Вы находитесь на странице: 1из 18

GEA REF.

N°P180060_TC

“TECHNICAL & COMMERCIAL BUDGET OFFER”

for ALKORAYEF GROUP (KUWAIT)

EQUIPMENT:N°1 REFRIGERATION PACKAGE FOR NGSF

PLANT SITE LOCATION:KUWAIT

Version: (P180060_TC_00)
th
Date: Castel Maggiore - (Bologna),Italy,May 29 ,2018

Author: Mr. Tiziano Casalini (Proposal Engineer)

Department: GEA Refrigeration Italy S.p.A.


Sub - APC Oil & Gas Global
Alkhorayef Group - Kuwait

www.AlkhorayefKuwait.com

To : Kind Attn. of Mr. Shafeeque K. Hydrose


Project Control Manager
Tel.: +965-2221 3995, Ext: 5533
Fax: +965-2221 3998
Mob.: +965-6583 1064
E-Mail : shydrose@alkhorayef.com

Alkhorayef RFQ-Request For Quotation received by E-Mail on May 07th, 2018


Alkhorayef Group Tender Ref. N° : RFQ/T17/M/048, Refrigeration Package
Plant Site Location and Country : On shore in Kuwait
Client Ref. : KOC
Material / Equipment / Service : N°1 Refrigeration Package for New Gas Sweetening Facility (NGSF)
at BS-171 in West Kuwait (RFP-2029787)
GEA Refrigeration Italy‘s Ref. : Offer N° P180060 Rev.00 (be mentioned in all correspondence)

Dear Mr. Shafeeque K. Hydrose,


We regret the delay in our reply and with reference to your kind request received by E-Mail on
May 07th,2018, as agreed we herein transmit our complete budget offer (technical and commercial)
for the above mentioned project.

Always available for any further information you may require, we remain

Sincerely yours

Tiziano Casalini Giuseppe Falsiroli


Proposal Engineer Head of Oil & Gas Sales
APC Utilities Oil & Gas Sales Support & Offer Management
Business Area Solution,
Application Center Utilities

GEA Refrigeration Italy S.p.A.


Via delle Officine Barbieri, 7 • P.O.Box 57 • 40013 Castel Maggiore (Bologna) Italy
Tel. +39 051 718511 • Fax +39 051 714261
Technofrigo.posta@gea.com • gearefrigerationitaly@pec.it
www.gea.com
Cap. Soc. 2.580.000 i.v., Registro Imprese n. 00285550372, R.E.A. BO 14625
Cod. Fisc. 00285550372 - Partita IVA IT 00497811208
Socio Unico
Direzione e coordinamento GEA GROUP AKTIENGESELLSCHAFT
ex art 2497 e seguenti del Codice Civile

Page 2 / 18
1. REFERENCE DOCUMENTATION & INTRODUCTION TO THE DESIGN

This GEA Refrigeration Italy’s proposal has been prepared technically mainly in accordance to :

1) Your kind Request For Quotation (RFQ) received by E-Mail on May 07 th,2018.

2) Your Material Requisition (M.R.) – Doc. N° T17-ZA-01104_TS for Refrigeration Package –Rev. A and
also to the relevant attached applicable technical specifications received by E-Mail on May 07 th,2018.

3) Your additional technical information and comment received by E-Mail on May 17th,2018 to the GEA
request of technical clarifications (relevant to the use of butane as refrigerant fluid).

We have based our offer on using GEA Refrigeration Italy S.p.A. Engineering Procedures. These are based
on Petro-Chemical Industry standards and norms.
We believe that these standards will provide a package that will meet the demanding requirements of the site
conditions while offering a commercially competitive solution.

We inform you that in this first offer phase GEA will provide only the attached MAIN deviation list and

comments.

The complete and the GEA’s Detailed Deviation List and comments to the Specifications will follow at later
stage and / or eventually will be defined together at a later date at an eventual technical meeting.

But in any case, in this offer you can only find the deviations list and comments for as follow:

1) API 619 for the proposed lubricated butane bare screw compressors.

2) API 619 & 614 comments & deviations for the proposed lube oil system for the lubricated butane
screw compressors.

3) API 671 for the proposed couplings.

4) API 676 for the lube oil pumps (dedicated to only the specific manufacturers proposed by GEA that are
Pompe Cucchi or Ultra Pompe).

