190 0.1010 earthworks 1
0.3125 0.2222 0.2000 earthworks 1
0.3030 0.2439 0.1923 earthworks 1
0.3030 0.2439 0.1923 earthworks 1
0.1220 0.1000 0.0855 earthworks 1
0.1408 0.1149 0.0980 earthworks 1
0.1538 0.1205 0.1064 earthworks 1
0.1587 0.1299 0.1099 earthworks 1
0.0820 0.0752 0.0649 earthworks 1
204
0.0980 0.0901 0.0775 earthworks 1
0.1031 0.0952 0.0826 earthworks 1
0.1639 0.1493 0.1299 earthworks 1
earthworks 1
earthworks 1
earthworks 1
earthworks 1
earthworks 1
8.00 6.00 5.50 earthworks 1
3.3333 1.1111 0.8333 earthworks 1
0.5000 0.3846 0.3448 earthworks 1
0.8333 0.7143 0.5556 earthworks 1
earthworks 1
earthworks 1
earthworks 1
earthworks 1
- - - earthworks 1
- - - earthworks 1
- - - earthworks 1
- - - earthworks 1
- - - earthworks 1
- - - earthworks 1
- - - earthworks 1
205
- - - earthworks 1
- - - earthworks 1
0.0333 0.0208 0.0169 earthworks 1
0.0400 0.0303 0.0244 earthworks 1
0.0294 0.0238 0.0192 earthworks 1
0.1449 0.1149 0.0980 earthworks 1
0.0427 0.0350 0.0299 earthworks 1
0.0220 0.0200 0.0172 earthworks 1
0.1786 0.1408 0.1220 earthworks 1
0.0488 0.0400 0.0345 earthworks 1
0.0272 0.0250 0.0217 earthworks 1
0.1786 0.1408 0.1205 earthworks 1
0.0488 0.0400 0.0348 earthworks 1
0.0270 0.0250 0.0217 earthworks 1
0.2222 0.1639 0.1389 earthworks 1
0.0559 0.0450 0.0400 earthworks 1
0.0389 0.0350 0.0304 earthworks 1
earthworks 1
earthworks 1
earthworks 1
earthworks 1
0.1563 0.1250 0.1064 earthworks 1
0.1818 0.1449 0.1235 earthworks 1
206
0.1923 0.1538 0.1266 earthworks 1
0.2128 0.1695 0.1220 earthworks 1
0.0794 0.0649 0.0529 earthworks 1
0.0855 0.0699 0.0599 earthworks 1
0.0917 0.0752 0.0641 earthworks 1
0.1031 0.0847 0.0714 earthworks 1
0.0549 0.0500 0.0435 earthworks 1
0.0606 0.0552 0.0500 earthworks 1
0.0649 0.0599 0.0518 earthworks 1
0.0752 0.0649 0.0565 earthworks 1
earthworks 1
earthworks 1
civil works 2
civil works 2
0.0901 0.0840 0.0800 civil works 2
0.1099 0.1000 0.0952 civil works 2
0.3571 0.3125 0.2632 civil works 2
0.3125 0.2703 0.2174 civil works 2
0.0943 0.0800 0.0541 civil works 2
0.0541 0.0444 0.0408 civil works 2
0.0408 0.0333 0.0299 civil works 2
- 200.00 - civil works 2
civil works 2
207
civil works 2
civil works 2
civil works 2
civil works 2
- 0.8333 0.4545 civil works 2
- 2.5000 1.4286 civil works 2
10.0000 3.3333 - civil works 2
- 5.0000 - civil works 2
- 1.2500 - civil works 2
- 1.4286 - civil works 2
- 2.0000 - civil works 2
civil works 2
civil works 2
civil works 2
civil works 2
civil works 2
- 11.00 7.50 civil works 2
- 10.00 - civil works 2
- 3.20 - civil works 2
- 0.50 - civil works 2
- 3.30 - civil works 2
civil works 2
civil works 2
208
civil works 2
civil works 2
civil works 2
0.2632 0.2222 0.1563 civil works 2
civil works 2
civil works 2
civil works 2
civil works 2
civil works 2
0.5556 0.4000 0.2941 civil works 2
civil works 2
civil works 2
civil works 2
civil works 2
civil works 2
- 0.0400 0.0263 civil works 2
- 0.3448 - civil works 2
- 0.0714 - civil works 2
- 18.00 - civil works 2
- 22.00 - civil works 2
- 26.00 - civil works 2
- 1.1111 - civil works 2
- 1.2500 - civil works 2
209
- 1.6667 - civil works 2
civil works 2
civil works 2
civil works 2
civil works 2
civil works 2
- 0.0182 0.0167 civil works 2
0.2857 0.0313 0.0952 civil works 2
civil works 2
civil works 2
civil works 2
civil works 2
civil works 2
- 12.00 - civil works 2
civil works 2
civil works 2
civil works 2
civil works 2
civil works 2
5.00 4.00 3.00 civil works 2
- 0.0200 - civil works 2
10.00 8.00 6.00 civil works 2
- 0.0833 - civil works 2
210
- 1.4286 - civil works 2
- 0.0625 - civil works 2
- 0.0071 - civil works 2 3.24
- 0.1429 - civil works 2 45.36
- 0.0833 - civil works 2
0.1429 0.0833 0.0571 civil works 2
- 0.1961 - civil works 2
- 0.6667 - civil works 2
- 0.2222 - civil works 2
- 0.2222 - civil works 2
- 0.0167 - civil works 2
- 0.6667 - civil works 2
civil works 2
civil works 2
civil works 2
civil works 2
civil works 2
- 7.00 - civil works 2
- 6.00 - civil works 2
- 2.00 - civil works 2
civil works 2
civil works 2
civil works 2
211
civil works 2
- - - civil works 2
- - - civil works 2
- - - civil works 2
- - - civil works 2