(*) Note : Please refer also to all the exclusions proposed in this offer.

Page 3 / 18
2. BRIEF DESCRIPTION OF THE SCOPE OF SUPPLY.

The GEA Refrigeration Italy scope of supply, subject of the present offer, consists of n°1 Refrigeration
Package Unit that in accordance to your request and to your specifications it is sized for the total
maximum / design cooling duty- refrigeration capacity of : 5.200 kW.
The above mentioned Refrigerating System proposed by GEA according to your request and
specifications is operating with Butane mix as refrigerant gas (70% n-Butane + 30% i-Butane)

The Refrigeration Unit (as per attached GEA PFD-Process Flow Diagram) will be sized to supply
°
Butane liquid refrigerant (sub-cooled) at a temperature of ~ 45,6 C approx. and with a pressure
of ~ 7,14 bar a to n°1 refrigerant flooded evaporator shell and tube type heat exchanger kettle-BKU
type or equivalent that in this first phase as per your request is not included in the GEA basic scope
of supply and quotation.
The above mentioned flooded evaporator with butane on shell side will be used as chiller of process fluid
on the tube side.

The Refrigeration Unit proposed by GEA will consists mainly of the following equipment :
 No. 2 x 50% (Working-operating) identical butane oil flooded-lubricated screw compressors units ;
 No. 2 x 50% (Working-operating) Medium Voltage electric motors for screw compressors drive;
 No. 1 lubricating oil system with oil cooling system and auxiliaries in common to the two butane lubricated
screw compressors ; the lube oil system dedicated to the butane screw compressors is manly complete
with n°1 lube oil separator, n°1 oil cooler S & T cooled with butane thermosiphon type,
n°2 oil pumps , dual oil filters and strainers ,piping ,etc.);

 No. 1 x 100% Working-operating butane condenser heat exchanger air cooled type;
 No. 1 x 100% Working-operating butane liquid accumulator-receiver ; the above mentioned refrigerant
liquid receiver proposed by GEA in this first basic budget offer-price it is sized according to the GEA
experience in similar applications for a standard of hold up time and has not been sized in order to
contain all refrigerant charge of the whole system;
 No. 1 x 100% Working-operating butane superheater shell and tube type heat exchanger that will be
installed on suction and in common to the two screw compressors;
 No. 1 x 100% Working-operating butane suction drum-Knock Out Drum (K.O.D.), vertical type ,that will
be installed on suction and in common to the two screw compressors and used to prevent possible
butane refrigerant liquid on the compressors suction from the refrigerant flooded evaporator heat
exchanger / chiller of process fluid.

 No. 1 set of LGB - Local Gauge Board suitable for classified area;
 No. 1 remote U.C.P.-Unit Control Panel complete with PLC in common to the 2 compressors, suitable to be
installed in control room safe area;
 No. 1 set of piping up to the skids edges, valves and controls;
 No. 1 set of special tools for the screw compressor.
For more details relevant also to temperature , pressure, etc. please see and refer also to our attached
PFD-Preliminary Process Flow Diagram and related sheet for reference; the flow rates indicated in this
diagram are referred to max. capacity of the refrigeration system.
We have considered in this first phase that all the above mentioned main equipment (butane KOD, butane
compressors & relevant lubricating oil system, butane air cooler condenser, butane liquid receiver and butane
superheater) will be installed - located at Client’s charge at grade at zero elevation as per attached GEA
preliminary Plant Foot Print drawing.

The heat exchanger / butane evaporator used as chiller of process fluid we have considered that will be
installed – located at Client’s charge at grade at zero elevation at a max. distance of 10 -15 m. approx. from
the refrigerant KOD & two refrigerant screw compressors and from the refrigerant superheater .

Page 4 / 18
3. TECHNICAL DATA.
Type of compressors : screw, oil flooded;
Brand of the compressors : Howden or GEA ;
Compressors number : N°2 x 50%;
Speed of compressors : 1.480 rpm(direct coupled to electric motor);
Power supply
V/ph/Hz 3.300 / 3 / 50 MV el. mot. driver for compr.
V/ph/Hz 440/3/50 LV el. mot.driver / El. Heaters
V/ph/Hz 120/1/50 instruments, auxiliary circuit,
solenoid valves.