0.4000 0.3448 0.3125 civil works 2
0.6667 0.5000 0.4000 civil works 2
1.0000 0.7692 - civil works 2
0.6667 0.5556 - civil works 2
- 0.6667 - civil works 2
- 1.0000 - civil works 2
0.6667 0.5000 - civil works 2
2.0000 1.0000 - civil works 2
1.0000 0.6667 - civil works 2
2.0000 1.0000 - civil works 2
1.2500 1.0000 - civil works 2
- 5.0000 - civil works 2
0.0053 0.0044 - civil works 2
0.0039 0.0033 - civil works 2
0.0026 0.0022 - civil works 2
0.4762 0.4000 - civil works 2
0.6667 0.5000 - civil works 2
0.6667 0.5000 - civil works 2
212
1.0000 0.6667 - civil works 2
0.5556 0.5000 - civil works 2
0.4545 0.4000 - civil works 2
- 0.5000 - civil works 2
0.5882 0.5000 - civil works 2
0.6250 0.4762 - civil works 2
- 5.0000 - civil works 2
- 0.1190 - civil works 2
- - - civil works 2
0.3125 0.2500 - civil works 2
0.3030 0.2564 - civil works 2
0.4545 0.4000 - civil works 2
0.8333 0.6667 - civil works 2
civil works 2
civil works 2
civil works 2
civil works 2
1.0000 0.8333 - civil works 2
0.3030 0.2222 - civil works 2
0.3125 0.2500 - civil works 2
- 0.2381 - civil works 2
- 0.2273 - civil works 2
- 0.1818 - civil works 2
213
- 0.0420 - civil works 2
- 0.0300 - civil works 2
- 0.0240 - civil works 2
- 0.0140 - civil works 2
- 0.0100 - civil works 2
- 0.0080 - civil works 2
- 0.2439 - civil works 2
civil works 2
civil works 2
civil works 2
civil works 2
10.00 8.00 6.00 civil works 2
- 21.00 - civil works 2
- 2.50 - civil works 2
- 3.50 - civil works 2
civil works 2
civil works 2
civil works 2
civil works 2
- 0.4000 - civil works 2
0.5000 0.4000 0.2941 civil works 2
- 0.1149 - civil works 2
- 0.1408 - civil works 2
214
- 0.1754 - civil works 2
0.3125 0.2174 0.2000 civil works 2
0.4762 0.3226 0.1695 civil works 2
- 0.2564 - civil works 2
- 0.3125 - civil works 2
- 0.2500 - civil works 2
- 0.7692 - civil works 2
- 0.3846 - civil works 2
- 1.80 - civil works 2
- 1.90 - civil works 2
- 0.1613 - civil works 2
- 0.0606 - civil works 2
- 7.30 - civil works 2
- 0.60 - civil works 2
- 0.80 - civil works 2
- 0.90 - civil works 2
- 0.30 - civil works 2
- 0.10 - civil works 2
- 1.10 - civil works 2
- 3.90 - civil works 2
- 1.40 - civil works 2
- 0.80 - civil works 2
- 0.1639 - civil works 2
215
civil works 2
civil works 2
civil works 2
civil works 2
3.20 - 1.90 civil works 2
5.50 4.10 3.70 civil works 2
5.20 - 3.90 civil works 2
9.10 6.20 4.70 civil works 2
4.70 3.90 3.10 civil works 2
5.60 4.70 3.90 civil works 2
3.60 3.30 3.00 civil works 2
5.40 5.10 4.80 civil works 2
7.50 6.50 5.60 civil works 2
9.20 8.20 7.30 civil works 2
1.90 1.70 1.50 civil works 2
2.10 - 1.60 civil works 2
2.10 - 1.70 civil works 2
- 3.60 - civil works 2
2.40 1.80 1.30 civil works 2
2.70 2.10 1.50 civil works 2
civil works 2
civil works 2
Testing 3
216
Testing 3
0.1250 0.1000 0.0714 Testing 3
0.4000 0.3125 0.2564 Testing 3
2.5000 1.2500 1.1111 Testing 3
5.0000 2.0000 1.4286 Testing 3
10.0000 2.5000 1.4286 Testing 3
Testing 3
Testing 3
Testing 3
structural wor 4
structural wor 4
0.2857 0.2381 0.1724 structural wor 4
0.8333 0.5882 0.4545 structural wor 4
0.2083 0.2000 0.1587 structural wor 4
0.3030 0.2857 0.2273 structural wor 4
0.2632 0.2500 0.2083 structural wor 4
0.3030 0.2857 0.2381 structural wor 4
- 0.0500 - structural wor 4
0.0535 0.0400 0.0319 structural wor 4
0.0893 0.0667 0.0578 structural wor 4
- 0.0133 - structural wor 4
- 0.0263 - structural wor 4
217
structural wor 4
structural wor 4
structural wor 4
structural wor 4
0.1042 - - structural wor 4
0.0980 - - structural wor 4
0.0943 - - structural wor 4
0.0585 0.0244 - structural wor 4
- 0.0286 - structural wor 4
- 0.0286 - structural wor 4
- 0.0500 - structural wor 4
- 0.0294 - structural wor 4
- 0.0345 - structural wor 4
0.2778 0.2174 0.1754 structural wor 4
0.0175 0.0141 0.0087 structural wor 4
- 0.0357 - structural wor 4
0.1176 0.0781 0.0575 structural wor 4
- 0.0141 - structural wor 4
- 0.0345 - structural wor 4
- 0.0192 - structural wor 4
- 0.0263 - structural wor 4
structural wor 4
structural wor 4
218
structural wor 4
structural wor 4
structural wor 4
- 1.2000 - structural wor 4
- 0.3030 - structural wor 4
structural wor 4
structural wor 4