Environment : Industrial atmosphere;


Installation : Outdoor;
Site Conditions:
o Dust, Desert Environment : Considered;
o Winterization : not considered;
o Relative humidity : 15 / 100 %;
o Outdoor temper. Extreme : - 3 / 51.1 °C;

Design-Max. Refrigeration Duty: : 5.200 kW


2
Fouling factor for Refrigerant : 0,0001 m *K / W
2
Fouling factor for Lube Oil : 0,0001 m *K / W

Electrical Classification area : Zone-2, IIB, T3 - For Electrical


Zone-1, IIA/B, T3 - For Instrumentation
Mechanical protections for:
 Electric motors drivers : IP 55;
 Instruments : IP 65;
 Terminal boxes : IP 65;

Executions/protection for :
 Electric motors drivers : Ex-d;
 Instruments : Ex-d;
 Junction boxes : Ex-e;

Main Codes and Standards:


 Screw compressors : API 619 5th ed. with deviations ;
 Oil circuit for compressors : API 619 5th ed. with deviations;
 Shafts couplings : API 671 4th ed. with deviations;
 Lube oil pumps : API 676 3rd ed. with deviations;
 Compressors skid : Std. GEA;
 S & T heat exchangers : ASME VIII Div. 1 with “U” Stamp + TEMA R
For process / TEMA C for auxiliary(oil cooler);
 Air Cooler refrigerant condenser : API 661;
 Pressure Vessels : ASME VIII Div.1 with “U” Stamp ;
 Piping : ANSI B 31.3;
 Pipe flanges : ASME B 16.5;
 Pipe thread : ANSI NPT;
 PSV-Safety valves : API 520 ANSI B 9.1;
 Materials : ASTM;
 Electric motors drivers : IEC / CENELEC/ NEMA/NEC;
 Instruments : ISO / IEC / CENELEC;
 SIL Certification : For PLC not considered;
 SIL Certification : For instrumentation not considered;
 Oil ejector-oil recovery system : Std. Mfr. GEARI;
- Note :Voting Logic for shut-down interlock philosophy for the instrumentation supplied by GEA is 1oo1;

Page 5 / 18
4. TECHNICAL DESCRIPTION

1) No. 2 x 50% BUTANE SCREW COMPRESSORS

Material of each bare screw compressor:


 Casing : Cast steel
 Rotors : Forged steel;
 Thrust bearings : Tilting Pad type;
 Radial bearings : sleeve;
 Shaft seal : double wet/dry suit to Plan 72.
Each compressor unit comprises:
 Manual suction and discharge stop valves;
 Suction and discharge check valves;
 No. 1 Suction strainer (CS housing, SS mesh);
 No. 1 Hydraulically actuated slide valve providing continuous capacity modulation
from 20 ÷ 100%;

MAIN COMPRESSOR PERFORMANCE (of each screw compressor)

Description GEARI Proposal


Refrigerant Butane Mix
(70% n-Butane + 30% i-Butane)

Max. Full Load(100%) Compressor Refrigeration 2.841


Capacity - (kW)
Max. Shaft Input Power at 100% Full Load- (kW) ~ 1.143
Rated Compressor Refrigeration Capacity at 2.600
partial load - (kW)
Shaft Input Power at rated condition (to reach ~ 1.080
2.600 kW of Refrig. capacity) & at partial load - (kW)
Butane Evaporating temperature (saturated) - °C ~ 11,2
Butane Evaporating pressure (saturated) - bar a ~ 1,51
Butane Suction superheating - °C ~ 23,8
Butane Suction temperature (superheated) - °C (23,8 + 11,2) = 35

Butane Condensing Temperature (saturated) - (°C) 61,1

Butane Condensing pressure (saturated) - bar a ~ 7,24


Butane Max. Discharge Temperature with ~ 95,4
compressor at partial load (superheated) - (°C)
Butane Min. Discharge Temperature with compressor ~ 86,8
at 100% load (superheated) - (°C)

Note : For other conditions please see & refer to the attached GEA PFD-Process Flow Diagram Drawing .

Page 6 / 18
2) No.1 OIL CIRCUIT in common to the n° 2 x 50% refrigerant screw compressors

 The oil circuit will be made manly by as follow :


 No. 1 oil separator, with oil carries over of 10-15 ppm max, connected to the two
compressors discharge. The oil separator is complete with PSV supplied loose.
 All materials : CS-Carbon Steel;
 Design / test pressure : 15 / code - bar G;
 Design temperature : - 29 / +120°C.
 No.1 electric heater : immerse type.
Note: The lube oil separator PV , vertical type, is supplied loose on skirt.
 No. 1 oil cooler thermosiphon type cooled by butane .
 Type : shell-and-tube BEM;
 Design/test pressure TS(butane) : 15 / code -bar G;
 Design / test pressure SS(oil) : 19 / code -bar G;
 Design temperature SS & TS : - 29 /+120°C.
 Main material for :
 Tubes : CS-Carbon Steel;
 Shell : CS-Carbon Steel;

 Oil piping.
 Material : CS-Carbon Steel up-stream filters and in
SS-Stainless Steel down-stream filters.
 Double oil filters.
 Material casing : stainless steel;
 Design temperature : - 29 /+120°C;
 Degree of filtration : 20 µm.
 Valves.
 Body/internal : CS-Carbon Steel /S.S.- Stainless Steel;
 No. 2 electric lube pumps for oil circulation(N°1 operating and n°1 as stand by).
Each pump is complete with internal safety valve, electric driver with coupling and with
non-sparking guard.
 Casing material : cast iron;
 Pump type : gear/screw;
 No. 1 suction strainer in CS, cleanable type on each oil pump suction line;

3) No.2 SETS OF AUX. SEAL FLUSH-GAS SYSTEMS, for Butane screw compressors (n°1 for each
compressor) dedicated to the double mechanical shaft seal wet/dry Plan 72.

4) No.2 COUPLINGS for the butane screw compressors and the relevant MV electric motors drivers,
(n°1 for each compressor)flexible type, with non-sparking protection guard.

5) No. 2 M.V. ELECTRIC MOTORS for Butane screw compressors drivers (n°1 for each compressor)
at 4 poles ,at 3.300 V / 3 ph / 50 Hz with a fixed speed of ~1.480 rpm , suitable for classified area
and each with an installed power of 1.200 kW ; each a.m. proposed MV electric motor is complete of
standard manufacturer bearings (antifriction rolling-ball type or equivalent ) and with standard
manufacturer lubrication system (grease).

Page 7 / 18
6) No.1 REFRIGERANT CONDENSER
 Refrigerant type : Mix Butane;
 Type : Air Cooler;
 Design / test pressure on butane side : 15 /code - bar G;
 Design temperature on butane side : - 29 /+120 °C.
 Tubes material : CS-Carbon Steel with Aluminium fins;
 Nr. of fans : total 10.
 Design air dry bulb ambient temperature
for the sizing of the air cooler : 51,1°C
 Butane Condensing pressure (saturated) : ~ 7,24 bar a

The air condenser is complete with:


* No. 1 Set of instruments;

Note 1):The air condenser is controlled by mean of VFD (out of GEA scope of supply)
installed on 50% of the fan motors. VFD are installed by client in MCC room (Safe Area).

Note 2) : Air Cooler structure:


The Air Cooler Condenser will be supplied separately to site, for mounting locally. Re-
assembly of the condenser at site is required.
For the correct functionality the condenser needs to be located above grade, to ensure that
there is sufficient static liquid head to drive the liquid refrigerant to the liquid receiver. We
therefore have assumed that the condenser will be located on dedicated structure or pipe
rack, by others.
GEA will include for the supply of the primary condenser steel work to support the tube
bundles, fans etc. However the secondary steel (such as pipe-rack) work is currently
excluded from our scope of supply. Please see below for our proposal as to this layout.

Page 8 / 18
7) No.1 REFRIGERANT KO DRUM ON COMPRESSORS SUCTION
 Refrigerant type : Mix Butane;
 Type: : vertical;
 All materials : CS-Carbon Steel;
 Design/test pressure : 15 / code- bar G;
 Design temperature : - 29 /+120 °C;

The KOD pressure vessel is complete with:


* No. 2 pressure safety valve (supplied loose) ;
* No. 1 internal demister
* No. 1 Set of manual stop valves;
* No. 1 Set of instruments;
* No. 1 Oil recovery system (with ejector);

Note : The KOD pressure vessel is supplied loose on skirt.