structural wor 4
structural wor 4
structural wor 4
structural wor 4
- 2.00 - structural wor 4
- 6.00 - structural wor 4
structural wor 4
structural wor 4
structural wor 4
structural wor 4
structural wor 4
- - - structural wor 4
- - - structural wor 4
- - - structural wor 4
- - - structural wor 4
- - - structural wor 4
219
- - - structural wor 4
structural wor 4
structural wor 4
structural wor 4
structural wor 4
40.30 38.40 36.50 structural wor 4
28.20 26.90 25.80 structural wor 4
22.50 20.60 20.10 structural wor 4
16.90 16.30 15.40 structural wor 4
12.00 11.50 10.90 structural wor 4
9.20 8.60 8.20 structural wor 4
6.90 6.70 6.50 structural wor 4
5.70 5.50 5.20 structural wor 4
5.30 5.10 4.90 structural wor 4
5.20 4.90 4.60 structural wor 4
55.40 52.80 50.60 structural wor 4
38.80 37.00 35.10 structural wor 4
29.50 28.4 26.90 structural wor 4
23.40 22.40 21.90 structural wor 4
16.60 15.80 15.10 structural wor 4
12.40 11.90 11.30 structural wor 4
9.90 9.20 8.70 structural wor 4
6.80 6.60 6.20 structural wor 4
220
6.10 5.90 5.60 structural wor 4
6.10 5.90 5.60 structural wor 4
41.20 40.80 39.10 structural wor 4
29.20 28.60 27.40 structural wor 4
22.70 22.00 21.20 structural wor 4
17.60 17.30 16.90 structural wor 4
12.40 12.20 11.80 structural wor 4
9.40 9.20 8.70 structural wor 4
7.40 7.20 7.00 structural wor 4
7.00 6.80 6.40 structural wor 4
6.40 6.10 5.90 structural wor 4
5.30 5.10 4.80 structural wor 4
48.90 48.00 45.50 structural wor 4
34.40 33.60 31.90 structural wor 4
26.60 25.80 24.30 structural wor 4
20.90 20.40 19.50 structural wor 4
14.60 14.40 13.80 structural wor 4
11.30 10.80 10.50 structural wor 4
8.60 8.40 8.20 structural wor 4
structural wor 4
structural wor 4
structural wor 4
structural wor 4
221
- 48.00 - structural wor 4
- 120.00 - structural wor 4
structural wor 4
structural wor 4
structural wor 4
structural wor 4
- 0.0143 - structural wor 4
- 0.0357 - structural wor 4
- 0.1053 - structural wor 4
- 0.3333 - structural wor 4
- 0.3704 - structural wor 4
- 0.4167 - structural wor 4
- 0.4762 - structural wor 4
- 0.3571 - structural wor 4
- 0.5263 - structural wor 4
- 0.4000 - structural wor 4
- 0.4762 - structural wor 4
- 0.7692 - structural wor 4
- 0.0114 - structural wor 4
- 0.0132 - structural wor 4
- 0.2857 - structural wor 4
- 0.3030 - structural wor 4
- 0.3125 - structural wor 4
222
- 1.2500 - structural wor 4
- 1.4286 - structural wor 4
structural wor 4
structural wor 4
structural wor 4
structural wor 4
- 0.0862 - structural wor 4
- 0.0709 - structural wor 4
- 0.0532 - structural wor 4
- 0.1190 - structural wor 4
- 0.0980 - structural wor 4
- 0.0840 - structural wor 4
- 0.1852 - structural wor 4
- 0.1538 - structural wor 4
- 0.1266 - structural wor 4
structural wor 4
structural wor 4
structural wor 4
structural wor 4
1.1111 0.6250 0.5000 structural wor 4
0.6250 0.5000 0.4348 structural wor 4
0.5000 0.4348 0.4000 structural wor 4
0.4348 0.4000 0.3226 structural wor 4
223
0.9091 0.5882 0.5556 structural wor 4
0.5882 0.5556 0.4000 structural wor 4
0.5556 0.4000 0.3846 structural wor 4
0.4000 0.3846 0.2857 structural wor 4
1.6667 1.2500 0.8333 structural wor 4
1.1111 1.0000 0.9091 structural wor 4
1.0000 0.9091 0.7692 structural wor 4
0.8333 0.7692 0.6667 structural wor 4
0.6667 0.6250 0.5556 structural wor 4
0.7143 0.6667 0.5882 structural wor 4
0.1887 0.1408 0.1000 structural wor 4
1.1111 0.5556 0.5263 structural wor 4
1.0000 0.4545 0.4000 structural wor 4
0.8333 0.4000 0.3448 structural wor 4
1.0000 0.7143 0.5000 structural wor 4
0.5263 0.4348 0.3030 structural wor 4
0.4348 0.3571 0.2857 structural wor 4
0.3125 0.2222 0.2500 structural wor 4
0.2632 0.2083 0.1852 structural wor 4
1.0000 0.6667 0.5556 structural wor 4
0.3125 0.2439 0.1852 structural wor 4
0.8333 0.3571 0.3125 structural wor 4
0.7692 0.6250 0.5556 structural wor 4
224
0.5556 0.4762 0.4167 structural wor 4
0.5000 0.4348 0.4000 structural wor 4
0.1266 0.1053 0.0971 structural wor 4
0.1449 0.1333 0.1205 structural wor 4
0.1176 0.0980 0.0833 structural wor 4
0.2857 0.2222 0.1667 structural wor 4
0.1923 0.1538 0.1333 structural wor 4
- 2.50 3.50 structural wor 4
1.4286 1.2500 1.0000 structural wor 4
1.2500 1.1111 0.8333 structural wor 4
2.5000 1.6667 - structural wor 4
1.4286 1.2500 - structural wor 4
- 0.4000 0.3571 structural wor 4
- 0.4348 0.3846 structural wor 4
0.9091 0.7143 0.5556 structural wor 4
- 0.0033 0.0020 structural wor 4
0.4762 0.3125 0.2632 structural wor 4
0.5263 0.3333 0.2857 structural wor 4
- 0.0641 0.0571 structural wor 4
- 0.0230 0.0211 structural wor 4
- 0.0341 0.0321 structural wor 4
0.3571 0.2857 0.2381 structural wor 4
0.8333 0.6667 0.5263 structural wor 4
225
1.1111 0.9091 0.7143 structural wor 4
0.1316 0.1220 0.1099 structural wor 4
0.3226 0.2564 0.2222 structural wor 4
0.2222 0.1613 0.1408 structural wor 4
0.3226 0.2703 0.2222 structural wor 4
structural wor 4
structural wor 4
structural wor 4
structural wor 4
- 0.1408 - structural wor 4
structural wor 4
structural wor 4
structural wor 4
structural wor 4
0.1408 0.1053 0.0800 structural wor 4
0.2778 0.2222 0.1786 structural wor 4
0.1515 0.1053 0.0800 structural wor 4
0.2381 0.1887 0.1587 structural wor 4
0.0500 0.0435 0.0400 structural wor 4
0.1000 0.0800 0.0699 structural wor 4
0.1299 0.1000 0.0800 structural wor 4
0.2632 0.2083 0.1695 structural wor 4
structural wor 4
226
structural wor 4
structural wor 4
structural wor 4
0.6667 0.4762 0.3226 structural wor 4
0.8333 0.6250 0.4000 structural wor 4
1.0000 0.7143 0.4762 structural wor 4
1.1111 0.8333 0.5556 structural wor 4
0.3226 0.2500 0.1724 structural wor 4
0.4000 0.3030 0.2000 structural wor 4
0.4762 0.3448 0.2381 structural wor 4
0.5556 0.4167 0.2703 structural wor 4
0.4762 0.3704 0.2439 structural wor 4
0.6250 0.4348 0.2857 structural wor 4
0.7143 0.5263 0.3571 structural wor 4
0.8333 0.6250 0.4000 structural wor 4
0.2381 0.1818 0.0901 structural wor 4
0.3030 0.2222 0.1493 structural wor 4
0.3030 0.2222 0.1493 structural wor 4
0.4000 0.3030 0.2000 structural wor 4
0.2632 0.2000 0.1299 structural wor 4
0.3125 0.2381 0.1587 structural wor 4
0.3846 0.2941 0.1887 structural wor 4
0.4348 0.3226 0.2222 structural wor 4
227
0.1299 0.1000 0.0704 structural wor 4
0.1695 0.1299 0.0901 structural wor 4
0.1923 0.1389 0.1000 structural wor 4
0.2128 0.1587 0.1099 structural wor 4
0.5263 0.3846 0.2632 structural wor 4
0.6250 0.4762 0.3125 structural wor 4
0.7692 0.5556 0.3704 structural wor 4
0.8333 0.6667 0.4348 structural wor 4
0.2632 0.2000 0.1299 structural wor 4
0.3125 0.2381 0.1613 structural wor 4
0.3704 0.2778 0.1923 structural wor 4
0.4348 0.3226 0.2222 structural wor 4
structural wor 4
structural wor 4
structural wor 4
structural wor 4
0.60 - 0.30 structural wor 4
1.50 - 0.40 structural wor 4
1.80 - 0.80 structural wor 4
1.90 - 0.80 structural wor 4
2.50 - 1.10 structural wor 4
4.20 - 2.30 structural wor 4
9.20 - 8.20 structural wor 4
228
10.10 - 9.50 structural wor 4
11.50 - 10.20 structural wor 4
- 0.0658 - structural wor 4
- 0.0870 - structural wor 4
- 0.1493 - structural wor 4
- 5.0000 - structural wor 4
- 0.4000 - structural wor 4
structural wor 4
structural wor 4
structural wor 4
structural wor 4
0.0333 0.0250 0.0200 structural wor 4
0.0118 0.0100 0.0083 structural wor 4
0.0250 0.0200 0.0143 structural wor 4
0.4762 0.4348 0.4000 structural wor 4
0.6667 0.5556 0.4762 structural wor 4
1.2500 0.9091 0.6667 structural wor 4
0.3571 0.3226 0.3030 structural wor 4
- 0.7692 0.6250 structural wor 4
0.6667 - 0.5882 structural wor 4
1.0000 0.6667 0.4348 structural wor 4
- 1.2500 0.9091 structural wor 4
- 2.5000 1.6667 structural wor 4
229
0.4762 0.4348 0.3846 structural wor 4
- 1.1111 1.0000 structural wor 4
0.8333 0.7143 0.6250 structural wor 4
0.2500 0.2222 0.1818 structural wor 4
1.1111 0.7692 0.5882 structural wor 4
0.8333 0.6667 0.5556 structural wor 4
1.1111 0.9091 0.8333 structural wor 4
1.6667 1.4286 1.1111 structural wor 4
1.2500 1.0000 0.9091 structural wor 4
2.0000 1.6667 1.2500 structural wor 4
1.6667 1.2500 1.0000 structural wor 4
1.6667 0.9091 0.6667 structural wor 4
2.5000 2.0000 1.6667 structural wor 4
structural wor 4
structural wor 4
structural wor 4
structural wor 4
- - - structural wor 4
- - - structural wor 4
- - - structural wor 4
- - - structural wor 4
- - - structural wor 4