8) No.1 REFRIGERANT SUCTION SUPERHEATER


 Refrigerant type : Mix Butane;
 Type : Shell and tube BEM;
 Material for tubes : CS- Carbon Steel;
 Material for shell : CS-Carbon Steel;
 Design/test pressure SS-TS : 15 / code - bar G;
 Design temperature SS-TS : - 29/+120 °C;

The heat exchanger is complete with:


* No. 2 pressure safety valve (loose) ;
* No. 1 Set of manual stop valves;

Note :The a.m. heat exchanger is supplied loose on saddles.

9) No.1 REFRIGERANT LIQUID RECEIVER


 Refrigerant type : Mix Butane;
 Type : horizontal;
 Design/test pressure : 15/code -bar G;
 Design temperature : - 29 /+120°C;
 All materials : CS-Carbon Steel
The pressure vessel is complete with:
* No. 2 pressure safety valve (supplied loose) ;
* No. 1 Set of manual stop valves
* No. 1 Set of instruments;

Note : The liquid receiver pressure vessel is supplied loose on saddles.

Page 9 / 18
10) No.1 SET OF LOCAL GAUGE BOARDS to run the unit from the field, installed on the compressors
skids and each complete of:
a) Junction boxes with:
 Start/stop push buttons;
 Interface terminal board;
 Manual/automatic capacity control selector switch;
 Signal lamps for: alarm & shut down, capacity control, heating and solenoids;
 Ammeter for main motor;
 Horn alarm.
Execution of the junction boxes : Ex-e

b) Instrumentation with the following characteristic:


 Pressure instrument with : block and bleed valves;
 Type of transmitters : 4 ÷ 20 mA;
 Tubing and instrument fittings : stainless steel;
 Thermometric pockets : threaded;
 Shout down philosophy : 1oo1;

Variables Quantity Type Alarm Shut-down Control Indicator

ON EACH COMPRESSOR UNIT


 suction P 1 transmitter L
 DPT disc./pump filter 2 transmitter L LL
 discharge P 2 transmitter H HH
 oil T on separator 2 transmitter L LL
 oil T on circuit 2 transmitter H HH
 oil heater 1 transmitter X
 discharge temperature 2 transmitter H HH
 pump filter DPT 1 transmitter H
 suction P 1 gauge X
 suction filter DP 1 gauge X
 discharge P 1 gauge X
 oil T on circuit 1 gauge X
 oil level 1 gauge X
 oil flow 1 sight-glass X
 suction T 1 gauge X
 discharge T 1 gauge X
 oil pump P 2 gauges X
 oil level 1 transmitter L
 pump filter DP 1 gauge X
 slide position 1 transmitter X
 suction P (capacity cont.) 1 transmitter X

Page 10 / 18
Follow from previous Point 10

Variables Quantity Type Alarm Shut-down Control Indicator

ON THE AIR CONDENSER


 pressure 1 gauge X

ON THE LIQUID RECEIVER


 pressure 1 gauge X
 liquid level 1 gauge
 liquid level 1 transmitter L

ON THE KO DRUM
 pressure 1 gauge X
 pressure 1 transmitter H
 liquid level 1 gauge X
 liquid level 2 transmitter H HH

ON THE SUPERHEATER
 pressure 1 gauge X
 temperature 1 gauge X

11) ELECTRICAL WIRING between the instruments and the junction boxes on the racks.

12) NOISE HOODS jacket type on the bare compressors, if necessary to respect 85 dB(A).

13) PAINTING of all the equipment included in GEA Refrigeration Italy ’s scope of supply as per

project specification.

14) TESTS NOT WITNESSED for all the equipment included in GEA Refrigeration Italy ’s scope

of supply according to project specification.

15) No.1 SET OF SPECIAL TOOLS for the screw compressors.

16) No.1 SET OF LIFTING DEVICE & METALLIC LIFTING BEAMS (spreader bar etc.) necessary

for the equipment included in the GEA’s scope of supply.

Page 11 / 18
17) No.1 SET OF EARTH LUGS-LIFTING LUGS AND GROUNDING LUGS for the equipment
included in GEA Refrigeration Italy’s scope of supply ;

18) No.1 SET OF NECESSARY METALLIC STAIRWAYS, LADDERS, GRATING AND PLATFORMS
for the above various equipment and skids included in GEA Refrigeration Italy ’s scope of
supply, supplied prefabricated and loose suitable to be installed on site at Client ‘s charge.