- - - structural wor 4
230
- - - structural wor 4
- 3.3333 - structural wor 4
0.0063 0.0056 0.0048 structural wor 4
0.0032 0.0027 0.0024 structural wor 4
- 0.0083 - structural wor 4
- 0.0111 - structural wor 4
structural wor 4
structural wor 4
structural wor 4
structural wor 4
0.50 1.10 1.20 structural wor 4
- 4.00 - structural wor 4
0.0250 0.0200 0.0182 structural wor 4
- 2.40 - structural wor 4
4.00 3.50 2.00 structural wor 4
- 0.70 - structural wor 4
structural wor 4
structural wor 4
structural wor 4
structural wor 4
- 0.5000 - structural wor 4
- 1.0000 - structural wor 4
- 0.4545 - structural wor 4
231
structural wor 4
structural wor 4
structural wor 4
structural wor 4
8.00 4.00 4.00 structural wor 4
10.00 8.00 - structural wor 4
25.00 10.00 - structural wor 4
45.00 25.00 - structural wor 4
60.00 45.00 - structural wor 4
- 2.00 - structural wor 4
- 0.2857 - structural wor 4
- 0.4762 - structural wor 4
- 0.4000 - structural wor 4
- 2.0000 - structural wor 4
- 0.6667 - structural wor 4
- 1.0000 - structural wor 4
- 2.0000 - structural wor 4
- 2.0000 - structural wor 4
- 5.0000 3.3333 structural wor 4
- 10.0000 5.0000 structural wor 4
- 10.0000 - structural wor 4
- 2.00 - structural wor 4
- 5.00 - structural wor 4
232
- 1.2500 - structural wor 4
- 2.0000 - structural wor 4
60.00 53.00 50.00 structural wor 4
- 5.00 - structural wor 4
- 2.50 - structural wor 4
- 2.00 - structural wor 4
- 8.0 - structural wor 4
- 2.0 - structural wor 4
- 12.0 - structural wor 4
- 14.0 - structural wor 4
- 48.0 - structural wor 4
- 72.0 - structural wor 4
- 0.3125 0.4545 structural wor 4
- 2.50 - structural wor 4
- 6.50 - structural wor 4
structural wor 4
structural wor 4
structural wor 4
Roofing Syst 5
Roofing Syst 5
- 0.7692 - Roofing Syst 5
- 0.3704 - Roofing Syst 5
- 0.8333 - Roofing Syst 5
233
- 0.0312 - Roofing Syst 5
0.0549 0.0500 0.0461 Roofing Syst 5
0.0752 0.0602 0.0549 Roofing Syst 5
0.0709 0.0641 0.0621 Roofing Syst 5
0.0532 0.0498 0.0461 Roofing Syst 5
0.0962 0.0621 0.0602 Roofing Syst 5
0.1961 0.1852 0.1724 Roofing Syst 5
0.2326 0.2083 0.1961 Roofing Syst 5
0.2857 0.2326 0.2174 Roofing Syst 5
0.1754 0.1515 0.1316 Roofing Syst 5
0.4762 0.4348 0.4000 Roofing Syst 5
0.7692 0.6667 0.6250 Roofing Syst 5
0.1220 0.1111 0.1042 Roofing Syst 5
0.1316 0.1250 0.1099 Roofing Syst 5
0.1538 0.1351 0.1205 Roofing Syst 5
0.0833 0.0763 0.0654 Roofing Syst 5
0.0070 0.0060 0.0057 Roofing Syst 5
- 0.1087 - Roofing Syst 5
- 0.2564 - Roofing Syst 5
- 0.1099 - Roofing Syst 5
- 0.2632 - Roofing Syst 5
- 0.2857 - Roofing Syst 5
- 0.7692 - Roofing Syst 5
234
0.1961 0.1389 0.1075 Roofing Syst 5
0.7692 0.4000 0.2564 Roofing Syst 5
0.1370 0.1235 0.1111 Roofing Syst 5
0.2174 0.1923 0.1724 Roofing Syst 5
0.1852 0.1695 0.1515 Roofing Syst 5
- 0.1961 - Roofing Syst 5
- 0.0400 - Roofing Syst 5
- 0.0488 - Roofing Syst 5
Roofing Syst 5
Roofing Syst 5
Roofing Syst 5
roofing syste 5
roofing syste 5
0.2941 - 0.2174 roofing syste 5
- 0.6250 - roofing syste 5
- 0.1923 - roofing syste 5
- 3.3333 - roofing syste 5
roofing syste 5
roofing syste 5
roofing syste 5
Roofing Syst 5
Roofing Syst 5
- 0.0556 - Roofing Syst 5
235
- 0.1176 - Roofing Syst 5
- 0.0278 - Roofing Syst 5
- 0.0192 - Roofing Syst 5
- 0.0385 - Roofing Syst 5
Roofing Syst 5
Roofing Syst 5
Roofing Syst 5
roofing syste 5
roofing syste 5
- 0.0200 - roofing syste 5
- 0.0250 - roofing syste 5
- 0.0185 - roofing syste 5
roofing syste 5
roofing syste 5
roofing syste 5
roofing syste 5
roofing syste 5
- 0.0222 - roofing syste 5
- 0.0256 - roofing syste 5
- 0.0192 - roofing syste 5
- 0.0286 - roofing syste 5
- 0.7143 - roofing syste 5
roofing syste 5
236
roofing syste 5
architectural 6
architectural 6
- 0.2000 - architectural 6
- 0.2000 - architectural 6
- 0.2381 - architectural 6
- 0.2500 - architectural 6
architectural 6
architectural 6
architectural 6
architectural 6
architectural 6
- 0.0180 - architectural 6
- 0.6667 - architectural 6
- 0.0240 - architectural 6
- 0.0160 - architectural 6
237
- 0.0080 - architectural 6
architectural 6
architectural 6
architectural 6
architectural 6
architectural 6
- 0.5556 - architectural 6