19) No.1 SET OF COMMISSIONING SPARE PARTS according to the attached GEA’s standard
manufacturer list ;

20) No.1 SET OF NAME PLATES for all the equipment included in GEA Refrigeration Italy’s scope
of supply ;

21) No. 1 SET OF INTERNAL PIPING UP TO THE SKIDS EDGES, VALVES AND CONTROLS;

22) No. 1 REMOTE U.C.P.-UNIT CONTROL PANEL COMPLETE WITH PLC in common to the 2 compressors,
the control system will be supplied loose-free standing and is suitable to be installed remote in your
Control Room and used for the control of the complete refrigeration system .

23) TRANSPORT & DELIVERY of all the material included in GEA Refrigeration Italy scope of supply
up to F.O.B. as indicated in the attached GEA Sales Conditions according to the ICC Incoterms
2010 latest edition ;

24) PACKING of all the material included in GEA Refrigeration Italy scope of supply ; the packing it is
seaworthy type and suitable for shipping and realized according to the UNI 9151.
The seaworthy packing it is certificated (FAO ISPM-15).

25) ENGINEERING: detailed engineering, drawings and sketches, operating manual and inspection book
for the complete scope of supply.

Page 12 / 18
5. PRELIMINARY (main) ELECTRICAL CONSUMPTION

Main Electrical Consumption : Adsorbed Power Installed Power

-N°2 MV-Main drivers electric motors for screw


compressors (N°2 x 50 % operating) :~ 1.143/each (*Note 1) ~ 1.200 / each kW;
-N°2 Space Heaters for N°2 MV electric motors for compr. : ~ 1 / each ~ 1 /each kW;
-N°1 Oil heater for n°1lube oil separator for compress. : ~4 ~ 4 kW; Note(2)below
-N°2 Lube oil pumps Elec. Motors (N°1operat.& n°1 spare) : ~ 22 / each ~ 30 /each kW;
-N°10 LV Electric motors for fans for N°1 air cooler
refrigerant Condenser : ~ 38 x 10 = 380 ~ 55 x 10 = 550 kW.
-N°1 UCP- Remote control panel-system with PLC : ~5 ~5 kW.
-N°1 Set of Local Gauge Boards, solenoid valves etc. : ~ 11 ~ 11 kW.

Note (1) : The value of the absorbed power is the Max. & relevant to each compressor at 100% load
At partial load the absorbed power value for each compressor is ~ 1.080 kW /each

Note (2) : Only during heating phase

Note (3) : Utilities consumption relevant to the Double shaft seal for screw compressors will be defined
at a later stage.

Air flow rate consumption


For the Air flow rate consumption for n°1 proposed Refrigeration System according to GEA Refrigeration Italy‘ s
experience in similar application please consider at least 2 Nm3/h approx. for each control valve (LV),2 Nm3/h
approx. for each PV valve , and 0,5 Nm3/h approx. for each solenoid valve (XY).
For the a.m. refrigeration package in this first phase please consider a total estimated value of I/A-instrument
air flow rate equivalent to : ~ 45 Nm3 / h

Note (4) : Precise data will follow after detailed engineering

Note (5) : Turndown requested in the spec. for the whole refrigeration package : 30% - 100%

6. BATTERY LIMITS OF THE SUPPLY

In this first budget offer phase for your information please see to the attached GEA preliminary PFD –
Doc. N° P180060_GPFA_00

Page 13 / 18
7. EXCLUSIONS

Not included in our offer :

General
Ex.G1 Any item of scope not mentioned in this section.
Ex.G2 Standards or other codes not mentioned in this offer.
Ex.G3 Documentation not mentioned in this offer.
Ex.G4 Non-standard documentation, testing or certification for proprietary items.
Ex.G5 Attendance to meetings outside GEA premises.
Ex.G6 Inspection visits by GEA except where marked “W” in our ITP.
Ex.G7 Unloading and / or positioning of skids at site.
Ex.G8 Civil engineering.
Ex.G9 Site Installation.
Ex.G10 Site Supervision (see pricing for daily rates).
Ex.G11 Commissioning (see pricing for daily rates).
Ex.G12 Service and maintenance contracts (available as option).
Ex.G13 Spare parts other than specified in our offer.
Ex.G14 Customer format P&ID check when redrawn from GEA P&ID.
Ex.G15 Oil Flushing and Oil for Oil Flushing.
Ex.G16 Any additional requirement generated during HAZOP, SIL, FMECA or SIL studies.
Ex.G17 Third part approval & inspection.
Ex.G18 Full material traceability for pipework.
Ex.G19 Third part approval & inspection.
Ex.G20 Applicable taxes, fees or permits.
Ex.G21 Vacuum test.
Ex.G22 N°1 butane hot gas by-pass system 0-20% for the refrigeration package.
Ex.G23 3D modelling with PDMS, PDM or PDS for the whole refrigeration package.
Ex.G24 N°1 Butane flooded evaporator shell and tube type heat exchanger kettle-BKU type or
equivalent used as chiller of process fluid and complete with instrument ,valves etc.
Ex.G25 Transport and delivery from F.O.B. as indicated in the attached GEA Sales Conditions
up to the site in Kuwait.

Electrical
Ex.E1 LV and HV cabling, cabling glands and /or Isolation Switches.
Ex.E2 Wiring between skids and/or to remote panel.
Ex.E3 Motor or heater switchgear, MCC’s, Starter panels, Power Panels.
Ex.E4 VFD for the Air Cooler fans electric motors.
Ex.E5 Ammeters.
Ex.E6 Lighting and small power.
Ex.E7 ESPB’s.
Ex.E8 Trace Heating.

Instrumentation
Ex.I1 MMS (e.g. Bently Nevada), DCS or ESD Systems.
Ex.I2 Emergency Blowdown valves.
Ex.I3 Bursting Discs or locking devices for PSV's.
Ex.I4 Balanced bellow relief valves.
Ex.I5 SIL studies for control systems.
Ex.I6 Instrument cabling from junction boxes to DCS / ESD or any remote location outside
individual skid limits.
Ex.I7 HAZOP / LOPA / FMECA studies.
Ex.I8 1oo2 or 2oo3 Voting.
Ex.I9 Wake calculations for thermowells.

Page 14 / 18
7. EXCLUSIONS (follow from previous page)

Instrumentation (follow from previous page)


Ex.I10 Proximity switches for actuated valves.
Ex.I11 Re-calibration of instruments in our workshop.
Ex.I12 Refrigerant leak detection.
Ex.I13 Gas and /or fire alarms or F&G detection systems.
Ex.I14 Interlocking devices for relief valves.
Ex.I15 FAT Tests for Control Valves.
Ex.I16 Re-calibration of sub-vendor calibrated instruments in our workshop.
Ex.I17 Compressors / motor condition monitoring equipment.
Ex.I18 Wiring of air cooled condenser vibration switches.
Ex.I19 Instrumentation sunshade.

Mechanical
Ex.M1 “String” tests or skid performance tests.
Ex.M2 Compressors performance tests other than mechanical run test.
Ex.M3 First charge of butane refrigerant and oil.
Ex.M4 Passive fire protection.
Ex.M5 Thermal insulation and heat tracing.
Ex.M6 Steel structures other than the skid base frames.
Ex.M7 Maintenance platforms / ladders except where stated in section one.
Ex.M8 Vibration mounts.
Ex.M9 Lock devices for locked open or locked closed valves.
Ex.M10 Vacuum pumps, oil charging pumps or refrigerant pump-out units.
Ex.M11 Foundation bolts and anchor bolts for the skids and equipment.
Ex.M12 Piping or pipe supports between specified skids or outside the skid limits.
Ex.M13 Pipe stress analysis within skid limits.
Ex.M14 Fire safe valves, leak detection, gas/fire alarms.
Ex.M15 Underslung/Drip pan maintenance platforms.
Ex.M16 Shop assembly and trial run of the air condensers.
Ex.M17 Bolting and gaskets for flange to piping connections (client interface points).