- 0.2500 - architectural 6
- 0.7692 - architectural 6
- 0.9091 - architectural 6
architectural 6
architectural 6
architectural 6
architectural 6
architectural 6
238
0.3125 0.2381 0.1887 architectural 6
- 0.1000 - architectural 6
architectural 6
architectural 6
architectural 6
architectural 6
architectural 6
- 0.0400 - architectural 6
- 0.1111 - architectural 6
- 0.0833 - architectural 6
- 0.1538 - architectural 6
- 0.0500 - architectural 6
architectural 6
architectural 6
architectural 6
architectural 6
- 0.7143 - architectural 6
239
architectural 6
architectural 6
architectural 6
architectural 6
- 0.2000 - architectural 6
architectural 6
architectural 6
architectural 6
architectural 6
240
- 0.0800 - architectural 6
- 0.0606 - architectural 6
- 0.10 - architectural 6
architectural 6
architectural 6
architectural 6
architectural 6
- 0.0901 - architectural 6
241
- 0.0602 - architectural 6
- 0.0351 - architectural 6
- 0.80 - architectural 6
- 0.70 - architectural 6
- 0.60 - architectural 6
- 0.60 - architectural 6
- 0.40 - architectural 6
- 0.60 - architectural 6
- 0.10 - architectural 6
architectural 6
architectural 6
architectural 6
architectural 6
- 0.0704 - architectural 6
- 0.0800 - architectural 6
- 0.0400 - architectural 6
- 0.9091 - architectural 6
- 0.1493 - architectural 6
- 0.0500 - architectural 6
- 0.3030 - architectural 6
- 0.4545 - architectural 6
- 0.2778 - architectural 6
242
- 0.4167 - architectural 6
- 0.6667 - architectural 6
- 0.5000 - architectural 6
- 0.2500 - architectural 6
- 0.5000 - architectural 6
- 0.1250 - architectural 6
- 0.1667 - architectural 6
- 0.1667 - architectural 6
- 0.2222 - architectural 6
- 0.4348 - architectural 6
- 0.0500 - architectural 6
- 0.0606 - architectural 6
- 0.1408 - architectural 6
- 0.1613 - architectural 6
- 0.4000 - architectural 6
- 0.5000 - architectural 6
- 0.5000 - architectural 6
- 0.5882 - architectural 6
- 0.3448 - architectural 6
- 0.1639 - architectural 6
- 0.2000 - architectural 6
- 0.2381 - architectural 6
- 0.2439 - architectural 6
243
1.1111 0.5882 - architectural 6
- 0.4000 - architectural 6
architectural 6
architectural 6
architectural 6
architectural 6
architectural 6
- 0.4000 - architectural 6
- 0.0400 - architectural 6
- 0.2500 - architectural 6
- 0.6667 - architectural 6
- 0.5882 - architectural 6
- 0.0595 - architectural 6
architectural 6
architectural 6
architectural 6
architectural 6
244
- 3.3333 - architectural 6
- 5.0000 - architectural 6
- 0.4000 - architectural 6
- 0.1613 - architectural 6
- 0.2222 - architectural 6
- 0.2000 - architectural 6
- 0.1818 - architectural 6
- 0.2857 - architectural 6
- 0.1299 - architectural 6
- 0.1724 - architectural 6
- 0.1613 - architectural 6
- 0.1408 - architectural 6
- 0.1515 - architectural 6
- 0.1724 - architectural 6
- 0.1205 - architectural 6
architectural 6
architectural 6
architectural 6
architectural 6
245
- 0.3226 - architectural 6
- 0.2778 - architectural 6
- 0.3846 - architectural 6
- 0.3226 - architectural 6
architectural 6
architectural 6
architectural 6
architectural 6
- 0.1053 - architectural 6
- 0.5000 - architectural 6
246
- 0.7692 - architectural 6
- 0.5000 - architectural 6
- 0.7692 - architectural 6
architectural 6
architectural 6
architectural 6
architectural 6
- 0.0140 - architectural 6
- 0.0340 - architectural 6
- 0.0568 - architectural 6
architectural 6
architectural 6
architectural 6
architectural 6
247
- 0.0690 - architectural 6
- 0.0143 - architectural 6
- 0.0357 - architectural 6
- 0.0286 - architectural 6
- 0.8333 - architectural 6
- 0.9091 - architectural 6
- 0.0400 - architectural 6
architectural 6
architectural 6
architectural 6
architectural 6
248
- 0.0556 - architectural 6
architectural 6
architectural 6
architectural 6
architectural 6
- 3.00 - architectural 6
- 5.00 - architectural 6
- 8.00 - architectural 6
- 1.00 - architectural 6
- 2.00 - architectural 6
architectural 6
architectural 6
architectural 6
architectural 6
- 1.4286 - architectural 6
- 0.8333 - architectural 6
architectural 6
architectural 6
architectural 6
architectural 6
249
1.30 0.90 0.60 architectural 6
- 0.1316 - architectural 6