Page 15 / 18
8. BUDGET PRICES

Sr. No Budget Price


Description

Basic Budget Price for the supply of N°1 Refrigeration Package


A. sized for a design duty of 5.200 kW considering a delivery of the
goods F.O.B. as indicated in the attached GEA Sales Conditions
according to the ICC Incoterms 2010 latest edition. In this above
basic price please consider that are included mainly also as follow :

1) N°1 set of spare parts necessary for the commissioning and


start up (according to the recommended GEA list).

2) The export packing seaworthy type and marking of the goods.

3) The tests & inspections, engineering documents ,drawings,


operating manuals etc.

THE VALUE OF THE PROPOSAL IS BASED ON GEA ASSUMPTIONS, IN CASE OF VARIATION GEA
RESERVE THE RIGHTS TO CONFIRM THE PRICE.
1.
DAILY RATE FOR SITE / FIELD SERVICES ,TESTS, AND FIELD For the daily rate tariff
SUPERVISION ON SHORE IN KUWAIT please refer to the relevant
GEA attachment
“P180060_DR_2018”.
2. Excise duty. Excluded

3. Sales tax / VAT. Excluded


4. Transport of all the material included in GEA Refrigeration Italy’s Excluded
scope of supply from F.O.B. as indicated in the attached GEA Sales
Conditions up to the site in Kuwait according to ICC Incoterms
2010 latest edition.

Note : For the Terms and Conditions please see relevant attachment “P180060_STC_00”with the
GEA standard Terms of Sale.

The terms of the Technical Documents and Standard Terms of Sale as attached, shall be
deemed incorporated mutatis mutandis into this document in so far as the same do not
conflict with the terms of this document.

Always available for any further information you may require, we remain
Sincerely yours,

Giuseppe Falsiroli

Head of Oil & Gas Sales


Sales Support & Offer Management
Business Area Solution,
Application Center Utilities

Page 16 / 18
9. GEA ATTACHMENTS LIST

9.A) GEA COMMERCIAL ATTACHMENTS & ADDENDUM

_01) P180060_GEA_S.T.C._00_ (GEA Standard Terms of Sale & Conditions) Rev.00

_02) P180060_GEA Supervision D.R.(Daily Rates) 2018, Rev.00

_03) P180060_GEA_V.L._(GEA Standard Vendor List for Iran)

_04) P180060_GEA GEN_ LI_(GENERAL REFERENCE LIST)

_05) P180060_GEA_Catalogue- Brochure Ap _ Oil and Gas Industry

9.B.) GEA TECHNICAL ATTACHMENTS

1) P180060_LI_DEV_API 619_5th_00_GEA LIST OF DEVIATIONS TO THE API 619 FOR THE


LUBRICATED BARE SCREW COMPRESSORS).

2) P180060_LI_DEV_API 619_& API 614_GEA COMMENTS-LIST FOR THE LUBE OIL SYSTEM FOR THE
LUBRICATED BARE SCREW COMPRESSORS.

3) P180060_LI_DEV_API 671_FOR COUPLINGS.

4a) P180060_LI_DEV_API 676_00 FOR OIL PUMPS_(relevant to a specific manufacturer Pompe Cucchi
proposed by GEA).

4b) P180060_LI_DEV_API 676_00 FOR OIL PUMPS_(relevant to a specific manufacturer Ultra pompe proposed
by GEA).

5) P180060_GQPA_(GEA ITP STD)

6) P180060_GDLA_00_(GEA TYPICAL DOCUMENT LIST).

7) P180060_PC_SS_00 _(GEA STD. PIPING CLASS WITH S.S.- INOX PIPING.

8) P180060_PC_CS_00 _(GEA STD. PIPING CLASS WITH C.S. – L.T.C.S. PIPING.

9) P180060_GEA_EJECTOR_00

10) P180060_GEA_CSP_00_(COMMISSIONING SPARE PARTS LIST)

11) P180060_GPFA_REV.00_(GEA PROCESS FLOW DIAGRAM DRAWING)

12) P180060_GAYA_REV.00_(GEA PLANT FOOT DRAWING)

Page 17 / 18
10. GEA REFERENCES

GEA Refrigeration Italy S.p.A. has experience in supply similar unit to KOC. This is the main reference:

Client : Petrofac
Project : GC-32 NEW GATHERING CENTER FOR SEK
Equipment : Refrigeration Packages 0032-A6-Z-1501/2501/3501
GEA Refrigeration’s ref. : 01230

Page 18 / 18