- 0.2222 - architectural 6
- 0.1163 - architectural 6
- 1.20 - architectural 6
250
0.0990 0.0592 0.0400 architectural 6
- 0.20 - architectural 6
- 0.60 - architectural 6
- 0.40 - architectural 6
- 6.30 - architectural 6
- 2.0000 - architectural 6
architectural 6
architectural 6
architectural 6
architectural 6
251
0.30 0.10 - architectural 6
- 0.20 - architectural 6
- 0.30 - architectural 6
- 0.4348 - architectural 6
- 0.10 - architectural 6
- 3.3333 - architectural 6
- 0.0435 - architectural 6
- 0.0794 - architectural 6
- 0.5882 - architectural 6
- 0.2941 - architectural 6
- 0.2632 - architectural 6
252
- 0.2381 - architectural 6
- 0.1818 - architectural 6
architectural 6
architectural 6
architectural 6
architectural 6
- 0.5556 - architectural 6
- 0.1299 - architectural 6
- 0.1613 - architectural 6
architectural 6
architectural 6
electrical wor 7
electrical wor 7
- 12.00 - electrical wor 7
253
- 12.00 - electrical wor 7
11.00 5.00 - electrical wor 7
12.00 6.00 - electrical wor 7
- 5.00 - electrical wor 7
- 1.00 - electrical wor 7
- 10.00 - electrical wor 7
12.0 9.00 - electrical wor 7
12.0 6.00 - electrical wor 7
0.0005 - - electrical wor 7
- 1.0 - electrical wor 7
electrical wor 7
electrical wor 7
electrical wor 7
electrical wor 7
- 38.0 - electrical wor 7
- 16.0 - electrical wor 7
- 8.0 - electrical wor 7
- 0.1613 - electrical wor 7
- 0.1786 - electrical wor 7
- 0.2326 - electrical wor 7
- 0.2703 - electrical wor 7
- 0.2857 - electrical wor 7
- 0.5556 - electrical wor 7
254
- 0.6250 - electrical wor 7
- 1.0000 0.6667 electrical wor 7
- 1.4286 0.8333 electrical wor 7
1.4286 0.8333 0.3226 electrical wor 7
- 5.0000 - electrical wor 7
- 2.0000 - electrical wor 7
- 0.7692 - electrical wor 7
electrical wor 7
electrical wor 7
mechanical w 8
mechanical w 8
- 0.3030 - mechanical w 8
- 0.3226 - mechanical w 8
- 0.3226 - mechanical w 8
- 0.4762 - mechanical w 8
- 0.4000 - mechanical w 8
- 0.4545 - mechanical w 8
- 0.4000 - mechanical w 8
- 0.3448 - mechanical w 8
- 0.5263 - mechanical w 8
mechanical w 8
mechanical w 8
mechanical w 8
255
mechanical w 8
- 1.20 - mechanical w 8
- 1.60 - mechanical w 8
- 3.3333 - mechanical w 8
- 5.0000 - mechanical w 8
- 5.0000 - mechanical w 8
- 0.90 - mechanical w 8
- 1.20 - mechanical w 8
- 1.80 - mechanical w 8
- 0.10 - mechanical w 8
- 0.20 - mechanical w 8
- 0.30 - mechanical w 8
0.30 0.60 1.20 mechanical w 8
- 0.4545 - mechanical w 8
- 0.5556 - mechanical w 8
- 0.6667 - mechanical w 8
- 0.8333 - mechanical w 8
- 1.2500 - mechanical w 8
- 2.5000 - mechanical w 8
- 3.3333 - mechanical w 8
- 0.2000 - mechanical w 8
- 15.00 - mechanical w 8
mechanical w 8
256
mechanical w 8
mechanical w 8
mechanical w 8
- 3.00 - mechanical w 8
- 2.00 - mechanical w 8
- 1.00 - mechanical w 8
- 12.00 - mechanical w 8
75.00 65.00 52.00 mechanical w 8
mechanical w 8
mechanical w 8
mechanical w 8
mechanical w 8
14.00 12.00 11.00 mechanical w 8
- 60.00 48.00 mechanical w 8
- 1.00 - mechanical w 8
8.00 6.00 4.00 mechanical w 8
- 5.00 - mechanical w 8
- 2.00 - mechanical w 8
- 2.00 - mechanical w 8
- 2.00 - mechanical w 8
mechanical w 8
mechanical w 8
mechanical w 8
257
mechanical w 8
- 0.1754 - mechanical w 8
- 0.1235 - mechanical w 8
- 0.1053 - mechanical w 8
- 0.0820 - mechanical w 8
- 0.0658 - mechanical w 8
- 0.0549 - mechanical w 8
- 0.0450 - mechanical w 8
- 0.0361 - mechanical w 8
- 0.0300 - mechanical w 8
- 0.0943 - mechanical w 8
- 0.0781 - mechanical w 8
- 0.0472 - mechanical w 8
- 0.0391 - mechanical w 8
- 0.2128 - mechanical w 8
- 0.1818 - mechanical w 8
- 0.1515 - mechanical w 8
- 0.2273 - mechanical w 8
- 0.2000 - mechanical w 8
- 0.1613 - mechanical w 8
- 0.3125 - mechanical w 8
- 0.2632 - mechanical w 8
- 0.2222 - mechanical w 8
258
- 0.4762 - mechanical w 8
- 0.3846 - mechanical w 8
- 0.3226 - mechanical w 8
- 0.7143 - mechanical w 8
- 0.5882 - mechanical w 8
- 0.4167 - mechanical w 8
- 0.9091 - mechanical w 8
- 0.7692 - mechanical w 8
- 0.6250 - mechanical w 8
- 0.1205 - mechanical w 8
- 0.1000 - mechanical w 8
- 0.0800 - mechanical w 8
- 0.1299 - mechanical w 8
- 0.1099 - mechanical w 8
- 0.1000 - mechanical w 8
- 0.1923 - mechanical w 8
- 0.1613 - mechanical w 8
- 0.1299 - mechanical w 8
- 0.3704 - mechanical w 8
- 0.3030 - mechanical w 8
- 0.2500 - mechanical w 8
- 0.5882 - mechanical w 8
- 0.4762 - mechanical w 8
259
- 0.4000 - mechanical w 8
- 0.7143 - mechanical w 8
- 0.6250 - mechanical w 8
- 0.4762 - mechanical w 8
- 2.40 - mechanical w 8
- 0.1099 - mechanical w 8
- 0.0602 - mechanical w 8
- 0.0500 - mechanical w 8
- 0.1099 - mechanical w 8
- 0.0602 - mechanical w 8
- 0.0500 - mechanical w 8
- 0.1515 - mechanical w 8
- 0.0800 - mechanical w 8
- 0.0699 - mechanical w 8
- 0.1613 - mechanical w 8
- 0.0901 - mechanical w 8
- 0.0800 - mechanical w 8
- 0.1724 - mechanical w 8
- 0.1000 - mechanical w 8
- 0.0826 - mechanical w 8
- 0.0800 - mechanical w 8
- 0.0699 - mechanical w 8
0.0893 0.0602 0.0332 mechanical w 8
260
- 0.1000 - mechanical w 8
- 0.0800 - mechanical w 8
- 0.0699 - mechanical w 8
- 0.1408 - mechanical w 8
- 0.1099 - mechanical w 8
0.1205 0.1000 0.0725 mechanical w 8
- 0.1471 - mechanical w 8
- 0.2222 - mechanical w 8
- 0.1818 - mechanical w 8
- 0.4000 - mechanical w 8
- 0.3448 - mechanical w 8
- 0.2703 - mechanical w 8
- 0.5263 - mechanical w 8
- 0.4348 - mechanical w 8
- 0.3704 - mechanical w 8
- 0.3571 - mechanical w 8
- 0.2941 - mechanical w 8
- 0.2632 - mechanical w 8
- 0.3704 - mechanical w 8
- 0.3125 - mechanical w 8
- 0.2778 - mechanical w 8
- 0.4000 - mechanical w 8
- 0.3448 - mechanical w 8
261
- 0.2941 - mechanical w 8
- 0.4167 - mechanical w 8
- 0.3704 - mechanical w 8
- 0.3030 - mechanical w 8
- 0.4545 - mechanical w 8
- 0.3846 - mechanical w 8
- 0.3448 - mechanical w 8
- 0.9091 - mechanical w 8
- 0.4167 - mechanical w 8
- 0.4000 - mechanical w 8
- 0.3448 0.2381 mechanical w 8
- 0.4000 0.2632 mechanical w 8
- 0.4762 0.3846 mechanical w 8
- 0.2778 - mechanical w 8
- 0.2326 - mechanical w 8
- 0.2000 0.1250 mechanical w 8
- 0.2941 - mechanical w 8
- 0.2439 - mechanical w 8
- 0.2222 0.1111 mechanical w 8
- 0.3030 - mechanical w 8
- 0.2632 - mechanical w 8
- 0.2439 - mechanical w 8
- 0.3333 - mechanical w 8
262
- 0.2857 - mechanical w 8
- 0.2500 - mechanical w 8
- 0.3571 - mechanical w 8
- 0.3030 - mechanical w 8
- 0.2703 - mechanical w 8
- 0.3846 - mechanical w 8
- 0.3226 - mechanical w 8
- 0.2778 - mechanical w 8
- 0.1429 - mechanical w 8
0.2500 0.1818 0.1111 mechanical w 8
mechanical w 8
mechanical w 8
roads and hi 9
roads and hi 9
- 2.5000 - roads and hi 9
- 0.0800 - roads and hi 9
- 0.1299 - roads and hi 9
- 0.1493 - roads and hi 9
roads and hi 9
roads and hi 9
roads and hi 9
roads and hi 9
roads and hi 9
263
- 0.0333 - roads and hi 9
- 0.0040 - roads and hi 9
roads and hi 9
- 0.0200 - roads and hi 9
- 0.0029 - roads and hi 9
roads and hi 9
roads and hi 9
roads and hi 9
roads and hi 9
roads and hi 9
0.0030 0.0026 0.0022 roads and hi 9
0.0351 0.0321 0.0221 roads and hi 9
- 0.0170 - roads and hi 9
- 0.0180 - roads and hi 9
- 0.0260 - roads and hi 9
- 0.0173 - roads and hi 9
roads and hi 9
roads and hi 9
264
PRODUCTION RATES
9.0 Underpinning 3
2
265 of
13.0 Site Clearance 4
2
20.0 Dewatering 6
2
21.0 Demolition 6
2
24.0 Waterproofing 7
4
25.0 Trackwork 7
4
29.0 Reinforcement 8
4
266 of
30.0 Post Tensioning 9
4
33.0 Formwork 9
4
34.0 Decking 10
4
267 of
47.0 Flat and Layered Roofs 15
5
48.0 Wallpapering 15 6
50.0 Stonework 15 6
51.0 Screeding 16 6
53.0 Rendering 16 6
54.0 Plastering 16 6
55.0 Plasterboard 16 6
56.0 Partitioning 16 6
57.0 Painting 17 6
58.0 Landscaping 18 6
62.0 Blockwork 19 6
268 of
64.0 Concrete Finishing 19 6
75.0 Escalators 23
8
76.0 Drainage 23
8
269 of
PRODUCTION RATES
Table of Contents
5.0 Blockwork 19 6
270 of
13.0 Commercial Kitchen 20 6
22.0 Decking 10
4
23.0 Demolition 6
2
24.0 Dewatering 6
2
26.0 Drainage 23
8
28.0 Escalators 23
8
271 of
2.0 Fencing Works 5
2
5.0 Formwork 9
4
9.0 Landscaping 18 6
14.0 Painting 17 6
15.0 Partitioning 16 6
16.0 Plasterboard 16 6
17.0 Plastering 16 6
272 of
19.0 Power Supply 21
7
21.0 Reinforcement 8
4
24.0 Rendering 16 6
28.0 Screeding 16 6
273 of
36.0 Small or Deep Excavation 2
1
41.0 Stonework 15 6
45.0 Trackwork 7
4
47.0 Underpinning 3
2
49.0 Wallpapering 15 6
50.0 Waterproofing 7
4
274 of